12. HORIZONTAL DRILLING Underpass replacing the Saragossa-Alsasua-Noáin route grade crossing. VÍAS Y CONSTRUCCIONES Miranda de Ebro underpass ROVER ALCISA 147

Upload: estructuras-corellanas

Post on 17-Mar-2016

213 views

Category:

Documents


0 download

DESCRIPTION

Miranda de Ebro underpass ROVER ALCISA Underpass replacing the Saragossa-Alsasua-Noáin route grade crossing. VÍAS Y CONSTRUCCIONES 147 Horizontal Drilling UNDERPASS IN MIRANDA DE EBRO-2004 UNDERPASS IN MIRANDA DE EBRO-2004 148 Horizontal Drilling UNDERPASS IN NOAIN-2008 149 Horizontal Drilling UNDERPASS IN NOAIN-2008 150

TRANSCRIPT

12. HORIZONTAL DRILLING

Underpass replacing the Saragossa-Alsasua-Noáin route grade crossing. VÍAS Y CONSTRUCCIONES

Miranda de Ebro underpass ROVER ALCISA

147

HORIZONTAL DRILLINGHorizontal Drilling

148

UNDERPASS IN MIRANDA DE EBRO-2004

UNDERPASS IN MIRANDA DE EBRO-2004

HORIZONTAL DRILLINGHorizontal Drilling

149

UNDERPASS IN NOAIN-2008

150

HORIZONTAL DRILLINGHorizontal Drilling

UNDERPASS IN NOAIN-2008