1 Pre-Feasibility Report (Part of Environmental Clearance Application) For Proposed Residential Building Construction Project at Survey/Block no. 114, 15, 116, 117, 157 & 158 - FP no.47, 48, 49, 50, 79 & 80, Village Kudasan, District: Gandhinagar, By S. R. Infracon 5, Ramkutir Bungalow, near Vasant Vihar Tower, Shahibaug, Ahmedabad October 2015

Upload: phungnguyet

Post on 09-Mar-2018

215 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: (Part of Environmental Clearance Application) For Proposed ...environmentclearance.nic.in/.../TOR/...PreFeasibilityReport(PFR).pdf · For Proposed Residential Building Construction

1

Pre-Feasibility Report (Part of Environmental Clearance Application)

For

Proposed Residential

Building Construction Project

at

Survey/Block no. 114, 15, 116, 117, 157 & 158

- FP no.47, 48, 49, 50, 79 & 80,

Village Kudasan,

District: Gandhinagar,

By

S. R. Infracon

5, Ramkutir Bungalow, near Vasant Vihar Tower,

Shahibaug,

Ahmedabad

October 2015

Page 2: (Part of Environmental Clearance Application) For Proposed ...environmentclearance.nic.in/.../TOR/...PreFeasibilityReport(PFR).pdf · For Proposed Residential Building Construction

2

CONTENT

1. Executive Summary

2. Introduction of the Project / Background Information

3. Project Description

4. Site Analysis

5. Planning Brief

6. Proposed Infrastructure

7. Rehabilitation and Resettlement (R &R)

8. Project Schedule and Cost Estimate

9. Analysis of the Proposal (Final Recommendations)

Page 3: (Part of Environmental Clearance Application) For Proposed ...environmentclearance.nic.in/.../TOR/...PreFeasibilityReport(PFR).pdf · For Proposed Residential Building Construction

3

1. Executive Summary

This is a Residential Building Construction Housing Project proposed by M/s S. R. Infracon. The project is

low rise Building Construction Project having built up area 38,798.18 sq.m. Proposing plot (area of

10,667.00 sq.m.) at village Kudasan, Taluka & District Gandhinagar (Survey/Block no. No. 114, 15, 116,

117, 157 & 158 - FP no.47, 48, 49, 50, 79 & 80, Village Kudasan, District: Gandhinagar). The 168 Housing

units are proposed with parking area of about 12,114.64 sq.m., 1094.77sq.m. common plot area with

4.00 m minimum margin on periphery with green belt development area. The building construction will

involve a Basement, hollow plinth, ground floor and up to six floor level having height of 27.85 m above

ground. The building will be constructed as frame RCC structure with brick/AAC work for walls. The Soil

investigation report, NBC norms and relevant IS codes including for earthquake zone are referred while

designing the project. During construction phase, the safety practices will be implemented and basic

needs (water supply, electricity, bathing & toilet facility, drainage facility etc) of workers will be

addressed. The construction materials transportation will be optimally managed to minimize the impact

on noise level, fuel consumption, flue gas emission and dust minimizing measures. Facilities like, water

supply, sewerage connection, power supply, emergency power provision, access road, parking space,

common plot (garden / landscape area), etc are planned and will be provided for tenants.

.

Page 4: (Part of Environmental Clearance Application) For Proposed ...environmentclearance.nic.in/.../TOR/...PreFeasibilityReport(PFR).pdf · For Proposed Residential Building Construction

4

2. Introduction of the Project / Background Information

2.1. Identification of Project and Project Proponent

This is a residential building construction Housing Project. M/s S. R. Infracon is Project

Proponent for this project. The Project Proponent is Partnership firm having its office Shivalay

Residency, opp Urjanagar 1, Kudasan, Taluka & District Gandhinagar.

Image 1: Image showing location of Proposed Project Site of M/s S. R. Infracon

2.2. Brief Description of nature of the Project

The plot area of the project site is 10,667.00 sq.m. The proposed built up area for Construction

is 38,798.18 sq.m. including covered parking area. The built up area is more than 20,000 sq.m.

and hence the Environmental Clearance is applicable to the project under heading “≥20,000

sq.m. and <1,50,000 sq.m. of built-up area for category 8(a) of Schedule to EIA Notification 2006.

2.3. Need of the Project and it’s important to the country and or region

Housing is the primary need of the human and other living organisms on this Earth. The

providing housing is the primary agenda of the Nation. The need for the Housing Infrastructure

Development is ongoing process in India due to ever increasing population, change in social

status, economic condition of family and so many other socio economic reasons.

Urbanization trend in India is increasing due to many factors. Urban areas are increasing in

physical boundaries due to need of basic infrastructures and development works. Gandhinagar

is being State Capital of Gujarat and needs Urban Development Plans, Town Planning and

Development Schemes by appropriate Authorities for future demands. Many Cities & Mega

Cities in India and in other countries developed their plans for next decades to meet the future

requirement. City is also following the path for better future to the citizen.

Page 5: (Part of Environmental Clearance Application) For Proposed ...environmentclearance.nic.in/.../TOR/...PreFeasibilityReport(PFR).pdf · For Proposed Residential Building Construction

5

The land in the city area is allowed for developing the Residential and Commercial

Infrastructure. M/s S. R. Infracon is proposing for developing the Residential Infrastructure

project at village Kudasan, Taluka & District Gandhinagar (Survey/Block no. No. 114, 15, 116,

117, 157 & 158 - FP no.47, 48, 49, 50, 79 & 80, Village Kudasan, District: Gandhinagar).

2.4. Demand Supply gap

Please refer section 2.3 above for the need of the project.

2.5. Imports Vs Indigenous production

The project is about the development of Infrastructure Project for local need and will not a

manufacturing activity.

2.6. Export Possibility

Not Applicable as this is an Infrastructure Project.

2.7. Domestic and or Export Markets

The project will attract the customers from local, rural areas, state Gujarat and other states as

well as from other countries for procuring the Housing facilities in Gandhinagar City based on

their demand / future planning or requirement.

2.8. Employment Generation

Employment generation is envisaged during construction phase for about twenty four months

for about 100 workers. The residential units, post construction phase, will attract about 5-8

long term employment.

Page 6: (Part of Environmental Clearance Application) For Proposed ...environmentclearance.nic.in/.../TOR/...PreFeasibilityReport(PFR).pdf · For Proposed Residential Building Construction

6

3. Project Description

3.1. Type of Project and interlinked and interdependent Project, if any

The project is “Building and Construction projects” activity type under EIA notification 2006 and

amendment 2009, serial number 8 category “B(a)” project will be treated as B2 as the activity will not

require EIA study report for Environmental Clearance (Please refer 7(i)I Stage (1) Screening) .

3.2. Location (map showing general location, specific location, and project boundary & project site

lay out) with co-ordinates

The project is located near Shivalay Residency, opposite Urjanagar 1, Kudasan, Gandhinagar.

The latitude and longitude of the project is

Latitude 23°10'43.46"N

Longitude 72°37'49.74"E

Please Annexure 11 showing general location of site and specific location of the project site

with project boundary. Please refer Annexure 11 for Project Site Lay out plan.

3.3. Details of alternate site considered and the basis of selecting the proposed site, particularly the

environmental considerations gone into should be highlighted

This is infrastructure housing development project, need of the nation, state and society to

cater the primary need of the family. For such project, the alternative site study was not

needed at the time of land procurement.

3.4. Size or magnitude of the Operations

The project is about the building construction project having residential units. Project

Proponent proposes six residential blocks having 168 residential units. The basement (for

parking) and with Hollow Plinth for Parking and Ground floor to sixth floors are proposed for

residential use. Total built up area estimated is 38,798.18 sqm including a basement & Hollow

Plinth for parking purpose.

3.5. Process Description with process details (a schematic diagram, flow chart showing the project

lay out, component of the project etc. should be given)

Not applicable as this is Infrastructure Housing Development Project.

3.6. Raw materials required and estimated quantity, likely sources, marketing area of final

product/s, mode of transport of raw material and finished product/s

The project will require building materials for building construction. Project Proponent will

require Cement, Steel, Sand, Bricks, aggregates etc building materials. The estimated quantity

requirement is stated in Annexure 6 with the tentative sources.

Page 7: (Part of Environmental Clearance Application) For Proposed ...environmentclearance.nic.in/.../TOR/...PreFeasibilityReport(PFR).pdf · For Proposed Residential Building Construction

7

3.7. Resource Optimization/ recycling and reuse envisaged in the project, if any should be briefly

outlined

Man power and building materials Resources will be optimally consumed during construction

phase using Project Planning and Project Management.

3.8. Availability of water, energy, power, requirement and source should be given

The water will be catered from ground water during construction phase. Post construction

phase, it will be catered through Municipal Corporation-Gandhinagar. The electricity supply

during both phases will be catered through local supplier Uttar Gujarat Vij Company Limited

(UGVCL), Gandhinagar. The Diesel Generating set of 25 KVA capacity will be installed for

emergency power requirement.

3.9. Quantity of wastes to be generated (liquid and solid) and scheme for their Management /

disposal

The estimated sewage generation during construction phase will be4.30cu.m./d and 160.29

cu.m./d during post-construction phase. The sewage generated during construction phase will

be treated and disposed off through Septic Tank and Soak Well system. For more details please

refer Annexure 5.

Post BU permission, the Drainage connection will be approached and is available near the

project site. The nearest sewage pumping station is located about 0.67 km from site.

The municipal solid waste (MSW) generation estimation is made based on the literature survey

like CPCB manual, and is estimated as 600kg/d post construction phase. The waste will be

collected block wise and disposed off through GMC registered MSW contractors. For more

details please refer Annexure 7.

3.10. Schematic representations of the feasibility drawing which give information of EIA purpose

Not applicable as the Developmental projects with built up area less than 1,50,000 sq.m. will

not required EIA study.

Page 8: (Part of Environmental Clearance Application) For Proposed ...environmentclearance.nic.in/.../TOR/...PreFeasibilityReport(PFR).pdf · For Proposed Residential Building Construction

8

4. Site Analysis

4.1. Connectivity

The project site is located within GUDA area at Kudasan near Urjanagar 1, having good road

network connection to other part of city and state Gujarat. The project site well connected with

Railway and Airport.

4.2. Land Form, Land use and land ownership

The land is Non-Agriculture purpose and is ordered by District Collector Authority-Gandhinagar. The land is owned by original land owners and have Development Agreement with Project Proponent and same is enclosed as Annexure 2 and 3. The land orders from original land survey/block nos. to FP no. are summarized in Table 1 and ownership document is enclosed as Annexure 3.

Table 1: Land Details - Summary of the land parts

No. Survey / Block

no.

OP no.

Area of Survey / Block no.

Ownership name

NA permission details

TP scheme

no.

FP no

Area in sqm for FP

no.

1 114 47 4,518 Hiteshbhai Govindbhai & Others

Letter no. SR31/15/15033 to 15047/2015 dated 25-06-2015

06 47 2937

2 115 48 4,519 Manilal Atmaram

Letter no. SR73/15/15093 to 15106/2015 dated 25-06-2015

06 48 2937

3 116 49 357 Devajibhai Kacharabhai & others

Letter no. SR72/15/15152 to 15165/2015 dated 25-06-2015

06 49 232

4 117 50 5,232 Devajibhai Kacharabhai & Nanabhai Kacharabhai

Letter no. SR72/15/16265 to 16278/2015 dated 10-07-2015

06 50 3401

5 157 79 952 Manilal Atmaram

Letter no. SR72/15/16349 to 16362/2015 dated 10-07-2015

06 79 619

6 158 80 832 Hitesbhai Govindbhai & Others

Letter no. SR72/15/15166 to 15179/2015 dated 25-06-2015

06 80 541

Total are in sqm 16,410 Total are in sqm 10,667

4.3. Topography (along with map)

The land is plain in topography.

Page 9: (Part of Environmental Clearance Application) For Proposed ...environmentclearance.nic.in/.../TOR/...PreFeasibilityReport(PFR).pdf · For Proposed Residential Building Construction

9

4.4. Existing Land use pattern (agriculture, non-agriculture, forest, water bodies (including areas

under CRZ)), shortest distance from the periphery of the project to periphery of the forest,

national park, wild life sanctuary, eco sensitive areas, water bodies (distance from HFL of the

river), CRZ. In case of notified area, a copy of gazette notification should be given

The land is Non-Agriculture type proposed for Residential use. It is neither falling under water

bodies nor under CRZ notification. The project site is located within the GUDA area.

4.5. Existing Infrastructure

The area is having basic infrastructure like road, electricity supply, water supply and drainage

facility, telecommunication facility to surrounding area.

4.6. Soil Classification

The overburden filled up soil is observed up to 10.5 m depth found sand silt mixture in shallow,

non-plastic silty sand found in middle of the bore hole and found clayey sand of low plasticity

during soil investigation carried out by M/s Mukesh A. Patel Technical Consultancy & Civil

Engineering Laboratory, Ahmedabad. For more details please refer Annexure 4.

4.7. Climate data from Secondary sources

The climate of the city is hot and arid. The temperature recorded from 4.0 oC to 46.0 oC. The

average rain fall is about 670 mm.

4.8. Social Infrastructure available

The project is about the housing infrastructure will provide the social infrastructure to the

users.

Page 10: (Part of Environmental Clearance Application) For Proposed ...environmentclearance.nic.in/.../TOR/...PreFeasibilityReport(PFR).pdf · For Proposed Residential Building Construction

10

5. Planning Brief

5.1. Planning Concept (type of industries, facilities, transportation etc) town and country planning /

development authority classification

The proposed project is planned based on the General Development Regulation prepared and

implement by GUDA and GMC.

5.2. Population projection

We estimated to cater housing to about 1176 persons and 5-8 person employment.

5.3. Land use planning (break up with green belt)

The total plot area is 10,667.00 sq.m. The common plot proposed in 1,094.77 sq.m area. The

built up area at ground floor area will be 3,770.64 sq.m. The parking at ground floor open to sky

is 411.14 sq.m. The balance 5,788.80 sq.m. area is allotted for access road, margin area around

the scheme.

5.4. Assessment of Infrastructure Demand (Physical and Social)

The following infrastructure are estimated

Water: The water requirement is estimated as 7.91 cu.m./d during construction phase

(Source Ground water) and 183.95 cu.m./d post-construction phase (GMC water supply-To

apply during B.U. permission)

Electricity: The estimated electricity connected load will be 2,350 KW

Parking Space: 12,114.64 sq.m. (A basement, ground level and Hollow Plinth parking)

Drainage Facility: Available (To apply during B.U. permission) with Pumping station about

0.6 km from project site.

MSW disposal: Will be Available on demand application

Access Road: Available and will be connected to Gandhinagar GIFT city Ring road

Communication Facility: Will be available

Fire Brigade facility: On demand will be available in case of emergency. The Fire Station is

6.7 km away from project site and approximate travel time is 13 minutes.

Other services like, Education, health services may available based on the social and economic

capacity to the users.

5.5. Amenities and facilities

The amenities and facilities will be available as described above and more such social and

economic networking available due to location within city area.

Page 11: (Part of Environmental Clearance Application) For Proposed ...environmentclearance.nic.in/.../TOR/...PreFeasibilityReport(PFR).pdf · For Proposed Residential Building Construction

11

6. Proposed Infrastructure

6.1. Industrial Area (Processing area)

Not applicable

6.2. Residential Area (Non-Processing area)

The project is about the Residential purpose.

6.3. Green Belt

The estimated Common plot area is 1094.77 sq.m. and about 160 tree will be planted.

6.4. Social Infrastructure

As addressed in Section 5.4 in chapter 5.

6.5. Connectivity (Traffic and Transportation Road/Rail/Metro/Water way etc)

The project site is located within Gandhinagar City area having good road network connection

to other part of city and state Gujarat. The proposed project is located at 24 m wide road

connected with Gandhinagar GIFT city Ring road. The project site well connected with Railway

and Airport.

6.6. Drinking Water Management (Source & Supply of water)

The drinking water will be available from GMC/GUDA water supply.

6.7. Sewerage System

The GUDA/GMC Sewerage system will be available.

6.8. Industrial Waste Management

Not applicable

6.9. Solid Waste Management

The Municipal Solid Waste will be managed as per the GMC practice. For more details please

refer Annexure 7.

6.10. Power requirement and supply / source

The power requirement is estimated about 2,350 KW and will be met with from Uttar Gujarat

Vij Company Limited (UGVCL). The Emergency requirement will be met with by installing 25

KVA capacity D.G. set.

Page 12: (Part of Environmental Clearance Application) For Proposed ...environmentclearance.nic.in/.../TOR/...PreFeasibilityReport(PFR).pdf · For Proposed Residential Building Construction

12

7. Rehabilitation and Resettlement (R &R)

7.1. Policy to be adopted (Central/State) in respect of the project affected persons including home

oustees, land oustees, and landless labours (a brief outline to be given)

Not Applicable

Page 13: (Part of Environmental Clearance Application) For Proposed ...environmentclearance.nic.in/.../TOR/...PreFeasibilityReport(PFR).pdf · For Proposed Residential Building Construction

13

8. Project Schedule and Cost Estimate

8.1. Likely date of start of construction and likely date of completion (Time schedule of the project

to be given)

The Project Proponent desires to start as early as possible to minimize the future risks and

competitiveness of the project. However, as part of procedure to obtain pre-construction

approvals from Statutory Authorities as per the various Acts /Rules /Notifications /Regulations

/Guidelines etc, The Project Proponent may start the project during January 2016 and

estimated to be completed within about 24 months. The completion time may vary depending

upon the various factors affecting the project.

8.2. Estimated Project cost along with analysis in terms of economic viability of the Project.

The estimated Project cost is about Rs. 30.00 crores.

Page 14: (Part of Environmental Clearance Application) For Proposed ...environmentclearance.nic.in/.../TOR/...PreFeasibilityReport(PFR).pdf · For Proposed Residential Building Construction

14

9. Analysis of the Proposal (Final Recommendations)

9.1. Financial and Social benefits with special emphasis on the benefits to the local people including

tribal population, if any, in the area.

The project is Housing Infrastructure Building Construction Project. The project will attract the

people to basic need of housing at prima location of city area benefitting to economic

transportation, basic amenities. The project is viable considering present scenario and

Developmental plans of Statutory Authorities.