TITLE Prepared by: PART 4: PART 4: IMPLEMENTATION & OPERATION IMPLEMENTATION & OPERATION 4.2 Hazard Identification, Risk Assessment and Risk Control (HIRARC)

Upload: dodat

Post on 06-Feb-2018

235 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: PART 4: IMPLEMENTATION & OPERATION TITLE · PDF file04.05.2012 · PART 4: IMPLEMENTATION & OPERATION ... (HIRARC) Learning Objectives To define what is risk assessment. ... assessment

TITLE

Prepared by:

PART 4: PART 4: IMPLEMENTATION & OPERATIONIMPLEMENTATION & OPERATION

� 4.2 Hazard Identification, RiskAssessment and Risk Control (HIRARC)

Page 2: PART 4: IMPLEMENTATION & OPERATION TITLE · PDF file04.05.2012 · PART 4: IMPLEMENTATION & OPERATION ... (HIRARC) Learning Objectives To define what is risk assessment. ... assessment

Learning Objectives

� To define what is risk

assessment.

� To assess the hazard

� To describe the

method of identifying

hazard.

� To assess the hazard

identification, risk

assessment and risk

control process.

� To construct the risk

assessment matrix.

Page 3: PART 4: IMPLEMENTATION & OPERATION TITLE · PDF file04.05.2012 · PART 4: IMPLEMENTATION & OPERATION ... (HIRARC) Learning Objectives To define what is risk assessment. ... assessment

� What is Risk assessment??:

The process of evaluating the risks to safety and health arising from hazards at work.

Risk Assessment

� Risk assessment results is documented and used for:

1. Risk control in OSH management

2. Future reference and review

Page 4: PART 4: IMPLEMENTATION & OPERATION TITLE · PDF file04.05.2012 · PART 4: IMPLEMENTATION & OPERATION ... (HIRARC) Learning Objectives To define what is risk assessment. ... assessment

1. Integrate Risk Management as part of planningat all levels of business

2. Accept all risks

Basic Principles Of Risk Management

2. Accept all risks

3. Make risk decisions appropriately (depending on level of risk)

4. Manage the risk

Page 5: PART 4: IMPLEMENTATION & OPERATION TITLE · PDF file04.05.2012 · PART 4: IMPLEMENTATION & OPERATION ... (HIRARC) Learning Objectives To define what is risk assessment. ... assessment

� Before Operation

� During Operation

When To Carry Out Risk Assessment

� After Operation

Page 6: PART 4: IMPLEMENTATION & OPERATION TITLE · PDF file04.05.2012 · PART 4: IMPLEMENTATION & OPERATION ... (HIRARC) Learning Objectives To define what is risk assessment. ... assessment

� Review whenever there are changes:

� Internal

� Before modification, changes or introduction of new

�Materials, machinery or

When To Review Risk Assessment

�Materials, machinery or processes, working procedures.

� External

� Amendments of national laws and regulations

� Developments in OSH knowledge and technology

Page 7: PART 4: IMPLEMENTATION & OPERATION TITLE · PDF file04.05.2012 · PART 4: IMPLEMENTATION & OPERATION ... (HIRARC) Learning Objectives To define what is risk assessment. ... assessment

� Hazard Identification

� Risk Assessment

Basic Components Of Risk Management

� Risk Control

� Review

Page 8: PART 4: IMPLEMENTATION & OPERATION TITLE · PDF file04.05.2012 · PART 4: IMPLEMENTATION & OPERATION ... (HIRARC) Learning Objectives To define what is risk assessment. ... assessment

Risk Assessment

Page 9: PART 4: IMPLEMENTATION & OPERATION TITLE · PDF file04.05.2012 · PART 4: IMPLEMENTATION & OPERATION ... (HIRARC) Learning Objectives To define what is risk assessment. ... assessment

� Severity in terms of:

� Harm to health

� Damage to property

� Damage to environment

Determining Severity

� Or the combination of the above

Page 10: PART 4: IMPLEMENTATION & OPERATION TITLE · PDF file04.05.2012 · PART 4: IMPLEMENTATION & OPERATION ... (HIRARC) Learning Objectives To define what is risk assessment. ... assessment

Severity

Determine severity categories:

� Catastrophic (Major fatality & irrecoverable damage)

� Fatal (normally irreversibleinjury or damage to health)

� Serious (Non-fatal injury, � Serious (Non-fatal injury, permanent disability.)

� Minor (Disabling but not permanent injury)

� Negligible injuries (first aid type injury)

Page 11: PART 4: IMPLEMENTATION & OPERATION TITLE · PDF file04.05.2012 · PART 4: IMPLEMENTATION & OPERATION ... (HIRARC) Learning Objectives To define what is risk assessment. ... assessment

� Most likely - could happen frequently

� Possible – has a good chance of occurring & not unusual.

Likelihood

� Conceivable – occurred sometime in future.

� Remote – not been known to occur many times.

� Inconceivable – impossible & never occured

Page 12: PART 4: IMPLEMENTATION & OPERATION TITLE · PDF file04.05.2012 · PART 4: IMPLEMENTATION & OPERATION ... (HIRARC) Learning Objectives To define what is risk assessment. ... assessment

SeverityLikelihood

Most Likely

(5)

Possible

(4)

Conceivable

(3)

Remote

(2)

Inconceivable

(1)

Catastrophic

A. Qualitative Risk Table

Catastrophic

(5) High-25 High-20 High-15 Medium-10 Medium-5

Fatal

(4) High-20 High-16 Medium-12 Medium-8 Low-4

Serious

(3) High-15 Medium-12 Medium-9 Medium-6 Low-3

Minor

(2) Medium-10 Medium-8 Medium-6 Low-4 Low-2

Negligible

(1) Medium-5 Medium-4 Low-3 Low-2 Low-1

Page 13: PART 4: IMPLEMENTATION & OPERATION TITLE · PDF file04.05.2012 · PART 4: IMPLEMENTATION & OPERATION ... (HIRARC) Learning Objectives To define what is risk assessment. ... assessment

Status of Risk

RISK DESCRIPTION ACTION

15 – 25 HIGH

A HIGH risk requires immediate action to control the hazard as detailed in the hierarchy of control. Actions taken must be documented on the risk assessment form including date for completion.

A MEDIUM risk requires a planned approach to

5 – 12 MEDIUM

A MEDIUM risk requires a planned approach to controlling the hazard and applies temporary measure if required. Actions taken must be documented on the risk assessment form including date for completion.

1 – 4 LOW

A risk identified as LOW may be considered as acceptable and further reduction may not be necessary. However, if the risk can be resolved quickly and efficiently, control measures should be implemented and recorded.

Page 14: PART 4: IMPLEMENTATION & OPERATION TITLE · PDF file04.05.2012 · PART 4: IMPLEMENTATION & OPERATION ... (HIRARC) Learning Objectives To define what is risk assessment. ... assessment

Determine severity categories:

� 4: Fatality & Permanent Disability

� 3: More than 4 days MC

B. Semi – Quantitative Risk Assessment

� 2: Less than or 4 days MC

� 1: First aid and near misses

Page 15: PART 4: IMPLEMENTATION & OPERATION TITLE · PDF file04.05.2012 · PART 4: IMPLEMENTATION & OPERATION ... (HIRARC) Learning Objectives To define what is risk assessment. ... assessment

Determining Likelihood of Occurrence of

Hazard

� 4: Daily

Semi – Quantitative Risk Assessment

� 3: Weekly

� 2: Monthly

� 1: Yearly

Page 16: PART 4: IMPLEMENTATION & OPERATION TITLE · PDF file04.05.2012 · PART 4: IMPLEMENTATION & OPERATION ... (HIRARC) Learning Objectives To define what is risk assessment. ... assessment

LIKELIHOOD

SE

VE

RIT

Y

Yearly Monthly Weekly Daily

1 2 3 4

Semi – Quantitative Risk Assessment

SE

VE

RIT

Y

First Aid and Near Misses

1 1 2 3 4

Less than or 4 days

MC2 2 4 6 8

More than 4 days MC

3 3 6 9 12

Fatality & Permanent Disability

4 4 8 12 16

Page 17: PART 4: IMPLEMENTATION & OPERATION TITLE · PDF file04.05.2012 · PART 4: IMPLEMENTATION & OPERATION ... (HIRARC) Learning Objectives To define what is risk assessment. ... assessment

Activities / process /

facilities/ equipmentHazard Effect

Current Risk

Control

Legal

Reqmt

Risk Action &

RecommendationsSeverity. LikelihoodRisk

Rating

Arc WeldingPhysical:-Radiation

Eyes …Face shield

FMA, OSHA

2 3 6PPE-goggles, eye wash station, job rotation

Chemical:-Fumes

Breathing …..-

FMA, OSHA

2 3 6Exhaust fan, respirator, job rotation

Physical:- Spark

Skin blisterGloves, overall, kasut

FMA, OSHA

2 3 6

Fire resistance coverall , glove, fire extinguisher,

Risk Assessment Form

overall, kasut OSHA2 3 6

extinguisher, emergency shower

Page 18: PART 4: IMPLEMENTATION & OPERATION TITLE · PDF file04.05.2012 · PART 4: IMPLEMENTATION & OPERATION ... (HIRARC) Learning Objectives To define what is risk assessment. ... assessment

Risk Control

Page 19: PART 4: IMPLEMENTATION & OPERATION TITLE · PDF file04.05.2012 · PART 4: IMPLEMENTATION & OPERATION ... (HIRARC) Learning Objectives To define what is risk assessment. ... assessment

Principle of Control

•Substitution

•Modify process

•Enclosure

•Local exhaust

•Fugitive

emission control

•Isolation

•Housekeeping

•General

ventilation

•Continuous area

monitoring

•Dilution

ventilation

•Automation or

remote control

•Training and

education

•Worker rotation

•Enclosure of

worker

•Personal

monitoring

•Personal

protective devices

Page 20: PART 4: IMPLEMENTATION & OPERATION TITLE · PDF file04.05.2012 · PART 4: IMPLEMENTATION & OPERATION ... (HIRARC) Learning Objectives To define what is risk assessment. ... assessment

Hierarchy Of Control

MOST EFFECTIVE

Elimination - remove the hazard.

FAIRLY EFFECTIVE

Substitution - use less hazardous

one.

Isolation – isolate the work area i.e.

X-ray machine in restricted roomX-ray machine in restricted room

Engineering Control – design,

isolation at source, barricade,

guarding,

LEAST EFFECTIVE

Administrative Control – safe work

procedure, isolation i.e. reduce

exposure time and limit, training,

signage etc

PPE - last resort.