pakistan development forum (pdf) - world...
TRANSCRIPT
![Page 1: PAKISTAN DEVELOPMENT FORUM (PDF) - World Banksiteresources.worldbank.org/.../Pakistan-Development-Forum/... · pakistan development forum (pdf) 12th-14th may, ... mirani dam bal](https://reader031.vdocuments.site/reader031/viewer/2022030407/5a8419e27f8b9aa5408b68cc/html5/thumbnails/1.jpg)
1
PAKISTAN DEVELOPMENT FORUM (PDF)12th-14th May, 2003, Islamabad
Presentation onPLANNING FOR WATER RESOURCES
Dr. Shahid Amjad ChaudhryDeputy Chairman,Planning CommissionGovernment of Pakistan
![Page 2: PAKISTAN DEVELOPMENT FORUM (PDF) - World Banksiteresources.worldbank.org/.../Pakistan-Development-Forum/... · pakistan development forum (pdf) 12th-14th may, ... mirani dam bal](https://reader031.vdocuments.site/reader031/viewer/2022030407/5a8419e27f8b9aa5408b68cc/html5/thumbnails/2.jpg)
2
PRESENTATION OUTLINEPRESENTATION OUTLINE! Background! Poverty in Pakistan! Water Availability in Pakistan! Water Availability vs Population growth! Escapage below Kotri! Seepage losses in irrigation system! Reservoir Sedimentation! Water Sector Issues! Sub-Sectors of Water Resources! Water Resources Development Matrix! Water Storages! Construction of New Canals! Irrigated Areas & Water Projects! Remodelling/Rehabilitation/Lining of Canals & Watercourses! Drainage & Reclamation! Flood Control! Physical Targets
![Page 3: PAKISTAN DEVELOPMENT FORUM (PDF) - World Banksiteresources.worldbank.org/.../Pakistan-Development-Forum/... · pakistan development forum (pdf) 12th-14th may, ... mirani dam bal](https://reader031.vdocuments.site/reader031/viewer/2022030407/5a8419e27f8b9aa5408b68cc/html5/thumbnails/3.jpg)
3
BACKGROUNDBACKGROUND
! Share of agriculture in GDP is 25%.
! Employment in Agriculture is 49%.
! Rural Poverty is 39% as compared to urban poverty
(23%) and is on increase particularly in drought hit areas.
! Increase in irrigated areas is important to alleviate
poverty by development and Integrated Management of
Water Resources.
![Page 4: PAKISTAN DEVELOPMENT FORUM (PDF) - World Banksiteresources.worldbank.org/.../Pakistan-Development-Forum/... · pakistan development forum (pdf) 12th-14th may, ... mirani dam bal](https://reader031.vdocuments.site/reader031/viewer/2022030407/5a8419e27f8b9aa5408b68cc/html5/thumbnails/4.jpg)
4
POVERTY IN PAKISTAN(Head Count Ratio)
24.9627.72
24.54
30.6332.13
27.03
32.99
28.83
34.67
38.98
19.76
15.15 14.83
19.1
22.67
0
5
10
15
20
25
30
35
40
45
1992-93 1993-94 1996-97 1998-99 2000-01YEARS
PERC
ENTA
GE
Overall Rural Urban
![Page 5: PAKISTAN DEVELOPMENT FORUM (PDF) - World Banksiteresources.worldbank.org/.../Pakistan-Development-Forum/... · pakistan development forum (pdf) 12th-14th may, ... mirani dam bal](https://reader031.vdocuments.site/reader031/viewer/2022030407/5a8419e27f8b9aa5408b68cc/html5/thumbnails/5.jpg)
5
WATER AVAILABILTY IN PAKISTANWATER AVAILABILTY IN PAKISTAN
AVAILABILITY 155.7 MAF
USES
ABOVE RIM STATIONS 5.7 MAF
CANAL DIVERSION 105.4 MAF
TOTAL 111.1 MAF
BALANCE AVAILABLE 44.6 MAF
![Page 6: PAKISTAN DEVELOPMENT FORUM (PDF) - World Banksiteresources.worldbank.org/.../Pakistan-Development-Forum/... · pakistan development forum (pdf) 12th-14th may, ... mirani dam bal](https://reader031.vdocuments.site/reader031/viewer/2022030407/5a8419e27f8b9aa5408b68cc/html5/thumbnails/6.jpg)
6
11
98.6
210
200
190
180
170
160
150
140
130
120
110
100
90
80
70
60
50
40
30
9000
8000
7000
6000
5000
4000
3000
2000
1000
01951 1961 1972 1981 1992 2000 2012 2020
PER
CAP
ITA
AVAI
LAB
ILIT
Y (M
) 3
POPU
LATI
ON
( M
ILLI
ONS)
CANA
LS D
IVER
SIO
N (M
AF)
POPU
LATI
ON
( M
ILLI
ONS)
YEARSYEARS
210
200
190
180
170
160
150
140
130
120
110
100
90
80
70
60
50
40
30
AFTERTARBELA
INDEPENDENCE
AFTER TREATYBEFORE TREATY
AFTERMANGLA
103106
PER CAPITA
AVAILABILITY
1700 m3
19921400 m3
2000
1000 m32012
885 m32020
5650 m3(1951)
WATER SHORT
COUNTRY
216.8
178
138
POPULATIONGROWTH
WATER AVAILABILITY VS POPULATION GROWTHWATER AVAILABILITY VS POPULATION GROWTH
![Page 7: PAKISTAN DEVELOPMENT FORUM (PDF) - World Banksiteresources.worldbank.org/.../Pakistan-Development-Forum/... · pakistan development forum (pdf) 12th-14th may, ... mirani dam bal](https://reader031.vdocuments.site/reader031/viewer/2022030407/5a8419e27f8b9aa5408b68cc/html5/thumbnails/7.jpg)
7
ESCAPAGE BELOW KOTRIESCAPAGE BELOW KOTRI
3 0. 39
80. 59
29 . 81
20 . 10
9 .6 8
4 5. 91
29. 55
10. 9 8
2 6. 90
17. 5 3
52 .8 6
1 7. 22
4 2. 34
53 .2 9
29. 11
91 .8 3
62 . 76
45. 40
20. 79
8. 83
0. 77 1 . 93 2. 32
81 .4 9
35. 1 53 3. 79
69 . 08
0
20
40
60
80
100
76-7
7
77-7
8
78-7
9
79-8
0
80-8
1
81-8
2
82-8
3
83-8
4
84-8
5
85-8
6
86-8
7
87-8
8
88-8
9
89-9
0
90-9
1
91-9
2
92-9
3
93-9
4
94-9
5
95-9
6
96-9
7
97-9
8
98-9
9
99-0
0
00-0
1
01-0
2
*02-
03
Years
Annu
al D
ischa
rge
(MA
F)
AVG.(35.20)
(HYDROLOGICAL YEAR FROM APRIL TO MARCH)(HYDROLOGICAL YEAR FROM APRIL TO MARCH)
![Page 8: PAKISTAN DEVELOPMENT FORUM (PDF) - World Banksiteresources.worldbank.org/.../Pakistan-Development-Forum/... · pakistan development forum (pdf) 12th-14th may, ... mirani dam bal](https://reader031.vdocuments.site/reader031/viewer/2022030407/5a8419e27f8b9aa5408b68cc/html5/thumbnails/8.jpg)
8
41Crop Use
173058Fields
65Total
253083Watercourses
7890Disty. And Minors
1615106Main and Branch Canals
MAF% age
LossDelivery at Head
(MAF)
Location
SEEPAGE LOSSES IN IRRIGATION SYSTEMSEEPAGE LOSSES IN IRRIGATION SYSTEM
![Page 9: PAKISTAN DEVELOPMENT FORUM (PDF) - World Banksiteresources.worldbank.org/.../Pakistan-Development-Forum/... · pakistan development forum (pdf) 12th-14th may, ... mirani dam bal](https://reader031.vdocuments.site/reader031/viewer/2022030407/5a8419e27f8b9aa5408b68cc/html5/thumbnails/9.jpg)
9
SEEPAGE LOSSES IN IRRIGATION SYSTEMSEEPAGE LOSSES IN IRRIGATION SYSTEM
Total loss of water in the system 65 MAF
Loss of water underlain by Fresh water area 33 MAF
Loss of water underlain by Saline water areas 32 MAF
Loss in bigger canals underlain by Saline water 8 MAF
Loss in distributaries & Minors underlain by
Saline water 3.5 MAF
Loss in water-courses underlain by Saline water 12.5 MAF
Loss in Field underlain by Saline water 8 MAF
![Page 10: PAKISTAN DEVELOPMENT FORUM (PDF) - World Banksiteresources.worldbank.org/.../Pakistan-Development-Forum/... · pakistan development forum (pdf) 12th-14th may, ... mirani dam bal](https://reader031.vdocuments.site/reader031/viewer/2022030407/5a8419e27f8b9aa5408b68cc/html5/thumbnails/10.jpg)
10
RESERVOIR SEDIMENTATION (MAF)RESERVOIR SEDIMENTATION (MAF)
5.942 (32%)4.266 (23%)18.368TOTAL
0.481 (55%)0.373 (43%)0.870 (1971)CHASHMA
1.510 (26%)1.059 (18%)5.882 (1967)MANGLA
3.951 (34%)2.834 (24%)11.616 (1974)TARBELA
STORAGE LOSS BY YEAR 2010
(PROJECTED) (MAF)
STORAGE LOSS BY THE YEAR 2001
(MAF)
ORIGINAL STORAGE CAPACITY (MAF)RESERVOIR
![Page 11: PAKISTAN DEVELOPMENT FORUM (PDF) - World Banksiteresources.worldbank.org/.../Pakistan-Development-Forum/... · pakistan development forum (pdf) 12th-14th may, ... mirani dam bal](https://reader031.vdocuments.site/reader031/viewer/2022030407/5a8419e27f8b9aa5408b68cc/html5/thumbnails/11.jpg)
11
WATER SECTOR ISSUESWATER SECTOR ISSUES
! WATER SCARCITY! WATER ESCAPAGE TO SEA! NEED FOR ADDITIONAL RESERVOIRS! SAFE DISPOSAL OF DRAINAGE EFFLUENT TO SEA! PROTECTION OF INFRASTRUCTURE FROM
ONSLAUGHT OF FLOODS.! MINING OF GROUND WATER! SEEPAGE LOSSES IN IRRIGATION SYSTEM! LACK OF PRIVATE SECTOR PARTICIPATION! DETERIORATING INSTITUTIONAL CAPACITIES OF KEY
WATER SECTOR INSTITUTIONS.! INCREASED POVERTY IN BACKWARD IRRIGATED
AREAS.
![Page 12: PAKISTAN DEVELOPMENT FORUM (PDF) - World Banksiteresources.worldbank.org/.../Pakistan-Development-Forum/... · pakistan development forum (pdf) 12th-14th may, ... mirani dam bal](https://reader031.vdocuments.site/reader031/viewer/2022030407/5a8419e27f8b9aa5408b68cc/html5/thumbnails/12.jpg)
12
SUBSUB--SECTORS OF WATER RESOURCES DEVELOPMENTSECTORS OF WATER RESOURCES DEVELOPMENT
! WATER STORAGES
! CONSTRUCTION OF NEW CANALS
! REMODELLING/REHABILITATION/LINING OF CANALS &
WATER-COURSES
! DRAINAGE & RECLAMATION.
! FLOOD CONTROL
![Page 13: PAKISTAN DEVELOPMENT FORUM (PDF) - World Banksiteresources.worldbank.org/.../Pakistan-Development-Forum/... · pakistan development forum (pdf) 12th-14th may, ... mirani dam bal](https://reader031.vdocuments.site/reader031/viewer/2022030407/5a8419e27f8b9aa5408b68cc/html5/thumbnails/13.jpg)
13
WATER RESOURCES DEVELOPMENTWATER RESOURCES DEVELOPMENT
Issue S trategy
M id-term Plan(10 Years)
Lon g-Term Plan(10 -20 Ye ars)
W ater S torageC apacity
M aintain e xistingstor age c apacity b yadding wa ter s tor ag eof 5.34 M AF tocom pensa te forstor age los s of 5 .9M AF
De velopm ent of 30M AF o f stora ges.
C onstr uction of N ewFlood W ater C anals
Use 3.03 M A F o fFlood water & 2.7M AF of perennialwater.
M aintain the existing& new canalsystems .
R emo delling/R ehab ilitation/lining of canalsan d w ater courses
Con serve 6 M AF ofwater thro ughselected IrrigationS ystem R ehabilitationin Sindh, P unjab andimpro vem e nt of 7 500 0watercours es.
Lin e alldis trib utaries,m inors andwatercoursesunderlain b y salinewater are as.
![Page 14: PAKISTAN DEVELOPMENT FORUM (PDF) - World Banksiteresources.worldbank.org/.../Pakistan-Development-Forum/... · pakistan development forum (pdf) 12th-14th may, ... mirani dam bal](https://reader031.vdocuments.site/reader031/viewer/2022030407/5a8419e27f8b9aa5408b68cc/html5/thumbnails/14.jpg)
14
WATER RESOURCES DEVELOPMENTWATER RESOURCES DEVELOPMENTIss ue S tra te g y
M id -te rm P la n(10 Y e ars )
Lo n g- Ter m P la n(10 -2 0 Y ea rs)
D ra in ag e &R ecla m a tion
R e sto re p ro d uct iv ity o f la nd b yre c lam in in g 6 .6 M .A o fd is a stro u s ar ea th ro u ghN a tio n al D r a in ag e P ro g ram m e ,R B O D -I, R B O D -II , G ro un d w ate rM an ag em en t, M as ter D ra in ag eP lan .
D ra in ag e A c co rd ,ba se d o n M as terD ra in ag e P lan an dsu sta in th erec la im e d a re a .
F lo odC on tro l
R e du c e c o los s a l lo s se s b yo n slau g h t o f flo o ds , b yc on s tr uc ting 11 01 K me m b an km e nts , 3 03 sp u rs ,h arn e ss 3 3 h ill to r re n ts a n dim p ro ve f lo o d fo rec as ting &w a rn in g s y stem thro u g h F loo dM an ag em en t o f M u rri B ug h tiH il l T or ren ts , 2 n d F lo od S ec torP ro jec t, N o rm a l F loo dP ro gra m m e & F an M a na g em en to f M ith a n w an H ill To rre nts .
C on tinu atio n o fF lo o d C on tro lP rog ram m e ba se don fe e d b ac k fro mth e M id -T er mP la n .
![Page 15: PAKISTAN DEVELOPMENT FORUM (PDF) - World Banksiteresources.worldbank.org/.../Pakistan-Development-Forum/... · pakistan development forum (pdf) 12th-14th may, ... mirani dam bal](https://reader031.vdocuments.site/reader031/viewer/2022030407/5a8419e27f8b9aa5408b68cc/html5/thumbnails/15.jpg)
15
WATER STORAGES
![Page 16: PAKISTAN DEVELOPMENT FORUM (PDF) - World Banksiteresources.worldbank.org/.../Pakistan-Development-Forum/... · pakistan development forum (pdf) 12th-14th may, ... mirani dam bal](https://reader031.vdocuments.site/reader031/viewer/2022030407/5a8419e27f8b9aa5408b68cc/html5/thumbnails/16.jpg)
16
NEED FOR ADDITIONAL RESERVOIRSNEED FOR ADDITIONAL RESERVOIRS
! WATER-SHORT LAND-RICH COUNTRY
! RAPIDLY INCREASING POPULATION.
! DEPLETING ON-LINE STORAGES.
! LARGE ESCAPAGES OF UNCONTROLLED FLOOD FLOWS INTO
SEA.
! EFFECTIVE RIVER REGULATION AND INTEGRATED WATER
RESOURCE MANAGEMENT
![Page 17: PAKISTAN DEVELOPMENT FORUM (PDF) - World Banksiteresources.worldbank.org/.../Pakistan-Development-Forum/... · pakistan development forum (pdf) 12th-14th may, ... mirani dam bal](https://reader031.vdocuments.site/reader031/viewer/2022030407/5a8419e27f8b9aa5408b68cc/html5/thumbnails/17.jpg)
17
BACKGROUND FOR FUTURE STORAGESBACKGROUND FOR FUTURE STORAGES
! DEVELOPMENT OF WATER STORAGES AT STAND STILL SINCE
1976
! STORAGE CAPACITY ONLY 11% OF TOTAL SURFACE WATER
! HYDROPOWER ONLY 16% OF TOTAL POTENTIAL
! IMPROVE HYDEL/THERMAL POWER MIX.
! 22.5 MA CULTURABLE LAND AVAILABLE FOR DEVELOPMENT
![Page 18: PAKISTAN DEVELOPMENT FORUM (PDF) - World Banksiteresources.worldbank.org/.../Pakistan-Development-Forum/... · pakistan development forum (pdf) 12th-14th may, ... mirani dam bal](https://reader031.vdocuments.site/reader031/viewer/2022030407/5a8419e27f8b9aa5408b68cc/html5/thumbnails/18.jpg)
18
OBJECIVES FOR FUTURE STORAGESOBJECIVES FOR FUTURE STORAGES
! DEVELOPMENT OF 65 MAF OF STORAGES
! DEVELOPMENT OF 23,000 MW OF HYDRO, COAL AND GAS
POWER STATIONS
! DEVELOPMENT OF LOW HEAD HYDELS ON CANALS
! ENCOURAGE PRIVATE SECTOR INVESTMENT
(FOREIGN/LOCAL) AND PRIVATE/PUBLIC SECTOR JOINT
VENTURES
! SUPPORT ECONOMY AND POVERTY ALLEVIATION IN
BACKWARD AREAS
![Page 19: PAKISTAN DEVELOPMENT FORUM (PDF) - World Banksiteresources.worldbank.org/.../Pakistan-Development-Forum/... · pakistan development forum (pdf) 12th-14th may, ... mirani dam bal](https://reader031.vdocuments.site/reader031/viewer/2022030407/5a8419e27f8b9aa5408b68cc/html5/thumbnails/19.jpg)
19
EXISTING SURFACE STORAGESEXISTING SURFACE STORAGES
W-0.02215SOANSIMLY DAM (1972)
W-0.04114KURANGRAWAL (1962)
I-0.06115KOHAT TOITANDA (1965)
I,W-0.09167HAROKHANPUR (1984)
I,W-0.76151HUBHUB (1983)
472217.74TOTAL
I-0.78-INDUSCHOTIARI LAKE
I,W-0.32-INDUSKINJHAR LAKE
I-0.75-INDUSMANCHAR LAKE
I-0.08--HAMAL LAKE
I-0.0435PISHINBKD KHAN (1900)
I,P40.03107KURRAMBARAN DAM (1962)
I,P2400.04250KABULWARSAK (1960)
I,P-0.61-INDUSCHASHMA (1971)
I,P10004.82380JHELUMMANGLA (1966)
I,P34789.30485INDUSTARBELA(1976)
PURPOSEPOWER(MW)
LIVE STORAGE
(MAF)
HT. OF DAM (FT.)RIV ERPROJECT
I- IRRIGATION P- POWER W- WATER SUPPLY
![Page 20: PAKISTAN DEVELOPMENT FORUM (PDF) - World Banksiteresources.worldbank.org/.../Pakistan-Development-Forum/... · pakistan development forum (pdf) 12th-14th may, ... mirani dam bal](https://reader031.vdocuments.site/reader031/viewer/2022030407/5a8419e27f8b9aa5408b68cc/html5/thumbnails/20.jpg)
20
TOTAL STORAGE POTENTIALTOTAL STORAGE POTENTIAL
5.42SUB TOTAL
III
3.24NWFP
64.65TOTAL II & III
0.20SINDH
1.73BALOCHISTAN
PUNJAB
STORAGE SITES OUTSIDE EXISTING IRRIGATION SYSTEM
SUB TOTAL
3. RAISED MANGLA
2. OFF CHANNEL STORAGES
1. STORAGE SITES (RIVERS & TRIBUTARIES)
STORAGES WHICH CAN BE INTEGRATED WITH EXISTING IRRIGATION SYSTEM
SURFACE STORAGES IN OPERATION
ITEM
0.25
59.23
2.90
21.65
34.68
II
17.74I
TOTAL STORAGE CAPACITY (MAF)
Sr. No.
![Page 21: PAKISTAN DEVELOPMENT FORUM (PDF) - World Banksiteresources.worldbank.org/.../Pakistan-Development-Forum/... · pakistan development forum (pdf) 12th-14th may, ... mirani dam bal](https://reader031.vdocuments.site/reader031/viewer/2022030407/5a8419e27f8b9aa5408b68cc/html5/thumbnails/21.jpg)
21
PRIORITY WATER SECTOR PROJECTS PRIORITY WATER SECTOR PROJECTS –– PART IPART I
June 200914 Aug 2004515058362,0001.20NWFPKURRAM TANGI DAM
--
April 2003
April 2003
04 Oct 2002
03 Oct 2002
16 Aug 2001
30 Sep 2002
17 Aug 2001
22 Aug 2001
Ground Ground BreakingBreaking
--
Dec 2005
June 2006
June 2007
June 2007
June 2007
June 2007
June 2006
June 2006
Completion DateCompletion Date
215-25,0000.02Bal.SABAKZAI DAM
4351119,9200.08SkarduSATPARA DAM
5467-713,000-Bal.KACHHI FLOOD CANAL / TAUNSA BARRAGE
5170-412,000-SindhRAINEE FLOOD WATER CANAL
--2,6492,649216.4216.43,262,2063,262,2065.645.64--TOTAL:TOTAL:
498-33,2000.30Bal.MIRANI DAM
6500-1,534,000-PunjabTHAL FLOOD CANAL
4.51000130-2.9AJ&KRAISING MANGLA DAM
421417.4163,0861.13NWFPGOMAL ZAM DAM
Period Period (Yrs)(Yrs)
Tentative Tentative CostCost
(US$ M)(US$ M)
ConstructionConstructionPower Power (MW)(MW)
Area Under Area Under Irrigation Irrigation
(Acres)(Acres)Storage Storage ((MAFMAF))LocationLocationProjectProject
![Page 22: PAKISTAN DEVELOPMENT FORUM (PDF) - World Banksiteresources.worldbank.org/.../Pakistan-Development-Forum/... · pakistan development forum (pdf) 12th-14th may, ... mirani dam bal](https://reader031.vdocuments.site/reader031/viewer/2022030407/5a8419e27f8b9aa5408b68cc/html5/thumbnails/22.jpg)
22
STORAGE SITES PROPOSED FOR DETAILED STUDIES PARTSTORAGE SITES PROPOSED FOR DETAILED STUDIES PART--II
Sindh
Sindh
Sindh
Punjab
NWFP
Bal
PunjabNA
Location
TOTAL:
Sehwan Barrage Complex
Thar/Rainee Canal
Riverine Area Development
Greater Thal Canal
Chashma Right Bank Canal (Lift Cum Gravity)
Kachhi Canal
Thal ResevoirBasha Dam
Project
198DFI8
138FPFI7
--FI6
-CFI5
1721---
180FRI, P2
135DFI4
170FRI3
900F PFI, P1
Studies Cost
(R.Mil)Proposed
StudyPresent StatusPurpose
Sr. No
.
D – Detailed EngineeringF – FeasibilityW – Water SupplyI – Irrigation
C – Ready for ContructtionR – Reconnaissance PF – Pre FeasibilityP – Power
![Page 23: PAKISTAN DEVELOPMENT FORUM (PDF) - World Banksiteresources.worldbank.org/.../Pakistan-Development-Forum/... · pakistan development forum (pdf) 12th-14th may, ... mirani dam bal](https://reader031.vdocuments.site/reader031/viewer/2022030407/5a8419e27f8b9aa5408b68cc/html5/thumbnails/23.jpg)
23
CONSTRUCTION OF NEW CANALSPROJECT LOCATION TOTAL
WATERREQUIR-EMENT(MAF)
PERENIALWATER
FLOODWATER
AREA(MA)
COSTRs. M
COMPLETIONDATE
THALFLOODCANAL
PUNJAB 2.496 1.873 0.624 1.534 30,467 JUNE 2007
RAINEEFLOODCANAL
SINDH 1.307 -- 1.307 0.412 17,947 JUNE 2007
KACHHIFLOODCANAL
BALOCHIS-TAN
2.021 0.821 1.10 0.713 32,450 JUNE 2007
TOTAL 5.824 2.694 3.031 2.659 80,864
![Page 24: PAKISTAN DEVELOPMENT FORUM (PDF) - World Banksiteresources.worldbank.org/.../Pakistan-Development-Forum/... · pakistan development forum (pdf) 12th-14th may, ... mirani dam bal](https://reader031.vdocuments.site/reader031/viewer/2022030407/5a8419e27f8b9aa5408b68cc/html5/thumbnails/24.jpg)
24
! THE DAMS ARE BEING CONSTRUCTED FOR
WATER STORAGE OF 5.34 MAF TO COMPENSATE
STORAGE LOSS OF 5.942 MAF DUE TO
SEDIMENTATION BY THE YEAR 2010.
! THE NEW CANALS HAVE BEEN DESIGNED TO
UTILIZE 3.031 MAF OF FLOOD WATER OTHER
THAN PERENNIAL FLOW OF 2.694 MAF.
![Page 25: PAKISTAN DEVELOPMENT FORUM (PDF) - World Banksiteresources.worldbank.org/.../Pakistan-Development-Forum/... · pakistan development forum (pdf) 12th-14th may, ... mirani dam bal](https://reader031.vdocuments.site/reader031/viewer/2022030407/5a8419e27f8b9aa5408b68cc/html5/thumbnails/25.jpg)
25
PRESENTLY IRRIGATED AREAS AND PROPOSED WATER PROJECTS
3.8 MA44.4 MATOTAL
0.8 MA2.2 MABalochistan
0.5 MA2.3 MANWFP
1.5 MA33.4 MAPunjab
1.0 MA6.5 MASindh
Ongoing Schemes
Presently Irrigated Areas
AREABALOCHISTAN
SINDH
PUNJAB
Disputed Territory
NWFP
![Page 26: PAKISTAN DEVELOPMENT FORUM (PDF) - World Banksiteresources.worldbank.org/.../Pakistan-Development-Forum/... · pakistan development forum (pdf) 12th-14th may, ... mirani dam bal](https://reader031.vdocuments.site/reader031/viewer/2022030407/5a8419e27f8b9aa5408b68cc/html5/thumbnails/26.jpg)
26
REMODELLING/REHABILITATION/LINING OF CANALS
AND WATER-COURSES.
![Page 27: PAKISTAN DEVELOPMENT FORUM (PDF) - World Banksiteresources.worldbank.org/.../Pakistan-Development-Forum/... · pakistan development forum (pdf) 12th-14th may, ... mirani dam bal](https://reader031.vdocuments.site/reader031/viewer/2022030407/5a8419e27f8b9aa5408b68cc/html5/thumbnails/27.jpg)
27
MAJOR REHABILITATION/LINING OF WATER SECTOR PROJECTS
S.No NAME OF PROJECT TOTALCOST(Rs. M)
ESTIMATEDCOMPLETION
DATE
PSDP 2002-03ALLOCATION
(Rs. M)
1. IRRIGATION SYSTEM REHABILITATIONSINDH (PHASE-I)
12963 2007 1400
2. IRRIGATION SYSTEM REHABILITATIPUNJAB
20,500 2008 ---
3. LINING OF DISTRIBUTARIES & MINORSPUNJAB.
31,000 2008 ---
4. LINING OF CHANNELS IN SINDH 17,000 2007 ---
5. MODERNIZATION OF BARRAGES Pb. 30,000 2009 ---
6. ON-FARM WATER MANAGEMENTPROGRAMME
12,450 2005 ---
7. INSTALLATION OF TELEMETRICSYSTEM IN INDUS BASIN
450 2003 150
![Page 28: PAKISTAN DEVELOPMENT FORUM (PDF) - World Banksiteresources.worldbank.org/.../Pakistan-Development-Forum/... · pakistan development forum (pdf) 12th-14th may, ... mirani dam bal](https://reader031.vdocuments.site/reader031/viewer/2022030407/5a8419e27f8b9aa5408b68cc/html5/thumbnails/28.jpg)
28
DRAINAGE & RECLAMATION OBJECTIVESDRAINAGE & RECLAMATION OBJECTIVES
! RESTORING PRODUCTIVITY OF AGRICULTURAL LAND BY CONTROLLING WATERLOGGING & SALINITY.
! MANAGING QUANTITY & QUALITY OF DRAINAGE EFFLUENT IN AN ENVIRONMENTALLY SAFE MANNER.
! GROUNDWATER MANAGEMENT (QUANTITATIVE & QUALITATIVE) THROUGH TUBEWELL TRANSITION, AQUIFER MONITORING & MANAGEMENT.
! STUDY ON NATIONAL SURFACE DRAINAGE SYSTEM AND PREPARATION OF MASTER DRAINAGE PLAN.
![Page 29: PAKISTAN DEVELOPMENT FORUM (PDF) - World Banksiteresources.worldbank.org/.../Pakistan-Development-Forum/... · pakistan development forum (pdf) 12th-14th may, ... mirani dam bal](https://reader031.vdocuments.site/reader031/viewer/2022030407/5a8419e27f8b9aa5408b68cc/html5/thumbnails/29.jpg)
29
MAJOR DRAINAGE & RECLAMATION PROJECTSS.No NAME OF PROJECT TOTAL COST
(Rs. M)AREA TO BEBENEFITTED
(M.A)
ESTIMATEDCOMPLETION
DATE
1. NATIONAL DRAINAGE PROGRAMINCLUDING MASTER DRAINAGEPLAN
31,400 12.0 DEC. 2004
2. LBOD 33441 1.28 DEC. 2002
3. RBOD-I 4395 0.140 2005
4. RBOD-II 14,000 0.140 DEC. 2005
5. OTHER PROJECTS IN PUNJAB 3482 0.570 2004
![Page 30: PAKISTAN DEVELOPMENT FORUM (PDF) - World Banksiteresources.worldbank.org/.../Pakistan-Development-Forum/... · pakistan development forum (pdf) 12th-14th may, ... mirani dam bal](https://reader031.vdocuments.site/reader031/viewer/2022030407/5a8419e27f8b9aa5408b68cc/html5/thumbnails/30.jpg)
30
FLOOD CONTROL OBJECTIVESFLOOD CONTROL OBJECTIVES
! TO REDUCE COLOSAL LOSSES BY ONSLAUGHT OF
FLOODS .
! HARNESSING OF HILL TORRENTS TO REGULATE
FLOOD FLOWS.
! IMPROVEMENT IN FLOOD FORECASTING AND
WARNING SYSTEM.
! UPDATING FLOOD PLAIN MANNALS.
![Page 31: PAKISTAN DEVELOPMENT FORUM (PDF) - World Banksiteresources.worldbank.org/.../Pakistan-Development-Forum/... · pakistan development forum (pdf) 12th-14th may, ... mirani dam bal](https://reader031.vdocuments.site/reader031/viewer/2022030407/5a8419e27f8b9aa5408b68cc/html5/thumbnails/31.jpg)
31
FLOOD CONTROL PROJECTSS.No NAME OF PROJECT LOCATION TOTAL COST
(Rs. M)ESTIMATED
COMPLETIONDATE
1. FLOOD MANAGEMENT OF MURIBUGHTI HILL TORRENTS
BALOCHISTAN 125 2005
2. SECOND FLOOD SECTOR PROJECT ALL OVERPAKISTAN
4614 2005
3. NORMAL FLOOD PROGRAMME ALL OVERPAKISTAN
200 YEARLY BASIS
4. FAN MANAGEMENT OFMITHANWAN HILL TORRENTS
PUNJAB 364 2006
PHYSICAL TARGETS- EMBANKMENTS- SPURS- HARNESSING OF HILL
TORRENTS
1101 Km303 No.33 No.
![Page 32: PAKISTAN DEVELOPMENT FORUM (PDF) - World Banksiteresources.worldbank.org/.../Pakistan-Development-Forum/... · pakistan development forum (pdf) 12th-14th may, ... mirani dam bal](https://reader031.vdocuments.site/reader031/viewer/2022030407/5a8419e27f8b9aa5408b68cc/html5/thumbnails/32.jpg)
32
PHYSICAL TARGETS (2001PHYSICAL TARGETS (2001--2011)2011)Water Availability
- Incremental 12.44 MAF- Commulative 146.92 MAF
Additional area to be irrigated 3.26 MA
Disastrous area to be protected 6.60 MASCARP Tubewells
- Installation/Rehabilitation 2200 No.- Transition 7000 No.
Surface Drains- Rehabilitation 4088 Km- New 2428 Km
Sub-surface Drains 1.00 MAFlood Control
- Embankments 1101 Km- Spurs 303 Km
OFWM- Watercourse Improvement 75000 No.- Precision Land Leveling 368,777 Acres