page 1 shipping and billing for related (owned) factories by mis department
TRANSCRIPT
Page 1
Shipping and Billingfor Related (Owned) Factories
By MIS Department
Page 2Glossary of Training Terms
• The following terms will be used throughout this training program:– Field: A box on the screen into which you enter
information– Value: The information (data) being entered in the
field. Example: Division number, FGPO number– Icon: An image you may click to perform a function
such as select, submit or exit– (Single-)Click: Also “Select.” Hitting the left mouse
button once. This will activate an icon or select a row in a list of values
– Double-click: Hitting the left mouse button twice o the same part of the screen. Used only to select and return a value from a list.
Page 3Using the RLM System
• These are the primary RLM icons you will use:– Search: Located next to entry fields. Clicking this
icon brings up a pop-up window with a list of all possible values for the field (for example, the next to the Division field will show a list of all divisions) (Shift-F9 keys or F21 key)
– Select: Located on the Search pop-up windows. You may click on a line and click Select to return its value to the main screen
– OK (Submit): Located in the bottom right corner of each screen. Processes the information on screen and brings you to the next screen
– Return (Back): Located at the top of each screen. Click this icon to go back one screen (F2 key)
– Exit: Located at the top of each screen. Click this icon to return to the menu or close a pop-up (F3 key)
Page 4
Enter your User ID and
Password here
Note: User ID and Password are initially assigned by MIS. You will be prompted to change it the first time you login. The password field IS case-sensitive.
Sign On
Click OK
Page 5
Click the check (or hit the Enter key) to proceed
Welcome
Click here to proceed
(Enter key)
Page 6
Enter your Company number
If you don’t enter a Company or enter the wrong number, you will receive this
error: Click OK
Select Application
Click the Inter-Company Billing
button in the menu
Page 7Inter-Company Billing Menu
Select option 1
Page 8Available Shipments
A list of shipments appears. Shipments are created when the first carton is scanned into the Container
Loading program. Each PO in a container attached to a shipment has its own line
Enter a PO, shipment or container number here and press F16 (or Shift-
F4) to search the list
Page 9Available Shipments
The search parameter appears here
Check the box that is the type you are searching
for
Click OK
Page 10Select a Shipment
Type “S” on a line to
view/edit a shipment
Click OK
Page 11Update Shipment Header
The shipment number is assigned by RLM and cannot
be changed
Edit the ship date if
necessary
The Warehouse number is here and is assigned based
on the POs on the shipment. The number is the Primary warehouse, even if the shipment has multiple
warehouse
Page 12Update Shipment Header (continued)
The cycle (MGO - ocean or MGA - air)
and check point (SHP) appears here.
Edit if necessary
Enter payment
terms here
Enter the flight or vessel number
here
Page 13Update Shipment Header (continued)
Enter the shipment
terms here
Enter Ship Via info here
You may enter comments in these
lines
Enter O for Ocean, A for Air
or click the icon to search
Page 14Check Container Contents
Type “A” on a line to view the
container
Click OK
BEFORE THE LOADERS CLOSE THE CONTAINER: Check the contents of the container
Page 15View Container on Shipment
Type “C” to view the contents of this
container. Hit the Enter key to submit
Page 16View Container Contents
The list of cartons scanned into the container appears. “St” of A means the carton is assigned to the container.
Click “More Info” to see the carton
numbers
Use this list to check the container contents. If there is an error with the loading, notify the loaders to UNSCAN the
incorrect cartons from the container
Page 17Note: Re-Open Closed Container
To re-open a CLOSED container, type “S” and
hit the Enter key
Page 18Re-Open Closed Container
Remove the Seal # and hit the Enter key
Click Return to go back
Page 19Note: Remove Container
If you want to remove the container from this shipment, type “U” and
hit the Enter key
Page 20Print Shipping Documents: Error
Type “P” on a CLOSED container line to print
the shipping documents and hit the Enter key
P
If one or more POs on the container are not closed,
you will get an error
Page 21Print Shipping Documents
P
If all POs on the container are closed, you will be able
to printSelect the
document(s) you want to
Click OK to submit
Page 22Ship and Bill
Type “T” on a CLOSED container line to ship and bill it, then hit the
Enter key
T
If one or more POs on the container are not closed or have Status = UNCONFI, you will get
an error. UNCONFI means the cost has not been Approved – contact Jordache Production
Page 23Date Error
This screen appears if the shipment date is in a different month from the current date. Return to Shipment Header Maintenance and change the
date of the shipment.
Page 24Ship and Bill - Finished
Press “Toggle Unship/Ship” to see all SHIPPED POs (this
may take some time to load)
When you Ship/Bill, the shipped lines disappear from the screen.
Type “P” then the Enter key on a SHIPPED
container line to reprint the Packing List and Comm. Invoice
P
Page 25What Happens Next
• When you Ship/Bill, RLM automatically creates invoices for the Vendor and for Jordache and reprints the Commercial Invoice
• AP and AR records are also created in all the affected companies. AP is automatic, while AR updates at the end of the day
Page 26Create a New Shipment
• In the event that you need to create a shipment instead of waiting for the Loading program, follow the instructions on the next slides
Page 27New Shipment
Click here to create a new shipment
Page 28New Shipment Created
The new shipment appears. Notice the
rest of the row is blank
Type “A” to add a container to this
shipment and hit the Enter key
Page 29Create New Shipment
The shipment number is assigned by RLM and cannot
be changed
Edit the ship date if
necessary
Enter the Warehouse number here. If there are POs to two warehouses on the shipment, use the primary one (with the
most units).
Page 30Create New Shipment (continued)
Enter the cycle (MGO - ocean or MGA - air)
and check point (SHP)
Enter payment
terms here
Enter the flight or vessel number
here
Page 31Create New Shipment (continued)
Enter the shipment
terms here
Enter Ship Via info here
You may enter comments in these
lines
Enter O for Ocean, A for Air
or click the icon to search
Page 32Add Container to Shipment
A list of containers appears. Containers are created when the Loaders begin to scan boxes into a container. You
may add a container to a shipment at any time, regardless of whether it has units scanned to it
Type “A” to add this container to the
shipment and hit the Enter key
Note: Typing “U” on a container already
assigned to a shipment will remove it!
Page 33Container Added
The Shipment Number is now associated with
this container
Click Return to go back to the shipment list
Page 34PO Lines in Container Added to Shipment
Now that the container has been added, a
shipment line for each PO on the container
has been added
You must wait until the status for every PO on the container is CLOSED (or
UNCONFI) in order to print