20
From Rags to Riches lift station ragging solutions Presented by: Craig B Anderson, P.E., Principal Engineer Murray, Smith & Associates, Inc. PACIFIC NORTHWEST CLEAN WATER ASSOCIATION 2010 CONFERENCE October 24-27, 2010

Upload: others

Post on 30-Apr-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PACIFIC NORTHWEST CLEAN WATER ASSOCIATION 2010 … · PACIFIC NORTHWEST CLEAN WATER ASSOCIATION. 2010 CONFERENCE. October 24-27, 2010. Presentation Overview 2 Background – New household

From Rags to Riches lift station ragging solutions

Presented by:Craig B Anderson, P.E., Principal Engineer

Murray, Smith & Associates, Inc.

PACIFIC NORTHWEST CLEAN WATER ASSOCIATION2010 CONFERENCEOctober 24-27, 2010

Page 2: PACIFIC NORTHWEST CLEAN WATER ASSOCIATION 2010 … · PACIFIC NORTHWEST CLEAN WATER ASSOCIATION. 2010 CONFERENCE. October 24-27, 2010. Presentation Overview 2 Background – New household

2

Presentation Overview

Background– New household products– Collection system impacts

Case Study (Glenwood Lift Station)– History– Options Evaluated– Solution Effectiveness– Return on Investment

Other Mitigation Options Conclusion

Page 3: PACIFIC NORTHWEST CLEAN WATER ASSOCIATION 2010 … · PACIFIC NORTHWEST CLEAN WATER ASSOCIATION. 2010 CONFERENCE. October 24-27, 2010. Presentation Overview 2 Background – New household

3

BackgroundNonwoven technologies developed in 1940s and 1950s

Limited commercial products until 1990s

New product development and rapid growth starting in 1990s

2010 slow down (saturation)

Flushable/”Green”solutions VF

D US

E

Page 4: PACIFIC NORTHWEST CLEAN WATER ASSOCIATION 2010 … · PACIFIC NORTHWEST CLEAN WATER ASSOCIATION. 2010 CONFERENCE. October 24-27, 2010. Presentation Overview 2 Background – New household

4

Background

Life at home made easier, but at a cost….

– Increased sewer back-ups (service lines)

– Increased Sewer Rates (O&M)

– Lift stations

– WWTP

– Collection System

Page 5: PACIFIC NORTHWEST CLEAN WATER ASSOCIATION 2010 … · PACIFIC NORTHWEST CLEAN WATER ASSOCIATION. 2010 CONFERENCE. October 24-27, 2010. Presentation Overview 2 Background – New household

5

Glenwood Lift Station (Boise)

Problem StatementFacility built in 1976 (good condition)

Critical Facility/Location

High and increasing levels of pump maintenance

Gravity service potential in <10 years

Page 6: PACIFIC NORTHWEST CLEAN WATER ASSOCIATION 2010 … · PACIFIC NORTHWEST CLEAN WATER ASSOCIATION. 2010 CONFERENCE. October 24-27, 2010. Presentation Overview 2 Background – New household

6

Glenwood Lift Station (Boise)

Glenwood Lift Station

West Boise WWTP

Page 7: PACIFIC NORTHWEST CLEAN WATER ASSOCIATION 2010 … · PACIFIC NORTHWEST CLEAN WATER ASSOCIATION. 2010 CONFERENCE. October 24-27, 2010. Presentation Overview 2 Background – New household

7

Glenwood Lift Station (Boise)

75 ft

Page 8: PACIFIC NORTHWEST CLEAN WATER ASSOCIATION 2010 … · PACIFIC NORTHWEST CLEAN WATER ASSOCIATION. 2010 CONFERENCE. October 24-27, 2010. Presentation Overview 2 Background – New household

8

Glenwood Lift Station (Boise)

OPTIONS EVALUATED

• Do Nothing• Operational Changes• Impeller Retrofit (Delta Impeller)• Grinder• Pump Replacement

• Grinder Pump

• Helical Impeller

Page 9: PACIFIC NORTHWEST CLEAN WATER ASSOCIATION 2010 … · PACIFIC NORTHWEST CLEAN WATER ASSOCIATION. 2010 CONFERENCE. October 24-27, 2010. Presentation Overview 2 Background – New household

9

Glenwood Lift Station (Boise)

OPTION REFINEMENT

• Do Nothing• Operational Changes• Impeller Retrofit• Grinder• Pump Replacement

• Grinder Pump

• Helical Impeller

(80 man-days a year)

(no effect)

(low cost, but capacity decrease)

(City decision to not evaluate)

(moderate initial cost & City experience)

(initial option – collection system concern)

Page 10: PACIFIC NORTHWEST CLEAN WATER ASSOCIATION 2010 … · PACIFIC NORTHWEST CLEAN WATER ASSOCIATION. 2010 CONFERENCE. October 24-27, 2010. Presentation Overview 2 Background – New household

10

Glenwood Lift Station (Boise)

OPTION EVALUATION

Page 11: PACIFIC NORTHWEST CLEAN WATER ASSOCIATION 2010 … · PACIFIC NORTHWEST CLEAN WATER ASSOCIATION. 2010 CONFERENCE. October 24-27, 2010. Presentation Overview 2 Background – New household

11

Glenwood Lift Station (Boise)

OPTION EVALUATION

Page 12: PACIFIC NORTHWEST CLEAN WATER ASSOCIATION 2010 … · PACIFIC NORTHWEST CLEAN WATER ASSOCIATION. 2010 CONFERENCE. October 24-27, 2010. Presentation Overview 2 Background – New household

12

Glenwood Lift Station (Boise)

SOLUTION EFFECTIVENESS

• Installed in early 2007• No ragging/problems since installed

• 2 year simple payback (45% ROI)

• PW break even at only 24% O&M reduction

• PW break even with replacement every 2 ½ years

Page 13: PACIFIC NORTHWEST CLEAN WATER ASSOCIATION 2010 … · PACIFIC NORTHWEST CLEAN WATER ASSOCIATION. 2010 CONFERENCE. October 24-27, 2010. Presentation Overview 2 Background – New household

13

Other Options

Rag Removal– Regular Pump Maintenance (Do nothing)

– Public Education

– Screening

– Grinder

– Product (rag) development

Lift Station Modification– Operation (VFD low flow point & pump sequencing)

– Modified Pump Types (grinder and helical)

Page 14: PACIFIC NORTHWEST CLEAN WATER ASSOCIATION 2010 … · PACIFIC NORTHWEST CLEAN WATER ASSOCIATION. 2010 CONFERENCE. October 24-27, 2010. Presentation Overview 2 Background – New household

14

Public EducationTheory of removing rags from waste stream by education

Page 15: PACIFIC NORTHWEST CLEAN WATER ASSOCIATION 2010 … · PACIFIC NORTHWEST CLEAN WATER ASSOCIATION. 2010 CONFERENCE. October 24-27, 2010. Presentation Overview 2 Background – New household

15

Public Education

Success based on customer ownership of problem

• Local lift station

• Increasing sewer rates

If no ownership, then education can result in……

Page 16: PACIFIC NORTHWEST CLEAN WATER ASSOCIATION 2010 … · PACIFIC NORTHWEST CLEAN WATER ASSOCIATION. 2010 CONFERENCE. October 24-27, 2010. Presentation Overview 2 Background – New household

16

Operation

VFD Setting

• Increase minimum flow point

Pump Cycling

• Return to on/off control

• Make sure motors protected

Combination

Page 17: PACIFIC NORTHWEST CLEAN WATER ASSOCIATION 2010 … · PACIFIC NORTHWEST CLEAN WATER ASSOCIATION. 2010 CONFERENCE. October 24-27, 2010. Presentation Overview 2 Background – New household

17

OperationPump Cycling

Page 18: PACIFIC NORTHWEST CLEAN WATER ASSOCIATION 2010 … · PACIFIC NORTHWEST CLEAN WATER ASSOCIATION. 2010 CONFERENCE. October 24-27, 2010. Presentation Overview 2 Background – New household

18

Modified Pump/Impeller TypesGrinder Pumps

• Standard for some City’s in Southern Idaho

• Higher HP

• Can be favorable with downstream re-ragging

Page 19: PACIFIC NORTHWEST CLEAN WATER ASSOCIATION 2010 … · PACIFIC NORTHWEST CLEAN WATER ASSOCIATION. 2010 CONFERENCE. October 24-27, 2010. Presentation Overview 2 Background – New household

19

Modified Pump/Impeller TypesHelical Impellers

• Passes rags (no breakdown)

• Comparable HP

• Specify hardened impeller and volute

Page 20: PACIFIC NORTHWEST CLEAN WATER ASSOCIATION 2010 … · PACIFIC NORTHWEST CLEAN WATER ASSOCIATION. 2010 CONFERENCE. October 24-27, 2010. Presentation Overview 2 Background – New household

20

Conclusions

Lift station ragging conclusions: Do Nothing costs can be significant

Multiple solutions (facility specific)

Evaluate City Standards for flow-paced facilities

Acknowlegements• City of Boise/CH2M HILL

• City of Nampa/Pharmer Engineering

• Pump Suppliers (Vaughan, Wemco & Hayward Gordon)

Questions/Discussions