part-financed by the european union (european regional development fund) rail baltica growth...

59
Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Upload: antony-barrett

Post on 26-Dec-2015

222 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING

WP4

25/11/2011

Page 2: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

PROJECT TEAM

2

Piotr Dwojacki, PhD (College of Business and Administration)

Maciej Komosa, PhD (Consultant, expert in evaluation projects)

Miron Mironowicz, MSc. (Expert in transport)

Magdalena Jażdżewska-Gutta, MSc. (Assistan Lecturer of University of Gdansk)

Page 3: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

INTERVIEW MEETINGS

3

Latvia

- DB Schenker – logistics service provider- BMGS customer- Kreiss – truck carrier- Pindstrup Latvia - customer- Sungate – logistics services- LDz – rail infrastructure management- MSC LATVIA – sea carrier- TRANSPORTBETONS MB - customer- DSV Transport – logistics service provider- LUKOIL BALTIJA R - customer

Page 4: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

INTERVIEW MEETINGS

4

Lithuania

- ORLEN Lietuva - customer of freight transport- DSV TRANSPORT – logistics service provider- JSC Lithuanian railways – rail services and infrastructure- AB Achema – producer of fertilizers- AD REM Group – logistics services provider- Lietuvos Geležinkeliai, AB- Transimeksa – logistics services provider

- Schenker (28.11)- Gefco Baltic (29.11)- Maxima Grupe (28.11)

Page 5: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

INTERVIEW MEETINGS

5

Poland

- CTl Logistic – rail carrier- PKP CARGO Logistics – rail services provider- PKP CARGO S.A - rail services provider- PKP CARGO service sp. z o.o. - rail services provider- Polimex-Mostostal SA – customer of freight transport- Adampol Sp. z o.o. - customer of freight transport

Page 6: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

INTERVIEW MEETINGS

6

Germany

- Müller - Die lila Logistik- logistics services provider

- Leipa Logistik (28.11)

Page 7: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

SOME DIFFICULT ISSUES• Language!

– Could tell more– Members of board of management

• Did not want to reveal confidential information (e.g. in the area of networking)

• Problems with German respondents– Not interested in RB project– Don’t have time

7

Page 8: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

UNDERSTANDING RAIL BALTICA…

• „The simple way to get to the Western countries by railway and the simple way to transport goods and people from the western part of Russian Federation to the Western Europe”

• „In Poland goods are usually transported on the line N-S and Rail Baltica will connect the E with W”

8

Page 9: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

DIRECTIONS

• Latvia, Lithuania (mainly E-W)– from seaports to the East (mainly Russia) – East-West

direction– Sometimes: Kaunas, Riga, Tallin („the inland connection –

not really” – sea carrier)• Germany, Poland (E-W)

– Berlin or German border to Łódź or Warsaw

• Rail Baltica: N-S

9

Page 10: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

A BOTTLENECK?

• Lithuania to Poland?

• Lithuanian customer:• „to Klaipeda and Tallin mainly railway, to areas in Poland

mainly trucks”• „I: Which part of existing RB railway needs improvement?• R: The part to Poland• I: Which of those parts give you the most trouble?• R: Poland”

10

Page 11: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

ROUTES, DIRECTIONS

• The customer decides about everything

• „what are the main obstacles in using rail transport on the Berlin-Kaunas-Tallinn route?

• Nobody operates this route”

11

Page 12: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

OTHER BOTTLENECKS?

• Not enough wagons (LV) – limited resources

12

Page 13: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

PASSENGER VS. CARGO

• Modernisation – first for passenger cargo• In the situation of congestion – passenger train goes

first

• Not good for cargo operators

13

Page 14: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

PASSENGERS

• Culture of using railways• „it’s not a profit making area” (LT)

14

Page 15: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

WHO DOES INTERMODAL?

• Rather railway operators offer trucking service

• Trucking companies treat railways as competitors

15

Page 16: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

• Enabling transportation that would eliminate the need of changing of the loading unit, whilst re-loading of goods increases the cost of transport considerably, would for sure generate an attractive solution

• Reloads are quite expensive. Less reloads we have, the more attractive it is [the transport mode]

(Latvia, Poland)

16

INTERMODAL PERSPECTIVE

Page 17: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

I – „What are the barriers to increase the intermodal transport in the company?”

R – „It is combination for passengers, number of reloads from box to box, from unit to unit. It is kind of risk of enemies, of loss customers, when we are talking about reloading containers, sea to truck, from truck to rail.”

17

INTERMODAL PERSPECTIVE

Page 18: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

RAIL BALTICA

• Needed vs. not important?

18

Page 19: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

IMPORTANT

• „ to rail all the goods in the same wagon from Europe to Latvia. Right now we do not have this option. This would be easier and save a lot of time” (LV)

19

Page 20: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

NOT IMPORTANT

• „Does your comapny have any expectations towards Rail Baltica?

• No. It does not concern us”

• (sea carrier)

20

Page 21: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

RAIL BALTICA - ASSESSMENT

• Cannot say anything as it doesn’t exist – talking about non-existing product

• Someone must offer services in this route

21

Page 22: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

COMPETITIVENESS

• RB must be more competitive than sea and road transport

• What does competitiveness mean?– Speed– Cost

22

Page 23: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

COMPETITIVE ADVANTAGE: „FAST AND CHEAP”

• „[competitive transport] is ease of use, reasonable price, speed, door to door transport, faster than flights”

• „First of all this is the speed of delivery and possibility to reduce the costs of delivery”

• „in some cases the cost of transportation by the railway is similar to transportation by the air. It is quite expensive”

23

Page 24: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

COMPETITION: ROAD TRANSPORT• The demand shows that Europe needs road transport.

Fruits cannot be transported by trains, because the time of transport is too long and it is not compatible. It would probably be [important] for Russia. (Latvia)

24

Page 25: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

COMPETITION: SEA TRANSPORT

• „Rail Baltica is, in a way, a competitive project, as it will enable transportation from the Hamburg port, through Berlin, to Warsaw, Lithuania, Latvia, Estonia and that eliminates the need of sea transportation” (Poland)

25

Page 26: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

COMPETITION: AIR TRANSPORT

• „Today’s mobility is low cost airlines, especially for young people. This really opens the world” (Latvia)

26

Page 27: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

COMPETITION: PIPELINES TRANSPORT

• „using the railway is very expensive (…) this is very expensive comparing to the transport by the oil pipeline”

27

Page 28: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

• Amount of elements for one project in one region in one time (construction projects - customers’ perspective)

• Oversize - units longer than 40-45 feet - size, it is too complicated for logistic process the roads

• Density of stations / terminals

FACTORS INFLUENCING COMPETITIVENESS

28

Page 29: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

PRICE

• Should be cheaper • Price for the access to infrastructure (even 25-30 PLN -

5-7 EUR per km)

29

Page 30: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

PRICES

The only condition that it [Rail Baltica] would be interesting for us, it could be very cheap. Then we will use it instead of our trucks. The price must cover the risk of railway (…) – It should be for free. (Latvia)

30

Page 31: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

TIME 1

• Time of loading of a train– Longer than truck– Shorter than train

• Time to change the gauge of tracks:– „few to less than 20 hrs” (PL)

31

Page 32: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

TIME 2• Kaunas to Berlin by truck:

– 60 hrs (25 hrs pure driving) (DE) • Tallin to Warsaw/Berlin truck

– 36 hrs sea– 60+12 hrs road– Tallin to Berlin: 24-30 hrs would be attractive

• Kaunas to Berlin– 3-4 working days would be sufficient (customer)– 1500 EUR per trailer (price)– 14-20 hrs (road) (trucking company)

32

Page 33: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

TIME 3

• Passenger– Kaunas to Berlin 20 hrs (a guess) by bus– -Riga to Tallin 9 hrs by rail– Tallin to Warsaw should be 10 hrs– Warsaw to Berlin 7 hrs

33

Page 34: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

SPEED• Rail (cargo)

– Poland: 22 km/h (some places 14 km/h)– Latvia: 40 km/h– Europe: 60 km/h

• Truck:– 60 km/h (average) – German company– 80 km/h (PL)

• What speed?– 50-60 km/h would be attractive– 100 km/h for freight (LV)– 120 km/h – standard required by EC

34

Page 35: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

STANDARDS

• Gauge: narrow vs. wide track• Common (Europaen) standards

35

Page 36: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

CAPACITY

• Is not a problem – there is excess capacity

36

Page 37: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

RELOADING

• Reloading to other wagon or changing from truck to train (or the other way round) – Not suitable for all products (e.g. fruit, fertilizers)– Time-consuming

37

Page 38: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

TERMINALS

• Should include couple of terminals• Availability of terminals

– Important for customers– Availabity of rail-road terminals for customers – max. Of 40

km (DE)

38

Page 39: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

MODAL SHIFT

• Forecast: „could shift 10 mln tons per year from road to rail” (if there is the same gauge)

• 750 m of train carries the same load of cargo as 3 km of trucks

39

Page 40: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

SOME IDEAS

• Semi-trailers– „possible”, „interesting”

40

Page 41: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

RB AS SEEN BY SOME CUSTOMERS

• Will get opportunity to chose the way of transport

41

Page 42: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

COMPETITION ONCE MORE• RB seen as a competition (THREAT)

– Sea transport (can be complementary as well) • For bulk cargo

– Trucking companies • Not for bulk cargo• „Trucking lobby is too great” (said by railway operator)• Free the trucks for other customers (or it will be easier for us

to get a truck) – problem of limited resources and high demand• The gap is getting bigger and bigger

42

Page 43: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

TOTAL PRODUCT!• Speed• Price• Quality• Paperwork • Regular and often connection (not once a week - DE)• Trustworty, on time safe (DE)

43

CUSTOMER DECIDES!

Page 44: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

CUSTOMER DECIDES!• Factors for RB success:

– „There must be cargo”– „Cargo to carry”

44

Page 45: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

COMPETITIVE ADVANTAGE

• Bulk• Overgauge• Time and cost?

45

Page 46: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

„OPERATIONALITIES”

• Need to „unify custom processes. And unify the amounts of payment” (Latvia),

• Challenge: „Different systems of the documents required going to transit through the countries” (Lithuania)

46

Page 47: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

ACTION

• Modernisation/building: „The ones who will gain sth from this should do sth” (LV)

47

Page 48: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

NETWORKING

• Universities – training, internships, sometimes planning and analyses

• „You need to create clusters of cooperation” (PL)• Cooperation in order to increase profit• Mainly suppliers and customers• Competitors – rarely• Producers:

– Producers’ organisations

48

Page 49: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

NETWORKING

• Rail – cooperation with seaports (sometimes and only cooperation) (LT)

49

Page 50: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

NETWORKING• The Association of Harbors • Construction Association in

Latvia• Latvian Logistic Association • Latvian Supply Chain Cluster • Association of Producers of

Building Materials in Latvia• Latvian Association of

Transportation

• PKP Group• Polish International Freight

Forwarders Association – PIFFA (PISIL)

• University of Latvia, Transport and Communication institute and Riga Technical University

50

Page 51: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

RAIL BALTICA STAKEHOLDERS MAP(FOR INITIAL STAGE OF RB PROJECT)

51

Page 52: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

PRIVATE BUSINESS: BASIC DIMENSIONS• Stage of the project • Attitude (positive / negative) • Single and multi business• Strategic analyses • Strategic options • Bargaining power / barriers of entry

Strategic analyses according to Michael E. Porter Forcefield analysis according to Kurt Lewin

52

Page 53: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

EARLY STAGE: DECISION PROCESS

53

At the stage different options are possible / available - according to individual perception ofRail Baltica concept and own business uderstanding

Page 54: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

We distinguish single- and multi-business transport companies, differing with the way of understanding the effects of the Project and with approach to their strategies.

54

Page 55: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

DECISION MAP: FACTORS INFLUENCING STRATEGIC DECISIONS*

(RBGC stakeholders response)

55* General idea to be adopted to specific group of companies or country

Page 56: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

56

INTERVIEW MEETINGS CONDUCTED BYLUT KOUVOLA• Finland:

– DHL Freight (Finland) Oy (Logistics service provider)– Itella Logistics Oy (Logistics service provider)– Schenker Oy (Logistics service provider)– Viking Line Abp (Passenger + freight)– YIT rakennus Oy (Client of freight transport)– Peikko Group Oy (Client of freight transport)– Stora Enso Oyj (Client of freight transport)

• Estonia:– AS Schenker (Logistics service provider)– Ericsson Eesti AS (Client of freight transport)– AS Estonian Air (Passenger + freight)– AS Lux Express Estonia (Passenger transport)– AS Balbiino (Client of freight transport)– AS Onninen (Client of freight transport)– Ensto Elekter AS (Client of freight transport)– DHL Estonia AS (Logistics service provider)

Page 57: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

57

INTERVIEW FINDINGS (FIN & EST)

- Inland transportation mostly by road

– Price level of road transport has decreased since 2008

- Number of passengers have decreased in road and air transport (Estonia)

– Using private cars has increased its market share, and the trend is continuing

– Attitude towards public transportation is poor

- Local public transport companies are trying to improve their image

Page 58: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

58

INTERVIEW FINDINGS (FIN & EST)

- Price level of supply chain costs is the most important factor– Should be comparable with road and sea transport– ”No one want to use rail transport if it costs more” –Interviewee

- Time is important factor– In Finland from 20 to 48 hours (Helsinki - Berlin)– In Estonia from 10 to 24 hours (Tallinn - Berlin)

- Frequency should be at average level (1-4 times a day at least)- Easiness is very important for some clients of freight transport- Most global companies stress the importance of good connections forward

from Warsaw and Berlin– Connection between Tallinn-Warsaw-Berlin is not enough, especially on

freight side– Many logistics service providers have need for good connections to

South from Warsaw

Page 59: Part-financed by the European Union (European Regional Development Fund) RAIL BALTICA GROWTH CORRIDOR, PROJECT MEETING WP4 25/11/2011

Part-financed by the European Union (European Regional Development Fund)

59

INTERVIEW FINDINGS (FIN & EST)- Rail Baltica is seen mostly as positive

- More positive attitude in Finland

- Estonians are a little bit sceptical whether the actual investment project will ever start

- Rail Baltica is not seen as threat for logistics providers and freight transport companies

- Rail Baltica will be success only, if it co-operates with other transport modes and companies

- Logical to extend to Helsinki and St. Petersburg

- ”Is there enough volume?” –some interviewees

- IMO sulphur regulations are seen as a great threat for Finnish transportation and whole economy

- Rail Baltica is seen as a great alternative for sea transport