Page 1: Part 139 Contractor Reference Guide

PART  139  REFERENCE  GUIDE  BCAD  OPERATIONS  

Page 2: Part 139 Contractor Reference Guide

139.305  Paved  Area  

Unacceptable   Acceptable  

>  3  inch  lip  >3  IN.  

Pavement  Lip  >3  inches   No  Pavement  Lip  

Page 3: Part 139 Contractor Reference Guide

139.305  Paved  Area  

Unacceptable   Acceptable  

Holes  Exceeding  3  IN.  Depth  OR  45  Degrees  OR  5  IN.  Diameter  

Page 4: Part 139 Contractor Reference Guide

139.309  Safety  Area  

Unacceptable   Acceptable  

Ponding  &  Water  AccumulaEon  

Page 5: Part 139 Contractor Reference Guide

139.309  Safety  Area  

Unacceptable   Acceptable  

Page 6: Part 139 Contractor Reference Guide

139.309  Safety  Area  Unacceptable   Acceptable  

Debris,  Loose  Objects,  And  Lips  

Page 7: Part 139 Contractor Reference Guide

139.309  Safety  Area  

Unacceptable   Acceptable  

Humps,  Ruts  in  Safety  Area  

Page 8: Part 139 Contractor Reference Guide

139.309  Safety  Area  

Unacceptable   Acceptable  

Manhole  Cover  Not  Properly  FiMed  

Page 9: Part 139 Contractor Reference Guide

139.311  Markings  

Taxiway  Centerline  Stripe  12  inches  with  6  inch  black  border  

Surface  Painted  Hold  Sign  LeMers  12  S.  length      

12  ;.  

6  IN.   6  IN.  

12  IN.  

Page 10: Part 139 Contractor Reference Guide

139.311  Paved  Marking  Unacceptable   Acceptable  

Cracks,  blistering,  and  fading  

3  FT.  x  25FT.  

Page 11: Part 139 Contractor Reference Guide

139.311  Paved  Marking  

Runway  Hold  PosiGon  Specs  

Page 12: Part 139 Contractor Reference Guide

139.311  Signs  Unacceptable   Acceptable  

SpoMed  Spray  Paint  

Page 13: Part 139 Contractor Reference Guide

139.311  Signs  

Unacceptable   Acceptable  

>3  IN.  Lip  

Page 14: Part 139 Contractor Reference Guide

139.311  Signs  

Unacceptable   Acceptable  

Faded  Panels  

Page 15: Part 139 Contractor Reference Guide

139.311  Signs  

Unacceptable   Acceptable  

Arrow  Space  >12  Inches  

Page 16: Part 139 Contractor Reference Guide

139.311  Signs  

Unacceptable   Acceptable  

Grounding  Rode  >3  Inches   Grounding  Rode  <  3  Inches  

Page 17: Part 139 Contractor Reference Guide

139.311  Lighting  

Unacceptable   Acceptable  

Frangible  Coupling  >3  Inches  

Page 18: Part 139 Contractor Reference Guide

139.323  TrafFic  &  Wind  Indicators  

Unacceptable   Acceptable  

PorEon  of  Wind  Sock  Unlighted