Page 1: PA Public Utility Commission 2020 Pipeline Safety Seminar ...€¦ · PHMSA Overall Leak Summary For All PA Gas Distribution Operators . ... Summary of FL-1 Question Nos. 29 & 30

Annual Data ReportB y C h r i s to p he r W h i t e a s h

PA Public Utility Commission

2020 Pipeline Safety Seminar

September 10TH 2020

Page 2: PA Public Utility Commission 2020 Pipeline Safety Seminar ...€¦ · PHMSA Overall Leak Summary For All PA Gas Distribution Operators . ... Summary of FL-1 Question Nos. 29 & 30

Pipeline Safety Discussion Topics❖ Difference Between FL-1 Data & Annual Report Data

❖ Quick Look At Some Damage Prevention Data

❖ Hazardous Leaks Overview

❖ NTSB PE Recommendation – Review Of Operator Comments

❖ Update On The Rate Of Pipe Replacement

❖ Summary Of Plastic/Steel Failures

❖ Conclusion/Summary

Page 3: PA Public Utility Commission 2020 Pipeline Safety Seminar ...€¦ · PHMSA Overall Leak Summary For All PA Gas Distribution Operators . ... Summary of FL-1 Question Nos. 29 & 30

https://primis.phmsa.dot.gov/comm/StatePages/Pennsylvania.htm

PHMSA Overall Leak Summary For All PA Gas Distribution Operators

Page 4: PA Public Utility Commission 2020 Pipeline Safety Seminar ...€¦ · PHMSA Overall Leak Summary For All PA Gas Distribution Operators . ... Summary of FL-1 Question Nos. 29 & 30

Total Lines Hits Per 1,000 Tickets Received Per PHMSAAll PA Gas Distribution Operators

560 540 480 280 560 470 510

2.65

2.09 2.11 2.17 2.37 2.09 2.18 2.14

APPROXIMATELY 3,400 LINE HITS ELIMINATED SINCE 2012 BY PA GAS DISTRIBUTION OPERATORS!!!

Page 5: PA Public Utility Commission 2020 Pipeline Safety Seminar ...€¦ · PHMSA Overall Leak Summary For All PA Gas Distribution Operators . ... Summary of FL-1 Question Nos. 29 & 30

Total Line Hits Per 1,000 Tickets Marked

8.1 8.2

7.57.2

5.75.5 5.6

4.3 4.4

3.83.4

3.13.3 3.4

2.4

3.1

2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019

Page 6: PA Public Utility Commission 2020 Pipeline Safety Seminar ...€¦ · PHMSA Overall Leak Summary For All PA Gas Distribution Operators . ... Summary of FL-1 Question Nos. 29 & 30

Utility First Party Line Hits (2015-2019)

0

50

100

150

200

250

300

Company A Company B Company C Company D Company F Company E

2015 2016 2017 2018 2019

Page 7: PA Public Utility Commission 2020 Pipeline Safety Seminar ...€¦ · PHMSA Overall Leak Summary For All PA Gas Distribution Operators . ... Summary of FL-1 Question Nos. 29 & 30

% Of Total Line Hits By Utility – 1st Party Hit

0%

10%

20%

30%

40%

50%

60%

Company A Company B Company C Company D Company F Company E

2015 2016 2017 2018 2019

Page 8: PA Public Utility Commission 2020 Pipeline Safety Seminar ...€¦ · PHMSA Overall Leak Summary For All PA Gas Distribution Operators . ... Summary of FL-1 Question Nos. 29 & 30

Hazardous Leaks Repaired On Mains In 2019

279

617

167

246

905

432

0

100

200

300

400

500

600

700

800

900

1,000

Company A Company B Company C Company D Company F Company E

Page 9: PA Public Utility Commission 2020 Pipeline Safety Seminar ...€¦ · PHMSA Overall Leak Summary For All PA Gas Distribution Operators . ... Summary of FL-1 Question Nos. 29 & 30

Hazardous Leaks Repaired On Services In 2019

351

913

296

422

1,144

727

0

200

400

600

800

1,000

1,200

1,400

Company A Company B Company C Company D Company F Company E

Page 10: PA Public Utility Commission 2020 Pipeline Safety Seminar ...€¦ · PHMSA Overall Leak Summary For All PA Gas Distribution Operators . ... Summary of FL-1 Question Nos. 29 & 30

Total Hazardous Leaks Repaired In 2019

630

1,530

463

668

2,049

1,159

0

500

1,000

1,500

2,000

2,500

Company A Company B Company C Company D Company F Company E

Page 11: PA Public Utility Commission 2020 Pipeline Safety Seminar ...€¦ · PHMSA Overall Leak Summary For All PA Gas Distribution Operators . ... Summary of FL-1 Question Nos. 29 & 30

Total Hazardous Leaks Repaired On Mains Per Year

4,582 3,965

2,783

2,539

3,009

2,590

0

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

4,500

5,000

2014 2015 2016 2017 2018 2019

Page 12: PA Public Utility Commission 2020 Pipeline Safety Seminar ...€¦ · PHMSA Overall Leak Summary For All PA Gas Distribution Operators . ... Summary of FL-1 Question Nos. 29 & 30

Total Hazardous Leaks Repaired On Services Per Year

5,955

5,371

4,4764,124

4,621

3,853

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

2014 2015 2016 2017 2018 2019

Page 13: PA Public Utility Commission 2020 Pipeline Safety Seminar ...€¦ · PHMSA Overall Leak Summary For All PA Gas Distribution Operators . ... Summary of FL-1 Question Nos. 29 & 30

Total Hazardous Leaks Repaired (2015-2019)

0

500

1,000

1,500

2,000

2,500

3,000

Company A Company B Company C Company D Company F Company E

2015 2016 2017 2018 2019

Page 14: PA Public Utility Commission 2020 Pipeline Safety Seminar ...€¦ · PHMSA Overall Leak Summary For All PA Gas Distribution Operators . ... Summary of FL-1 Question Nos. 29 & 30

Summary of FL-1 Question Nos. 29 & 30

Large Operator Comments

Question 29 (Potential Impact)▪ Will Hinder Capital Improvements

▪ PE Pipeline Expertise Is Limited

▪ NTSB Request Is Broadly Based

▪ Promotes Delays/Costs/Insurance

Question 30 (Action Taken)▪ Emergency Work – No PE Clause

▪ Non-Critical Work – No PE Clause

▪ PE For All Other Work W/O Stamp

▪ Probing MOC/OQ & Other Processes For Improvements

Small Operator Comments

Question 29 (Potential Impact)▪ Small Customer Base

▪ Large Financial Impacts

▪ PE Shortage With Gas Experience

▪ Unneeded NTSB Recommendation

Question 30 (Action Taken)▪ None – Otherwise Out Of Business

▪ Educate Staff On Lessons Learned

▪ Minimal Infrastructure/Unjustified

▪ Probing MOC/OQ & Other Processes For Improvements

Page 15: PA Public Utility Commission 2020 Pipeline Safety Seminar ...€¦ · PHMSA Overall Leak Summary For All PA Gas Distribution Operators . ... Summary of FL-1 Question Nos. 29 & 30

Miles of Pipe Material RemainingEnd of 2019

0

500

1,000

1,500

2,000

2,500

3,000

Company A Company B Company C Company D Company E Company F

UP Bare UP Coated CP Bare

CI/WI Ductile Iron

Page 16: PA Public Utility Commission 2020 Pipeline Safety Seminar ...€¦ · PHMSA Overall Leak Summary For All PA Gas Distribution Operators . ... Summary of FL-1 Question Nos. 29 & 30

Miles of Pipe Material RemainingEnd of 2019

0

500

1,000

1,500

2,000

2,500

3,000

Company A Company B Company C Company D Company E Company F

UP Bare UP Coated CP Bare

CI/WI Ductile Iron

Page 17: PA Public Utility Commission 2020 Pipeline Safety Seminar ...€¦ · PHMSA Overall Leak Summary For All PA Gas Distribution Operators . ... Summary of FL-1 Question Nos. 29 & 30

Miles of Cast Iron/Wrought Iron Remaining(2015-2019)

0

200

400

600

800

1,000

1,200

1,400

1,600

Company A Company B Company C Company D Company E Company F

2015 2016 2017 2018 2019

Page 18: PA Public Utility Commission 2020 Pipeline Safety Seminar ...€¦ · PHMSA Overall Leak Summary For All PA Gas Distribution Operators . ... Summary of FL-1 Question Nos. 29 & 30

Miles of Cast/Wrought Iron RemainingEnd of 2019

80137

69

539

1,306

242

0

200

400

600

800

1000

1200

1400

Company A Company B Company C Company D Company E Company F

Page 19: PA Public Utility Commission 2020 Pipeline Safety Seminar ...€¦ · PHMSA Overall Leak Summary For All PA Gas Distribution Operators . ... Summary of FL-1 Question Nos. 29 & 30

Miles Of Bare Steel Remaining (2015-2019)

0

500

1,000

1,500

2,000

2,500

3,000

3,500

Company A Company B Company C Company D Company E Company F

2015 2016 2017 2018 2019

Page 20: PA Public Utility Commission 2020 Pipeline Safety Seminar ...€¦ · PHMSA Overall Leak Summary For All PA Gas Distribution Operators . ... Summary of FL-1 Question Nos. 29 & 30

Total Miles Of Main Replaced Per Year

312.1 314.6348.2 355.5

437.3

2015 2016 2017 2018 2019

81.8 Miles – [2019 – 2018]

7.3 Miles – [2018 -2017]

33.6 Miles – [2017 – 2016]

2.5 Miles – [2016 -2015]

Page 21: PA Public Utility Commission 2020 Pipeline Safety Seminar ...€¦ · PHMSA Overall Leak Summary For All PA Gas Distribution Operators . ... Summary of FL-1 Question Nos. 29 & 30

Total Miles Of Remaining Cast Iron & Wrought Iron2015 - 2019

2,884 2,772 2,634 2,506 2,382

0

500

1,000

1,500

2,000

2,500

3,000

3,500

2015 2016 2017 2018 2019

Page 22: PA Public Utility Commission 2020 Pipeline Safety Seminar ...€¦ · PHMSA Overall Leak Summary For All PA Gas Distribution Operators . ... Summary of FL-1 Question Nos. 29 & 30

Total Miles Of Remaining Bare Steel 2015 - 2019

6 , 2 7 7 6 , 0 6 3 5 , 8 4 5 5 , 5 6 5 5 , 2 6 9

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

2015 2016 2017 2018 2019

Page 23: PA Public Utility Commission 2020 Pipeline Safety Seminar ...€¦ · PHMSA Overall Leak Summary For All PA Gas Distribution Operators . ... Summary of FL-1 Question Nos. 29 & 30

0

200

400

600

800

1,000

1,200

1,400

1,600

Company A Company B Company C Company D Company E Company F

929

385

245

886

1,568

627

Plastic Service Failures [90.6%]

Plastic Main Failures [9.4%]

778 Unknown Plastic Failures [15.2%]

Plastic Failures At Services & Mains (2018-2019)

Page 24: PA Public Utility Commission 2020 Pipeline Safety Seminar ...€¦ · PHMSA Overall Leak Summary For All PA Gas Distribution Operators . ... Summary of FL-1 Question Nos. 29 & 30

0

10

20

30

40

50

Company A Company B Company C Company D Company E Company F

28.7

22.9

5.5

20.7

44.1

11.9

Plastic Failures For Every 10,000Plastic Service Lines

Number Of Plastic Service Failures For Every 10,000 Plastic Service Lines (2018-2019)

Page 25: PA Public Utility Commission 2020 Pipeline Safety Seminar ...€¦ · PHMSA Overall Leak Summary For All PA Gas Distribution Operators . ... Summary of FL-1 Question Nos. 29 & 30

Largest 10 Plastic/Steel Failures By Manufacturer On Mains & Services [2018-2019]

Manufacturer Mains Manufacturer ServicesAldyl A 146 Kerotest Valve 2,311

GF Central Plastics 94 UNKNOWN 696

UNKNOWN 75 Aldyla A 138

Plexo 74 Plexo 127

Dresser 13 Perfection 92

EXTRON 12 Dresser 78

Friatec 8 GF Central Plastics 71

AMP 6 Handley 62

Drisco 5 Normac 54

Performance Pipe 5 Continental 33

Page 26: PA Public Utility Commission 2020 Pipeline Safety Seminar ...€¦ · PHMSA Overall Leak Summary For All PA Gas Distribution Operators . ... Summary of FL-1 Question Nos. 29 & 30

Inside Meter Sets2015 - 2019

919,788

896,346

886,815

859,861

843,141

800,000

820,000

840,000

860,000

880,000

900,000

920,000

940,000

2015 2016 2017 2018 2019

Page 27: PA Public Utility Commission 2020 Pipeline Safety Seminar ...€¦ · PHMSA Overall Leak Summary For All PA Gas Distribution Operators . ... Summary of FL-1 Question Nos. 29 & 30

SUMMARY

• Addressed Specific FL-1/Annual Report Variations

• Summarized Core FL-1 Data To Include:• Damage Prevention

• Hazardous Leaks

• Pipe Replacement

• Plastic/Steel Failures

• Inside Meter Sets

• Reviewed PE Recommendations & How Pipes ACT 2020 May Be Effected

• Explored Distinct Avenues To Describe How The Data & Information Presented Today May Effect Pipeline Safety