page 2 eueb, march 8, 2012 thank you very much for your invitation

11

Upload: alicia-wood

Post on 14-Jan-2016

214 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Page 2 EUEB, March 8, 2012 Thank you very much for your invitation
Page 2: Page 2 EUEB, March 8, 2012 Thank you very much for your invitation

Page 2

EUEB, March 8, 2012

Thank you very much for your invitation

Page 3: Page 2 EUEB, March 8, 2012 Thank you very much for your invitation

Page 3

Status of the project

January 16, 2012:

Kick- off meeting Chiara Briatore/ELC; Jürgen Sturm/ELC; Otmar Franz/Osram; James

Hooker/Havells-Sylvania; Peter Hunt/Lighting Association, UK; Kees Van Meerten/Philips Lighting; Michel Quicheron/JRC, Ispra; Renata Kaps/JRC, Seville

Stakeholders: Stephen Bonner/Texas Instruments; Christianna Papazahariou/LG Electronics; Dirk Van Hessche/PlasticsEurope

Launch of Eco-Lighting website: http://www.eco-lighting-project.eu/

New assignment to carry out within the “Eco-Lighting project”: Ecolabel and GPP drafting criteria

Page 4: Page 2 EUEB, March 8, 2012 Thank you very much for your invitation

Page 4

Status of the project

Eco-lighting = Ecolabel + GPP criteria revision

CELMA – European Luminaires Association – invited to join the Eco-Lighting Steering Committee for GPP criteria revision, to take care of the system approach - luminaries, controls,..-

Ecolabel Scope: household, domestic, LEDs

GPP Scope: revision of Indoor and Street Lighting including LEDs and Lighting Management Systems

Page 5: Page 2 EUEB, March 8, 2012 Thank you very much for your invitation

Click to edit Master title style

5

Ecolabel and GPP criteria development process

Common preliminary report

Proposal for technical report and draft criteria areas

First Ad Hoc Working Group (focus on ecolabel)

Technical report and draft ecolabel criteria

Technical report and draft GPP criteria

Second Ad Hoc Working Group (two following days, one Ecolabel, one GPP)

EUEB GPP Advisory Group

Regulatory Committee

Ecolabel criteria

GPP criteria

Possibility for all stakeholders to comment

Possibility for all stakeholders to participate

Possibility for all stakeholders to participate

Coordinated annual workplans for GPP and Ecolabel

Page 6: Page 2 EUEB, March 8, 2012 Thank you very much for your invitation

Page 6

Tasks and Tasks leaders

Task 1 - Product group definition - Kees van Meerten (Philips)

Subgroup task 1: K van Meerten, Otmar Franz, Zoltan Pilter, Klaus Meyer-Pohl, Chiara Briatore

Task 2 - Economic and market analysis – C Briatore (ELC)

Subgroup task 2: C Briatore, JRC, IPTS, Peter Hunt, Tom Lock

Task 3 - Technical analysis (including BAT/BNAT) - Nils Borg (Eceee)

Subgroup task 3: Nils Borg, Kees van Meerten, Otmar Franz, James Hooker, Zoltan Pilter, Peter Hunt, Tom Lock, Klaus Meyer-Pohl

Task 4 - Policy impact and sensitivity analysis - Paolo Bertoldi (JRC)

Subgroup task 4: P Bertoldi, Michel Quicheron, Renata Kaps

Task 5 - Draft criteria proposal and technical background report – Z Pilter (GE)

Subgroup task 5: P Bertoldi, Michel Quicheron, K van Meerten, Otmar Franz, Klaus Meyer-Pohl, James Hooker

Task 6 - Final report and manuals - Juergen Sturm (ELC)

Subgroup task 6: Juergen Sturm, DG Environment

Page 7: Page 2 EUEB, March 8, 2012 Thank you very much for your invitation

Page 7

Timeline

First we concentrate on the development of Ecolabel criteria

Then we’ll take existing GPP criteria as starting point, and see how they need to be adapted in the light of the new Ecolabel criteria.

GPP will be mainly CELMA task (Peter Thorns, Head of Strategic Lighting Applications/Thorn Lighting Ltd will officially join the project team and Steering Committee)

Page 8: Page 2 EUEB, March 8, 2012 Thank you very much for your invitation

Page 8

Timeline

March 2013 deadline to present the revised criteria to the June regulatory committee to be adopted (Final criteria + Technical background report + Preliminary report)

feedback 2nd AHWG

2nd AHWG on January 2013 – 2 following days – one Ecolabel, one GPP)

draft final criteria + technical background report updated

feedback 1st AHWG

1st AHWG on September 2012 – 1 day for both Ecolabel and GPP)

1st criteria proposal + technical background report + working document

publish preliminary report (June 2012)

Page 9: Page 2 EUEB, March 8, 2012 Thank you very much for your invitation

Page 9

Timeline

Before June 2012 (preliminary report):

Scoping document (Task 1, on-going): will be published on the website end of March 2012

Market analysis (Task 2, on-going - questionnaire not necessary: team members provide data)

Technical analysis + environmental assessment; improvement potential + BAT + LCC+ LCA (Task 3 to be started end of March)

LCA: will fill in the gaps where necessary

Submitted to external quality assessment

Sensitivity analysis and policy impact (Task 4, to be started)

Page 10: Page 2 EUEB, March 8, 2012 Thank you very much for your invitation

Page 10

Open questions and further clarification

Ecolabel fees - Business case

Company A has an energy saving product whit 5 different wattages (to replace 25 to 100 watt GLS) with 2 different lamp caps (E 27 and B22), two different voltages (220 and 240), two different colours (warmwhite and cool daylight) = 40 types x 1.500 (German example)= 60.000 euros x year x product

Market Surveillance

Companies and consumers have to be reassured on the effective protection of the label against infringement

Page 11: Page 2 EUEB, March 8, 2012 Thank you very much for your invitation

Page 11