padre dam mwd staffing workshop
TRANSCRIPT
![Page 1: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/1.jpg)
1
Padre Dam MWD Staffing Workshop
May 17, 2010
Presented by:
The Management Team
![Page 2: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/2.jpg)
2
1.Workshop Goals
2.Introduction & Historical Data
3.Department Services and Organization- Operations- Engineering - Finance- Communications- Human Resources- Administration
4.Questions & Answers
Agenda
![Page 3: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/3.jpg)
3
1. Clearly define the services that Padre Dam MWD provides;
2. Identify the staff positions that provide our services;
3. Provide a historical perspective in terms of District service area changes and how they relate to staffing levels;
4. Examine efficiencies currently deployed in the District.
Workshop Goals
![Page 4: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/4.jpg)
4
“Organizations in every industry are becoming more and more aware that high-performing employees are the most critical source of their strategic success.”
Dan BoccabellaSenior Director at SumTotal Systems, Inc.
![Page 5: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/5.jpg)
5
“…to provide quality water, recycled water, park & recreational facilities, and wastewater management services to our customers. We accomplish this Mission in the most cost-effective manner possible, earning the Customer and Community Respect”
Mission
![Page 6: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/6.jpg)
6
AGE 45
AGE 55
2000/01 2009/10
On average, actual staffing levels have
been 3.6FTE lower than budget.
Historical Data
2007/085-Year Plan
Actual123
130136
131139 139 140
155 155 155
Budget133 131
142147
142 142 140
150155 156
![Page 7: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/7.jpg)
7
AGE 45
AGE 55
2000/01 2009/10
Historical Data
2007/085-Year Plan
Actual123
130136
131139 139 140
155 155 155
Population
126051126759
127467128161
127562 127894 128103
130458
132509
136424
![Page 8: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/8.jpg)
8
AGE 45
AGE 55
2000/01 2009/10
Historical Data
2007/085-Year Plan
Actual123
130136
131139 139 140
155 155 155
486496
505
544550 552
557566
584 588
Pipeline (mi)
102 miles of additional pipeline to maintain
![Page 9: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/9.jpg)
9
AGE 45
AGE 55
2000/01 2009/10
Historical Data
2007/085-Year Plan
Actual123
130136
131139 139 140
155 155 155
106.3 106.3 106.3 106.3 106.3 106.3 106.3
107.8108.8 108.8
Gallons of water (mil)
2 million gallon increase in water storage, protection and quality management.
![Page 10: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/10.jpg)
10
AGE 45
AGE 55
2000/01 2009/10
Historical Data
2007/085-Year Plan
Actual123
130136
131139 139 140
155 155 155
4
20 2119
27
21
45
49 50
Line Breaks
Line break frequency directly relates to the age of our District’s infrastructure.
![Page 11: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/11.jpg)
11
AGE 45
AGE 55
2000/01 2009/10
Historical Data
2007/085-Year Plan
Actual123
130136
131139 139 140
155 155 15590
137
207
118106
184163
144156
Valves Replaced
![Page 12: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/12.jpg)
12
AGE 45
AGE 55
2000/01 2009/10
Historical Data
2007/085-Year Plan
Actual123
130136
131139 139 140
155 155 155
129,250 132,599 125,189
226,990
CCTV Footage
![Page 13: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/13.jpg)
13
- Padre Dam has $250 million in existing infrastructure.
- 136,000 people rely on Padre Dam for 24/7 water and wastewater services.
- A direct correlation exists between:
Backdrop
Staffing Levels
Appropriate Infrastructure Maintenance & Improvement
&
![Page 14: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/14.jpg)
14
According to the “2009 Report Card for America’s Infrastructure”through the American Society of Civil Engineers:
“America’s drinking water systems face an annual shortfall of at least $11 billion to replace aging facilities that are near the end of their useful lives and to comply with existing and future federal water regulations.”www.infrastructurereportcard.org
Backdrop
![Page 15: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/15.jpg)
15
- Our District is 55 years old (pre–WWII pipes in some areas)
- The Five-Year Business Plan has increased our efforts to appropriate levels in terms of preventative & predictive maintenance & infrastructure improvements.
- Years from now, the Board and Management of Padre Dam will be judged based on the work we did to maintain and improve the infrastructure placed under our supervision and care.
Backdrop
![Page 16: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/16.jpg)
16
- Efficiency in our deployment of services is a requirement... A mandate from our customers.
- We are committed to efficiency with regard to the allocation of human resources.
- We recognize the need to continually examine our functions and organizational structure to realize the greatest efficiencies possible.
Backdrop
![Page 17: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/17.jpg)
17
Operations Department
![Page 18: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/18.jpg)
18
Operations24/7/365
Providing Safe Drinking Waterand
Wastewater Collections/Recycled Water
• Water Quality and Fire Flow Management• Emergency Response• After Normal Working Hours• Meet or Exceed all Compliance Issues with Regulatory Agencies
![Page 19: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/19.jpg)
19
Operations
• Operations is the Largest Department at Padre Dam MWD• 85 Employees = 82.5 FTE• 16 Cost Centers• Water Supply Permit / Licensed Operators• Staff Increase for 5-Year Business Plan• Maintenance Programs Created that were Never Being Done
![Page 20: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/20.jpg)
20
![Page 21: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/21.jpg)
21
Water DeliveryDistribution/SCADA Department
• Shift work 24-Hour Coverage/Dynamic Hydraulics/ Potable Water Distribution
• Water Sample Compliance• California Department of Public Health (CDPH) Compliance• Site Security/Alarms• Operate 387 Miles of Potable Water Pipelines• 33 Miles of Recycled Water Pipelines• 27 Reservoirs • 17 Pump Stations• 17 Pressure Reducing Stations• 7 Flow Control Facilities
![Page 22: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/22.jpg)
22
Cross Training
• Operations Takes Full Advantage of Cross Training• Pump Techs / AMR / Distribution Operators/ and Electricians as
Examples• Current Economic Cycle / Developer Work• Org Charts May Not Reflect Where Employees are at a Certain Time
![Page 23: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/23.jpg)
23
![Page 24: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/24.jpg)
24
Distribution System Maintenance (14 Employees),
SCADA (1 Employee) & Electrical (3 Employees)
• Main Flushing/Dead Ends• Valve Exercising• Fire Hydrant Maintenance• Sample Collections for Construction Projects• SCADA Maintenance• Cathodic Protection/Coatings Maintenance and Repairs • Valve Replacement Program• Pump Replacements• Chloramination Station Operation & Maintenance• Electrical Department-Electricians• Reservoir Inspections• Pump & Motor Reconditions • Calibration Program
![Page 25: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/25.jpg)
25
![Page 26: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/26.jpg)
26
![Page 27: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/27.jpg)
27
![Page 28: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/28.jpg)
28
Compliance/Backflow DepartmentRecycled Water Distribution System
2 Employees
• Backflow Device Tracking/Yearly Testing & Compliance of 2,351 Backflow Units
• Cross-Connection Shut-Down Tests (32) Per Year, 300 Turn-offs• CDPH Annual Compliance• Backflow Incidents are the Number 1 Threat to Public Health • Coordination with Recycled Water Customers
![Page 29: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/29.jpg)
29
![Page 30: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/30.jpg)
30
Meter Technician Department6 Employees
• Automated Meter Reading (AMR) System Installed• 22,282 Meters Installed• Software Deployment/Customer Interface Beginning• Tracking New/Unknown Issues from AMR Going Forward• Assessing New Workload Issues and Staff Realignment • Meter Re-reads; Field Check Errors • Duties Interface and Assist Customer Service Department • First Line of Customer Service Interface in the Field
![Page 31: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/31.jpg)
31
Other Duties
• New & Discontinuance of Service • Leak Checks; Water Use Violations • Shut-Off Notifies (570 per month average) • Non-payment Shut-offs (45 per month average) • High & Low Pressure Calls • Meter Box Maintenance • Rebuild & Test Meters • Install New Meters - Replace Dead Meters • Construction Meter Sets • Construction Meter Repairs• Sequence New and Existing Routes • Replace Damaged Meter Boxes • Return to Sewer Audits
![Page 32: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/32.jpg)
32
![Page 33: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/33.jpg)
33
20 Employees
![Page 34: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/34.jpg)
34
• 160 Miles of Sewer Collection Lines• 4 Lift Stations• Influent Pump Station (IPS)• Odor Control Facilities• Vactor Crews for Line Maintenance• Mandatory Compliance for Sewer Overflows/ Full System Assessment
with CCTV by 2012• Industrial Waste Compliance & Monitoring• Grease Trap Program• Sewer Strength Monitoring • CCTV Collection Lines 50-75 Miles Per Year• After Hours Emergency Response• Complete System Cleaning Turn Around Every Two Years • (SSO)-Sanitary Sewer Overflow & (WDR) Waste Discharge Requirements
Wastewater Collection System Department (10 Employees)and Industrial Compliance (1 Employee)
![Page 35: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/35.jpg)
35
![Page 36: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/36.jpg)
36
![Page 37: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/37.jpg)
37
Construction and Maintenance Department(23 Full-Time Employees, 1 Temporary Full-time Employee)
Warehouse Operations (2 Full-time Employees)
• Water Main & Service Lateral Break Repairs• Sewer Break Repairs• Valve Replacement Program• Heavy Equipment Operation• General Construction• Heavy Maintenance Work Orders• Water Service Installations• Sewer Lateral and Main Installations• Fire Hydrants/Fire Services• Inventory Control/Purchasing• Supplies - In stock for Emergencies
![Page 38: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/38.jpg)
38
![Page 39: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/39.jpg)
39
![Page 40: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/40.jpg)
40
![Page 41: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/41.jpg)
41
![Page 42: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/42.jpg)
42
![Page 43: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/43.jpg)
43
![Page 44: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/44.jpg)
44
![Page 45: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/45.jpg)
45
![Page 46: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/46.jpg)
46
Mechanics2 Employees
• Fleet Maintenance of 93 Road Compliant Vehicles and 60 Pieces ofHeavy Equipment
• DOT / CHP Transportation Compliance Programs• Fleet Software Tracking Program • Welding and Fabrication• Sewage Lift Stations• Assist with Pump Station Repairs• Department Use to have 4 Mechanics, Now 2
![Page 47: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/47.jpg)
47
![Page 48: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/48.jpg)
48
Facilities Maintenance6 Full-Time Employees
1 Temporary Full-Time Employee
• General Maintenance of all 78 off-site District Facilities• Reservoir Site Maintenance• Janitorial• Management of Outsourced Contracts• Emergency Response• Tree Maintenance• Landscaping Issues
![Page 49: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/49.jpg)
49
![Page 50: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/50.jpg)
50
![Page 51: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/51.jpg)
51
44 Employees
![Page 52: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/52.jpg)
52
Water Recycling Facility/Laboratory Operations (WRF)6 Plant Employees
3 Laboratory Employees
• Produces 2 MGD of Recycled Water to the Community (Purple Pipe) • Water Flow Support for Padre Dam’s Santee Lakes• Compliance Sampling Programs• Regional Water Quality Control Board (RWQCB) Permit Compliance• National Pollutant Discharge Elimination Permit (NPDES) Compliance• WRF Laboratory Supports Internal Sampling for Operations Environmental
Laboratory Accreditation Program (ELAP) through CDPH • Biological Testing of the San Diego River Basin (Compliance)• Monitoring and Record Keeping
![Page 53: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/53.jpg)
53
![Page 54: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/54.jpg)
54
![Page 55: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/55.jpg)
55
![Page 56: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/56.jpg)
56
Laboratory (3 employees) fall under the supervision of the Director of Operations and Water Quality.
6 Employees
![Page 57: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/57.jpg)
57
Operations Administration
• Administrative and Organizational Oversight of 85 Employees in 16 Cost Centers
• Operating Budget Oversight• CIP Evaluations• Fleet Management and Purchasing• Rate and TOU Management• Project Design & Oversight• We Do Not Hire Staff for any Positions We Do Not Need in Operations
![Page 58: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/58.jpg)
58
Regulatory Agencies
Jurisdiction Agency Regulates or OverseesFederal Environmental Protection Agency (EPA)
Risk Management Plan, Vulnerability Assessments, Hazard MitigationDepartment of Transportation (DOT)Commercial Drivers LicenseVehicle Inspections, Random Drug and Alcohol ScreeningEqual Employment Opportunity Commission (EEOC) Americans with Disabilities Act (ADA)Federal Emergency Management Agency (FEMA)National Incident Management System Compliance (NIMS) Incident Command System ICS)
![Page 59: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/59.jpg)
59
Jurisdiction Agency Regulates or OverseesState Department of Public Health (DPH)
Water Supply PermitOperator CertificationSanitary SurveyAnnual Water Quality ReportDepartment of Toxic Substance Control (DTSC)Hazardous Waste DisposalDepartment of Motor Vehicles (DMV)Commercial Drivers License, Vehicle RegistrationsSmog Inspection ComplianceCalifornia Highway Patrol (CHP)BIT Inspections
![Page 60: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/60.jpg)
60
Jurisdiction Agency Regulates or OverseesState California Air Resources Board (CARB)
Diesel Engine Regulations Diesel Engine Smog ChecksDiesel Generator EnginesRegional Water Quality Control Board (RWQCB)WRF Permit to Operate Sewer Spill Compliance Storm Water Compliance Operator Certification
![Page 61: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/61.jpg)
61
Jurisdiction Agency Regulates or OverseesState Office of Emergency Services (OES)
Hazard MitigationDisaster PreparednessEmergency ManagementCalifornia Occupational Safety and Health (CAL-OSHA) Construction Activities, Trenching/Shoring, Inspections of FacilitiesPressure VesselsAsbestosGeneral Industry Safety OrdersInjury and Illness Prevention Plan (IIPP)California Department of Industrial Relations (DIR) Workers CompensationDepartment of Water ResourcesDam Safety
![Page 62: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/62.jpg)
62
Jurisdiction Agency Regulates or OverseesCounty Air Pollution Control District (APCD)
Diesel GeneratorsFuel Filling Stations Odor Control SystemsOffice of Emergency Services (OES)Disaster Preparedness Emergency ManagementDepartment of Environmental HealthHazmat Business PlansRecycled WaterSewer SpillsStorm Water DischargeUnderground/Aboveground Fuel Storage Tanks Universal Waste DisposalHazardous Materials Disposal
![Page 63: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/63.jpg)
63
![Page 64: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/64.jpg)
64
Questions?
Questions?
![Page 65: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/65.jpg)
65
Engineering Department
![Page 66: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/66.jpg)
66
Engineering Department
27 Employees
![Page 67: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/67.jpg)
67
Infrastructure• Replacement
• Expansion
![Page 68: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/68.jpg)
68
CORE FUNCTIONS• Feasibility
• Design
• Environmental
• Right of Way
• Agency Coordination
• Construction Management
• Utility Location
• Developer Services
• Customer Service
• Plan Checking
• Mapping/GIS
• Easement Acquisition
• Inspection
• Post Construction
• Cathodic Protection
![Page 69: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/69.jpg)
69
Engineering Department
27 Employees
![Page 70: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/70.jpg)
70
Engineering Department
27 Employees
![Page 71: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/71.jpg)
71
Planning and Design• Master Planning
• Studies
• Project Feasibility
• Design
• Agency Coordination
• Specifications
• Construction Documents
![Page 72: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/72.jpg)
72
• Water
• Wastewater
• Recycled Water
• Park
• WRF
• As‐Builts
• Project Management
• Billing Credits
![Page 73: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/73.jpg)
73
![Page 74: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/74.jpg)
74
Engineering Department
27 Employees
![Page 75: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/75.jpg)
75
Development Services
• Customer Service
• Plan Checking
• Agency Coordination
• Construction Monitoring
• Master Plan Implementation
• Recycled Water Coord.
• Special Projects
![Page 76: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/76.jpg)
76
• Developer Conditions & Studies
• Additional Work– County/City Street Improvements/Drainage
– CALTrans
– School Districts
– Forrester Creek
– Fanita Ranch
![Page 77: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/77.jpg)
77
![Page 78: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/78.jpg)
78
Engineering Department
27 Employees
![Page 79: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/79.jpg)
79
Field Engineering
• Construction Management
• Inspection– CIP
– Development
• Utility Locations
• Cathodic Protection
![Page 80: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/80.jpg)
80
Engineering Department
27 Employees
![Page 81: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/81.jpg)
81
Right of Way/Environmental• Encroachments• Quit Claims• Easements• Property Acquisition• CEQA• Mitigation• NCCP• Cell Sites• Special Projects
![Page 82: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/82.jpg)
82
Engineering Department
27 Employees
![Page 83: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/83.jpg)
83
GIS• Mapping
• Asset Management
• Applications
• Predictive & Preventative Maint.
• GPS
• Special Projects– Drought
– AMR
– Detachment
• District Wide Support
![Page 84: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/84.jpg)
84
Cathodic Protection
4%
![Page 85: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/85.jpg)
85
![Page 86: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/86.jpg)
86
Questions?
![Page 87: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/87.jpg)
87
Finance Department
![Page 88: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/88.jpg)
88
FINANCE DEPARTMENTFINANCE DEPARTMENT
Chief Financial Officer/Director of Finance(12 Employees)
Accounting Manager(6 Employees)
Accountant
Accounting Spec.
Accounting Spec.
PT Accounting Spec.
Account Spec./Tech Sup.
Interim Info. Systems Manager(5 Employees)
Info. Sys. Tech Spec.Vacant
Info Sys. Tech Spec.
Programmer/Analyst
Programmer/Analyst
![Page 89: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/89.jpg)
89
ACCOUNTINGACCOUNTING
Chief Financial Officer/Director of Finance(12 Employees)
Accounting Manager(6 Employees)
Accountant
Accounting Spec.
Accounting Spec.
PT Accounting Spec.
Account Spec./Tech Sup.
Interim Info. Systems Manager(5 Employees)
Info. Sys. Tech Spec.Vacant
Info Sys. Tech Spec.
Programmer/Analyst
Programmer/Analyst
![Page 90: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/90.jpg)
90
Staff (>150 Employees)
Vendors (>1,000 Active)
Board of Directors
Padre Dam Customers
External Entities
Compliance Requirements
ACCOUNTINGACCOUNTING
SERVICE
![Page 91: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/91.jpg)
91
ACCOUNTINGACCOUNTINGMAJOR FUNCTIONS
Accounts PayablePayroll
General LedgerBudget
Financial ReportingInvesting
Financing
![Page 92: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/92.jpg)
92
Payment ManagementAssist Purchasing ProcessorsReview InvoicesVendor MaintenanceVerify Proper AuthorizationsVendor DiscountsCash Management
Weekly & On Demand
> 100 Checks / >$1M Week
Compliance / Reporting1099s, W9s, DE542
ACCOUNTINGACCOUNTING
ACCOUNTS PAYABLE
![Page 93: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/93.jpg)
93
155 employees, 5 Board Members
Bi-Weekly, On Demand & Board
Employee IssuesDeductions, Benefits, Accruals, Leave
ComplianceFederal & State Labor CodesWage & Hour LawsExempt & Non Exempt
Reporting W2s, PERS, IRS, State
ACCOUNTINGACCOUNTING
PAYROLL
![Page 94: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/94.jpg)
94
ACCOUNTINGACCOUNTING
BUDGET
Capital, CIP & Operating
Track Performance
Historical Perspective
Projections
Financial Analysis
Work with Departments
![Page 95: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/95.jpg)
95
ACCOUNTINGACCOUNTING
FINANCIAL MANAGEMENTRate Setting
Water, Sewer, Pumping, Pass-Through
Investing & Monitoring
Financing: Debt / GrantsAMR, COP, Cabins’ Project, WRF
CovenantsBank, ’04 & ’09 COPs, Rating Agencies
Policies & Procedures
Strategic Planning
![Page 96: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/96.jpg)
96
ACCOUNTINGACCOUNTINGFINANCIAL REPORTING
Financial Statements
Program ReportingRetail & Wholesale WaterRecycled WaterSewerPark
IRS/State Reporting
Periodic & Ad Hoc Reporting
Board Projects
Rating Agencies / Bondholders
Annual Audit
![Page 97: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/97.jpg)
97
ACCOUNTINGACCOUNTINGCOMPLIANCE
“GAAP” Generally Accepted Accounting Principals
“FASB” Financial Accounting Standards Board
“GASB” Governmental Accounting Standards Board
IRS / State of California
Internal Policies
Government Code
Other LawsProp 218 / AB 3030 / Labor Law
![Page 98: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/98.jpg)
98
ACCOUNTINGACCOUNTING
OTHER TASKS
Leases / Other Income
Developer Projects
District Wide Requests
Purchasing Training
General Ledger
Fixed Assets
Bank Reconciliations
![Page 99: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/99.jpg)
99
INFORMATION SYSTEMSINFORMATION SYSTEMS
Chief Financial Officer/Director of Finance(12 Employees)
Accounting Manager(6 Employees)
Accountant
Accounting Spec.
Accounting Spec.
PT Accounting Spec.
Account Spec./Tech Sup.
Interim Info. Systems Manager(5 Employees)
Info. Sys. Tech Spec.Vacant
Info Sys. Tech Spec.
Programmer/Analyst
Programmer/Analyst
![Page 100: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/100.jpg)
100
Technical Support
Network Support
Hardware & Software Support
Project Support
Programming
Reporting
INFORMATION SYSTEMSINFORMATION SYSTEMS
MAJOR FUNCTIONS
![Page 101: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/101.jpg)
101
161 Desktop Computers
44 Laptop Computers
10 Physical & 19 Virtual Servers
70 Applications SupportedJDE, Utility Billing, AMR, Microsoft
5 LocationsCSC, Ops, WRF, Alpine, Park
INFORMATION SYSTEMSINFORMATION SYSTEMS
STATISTICS
>200
![Page 102: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/102.jpg)
102
INFORMATION SYSTEMSINFORMATION SYSTEMS
TELECOMMUNICATIONSTelephone
Voicemail
Call Distribution Centers
Paging System
Blackberry Integration
Park
![Page 103: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/103.jpg)
103
INFORMATION SYSTEMSINFORMATION SYSTEMS
NETWORK MANAGEMENTLocal Area NetworkWide Area NetworkPrintingVirtualizationRemote AccessHardwareSystem UpgradesSCADA
![Page 104: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/104.jpg)
104
INFORMATION SYSTEMSINFORMATION SYSTEMS
SECURITYCYBER
FirewallsVirus ProtectionSpam & Web Filtering
SITEGate AccessSecurity Cameras
DISASTERBackups
![Page 105: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/105.jpg)
105
INFORMATION SYSTEMSINFORMATION SYSTEMS
INFORMATION MANAGMENT
Database Administration
Document Management
Website Support
Help Desk
User Training
![Page 106: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/106.jpg)
106
INFORMATION SYSTEMSINFORMATION SYSTEMSSOFTWARE
Utility BillingCustomer DatabaseOn-Line Bill PayOnline Account AccessAMR
JDE WorldFinancialHRPayrollWarehousePurchasingGeneral LedgerBudgeting
Office Productivity SuitesWordExcelAccessPowerPointOutlookPublisher
OtherSCADAGISPark Reservation……… Over 70 different Programs
Software Deployment
Updates
Licensing
Support Contracts
![Page 107: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/107.jpg)
107
INFORMATION SYSTEMSINFORMATION SYSTEMS
CURRENT PROJECTSAMR
Radio UpdatesDuplicate Read MitigationImproper Radio-to-Meter Installation Mitigation
Information Reporting E-Billing, On-Line Bill Pay AutomationOn-Line Bill CalculatorLock Box TransfersThin ComputingFile Server ReplacementMS Configuration Manager File Server Replacement
![Page 108: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/108.jpg)
108
INFORMATION SYSTEMSINFORMATION SYSTEMSPROJECTS IN QUE
Monthly BillingFile Serve ReplacementPayroll Check PrinterDocument Management UpgradeWRF Network UpgradeTax Software (Vertex)IBM I-5 Operating System UpgradeJDE A.92 UpgradeCustomer Service Point-of–Sale RegisterEmployee Self Service Over 200 Requests in Track-ItSecurity Camera InfrastructureRemote Reservoir Security Cameras
![Page 109: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/109.jpg)
109
INFORMATION SYSTEMSINFORMATION SYSTEMSHIGHLY SPECIALIZED
Programming languagesRPG III, RPG IV, ILE, C++, JAVA, Java Script
Web ProgrammingJava, XML, HTML, XHTML
Operating SystemsWindows XP, 7, Windows 2003, 2008, IBM V5r3, V5r4, V6.1
DatabaseDB2, SQL Server
Network SupportRouting, Switching, LAN, WAN
Network ProtocolsOSI Model, TCP/IP, DNS, DHCP, IPv4, IPv6, 802.11
Network SecurityCisco IOS, IP SEC, SSL
![Page 110: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/110.jpg)
110
Questions?
![Page 111: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/111.jpg)
111
Communications Department
![Page 112: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/112.jpg)
112
CommunicationsDirector of Communications
(12 Employees)
Communications Coord.
PT Staff Support
Cust. Serv. Manager
Lead Cust. Service Rep. Cust. Serv. Rep.
Cust. Serv. Rep. Cust. Serv. Rep.
Cust. Serv. Rep. Cust. Serv. Rep.
Cust. Serv. Rep. PT Staff Support
PT Staff Support
![Page 113: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/113.jpg)
113
Staffing Levels
Communications Customer Service
.5.25‐1PTEs
21‐2FTEs
Current2000‐2009
2.5‐2PTEs
87‐8FTEs
Current1983‐2009
![Page 114: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/114.jpg)
114
CUSTOMERCOMMUNICATIONSBrandingPrint and OnlineClassroom ActivitiesSpecial EventsPublic SpeakingMedia Relations
CUSTOMER SERVICECustomer AccountsCustomer BillingPayment ProcessingCustomer SupportCollections
WATER EFFICIENCYMulti‐Agency InitiativesCustomer OutreachIncentivesLandscape ClassesCSC Garden
Responsibilities
DEMAND MANAGEMENTDrought ResponseWater BudgetsWater Use RestrictionsEnforcement
COMMUNICATIONSSUPPORTBoardGeneral ManagerDepartments
SUPPLY CHAINMANAGEMENTLegislative Advocacy
![Page 115: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/115.jpg)
115
Communications WorkloadBMPsBMP 1: Residential SurveysBMP 2: Residential RetrofitsBMP 3: System Water AuditsBMP 4: MeteringBMP 5: LandscapeBMP 6: Clothes WashersBMP 7: Public InfoBMP 8: School EducationBMP 9: CIIBMP 10: WholesalerBMP 11: RatesBMP 12: Conservation CoordinatorBMP 13: Waste ProhibitionsBMP 14: ULFTs
AB 1420Effective January 2009
SB 7Effective November 2009
AB 1881Effective January 2010
Mandatory ConservationEffective June 2008
Water BudgetsEffective July 2009
CSC GardenOpening June 2010
![Page 116: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/116.jpg)
116
Customer Service Workload2005‐2009
2005 Outsourced billing2009 New vendor for billing
Process Improvement2008 Level billing cycles
Improved Customer Service2005 Credit card option2009 E‐billing2009 Online bill calculator
Increased Workload2008 Ag rates2009 Water budgets
Prior to 2005
Manual Billing• Printing• Folding• Inserting• Sorting
Manual Payments• Opening envelopes• Stubs & checks• Data entry• Bank deposit• Filing
2010
Outsourced payments
AMR
est. 12 hours/week fortransition to monthly billing
![Page 117: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/117.jpg)
117
Outsourced BillingInfoSendFSSIIn‐House
73,0920.42796,9900.5346296,1400.427Total
1,3680.00766,2700.0348316,9400.094Staff Time
6,0600.16833n/an/an/an/aE‐Billing Cost
19,0080.13228,4400.153812,6000.07Per Piece Cost
$46,656$0.324$62,280$0.346$66,000$0.37Postage
AnnualPer pieceAnnualPer pieceAnnualPer piece
Efficiencies
RT LawrenceIn‐House
$20,836$21,935Annual Estimate
$1,736.77$1,827.92Monthly Estimate
Outsourced Payments
![Page 118: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/118.jpg)
118
Questions?
![Page 119: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/119.jpg)
119
Human Resources Department
![Page 120: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/120.jpg)
120
Director of Human Resources(3 Employees)
Human Resources Specialist Safety & Risk Manager
Human Resources Department3 Employees
![Page 121: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/121.jpg)
121
• Essential Functions:• Recruitments• Compensation• Benefits• Labor Relations• Training• Supervisory coaching• Employment issues
Human Resources, Safety and Risk Management
![Page 122: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/122.jpg)
122
• Essential Functions Continued:• Health & safety• Risk management• Loss Control• Security • Emergency preparedness.
Human Resources, Safety and Risk Management
![Page 123: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/123.jpg)
123
• Currently 155 employees, 31 volunteers and 81 retirees or widow(er)s retirees• Employees include both full and part-time
and temporaries
• Since 2007, average 23 recruitments per year• Recruitments include temps, interns and
volunteers• Reduced cost and turnaround time on
recruitments with technology
Human Resources, Safety and Risk Management
![Page 124: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/124.jpg)
124
• Since 2007, average 13 retirements/resignations per year• Resignations include exiting temporaries and
seasonal workers• Retirees move from one benefit plan to
another
Human Resources, Safety and Risk Management
![Page 125: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/125.jpg)
125
• Mandatory requirements affecting employee relations: • Training (harassment awareness)• Postings (i.e., minimum wage)• Insurance (i.e., dependent coverage)• ICE (I-9)• Dept. of Fair Employment & Housing• Equal Employment Opportunity Commission• Employment Development Department• Americans with Disabilities Act
Human Resources, Safety and Risk Management
![Page 126: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/126.jpg)
126
• Responsible for Safety & Health Compliance: • Training• Injury/Illness Prevention Program• Workers’ Compensation claims liaison
• Average 12 claims per year• 296 modified duty days per year• 50 lost time days per year
Human Resources, Safety and Risk Management
![Page 127: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/127.jpg)
127
• DOT Regulations for Commercial Drivers• 48 Commercial Drivers• 50% randomly tested for drugs every year• 10% randomly tested for alcohol every year
• Annual Safety Physicals
Human Resources, Safety and Risk Management
![Page 128: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/128.jpg)
128
• Responsible to the following regulatory agencies for Safety & Health Compliance:
• OSHA and CalOSHA
• California Dept. of Industrial Relations
• Federal Dept. of Transportation
Human Resources, Safety and Risk Management
![Page 129: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/129.jpg)
129
• Responsible for Loss Control and Risk Financing:
• Local Hazard Mitigation Plan
• Risk Management Plan
• Liability Claims Management• Average 15 claims per year
• Purchase all Insurance programs
Human Resources, Safety and Risk Management
![Page 130: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/130.jpg)
130
• Responsible to the following regulatory agencies for loss control and risk financing:
• U.S. and State EPA
• California Dept. of Public Health
• California Dept. of Environmental Health
Human Resources, Safety and Risk Management
![Page 131: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/131.jpg)
131
• Responsible for Emergency Preparedness:
• Emergency Response Plan amendments
• Training & Emergency Exercises
Human Resources, Safety and Risk Management
![Page 132: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/132.jpg)
132
• Responsible to the following regulatory agencies for Emergency Preparedness:• FEMA• Cal-EMA• County of San Diego• Department of Homeland Security
Human Resources, Safety and Risk Management
![Page 133: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/133.jpg)
133
• Responsible for Site and Employee Security from Threat Situations:
• Vulnerability Assessment
• Installation of security devices and programs
• Monitoring of security devices and programs
Human Resources, Safety and Risk Management
![Page 134: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/134.jpg)
134
• Responsible to the following regulatory agencies for Site and Employee Security:
• U.S. EPA
• U.S. Dept. of Homeland Security
Human Resources, Safety and Risk Management
![Page 135: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/135.jpg)
135
Questions?
![Page 136: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/136.jpg)
136
Administration Department
![Page 137: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/137.jpg)
137
Administration Staffing ATTACHMENT 2
Number of Employees represents both full and part-time employees; FTE is 155
Customers
Board of Directors(Elected)
Best, Best & KriegerGeneral Counsel
Chief Executive Officer/General Manager(155 Employees)
Board Secretary
PT Admin Asst.
Dir. of Ops & Water Quality(85 Employees)
Dir. of Eng. and Planing(28 Employees)
Chief Financial Officer/Dir. of Finance(12 Employees)
Dir. of Human Resources(3 Employees)
Dir. of Park & Recreation(20 Employees, 31 Volunteers)
Dir. of Communications(12 Employees)
![Page 138: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/138.jpg)
138
1. General Manager 1
2. Board Secretary/Executive 1
3. ½ time Administrative Assistant ½
• Total Staff positions 2 ½• Prior staff positions 4
Administration Staffing
![Page 139: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/139.jpg)
139
• Leadership
• Board Interaction and Support
• Policy implementation
• Strategic Planning – 5 Year Business Plan & Budget
• Manage Daily Operations thru Mgmt Team
• Oversee all Operations for water/sewer/park services for customers
• Workforce Partnership & Employee motivation
• High level Organization Performance
Administration Functions
![Page 140: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/140.jpg)
140
• Long Term Planning
• Vision & Planning
• Develop a Plan-Water/Sewer system reliability
• Aging infrastructure
• Increase preventative/predictive maintenance
• 5-yr Business Plan & Budget
• Increase in staffing levels
• Increase in CIP projects
• Flexible-changing conditions
• Request Board Approval
Administration Functions
![Page 141: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/141.jpg)
141
• Board of Directors Support
• Board and Committee meetings
• Agendas, minutes, resolutions, ordinances, public hearing notices, ensuring compliance with legal requirements
• Coordinate with legal counsel
• Activities related to elections, Board Member appointments, and division boundary changes
• District Website – Board of Directors information and meeting materials
• Annual Filings (FPPC, County Registrar, and State)
• Various meetings, conferences, travel
• Facilitate communications among Board, Management, Legal Counsel, and Customers
Administration Services
![Page 142: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/142.jpg)
142
• Implementation Services
• Rules and Regulations
• Standard Practices & Policies
• Conflict of Interest Code
• Documentation and Record Retention
• Public Records Requests
Administration Services
![Page 143: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/143.jpg)
143
• Budget Oversight
• Board and General Manager budgets
• District-wide expenditure and budget reviews
• Supply Chain Oversight
• SDCWA, Metro JPA, SD County, City of San Diego, City of Santee, State Gov’t
• Relationship Management
• Customers, employees, interagency relations, press, public media, management, Board
• Highest ethical & professional standards
• Highly regulated industry-compliance
Administration Services
![Page 144: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/144.jpg)
144
• Provide stable & reliable Customer water/sewer/park services
• Provide stable financial condition-balanced budget-money for emergencies
• Live within the “household budget” concept
• Provide stable & reasonable water/sewer rates
• Control operating expenses
Administration Services
![Page 145: Padre Dam MWD Staffing Workshop](https://reader031.vdocuments.site/reader031/viewer/2022012300/61e131187f28ff786d580fe1/html5/thumbnails/145.jpg)
145
Questions?