paving the way for the mediterranean solar plan

17
Título: Proyecto fotográfico para evidenciar los estereotipos que la muñeca Barbie estimula entre la población femenina de la FES Acatlán de 18 a 20 años (primero a quinto semestre)

Upload: climatechangeconference

Post on 18-Nov-2014

364 views

Category:

Technology


0 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Paving the way for the Mediterranean Solar Plan

EU Israel Cooperation on Climate Change

Paving the Way for the Mediterranean Solar Plan

Z’ev GrossCountry Coordinator

Page 2: Paving the way for the Mediterranean Solar Plan

What is the Mediterranean Solar Plan (MSP)?

Originally articulated by France, Germany and Egypt (2006/2007)

Officially launched as a project of The Union for the Mediterranean (UfM)

Part of the EU/Med free trade area effort (Barcelona Process)

Will define large scale RE projects for power, develop grid interconnections as well as EE opportunities

Originally designed to put 20 GW RE (solar) capacity by 2020

Page 3: Paving the way for the Mediterranean Solar Plan

EU Directive – Promotion of Use of Energy from Renewable Resources (2009)

Enhancing ramifications on MSP- supported MSP by giving it a market

(import)Restricting Ramifications on MSP

- support limited to power sourced in facilities commissioned after Directive goes into force

- Mechanisms to track and account for generation, imports etc.

- Must be incorporated in agreements with third countries

Page 4: Paving the way for the Mediterranean Solar Plan

Paving the Way for MSPEU funded project creating “platform” for MSP;Itself aimed at assisting the Mediterranean Partner

Countries create an environment enabling significant increase in deployment of sustainable energy systems based on RE;

PWMSP structured to address country by country needs (“vertical tasks”) as well as regional issues which must be addressed to assure the successful implementation of MSP (“horizontal tasks”).

Project Consortium: MVV decon (Germany)(Consortium Leader), ENEA (Italy); RTE International (France); Sonelgaz (Algeria); Terna (Italy)

Page 5: Paving the way for the Mediterranean Solar Plan

“Vertical Task” 1 - Improvement of Regulatory and Legislative Framework

Benchmarking of existing practices (vs. EU) (x)

Roadmaps- Regulatory Convergence (vs. EU) (c)

Discussion of Roadmaps with Country Stakeholders

Definition of Infrastructure Needs (x)Revised National Roadmaps – Regional

Roadmap – Regional SeminarImplementation of Regional Roadmap

Page 6: Paving the way for the Mediterranean Solar Plan

“Vertical Task” 2 – Transfer of Knowledge and Capacity Building

Improved intra/inter regional transfer of knowledge- Questionnaire + baseline (c)- Roadmap for cooperation- International Seminar – Euro-Med cooperation in

R&D- F/U of knowledge transfer

Capacity Building- Clean Technology Platform (good practices database)- Strategic research agenda and implementation plan- Training Programs

Page 7: Paving the way for the Mediterranean Solar Plan

“Vertical Task” 3 - Support to Implement Sustainable Energy Policies

Institutional setting for RE promotion- Benchmarking institutional setting- Roadmaps to best practice- Discussion with stakeholders- Revised roadmaps + regional seminar

Policies allowing competitive RE deployment- Promotion of arrangements for registering CDM

projects- Promoting registration of certificates of renewables’ origin- Promoting transparent, low-risk instruments for grid- connected renewables- Ensuring preferential dispatch- Manual of best practice

Page 8: Paving the way for the Mediterranean Solar Plan

“Vertical Task” 3 - Support to Implement Sustainable Energy Policies (cont.)

Recommendations on Governance of MSP- Advice on governance

Page 9: Paving the way for the Mediterranean Solar Plan

“Vertical Task” 4- Support to InvestmentBridging Fossil/Alternative/RE cost gap

- Determination of costs and benefits (c)- Determination of cost sharing formulae

Making projects bankable- Creation of support tools for MSP

project investment- Direct assistance to investors- MSP investment Road Show

Page 10: Paving the way for the Mediterranean Solar Plan

“Horizontal Task” A – Mediterranean Grid and European Backbone Evaluation

Assess present state of electrical infrastructures

Network access and potential congestionDefine needs for refurbishment and

reinforcement

Page 11: Paving the way for the Mediterranean Solar Plan

“Horizontal Task” B – Key Issues Supporting MSP Master Plan Implementation

Definition of the adequacy of generation evolution in light of exchanges situation with neighboring countries

Conceptual design of a portable and scalable reference project for rural application

Assess storage technologies and define guidelines for tailored application to specific needs of Southern and Eastern Med countries

Coordination with ongoing EU efforts – e.g. MEDRING

Page 12: Paving the way for the Mediterranean Solar Plan

Thank you for your Attention

Z’ev [email protected]

050-6206269