Paula J. Trigg, County Engineer
Public Works and Transportation Committee
February 26, 2014
2014 CONSTRUCTION PROGRAM PREVIEW
![Page 2: Paula J. Trigg, County Engineer Public Works and Transportation Committee February 26, 2014 2014 CONSTRUCTION PROGRAM PREVIEW](https://reader037.vdocuments.site/reader037/viewer/2022110205/56649c865503460f9493db79/html5/thumbnails/2.jpg)
PRESENTATION SCHEDULE:2014-2019 5-YEAR HIGHWAY IMPROVEMENT PROGRAM
PWTC 2014 Meeting Date Presentation Topic
February 26 • Preview 2014 Construction
April 2 • Overview/Source of Projects
April 30 • Preservation Projects
May 7 • Modernization and Expansion Projects
May 28 • Funding and Revenue
June 4 • Project Listings
June 25 • Draft Program Document
![Page 3: Paula J. Trigg, County Engineer Public Works and Transportation Committee February 26, 2014 2014 CONSTRUCTION PROGRAM PREVIEW](https://reader037.vdocuments.site/reader037/viewer/2022110205/56649c865503460f9493db79/html5/thumbnails/3.jpg)
2014 CONSTRUCTION PROGRAM TOTALS $171M
![Page 4: Paula J. Trigg, County Engineer Public Works and Transportation Committee February 26, 2014 2014 CONSTRUCTION PROGRAM PREVIEW](https://reader037.vdocuments.site/reader037/viewer/2022110205/56649c865503460f9493db79/html5/thumbnails/4.jpg)
$72MPROJECTS CONTINUED FROM 2013• Fairfield Road at IL 176
• Wadsworth Road: IL 131 to Cambridge Dr
• Washington Street: Cedar Lake Rd to Hainesville Rd
• Rollins Road at IL 83
• Delany Road: Sunset Ave to York House Rd
![Page 5: Paula J. Trigg, County Engineer Public Works and Transportation Committee February 26, 2014 2014 CONSTRUCTION PROGRAM PREVIEW](https://reader037.vdocuments.site/reader037/viewer/2022110205/56649c865503460f9493db79/html5/thumbnails/5.jpg)
$37MNEW PROJECTS WITH CONSTRUCTION IN 2014• River Road and Roberts Road: New Roundabout
• Peterson Rd, US 45 to IL 83: Add lanes
• Winchester Rd/Metra, Gilmer at Wildlife Way: Intersection improvements
• 10 resurfacing projects
• 6 Non-motorized travel improvement projects
• 2 Adaptive Control for Signals
• Drainage Improvements / Retaining Wall
![Page 6: Paula J. Trigg, County Engineer Public Works and Transportation Committee February 26, 2014 2014 CONSTRUCTION PROGRAM PREVIEW](https://reader037.vdocuments.site/reader037/viewer/2022110205/56649c865503460f9493db79/html5/thumbnails/6.jpg)
$61MLATE-2014 LETTINGS• Peterson Road: IL 83 to Alleghany Rd
• Alleghany Road: Peterson Rd to IL 120
• Washington Street: Hainesville Rd to Lake St
• Hawley Street: US 45 to Midlothian Rd
• O’Plaine Road: Kennedy Drive south of IL 120
![Page 7: Paula J. Trigg, County Engineer Public Works and Transportation Committee February 26, 2014 2014 CONSTRUCTION PROGRAM PREVIEW](https://reader037.vdocuments.site/reader037/viewer/2022110205/56649c865503460f9493db79/html5/thumbnails/7.jpg)
COMMUNICATING WITH STAKEHOLDERS• Websites
• lakecountyil.gov/transportation
• Lakecountypassage.com
• Project-specific• Project details/background/schedule
• What’s done, what’s to come
• Sign up for emails/alerts
• Work zone cameras
• Enhanced Email
• Construction Updates• Social Media
• Facebook.com/lcdot
• Twitter.com/lcdot
![Page 8: Paula J. Trigg, County Engineer Public Works and Transportation Committee February 26, 2014 2014 CONSTRUCTION PROGRAM PREVIEW](https://reader037.vdocuments.site/reader037/viewer/2022110205/56649c865503460f9493db79/html5/thumbnails/8.jpg)
ENHANCED PROJECTS WEBPAGE• All 2014 projects
• Zoom to project
• Switch between topographicand satellite base images
• Interactive table view
![Page 9: Paula J. Trigg, County Engineer Public Works and Transportation Committee February 26, 2014 2014 CONSTRUCTION PROGRAM PREVIEW](https://reader037.vdocuments.site/reader037/viewer/2022110205/56649c865503460f9493db79/html5/thumbnails/9.jpg)
EMAILED CONSTRUCTION UPDATES• Same layout as 2013
• Implementing Constant Contact email tool
![Page 10: Paula J. Trigg, County Engineer Public Works and Transportation Committee February 26, 2014 2014 CONSTRUCTION PROGRAM PREVIEW](https://reader037.vdocuments.site/reader037/viewer/2022110205/56649c865503460f9493db79/html5/thumbnails/10.jpg)
PROJECT WEBSITES• Continue providing expanded project information through dedicated websites
for major projects:
• Fairfield176.com
• Wadsworth131.com
• RollinsRoadGateway.com
• WashingtonStreetInfo.com
• New for 2014:
• River and Roberts