PANCHPATMALI BAUXITE MINE, NALCO RECLAMATION AND REHABILITATION OF MINED OUT AREA AT PANCHPATMALI BAUXITE MINE OF M/S NALCO -A CASE STUDY

Upload: others

Post on 09-Jun-2022

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PANCHPATMALI BAUXITE MINE, NALCO

PANCHPATMALI BAUXITE MINE,

NALCO

RECLAMATION AND REHABILITATION

OF

MINED OUT AREA

AT PANCHPATMALI BAUXITE MINE OF M/S NALCO

-A CASE STUDY

Page 2: PANCHPATMALI BAUXITE MINE, NALCO

BRIEF DETAILS OF THE MINE

PANCHPATMALI BAUXITE MINE OF NALCO IS THE ASIA’S

LARGEST BAUXITE MINE.

A CAPTIVE BAUXITE MINE FOR SUPPLY OF BAUXITE ORE TO

ALUMINA REFINERY OF NALCO .

THE MINE COMMISSIONED IN THE YEAR 1986-87.

THE PRESENT PRODUCTION CAPACITY OF THE MINE IS 6.825

MIL TON PER YEAR .

LOCATED OVER PANCHPATMALI HILL IN KORAPUT DISTRICT

OF ODISHA.

Page 3: PANCHPATMALI BAUXITE MINE, NALCO

North Block

Central Block

N

S

Present Working area

CB Sec-II: Bxt Reserve - 63.31 Mil

Ton (Cut off +20% Al2O3, SiO2: - 7%)

CB Sec-I: Exhausted

NB-I:Bxt Reserve-46.74 Mil Ton (Cut off +20% Al2O3, SiO2: - 7%)

NB-II: Bxt Reserve-17.29 Mil Ton

(Cut off- +20% Al2O3 , SiO2: -7%,

as on 31.03.2016)

SMCP

FLDC

Cable belt conveyor

To Alumina Refinery, Damanjodi

Approach Road to Mine

Back filled/ Reclaimed

FMG

Common ML Boundary

Central Block

Primary Crusher

house

Back filled/ Reclaimed

Admn Building

Panchpatmali Bauxite Deposit

South Block: Bxt Reserve- 82.05 Mil Ton

(Cu off +20% Al2O3,

SiO2: - 7%)

Explosive Magazine

Total Bxt. Reserve- 317.72 Mn T •Consumed : 107 Mn T (till 31st March 2016) •Left Out reserves( mineble ) after IBM Guideline :210.72 MT (as on 31st March 2016)

Page 4: PANCHPATMALI BAUXITE MINE, NALCO

LEASE DETAILS

LEASE NAME LEASE VALIDITY TOTAL AREA

(HA)

FOREST AREA

(HA)

NON-

FOREST

AREA

(HA)

CENTRAL AND

NORTH BLOCK

16-11-2032 1315.264 1294.283 20.981

SOUTH BLOCK

19-07-2029 528.262 189.552 338.71

Page 5: PANCHPATMALI BAUXITE MINE, NALCO

ENVIRONMENTAL SETTING

L O C AT I O N - 1 1 0 0 M a b o v e M S L T O 1 2 6 6 M

a b o v e M S L ,

3 0 0 M A B O V E S U R R O U N D I N G

V A L L E Y A R E A .

TEMPERATURE- WINTER- (70C TO 300C), SUMMER UPTO 400C

AVERAGE YEARLY RAINFALL- 1600-1800 MM

WIND SPEED- 15 KM/HOUR (AVG.), SW-NE

HUMIDITY 40% TO 90%

PRE MINING VEGETATION GRASS & HERBS (No Tree Growth)

LOCATION OF SENSITIVE ZONES

LIKE RESERVE FORESTS,

SANCTUARIES ,ETC.

NOT WITH IN 100KM RADIUS OF THE MINE

Page 6: PANCHPATMALI BAUXITE MINE, NALCO

6

FULLY MECHANIZED,

OPEN CAST MINE

(CAPTIVE USE)

CAPACITY- 68 .25

LAKH TPY OF

BAUXITE ORE

CERTIFIED UNDER

ISO 9001 , ISO14001,

OHSAS 18001&

SA 8000

FEATURES OF PANCHPATMALI

BAUXITE MINE

Page 7: PANCHPATMALI BAUXITE MINE, NALCO

Key parameters

Top soil - 0 - 1 mtr.

OB thickness - 2 - 4 mts.

Bxt. thickness -14 mtr. Avg.

Soil Laterite

Bauxite

PLK

CROSS-SECTIONAL VIEW OF PANCHAPATMALI

BAUXITE DEPOSIT

Page 8: PANCHPATMALI BAUXITE MINE, NALCO

O V E R B U R D E N ( TO P S O I L & A L U M I N O U S L AT E R I T E )

S T R I P P I N G

BAUXITE EXCAVATION IN TWO PHASES

(TOP BAUXITE & BOTTOM BAUXITE)

SIZE REDUCTION BY PRIMARY CRUSHERS FROM BAUXITE LUMPS OF

MAX 1 M X 1M X 1M SIZE TO -150 MM SIZE AND IN-PIT

TRANSPORTATION THROUGH A BELT CONVEYOR

TRANSPORTATION OF CRUSHED BAUXITE (MAX. LUMP SIZE -150 MM)

TO ALUMINA REFINERY PLANT THROUGH CABLE BELT CONVEYOR

SYSTEM

RECLAMATION & REHABILITATION OF THE MINED OUT AREA BY USE

OF LATERITIC OVERBURDEN AND TOP SOIL. FOLLOWED BY

PLANTATION

PROCESS OF MINING AT

PANCHPATMALI BAUXITE MINE

Page 9: PANCHPATMALI BAUXITE MINE, NALCO

A B

C

E

F

G

Land

reclamation

and

plantation

SITE

OFFICE

DIFF.TRENCHES

SUMP

CENTRAL HAUL ROAD

LAND RECLAMATION

TDS BUILDING

FMG

CENTRAL HAUL

ROAD WITH

WATER

SPRINKLING

AND

ILLUMINATION

N

\

PERIFERAL

BARRIERS

Method of Mining : Schematic View of Trench Mining

9

Page 10: PANCHPATMALI BAUXITE MINE, NALCO
Page 11: PANCHPATMALI BAUXITE MINE, NALCO

TOP BAUXITE

MINING

Page 12: PANCHPATMALI BAUXITE MINE, NALCO

RIPPING

&

DOZING

IN TOP

BAUXITE

Page 13: PANCHPATMALI BAUXITE MINE, NALCO

BOTTOM

BAUXITE

MINING BY

BACKHOE

EXCAVATOR

Page 14: PANCHPATMALI BAUXITE MINE, NALCO

MINED OUT

AREA

Page 15: PANCHPATMALI BAUXITE MINE, NALCO

TWIN 900 TPH PRIMERY

CRUSHERS

One 900 TPH semi-mobile crusher with 4.5 km long conveyor to main crusher

Fully covered 14.6 km long single flight cable belt conveyor from mine to Alumina Refinery plant

CRUSHING AND

CONVEYING SYSTEM

Page 16: PANCHPATMALI BAUXITE MINE, NALCO

THE CONCURRENT MINED OUT AREA

REHABILITATION PLAN HAS GOT THE FOLLOWING

FIVE COMPONENTS-

• BACK FILLING OF MINED OUT AREA WITH DUMPING OF LATERTIC

OVER BURDEN

• DOZING & LEVELLING OF DUMPS TO FORM BENCHES ( 1M TO

4M)AND TERRACES.

• DUMPING AND SPREADING OF TOP SOIL IN THICKNESS OF 0.3Mtr.

• AFFORESTATION WITH SUITABLE PLANT SPEICES.

• MAINTENANCE OF THE PLANTATION( WITH SOIL WORKING &

APPLICATION OF MANURE , FERTLIZER .INSECTICIDES &

PESTICIDES) FOR THREE YEARS INCLUSIVE OF YEAR OF

PLANTATION.

• WATCH & WARD COVERAGE FOR ENTIRE PLANTATION .

Page 17: PANCHPATMALI BAUXITE MINE, NALCO

THE AFFORESTATION PLAN IS PREPARED KEEPING IN VIEW

THE FOLLOWING OBJECTIVES

TO PROVIDE A GREEN BELT AROUND THE PERIPHERY OF

THE MINING AREA TO COMBAT THE DISPERSAL OF DUST &

NOISE IN THE ADJOINING AREAS.

PROTECT THE EROSION OF THE SOIL.

CONSERVE MOISTURE FOR INCREASING GROUND WATER

RECHARGING.

RESTORE AESTHETIC BEAUTY OF THE LOCALITY.

AFFORESTATION PROGRAMME

Page 18: PANCHPATMALI BAUXITE MINE, NALCO

BACK FILLING

OF MINED

OUT AREA

WITH

LATERITIC

OVER

BURDEN.

Page 19: PANCHPATMALI BAUXITE MINE, NALCO

SPREADING

OF TOP

SOIL

Page 20: PANCHPATMALI BAUXITE MINE, NALCO

SPECIES SELECTED FULFIL THE FOLLOWING SPECIFIC

REQUIREMENTS OF THE AREAS:

1. AVAILABILITY OF SEED MATERIAL.

2. CAPACITY TO ENDURE WATER STRESS AND CLIMATIC

EXTREMES

3. ADAPTABILITY & RATE OF GROWTH.

4. CANOPY FOR SHADES AND FRUITS.

CRITERIA FOR SELECTION OF SPECIES

Page 21: PANCHPATMALI BAUXITE MINE, NALCO

PLANTATION

SUPPORT GIVEN

BY A HIGH

ALTITUDE

NURSERY:

AREA-3 ACRES

CAPACITY-

2,00,000

SEEDLINGS PER

ANNUM

Page 22: PANCHPATMALI BAUXITE MINE, NALCO

PITTING PRIOR TO PLANTATION

PIT SIZE-

30CMX 30 CM X60CM

SPACING -2.5 M

DENSTY -2500 PITS PER HA

Page 23: PANCHPATMALI BAUXITE MINE, NALCO

PLANTATION CARRIED OUT BY PANCHPATMALI

BAUXITE MINE

A) AREA

PLANTATION IN BACK FILLED AREA

PLANTATION OVER PERIPHERAL BARRIER

PLANTATION OVER VACCANT SPACES IN HILL SLOPES

PLANTATION IN CONVEYOR CORRIDOR & ALONG MINE

ACCESS ROAD .

B) DOMINATING PLANT SPECIES

SILVER OAK

ACACIA

KARANJ

PINE

BAMBOO

ROSE APPLE

JAMUN

Page 24: PANCHPATMALI BAUXITE MINE, NALCO

IMPLEMENTATION OF

PROGRESSIVE MINE CLOSURE

PLAN ( STATUS AS ON 30.11.2016)

LEASE

AREA

(HA)

OPENED

UP

AREA

(HA)

RECLAIMED AND

REHABILITATED

AREA

(HA)

AREA UNDER

ACTIVE MINING

INCLUSIVE OF

PERMANENT

HAUL ROADS

(HA)

1315.264

472.77 295.64 177.13

Page 25: PANCHPATMALI BAUXITE MINE, NALCO

PLANTATION IN BACKFILLED AREA WITH

THE PERMANENT HAUL ROAD

Page 26: PANCHPATMALI BAUXITE MINE, NALCO

PINE PLANTATION IN RECLAIMED AREA

Page 27: PANCHPATMALI BAUXITE MINE, NALCO

JAMUN PLANTATION IN

RECLAIMED AREA

Page 28: PANCHPATMALI BAUXITE MINE, NALCO

AVENUE PLANTATION ALONG

MINE ACCESS ROAD

Page 29: PANCHPATMALI BAUXITE MINE, NALCO

SILVER OAK PLANTATION ON

PERIPHERAL BARRIER

Page 30: PANCHPATMALI BAUXITE MINE, NALCO

ACACIA PLANTATION OVER VACANT

SPACES ON HILL SLOPES

Page 31: PANCHPATMALI BAUXITE MINE, NALCO

DISTRIBUTION OF

SEEDLINGS TO VILLAGERS

TO CREATE GREEN BELT

AROUND THE MINE

(11,100 nos distributed during 2016-17)

Page 32: PANCHPATMALI BAUXITE MINE, NALCO

LAND SCAPING SHOWING ADMN.BUILDING OF

PANCHPATMALI BAUXITE MINE IN THE

BACKGROUND

Page 33: PANCHPATMALI BAUXITE MINE, NALCO

DETAILS OF PLANTATION CARRIED OUT BY PANCHPATMALI

BAUXITE MINE SINCE INCEPTION

TOTAL AREA

COVERED

(IN BACK FILLED

AREA, PERIPHERAL

BARRIER AND HILL

SLOPES)

TOTAL

PLANTATION

IN MINED OUT

AREA

TOTAL PLANTATION

OUTSIDE MINING

AREA

TOTAL

PLANTATION

1088.94

HA

11,22,709

NOS

21,82,745

NOS

33,05,454

NOS

-OVERALL SURVIVABILITY- APPX. 70%

-GAP FILLING IS USUALLY CARRIED OUT TO IMPROVE THE

DENSITY OF PLANTS

(STATUS AS ON 30.11.2016)

Page 34: PANCHPATMALI BAUXITE MINE, NALCO

EXPENDITURE INCURRED TOWARDS LAND RECLAMATION

& PLANTATION

COST OF PLANTATION PER TON OF BAUXITE PRODUCTION

DEPENDS ON THE FOLLOWING FACTORS;

BAUXITE PRODUCTION ACHIEVED DURING THE FINANCIA L

YEAR

OPERATING AND MAINTENANCE COST OF HEAVY EARTH

MOVING EQUIPMENTS

THCKNESS OF THE DEPOSIT AND AREA AVAILABLE FOR

LAND RECLAMATION AND PLANTATION

THE COST OF PLANTATION VARIES BETWEEN RS10 TO RS 15

PER TON OF BAUXITE PRODUCED .

Page 35: PANCHPATMALI BAUXITE MINE, NALCO

ROSE APPLE

PLANTATION

JAMUN

PLANTATION

Page 36: PANCHPATMALI BAUXITE MINE, NALCO

GUAVA

PLANTATION

PINE

PLANTATION

Page 37: PANCHPATMALI BAUXITE MINE, NALCO

GRASS TURFING ON

SLOPES TO PREVENT

SOIL EROSION

Page 38: PANCHPATMALI BAUXITE MINE, NALCO

SUSTAINING ECOSYSTEM BY PROVISION OF

WATER HARVESTING STRUCTURES

CONSTRUCTION

OF PONDS AND

SEDIMENTATION

BASIN WITHIN

MINE AREA

Page 39: PANCHPATMALI BAUXITE MINE, NALCO

LAND BEFORE AND AFTER MINING

BEFORE AFTER

Page 40: PANCHPATMALI BAUXITE MINE, NALCO

AWARDS FOR ENVIRONMENT PROTECTION

& PLANTATION

o INDIRA PRIYADARSHINI

VRKSHAMITRA AWARD BY

MOEF&CC – 1994

o POLLUTION CONTROL

EXCELLENCE AWARD BY

SPCB,ODISHA-1998

o GEM GRANITE ENVIRONMENT

AWARD BY FIMI-2013

o SITARAM RUNGTA SOCIAL

AWARENESS AWARD BY FIMI-2014

o POLLUTION CONTROL

EXCELLENCE AWARD BY SPCB,

ODISHA-2015

Page 41: PANCHPATMALI BAUXITE MINE, NALCO

41

Page 42: PANCHPATMALI BAUXITE MINE, NALCO

EXPENDITURE INCURRED TOWARDS LAND RECLAMATION

& PLANTATION IN LAST 3 YEARS

Sl. No Activity 2013-14 2014-15 2015-16

1. Backfilling and land

reclamation (Rs)

10,53,57,667 8,12,73,516 5,21,25,970

2. Plantation and

Horticulture(Rs)

57,48,011 56,73,359 66,90,762

3 Production (MT) 62,92,677 57,39,120 63,40,142

4 Expenses (Rs) / Tonne of

bauxite produced

17.66 15.15 9.28