part l: experience statement for domestic builder … carry out excavation (cpcccm2002a) o install...
TRANSCRIPT
PRACTITIONERFORM
Part L:Experience Statement forDomesticBuilder(limited toEarthworksandExcavationwork)
Howtofilloutthisstatement
STEP1Readabouttheskills,knowledgeandexperiencethatyouneedtodemonstratetotheVictorian Building Authority (VBA)ifyouareapplyingforregistrationintheclassofDomesticBuilder(limited toEarthworksandExcavationwork).
STEP2Fillouttables1and2:
Intable1,tellusaboutyourgeneralexperienceinEarthworksandExcavationwork.
Intable2,tellusaboutthreespecificprojectsthatdemonstrateyourexperienceinEarthworksandExcavationwork.
STEP3Readtable3.Itexplainsthetypesofevidencethatyoucanusetodemonstratetheexperiencethatyounoteintable2.YouwillneedtopresentyourevidenceportfoliototheVBAwhenyoulodgeyourapplication.
Remember
• Pleaseincludeasmuchdetailaspossible,becausethis statement will be usedtoworkoutwhetheryouhaveenoughexperienceforregistration.
• Inyourapplication,youwillneedtoprovidereferencestoconfirmyouhavecompletedthiswork.
• Itisanoffenceundersection246oftheBuildingAct1993togiveanyfalseormisleadingstatementorinformationinyourapplication.
• Tomeettheexperiencerequirementsforregistration,youdon’tneedtohavedonealltheworkitemslistedincolumn1oftable1.Butyoudoneedexperienceinmostofthem.
• Wewillreturnyourapplicationifthisstatementisincompleteordoesn’thaveenoughdetail,andaskyouformoreinformation.
1©StateofVictoria,VictorianBuildingAuthority2017 (published September 2017)
Statement of Experience for Domestic Builder - earthworks and excavation work - Page 1/12
2
PRACTITIONERFORM
STEP1.Learnaboutskills,knowledgeandexperiencethatyouneed
QualificationsIfyouhavesuccessfullycompletedthefollowingqualifications,youwillsatisfysomeofthetechnicalknowledgerequiredforEarthworksandExcavationwork:
• CertificateIIIinCivilConstructionPlantOperations (RII30815),including theunits:
o Applytheprinciplesofearthworksconstruction (RIIMPO402D)o Conductearthworks (RIICRC306D)o Carryoutexcavation (CPCCCM2002A)o Installtrenchsupport (RIICCM210D).
Otherrelevantunitsofcompetencyinclude:
Ifyouhavenotcompletedtheseunitsofcompetency,theVBAwillassessyourEarthworksandExcavationworksknowledgeagainstthecompetenciesincludedintheunits.
ExperienceSotheVBAcanassesswhetheryouhavetherequiredexperienceinthiscomponentofdomesticbuildingwork,youshouldprovideaportfolio(tables1,2and3)ofevidencethatdemonstratesyourexperience.Thisevidencemustshowyoucancarryout,andarrangeormanagethecarryingoutofalltheactivitiesassociatedwithEarthworksandExcavationworkinacompetentmannerandtoaprofessionalstandard.
Yourportfolioshouldincludeevidenceof:
• yourexperienceintheareasthatyoutickintable1• yourparticipationinEarthworksandExcavationworkforthethree
differentresidentialprojectsthatyounoteintable2• yourknowledgeandapplicationoftheNationalConstructionCodeand
relevantAustralianStandards.
Statement of Experience for Domestic Builder - earthworks and excavation work - Page 2/12
Arrange building applications and approvals (CPCCBC4026A) Produce labour and material schedules for ordering (CPCCBC4005A) Select and prepare a construction contract (CPCCBC4003A).
oo
o
3
PRACTITIONERFORM
STEP2.Completetables1and2
Table1.FilloutthistabletodescribeallEarthworksandExcavationworkthatyouhavedone
Whattypeofworkhaveyoudone?Tickthebox.
Howmanytimeshaveyoudonethistypeofwork?Tickthebox. Whatwereyourexactresponsibilities?Listinpointform.
Establishedtherequirementforabuildingpermitfortheproposedwork
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Appliedforandobtainedabuildingpermitforproposedwork
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Statement of Experience for Domestic Builder - earthworks and excavation work - Page 3/12
PRACTITIONERFORM
Compliedwithabuildingpermit
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Arrangedrelevantcertificationofcompletedbuildingwork
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Producedcostestimatesandquotesforproposedwork
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Interpretedplans,drawingsandspecifications
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
4Statement of Experience for Domestic Builder - earthworks and excavation work - Page 4/12
5
PRACTITIONERFORM
Protectedpublicassetssuchasfootpaths,drivewaysandservices
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Undertookabolishmentofservices
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Markedoutservicesandsetoutpoints,includingsitelevelsandexcavationlimits
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Establishedsitedrainagerequirementsanddrainagesystems
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Statement of Experience for Domestic Builder - earthworks and excavation work - Page 5/12
6
PRACTITIONERFORM
Setoutsub-gradetoplan ☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Informedplantoperatorsofjobrequirements
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Monitoredthicknessandmoisturecontentofearth
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Monitoredstabilisationofexistingmaterial
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Statement of Experience for Domestic Builder - earthworks and excavation work - Page 6/12
PRACTITIONERFORM
Removedsurfaceareaprotrusionsandplacedgeo-syntheticmaterial
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Placedandcompactedsub-gradereplacementmaterials
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Dugexcavationstoensurecorrectroute,lineanddepthfromsiteplansandinstructions
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Installedtrench/excavationsupport
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
7Statement of Experience for Domestic Builder - earthworks and excavation work - Page 7/12
8
PRACTITIONERFORM
Table2.FilloutthistabletodescribethreeEarthworksandExcavationprojectsthatyouhavedone
BriefdescriptionPeriodofwork(mustincludeactualdates)
Workaddress(orwhereworkwasundertaken)
Nameandcontactnumberofyouremployer
Buildingpermitnumber
Project1
Startdate:
Enddate:
Project2
Startdate:
Enddate:
Statement of Experience for Domestic Builder - earthworks and excavation work - Page 8/12
PRACTITIONERFORM
Project3
Startdate:
Enddate:
Pleasecontinuetonextpage
9Statement of Experience for Domestic Builder - earthworks and excavation work - Page 9/12
10
PRACTITIONERFORM
STEP3.Usetable3tocreateyourevidenceportfolio
Table3.Usethistabletocreateanevidenceportfoliothatsupportsyourexperienceintable2
Areaofexperience Suggestedevidenceordocumentation
Applyforabuildingpermitforthe work Copiesofdocumentsthatyoupreparedinsupportofanapplicationforabuildingpermit
Enterintoandadministerappropriatecontracts Copiesofcontractsbetweenyouandtheclientorbuilderforthework
Documentationthatdemonstratesyourcapacitytocorrectlycompleteadomesticbuildingcontract
Evidenceyousuccessfullycompletedtraininginthefollowingunitsofcompetency:
• Selectandprepareaconstructioncontract• Administeraconstructioncontract
Producecostestimatesforearthworksandexcavationwork,includinghaving:
• surveyedtheworkareaforeaseofaccessandsafemovementofequipment
• scopedthesizeofwork• identifiedtaskandresourcerequirements• calculatedquantitiesofearth/soiltobe
excavated• identified,addressedandreported
environmentalissuesandgroundconditions
Notestakenduringsitesurveyactivities
Copiesofquotesthatyouprepared,respondingtoplansorjobrequirements.Quotesshouldinclude:
• startandenddates• adescriptionofworkstobeundertaken
Owndrawingsandworkingcalculationsofscopeofworkandquantityofsoiltobeexcavated
Labourschedulesandcostingsforspecificworkthatyouundertook
Statement of Experience for Domestic Builder - earthworks and excavation work - Page 10/12
11
PRACTITIONERFORM
Prepareforearthworksandexcavations,includingevidenceofhaving:
• developedandimplementedajobplanfortheearthworksandexcavationwork
• interpretedprojectsitesoil/rock&geologicaldata• installedrelevantsignagerequirements• selectedandmaintainedappropriateequipment• identifiedcompactionstandardsandtesting
requirements• identifiedundergroundservicesandarrangedfor
abolishment
CopiesofWorkSafenotificationsadvisingofanintentiontocommenceexcavationoperations
Soilreports
Ajobplanshowinginterpretationofinformationfromsoilreports
TherelevantSWMSforeachsitethatyouprepared
Siteplanswithsetoutrequirements
Correspondencewithutilitiescompanies,ownerorbuilderaboutidentificationandabolishmentofservices
WorkSafenotificationsyouhavepreparedorsubmitted,aboutintentiontocommenceexcavationoperationsintrenches,shaftsandtunnels
Carryoutearthworksandexcavationworksafelyandtostandard/specification,includingevidenceofhaving:
• setoutsub-gradetoplanandconductedearthworkssafely,effectivelyandefficiently
• informedplantoperatorsofjobrequirements• assessedearthworksinprogress• monitoredthicknessandmoisturecontent• monitoredstabilisationofexistingmaterial• removedsurfaceareaprotrusionsandplacedgeo-
syntheticmaterial• placedandcompactedsub-gradereplacement
materialscorrectly
Onsitedocumentationusedtocommunicatewithplantoperators
Planandprovideonsitesupervision Projectmanagementschedulesorspreadsheetsusedforeachproject,indicatingeachstagework,timelinesandmilestones
Otherdocumentationrelatingtoonsitesupervisionduringthework
Performactivitiesafterearthwork/excavationwork Documentsrecordingmaterialsdisposedof,recycledorstoredaccordingtojobrequirements
Statement of Experience for Domestic Builder - earthworks and excavation work - Page 11/12
12
PRACTITIONERFORM
Remember:Theinformationprovidedinthisformmustbetrueandcorrect.Itisanoffenceundersection246oftheBuildingAct1993togivefalseormisleadinginformationinrelationtoanapplicationforregistration,andthisoffencecarriesamaximumpenaltyof120penaltyunits.
Ideclarethattheinformationcontainedinthisformiscompleteandtruetothebestofmyknowledge.AndIunderstandthattheVBAmaymakeenquiriestoverifyanyoftheinformationIhavegivenonthisform,andIconsentfortheinformationprovidedinthisformtobesharedwithanyotherthirdpartyforthatpurpose.
Applicantname
Applicantsignature
Date
Statement of Experience for Domestic Builder - earthworks and excavation work - Page 12/12
(must be a handwritten signature)