painting & sand blasting report for trussed structure
TRANSCRIPT
-
7/27/2019 Painting & Sand Blasting Report for Trussed Structure
1/1
SR.No.
FIRST SIDE SECOND SIDE REMARKS FIRST SIDE SECOND SIDE REMARKS
CHECKED
PHYSICAL COND.
NAME NAME NAME
SIGN SIGN ACCEPT SIGN
DATE DATE RECTIFY & RE-OFFER DATE
PAINTING/SLAG BLASTING
INSPECTION REPORTW.O. No.PROJECT:
PART DESCRIPTION PART IDENTIFICATION REPORT NO.
PAGE NO.:1 OF 1
OBESERVATIONS/REMARKS :
SLAG BLASTING STATUS PAINTING STATUS
Inspection passed.
Rectification works listed above to be completed and inspection is required after repair works
Rejected
Rectification works listed above to be completed but no further inspection required.
SAGGING
INSPECTION RESULTS :
Drawing No.
SURFACE ROUGHNESS
CONTRACTOR SIGNATORY AXON PRODUCTION
X NOT APPLICABLEQC CHECK SHEET
SURFACE DEFECT CHECK
OVER LAPPING
AXON QA/QC
STATUS
TCE