PARTNERSHIP TO ADVANCE CLEAN ENERGY
DEPLOYMENT (PACE-D)
Technical Assistance Program
Business Requirement Definition Document of
Unified Solar Rooftop Transaction Portal for the
State of Andhra Pradesh
Submitted to USAID on December 2, 2017
Table Of Contents
LIST OF FIGURES .................................................................................................................
LIST OF TABLES ....................................................................................................................
LIST OF ACRONYMS .............................................................................................................
1 INTRODUCTION ........................................................................................................... 1
1.1 PURPOSE OF BUSINESS REQUIREMENT DEFINITION(BRD) DOCUMENT AND
INTENDED AUDIENCE ........................................................................................................ 1
1.2 PROJECT OBJECTIVE ................................................................................................. 1
1.3 BACKGROUND AND NEED FOR DEVELOPMENT OF USRTP ................................... 1
1.4 BENEFITS ..................................................................................................................... 2
1.5 MAJOR STAKEHOLDERS OF SOLAR ROOFTOP PROGRAM .................................... 3
1.6 PROJECT SCOPE ........................................................................................................ 3
1.6.1 IN-SCOPE FUNCTIONALITIES ....................................................................... 4
1.6.2 OUT OF SCOPE FUNCTIONALITIES ............................................................. 4
1.7 KEY ASSUMPTIONS, CONSTRAINTS, AND DEPENDENCIES ................................... 4
1.7.1 ASSUMPTIONS ............................................................................................... 4
1.7.2 CONSTRAINTS ............................................................................................... 4
1.7.3 RISKS .............................................................................................................. 4
1.7.4 DEPENDENCIES ............................................................................................ 5
2 BUSINESS PROCESS .................................................................................................. 6
2.1 CURRENT PROCESS ................................................................................................... 6
2.2 PROPOSED BUSINESS PROCESS ............................................................................. 7
3 BUSINESS REQUIREMENTS ....................................................................................... 9
3.1 BUSINESS REQUIREMENTS ....................................................................................... 9
3.2 USE CASES ................................................................................................................ 11
3.2.1 USE CASES FOR GENERAL FUNCTIONALITIES........................................ 11
3.2.2 USE CASES FOR NREDCAP FUNCTIONALITIES ....................................... 14
3.2.3 USE CASES FOR DISCOM FUNCTIONALITIES .......................................... 34
3.2.4 USE CASES FOR DES – CEIG FUNCTIONALITIES ..................................... 46
3.2.5 USE CASES FOR INFORMATION FUNCTIONALITIES ................................ 47
4 VERSIONS AND APPROVALS ................................................................................... 58
4.1 VERSION HISTORY .................................................................................................... 58
4.2 APPROVALS ............................................................................................................... 58
ANNEXURES ..................................................................................................................... 59
LIST OF FIGURES
Figure 1: SNAs Existing Subsidy Disbursement Process ...................................................... 6
Figure 2: DISCOMs Existing Interconnection Process ........................................................... 7
Figure 3: Stakeholder Interaction on USRTP ........................................................................ 8
Figure 4: Registration Process ............................................................................................ 12
Figure 5: Residential Consumer Registration Process ........................................................ 13
Figure 6: Non-Residential Consumer Registration Process ................................................. 13
Figure 7: Process Flow Chart for Subsidy Application ......................................................... 15
Figure 8: Flow Chart to Fill Subsidy Application Form ......................................................... 16
Figure 9: Flow Chart for Subsidy Application Fee Payment ................................................. 18
Figure 10: Flow Chart of Acknowledgement Receipt on Subsidy Application ..................... 19
Figure 11: Review of Subsidy Application ........................................................................... 20
Figure 12: Scheduling Site Visit .......................................................................................... 21
Figure 13: Review of Completed Subsidy Application ......................................................... 22
Figure 14: Review of Subsidy Application at HO ................................................................. 24
Figure 15: Issuance of In-Principle Sanction Letter ............................................................. 25
Figure 16: Process Flow for Subsidy Disbursement ............................................................ 27
Figure 17: Flow Chart for Scheduling and Conducting Joint Inspection ............................... 28
Figure 18: Submission of Documents for Subsidy Disbursal ............................................... 29
Figure 19: Verification of Submitted Documents for Subsidy Disbursal at HO ..................... 31
Figure 20: Disbursement of Subsidy ................................................................................... 32
Figure 21: Process for Registration and Addressing of Complaints ..................................... 33
Figure 22: Filling of Interconnection Application Form Online ............................................. 35
Figure 23: Fee Payment and Receipt of Acknowledgement for Interconnection Application 36
Figure 24: Utility Review Process ....................................................................................... 37
Figure 25: Interaction During Installation Process ............................................................... 39
Figure 26: Meter Procurement Process ............................................................................... 40
Figure 27: Commissioning Process for System <10 kWp .................................................... 43
Figure 28: Commissioning Process for System >10 kWp .................................................... 44
Figure 29: Escalation Process in APEPDCL ....................................................................... 46
Figure 30: Publically Accessible Functionalities .................................................................. 47
Figure 31: Informational Functionality ................................................................................. 48
Figure 32: Help Related Functionalities ............................................................................... 49
Figure 33: Updates on the Portal ........................................................................................ 50
Figure 34: Logins for NREDCAP Officials ........................................................................... 51
Figure 35: Logins for APEPDCL Officials ............................................................................ 52
Figure 36: Logins for APSPDCL Officials ............................................................................ 54
LIST OF TABLES
Table 1: Stakeholders of the Solar Rooftop Program in AP ................................................... 3
Table 2: Functional Requirements......................................................................................... 9
Table 3: Non-Functional Requirements ............................................................................... 11
Table 4: List of Documents to Be Uploaded During Subsidy Application ............................. 16
Table 5: Fee Payment Rates ............................................................................................... 18
Table 6: List of Documents to Be Uploaded With Form 1(A) ............................................... 35
Table 7: Feasibility Inspection and Approving Authority ...................................................... 37
Table 8: Meter Procurement and Testing Charges for Procurement From APEPDCL ......... 41
Table 9: Meter Testing Charges for Procurement From External Agency ............................ 41
Table 10: Logins Required for NREDCAP Officials ............................................................. 52
Table 11: Logins Required for APEPDCL Officials .............................................................. 53
Table 12: Logins Required for APSPDCL Officials .............................................................. 54
Table 13: Version History of the Document ......................................................................... 58
Table 14: Approvals for the Document ................................................................................ 58
LIST OF ACRONYMS
Acronyms Definition
AE Assistant Engineer
ADE Assistant Divisional Engineer
AP Andhra Pradesh
APEPDCL Eastern Power Distribution Company of Andhra Pradesh Limited
API Application Programming Interface
APPC Average Power Purchase Cost
APSPDCL Southern Power Distribution Company of Andhra Pradesh Limited
BESCOM Bangalore Electricity Supply Company Limited
BIS Bureau of Indian Standards
BOS Balance of System
BRD Business Requirement Definition
C, O&M Commercial Operation and Maintenance
CEIG Chief Electrical Inspector to Government
CERC Central Electricity Regulatory Commission
CFA Central Financial Assistance
CGM Chief General Manager
CMD Chairman and managing Director
CSC Customer Support Centre
DC Direct Current
DE Divisional Engineer
DES – CEIG Directorate of Electrical Safety – Chief Electrical Inspector to Government of Andhra Pradesh
DGM Deputy General Manager
DISCOMs Distribution Companies
DM District Manager
DO District Office
DSM Demand Side Management
EE Executive Engineer
EODB Ease of Doing Business
EOI Expression of Interest
EPC Engineering, Procurement, and Construction
FIT Feed-in Tariff
FI/FIs Financial Institutions
FY Fiscal Year
GM General Manager
GOI Government of India
GOK Government of Karnataka
GOAP Government of Andhra Pradesh
GST Goods and Service Tax
GW Gigawatt
GWp Gigawatt Peak
HLU High Level Use
Acronyms Definition
HO Head Office
HT High Tension
HTML HyperText Markup Language
IFSC Indian Financial System Code
JNNSM Jawaharlal Nehru National Solar Mission
JS JavaScript
KERC Karnataka Electricity Regulatory Commission
KPTCL Karnataka Power Transmission Corporation Limited
KREDL Karnataka Renewable Energy Development Limited
kV Kilovolt
kVA Kilovolt Ampere
kWp Kilowatt Peak
LCOE Levelized Cost of Energy
LDC Load Dispatch Center
LEC Licensed Electrical Contractor
LLU Low Level Use
LT Low Tension
M and P Metering and Protection
MD Managing Director
MCB Miniature Circuit Breaker
MCCB Molded Case Circuit Breaker
MNRE Ministry of New and Renewable Energy
MT Meter Testing
MVC Model View Controller
MW Megawatt
MWp Megawatt Peak
NEFT National Electronic Funds Transfer
NOC No Objection Certificate
NREDCAP New and Renewable Energy Development Corporation of Andhra Pradesh Limited
O&M Operations and Maintenance
OSD Officer on Special Duty
P and MM Purchase and Material Management
PACE-D Partnership to Advance Clean Energy – Deployment
PERT Program Evaluation Review Technique
PPA Power Purchase Agreement
PSU Public Sector Undertaking
PV Photovoltaic
R and IA Revenue and Internal Audit
RDBMS Relational Database Management System
RESCO Renewable Energy Services Company
RTGS Real Time Gross Settlement
ROI Return on Investment
SECI Solar Energy Corporation of India
Acronyms Definition
SERC State Electricity Regulatory Commission
SE Superintending Engineer
SNA State Nodal Agency
SOE Statement of Expenditure
SPIN Online Application for Solar Photovoltaic Installation
SRTPV Solar Rooftop Photovoltaic
TA Technical Assistance
URL Uniform Resource Locator
USAID United States Agency for International Development
USRTP Unified Solar Rooftop Transaction Portal
VC Vice Chairman
XML Extensible Markup Language
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 1
1 INTRODUCTION
1.1 PURPOSE OF BUSINESS REQUIREMENT DEFINITION(BRD) DOCUMENT AND INTENDED AUDIENCE
This document intends to describe the business requirements in developing Unified Solar
Rooftop Transaction Portal (USRTP) for the State of Andhra Pradesh (AP) in partnership
with New and Renewable Energy Development Corporation of Andhra Pradesh Limited
(NREDCAP). The business requirements have been described in this document using the
‘Use Case’ approach. This document is prepared for the stakeholders namely NREDCAP,
Southern Power Distribution Company of Andhra Pradesh Limited (APSPDCL), Eastern
Power Distribution Company of Andhra Pradesh Limited (APEPDCL), Directorate of
Electrical Safety — Chief Electrical Inspector to Government of Andhra Pradesh (DES –
CEIG), partnering banks and financial institutions (FIs). This document will provide
information to system developers while designing solutions to the business requirements.
1.2 PROJECT OBJECTIVE
The objective is to develop a USRTP enabling interaction of multiple stakeholders on one
platform providing a one-stop solution for all the stakeholders involved in the process of
installation of grid connected solar rooftop plants. The objective of the project is to digitize
the complete process of application, approval, and implementation of solar rooftop in AP.
This will avoid delays in seeking approvals and thus ensure faster installation of solar rooftop
plants. Ultimately, aiding in fulfilling the national level target of installing 40 gigawatt (GW) of
solar rooftop systems in the country by 2022 under the target of the Jawaharlal Nehru
National Solar Mission (JNNSM).
This document aims to cover the business requirements of the following key areas:
Consumer interactions with:
NREDCAP.
Distribution Companies (DISCOMs).
DES – CEIG.
Banks and FIs.
Informative content and dashboard.
1.3 BACKGROUND AND NEED FOR DEVELOPMENT OF USRTP
Clean energy policy and regulatory support is one of the focal areas of United States Agency
for International Development (USAID) funded Partnership to Advance Clean Energy -
Deployment (PACE-D) Technical Assistance (TA) Program. As a part of this initiative, the
Program aims to strengthen the organizational, institutional, and resource capabilities of the
State Nodal Agencies (SNA) and designated DISCOMs in 11 states including AP. The
Program has associated with NREDCAP to provide necessary TA in promoting installation of
solar rooftop systems in the State of AP.
The Program during its support to Bangalore Electricity Supply Company Limited (BESCOM)
in Karnataka undertook a study to understand the state of deployment of solar rooftop
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 2
systems. The study was undertaken through personal interview and online survey of
consumers from different consumer categories. Through the study conducted, the Program
identified issues such as time consuming nature of approvals and installation, lack of penal
mechanism for non-adherence to timelines, limited interaction with FIs etc. Based on these
issues, the Program provided recommendations related to operational, financial, and
informational aspects. These recommendations included development of a web dashboard
to track stepwise progress of the application.
Subsequently, the Program in the bid to provide TA to 11 states undertook an interaction
with the solar rooftop developers in multiple states including AP. Following is the feedback
received from the developers in AP:
More clarity is required in guidelines and procedure to apply for net metering.
Absence of online application system makes tracking of solar rooftop application under
net metering tedious. Hence, there is a need to develop an online system to facilitate
ease of application.
Offline solar rooftop application procedure does not follow timelines provided in the
policy.
The process to avail subsidy should be more clearly defined to facilitate ease in
disbursement of subsidy.
Problems are faced in availing loan due to lack of awareness among financial institution
regarding solar rooftop, benefits and risks. Availing loans is tedious for small developers
and residential consumers.
Enhanced coordination between DISCOM and SNA is essential.
Enhanced inter-departmental coordination in DISCOM will facilitate faster solar rooftop
deployment process.
Time taken to get DES – CEIG approval for projects of size >10 kilowatt (kW) is long.
The study conducted in Karnataka as well as the survey conducted in AP emphasized on the
need for development of an online platform to expedite the process of seeking approvals for
solar rooftop installation and development of a one stop solution for information related to
application and installation of solar rooftop systems.
1.4 BENEFITS
The benefits of this project include the following:
Integration of multiple stakeholders on a single platform enabling seeking of
approvals through a single medium.
Accountability of each approving authority within each stakeholder organization in
case of non-adherence to timelines due to designing of escalation process.
Enhanced intra-stakeholder interactions.
Access to all informational content such as procedures, guidelines, regulations, and
policies pertaining to solar rooftop.
Establishment and implementation of definite timelines from submission of
application to commissioning of system.
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 3
Short meter procurement and testing process.
1.5 MAJOR STAKEHOLDERS OF SOLAR ROOFTOP PROGRAM
The major stakeholders of solar rooftop program include NREDCAP, APDISCOMs, DES –
CEIG, Banks/FIs, Consumers, and Channel Partners/Implementing Agency.
Table 1: Stakeholders of the Solar Rooftop Program in AP
Stakeholder Role
NREDCAP NREDCAP as SNA is responsible for promotion and development of
renewable energy in AP. Responsible for disbursal of subsidy from
central and state governments.
APEPDCL APEPDCL is one of the two DISCOMs in the State of AP supplying
power to 49.7 lakh consumers in the districts of Srikakulam,
Vishakhapatnam, Vizianagaram, East Godavari, and West Godavari.
APEPDCL interprets and the provisions of policy and follow guidelines
thereby allowing consumers to interconnect their solar rooftop system to
the grid.
APSPDCL APSPDCL is one of the two DISCOMs in the State of AP supplying
power to consumers in the districts of Krishna, Guntur, Prakasam,
Nellore, Kadapa, Chittor, Anantapur, and Kurnool.
APSPDCL interprets the provision of policy and follow guidelines
thereby allowing consumers to interconnect their solar rooftop system to
the grid.
DES – CEIG The DES – CEIG scrutinizes and approves drawings for solar power
plants. It inspects installations for which drawings have been approved
and issues Statutory Certificate on receipt of complete compliance
reports.
Consumers They are the consumers of DISCOMs on whose rooftops the solar
rooftop systems will be installed.
Consumers collect information available from the DISCOM/system
installer and evaluate investment, payback, and risk associated with the
installation of solar rooftop system.
Banks and FIs Banks and FIs provide majority of the capital required for the
implementation of solar rooftop projects. They also undertake a detailed
technical, financial, commercial, and regulatory due diligence before
finalizing on financing of these projects.
Channel
Partner/Implementing
Agency
The Channel Partners are agencies empaneled by the Ministry of New
and Renewable Energy (MNRE) that facilitate individual and small group
of clients to access the provisions/benefits available to solar rooftop
system owners. The empanelment with MNRE is based on the
certificate from a rating agency in the country for technical and financial
strength.
The Channel Partners/Implementing Agencies can include Renewable
Energy Service Providing Companies (RESCOs), system integrators,
project developers, vendors/suppliers of solar equipment, and
manufacturers of solar equipment, etc.
1.6 PROJECT SCOPE
This section depicts the scope of USRTP both in terms of In-Scope and Out of Scope
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 4
functionalities.
1.6.1 In-Scope Functionalities
The in-scope functionalities include:
Development of interactive functions between —
Consumer and APDISCOMs.
Consumer and NREDCAP.
Consumer and banks/FIs.
Track status of solar rooftop application.
Geo-tagging of projects.
Informative content regarding DES – CEIG’s Ease of Doing Business (EODB) portal.
Provide informative content such as policies, regulations, guidelines, and notifications
related to solar rooftop.
1.6.2 Out of Scope Functionalities
The out of scope functionalities include:
Development of interactive functions between consumer and DES – CEIG.
Development of interface with DES – CEIG’s EODB portal and AP’s “MeeSeva”
portal.
Development of mobile application.
1.7 KEY ASSUMPTIONS, CONSTRAINTS, AND DEPENDENCIES
1.7.1 Assumptions
The process adopted for both APEPDCL and APSPDCL is same.
A new set of guidelines for solar rooftop indicating implementation of the portal will be
introduced.
The DES – CEIG’s process for consumers seeking drawing and safety clearance will
be implemented through the DES – CEIG’s EODB portal.
The system installer will have access to the portal through individual registered
consumer’s interface.
1.7.2 Constraints
The portal caters to enabling installation of only grid connected solar rooftop
systems.
1.7.3 Risks
Modifications in AP Solar Power Policy 2015 related to solar rooftop.
Change in subsidy allocation by MNRE to different categories of consumers and
removal of subsidy provision.
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 5
1.7.4 Dependencies
Installation of grid connected solar rooftop system in the State of AP will be expedited
through the implementation of the portal.
The DES – CEIG’s EODB portal will facilitate seeking drawing and safety approvals
for installation of solar rooftop systems.
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 6
2 BUSINESS PROCESS
This chapter provides description of the current processes implemented and the proposed
business processes.
2.1 CURRENT PROCESS
To seek clearance for solar rooftop installation process, the multiple stakeholders
independently and discretely interact with the consumer/implementing agency. The process
presently followed by the individual stakeholders is depicted in Figure 1 and 2 respectively.
SNA Process
NREDCAP’s subsidy disbursement procedure is given in Figure 1.
DISCOM Procedure
The application process for APEPDCL and APSPDCL are adopted through ‘MeeSeva’
center and ‘Customer Support Center’ (CSC) respectively. The procedure followed is
depicted in Figure 2.
Offline Submission of MNRE Form A/B/C by Consumer/Implementing Agency
Site Visit and Review of Application by District Manager (DM)
Review of Application by Officer on Special Duty (OSD)/General Manager (GM) (Solar).
Approval of Subsidy by VC and MD, NREDCAP
Disbursement of Subsidy via Cheque Payment
Joint Inspection After Commissioning of System
Figure 1: SNAs Existing Subsidy Disbursement Process
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 7
2.2 PROPOSED BUSINESS PROCESS
The proposed process intends to mediate the entire submission of application, allotment of
time slot, grant of internal approval, receipt of approval by consumer, and subsidy
disbursement process through the online portal. All inter and intra stakeholder interactions
between consumers, NREDCAP, and DISCOMs will be facilitated through the USRTP.
Additionally, the portal will also have a feature for the consumers to approach Banks/FIs to
avail loans. The stakeholder interactions via USRTP is presented in Figure 3.
Online Consumer Application Along With Payment
Inspection by DISCOM Officials, Deemed Approval/Disapproval
Installation of SPV System by Customer and Request for Inspection by DISCOM Official
Inspection, Calibration of Meters, and Deemed Approval by DISCOM Officials Payment of Metering Cost by the Consumer
Synchronization of Installed SPV System by DISCOM Officials
Consumers Shall Enter Into an Agreement With DISCOMs Within 15 Working Days/Otherwise Feasibility Is Deemed to Be Cancelled
Net Billing System Started Within One Month of Installation (ERO)/Circle Office
7 Days
15 Days
3 Months
10 Days
7 Days
1 Month/Next Billing Cycle
Figure 2: DISCOMs Existing Interconnection Process
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D Technical Assistance Program United States Agency for International
Development Contract AID-386-C-12-00001 8
Figure 3: Stakeholder Interaction on USRTP
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 9
3 BUSINESS REQUIREMENTS
3.1 BUSINESS REQUIREMENTS
This section lists the functional and non-functional requirements. The user requirements
have been captured and organized adopting the use case approach. The High Level Use
(HLU) Cases depict the overall process flow and the Low Level Use (LLU) Cases depict the
business requirements, both as elaborated in Section 3.2. The functional requirements for
the USRTP is illustrated in Table 2.
Table 2: Functional Requirements
Requirement
Number
Description Use Case
Number
Impacted
Stakeholders
General Functionality
FR-G-001 Registration Process HLU1 Consumers
FR-G-002 Residential Consumer Registration Process LLU1.1 Residential
Consumers
FR-G-003 Non-Residential Consumer Registration
Process
LLU1.2 Non-Residential
Consumers
General Functionality for NREDCAP
FR-GFN-001 Application for Subsidy Process HLU2 Consumers,
NREDCAP Officials
FR-GFN-002 Filling Application Form LLU2.1 Consumers/Channel
Partners
FR-GFN-003 Subsidy Application Fee Payment LLU2.2 Consumers/Channel
Partner
FR-GFN-004 Generating Acknowledgement Receipt on
Subsidy Application
LLU2.3 Consumers/Channel
Partners and
NREDCAP Officials
FR-GFN-005 Reviewing Subsidy Application and
Addressing Deficiencies
LLU2.4 Consumers/Channel
Partners and
NREDCAP Officials
FR-GFN-006 Scheduling Site Visit by NREDCAP LLU2.5 Consumers/Channel
Partners and
NREDCAP Officials
FR-GFN-007 Reviewing Completed Subsidy Application
at DO, NREDCAP
LLU2.6 Consumers/Channel
Partners and
NREDCAP Officials
FR-GFN-008 Reviewing Subsidy Application at HO,
NREDCAP
LLU2.7 Consumers/Channel
Partners and
NREDCAP Officials
FR-GFN-009 Issuing In-Principle Subsidy Sanction Letter LLU2.8 Consumers/Channel
Partners and
NREDCAP Officials
FR-GFN-010 Subsidy Disbursement HLU3 Consumers/Channel
Partners and
NREDCAP Officials
FR-GFN-011 Scheduling and Conducting Joint
Inspection by NREDCAP
LLU3.1 Consumers/Channel
Partners and
NREDCAP Officials
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 10
Requirement
Number
Description Use Case
Number
Impacted
Stakeholders
FR-GFN-012 Submitting Documents for Subsidy
Disbursal
LLU3.2 Consumers/Channel
Partners and
NREDCAP Officials
FR-GFN-013 Verifying Submitted Documents for Subsidy
Disbursal at HO
LLU3.3 Consumers/Channel
Partners and
NREDCAP Officials
FR-GFN-014 Subsidy Disbursement LLU3.4 Consumers/Channel
Partners and
NREDCAP Officials
FR-GFN-015 Procedure for Registration and Addressing
Complaints
LLU3.5 Consumers/Channel
Partners and
NREDCAP Officials
General Functionality for DISCOMs
FR-GFD-001 Procedure for Application Submission to
DISCOM to Install Grid Connected Solar
Rooftop Systems
HLU4 Consumers/Channel
Partners and DISCOM
Officials
FR-GFD-002 Filling Interconnection Application Form LLU4.1 Consumers/Channel
Partners and DISCOM
Officials
FR-GFD-003 Fee Payment and Receipt of
Acknowledgement for Interconnection
Application
LLU4.2 Consumers/Channel
Partners and DISCOM
Officials
FR-GFD-003 Technical Feasibility Determination and
Intimation to Consumer About Outcome of
Feasibility Study and Inspection
HLU5 Consumers/Channel
Partners and DISCOM
Officials
FR-GFD-004 Procedure for Interaction During Installation
Process
HLU6 Consumers/Channel
Partners and DISCOM
Officials
FR-GFD-005 Meter Procurement Process LLU6.1 Consumers/Channel
Partners and DISCOM
Officials
FR-GFD-006 Inspection and Commissioning Process by
DISCOM
HLU7 Consumers/Channel
Partners and DISCOM
Officials
FR-GFD-007 Escalation Process for APEPDCL HLU8 Consumers/Channel
Partners and DISCOM
Officials
FR-GFD-008 Functionalities Related to DES – CEIG HLU9 Consumers/Channel
Partners
General Information Functionality
FR-GIF-001 Informational Functionalities HLU10 Consumers
FR-GIF-002 Information Functionalities LLU10.1 Consumers
FR-GIF-003 Help Related Functionalities LLU10.2 Consumers
FR-GIF-004 Location Information LLU10.3 NREDCAP Officials,
and DISCOM Officials
FR-GIF-005 Updates LLU10.4 Consumers and
NREDCAP Officials
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 11
Requirement
Number
Description Use Case
Number
Impacted
Stakeholders
FR-GIF-006 Informational Functionalities on
Consumer/DISCOM/SNA Dashboard
HLU18 Consumer, DISCOM
Officials and
NREDCAP Officials
Usability Requirements
FR-U-001 The Portal Should Be Active 24/7
FR-U-002 Portal Should Be Viewable on Desktop,
Laptops, Tablets, and Mobiles
Scalability Requirements
FR-SC-001 There Must Be No Restriction on the
Number of Users That Can Be
Accommodated Concurrently
FR-SC-002 Amount of Data That Can Be
Accommodated on the Portal Should Be at
Least 100 GB and Should Be Scaled Up in
the Future as per Requirements
Reporting Requirements
FR-R-001 Report Generation for DISCOM and SNA HLU14 DISCOM Officials and
NREDCAP Officials
FR-R-002 Time Schedule Report Generation for
DISCOM and NREDCAP Site Visit
HLU15 DISCOM Officials and
NREDCAP Officials
FR-R-003 List of All Applications Received by
DISCOM for Solar Rooftop Installations
HLU16 DISCOM Officials
FR-R-004 List of All Applications Received for
Subsidy
HLU17 NREDCAP Officials
The non-functional requirements of the USRTP is presented in Table 3.
Table 3: Non-Functional Requirements
Requirement
Number
Description Use Case
Number
Impacted
Stakeholders
NFR-001 Login IDs for NREDCAP Officials HLU11 NREDCAP Officials
NFR-002 Login IDs for APEPDCL Officials HLU12 APEPDCL Officials
NFR-003 Login IDs for APSPDCL Officials HLU13 APSPDCL Officials
3.2 USE CASES
This section defines the HLU and LLU Cases capturing user requirements.
3.2.1 USE CASES FOR GENERAL FUNCTIONALITIES
HLU Case Number: HLU1
Description: Registration Process
Actors: Consumers
Flow Chart
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 12
Figure 4: Registration Process
Business Rules:
To avail access to the online application process, the portal should enable all types of
consumers to register themselves on the portal.
Consumer’s basic contact details such as Name, Address, Contact Number, Email ID
and a Password of their choice should be collected at registration stage.
LLU Case Number: LLU1.1
Description: Residential Consumer Registration Process
Actors: Residential Consumers
Flow Chart:
Residential Consumers All Other Consumers R
eg
istr
ati
on
Pro
ce
ss
Basic Information: Name, Address
Basic Information: Name, Address
Other Information: DISCOM Name, Consumer
Number, Service Type
Details of Primary Contact Person
Other Information: DISCOM Name, Consumer
Number, Service Type
Email ID, Password
Details of Alternate Contact Person
Email ID, Password
Registration Complete
Registration Complete
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 13
Figure 5: Residential Consumer Registration Process
Business Rules:
The residential consumer’s basic details such as Name, Address, Mobile Number,
Email ID, DISCOM Name, Consumer Number and Service Type (High
Tension[HT]/Low Tension[LT]) should be collected during the registration process.
A password of consumer’s choice should be collected at registration stage to enable
logging on to the portal.
On fulfillment of filling these criteria, the registration for residential consumers will be
complete.
On completion of registration an intimation regarding successful registration will be
sent to the consumer on their registered email address
LLU Case Number: LLU1.2
Description: Non-Residential Consumer Registration Process
Actors: Non-Residential Consumers
Flow Chart
Figure 6: Non-Residential Consumer Registration Process
Business Rules:
Residential Consumer
Basic Information: Name, Address, Mobile Number
Other Information: DISCOM Name,
Consumer Number, Service
Type
Email ID, Password
Registration Complete. Receipt of
Email.
Non-Residential Consumers
Basic Information: Name, Address of
Organization
Other Information: DISCOM Name,
Consumer Number, Service Type
Details of Primary Contact Person
Details of Alternate Contact Person
Email ID, Password Registration Complete
Receipt of Email
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 14
The non-residential consumer’s basic details such as Name of Organization, Address
of Organization, Phone Number, Email ID, DISCOM name, Consumer Number, and
Service Type (HT/LT) should be collected via registration process.
Details of the primary contact person of the organization such as Name, Designation,
Email ID, Mobile Number, and Phone Number should be collected.
A provision to collect details of an alternate contact should also be made.
The primary contact’s Email ID will be the registered Email ID and a Password will be
set by the primary contact person.
On fulfillment of filling these criteria the registration for residential consumers will be
complete.
On completion of registration an intimation regarding successful registration will be
sent to the consumer on their registered email address.
3.2.2 USE CASES FOR NREDCAP FUNCTIONALITIES
HLU Case Number: HLU2
Description: Application for Subsidy Process
Actors:
Eligible Consumers/Channel Partners
District Manager (DM) at District Office (DO), NREDCAP
Project Director at Head Office (HO), NREDCAP
Assistant Manager at HO, NREDCAP
Deputy General Manager (DGM) (Finance and Administration [F and A])
Officer on Special Duty (OSD) General Manager (GM) (Solar) at HO, NREDCAP
Vice Chairman (VC) and Managing Director (MD) at HO, NREDCAP
Flow Chart
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 15
Figure 7: Process Flow Chart for Subsidy Application
Business Rules:
Eligible consumer’s subsidy application should be collected in web based format.
Application fee payment must be facilitated online.
Acknowledgement receipt of application submission and fee receipt should be
provided to the consumer.
Application reviewing by SNA officials should be enabled online.
Online scheduling of site visit by DM through time slot allotment should be enabled.
Intimation of deficiencies in application by DM and revision of the shortcomings in
application form by the consumer should be allowed.
The In-Principle Sanction Letter on verification of completed application should be
provided to the consumer through the portal.
LLU Case Number: LLU2.1
Description: Filling Application Form
Actors: Consumers/Channel Partners
Flow Chart
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 16
Figure 8: Flow Chart to Fill Subsidy Application Form
Business Rules:
The consumers eligible to avail subsidy are as follows:
Central Financial Assistance (CFA) (30 percent of benchmark cost):
Residential, Institutional, and Social Sector
State Government Subsidy (20 percent of benchmark cost): Residential
consumer (1-200 units per month consumption) and government institutions
The eligible consumer/implementing agency willing to avail subsidy should be able to
fill the subsidy application form online. The subsidy application formats, Format S1A,
S1B, S1C are attached as Annexure I, II, and III respectively. The format to be filled
is based on the capacity of system to be installed.
Format S1A: 1-5 kWp capacity.
Format S1B: Above 5 kWp and up to 50 kWp capacity.
Format S1C: Above 50 kWp and up to 500 kWp capacity.
Documents to be uploaded while applying for subsidy are provided in Table 4.
Table 4: List of Documents to Be Uploaded During Subsidy Application
Form Capacity Documents to be Uploaded
S1A 1-5 kWp Capacity Passport size photo of beneficiary with signature
ID Proof: Aadhar Card with beneficiary’s mobile number
Latest electricity bill
DISCOM consent
Photograph of the front view of the proposed site with
date
Submit Subsidy Application in Form
S1A for System Size 1-5 kWp
Submit Subsidy Application in Form
S1B for System Size >5 kWp and Up to
50 kWp
Submit Subsidy Application in Form
S1C for System Size >50 kWp and up to
500 kWp
Eligible Consumer
CFA (30 Percent of MNRE Benchmark Cost)
State Government Subsidy (SGS) (20 Percent of MNRE Benchmark Cost)
Residential, Institutional, and
Social Sector
Government Institutions
Residential Consumer (Consumption <200
Units/Month)
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 17
Form Capacity Documents to be Uploaded
Agreement/Consent Certificate from user/beneficiary on
INR 25/- Stamp Paper (format present along with Form
S1A)
S1B Above 5 kWp and Up to
50 kWp Capacity
Passport size photo of beneficiary with signature
ID Proof: Aadhar Card with beneficiary’s mobile number
Latest electricity bill
DISCOM consent
Executive summary of the proposal
Calculations and justification of proposed capacity
Sketch/Line diagram of complete solar photovoltaic
(SPV) system with details
Schematic diagram of the system including protecting
interlocking devices, monitoring and data logging points
to be provided.
Completion schedule with milestones (Program
Evaluation Review Technique (PERT) chart preferably)
Single line diagram elaborating interconnection of the
SPV plant to the grid
Letter of Consent for synchronization of SPV plant with
the Network of Distribution Licensee/NOC (not
mandatory)
Single line diagram elaborating type and location of
meter(s)
Copy of agreement made with distribution licensee
and/or third party (not mandatory)
Undertaking from the consumer/beneficiary regarding
the acceptability and cost sharing of the project
(Agreement/Consent Certificate from user/beneficiary
on INR 25/- Stamp Paper [format present along with
Form S1B])
Photograph of the front view of the proposed site with
date
S1C Above 50 kWp and Up to
500 kWp
Passport size photo of beneficiary with signature
ID Proof: Aadhar Card with beneficiary’s mobile number
Latest electricity bill
DISCOM consent
All attachments as indicated in Form S1B
Calculation for unit cost of power generation
Cost benefit analysis and payback period
Respective drawings for layout, connection,
components etc.
Connectivity details with grid and metering arrangement
(with sketch diagram)
Agreement with distribution licensee/DISCOMs (not
mandatory)
Photograph of the front view of the proposed site with
date
Agreement/Consent Certificate from user/beneficiary on
INR 25 Stamp Paper (format present along with Form
S1C)
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 18
LLU Case Number: LLU2.2
Description: Subsidy Application Fee Payment
Actors: Consumers/Channel Partners
Flow Chart
Figure 9: Flow Chart for Subsidy Application Fee Payment
Business Rules:
The consumer should be able to pay the subsidy application fees online to
NREDCAP through the portal.
Depending on the system size, the consumer will be required to pay the fees as
indicated in Table 5.
Portal should allow submission of application only after the completion of fee
payment through the portal.
Table 5: Fee Payment Rates
Sr. No. System Size Fees (INR)
1. Up to 5 kWp 1,000 + Taxes*
2. 6-100 kWp 5,000 + Taxes*
3. 101-1,000 kWp 10,000 + Taxes*
*Taxes will be levied as per the applicable Goods and Service Tax (GST) rates (18 percent
for fiscal year [FY] 2017-18).
LLU Case Number: LLU2.3
Description: Generating Acknowledgement Receipt on Subsidy Application
System Size 1-5 kWp: INR 1,000 + 18 Percent GST
System Size >5 kWp and Up to 50 kWp:
INR 5,000 + 18 Percent GST
System Size >50 kWp and Up to 500 kWp:
INR 10,000 + 18 Percent GST
Fill Subsidy Application Form
Online Payment of Subsidy Application Fees
Submit Subsidy Application
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 19
Actors: Consumers/Channel Partners and DM at DO, NREDCAP
Flow Chart
Figure 10: Flow Chart of Acknowledgement Receipt on Subsidy Application
Business Rules:
The subsidy application on submission by the consumer should be received by the
DM at the appropriate DO of NREDCAP.
On delivery of the application to the DM, a system generated acknowledgement
should be given to the consumer indicating receipt of application form and the
assigned application number.
LLU Case Number: LLU2.4
Description: Reviewing Subsidy Application and Addressing Deficiencies
Actors:
Consumers/Channel Partners
DM at DO, NREDCAP
Flow Chart
Generation of System Generated Acknowledgement Receipt
Submit Subsidy Application Receipt of Application by DM
Acknowledgement Received by Consumer
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 20
Figure 11: Review of Subsidy Application
Business Rules:
The DMs through their login should be able to review the subsidy applications
received from consumers.
On reviewing the application, the DM must have three options.
Reject Application: The application should be rejected if the applicant is
ineligible to receive subsidy and the reason for rejection should be provided.
Communicate Shortfall: In case of any shortfall/deficiencies in application, the
DM must communicate the same to the consumer within a span of seven
working days from the receipt of subsidy application.
Approve Application: The DM must approve the completed application if
deficiencies have been addressed by the consumer and forward it to the HO
after performing site visit.
If any shortfalls are noted and communicated to the consumer, the consumer must
address the deficiencies/shortfalls within 10 days of receipt of intimation of
deficiencies/shortfalls and submit the revised documents online.
LLU Case Number: LLU2.5
Description: Scheduling Site Visit by NREDCAP
Actors: Consumers/Channel Partners and DM at DO, NREDCAP
Flow Chart
Deficient Application
Reject Application Complete Application
Review of Subsidy Application
Ineligible Consumers Eligible Consumers
Conduct Site Visit
Send Intimation of Deficiencies/
Shortfall
DM
Submit Revised Application
Online
Consumers
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 21
Figure 12: Scheduling Site Visit
Business Rules:
The DMs through their login should be able to review the subsidy applications
received.
If the consumer is ineligible to receive subsidy, the DM will reject the application
through the portal and should have a provision to provide a reason for rejection of the
application.
If the consumer is eligible to receive subsidy, the DM will schedule a visit to the site
location by allotting time slots to the eligible consumers.
The DM will suggest three time slots to the consumer preferably on different dates
through the portal. The consumer should then select one slot from the suggested
slots.
LLU Case Number: LLU2.6
Description: Reviewing Completed Subsidy Application at DO, NREDCAP
Actors:
Consumers/Channel Partners
DM at DO, NREDCAP
VC and MD at HO, NREDCAP
OSD/GM (Solar) at HO, NREDCAP
Assistant Manager at HO, NREDCAP
Project Director at HO, NREDCAP
Scheduling Site Visit Reject Application
Allotment of Three Time Slots
Scheduling of Site Visit by DM
Ineligible Consumers Eligible Consumers
Selection of One Time Slot by Consumer
Conducting Site Visit
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 22
Flow Chart
Figure 13: Review of Completed Subsidy Application
Business Rules:
In case any deficiencies/shortfalls in the application are communicated to the
consumer, the DM is required to verify whether the consumer has addressed all
deficiencies/shortfalls.
After conducting site visit, if the site is appropriate for installation of solar rooftop
system and after verifying completeness of the application, the DM should be able to
upload a signed copy of Affidavit/
Declaration on INR 25 Stamp Paper.
If the application is complete in all respects, the DM should be able to forward the
application to the HO along with a signed Affidavit/Declaration by selecting
‘Approved’.
Application must be forwarded to HO within 7 working days of receipt of completed
application.
At the HO the completed application should be received simultaneously by the
following:
VC and MD at HO, NREDCAP
OSD/GM (Solar) at HO, NREDCAP
Assistant Manager at HO, NREDCAP
Project Director at HO, NREDCAP
LLU Case Number: LLU2.7
Description: Reviewing Subsidy Application at HO, NREDCAP
Actors:
Consumers/Channel Partners
VC and MD at HO, NREDCAP
Uploading Scanned Signed Copy of Affidavit/Declaration on INR 25 Stamp Paper
by DM
Forwarding Completed Application Along With the Uploaded Affidavit/Declaration to HO
Completion of Site Visit
Reviewing Completed Subsidy Application
DM Consumer
Received by Consumer
HO, NREDCAP
Assistant Manager, NREDCAP
Project Director, NREDCAP
VC and MD, NREDCAP
OSD/GM (Solar), NREDCAP
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 23
OSD/GM (Solar) at HO, NREDCAP
Assistant Manager at HO, NREDCAP
Project Director at HO, NREDCAP
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D Technical Assistance Program United States Agency for International
Development Contract AID-386-C-12-00001 24
Flow Chart
Figure 14: Review of Subsidy Application at HO
Approved Rejected Approved
Receipt of Intimation
Project Director Assistant Manager
Verification of Application
VC and MD
Application Terminated
Receipt of Complete Subsidy Application From DM
OSD/GM (Solar)
Verification of Application
Disapproved
Approved Rejected
Verification of Application
Receipt of Intimation
Application Terminated
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 25
Business Rules:
Details of the application and eligibility of the consumer for sanction of subsidy
should be first verified by the Project Director and Assistant Manager at HO and
further intimated to the OSD/GM (Solar).
The Assistant Manager on reviewing the application should have the option to
select ‘Approved’ and ‘Disapproved’.
The Project Director on reviewing the application should have the option to
select ‘Approved’ and ‘Rejected’. If the Project Director selects ‘Rejected’, the
subsidy application will be terminated.
The Subsidy Application is then reviewed by the OSD/GM (Solar).
The verification responses of the Assistant Manager and Project Director
should be visible to the OSD/GM (Solar).
The OSD/GM (Solar) should also have the option to select ‘Approved’ and
‘Rejected’.
On receipt of approval from both the Assistant Manager and Project Director,
the OSD/GM (Solar) should be able to review the application and
approve/reject the application by selecting ‘Approved’ or ‘Rejected’.
On receipt of ‘Disapproved/Rejected’ response from Assistant Manager or
Project Director, the OS/GM (Solar) should be able to review and select
‘Approved’ or ‘Rejected’.
On approval/rejection of the subsidy application by the OSD/GM (Solar), the VC and
MD, NREDCAP should be intimated regarding the eligibility of the applicant.
LLU Case Number: LLU2.8
Description: Issuing In-Principle Subsidy Sanction Letter
Actors:
Consumers/Channel Partners
VC and MD at HO, NREDCAP
OSD/GM (Solar) at HO, NREDCAP
Flow Chart
Figure 15: Issuance of In-Principle Sanction Letter
Issuance of In-Principle Sanction Letter
Receipt of Intimation
Consumer DGM (F and A)
Receipt of Intimation on Eligibility of Applicant
VC and MD
Receipt of Complete Subsidy Application From DM
DM
Receipt of In-Principle Sanction Letter
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 26
Business Rules:
The review of subsidy application at HO and issuance of In-Principle Sanction Letter
should be completed within three working days of receipt of the completed
application from the DM.
The VC and MD, NREDCAP on receipt of confirmation of eligibility from OSD/GM
(Solar) should be able to issue In-Principle Sanction Letter to the consumer.
Format of the In-Principle Sanction Letter (Form S2) is attached as Annexure IV.
On issuance of In-Principle Sanction letter, the consumer should be able to receive
the letter through the portal.
The DM and DGM (F and A) should be able to receive the intimation of issuance of
the In-Principle Sanction letter.
HLU Case Number: HLU3
Description: Subsidy Disbursement
Actors:
Consumers/Channel Partners
DM at DO, NREDCAP
VC and MD at HO, NREDCAP
OSD/GM (Solar) at HO, NREDCAP
DGM (F and A) at HO, NREDCAP
Project Director at HO, NREDCAP
Assistant Manager at HO, NREDCAP
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D Technical Assistance Program United States Agency for International
Development Contract AID-386-C-12-00001 27
Flow Chart:
Figure 16: Process Flow for Subsidy Disbursement
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 28
Business Rules:
The consumers should be able to send a request online for initiating a joint inspection
of the system.
The DM should be able to allot the time slot through the portal for conducting joint
inspection.
The consumers should be able to upload documents required by NREDCAP for
disbursement of subsidy.
The NREDCAP officials should receive the uploaded documents through the portal.
The NREDCAP officials should be able to verify the documents online and approve
subsidy disbursement.
The DGM (F and A) will release subsidy to the Beneficiary through online payment
mode.
LLU Case Number: LLU3.1
Description: Scheduling and Conducting Joint Inspection by NREDCAP
Actors:
Consumers/Channel Partners
DM at DO, NREDCAP
Flow Chart
Figure 17: Flow Chart for Scheduling and Conducting Joint Inspection
Business Rules:
On completion of installation and commissioning of the solar rooftop system, the
consumer should be able to send a request online to the DM for allotment of time slot
for Joint Inspection.
On receipt of request, the DM should provide the consumer a choice of three time
slots on preferably three different days for conducting the Joint Inspection.
Send Request for Joint Inspection
Consumer
Completion of System
Commissioning
DM
Receive Request for Joint
Inspection
Scheduling Joint Inspection
Allotment of Three Time Slots
Selection of One Time Slot by Consumer
Conducting Joint Inspection
Signing Joint Inspection Form
Receiving Signed Joint Inspection
Form
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 29
The consumer must confirm one of the allotted slots.
The DM will then conduct site visit and sign the Joint Inspection Certificate (Form S3)
attached as Annexure V.
The Joint Inspection must be completed within seven days of receiving request for
Joint Inspection.
The DM is required to inspect the system in the presence of consumer and system
installer.
LLU Case Number: LLU3.2
Description: Submitting Documents for Subsidy Disbursal
Actors:
Consumers/Channel Partners
DM at DO, NREDCAP
VC and MD at HO, NREDCAP
OSD/GM (Solar) at HO, NREDCAP
Project Director at HO, NREDCAP
Assistant Manager at HO, NREDCAP
Flow Chart
Figure 18: Submission of Documents for Subsidy Disbursal
Business Rules:
On completion of inspection, the consumer must be able to upload the following list of
documents to be received by the DM at DO and OSD/GM (Solar), Project Director, and
Assistant Manager at HO.
Copy of Work Order.
Invoice.
Joint Inspection Report in original with the date of commissioning.
Project Completion Report in original (Form S4) along with SPV panel numbers and
inverter details. Format of Project Completion Report is attached as Annexure VI.
Photographs (with beneficiary/organization).
Synchronization Letter with serial number of meter.
Statement of expenditure (SOE) (Form S5) from Chartered Accountant in original.
Form S5 is attached as Annexure VII.
Receive Uploaded Documents
Consumer
Online Submission
of Documents
Assistant
Manager Project
Director DM
OSD/GM
(Solar)
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 30
One-month electricity bills (after commissioning, indicating export/import of energy).
Authorization letter in case of disbursement of subsidy to the System Integrator
(Form S6); if not to the beneficiary, along with the counter signature of District
Manager. Form S6 is attached as Annexure VIII.
LLU Case Number: LLU3.3
Description: Verifying Submitted Documents for Subsidy Disbursal at HO
Actors:
Consumers/Channel Partners
DM at DO, NREDCAP
VC and MD at HO, NREDCAP
OSD/GM (Solar) at HO, NREDCAP
Project Director at HO, NREDCAP
Assistant Manager at HO, NREDCAP
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D Technical Assistance Program United States Agency for International
Development Contract AID-386-C-12-00001 31
Flow Chart
Figure 19: Verification of Submitted Documents for Subsidy Disbursal at HO
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 32
Business Rules:
The DM at DO and OSD/GM (Solar), Project Director and Assistant Manager at HO
should be able to receive the uploaded documents.
The Project Director and Assistant Manager should be able to verify the
completeness of the documents and the outcome of verification should be intimated
to OSD/GM (Solar) by selecting ‘Complete’ or ‘Incomplete’.
The consumer should upload the documents and the Project Director and Assistant
Manager should complete the verification process within seven days of the
completion of inspection.
If funds are available, the OSD/GM (Solar) on receipt of outcome of verification
should be able to ‘Approve’ or ‘Reject’ the application. Selecting ‘Approve’ should
forward the documents to Finance team. Selecting ‘Reject’ should terminate the
application and there should be a provision for conveying reason for termination to
the consumer.
If the OSD/GM (Solar) approves the application, the finance team should be able to
check the documents and verify their completeness.
The finance team should intimate the OSD/GM (Solar) about the completeness of the
application by selecting ‘Complete’ or ‘Incomplete’.
If the application is complete and verified by the finance team, the OSD/GM (Solar)
should confirm Approval to VC and MD, NREDCAP for disbursement of subsidy.
LLU Case Number: LLU3.4
Description: Subsidy Disbursement
Actors:
Consumers/Channel Partners
VC and MD at HO, NREDCAP
OSD/GM (Solar) at HO, NREDCAP
DGM (F and A) at HO, NREDCAP
Flow Chart
Figure 20: Disbursement of Subsidy
Approve Reject Release of Subsidy
Receipt of Complete Application With All
Documents
Consumer/Channel
Partner DGM (F and A) OSD/GM (Solar) VC and MD
Receipt of Intimation of
Subsidy Release
Receipt of Subsidy
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 33
Business Rules:
On completion of verification procedure at the HO, the OSD/GM (Solar) should be
able to forward the completed application and documents to the VC and MD,
NREDCAP for disbursement of subsidy.
The VC and MD, NREDCAP should be able to ‘Accept’ or ‘Reject’ the application.
If the VC and MD, NREDCAP ‘Approves’ the application, the DGM (F and A),
NREDCAP should be intimated.
The DGM (F and A), NREDCAP will then release the subsidy via online payment to
the Consumer/Channel Partner.
The Consumer/Channel Partner should receive the subsidy and simultaneously, the
OSD/GM (Solar), NREDCAP should be intimated of the subsidy release.
If funds are available, the subsidy release should be completed within five days after
the verification of documents at HO.
LLU Case Number: LLU3.5
Description: Procedure for Registration and Addressing Complaints
Actors:
Consumers
DM at DO, NREDCAP
OSD/GM (Solar) at HO, NREDCAP
Flow Chart
Figure 21: Process for Registration and Addressing of Complaints
Business Rules:
The consumer should have the facility to lodge a complaint against the System
Installer pertaining to technical specification, performance, operation and
maintenance, and guarantee/warrantee.
The DM at DO and OSD/GM (Solar) at HO should be able to receive the complaint.
Consumer NREDCAP
(DO and HO)
Ad
dre
ss
Co
mp
lain
ts
Registration of Complaint
Receive Complaint from Beneficiary and Forward Complaint
Channel Partner
Address Complaints
15 Day
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 34
The DM should then forward the complaint received to the empaneled System
Installer/Channel Partner. A time duration of 15 days should be granted to address
the complaint and perform rectification.
In case of failure to address the complaint, the NREDCAP will initiate appropriate
action against the System Installer/Channel Partner.
3.2.3 USE CASES FOR DISCOM FUNCTIONALITIES
HLU Case Number: HLU4
Description: Procedure for Application Submission to DISCOM to Install Grid Connected
Solar Rooftop Systems
Actors:
Consumers
Assistant Divisional Engineer (ADE) (Operations)
Superintending Engineer (SE) (Operations)
Flow Chart
Business Rules:
On completion of registration on the portal, the consumer should apply online for
interconnection of the solar rooftop system through the portal.
The DISCOM officials should be able to receive the interconnection application.
The consumer should upload additional documents as required along with the
application form on the portal.
The applicant should complete online payment of fees prior to the submission of
application form.
Consumer DISCOM
Ap
pli
ca
tio
n P
roc
es
s
Apply Online Using Form 1(A) Upload Documents
Online Payment of Fees Receipt of Application by
ADE(Operations): 1-56 kWp SE (Operations): >56 kWp
Receipt of Fees
Generate Acknowledgement Receipt in Form 1(C)
Receive Acknowledgement Receipt
1 Day
Submit ‘Authorization Certificate and Declaration for
Groups/Societies’ in Form 1(B)
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 35
A system generated acknowledgement should be generated confirming receipt of
application and fees, specifying the application number.
LLU Case Number: LLU4.1
Description: Filling Interconnection Application Form
Actors: Consumers
Flow Chart
Figure 22: Filling of Interconnection Application Form Online
Business Rules:
The applicant must fill the Application Form (Form 1(A)) online on the USRTP. Form
1(A) is attached as Annexure IX.
If the applicant is a Group/Society etc., the applicant must fill additional Declaration
Form/Authorization Letter (Form 1(B) and submit as an attachment along with the
Application Form (Form 1(A)). Form 1(B) is attached as Annexure X.
The applicant must submit/upload following documents as specified in Table 6 along
with the Application Form.
Table 6: List of Documents to Be Uploaded With Form 1(A)
Sr. No. Documents
1 Copy of Latest Electricity Bill
2 Identity Proof (Aadhaar Card)
3 Authorization Certificate and Declaration for Groups/Societies in Format 1(B) in Case
Applicant is Group/Society
LLU Case Number: LLU4.2
Description: Fee Payment and Receipt of Acknowledgement for Interconnection Application
Actors:
Consumers
ADE (Operations)
Fill Interconnection Application Form 1(A)
Upload ‘Authorization Certificate and Declaration for Groups/Societies’ in Form
1(B) in Case of Groups/Societies
Consumer
Upload Documents
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 36
SE (Operations)
Flow Chart
Figure 23: Fee Payment and Receipt of Acknowledgement for Interconnection Application
Business Rules:
Prior to the submission of Interconnection Application Form, the applicant must
complete the process of online fees payment. The applicant must pay INR 25 as
fees.
The portal should allow submission of Interconnection Application Form only on
completion of fee payment through the portal.
The application form should be submitted to ADE (Operations) for LT connectivity
(capacity ≤ 56 kWp) and SE (Operations) for HT connectivity (for capacity >56 kWp).
After submission of the Interconnection Application Form, the applicant should
receive an automatically generated acknowledgement in Form 1(C) upon submission
of application form along with the application fees. The acknowledgment receipt
should have a unique application number assigned to each applicant for future
correspondence. Form 1(C) is attached as Annexure XI.
HLU Case Number: HLU5
Description: Technical Feasibility Determination and Intimation to Consumer About Outcome
of Feasibility Study and Inspection
Actors:
Consumers
ADE (Operations)
SE (Operations)
Flow Chart
Receipt of Application by ADE(Operations): 1-56 kWp SE (Operations): >56 kWp
Receipt of Fees
Consumer
Online Payment of Interconnection Application
Fees
DISCOM
Submit Interconnection Application
Acknowledgement Receipt Form 1(C) Received
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 37
Figure 24: Utility Review Process
Business Rules:
On receipt of the Interconnection Application Form, the DISCOM should undertake
the technical feasibility determination of the rooftop site within seven days of the date
of receipt of the application.
The DISCOM officers as detailed in Table 7 should undertake the technical feasibility
study and should intimate the consumer regarding the feasibility.
Table 7: Feasibility Inspection and Approving Authority
Sr. No. Type of Service Authority
1. LT (≤56 kW) ADE (Operations)
2. HT (>56 kW, ≤1,000 kW) SE (Operations)
The Feasibility Inspection Authority (ADE (Operations)/SE (Operations) should
prepare the Technical Feasibility Report in Form 2 and upload it online to share with
the applicant. The feasibility inspection process should be completed within seven
days of the receipt of application. Form 2 is attached as Annexure XII.
There are three possible outcomes of the technical feasibility inspection.
Technically Feasible: If the technical feasibility is satisfactory, DISCOM should
approve the application and intimate the same to the applicant by providing a
Letter of Approval (LOA) (Form 5) within seven days from the receipt of
application. Form 5 is attached as Annexure XVI. This LOA must be provided
through the portal.
Technically Not Feasible: In case the technical feasibility is negative/
unsatisfactory, the same should be intimated to the applicant within seven days
from the receipt of application. The DISCOM should send the intimation online
about the termination of application in Form 3(B) attached as Annexure XIV. The
signing authority is same as the feasibility inspecting and approving authority.
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 38
Deficiencies and Resolution of Deficiencies: In case of deficiencies in the
application form, which can be rectified, the DISCOM should intimate the same to
the applicant online through Form 3(A) within seven days from the receipt of the
application. Further, if any technical constraints are observed during inspection
due to which, it is not feasible for DISCOM to provide connectivity up to the
capacity proposed by the applicant, in such case the applicant will be given an
option to install the system at a reduced capacity or withdraw the application.
This should be intimated through Form 3(A) attached as Annexure XIII.
The applicant should then remove the identified deficiencies in the application
form within a period of seven days from the receipt of intimation (Form 3(A)) and
intimate the DISCOM about the resolution of the deficiencies in Form 4 attached
as Annexure XV. Further, DISCOM will assess the response and provide a LOA
(Format 5) to the applicant upon satisfaction. If the deficiencies are not removed
in the said period, the application shall stand cancelled/deemed terminated.
Communication through Form 3(A), Form 3(B), and Form 5 on the portal shall be
done by ADE (Operations) for LT and SE (Operations) for HT.
HLU Case Number: HLU6
Description: Procedure for Interaction During Installation Process
Actors:
Consumers
ADE (Operations)
SE (Operations)
AE (Operations)
DE (Operations)
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 39
Flow Chart
Figure 25: Interaction During Installation Process
Business Rules:
The Interconnection Agreement between the DISCOM and the applicant in duplicate
will be signed physically in the presence of witness and one copy will be retained with
the consumer. Format 6(A) and 6(B) of the Interconnection Agreement for individual
consumer and groups/societies are attached as Annexure XVII and XVIII
respectively. The consumer should upload a scanned copy of the document
agreement signed by both DISCOM and consumer on the portal.
The Interconnection Agreement must be signed and uploaded within 15 days of the
receipt of LOA. If the agreement is not signed within the stipulated time frame, then
the feasibility is cancelled.
The DISCOM entities responsible for signing the agreement are:
LT: ≤56 kWp — ADE (Operations)
HT: >56 kWp — SE (Operations)
The applicant should complete the installation of solar rooftop project within three
months of submission of the Interconnection Agreement to DISCOM. However, the
applicant shall be at liberty to complete the installation process before this period and
approach the DISCOM for initiating the next step.
The application for procurement of net meter from the DISCOM must be submitted
simultaneously to the installation process. The Intimation of meter procurement
should be submitted at least 15 days before the submission of Form 9 (intimation to
DISCOM for readiness of the system for system checks, synchronization with
DISCOM grid and installation of meters). It shall be mandatory for all the consumers
Consumer
Ins
talla
tio
n P
roc
es
s
Submit Signed Interconnection Agreement
in Format 6(A)/6(B)
DISCOM
Send LOA From DISCOM by ADE (Operations) for LT and SE (Operations) for HT
(Form 5)
Receipt of Agreement
15 Days
System Installation
90 Days
Agreement Signed
Feasibility Cancelled
Agreement Not Signed
Meter Procurement Application
15 Days Before Submission of Form 9
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 40
to approach DISCOM for meter procurement. Only on the receipt of communication
about non-availability of meters from DISCOM, the consumers shall procure meters
by themselves.
LLU Case Number: LLU6.1
Description: Meter Procurement Process
Actors:
Consumers
AE (Operations)
DE (Operations)
ADE (Operations)
SE (Operations)
Flow Chart
Figure 26: Meter Procurement Process
Business Rules:
Procurement From DISCOM: The applicant should procure net meter from
DISCOM. The applicant should submit the Intimation Form (Form 7[A]) to DISCOM at
Consumer
Me
ter
Pro
cu
rem
en
t P
roc
ess
Submit Intimation/Application to Procure Net Meter From
DISCOM and in Format 7(A)
DISCOM
Receipt of Form 7(A) by AE (Operations) for LT and AE
(Operations) and DE (Operations) for HT.
Assigning Net Meter in Form 7(B) by AE (Operations) for LT and
AE (Operations) for HT Receipt of Form 7(B)
Pro
cu
rem
en
t fr
om
DIS
CO
M
Se
lf-P
roc
ure
me
nt
Submit Request for Meter Testing in Format 7(C) If Meter Is
Not Available With DISCOM. Payment of Meter Testing Fees
Request for Testing and Fees Received by ADE (Operations) for LT and SE (Operations) for
HT
Application to Procure Meter From DISCOM Must Be Submitted at Least 15 Days Before Submission of Form 9
Payment of Fee If Meter Is Available
With DISCOM.
Receipt of Meter Procurement Fees
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 41
least 15 days prior to the expected date of submission of Form 9. Form 7(A) is
attached as Annexure XIX. The DISCOM will intimate the applicant regarding
availability/allotment/assigning of the net meter through Form 7(B), attached as
Annexure XX. Upon receipt of Form 7(B) from the DISCOM, the applicant should
make necessary online payment as intimated in Form 7(B) for procurement and
testing of net meter to the DISCOM while submitting Form 9. The charges for meter
procurement and testing shall be as specified in Table 8.
Table 8: Meter Procurement and Testing Charges for Procurement From APEPDCL
Meter Type Charges (INR)
Single Phase LT Meter 2,230
Three Phase LT Meter 4,530
HT Trivector Meter 11,500/Meter
CT Meter (Up to 56 kWp) 12,500
The DISCOM authorities receiving application in Format 7(A) are:
LT: ≤56 kWp — AE (Operations)
HT: >56 kWp, <1,000 kWp — DE (Operations) and AE(Operation)
The DISCOM authorities conveying allotment in Format 7(B) are as follows
LT: ≤56 kWp — AE (Operations)
HT: >56 kWp, <1,000 kWp — AE (Operations)
Non-Availability of Meters With DISCOM and Self-Procurement: In case of non-
availability of meters with DISCOM, the applicant should purchase meter from an
external agency. The applicant shall submit the procured meter along with the test
certificate (received from manufacturer), a copy of LOA and ‘Request for Meter
Testing’ Form 7(C) filled online, to the DISCOM. The Form 7(C) is attached as
Annexure XXI.
The applicant should make an online payment for testing of the meters as per the
charges prescribed by the DISCOM through Form 7(B). These charges shall be as
specified in Table 9.
Table 9: Meter Testing Charges for Procurement From External Agency
Meter Type Testing Charges (INR)
Single Phase 200
Three Phase 500
HT 5,000
LT Trivector Meter 2,500
The DISCOM authorities receiving application in Format 7(C) for self-procurement
include:
LT: ≤56 kWp — ADE (Operations)
HT: >56 kWp, <1,000 kWp — SE (Operations)
HLU Case Number: HLU7
Description: Inspection and Commissioning Process by DISCOM
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 42
Actors:
Consumers
ADE (Operations)
SE (Operations)
Flow Charts
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D Technical Assistance Program United States Agency for International
Development Contract AID-386-C-12-00001 43
Figure 27: Commissioning Process for System <10 kWp
Consumer DISCOM
Co
mm
issio
nin
g P
roc
ess
fo
r S
ys
tem
<1
0 k
Wp
Payment of Meter Procurement Fees (in Case of Meter
Procurement From DISCOM) OR
Submit Request for Meter Testing (Form 7C) With Payment of Meter Testing Fees (in Case of Self-Procurement of Meters)
Upload Work Completion Report (Form 8) to DISCOM Submit System Readiness Form (Form 9) to DISCOM
Receipt of Form 8 and Form 9 Receipt of Meter Procurement Fees OR
Request for Meter Testing With Meter Testing Fees
Grant of Time Slots for Inspection
DISCOM Performs System Check Based on Checklist in Form 10
14 Days
Confirmation of Time Slot
Installation of Meters Along With Sealing of Meters (Form 11)
Applicant Starts Operation of SRTPV Facility
10 Days
Intimation for Removal of Deficiency (Form 12) Rectification of Deficiencies
15 Days
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D Technical Assistance Program United States Agency for International
Development Contract AID-386-C-12-00001 44
Figure 28: Commissioning Process for System >10 kWp
Consumer DISCOM
Co
mm
issio
nin
g P
roc
ess
fo
r S
ys
tem
>1
0k
wp
Payment of Meter Procurement Fees (in Case of Meter
Procurement From DISCOM) OR
Submit Request for Meter Testing (Form 7C) With Payment of Meter Testing Fees (in Case of Self-
Procurement of Meters) Submission of Work Completion Report (Form 8) to
DISCOM and EI; Inspection by EI
Receipt of Meter Procurement Fees OR Request for Meter Testing With Meter Testing Fees
Grant of Time Slots for Inspection Work Completion Report received
Receipt of Form 9.
Allotment of Time Slot
DISCOM Performs System Check Based on Checklist in Form 10
30 Days
Submit System Readiness Form (Form 9) to DISCOM
on Receipt of EI Inspection Certificate
Confirmation of Time Slot
Installation of Meters Along With Sealing of Meters (Form 11)
Applicant Starts Operation of SRTPV Facility
14 Days
10 Days
Intimation for Removal of Deficiency (Form 12) Rectification of Deficiencies
15 Days
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 45
Business Rules:
This section depicts the interaction between DISCOM and applicant after the
completion of installation.
Once the solar rooftop system is installed, the applicant shall submit the Work
Completion Report (Form 8) along with the technical specification of the installed
project to the DISCOM (for all system sizes) and to the Office of the Electrical
Inspectorate (for system size >10 kWp) as specified by the Government of Andhra
Pradesh. Form 8 is attached as Annexure XXII.
The authority receiving the Work Completion Report at DISCOM include:
LT: ≤56 kWp — ADE (Operations)
HT: >56 kWp, <1,000 kWp — SE (Operations)
System of size <10 kWp:
Form 8 should be uploaded as an attachment during submission of Form 9 to
the DISCOM.
The DISCOM shall inspect projects of system size <10 kWp.
The applicant shall submit the System Readiness Form (Form 9) to DISCOM
and request the DISCOM to grant timeslot for inspection, installation of meters,
and synchronization of system. An option of three time slots in the next seven
days shall be granted by the DISCOM and the same will be communicated
within three days from the receipt of Form 9. On receipt of time slots from
DISCOM, the applicant must confirm one time slot.
In case any deficiencies are noted by the DISCOM during inspection, these can
be intimated to the consumer via Form 12 attached as Annexure XXVI.
On addressing the deficiencies, Form 9 shall be resubmitted.
Commissioning process for systems of size <10 kWp is depicted in Figure 27.
System of size >10 kWp
The consumer shall upload the Work Completion Report in Form 8 to indicate
the completion of installation to the DISCOM.
The consumer shall submit an application to the CEIG for Safety Approval and
Safety Inspection and shall upload the Work Completion Report along with the
application.
CEIG shall inspect projects of system size >10 kWp.
CEIG shall issue inspection certificate within seven days of submission of the
application for Safety Approval and Safety Inspection from the applicant.
In case any defects are noted by CEIG, the applicant must carry out
rectification and intimate the CEIG about rectification of defects. On rectification
of defects, the CEIG shall issue the Inspection Certificate to the consumer
within 30 days.
The applicant shall then submit the System Readiness Form (Form 9) to the
DISCOM along with Inspection Certificate and request DISCOM to grant time
slot for installation of meters and synchronization of system. Form 9 must be
submitted within three days of the receipt of Inspection Certificate from EI.
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 46
DISCOM will provide an option of three time slots in the next 7 days. On receipt
of time slots from DISCOM, the applicant must confirm a time slot.
The commissioning process of the systems of size >10 kWp should be as
illustrated in Figure 28.
Form 9 is attached as Annexure XXIII.
The authority receiving Form 9 at DISCOM include:
LT: ≤56 kWp — ADE (Operations)
HT: >56 kWp, <1,000kWp — SE (Operations)
Subsequently, DISCOM shall perform necessary system check (as per the checklist
provided in Form 10), synchronize, install, and seal the meters within seven days of
the receipt of System Readiness Form (Form 9). The Form 10 is attached as
Annexure XXIV. The DISCOM will further issue a Letter of ‘Synchronization With
DISCOM Grid and Installation of Meters’ (Form 11) to the applicant. Form 11 is
attached as Annexure XXV.
The applicant can then start the operation of their solar rooftop system facility.
HLU Case Number: HLU8
Description: Escalation Process for APEPDCL
Actors:
Consumers
ADE (Operations)
SE (Operations)
Flow Chart
Figure 29: Escalation Process in APEPDCL
Business Rule:
In case of non-adherence to timelines by DISCOM officials to grant approvals/intimation to
the consumers through the USRTP, the following escalation process shall be adopted. The
process is illustrated in Figure 29.
3.2.4 USE CASES FOR DES – CEIG FUNCTIONALITIES
HLU Case Number: HLU9
Description: Functionalities Related to DES – CEIG
Actors: Consumers
Business Rules:
ADE DE SE GM (Commercial
and Solar)
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 47
The portal should provide a link to the APCEIG’s EODB portal to facilitate quick
access to apply for drawing approval and statutory clearance required for solar
rooftop system installation.
The portal should also provide access to the user manual of APCEIG’s EOBD portal
prepared by APFCSS for applying on the EODB portal to facilitate ease of obtaining
requisite clearances from DES – CEIG.
3.2.5 USE CASES FOR INFORMATION FUNCTIONALITIES
HLU Case Number: HLU10
Description: Informational Functionalities
Actors: Consumers
Flow Chart
Figure 30: Publically Accessible Functionalities
Business Rules:
The portal should provide an access to information enabling deployment of solar
rooftop projects.
The portal should contain general information and information related to installation,
finance and subsidy, and policy and regulatory.
The portal should provide information regarding any solar helpdesk created. It should
also provide links to the social media pages of the stakeholders and must provide
useful links to related websites.
The portal should contain a geotagging feature and a photo gallery of installations.
The portal should provide statistics of achievements through a dashboard feature.
A newsfeed to provide recent updates should be present on the portal.
LLU Case Number: LLU10.1
Description: Information Functionalities
Information
Publically Accessible Functionalities
Help Updates
• General • Installation • Finance and
Subsidy • Policy and
Regulatory • Photo Gallery of
Installations
• Solar Rooftop Helpdesk
• Social Media • Useful Links • Consumer
Feedback
• Installation Achievements
• Newsfeed
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 48
Actors: Consumers
Flow Chart
Figure 31: Informational Functionality
Business Rules:
The portal should provide the following information:
General:
Benefits of installation of solar rooftop systems.
Information regarding net metering and gross metering with animation to provide
information concerning the flow of electricity in both set ups.
Solar rooftop potential calculator.
Installation:
Procedures and timelines of setting up the solar rooftop system.
Procedure for empanelment of suppliers/implementing agencies.
List of empaneled suppliers and MNRE Channel Partners for solar rooftop
system installation.
Technical specifications of the solar rooftop systems to be installed.
Technical specifications of meters and modem.
Finance and Subsidy:
Information related to central and state government subsidy.
Information on interest rates of banks, loan tenures, and schemes introduced by
banks for financing solar rooftop projects.
Policy and Regulatory:
Information related to policy (solar policy, guidelines, etc.).
Regulations (net metering and gross metering).
Tariff Order (net metering and gross metering).
Guidelines and circulars issued regarding implementation of solar rooftop projects.
Photo Gallery of Installation in Progress/Completed
LLU Case Number: LLU10.2
Information
• General • Installation • Finance and Subsidy • Policy and Regulatory
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 49
Description: Help Related Functionalities
Actors: Consumers
Flow Chart
Figure 32: Help Related Functionalities
Business Rules:
Solar Rooftop Helpdesk:
Login ID for customer service executives to access information on the portal.
Addressing consumer and stakeholder queries through email and telephone.
Social Media:
Links to social media pages of the stakeholders so that Consumers can receive
quick updates and post queries on social media pages.
Publicize information related to solar rooftop system installation.
Useful Link Tabs for Quick Access to Websites:
MNRE
Andhra Pradesh Electricity Regulatory Commission (APERC)
APSPDCL
APEPDCL
NREDCAP
DES – CEIG
Consumer Feedback:
Consumers should be able to provide feedback regarding the implementing
agency and the portal.
LLU Case Number: LLU10.3
Description: Location Information
Actors:
NREDCAP Officials
DISCOM Officials
Flow Chart
Help
• Solar Rooftop Helpdesk
• Social Media • Useful Links • Consumer
Feedback
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 50
Business Rules:
Geotagging Feature Indicating Projects in Progress and Completed
Selection of geotag will provide the following details:
Application Number
Applicant Name
Applicant Category
Email Id
S. C. Number
Site Address
Metering Type
Plant Capacity
Latitude
Longitude
DISCOM Name
Commissioning Date
Current Status
Channel Partner Name
Total Cost (INR)
Financial Year
Contact Person Name
This feature should be available to DISCOM and SNA Officials on their dashboard and shall
not be available to the consumers.
LLU Case Number: LLU10.4
Description: Updates
Actors:
Consumers
NREDCAP Officials
Flow Chart
Figure 33: Updates on the Portal
Business Rules:
Updates
• Installation Achievements
• Newsfeed
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 51
A news feed providing information on the recent developments in the solar rooftop
sector should be available on the portal.
Achievements in AP relating to the installation of solar rooftop systems should be
available on the portal.
Statistics of year/quarter wise installed capacity should be available on the portal.
The ‘Dashboard’ feature should provide information on the following:
Capacity commissioned
Subsidy sanctioned
Capacity installation in-progress
Number of systems installed
Capacity installed with subsidy and capacity installed without subsidy
Countdown: Number of days to completion of installation on consumers’
dashboard.
HLU Case Number: HLU11
Description: Logins for NREDCAP Officials
Actors:
DM at DO, NREDCAP
VC and MD at HO, NREDCAP
OSD/GM (Solar) at HO, NREDCAP
Project Director at HO, NREDCAP
Assistant Manager at HO, NREDCAP
DGM (F and A) at HO, NREDCAP
Flow Chart
Figure 34: Logins for NREDCAP Officials
Officials at DO
DM, Anantapur
DM, Ongole
DM, East Godavari
DM, Vizianagaram
DM, Nellore
DM, Kadapa
DM, Vishakhapatnam
DM, Krishna
DM, Chittoor
DM, Srikakulam
DM, Guntur
DM, West Godavari
DM, Kurnool
Officials at HO
VC and MD
OSD/GM (Solar)
DGM (F and A)
Project Director
Assistant Manager
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 52
Business Rule
The entities as described in Table 10 should have logins to process the application and
release subsidy.
Table 10: Logins Required for NREDCAP Officials
Sr. No. Office Designation Number of Logins
1 HO
VC and MD 1
OSD/GM (Solar) 1
DGM (F and A) 1
Assistant Manager 1
Project Director 1
2 DO DM 13
Total 18
HLU Case Number: HLU12
Description: Logins for APEPDCL Officials
Actors: APEPDCL Officials
Flow Chart
Figure 35: Logins for APEPDCL Officials
Business Rules:
The number of logins required for APEPDCL officials is presented in Table 11.
Officials at Circle Office
SE (Operations), Eluru
SE (Operations), Rajahmundry
SE (Operations), Srikakulam
SE (Operations), Vizianagaram
DE (Operations): 20
ADE (Operations): 81
AE (Operations): 307 SE (Operations), Vishakhapatnam
Officials at HO
CMD
Director (Operations)
Director (Finance)
CGM (Expenditure)
CGM (Civil, Commercial, and
Solar Energy)
Officials at Division Office
Officials at Section Office
Officials at Sub-Division Office
GM (Commercial and Solar Energy)
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 53
The AE (Operations), ADE (Operations), DE (Operations), and SE (Operations)
should have access through the portal to grant approvals for solar rooftop process.
Table 11: Logins Required for APEPDCL Officials
Sr. No. Designation Number of Logins
1. AE (Operations) at Section Office 307
2. ADE (Operations) at Sub-division Office 81
3. DE (Operations) at Division Office 20
4. SE (Operations) at Circle Office 5
5. CMD 1
6. Director (Operations) 1
7. Director (Finance) 1
8. Chief General Manager (Expenditure) 1
9. Chief General Manager (Commercial, Civil,
and Solar Energy)
1
10. General Manager (Commercial and Solar
Energy)
1
Total 419
HLU Case Number: HLU13
Description: Logins for APSPDCL Officials
Actors: APSPDCL Officials
Flow Chart
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 54
Figure 36: Logins for APSPDCL Officials
Business Rules:
The number of logins required for APSPDCL officials is presented in Table 12.
The AE (Operations), ADE (Operations), DE (Operations), and SE (Operations)
should have access through the portal to grant approvals for solar rooftop process.
Table 12: Logins Required for APSPDCL Officials
Sr. No. Designation Number of Logins
1. AE (Operations) at Section Office 645
2. ADE (Operations) at Sub-division Office 168
3. DE (Operations) at Division Office 48
4. SE (Operations) at Circle Office 8
5. DE (M and P) 8
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 55
Sr. No. Designation Number of Logins
6. CMD 1
7. Director (HRD and Technical) 1
8. Director (Finance) 1
9. CGM (Revenue and Internal Audit [R and IA]) 1
10. CGM (Purchase and Material Management
[P and MM] and IPC)
1
11. CGM (Operations) 1
12. General Manager (IPC) 1
13. DE (IPC) 1
14. Circle Engineer at Zonal Office 3
15 DE (Technical) at Zonal Office 3
Total 891
HLU Case Number: HLU14
Description: Report Generation for DISCOM and SNA
Actors:
DISCOM Officials
SNA Officials
Business Requirements:
DISCOM Reports: The portal should enable the DISCOM Officials to generate reports.
DISCOM Officials should be able to generate reports for information at Circle Level, Division
Level, Sub-Division Level, and Section Level Offices. The template for the report is attached
as Annexure XXVII.
SNA Reports: The portal should enable the SNA Officials to generate reports. SNA Officials
should be able to generate reports for subsidy information at District Level and State Level.
The template for the report is attached as Annexure XXVIII.
HLU Case Number: HLU15
Description: Time Schedule Report Generation for DISCOM and NREDCAP Site Visit.
Actors:
ADE (Operations)
DM at DO, NREDCAP
Business Requirements:
ADE (Operations)
The ADE(Operations) shall grant 3 time slot options to consumers for installation of meter
after submission of the System Readiness Report (Form 9) Three time slots allocated shall
have the title ‘Option Number 1/2/3’. To enable the ADE (Operations) to check the time slots
allocated by themselves and the slots approved by the consumer the portal should enable
the ADE (Operations) to generate time schedule reports for site visit.
The report generated should have a ‘From’ date to enlist the allocated/scheduled site visits.
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 56
The report shall display the list of applicants to whom timeslots are granted sequentially
based on the date and timeslot provided. If 3 time slots are allotted to consumers and
consumers are yet to approve a slot, all 3 slots shall be displayed in the list with the ‘Option
Number’ displayed. If a slot is selected by the consumer, only the selected slot shall feature
in the list. The template for report generation is provided in the Annexure XXIX.
DM at DO, NREDCAP
The DM shall conduct two visits to the consumer location, site visit prior to In-Principle
Approval and Joint Inspection visit post commissioning of the system. In both cases the DM
shall grant 3 time slot options to the consumers. Three time slots allocated shall have the
title ‘Option Number 1/2/3’. To enable the DM to check the time slots allocated by
themselves and the slots approved by the consumer the portal should enable the DM to
generate time schedule reports for site visit.
The report generated should have a ‘From’ date to enlist the allocated/scheduled site visits.
The report shall display the list of applicants to whom timeslots are granted sequentially
based on the date and timeslot provided. If 3 time slots are allotted to consumers and
consumers are yet to approve a slot, all 3 slots shall be displayed in the list with the ‘Option
Number’ displayed. Additionally, the ‘Type of Visit’ (Site Visit/Joint Inspection Visit) should be
displayed in the report. If a slot is selected by the consumer, only the selected slot shall
feature in the list. The template for report generation is provided in the Annexure XXIX.
HLU Case Number: HLU16
Description: List of All Applications Received by DISCOM for Solar Rooftop Installations.
Actors:
All DISCOM Officials
Business Requirements:
All the DISCOM Officials should have a provision of viewing a list of applications received for
solar rooftop installation and the current status of the application. The entire history of the
applicant should be made available under this section along with Forms received from the
applicant and approvals granted to the applicant.
HLU Case Number: HLU17
Description: List of All Applications Received for Subsidy.
Actors:
All NREDCAP Officials
Business Requirements:
All the NREDCAP Officials should have a provision of viewing a list of applications received
for solar rooftop installation and the current status of the application. Officials should have an
option of viewing the subsidy applications DISCOM wise. The entire history of the applicant
should be made available under this section along with Forms received from the applicant
and approvals granted to the applicant.
HLU Case Number: HLU18
Description: Informational Functionalities on Consumer/DISCOM/SNA Dashboard
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 57
Actors:
Consumer
DISCOM Approvers
SNA Approvers
Business Rules:
The Consumer Dashboard should enable stepwise tracking of the DISCOM and
Subsidy application process.
o Enable application progress tracking.
o Enable visualization of status and target dates.
o Enable visualization of immediate action points.
o Enable access to all applications submitted and approvals received.
The DISCOM Dashboard should provide access to statistical data related to
application process mediated through the portal such as follows:
o Number of installation applications received and total capacity
o Number and capacity of installation for which LOAs are issued.
o Number and capacity of systems installed (with consumer end work
completed).
o Number and capacity of systems synchronized
o Number and capacity of applications rejected
o Number and capacity of applications pending approval from DISCOMs
o Access to the geotagging module
The SNA Dashboard should provide access to statistical data related to subsidy
application process mediated through the portal such as follows:
o Number of installation for which subsidy applications are received and total
capacity
o Number and capacity of installation for which In-Principle Sanction is granted.
o Number of systems and capacity with joint inspection by SNA completed.
o Number of systems and capacity for which subsidy is disbursed
o Number of systems and capacity installed (DISCOM wise and in the entire
state)
o Access to geotagging module
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 58
4 VERSIONS AND APPROVALS
4.1 VERSION HISTORY
Table 13: Version History of the Document
Date Version Description of Revision Revised by
December
12, 2017
V1 First Draft Document Submitted Idam Infrastructure
Advisory Pvt. Ltd.
April 20,
2017
V2 Revision in Form contents. Addition of
HLU14,15,16,17,18
Idam Infrastructure
Advisory Pvt. Ltd.
4.2 APPROVALS
Table 14: Approvals for the Document
Approver Name Role Signature Date
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D Technical Assistance Program United States Agency for International
Development Contract AID-386-C-12-00001 59
ANNEXURES
ANNEXURE I: FORM S1A
Ministry of New and Renewable Energy (Jawaharlal Nehru National Solar Mission)
Project Proposals for Grid Connected Rooftop and Small SPV Power Plants (1-5 kWp Capacity) (List Mode)
Sl. No.
Name, Complete Address, Email,
Phone, Fax, Mobile No. of the Beneficiary and Plant Location
Name and Complete
Address of the Agency/
Company Installed/Will
Install the Plant
Plant Size
(kWp)
Brief Specifications of
PV Module, Inverter, Meter,
Structure, Electric Wires, Battery Bank (If
any), etc.
Grid Connectivity
Level 230/400/440/ 11 kV/33 kV Single/Three
Phase
Costs of PV Module,
and Total Cost (in
INR)
Admissible Subsidy
From MNRE
Claimed (in INR)
Subsidy From
States, If any (in INR)
Power Purchase Arrangement and Price Net Metering/FIT (INR/kWh)
Photo and ID Proof of
Beneficiary to Be Given/
Attached
Remarks/ Any Other
Information 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12.
PV
Module…… Inverter…... Meter…….. BOS……… Any Other… Total (in INR)
2.
3
Signature _______ Name and Designation of Authorized Signatory*
of Implementing Agency
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 60
Affidavit/Declaration Certificate
(To Be furnished by Implementing Agency in INR 25/- Stamp Paper)
1. It is certified that I/We have read the guidelines issued by the Ministry vide No.---------
dated --- -- and the related provisions/terms and conditions for availing Central Financial
Assistance (CFA) from the Ministry of New and Renewable Energy and I/ We agree to
abide by these guidelines and related terms and conditions. Failure to comply with these
guidelines will result in denial of CFA by the Ministry.
2. This is to certify that Shri ………………… (Name and Designation) of ……………
(Organization) visited the proposed site on (Date) ……….. and found that there
is………… sq. m of south facing shadow free area is available at the site for installation
of the power plant. The latest photograph of the front view of the proposed site with date
is enclosed with the certificate. After installation photograph will be taken in same view
and will be submitted with completion report.
3. We confirm that the present proposal in full or part has not been submitted/ has been
submitted to any other agency for seeking support (In case proposal has been submitted
to any other agency or under consideration all details and a copy of the proposal must be
submitted along with the present proposal). The present proposal has neither been
submitted to MNRE nor has the CFA been availed from MNRE for the same proposal.
4. This is to certify that the various components of the PV module/inverter/meter/battery (if
any), electric wires, BOS etc. will conform to the Relevant Standards, as mentioned in the
‘Guidelines for Off-Grid and Decentralized Solar Applications for SPV Modules and
Components/Grid Connected Rooftop and Small Solar Power Plants under JNNSM’.
Copies of the Relevant IEC/BIS certificates has been maintained in the office.
5. We confirm that the individual applications, beneficiary’s identification, photograph of the
systems and the beneficiary of each along with detailed specifications of various
components have been received in the prescribed format. It has been kept and
maintained in our office. For any audit and inspection, it will be shown to the concerned
officer/authority.
6. We agree to place the details and photographs of the system and beneficiary on our
website for all systems.
7. We will provide/feed the data in the online monitoring system regularly as per instruction
of MNRE.
8. The plant site has been/will be inspected/verified by us and the final claim will be made
after the plant/system has been found satisfactory in all respect and fit/eligible for
receiving subsidy/CFA from MNRE.
9. The failure to comply with these guidelines will result in denial of CFA by MNRE.
I also hereby declare that all information submitted in the proposal are true to the best of
knowledge and belief. This is to confirm that in case of any dispute, the decision of
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 61
Secretary, Ministry of New and Renewable Energy, Government of India will be final and
binding on all.
Signature…………..………....
Name and Designation of Authorized Signatory*
of Implementing Agency
Place:
Date:
*Authorized signatory should be at least in the rank of District Manager of SNA.
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 62
Agreement/Consent/Certificate From User/ Beneficiary
(To Be Furnished by User/Beneficiary on INR 25/- Stamp Paper)
1. This is to certify that I …….... S/o Shri ………………………………….. Resident of
……………………............... herewith agree to install the Grid Connected Rooftop Project/
Small Power Plant of ………… kWp capacity as per the details submitted in the proposal.
2. I confirm that the CFA received will be utilized for this project only and not for any other
purpose. I herewith also confirm that the balance cost in addition to the CFA will be met
by me from my own/other resources.
3. I agree that the roof space will be made available in the proposed project site and is
owned by me/leased to me by the owner.
4. This is also confirmed that I will extend full cooperation including access to the project
site premise to the implementing/ executing agency during installation and O&M, of the
plant.
Signature ………………………….……
Name and Designation, Organization, Address
of the User/Beneficiary
(With Seal If Available)
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 63
ANNEXURE II: FORM S1B
Ministry of New and Renewable Energy
(Jawaharlal Nehru National Solar Mission)
Form B for Project Proposals for
Grid Connected Rooftop and Small SPV Power Plants
(For the Project Above 5 kWp and Up to 50 kWp)
PART- I: Project Details
[A] General Details
Sr. No. Description Remark
1. Title of the Project
2. Capacity of the Plant (kWp)
3. Category of the Applicant/Project Proponent
Government Organization/Public sector Undertaking(PSU)
/State Nodal Agency/Solar Energy Corporation of India (SECI)/
Channel Partner/RESCO/System Integrator/Finance Integrator/
Manufacture/Supplier of Solar equipment’s/Developer/
NGO/Financial Institutions/Financial Integrator/any Other
(Please specify)
4.
Details of the Applicant/Representative/Project Proponent
Name
Designation
Mailing Address
Telephone, Fax and Email (Website, if any)
5.
Executive Summary of the Proposal
(Please attach a separate sheet)
6. Objective for Implementing the Plant
(a) Sale of electricity to the distribution licensee at feed-in tariff
or competitively discovered rate
(b) sale of electricity to the distribution licensee at average
pooled price cost (APPC) and participation in REC
mechanism
(c) Sale of electricity to third party
(d) Self-consumption total or partial generation
(e) Diesel saving
(f) Combination of above (please mention)
(g) Any other, please specify
7. Any Other Detail Relevant for Consideration of
Support Under the Scheme by the Evaluation
Committee
Photo of the
beneficiary
with signature
Photo of the
beneficiary
with signature
Photo of the
beneficiary
with signature
Photo of the
beneficiary
with signature
Photo of the
beneficiary
with signature
Photo of the
beneficiary
with signature
Photo of the
beneficiary
with signature
Photo of the
beneficiary
with signature
Photo of the
beneficiary
with signature
Photo of the
beneficiary
with signature
Photo of the
beneficiary
with signature
Photo of the
beneficiary
with signature
Photo of the
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 64
[B] Details of the Plant Site/Location
Sr. No. Description Remark
1. Is the Plant Located at the Address Mentioned in [A]
4 Above; If No, Address of the Location of the
Plant(s)
Name
H. No.
Street/Locality/Road
District
State
Pin code
2. Is the Beneficiary Same as [B] 1. If No, Details of
Project Beneficiary/Organization
Head of the organization
Name of the contact person
Full address, phone, mobile, and email
3. Details of Proposed Power Plant
(a) Proposed capacity of the SPV power plant (kWp)
(b) Plant proposed at single site/multiple sites
(c) Interconnection with the electricity network at single
point or multiple point
(d) Availability of shadow free south facing rooftop/land
area for the power plant with photograph
(e) Total loads to be energized by SPV power plant (kW)
(f) Calculations and justification for the proposed
capacity (please elaborate)
(g) Expected annual energy generation
(h) Space for housing the plant control systems and
battery bank (if any)
4. Details of Electrical Load Where the Plant Is to Be
Installed
i. Total connected electrical load in kW (as per
electricity bill)
ii. Applicable consumer category
(domestic/commercial/individual/others, please
specify)
iii. Total electrical load to be met by the SPV power plant
(kW)
5. Technology Description and System Design/ Specification
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 65
Sr. No. Description Remark
i. Sketch/Line diagram of the complete SPV system
with details (please attach drawing)
ii. Capacity/Power of each PV module (kWp)
iii. Number of modules and total array capacity (Nos.
and kWp)
iv. Solar cell technology and module efficiency proposed
to be used (mono-crystalline/poly-crystalline/ thin
film/any other)
v. Details of tracking of PV array, if proposed (single
axis/double axis tracking etc.)
vi. PCU/Inverter capacity with detailed specifications
(kVA) (details of quality of output power, standards)
vii. Type of inverter (central/string/multi string/any other),
inverter efficiency
viii.Number of PCU/inverters proposed to be used
ix. DC bus voltage
x. Capacity of battery bank (current, voltage and AH), if
used, any
xi. Type of battery proposed (lead acid tubular/ lithium
ion/NaS/any other)
xii. Details of protections to be deployed on PV array and
AC output side
xiii. Details of metering, indication, data logging
operation
xiv. Schematic diagram of the system including
protecting interlocking devices, monitoring and data
logging points to be provided.
xv. Details of training of manpower to be provided for
successful operation of the plant. (Compliance to
BIS/IEC Standards is mandatory).
xvi. Details of mounting system:
- Roof mounted system
- Ground mounted system
6. Details of Building to Install the Electronics Control Panel and Battery Bank (If any) i. Whether any existing building is to be used as control
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 66
Sr. No. Description Remark
room, if so, details to be provided ii. If a new building is to be constructed, area, estimated
cost and layout, etc. to be provided and time frame to construct the building
Notes:
• It is mandatory to provide technical performance specifications of each component of the
power plant proposed to be installed under the project as applicable and for which the
performance will be warranted.
• All technical parameters and warranty requirements must meet or exceed the
requirements mentioned in the guidelines issued by the Ministry.
[C] Operations and Maintenance (O&M) Arrangements
Sr. No. Description Remark
Details of O&M arrangements
Arrangements for generation data
Collection through remote monitoring
(Applicable for SPV power plants having more than 5
kWp capacity)
Is dedicated staff being trained for O&M of the plant?
No. of personnel to be trained in O&M
[D] Project Duration and Implementation Schedule
Completion schedule with milestones (Please attach PERT CHART preferably).
[E] Monitoring Mechanism
Details of data monitoring on Daily, Monthly, and Annual energy generation
(Data logging and compilation and sharing with MNRE).
Please Provide Details in the Following Format
Own mechanism (up to 5 kWp)
Third party
Remote monitoring (for SPV power plants of 10
kWp and above)
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 67
[F] Costing of Project
Sr.
No.
System Unit Cost (INR
in Lakh)
Quantity Total Cost (INR
in Lakh)
1. Cost of systems hardware
- SPV modules
- Inverters
- Installation structure
- Electrical wires - Battery bank (if any)
- Meter
- Any other
2. Cost of transportation and insurance
3. Cost of civil works and electrical works
4. Cost of installation and commissioning
5. Cost of annual maintenance for five years
6. Cost of battery replacement
7. Any other related costs
Total cost
[G] Means of Finance
Sr.
No. Means of Finance (INR in Lakh)
1. Envisaged Central Financial Assistance from MNRE INR
2. Contribution of beneficiaries INR
3. Contribution of project proponent INR
4. Other source(s) of funding INR
5. Envisaged soft loan assistance, if any INR
Details of revenue to be collected with payback period
[H] Any Other Information
Signature
Seal
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 68
PART – II: Details of Grid Connectivity of the Project
(The developer shall submit “Single line diagram elaborating Interconnection of the
Solar Photovoltaic Plant to the Grid”)
Sr. No. Description Remarks
A.
Grid Connectivity Level:
Low voltage single phase supply (up to 10
kW SPV system)
Three phases low voltage supply (up to
100 kW SPV system)
Connected at 11kV level (100 kW to 1.5
MW SPV systems)
Connected at 11kV/33kV/66kV level (1.5
MW to 5.0 MW SPV systems)
Any other level
1. Distance of interfacing point of the SPV plant with the grid
2. Type of grid available
3.
Letter of consent for synchronization of SPV
plant with the Network of Distribution
Licensee/NOC (enclose letter)
4. Applicable fee and charges made for the grant
of connectivity, if any
B.
Details of Distribution Licensee Providing Grid Interconnection
Name and complete address of
Distribution licensee
Details of contact person
Phone number
Mobile
Fax
C.
Metering Arrangement for the Project (Along with the application for the consideration of Central Financial Assistance, the developer shall submit “Single line diagram elaborating type and location of Meter(s))
I. Export import meters
II. Two way meters
III. Three meter system
IV. Any other (pl. specify)
V. Price of meter
VI. Whether meter is approved by distribution licensee
VII. Class of energy meter
D.
Power Purchase Agreement (A copy of agreement made with distribution licensee and/or third party shall be enclosed)
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 69
Sr. No. Description Remarks
E.
Business Model Proposed for the Project
Solar installations owned by consumer: Solar rooftop facility owned,
operated and maintained by the consumer(s).
Solar rooftop facility owned by consumer but operated and maintained by the Third party
Solar installations owned, operated and maintained by Third party: Arrangement as a captive
generating plant for the roof owners
Solar lease model, sale to grid
Solar installations owned by the utility: Solar installations owned
operated and maintained by the DISCOM
Distribution licensee provides appropriate viability gap funds
Any other model (Pl. specify)
F.
Commercial Arrangement
Sale to distribution licensee: Sale at feed-in-tariff determined
by SERC Sale at rate discovered under
competitive bidding and adopted by SERC
Sale at average power purchase cost determined by SERC and participation in REC mechanism
Self or captive consumption: Participation in net metering
mechanism Sale of Surplus Power to Grid or
Third party Sale to Third Party:
Rate committed for sale of electricity o Sale of Power on Short Term
(Negotiation of rate at Regular Intervals) or
Sale of Power on Long Term Basis
Participation in REC Mechanism
Any other system, please specify
G.
Undertakings From Involved Parties 1. Undertaking from the
consumer/beneficiary regarding the acceptability of the project
2. Undertaking from the third party/project developer regarding quality assurance, installation, operation and maintenance of the system
H.
Any Other Relevant Information 1. Incentives availed from any other agency
(National/International) 2. Likely capacity utilization factor 3. Any other
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 70
Affidavit/Declaration Certificate
(To Be Furnished by Implementing Agency in INR 25/- Stamp Paper)
1. It is certified that I/We have read the guidelines issued by the Ministry vide No.---------
dated ----- and the related provisions/terms and conditions for availing Central Financial
Assistance (CFA) from the Ministry of New and Renewable Energy and I/ We agree to
abide by these guidelines and related terms and conditions. Failure to comply with these
guidelines will result in denial of CFA by the Ministry.
2. This is to certify that Shri ………………… (Name and Designation) of ……………
(Organization) visited the proposed site on (Date) ……….. and found that there
is………… sq. m of south facing shadow free area is available at the site for installation
of the power plant. The latest photograph of the front view of the proposed site with date
is enclosed with the certificate. After installation photograph will be taken in same view
and will be submitted with completion report.
3. We confirm that the present proposal in full or part has not been submitted/has been
submitted to any other agency for seeking support (In case proposal has been submitted
to any other agency or under consideration all details and a copy of the proposal must be
submitted along with the present proposal). The present proposal has neither been
submitted to MNRE nor the CFA has been availed from MNRE for the same proposal.
4. This is to certify that the various components of the PV module/inverter/meter/ battery (if
any), electric wires, BOS etc. will conform to the relevant standards, as mentioned in the
‘Guidelines for Off-Grid and Decentralized Solar Applications for SPV Modules and
Components/Grid Connected Rooftop and Small Solar Power Plants Under JNNSM’.
Copies of the Relevant IEC/BIS certificates has been maintained in the office.
5. We confirm that the individual applications, beneficiary’s identification, photograph of the
systems and the beneficiary of each along with detailed specifications of various
components have been received in the prescribed format. It has been kept and
maintained in our office. For any audit and inspection, it will be shown to the concerned
officer/authority.
6. We agree to place the details and photographs of the system and beneficiary on our
website for all systems.
7. We will provide/feed the data in the online monitoring system regularly as per instruction
of MNRE.
8. The plant site has been/will be inspected/verified by us and the final claim will be made
after the plant/system has been found satisfactory in all respect and fit/eligible for
receiving subsidy/CFA from MNRE.
9. The failure to comply with these guidelines will result in denial of CFA by MNRE
I also hereby declare that all information submitted in the proposal are true to the best of
knowledge and belief. This is to confirm that in case of any dispute, the decision of
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 71
Secretary, Ministry of New and Renewable Energy, Government of India will be final and
binding on all.
Signature…………..………....
Name and Designation of Authorized Signatory*
of Implementing Agency
Place:
Date:
*Authorized signatory should be at least in the rank of District Manager of SNA.
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 72
Agreement/Consent/Certificate From User/Beneficiary (To Be Furnished by User/Beneficiary on INR 25/- Stamp Paper)
1. This is to certify that I .... S/o Shri …………………………………..Resident of ……………………............... herewith agree to install the Grid Connected Rooftop Project/ Small Power Plant of ………… kWp capacity as per details submitted in the Form B/DPR of the proposal.
2. I confirm that the CFA received will be utilized for this project only and not for any other
purpose. I herewith also confirm that the balance cost in addition to the CFA will be met
by me from my own/other resources.
3. I agree that the roof space will be made available in the proposed project site and is owned
by me/leased to me by the owner.
4. This is also confirmed that I will extend full cooperation including access to the project site
premise to the implementing/executing agency during installation and O&M, of the plant.
Signature…..………………..………….…… Name and Designation, Organization, Address
of the User/Beneficiary
(With Seal If Available)
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 73
ANNEXURE III: FORM S1C
Ministry of New and Renewable Energy
(Jawaharlal Nehru National Solar Mission)
Format for Detailed Project Report for Grid Connected Rooftop and Small SPV Power
Plants (Capacity above 50 kWp to 500 kWp)
1. Introduction
2. All Information as per Form S1B
3. Rooftop solar power generation system description
4. System description and specifications of the components
(a) Solar PV module
(b) Grid Tie inverter
(c) Module mounting structure
(d) Array junction box
(e) AC distribution board
(f) Cable (all type)
(g) Earthing kit (maintenance free)
(h) Installation kit
(i) Meters
(j) Online monitoring system
(k) Any other component
5. Bill of material/system (No./quantities) (For above components)
6. Calculation for unit cost of power generation
7. Cost benefit analysis, payback period
8. Expected output
9. Respective drawings for layout, connection, components etc.
10. Connectivity details with grid and metering arrangement (with sketch diagram)
11. Agreement with distribution licensee/DISCOMs
12. Any other information
Signature
Seal
Photo of the
beneficiary
Photo of the
beneficiary
Photo of the
beneficiary
Photo of the
beneficiary
Photo of the
beneficiary
Photo of the
beneficiary
Photo of the
beneficiary
Photo of the
beneficiary
Photo of the
beneficiary
Photo of the
beneficiary
Photo of the
beneficiary
Photo of the
beneficiary
Photo of the
beneficiary
Photo of the
beneficiary
Photo of the
beneficiary
Photo of the
beneficiary
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 74
Affidavit/Declaration Certificate
(To Be Furnished by Implementing Agency in INR 25/- Stamp Paper)
1. It is certified that I/We have read the guidelines issued by the Ministry vide No.---------
dated ----- and the related provisions/terms and conditions for availing Central Financial
Assistance (CFA) from the Ministry of New and Renewable Energy and I/We agree to
abide by these guidelines and related terms and conditions. Failure to comply with these
guidelines will result in denial of CFA by the Ministry.
2. This is to certify that Shri ………………… (Name and Designation) of ……………
(Organization) visited the proposed site on (Date) ……….. and found that there
is………… sq. m of south facing shadow free area is available at the site for installation
of the power plant. The latest photograph of the front view of the proposed site with date
is enclosed with the certificate. After installation photograph will be taken in same view
and will be submitted with completion report.
3. We confirm that the present proposal in full or part has not been submitted/has been
submitted to any other agency for seeking support (In case proposal has been submitted
to any other agency or under consideration all details and a copy of the proposal must be
submitted along with the present proposal). The present proposal has neither been
submitted to MNRE nor the CFA has been availed from MNRE for the same proposal.
4. This is to certify that the various components of the PV module/inverter/meter/ battery(if
any), electric wires, BOS etc. will conform to the Relevant Standards, as mentioned in
the ‘Guidelines for Off-Grid and Decentralized Solar Applications for SPV Modules and
Components/Grid Connected Rooftop and Small Solar Power Plants Under JNNSM’.
Copies of the relevant IEC/BIS certificates has been maintained in the office.
5. We confirm that the individual applications, beneficiary’s identification, photograph of the
systems and the beneficiary of each along with detailed specifications of various
components have been received in the prescribed format. It has been kept and
maintained in our office. For any audit and inspection, it will be shown to the concerned
officer/ authority.
6. We agree to place the details and photographs of the system and beneficiary on our
website for all systems.
7. We will provide/feed the data in the online monitoring system regularly as per instruction
of MNRE.
8. The plant site has been/will be inspected/verified by us and the final claim will be made
after the plant/system has been found satisfactory in all respect and fit/eligible for
receiving subsidy/CFA from MNRE.
9. The failure to comply with these guidelines will result in denial of CFA by MNRE.
I also hereby declare that all information submitted in the proposal are true to the best of
knowledge and belief. This is to confirm that in case of any dispute, the decision of
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 75
Secretary, Ministry of New and Renewable Energy, Government of India will be final and
binding on all.
Signature…………..………....
Name and Designation of Authorized Signatory*
of Implementing Agency
Place:
Date:
*Authorized signatory should be at least in the rank of District Manager of SNA.
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 76
Agreement/Consent/Certificate From User/ Beneficiary
(To Be Furnished by User/Beneficiary on INR 25/- Stamp Paper)
1. This is to certify that I .... S/o Shri ………………………………….. Resident of
……………………............... herewith agree to install the Grid Connected Rooftop
Project/Small Power Plant of ………… kWp capacity as per details submitted in the
Form B/DPR of the proposal.
2. I confirm that the CFA received will be utilized for this project only and not for any other
purpose. I herewith also confirm that the balance cost in addition to the CFA will be met
by me from my own/other resources.
3. I agree that the roof space will be made available in the proposed project site and is
owned by me/leased to me by the owner.
4. This is also confirmed that I will extend full cooperation including access to the project
site premise to the implementing/executing agency during installation and O&M, of the
plant.
Signature…..………………..………….……
Name and Designation, Organization, Address
of the User/Beneficiary
(With Seal If Available)
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 77
ANNEXURE IV: FORM S2
Format of In-Principle Sanction Letter NREDCAP/OSD/GCRT/Domestic/61A/2016 Dt. To The Beneficiary Sir,
Sub: Installation of ___ kWp grid connected SPV power plants at______________ _____________________________________ - Reg.
Ref: 1) MNRE in principal sanction letter no. 03/73/2015-16/GCRT Dt.1.12.2015 2) Your proposal dated: _____________. We invite your attention to your proposal submitted vide reference 2nd cited for installation of ___ kWp grid connected Solar roof top system at ______________________________________________. Taking into consideration the in principle sanction communicated by MNRE vide reference 1st cited, in principle sanction is hereby accorded for taking up installation of ___ kWp grid connected solar rooftop system as per the terms and conditions detailed below:
1. The system shall be installed as per minimum technical requirements/standards for
SPV systems/plants given in sanction no.30/11/2012-13/NSM dt.26.6.2014 in vogue
and amended time to time.( Refer to MNRE website: www.mnre.gov.in)
2. The installation shall be taken up through NREDCAP empaneled suppliers only
as per the finalized rate contract rates.
3. Only indigenously manufactured PV modules will be used in the project.
4. The consent letter from respective DISCOM indicating their willingness/consent for
installation of grid connected solar rooftop system shall be submitted.
5. The maximum CFA will be limited to 30 percent of the project cost subject to
maximum of INR 21.00 per watt. The eligibility of Central Financial Assistance
(CFA) shall be as per the guidelines of Ministry of New and Renewable Energy
(MNRE) in vogue and amended time to time.
6. Proper metering arrangement may be incorporated so that the generation data from
the proposed SPV power plants will be available.
7. The installation of the system shall be completed and commissioned by
(date).
8. The release of CFA is subject to sanction and release of funds by MNRE and
submission of all relevant documents.
9. After completion and commissioning of the project the following documents shall be
submitted in duplicate for considering release of CFA.
1. Copy of Work Order.
2. Copy of Invoice.
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 78
3. Joint inspection report in original.
4. Project completion report in original.
5. Photographs (with beneficiary/organization)
6. Synchronization letter.
7. Statement of Expenditure (SOE) duly certified by Chartered Accountant in
original.
8. One-month electricity bill (after commissioning).
9. Authorization letter for disbursement of subsidy to the System Integrator.
10. Beneficiary photo, copy of ID proof (Aadhar card) and sanction letter.
Thanking you,
Signature
VC and MD
Copy to the District Manager, NREDCAP, _________ Dist. for information and necessary
action.
Copy to DGM (F and A), NREDCAP, for information.
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 79
ANNEXURE V: FORM S3 Joint Inspection Report
Certificate
(To Be Furnished by SNA/PSU/Channel Partner)
This is to certify that Shri………………………... (Name and designation) of……………….…
(organization) visited the …….… Nos. of plant sites on (date)……………. and found that
the grid connected rooftop systems as per the details enclosed have been installed in the
respective sites. The system has been completed and commissioned in all respect. It was
found working properly to the satisfaction of the user/ beneficiary. The latest photograph of
the system installed in the site with date is enclosed with the certificate. The system was
installed and commissioned on __________.
Signature Signature Signature
………………………… …………………………… ……………………………
Name and Designation of
Authorized Signatory* of
System Integrator With
Official Seal
Name and Designation of
Authorized Signatory of SNA
With Official Seal
Name and Designation of
Authorized Beneficiary/User
With Official Seal If any
Place: Date: *Authorized signatory should be at least in the rank of District Manager of SNA.
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 80
ANNEXURE VI: FORM S4 Project Completion Report for Solar Power Plants Under Net Metering Scheme
Sr. No. Component Observation
1.
Name and address of the beneficiary with
mobile No. and Email ID
2. Site location with complete address
3. Name of systems integrator/supplier
4. Capacity of system installed (kWp)
5. Specification of SPV modules
Types of modules(multi/mono)
Make of modules and year of manufacturing
Wattage and No. of modules
SI No. of modules
IEC Certificate date of issue, Agency, validity,
enclose IEC certificates
Whether imported or indigenous
RFID tag is pasted inside or out side
Type of RFID
6. PCU
Make and rating type of charge
controller/MPPT
Capacity in inv and year of manufacturing
Whether hybrid or stand alone
Whether indigenous or imported
Enclose test certificate as per MNRE
requirement
7. Batteries (where ever applicable )
Make of modules and year of
manufacturing
Type: Tubular Lead acid/VRLA/GEL
Rating and Nos.
No. of series and parallel combination
Enclosed test certificate as per MNRE
Requirement
Depth of discharge proposed
8. Structures (as per MNRE)
9. Whether system grouting
10. Cable make and size
Enclose certificates rating
11. Distribution box
Name
Make
Certificate
12. Earthling and protections
Lighting arrestor (type)
13.
Power bill (after installation of net meter) for two
month period
14.
Name and technical person trained to maintain
system with mobile number
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 81
Declaration
It is certified that all the components/subsystems and materials including junction boxes,
cables, distribution boards, switches, circuit breakers used as per MNRE requirement
and as per DPR submitted.
Signature of Customer Signature of Supplier Signature of the NREDCAP Official
Date: Place:
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 82
ANNEXURE VII: FORM S5
Format for Statement of Expenditure (SOE) (On the Letterhead of Auditor)
Name of the State
Implementing Agency
Name of the Project
Sanction No. and Date
CFA Sanctioned
CFA From MNRE
State Subsidy, If any
CFA Released
CFA From MNRE
State Subsidy, If any
Details About Completed Project
Sl. No.
Name of
the
Customer
Type of
the
System
Capacity
Installed
(kWp/No.) Location
Total
Expenditure
Incurred
(in INR)
MNRE
Share
(in INR)
User
Share
(in INR)
Total
Breakup of the CFA
Sl. No. Item Cost (in INR)
1.
CFA @ 30 percent for the capacity ____kWp SPV
grid connected power project
2. Service charges
3. Total eligible CFA (MNRE/State)
4. CFA released (MNRE/State)
5. Interest earned on released CFA
6. Total funds available (in case of advance release)
7.
Balance amount to be released by MNRE/unspent
amount to be returned to MNRE
(Charted Accountant)
Reg. No.
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 83
ANNEXURE VIII: FORM S6
Declaration
This is to certify that M/s__________________________ has installed _____ kWp
grid connected solar rooftop PV system as per MNRE specifications on our building (name
and address) and the system is working satisfactorily. Hence I request you to release the
eligible central and State Subsidy to M/s______________ (System Integrator) or
__________ (beneficiary name)
Dt: Signature:
Name:
Address: Witness:
1.
2.
Counter Signature by the Project Director/Dist. Manager, NREDCAP With Seal
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 84
ANNEXURE IX: FORM 1(A)
DISCOM Application Form for Solar Grid Interactive Rooftop and Small SPV Power Plants (In Terms of G.O.Ms.8 Dt:12.02.2015 of GOAP)
(To be Submitted by Applicant)
1. DISCOM Name*: APEPDCL/APSPDCL
(Details linked to registration on USRTP)
2. Service Connection Number* (SC No.)
Site Details
3.
Consumer Details
(Details linked to EPCCB
portal/APSPDCL portal)
Name:
Father/Husband’s Name:
Connected Load
Contracted Load:
Phase Type:
Category:
4.
Address of the site for installation*
(Details linked to EPCCB
portal/APSPDCL portal)
Door No./House No.:
Street Name:
Landmark:
Village Name:
Mandal Name:
District Name:
Pin code:
5. Section Name*
6. Plant Location* Latitude:
Longitude:
7. Proposed SPV plant capacity* (kWp) ----------
8. Approved plant capacity (kWp)
9. Connectivity Level* HT > 56 kW and above
LT ≤ 56 kW
10. Option for net metering/gross metering*
11. Existing DT Capacity (For HT Applicants
only)
12. Installing Agency*
Communication Details
13.
Name of the Registered Applicant/
Organization
(Details linked to registration on USRTP)
14. Primary Contact Name* (Non-residential
Consumers)
Affix recent Passport
Size Photo of
Applicant/Office bearer
of Group/Society
Affix recent Passport
Size Photo of
Applicant/Office bearer
of Group/Society
Affix recent Passport
Size Photo of
Applicant/Office bearer
of Group/Society
Affix recent Passport
Size Photo of
Applicant/Office bearer
of Group/Society
Affix recent Passport
Size Photo of
Applicant/Office bearer
of Group/Society
Affix recent Passport
Size Photo of
Applicant/Office bearer
of Group/Society
Affix recent Passport
Size Photo of
Applicant/Office bearer
of Group/Society
Affix recent Passport
Size Photo of
Applicant/Office bearer
of Group/Society
Affix recent Passport
Size Photo of
Applicant/Office bearer
of Group/Society
Affix recent Passport
Size Photo of
Applicant/Office bearer
of Group/Society
Affix recent Passport
For Office Use:
USRTP Application No.:
DISCOM Application No.:
Date:
Application Fee Details:
Transaction No:
Transaction Amount:
Date of Payment:
For Office Use:
USRTP Application No.:
DISCOM Application No.:
Date:
Application Fee Details:
Transaction No:
Transaction Amount:
Date of Payment:
For Office Use:
USRTP Application No.:
DISCOM Application No.:
Date:
Application Fee Details:
Transaction No:
Transaction Amount:
Date of Payment:
For Office Use:
USRTP Application No.:
DISCOM Application No.:
Date:
Application Fee Details:
Transaction No:
Transaction Amount:
Date of Payment:
For Office Use:
USRTP Application No.:
DISCOM Application No.:
Date:
Application Fee Details:
Transaction No:
Transaction Amount:
Date of Payment:
For Office Use:
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 85
15.
Mobile No.*
(Details linked to registration on USRTP)
Phone No.
(Details linked to registration on USRTP)
16. Registered Email ID*
(Details linked to registration on USRTP)
17. Correspondence Address
H. No.:
Street Name:
Landmark:
Village Name:
Mandal Name:
District Name:
Pin code:
18.
Applicant has to submit self-attested
photo ID proof *
(Voter ID card/Passport/PAN
card/Aadhar card/Driving license)
Type of ID card submitted*
ID card No.*
19. Applicant Type* Individual or Group/Society
20. In case of Group/Societies Attach Form 1B
21. Consumer Bank Details*
Account No.:
Bank Name
Branch Name:
IFSC Code:
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 86
Declaration
I hereby declare that the information furnished above is true to the best of my
knowledge and belief. If false, APSPDCL/APEPDCL has the right to reject/cancel the
application. Further, I hereby agree with the specifications, terms and conditions
stipulated by APSPDCL/APEPDCL for the selection and installation of solar rooftop
power plant.
Place: Signature:
Date: Name:
CHECK LIST: 1. Identity Proof (YES/NO)
2. Copy of latest electricity bill (YES/NO) 3. Authorization Certificate and Declaration for Groups and Societies (YES/NO)
4. Scanned Copy of a Cancelled Cheque (YES/NO)
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 87
ANNEXURE X: FORM 1 (B)
Authorization Certificate and Declaration for Groups/Societies (To be submitted by Applicant)
Authorization Certificate
(For the application registered for installation of renewable energy system under net/gross
metering program on behalf of a Trust/Committee/Housing Society etc.)
Date: ______________
We, ________________________________________________________ (Name of Trust/
Company/Committee/Housing Society, etc.), residing at ___________________
_________________________________________________________________________
______________________________________ Pin: _____________ wish to participate in
the on-going net/gross metering plan for installation of RTSPV system initiated by DISCOM
and we accept all the terms and conditions mentioned in the application form and any other
formats laid down by DISCOM for this purpose.
Mr./Ms. ______________________________ (Name of Official/Person), residing at
______________________________________________________________ is hereby
mutually authorized to accept on our behalf, all the terms and conditions of the RTSPV net/
gross metering program regarding installation and commissioning of RTSPV system
mentioned under the Application form or any other format prepared in this behalf by
DISCOM and to execute such documents, agreements and other writings as may be
necessary or required for this purpose
Further, the above authorized person namely Mr./Ms. ______________________________
_________________________ (Name with Contact Number) is also nominated as the
contact person on our behalf for any matter relating to the Installation, Operation, and
Inspection of RTSPV system.
Signature/Name of authorized person/organization
(With Stamp)
Designation of authorized person
Name of the signing officer
Designation of the signing officer
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 88
Declaration
We hereby declare that the information furnished in application form is true to the best
of my knowledge and belief. If found false, APSPDCL/APEPDCL has the right to
reject/cancel the application. Further, I hereby agree with the specifications, terms and
conditions stipulated by APSPDCL/APEPDCL for the selection and installation of solar
rooftop power plant.
Place: Date:
Sr.
No.
Consumer Name Installation Capacity
Share (Percent)
Consumer
Service Number
Signature for
Consent
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 89
ANNEXURE XI: FORM 1 (C)
Acknowledgement Slip (Automated response by the DISCOM)
Acknowledgement Your application for setting up of solar grid interactive rooftop and small SPV power plant under policy on net metering in accordance with of G.O.Ms.No.8, Dt. 12.05.2015 of GOAP has been received along with application fee.
The following Rooftop Solar Application Number has been allotted to your application.
DISCOM Application Number
USRTP Application Number
Date of Application
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 90
ANNEXURE XII: FORM 2 Technical Feasibility Report
(To Be Filled by DISCOM)
A Name of the Applicant
1. Service Connection No.
2. Category
3. Distribution
4. Pole number
5. Section
6. Address
7. Mobile No.
B Distribution Transformer Details
1. Name of the SS
2. DTR capacity in kVA
3. Voltage ratio
4. Total connected load on the DTR (in kVA)
5. Addl. loads sanctioned so far (in kVA)
6. Already proposed loads (in kVA)
7. Total load on DTR : X=4+5+6 (in kVA)
8. SPV generators already connected capacity in kW
9. Proposed SPV generators capacity in kW
10. Total generation capacity Y = 8 + 9 (in kW)
11. Difference between load and generation capacity Z = X - Y
12.
Whether the transformer capacity is adequate to cater the
proposed generator in addition to the existing loads and
generators capacity with EPDCL and other sources (if any)
C Feeder Details
1. Name of the 11 kV feeder
2. Name of 33/11 SS from which 11 kV feeder is emanating
3 Type and size of the conductor
4. Current carrying capacity of the feeder
5. Total connected DTR capacity on this 11 kV feeder (KVA)
6
SPV generators connected on this feeder, if any, and their
capacity
7. Maximum load reached on the feeder in Amps and KVA
8. Remarks
D
Whether Technically Feasible or Not to Export the Power
From Proposed SPV Generator
Yes
No
Yes, with reduced capacity
of kWp
Assistant Divisional Engineer Superintending Engineer
Operations, ----------- Operations, --------------
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 91
ANNEXURE XIII: FORM 3 (A)
Intimation of Deficiency Scrutinized in the Application
(To Be Filled by DISCOM)
Date To (Name of the Applicant) ___________________________ Sub: Intimation of Deficiency Ref: Application No. _________ dated _____________. . Dear Sir/Madam, This is to inform you that we have received your above mentioned Application.
Deficiencies in Application: On scrutinizing the application the DISCOM has found that
deficiencies exist in the application, because of the under-mentioned reason:
Technical Constraints: After undertaking the technical feasibility inspection it is found that it
is not feasible for the DISCOM to provide connectivity up to the applied capacity. Technical
constrains exist due to the under-mentioned reason:
.
However, the connectivity is feasible for a reduced capacity of ____ kW.
Based on this communication, the Applicant can:
1. Accept the connectivity at reduced capacity or
2. Withdraw the Application.
Please complete the above query within seven days of receipt of this intimation and submit the response as per ‘Response of Applicant for Removal of Deficiencies as Intimated After the Technical Feasibility’. In case you have not completed the formality within the given period, your application shall stand cancelled and paid fees, if any, shall not be refunded.
(Signature of Officer)
Designation of Authorized Officer
(ADE [Operations], Sub-Division Name/ SE[Operations], Circle Name)
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 92
ANNEXURE XIV: FORM 3 (B)
Intimation for Non-Feasibility and Termination of Application (To Be Filled by DISCOM)
Date To (Name of the Applicant) _________________________ Sub: Intimation for non-feasibility and termination of application
Ref: Application No. ___________; dated ___________.
Dear Sir/Madam,
This is to inform you that we have received your above mentioned application and on
technical scrutiny have found that:
The application is not feasible at this stage due to the following reasons:
___________________
___________________ (others, if any)
The application hereby stands terminated.
(Signature of Officer) Designation of Authorized Officer
(ADE [Operations], Sub-Division Name/ SE[Operations], Circle Name)
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 93
ANNEXURE XV: FORM 4
Response of Applicant for Removal of Deficiencies as Intimated After the Technical Feasibility
(To Be Filled by Applicant)
To The ADE (Operations)/SE(Operations) ____________ (Name of Sub-Division/Division/Circle) ____________ (Distribution Licensee Name) Sub: Response to Intimation on Deficiencies Ref: Application No. ____________; dated____________.
Dear Sir/Madam,
The response to deficiencies/technical constraints intimated by DISCOM is as follows.
Deficiencies in Application: The deficiencies in the application have been resolved by
undertaking the following corrective actions.
.
.
Technical Constraints:
The applicant will exercise the following option (tick the appropriate choice):
1. I accept the connectivity at reduced capacity as intimated by the DISCOM vide letter
dated _____ and request the DISCOM to process the case.
2. I withdraw my application.
(Signature of Applicant)
Name of Applicant
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 94
ANNEXURE XVI: FORM 5
Letter of Approval for Consumer With Respect to the Application for Net/Gross Metering and Grid Connectivity of Grid Connected Rooftop Solar PV System
(To Be Filled by the DISCOM)
Date:
To _________ (Name of the Applicant) _____ _ (S.C. No) Sub: Letter of Approval for Installation of Solar Rooftop System Ref: Application No. _________ Dated_________.
With reference to your above mentioned application number, approval is herewith accorded
for installing RTSPV of___________ kWp in your premises as per following terms and
conditions:
1. It is recommended that you select an empaneled system installer of your choice to
install the RTSPV system. A list of empanelled installers of grid-connect PV systems
by MNRE / NREDCAP is available on USRTP website.
2. All components of RTSPV system must comply with applicable BIS/IEC standards.
The list of standards to be complied with is available on USRTP website.
3. Applicant must submit the copy of Manufacturers Test Certificates for all components
for having complied with relevant BIS/IEC standards of the selected model along with
work completion report.
4. In case of any changes required at the premises of proposed site due to this
proposed installation, these shall be performed by applicant at own cost.
5. The grid connectivity of the system shall be in accordance with Solar Rooftop Policy/
Guidelines and any amendments thereof from time to time.
6. To procure net meter from DISCOM, applicant needs to intimate the same to
DISCOM by filling Form 7(A) along with net meter fee at least 15 days prior to the
expected installation completion date (fee details and technical specifications can be
found on DISCOMs/USRTP website).
7. In case the applicant is required to purchase the net meter on their own (with prior
permission from DISCOM), the same shall be purchased from DISCOM approved
vendors (as per DISCOMs approved technical specifications). These meters shall be
successfully tested from DISCOM or their authorized laboratory.
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 95
8. The DISCOM shall install meter and synchronize the RTSPV system with the grid
only on receiving NOC (for >10 kWp systems) from CEI/EI. For systems exempt from
NOC from CEI/EI, consumer need to submit safety certificate issued by a concerned
DISCOM engineer vide G.O.Ms 21.
9. Installed system must comply with safety requirements as stated in CEA/APERC
Regulations and all standards referred to in those regulations.
10. You are further requested to enter into the Agreement on Rs 10/-stamp paper as per
the Format 6(A)/ 6(B) within 15 days from receipt of this letter.
11. Please submit the following documents after installation of RTSPV system:
a. Inspection Report by Chief Electrical Inspector/Electrical Inspector,
Government of AP.
b. Work Completion Report in Form 8.
c. Test Certificate of Net meter from DISCOM approved laboratory, if applicable.
This approval is valid for three months from the date of this letter and the RTSPV system
should be installed within this period.
You may download all technical specifications, standards, and other requirements of the
solar rooftop system from ____________ (link to website of documents download).
Signature of Officer:
Name and Designation (ADE [Operations]/SE [Operations]):
Date:
Stamp:
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 96
ANNEXURE XVII: FORM 6(A)
Solar Rooftop Net/Gross Metering Connection Agreement (Individual Consumer)
(On Non-Judicial Stamp Paper Worth INR 10/-)
This Agreement is executed and entered into at (location) _______ on this (date) ___ day
of____ (month) _____ (year) between the Eligible Consumer, M/s/Mr./Mrs.
_________________ S/o, D/o, W/o _______________ residing at ____________(address)
__________________________________________which means their/his/its/ theirs,
successors as first party and _______Power Distribution Company Ltd. (herein after called
as DISCOM) and having its registered office at _______________________ (address)
______________________________________ as a DISCOM incorporated under the
provisions of Companies Act 1956 consequent to the AP Electricity Reforms Act, 1998
(which means its authorized representatives assigns, executors and its successors) as other
party herein after called the ‘Discom’.
Whereas, the eligible consumer has taken the responsibility to set up or facilitate the
requisite photovoltaic system and injection of power into the DISCOM’s grid
And whereas, the DISCOM agrees to benefit the eligible consumer for the electricity
generated and as per conditions of this Agreement and solar rooftop guidelines.
Both the party hereby agrees to as follows:
1. Eligibility
1.1 Eligible consumer is required to be aware, in advance, of the standards and conditions
his system has to meet for being integrated into grid/distribution system.
1.2 Eligible consumer agrees that connection of photovoltaic system to DISCOM’s
distribution system shall be bound by requirements of state Distribution Code and/or
DISCOM’s conditions of service. The grid shall continue to perform with specified
reliability, security and quality as per the Central Electricity Authority (Grid Standard)
Regulations, 2010, as amended from time to time.
1.3 All registered companies, government entities, partnership companies/firms, individuals
and all consumers of APDISCOM(s) will be eligible for setting up of solar power projects
within the state for sale of electricity/captive use, in accordance with the Electricity Act,
2003, and Andhra Pradesh Solar Power Policy, as amended from time to time.
1.4 Group of persons/societies will also be eligible for setting up Solar Rooftop Projects
(SRP) for sale of electricity to DISCOM/captive use or for self-consumption.
2. Capacity of the SPV Plant and Maximum Contracted Load of the Premises
2.1 The Eligible Developer/Consumer is proposing to install rooftop solar power plant of
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 97
_____ kWp capacity under solar _________ (Net/Gross) metering facility at D. No.
____,Street____, ___ (V), ____ (M),_____ (Dist.) having electrical service Connection
No.__ __, Category_______, Distribution______ for a contracted load of
____kW/HP/KVA. The Eligible Developer have requested DISCOM to provide grid
connectivity/necessary permissions to connect rooftop solar power plant and supply
solar energy into the distribution network of DISCOM at_______ voltage level which shall
be extended for a period of 25 years.
3. Governing Provisions
The Eligible Developer hereby undertake to comply with all the requirements of the
Electricity Act, 2003, the Rules and Regulations framed under, provisions of the tariffs,
applicable Charges and General Terms and Conditions of Supply prescribed by the
DISCOM with the approval of the Andhra Pradesh Electricity Regulatory Commission herein
after called as “Commission” from time to time and agree not to dispute the same.
4. Technical and Interconnection Requirements
4.1 Eligible consumer agrees that he will install, prior to connection of photovoltaic system to
DISCOM’s distribution system, an isolation device and agrees for the DISCOM to have
access to and operation of this, if required, for repair and maintenance of the distribution
system.
4.2 Eligible consumer agrees that in case of a power outage on DISCOM’s system,
photovoltaic system will shut down, unless special transfer and isolating capabilities have
been installed on photovoltaic system. The DISCOM shall not be obligated to accept and
may require the Eligible Developer to interrupt or reduce deliveries when necessary with
a reasonable notice to the Eligible Developer.
4.3 The Eligible Developer shall strictly adhere to the standards specified by CEA/MNRE
and installations of electrical equipment must comply with Indian Electricity rules, 1956.
4.4 The Eligible Developer can install SPV on building walls also.
4.5 Prior approval of Chief Electrical Inspectorate General (CEIG) is required in case of an
SRP connected at LT level of distribution network with more than 10 kW capacity.
4.6 Eligible consumer agrees that DISCOM will specify the interface/interconnection point
and metering point.
4.7 Eligible consumer agrees to adhere to following power quality measures as per
International or Indian standards and/or other such measures provided by
Commission/DISCOM.
a. Harmonic current: Harmonic current injections from a generating station shall not
exceed the limits specified in IEEE 519.
b. Synchronization: Photovoltaic system must be equipped with a grid frequency
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 98
synchronization device.
c. Voltage: The voltage-operating window should minimize nuisance tripping and should
be under operating range of 80 percent to 110 percent of the nominal connected
voltage. Beyond a clearing time of 2 seconds, the photovoltaic system must isolate
itself from the grid.
d. Flicker: Operation of photovoltaic system shouldn’t cause voltage flicker in excess of
the limits stated in the relevant sections of IEC standards or other equivalent Indian
standards, if any.
e. Frequency: When the distribution system frequency deviates outside the specified
conditions (50.5 Hz on upper side and 47.5 Hz on lower side), the photovoltaic
system shouldn’t energize the grid and should shift to island mode.
f. DC Injection: Photovoltaic system should not inject DC power more than 0.5% of full
rated output at the interconnection point or 1% of rated inverter output current into
distribution system under any operating conditions.
g. Power Factor: While the output of the inverter is greater than 50%, a lagging power
factor of greater than 0.9 should operate.
h. Islanding and Disconnection: The photovoltaic system in the event of voltage or
frequency variations must island/disconnect itself within IEC standard on stipulated
period.
i. Overload and Overheat: The inverter should have the facility to automatically
switch off in case of overload or overheating and should restart when normal
conditions are restored.
j. Paralleling Device: Paralleling device of photovoltaic system shall be capable of
withstanding 220% of the nominal voltage at the interconnection point.
k. The maximum penetration limits at the LT level of distribution network are as
specified in the Table below:
Year Maximum Penetration Limit — Ratio of Aggregate Installed
SRP Capacity Under the DTR to the DTR Capacity
FY 2015-16 50 percent
FY 2016-17 60 percent
4.8 Eligible consumer agrees to furnish all the data such as voltage, frequency, and
breaker, isolator position in his system, as and when required by the DISCOM.
4.9 Grid connectivity and evacuation facility:
The power generated from a solar power project shall be injected at an appropriate
voltage at the substation and/or interconnection point of the APTransco/DISCOM(s).
The Eligible Developer shall bear the entire cost of construction of power evacuation
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 99
facilities from the project up to the interconnection point and/or up to
APTransco/DISCOM(s) substation.
The Eligible Developer shall abide by the orders, rules, regulations, and terms and
conditions as approved by the Commission from time to time for operation of solar
power projects, power evacuation, transmission and wheeling of energy. Solar power
projects will be exempted from paying the supervision charges to APTransco/
DISCOM(s) towards the internal evacuation infrastructure within the project site and
up to interconnection point. Any upstream system-strengthening requirement shall be
borne by APTransco/DISCOM(s) on a priority basis.
4.10 It is imperative to seek the technical details of the installation infrastructure from the
supplier at the time of system installation and retain with the Eligible Developer/
consumer.
5. Implementation Process
Implementation of solar rooftop net/gross metering facility will be as per the following
guidelines:
a) Under Net Metering, power is first sent to the appliances and lights in the house, and if
excess remains, it is exported to the outside electricity network and its quantum
recorded.
i) Under Gross Metering, all solar electricity generated is exported to the outside
electricity network through an independent meter.
ii) Eligible Developers are allowed to avail the relevant subsidies and incentives from
MNRE and from other Departments.
iii) The eligible subsidy may be processed through NREDCAP (Nodal agency) or
Channel Partners of MNRE, GOI. The sanction and release of the subsidy will be
as per the guidelines issued by MNRE from time to time.
iv) Incentives/Other Charges/Administrative Fee — No distribution losses and charges
will be collected from the Eligible Developers/Group/Society/Individuals by the
DISCOMs. All other charges shall be applicable as per the Tariff Order amended
from time to time. The registration and facilitation fees shall be paid by Eligible
Developer to Nodal Agency as specified in the Policy.
5.1 Request for Connectivity
The eligible consumer will submit the required information in the prescribed format to the
DISCOM and get the proper acknowledgement and shall also provide related
interconnection equipment as per the DISCOM’s technical requirements, including safety
and performance standards. To prevent a net metering the eligible consumer from back-
feeding a de-energized line, the eligible consumer shall install an isolator switch that is
accessible to company personnel at all hours.
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 100
The customer shall not commence parallel operation of the net metering facility until the
customer has received approval to operate from the competent authority of DISCOM.
Modifications or changes made to a generator shall be evaluated by the DISCOM prior to
modifications/changes. The eligible consumer shall provide detailed information describing
the modifications or changes to the DISCOM in writing prior to making the modification to the
generating facility. The DISCOM shall review the proposed changes to the generating facility
and provide the results of its evaluation to the eligible consumer within forty- five (45)
calendar days of receipt of the customer’s proposal. Any items that would prevent parallel
operation due to violation of applicable safety standards and/or power generation limits shall
be explained along with a description of the modifications necessary to remedy the
violations.
5.2 Metering and Synchronization
All meters must be Smart Meters as per the standards specified by the CEA regulations as
amended from time to time. Eligible Developers shall be free to procure Meters, Current
Transformers (CT), and Potential Transformer (PT) either from open market or DISCOM. If
the metering equipment is purchased by the developer, the same is to be tested at standard
laboratory with consumer’s expenses.
Meter reading shall be done as per the prevailing DISCOM procedure. The applicable
customer charges shall be payable to DISCOM.
Billing process shall start within one month/next billing cycle after synchronizing the SRP
plant.
5.3 Energy Settlement and Billing/Invoicing
Energy settlement shall be done on a monthly basis. Group of persons/societies setting up
SRPs will be treated as collective generation for supply of power to the households of each
society /group member. In case of Apartments/Group Houses, common meter may be used
for net metering
Net Metering: The energy generated from SRP shall be adjusted against the consumption
of energy from the DISCOM by the Eligible Developer/Consumer every month. In case of
Groups/Societies, the energy generated shall be prorated as per the installed capacity share
indicated in the Agreement between the group/society and DISCOM. This computed energy
share shall be adjusted against the consumption of energy for each consumer every month.
In case of excess generation (after energy adjustment) in any month, payment shall be
made by the DISCOM for the net energy computed at the Average Cost to Serve
(ACS) as determined by APERC every year.
In case of excess consumption in any month, payment shall be made by the Eligible
Developer/Group/Society for the net energy at the applicable tariff as determined by
APERC every year.
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 101
Gross Metering: The payment for energy generated from SRP will be computed at the
Average Cost to Serve (ACS) of the DISCOM as determined by APERC every year. This
shall be adjusted against the total billing demand for consumption of energy for the Eligible
Developer/Consumer from the DISCOM every month. The balance amount after adjustment
for the month shall be made by the DISCOM.
A limit shall be defined for all Eligible Developers in terms of energy, beyond which no
payment shall be made by APDISCOM.
6. Access and Inspection
a) The DISCOM’s personal may enter the eligible consumer’s premises to inspect the
eligible consumer’s protective devices and read or test the meter.
b) DISCOM personnel reserve the right to inspect the SRP routinely at any time during the
term of the Agreement. As part of the inspection, DISCOM officials have to ensure that
check the following aspects:
All protective equipment of the SPV system are functioning as per specifications.
The SPV system including the panels, inverters, etc. continue to meet the
requirements of Indian & IEC standards post installation till contract completion.
c) An Eligible Developer, found indulging in theft of electricity or unauthorized use of
electricity, shall pay the additional charges as may be levied by the DISCOM as per
provisions of Electricity Act 2003. DISCOM may levy additional charge besides
disconnection of electricity supply.
7. Safety
7.1 Eligible consumer shall comply with the Central Electricity Authority (Measures Relating
to Safety and Electricity Supply) Regulations 2010 as amended from time to time.
7.2 Eligible consumer agrees that the design, installation, maintenance and operation of the
photovoltaic system are performed in a manner conducive to the safety of the
photovoltaic system as well as the DISCOM’s distribution system.
7.3 Due to DISCOM’s obligation to maintain a safe and reliable distribution system, eligible
consumer agrees that if it is determined by DISCOM that eligible consumer’s
photovoltaic system either causes damage to and/or produces adverse effects affecting
other distribution systems’ consumers or DISCOM’s assets, eligible consumer will have
to disconnect photovoltaic system immediately from the distribution system upon
direction from the DISCOM and correct the problem at his own expense prior to a
reconnection.
8. Clearances and Approvals
8.1. ------------------------------------------------------------------------------------------------------------------
8.2 All the approvals/clearances required to avail the metering facility shall be disposed by
the respective DISCOM within 14 days from the date of application.
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 102
8.3 The eligible consumer agrees to attain all the necessary approvals and clearances
before connecting the photovoltaic system to the distribution system.
8.4 Approvals shall be given only to those Eligible Developer with maximum allowable
capacity under single-phase service is 3 kWp and maximum allowable SPV plant
capacity under LT category is 56 kWp. For HT service, consumer shall be responsible to
match the SPV plant capacity with the DTR capacity.
8.5 The SRP capacity should be up to 1,000 kWp at a single location.
9. Injection of Solar Power
The solar power produced shall be injected in to the DISCOM network only after obtaining
prior approval from DISCOM and meeting all the requirements of departmental standards,
viz., protection switchgear, metering, feasibility approval etc.
10. Liabilities
10.1 Eligible consumer and DISCOM will indemnify each other for damages or adverse
effects from either party’s negligence or intentional misconduct in the connection and
operation of photovoltaic system or DISCOM’s distribution system.
10.2 DISCOM and eligible consumer will not be liable to each other for any loss of profits or
revenues, business interruption losses, loss of contract or loss of goodwill, or for indirect,
consequential, incidental or special damages, including, but not limited to, punitive or
exemplary damages, whether any of the said liability, loss or damages arise in contract,
or otherwise.
10.3 DISCOM shall not be liable for delivery or realization by eligible consumer for any fiscal
or other incentive provided by the central/state government.
11. Commercial Settlement
11.1 All the commercial settlement under this Agreement shall be made according to solar
rooftop guidelines and regulations of Electricity Regulatory Commission.
12. Connection Costs
12.1 The eligible consumer shall bare all costs related to setting up of photovoltaic system
including metering and interconnection costs.
12.2 Cost for interconnection equipment including the isolators, meters etc. are also to be
borne by the eligible consumer.
13. Date of Enforceability of the Agreement
This Agreement will be in a force for a period of 25 years or up to the tenure of the project
whichever is earlier from the date of commencement of this Agreement, until the eligible
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 103
consumer meet all the requirements, rules and conditions of this Agreement and the system
and its operation is in accordance with the Andhra Pradesh Solar Power Policy – 2015, and
its future amendments, if any.
14. Dispute Resolution
If, at any time, the DISCOM reasonably determines that either the eligible consumer may
endanger the DISCOM’s personnel or other persons or property, or the continued operation
of the consumer’s generator may endanger the integrity or safety of the DISCOM’s electric
system, or the consumer is not operating the system in compliance with the terms and
conditions of this Agreement the DISCOM shall have the right to disconnect and lock out the
SPV generator facility from the company’s electric system until the DISCOM is reasonably
satisfied that the SPV generator can operate in a safe and complain manner.
Any other disputes arising under/out of this Agreement shall be resolved promptly in good
faith and in an equitable manner by both the parties. Failing resolution of the dispute, party
may approach the commission under Section 86 (1) (f) of EA 2003.
15. Termination
15.1 The SRP shall be installed within three (3) months from the date of Agreement. In case
of any delay beyond three months, one time extension of 15 days shall be provided
after which the Agreement shall be deemed terminated without any reason.
15.2 The eligible consumer can terminate Agreement at any time by providing DISCOM with
90 days prior notice.
15.3 DISCOM has the right to terminate Agreement on 30 days prior written notice, if eligible
consumer breaches a term of this Agreement and does not remedy the breach within
30 days of receiving written notice from DISCOM of the breach.
15.4 Eligible consumer agrees that upon termination of this Agreement, he must disconnect
the photovoltaic system from DISCOM’s distribution system in a timely manner and to
DISCOM’s satisfaction.
16. Resale of Electric Power
The eligible consumer shall not sell electricity generated under this Agreement without the
sanction in writing obtained from the DISCOM.
17. Obligation of Consumer to Pay All Charges Levied by DISCOM
The eligible consumer shall abide by the rules and shall pay the maximum demand
charges, energy charges, surcharges, and other charges, if any, to the DISCOM in
accordance with the notified Tariff besides the applicability of the General Terms and
Conditions of Supply prescribed by the APERC from time to time.
18. Theft of Electricity or Unauthorized Use of Electricity
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 104
The eligible consumer, found indulging in theft of electricity or unauthorized use of electricity
shall pay the penal/additional charges as may be levied by the DISCOM besides
disconnection of supply as per the provisions of IE Act 2003 and General Terms and
Conditions of Supply.
In the witness, where of Mr. _________ for an on behalf of ________________ (eligible
consumer) and Mr. _________ for and on behalf of __________________ (DISCOM) agree
to this Agreement.
Signature of the Eligible Developer/
Consumer
Signature of the DISCOM Representative
Date:
Date:
Witness 1:
Witness 2:
Signature:
Signature:
Name and Address:
Name and Address:
Date: Date:
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 105
ANNEXURE XVIII: FORM 6(B)
Solar Rooftop Net/Gross Metering Connection Agreement (Societies/Group of Consumers)
(On Non-Judicial Stamp Paper Worth INR 10/-)
This Agreement is made and entered into at (location) _______ on this (date) ___ day of
_______ (month) ____ (year) between the group of persons/society (herein after called as
Eligible Developer/Consumer),represented by Shri./Smt. ________________S/o, ________
residing at ____ (address) ___________________________________________ as first
party AND _______Power Distribution Company of Andhra Pradesh Ltd. (herein after called
as DISCOM) and having its registered office at _____________ (address)
______________________________________ as a DISCOM incorporated under the
provisions of Companies Act 1956 consequent to the AP Electricity Reforms Act,1998
(Which means its authorized representatives assigns, executors and its successors) as other
party here in after called the “DISCOM”.
Whereas, the eligible consumer has taken the responsibility to set up or facilitate the
requisite solar photovoltaic system and injection of Power into the DISCOM’s grid
And whereas, the DISCOM agrees to benefit the eligible consumer for the electricity
generated and as per conditions of this Agreement and solar rooftop guidelines.
Both the party hereby agrees to as follows:
1. Eligibility
1.1 Eligible consumer is required to be aware, in advance, of the standards and conditions
his system has to meet for being integrated into grid/distribution system.
1.2 Eligible consumer agrees that connection of photovoltaic system to DISCOM’s
distribution system shall be bound by requirements of state Distribution Code and/or
DISCOM’s conditions of service. The grid shall continue to perform with specified
reliability, security and quality as per the Central Electricity Authority (Grid Standard)
Regulations 2010 as amended from time to time.
1.3 All registered companies, government entities, partnership companies/firms, individuals
and all consumers of APDISCOM(s) will be eligible for setting up of solar power projects
within the state for sale of electricity/captive use, in accordance with the Electricity Act,
2003 and Andhra Pradesh Solar Power Policy, as amended from time to time.
1.4 Group of persons/societies will also be eligible for setting up solar rooftop projects (SRP)
for sale of electricity to DISCOM/captive use or for self-consumption.
2. Capacity of the SPV Plant and Maximum Contracted Load of the Premises
2.1 The group of persons/society is proposing to install rooftop solar power plant of _____
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 106
kWp capacity under Solar _________(Net/ Gross) metering facility at D.No.
____,Street____, ___V,____(M)_____(Dist) against Common Service Connection
No_______,Category_____,Distribution______ and having individual electrical service
connections details furnished in the table below for a total contracted load of
____kW/HP/KVA and individual installed capacity share. The Eligible Developer has
requested DISCOM to provide grid connectivity/ necessary permissions to connect
rooftop solar power plant and supply solar energy into the distribution network of
DISCOM at_______ voltage level for the whole tenure of the project or 25 years
whichever is earlier.
2.2 The installed capacity share of members of the Group of persons/societies are as
follows:
Sl. No. Consumer Name Installed Capacity Share Consumer Service Number
3. Governing Provisions
The Eligible Developer hereby undertake to comply with all the requirements of the
Electricity Act, 2003, the Rules and Regulations framed under, provisions of the tariffs,
applicable charges and General Terms and Conditions of Supply prescribed by the
DISCOM with the approval of the Andhra Pradesh Electricity Regulatory Commission
herein after called as “Commission” from time to time and agree not to dispute the same.
4. Technical and Interconnection Requirements
4.1 Eligible consumer agrees that he will install, prior to connection of photovoltaic system to
DISCOM’s distribution system, an isolation device and agrees for the DISCOM to have
access to and operation of this, if required, for repair and maintenance of the distribution
system.
4.2 Eligible consumer agrees that in case of a power outage on DISCOM’s system,
photovoltaic system will shut down, unless special transfer and isolating capabilities have
been installed on photovoltaic system. The DISCOM shall not be obligated to accept and
may require the Eligible Developer to interrupt or reduce deliveries when necessary with
a reasonable notice to the Eligible Developer.
4.3 The Eligible Developer shall strictly adhere to the standards specified by CEA/MNRE
and installations of electrical equipment must comply with Indian Electricity rules, 1956.
4.4 The Eligible Developer can install SPV on building walls also.
4.5 Prior approval of Chief Electrical Inspectorate General (CEIG) is required in case of an
SRP connected at LT level of distribution network with more than 10 kWp capacity.
4.6 Eligible consumer agrees that DISCOM will specify the interface/inter-connection point
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 107
and metering point.
4.7 Eligible consumer agrees to adhere to following power quality measures as per
International or Indian standards and/or other such measures provided by
Commission/DISCOM.
a. Harmonic current: Harmonic current injections from a generating station shall not
exceed the limits specified in IEEE 519.
b. Synchronization: Photovoltaic system must be equipped with a grid frequency
synchronization device.
c. Voltage: The voltage-operating window should minimise nuisance tripping and should
be under operating range of 80% to 110% of the nominal connected voltage. Beyond
a clearing time of 2 seconds, the Photovoltaic system must isolate itself from the grid.
d. Flicker: Operation of photovoltaic system shouldn’t cause voltage flicker in excess of
the limits stated in the relevant sections of IEC standards or other equivalent Indian
standards, if any.
e. Frequency: When the distribution system frequency deviates outside the specified
conditions (50.5 Hz on upper side and 47.5 Hz on lower side), the photovoltaic
system shouldn’t energize the grid and should shift to island mode.
f. DC Injection: Photovoltaic system should not inject DC power more than 0.5% of
full rated output at the interconnection point or 1% of rated inverter output current
into distribution system under any operating conditions.
g. Power Factor: While the output of the inverter is greater than 50%, a lagging power
factor of greater than 0.9 should operate.
h. Islanding and Disconnection: The photovoltaic system in the event of voltage or
frequency variations must island/disconnect itself within IEC standard on stipulated
period.
i. Overload and Overheat: The inverter should have the facility to automatically switch
off in case of overload or overheating and should restart when normal conditions are
restored.
j. Paralleling device: Paralleling device of photovoltaic system shall be capable of
withstanding 220% of the nominal voltage at the interconnection point
k. The maximum penetration limits at the LT level of distribution network are as
specified in the table below:
Year Maximum Penetration Limit — Ratio of Aggregate Installed SRP
Capacity Under the DTR to the DTR Capacity
FY 2015-16 50 percent
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 108
Year Maximum Penetration Limit — Ratio of Aggregate Installed SRP
Capacity Under the DTR to the DTR Capacity
FY 2016-17 60 percent
4.8 Eligible consumer agrees to furnish all the data such as voltage, frequency, and breaker,
isolator position in his system, as and when required by the DISCOM.
4.9 Grid Connectivity and Evacuation Facility: The power generated from a solar power
project shall be injected at an appropriate voltage at the sub-station and/or
interconnection point of the APTransco/DISCOM(s). The Eligible Developer shall bear
the entire cost of construction of power evacuation facilities from the project up to the
interconnection point and/or up to APTransco/DISCOM(s) substation.
The Eligible Developer shall abide by the orders, rules, regulations and terms and
conditions as approved by the Commission from time to time for operation of Solar
Power Projects, power evacuation, transmission and wheeling of energy. Solar Power
Projects will be exempted from paying the Supervision charges to
APTransco/DISCOM(s) towards the internal evacuation infrastructure within the project
site and up to interconnection point. Any upstream system-strengthening requirement
shall be borne by APTransco/DISCOM(s) on a priority basis.
4.10 It is imperative to seek the technical details of the installation infrastructure from the
supplier at the time of system installation and retain with the Eligible Developer/
Consumer.
5. Implementation Process
Implementation of solar rooftop net/gross metering facility will be as per the following
guidelines:
I) Under Net Metering, power is first sent to the appliances and lights in the house, and if
excess remains, it is exported to the outside electricity network and its quantum
recorded.
i) Under Gross Metering, all solar electricity generated is considered as Export of
Energy into Electricity Network.
ii) Eligible Developers are allowed to avail the relevant subsidies and incentives from
MNRE and from other departments.
iii) The eligible subsidy may be processed through NREDCAP (Nodal agency) or Channel
Partners of MNRE, GOI. The sanction and release of the subsidy will be as per the
guidelines issued by MNRE from time to time.
iv) Incentives/Other Charges/Administrative Fee — No Distribution losses and charges
will be collected from the Eligible Developers/Group/Society/Individuals by the
DISCOMs. All other charges shall be applicable as per the Tariff Order amended from
time to time. The registration and facilitation fees shall be paid by Eligible Developer
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 109
to Nodal agency as specified in the Policy.
5.1 Request for Connectivity
The eligible consumer will submit the required information in the prescribed format to the
DISCOM and get the proper acknowledgement and shall also provide related
interconnection equipment as per the DISCOM’s technical requirements, including safety
and performance standards. To prevent a net metering the eligible consumer from back-
feeding a de-energized line, the eligible consumer shall install an isolator switch that is
accessible to company personnel at all hours.
The customer shall not commence parallel operation of the net metering facility until the
customer has received approval to operate from the competent authority of DISCOM.
Modifications or changes made to a generator shall be evaluated by the DISCOM prior to
modifications/changes. The eligible consumer shall provide detailed information describing
the modifications or changes to the DISCOM in writing prior to making the modification to the
generating facility. The DISCOM shall review the proposed changes to the generating facility
and provide the results of its evaluation to the Eligible Consumer within forty- five (45)
calendar days of receipt of the customer’s proposal. Any items that would prevent parallel
operation due to violation of applicable safety standards and/or power generation limits shall
be explained along with a description of the modifications necessary to remedy the
violations.
5.2 Metering and Synchronization
All meters must be Smart Meters as per the standards specified by the CEA regulations as
amended from time to time. Eligible Developers shall be free to procure Meters, Current
Transformers (CT), and Potential Transformer (PT) either from open market or DISCOM. If
the metering equipment is purchased by the Developer, the same is to be tested at standard
laboratory.
Meter reading shall be done as per the prevailing DISCOM procedure. The applicable
customer charges shall be payable to DISCOM.
Billing process shall start within one month of synchronizing the SRP.
5.3 Energy Settlement and Billing/Invoicing
Energy settlement shall be done on a monthly basis. Group of persons/societies setting up
SRP’s will be treated as collective generation for supply of power to the households of each
society /group member. In case of apartments/group houses, common meter may be used
for net metering
Net Metering: The energy generated from SRP shall be adjusted against the consumption
of energy from the DISCOM by the Eligible Developer/Consumer every month. In case of
Groups/Societies, the energy generated shall be prorated as per the installed capacity share
indicated in the Agreement between the group/society and DISCOM. This computed energy
share shall be adjusted against the consumption of energy for each consumer every month.
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 110
In case of excess generation (after energy adjustment) in any month, payment shall
be made by the DISCOM for the net energy computed at the Average Cost to Serve
(ACS) as determined by APERC every year.
In case of excess consumption in any month, payment shall be made by the Eligible
Developer/Group/Society for the net energy at the applicable tariff as determined by
APERC every year.
Gross Metering: The payment for energy generated from SRP will be computed at the
Average Cost to Serve (ACS) of the DISCOM as determined by APERC every year. This
shall be adjusted against the total billing demand for consumption of energy for the Eligible
Developer/Consumer from the DISCOM every month. The balance amount after adjustment
for the month shall be made by the DISCOM.
A limit shall be defined for all Eligible Developers in terms of energy, beyond which no
payment shall be made by APDISCOM.
6. Access and Inspection
a) The DISCOM’s personal may enter the Eligible consumer’s premises to inspect the
Eligible consumer’s protective devices and read or test the meter.
b) The DISCOM personnel reserve the right to inspect the SRP routinely at any time during the term of the Agreement. As part of the inspection, DISCOM officials have to ensure that check the following aspects
All protective equipment of the SPV system are functioning as per specifications.
The SPV system including the panels, inverters, etc. continue to meet the
requirements of Indian and IEC standards post installation till contract completion.
c) An Eligible Developer, found indulging in theft of electricity or unauthorized use of electricity, shall pay the additional charges as may be levied by the DISCOM as per provisions of Electricity Act 2003. DISCOM may levy additional charge besides disconnection of electricity supply.
7. Safety
7.1 Eligible consumer shall comply with the Central Electricity Authority (Measures Relating
to Safety and Electricity Supply) Regulations 2010 as amended from time to time.
7.2 Eligible consumer agrees that the design, installation, maintenance and operation of the
photovoltaic system are performed in a manner conducive to the safety of the
photovoltaic system as well as the DISCOM’s distribution system.
7.3 Due to DISCOM’s obligation to maintain a safe and reliable distribution system, eligible
consumer agrees that if it is determined by DISCOM that eligible consumer’s
photovoltaic system either causes damage to and/or produces adverse effects affecting
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 111
other distribution systems’ consumers or DISCOM’s assets, eligible consumer will have
to disconnect photovoltaic system immediately from the distribution system upon
direction from the DISCOM and correct the problem at his own expense prior to a
reconnection.
8. Clearances and Approvals
8.1._____________________________________________________________________.
8.2 All the approvals/clearances required to avail the metering facility shall be disposed by
the respective DISCOM within 14 days from the date of application
8.3 The eligible consumer agrees to attain all the necessary approvals and clearances
before connecting the photovoltaic system to the distribution system.
8.4 Approvals shall be given only to those Eligible Developer with maximum allowable
capacity under single-phase service is 3 kWp and maximum allowable SPV plant
capacity under LT category is 56 kWp. For HT Service, consumer shall be responsible
to match the SPV plant capacity with the DTR capacity.
8.5 The SRP capacity should be up to 1,000 kWp at a single location.
9. Injection of Solar Power
The solar power produced shall be injected in to the DISCOM network only after obtaining
prior approval from DISCOM and meeting all the requirements of departmental standards,
viz., protection switchgear, metering, feasibility approval etc.
10. Liabilities
10.1 Eligible consumer and DISCOM will indemnify each other for damages or adverse
effects from either party’s negligence or intentional misconduct in the connection and
operation of photovoltaic system or DISCOM’s distribution system.
10.2 DISCOM and eligible consumer will not be liable to each other for any loss of profits or
revenues, business interruption losses, loss of contract or loss of goodwill, or for indirect,
consequential, incidental or special damages, including, but not limited to, punitive or
exemplary damages, whether any of the said liability, loss or damages arise in contract,
or otherwise.
10.3 DISCOM shall not be liable for delivery or realization by eligible consumer for any fiscal
or other incentive provided by the central/State government.
11. Commercial Settlement
11.1 All the commercial settlement under this Agreement shall be made according to Solar
Rooftop Guidelines and Regulations of Electricity Regulatory Commission.
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 112
12. Connection Costs
12.1 The eligible consumer shall bare all costs related to setting up of photovoltaic system
including metering and interconnection costs.
12.2 Cost for interconnection equipment including the isolators, meters etc. are also to be
borne by the eligible consumer.
13. Date of Enforceability of the Agreement
This Agreement will be in a force for a period of 25 years or up to the tenure of the project
whichever is earlier from the date of commencement of this Agreement, until the eligible
consumer meet all the requirements, rules and conditions of this Agreement and the system
and its operation is in accordance with the Andhra Pradesh Solar Power Policy – 2015 and
its future amendments, if any.
14. Dispute Resolution
If at any time the DISCOM reasonably determines that either the eligible consumer may
endanger the DISCOM’s personnel or other persons or property, or the continued operation
of the consumer’s generator may endanger the integrity or safety of the DISCOM’s electric
system, or the consumer is not operating the system in compliance with the terms and
conditions of this Agreement the DISCOM shall have the right to disconnect and lock out the
SPV generator facility from the company’s electric system until the DISCOM is reasonably
satisfied that the SPV generator can operate in a safe and complain manner.
Any other disputes arising under/out of this Agreement shall be resolved promptly in good
faith and in an equitable manner by both the parties. Failing resolution of the dispute, party
may approach the commission under Section 86 (1) (f) of EA 2003.
15. Termination
15.1 The SRP shall be installed within three (3) months from the date of Agreement. In case
of any delay beyond three months, one time extension of 15 days shall be provided
after which the Agreement shall be deemed terminated without any reason.
15.2 The eligible consumer can terminate Agreement at any time by providing DISCOM with
90 days prior notice.
15.3 The DISCOM has the right to terminate Agreement on 30 days prior written notice, if
eligible consumer breaches a term of this Agreement and does not remedy the breach
within 30 days of receiving written notice from DISCOM of the breach.
15.4 The eligible consumer agrees that upon termination of this Agreement, he must
disconnect the photovoltaic system from DISCOM’s distribution system in a timely
manner and to DISCOM’s satisfaction.
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 113
16. Resale of Electric Power
The eligible consumer shall not sell electricity generated under this Agreement without the
sanction in writing obtained from the DISCOM.
17. Obligation of Consumer to Pay All Charges Levied by DISCOM
The eligible consumer shall abide by the rules and shall pay the maximum demand
charges, energy charges, surcharges and other charges, if any, to the DISCOM in
accordance with the notified Tariff besides the applicability of the General Terms and
Conditions of Supply prescribed by the APERC from time to time.
18. Theft of Electricity or Unauthorized Use of Electricity
The eligible consumer, found indulging in theft of electricity or unauthorized use of electricity
shall pay the penal/additional charges as may be levied by the DISCOM besides
disconnection of supply as per the provisions of IE Act 2003 and General Terms and
Conditions of Supply.
In the witness, where of Mr. _________ for an on behalf of ________________ (eligible
consumer) and Mr. _________ for and on behalf of __________________ (DISCOM) agree
to this Agreement.
Signature of Office Bearer of Group/
Society
Signature of the DISCOM Representative
Date:
Date:
Witness 1:
Witness 2:
Signature:
Signature:
Name and Address:
Name and Address:
Date: Date:
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 114
ANNEXURE XIX: FORM 7(A)
Intimation of Meter Procurement (To Be Filled by Applicant)
Date
To,
The AE (Operations)/DE(Operations)
(Name of Section/Sub-Division/Division/Circle)
(DISCOM Name)
Sub: Intimation of Meter Procurement
Ref: Application No._________________; dated________________________.
Dear Sir/Madam,
With reference to above mentioned Application number and receiving the Letter of Approval
after the technical feasibility, I/we intend to install _____ kWp of RTSPV system. In this
regards, I/we request DISCOM to provide a meter of class _____________ for RTSPV
installation. The meter shall be as per the Net/ Gross metering clause in Solar Rooftop
Policy/Guidelines.
I/We agree to pay fee as mentioned by DISCOM via online mode for procurement of meters.
(Signature of Applicant)
Name of the Applicant
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 115
ANNEXURE XX: FORM 7(B)
Intimation of Availability of Meter (To Be Filled by DISCOM)
Date
To
________________________ (Name of the Applicant)
Sub: Intimation of Availability of Meter
Ref: Application No. _________________ dated _________________________
Dear Sir/Madam,
Net meter of class _____ is available/ not available (tick (✔) appropriate) with DISCOM.
If Meter is Available:
1. You are hereby directed to make an online payment of INR towards meter
procurement charges while submission of ‘Intimation to the DISCOM for Readiness of
the System for System Checks, Synchronization with the DISCOM Grid and Installation
of Meters’
2. Appropriate meter will be sent by DISCOM test lab and shall be dispatched on the day of
final check and synchronization of RTSPV system with the DISCOM’s grid.
If Meter is Not Available:
1. As meter is not available with DISCOM it can be procured from external agency
2. An online ‘Request for Meter Testing’ is to be made through Form 7(C).
3. You are hereby directed to make an online payment of INR towards meter
testing charges while submission of Form 7(C) ‘Request for Meter Testing’.
4. You are advised to submit the procured meter to the DISCOM for testing within 3 days
after online submission of Form 9 ‘Intimation to the DISCOM for Readiness of the
System for System Checks, Synchronization with the DISCOM Grid and Installation of
Meters’
5. Hardcopies of the following are to be submitted while submitting the meter for testing:
a. A copy of the Form 7(C) ‘Request for Meter Testing’ along with meter testing fee
payment receipt.
b. A copy of the Letter of Approval.
c. Test Certificate (received from manufacturer).
d. A copy of Form 9 ‘Intimation to the DISCOM for Readiness of the System for
System Checks, Synchronization with the DISCOM Grid and Installation of Meters’
(Signature of Officer)
Designation of Authorized Officer
(AE [Operations], Section Name/ DE[Operations], Division Name)
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 116
ANNEXURE XXI: FORM 7(C)
Request for Meter Testing (To Be Filled by Applicant)
Date:
To
The ADE (Operations)/SE(Operations)
(Name of Sub-Division/Division/Circle)
(DISCOM Name)
Sub: Intimation of Meter Procurement
Ref: Application No. _________________ dated _________________________.
Dear Sir/Madam,
With reference to above-mentioned Application number and receiving the Letter of Approval
after the technical feasibility, I/we intend to install _____ kWp of RTSPV system vide letter
No _______ dated ________. In this regards, I/we have procured the meter from .
As per the of Solar Rooftop Policy/Guidelines, I request DISCOM to kindly test meter of
following specification (specifying Meter No., Class and other specifications described as per
CEA regulations).
Make
Model Number
Meter Type
Accuracy Class
I/We hereby agree to pay fees of INR __________ as mentioned by the DISCOM for testing
of meter through online mode.
I/We hereby agree to submit the procured meter to DISCOM for testing within 3 days of
online submission of Form 9 (Intimation to the DISCOM for Readiness of the System for
System Checks, Synchronization With the DISCOM Grid and Installation of Meters).
I /We hereby agree to submit hardcopies of the following while submitting the meter for
testing.
a. A copy of the Form 7(C) ‘Request for Meter Testing’ along with meter testing fee
payment receipt.
b. A copy of the Form 5 ‘Letter of Approval’.
c. Test Certificate (received from manufacturer).
d. A Copy of Form 9 ‘Intimation to the DISCOM for Readiness of the System for
System Checks, Synchronization With the DISCOM Grid and Installation of Meters'
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 117
(Signature of Applicant)
Name of the Applicant
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 118
ANNEXURE XXII: FORM 8
Work Completion Report (To Be Submitted by the Applicant for System Inspection)
To,
The Chief Electrical Inspector/ Electrical Inspector …………………………….. (Control
Area)
Government of Andhra Pradesh (if RTSPV to be inspected by CEI/EI)
ADE/SE-Operation Officer ………………………….. (if RTSPV size is exempted from
inspection by CEI/EI)
CC: Office of (Concerned) ADE (Operations) (In case of LT system)/SE (Operations) (in
case of HT system), DISCOM (in case submitted to CEI/EI)
CC: To NREDCAP in case of subsidised consumers, if applicable
Sir/Madam,
Sub: Submission of work completion report (to be submitted by the applicant)
for system documentation requirements.
Ref: Our Application No.: _______________ dated: ___________
With reference to the above, I hereby confirm to you that we have completed the work of
installation of the renewable energy system and submit the following basic information for
your perusal and request you to arrange to Inspect and Commission the system at the
earliest:
A. Details of the Solar PV Module
1. Model No.
2. Name and address of manufacturer
3. Capacity of each module (Wp)
4. No. of modules
5. Total capacity (kWp)
6. Date of installation
7. Applicable standard (BIS/IEC)
B. Details of the Inverter
1. Name and address of the inverter
manufacturer
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 119
2. Brand Name of the inverter
3. Model No.
4. AC capacity of individual inverter (kW)
5. No. of inverters installed
6. Total AC capacity of inverter (kW)
7. Serial Nos.
8. Date of Installation
9. Applicable Standard (BIS/IEC)
10. Is anti-islanding protection provided? Yes/No
C. Module Mounting Structure
1. Does the module mounting structure withstand
wind capacity up to 150 kmph?
Yes/No
2. Is total load of the structure +panel less than 60
kg/m2?
Yes/No
3. Applicable Standard (BIS/IEC)
D. Details of the Cables: DC
1. Make/Name of manufacturer
2. Size and type
3. Applicable standard (IEC)
E. Details of the AC Wiring
1. Make/Name of manufacturer
2. Size and type
3. Applicable standard (IEC)
F. Details of the DC Distribution Box
1. Make/Name of manufacturer
2. Sl. No.
3. High quality suitable capacity MOVs/SPDs
along with suitable reverse blocking diodes
4. MCB/Isolator quantity and capacity
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 120
5. Size and type
6. Applicable standard (IEC)
G. Details of the AC Distribution Box
1. Make/Name of manufacturer
2. Sl. No.
3. AC surge protection device
4. MCB/MCCB quantity and capacity
5. Size and type
6. Applicable standard (IEC)
H. Details of the Earthing
1. Earth resistance (shall be less than 5
ohms)
2. Size of the earth wire/flat*
3. Three separate earthing points
Modules, mounting structure and DC
surge protection device
Inverter, AC surge protection device
Lightening arrester
Yes/No
Yes/No
Yes/No
4. Size and type
5. Applicable standard (BIS/IEC)
Note: *Earthing shall be done in accordance IS 3043-1986, provided that earthing
conductors shall have a minimum size of 4 mm2 copper wire or 10 mm2 aluminium wire
or 3 mm2 X 70 mm2 hot dip galvanized iron flat strip.
I. Details of the Net Meter Details, If Purchased by Consumer (Please Enclose the
Test Report of the Net Meter Tested at the Laboratory of the
DISCOM/Designated Agency)
1. Make
2. Serial No.
3. Procured from DISCOM/outside agency
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 121
4. Manufacturer’s Name
5. Capacity
6. Type/Model
7. Single ph./three ph.
8. Rated current and CT ratio
9. Reference voltage and PT ratio
10. Date of test by MT, DISCOM
11. Applicable standard (BIS/IEC)
12. Month and year of manufacture
13. Class of meter
J. Details of the Caution Signage
K. Provision of Manual and Automatic Switches: Yes/No
L. G.P.S. Co-ordinates of the RTSPV System Installation
(i) Latitude: (ii) Longitude:
M. Whether Operation and Maintenance Manual Provided to the Consumer: Yes/
No
N. Capacity of Automatic Relay/Isolation Switch at Interconnection Point With
Grid
Certified that the above said RTSPV system was installed and the equipment used comply
with the Technical and Safety Standards as specified by the MNRE/CEA/MERC/DISCOM
under net metering program.
Signature of the Applicant Name and Signature of the System
Installer
Name and Address With Seal
Name: _______________________ Name of the firm and address:
______________________________ ____________________________
Date: ________________________ Date: _________________________
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 122
Enclosure:
1. Actual single line wiring diagram (SLD) of the SPV System and estimated energy
generation report. (PVsyst/PVSol etc.)
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 123
ANNEXURE XXIII: FORM 9
Intimation to the DISCOM for Readiness of the System for System Checks, Synchronization With the DISCOM Grid and Installation of Meters
(To Be Submitted by the Applicant)
Date
To
The ADE (Operations)/SE(Operations)
(Name of Sub-Division/Division/Circle)
(DISCOM Name)
Sub: System Checks, Synchronization with the DISCOM Grid and Installation of Meter(s).
Ref: Application No. __________________ dated__________________.
Dear Sir/Madam,
With reference to the above, I hereby confirm to you that the RTSPV system has been
installed as per the Technical and Safety Standards laid out by CEA/ APERC/ DISCOM.
The system is ready for synchronization with the DISCOMs grid and installation of meter(s).
If Meter Procured From DISCOM
I/We have paid fees of INR __________ as mentioned by the DISCOM for procurement and
testing of meter through online mode.
If Meter Procured From External Agency If Meter Is Not Available With DISCOM
I/We have procured meter from external agency as specified through the Form 7(C)
‘Request for Meter Testing’ and paid the meter testing fees of INR specified by the
DISCOM. I/We shall submit a hardcopy of the Form 7(C) ‘Request for Meter Testing’ along
with the meter and supporting documents to the DISCOM within 3 days of online submission
of the Form 9 intimating readiness of the system.
(Signature of Applicant)
Name of the Applicant
Enclosures:
1. NOC from CEI/EI, for systems >10 kWp.
2. Manufacturer’s Test Certificate of all the components used in installation of the
RTSPV system.
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 124
ANNEXURE XXIV: FORM 10
Guidelines for Pre-Commissioning Check Before and After Connecting the RTSPV System With DISCOM Network and Steps for Maintenance of Network Where Such
Connectivity Exists (For DISCOM Internal Purpose Only)
1. Mandatory Safety Precautions/Features
The following are mandatory safety precautions which will be taken care before and after
commissioning of grid connected Solar PV system.
(a) An inbuilt Inverter relay which trips on DISCOM supply failure and prevent any solar
power injection to the DISCOM Network when there is no power from DISCOM. The
anti-islanding protection shall be tested during the release of connection.
(b) The solar PV system should be separately grounded / earthed. A minimum of two
separate dedicated and interconnected earth electrodes must be used for the
earthing of the PV system support structure, with a total earth resistance not
exceeding 5 ohms.
(c) Lightning arrestor also must be provided for SPV.
(d) Manual isolator switch at an easily accessible location with locking facility shall be
provided.
(e) Caution stickers shall be used with the green back ground and the text “Solar PV
Systems” written in white letters. The size of these stickers shall be 10 CM (width) x
7 CM (height) with the text clearly printed in the center of the sticker. (applicable to
only 50 kW and above).
(f) All SPV consumers should have a mandatory sign board fitted near the existing
meter reading terminal stating that ‘This service is fitted with a LT grid connected
SPV plant”. The solar PV system caution stickers shall be fixed at the following
locations. (applicable to only 50 kW and above).
i. On or near to meter of service with grid connected solar PV system.
ii. On the consumer main switch, of a service connected with a grid connected
solar PV system.
iii. On LT poles with grid connected solar PV systems at height of about 1.50
meter from the ground.
iv. On LT feeder pillars with grid connected solar PV system on the street-facing
door of the feeder pillar.
v. On each of the LT take off poles of a distribution transformer to which solar
PV systems are connected.
vi. On substation end of HT feeder having solar PV system.
vii. A List of serviced connections of grid connected solar PV systems shall be
available at the Division Office and 33/11 kV S/S.
viii. A record may be maintained at the Division Office of each SPV plant’s
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 125
commissioning date and other details.
ix. The SPV connected details of pole/pillar box/DT/SS feeder end wise may be
maintained at Division Office.
(g) During planned/forced maintenance work on DISCOMs network, before taking up
the work in hand, besides ensuring all other provisions such as line earthing, de-
energization of the line section where the work is to carried out as per prevailing
norms further it should be ensured that supply from such small solar roof-top PV
power plants are not back feed and supply should also be disconnected by manual
isolating switch with locking facility installed in the premises of such consumers and
ensuring proper earthing.
2. The check list before release of connection.
A. Component Inspection Checklist
Sr.
No.
Item Type Yes No
1. Installation Layout — is it as per drawing? (Applicable only for 50
kW above)
2. Inverter IS/IEC standards qualified
3. PV panel IS/IES standards qualified
4. PV isolators/PV cables IS/IES standards qualified
5. AC disconnect manual switch provided with locking arrangement
B. Grid Connected Functional Safety Checklist
Sr.
No.
Item type Yes No
1. Check whether solar generation stops automatically when
DISCOM supply made off (inverter/PCU cut off)
2. Bi-directional flow recorded on Net meter
3. Solar generation meter ok?
4. Check all earthing points as per standard
5. Solar and bi-directional meter tested and sealed by DISCOM
meter testing lab
6. Check whether manual Isolating switch is installed at accessible
location
7. Check whether manual Isolating switch stops feeding supply in
DISCOM network when in OFF position
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 126
ANNEXURE XXV: FORM 11
PART I
Synchronization With the DISCOM Grid, Installation of Meter
(To Be Filled by the DISCOM)
Date
To
(Name of the Applicant)
Sub: Synchronization with DISCOM Grid and Installation of Meter
Ref: Application No. ____________________ dated____________________.
Dear Sir/Madam,
Synchronization test of solar rooftop PV system of …………. kWp, installed on the roof of
your premises has been conducted and your RTSPV system found satisfactory and
successfully synchronized with the DISCOMs grid. Meter with no …………. has been
installed and sealed on ……… (date).
Yours faithfully,
(Signature of Officer)
Designation of Authorized Officer
(ADE [Operations], Sub-Division Name/ SE[Operations], Circle Name)
Enclosure:
1. Inspection format for releasing of solar rooftop generating unit (to be uploaded by DISCOM).
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 127
PART II
INSPECTION FORMAT FOR RELEASING OF SOLAR ROOF TOP GENERATING UNIT
Date of Inspection: …………........
A Name of the applicant
1. S/C No.
2. Category
3. Distribution
4. Pole number
5. Section
6. Address
7. Mobile No.
B Meter Details
1. Meter make
2. Serial number
3. Capacity
4. Meter constant
5. Initial reading (Tri vector parameters)
6. i) Import
7. ii) Export
8. Name of the laboratory where the meter is tested (copy of test results to be enclosed)
C Grid Tie Inverter/Connecter
1. Make
2. Serial No.
3. Capacity
4. Input voltage
5. Output voltage
6. If grid supply fails, status of contactor (on or off)
D SPV Module
1. Make
2. Serial No.
3. Type of module
4. Capacity of each module
5. Number of modules
6. Total capacity of module
E
Details of protective system available (Feasibility shall be given only on availability of the above)
Enclosure: 1. Single line diagram of SPV generator
2. Specification sheets of all equipment
Assistant Divisional Engineer Superintending Engineer
Operations, ----------- Operations, --------------
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 128
ANNEXURE XXVI: FORM 12
Intimation for Removal of Deficiency in the System Installed (To Be Filled by the DISCOM)
Date
To
(Name of the Applicant)
Sub: Intimation for Removal of Deficiency Found During Inspection
Ref: Application No. ________ Dated________.
Dear Sir/Madam,
As requested on __________ (Date on which Form 9 was filled and submitted) to carry out
inspection and synchronization of your ______ kWp system we have found out that the
system does not adhere to:
a) E.g.: Earthing standards are not followed.
b) ____________________________________________________________
c) _____________________________________________________________
We request you to rectify the mistakes within 15 days and submit Form 9 again along with
this letter.
(Signature of Officer) Designation of Authorized Officer (ADE [Operations], Sub-Division Name/ SE[Operations],
Circle Name)
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D Technical Assistance Program United States Agency for International
Development Contract AID-386-C-12-00001 129
ANNEXURE XXVII: DISCOM Report
DISCOM Name Selection Criteria 1 Selection Criteria 2
DISCOM In Year In Month Upto Date Name of Circle Name of Division Name of Sub- Division
Name of Section
Report On Grid Connected Solar Rooftop Applications Received By (DISCOM Name) (Selection Criteria 1)
1 2 3 4 5 6 7 8
Sr.
No
.
Name of
Circle/Divi
sion/ Sub
Division/
Section
(Based on
Selection
Criteria 2)
Applications
Received
Applications
Awaiting
Technical
Feasibility
Applications
Rejected
Applications for
whom
LOA is granted
Applications
Received for
Meter
Procurement
Systems
Installed by
Consumers
Requests for
Synchronization
of System and
Installation of
Meters
Received
Systems
Synchronized
Numb
er
Capac
ity
(kW)
Numb
er
Capac
ity
(kW)
Numb
er
Capac
ity
(kW)
Numb
er
Capac
ity
(kW)
Numb
er
Capac
ity
(kW)
Numb
er
Capac
ity
(kW)
Numb
er
Capac
ity
(kW)
Numb
er
Capac
ity
(kW)
1
2
3
Tot
al
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D Technical Assistance Program United States Agency for International
Development Contract AID-386-C-12-00001 130
ANNEXURE XXVIII: SNA Report
Selection Criteria
In Year
In Month
Up to Date
Subsidy Applications Received by SNA (Selection Criteria)
Sr.No
Name of
District
Subsidy Applications
Received (Form S1A)
(1-5 kWp Capacity)
Subsidy Applications
Received (Form S1B)
(> 5 kWp, ≤50 kWp Capacity)
Subsidy Applications
Received (Form S1C)
(> 50 kWp, ≤ 500 kWp Capacity)
In Principle Sanctions Granted
Consumers to Whom Subsidy is Disbursed
Number Capacity
(kW) Number Capacity
(kW) Number Capacity
(kW) Number Capacity
(kW) Number Capacity
(kW)
1
2
3
Total
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D Technical Assistance Program United States Agency for International
Development Contract AID-386-C-12-00001 131
ANNEXURE XXIX: Site Visit Schedule Report
From Date
Sr. No
Date
Visit Type (Site
Visit/Joint Inspection
Visit)
Option Number
USRTP Application
Number
Applicant Name
Contact Person Name
Contact Number
Phone Number
Site Address
1
2
3
4
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 132
Business Requirement Definition Document of Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh: PACE-D
Technical Assistance Program United States Agency for International Development Contract AID-386-C-12-00001 133
U.S. Agency for International Development
1300 Pennsylvania Avenue, NW
Washington, DC 20523
Tel: (202) 712-0000
Fax: (202) 216-3524
www.usaid.gov
U.S. Agency for International Development