part of the bre trust bre: bim in wales dan rossiter bim team, bre wales 26 th of september, 2014
TRANSCRIPT
– About me
– What is BIM
– The Origins of BIM– Egan, Latham, Construction Strategy
– BIM Level 2 Requirements– BS1192, BS1192-2 and other documents
– BIM in Wales– Welsh Construction Strategy, CLAW Toolkit
– How the BRE can help– Education– Certification– Consultancy
Agenda
BIM (Building Information Modelling)
–It’s not just 3D CAD
–It’s not just a new technology application
–It’s not next generation, it here and now!
BIM is essentially value creating collaboration through the entire life-cycle of an asset, underpinned by the creation, collation and exchange of shared 3D models and intelligent, structured data attached to them.
http://www.bimtaskgroup.org/bim-faqs/
BETTER
INFORMATION
MANAGEMENT
What is BIM
The Origins of BIM
Latham Report1994
Egan Report1998
Never WasteA Good Crisis
2009
AcceleratingChange
2002
The Origins of BIM
Quiz Time
Based on the last eleven years of KPI’s:
What percentage of projects come in on time and no budget? ~50%
Wolstenholme, 2009
The Origins of BIM
“Production Information is generally, incorrect, incomplete, uncoordinated and ambiguous”
The Origins of BIM
– There is a detailed programme of measures Government will take that will reduce costs by up to 20% by the end of this parliament.
– Government will require fully collaborative 3D BIM (with all project and asset information, documentation and data being electronic) as a minimum by 2016. A staged plan will be published with mandated milestones showing measurable progress at the end of each year.
ConstructionStrategy
2011
The Origins of BIM
BIS BIM Strategy2011
– The Government as a client can derive significant improvements in cost, value and carbon performance through the use of open sharable asset information.
BIM Maturity Levels – Strategy Paper 2011
0 - Unmanaged CAD probably 2D, with paper (or electronic paper) as the most likely data exchange mechanism.
1 - Managed CAD in 2 or 3D format using BS 1192:2007 with a collaboration tool providing a common data environment, possibly some standard data structures and formats. Commercial data managed by standalone finance and cost management packages with no integration.
2 - Managed 3D environment held in separate discipline “BIM” tools with attached data. Commercial data managed by an Enterprise Resource Planning System (ERP). Integration on the basis of proprietary interfaces or bespoke middleware could be regarded as “pBIM” (proprietary). The approach may utilise 4D Programme data and 5D cost elements.
3 - Fully open process and data integration enabled by IFC / IFD. Managed by a collaborative model server. Could be regarded as iBIM or integrated BIM potentially employing concurrent engineering processes.
BIM Industry Documentation
PI For BIM(CIC)
BIM Protocol(CIC)
Uniclass(CPIC)
Digital Plan of Work(BIM Task Group)
CPIx Online(CPIC)
BIM in Wales
CEWales BIM Task Group
Working Paper2012
Recommendations:
–Alignment with UK Government with all Welsh Government funded projects at level 2 by 2016 and all Welsh Government Department Projects to lead at level 2 by 2015.
–A value or threshold for Wales could not be established in the timescales allowed. Collaborative working arrangements and internal business development should still be encouraged until such a value is set. Pilot projects are expected to inform the thresholds based on value and complexity by 2014/15.
–The following improvement areas are proposed: i. Added Value ii. Cost Predictability iii. Carbon Intelligence
BIM in Wales
Welsh Construction Procurement Strategy
2013
Key Objectives and Milestones:
–Alignment with the UK Government Building Information Modelling (BIM) strategy, with all Welsh Government funded projects at level 2 by 2016 and all Welsh Government Department projects to lead at level 2 by 2015.
BIM in WalesContains:–Introduction
–Setting the BIM Scene
–Business Case IT Investment
–Employer Information Requirements Template
–Employer Information Requirements Example
–Glossary of Terms
–Procurement Guide
–BIM and GSL Guide
–Collaborative Maturity Assessment Tool
–Standards and Protocol Reference
The CLAW All Wales BIM Toolkit2014 (Draft)
BIM Level 2 Training Course
– BIM Foundation Course (AP)Covering BIM processes, procedures, information models, management and collaboration
– BIM Level 2 PAS1192-2
Project Information Manager (PIM)
Task Information Manager (TIM)
– BIM Level 2 PAS1192-2
Project Delivery Manager (PDM)
BIM Level 2 Certification Schemes
BRE BIM Certificated Professional Schemes– Task Information Manager– Project Information Manager– Project Delivery Manager
BRE BIM Business System Certification Scheme– Audited BIM Capability Assessment
Business Certificate Scheme Benefits
– PAS 91 (Working towards UKAS accreditation )
– BRE Certificated
– Audited Business Evaluation
– Defined Industry Benchmark
– Lean Process– Reduced Employers Effort / Cost– Reduced Supply Chain Effort / Cost
– Checked by Industry Specialist and Supported by BuildingSMART UKI
BIM Checking Service
Documentation
–Employers Information Requirements (EIRs)
–BIM Execution Plans (BEP)
Models (BS 1192:2007. PAS 1192-2:2013, BS 1192-4, BS8541 Series)
–Naming Conventions
–Spatial Co-ordination
–Model Definition
–Volume Strategy
–Level of Definitions
–Data Segregation
–Annotations & symbology
– About me
– What is BIM
– The Origins of BIM– Egan, Latham, Construction Strategy
– BIM Level 2 Requirements– BS1192, BS1192-2 and other documents
– BIM in Wales– Welsh Construction Strategy, CLAW Toolkit
– How the BRE can help– Education– Certification– Consultancy
Summary