p14311: gate review
DESCRIPTION
P14311: Gate Review. December 12 th , 2013. Agenda. Overview of PCB Isolation Routing System Design 20 minutes Review of Bill of Materials and Sourcing Status 5 minutes Review of Technical Action Items from DDR 30 minutes Team Evaluation and Improvements for MSD II 5 minutes. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: P14311: Gate Review](https://reader035.vdocuments.site/reader035/viewer/2022062323/568162bc550346895dd34773/html5/thumbnails/1.jpg)
DECEMBER 12 T H , 2013
P14311: Gate Review
![Page 2: P14311: Gate Review](https://reader035.vdocuments.site/reader035/viewer/2022062323/568162bc550346895dd34773/html5/thumbnails/2.jpg)
Agenda
Overview of PCB Isolation Routing System Design 20 minutes
Review of Bill of Materials and Sourcing Status 5 minutes
Review of Technical Action Items from DDR 30 minutes
Team Evaluation and Improvements for MSD II 5 minutes
![Page 3: P14311: Gate Review](https://reader035.vdocuments.site/reader035/viewer/2022062323/568162bc550346895dd34773/html5/thumbnails/3.jpg)
PCB Isolation Routing System
Mobile Enclosure Assembly
Miscellaneous Electronics
Lighting
Interlock Switch
Emergency Stop Switch
Tower Light
Solid State Relay
Low Voltage Power Supply
Electronic Controls
Box
Controller PCBA
I/O Interfa
ce Board
Motor Drivers PCBA (3)
Cooling Fans
Milling Machine
Assembly
Zen Toolwork
s CNC DIY Kit
Router Support Structur
e
Vacuum Clamp
Assembly
Sacrificial Layer
Registration Pins (2-4)
Pressure Sensor
Air Pressure Solenoid
Router Assembl
y
Router
Collet
Temp Sensor
Shop Vacuum
Computer
Supply/Interconnect
Pressurized Air Line
120 VAC
Power Cord
Vacuum Table
Ducting
Debris Vacuum Ducting
Wiring
User Interface Assembly
PC Monito
rMach3 Interfa
ce
Keyboard Mouse
![Page 4: P14311: Gate Review](https://reader035.vdocuments.site/reader035/viewer/2022062323/568162bc550346895dd34773/html5/thumbnails/4.jpg)
V00100- PCB Isolation Routing System
![Page 5: P14311: Gate Review](https://reader035.vdocuments.site/reader035/viewer/2022062323/568162bc550346895dd34773/html5/thumbnails/5.jpg)
V00001- Mill CNC Kit
Electrical/Mechanical Characteristics:
Travel capacity: 7” (X) x 7” (Y) x 2” (Z)
High density PVC frame Steel guide rods with
precision linear bearings Stainless steel M8 x 1.25
lead screws with ball bearing supports
Brass anti-backlash lead screw nuts
Shinano dual shaft NEMA 17 stepper motors
![Page 6: P14311: Gate Review](https://reader035.vdocuments.site/reader035/viewer/2022062323/568162bc550346895dd34773/html5/thumbnails/6.jpg)
V00006-Router V00005-Specialty Collet
Bosch Colt Variable Speed Router16,000-35,000 rpm
Specialty Collet Kit1/8 in. Precision Grade (PG) Colt collet, nut, wrench, and lubricant Helps decrease TIR
![Page 7: P14311: Gate Review](https://reader035.vdocuments.site/reader035/viewer/2022062323/568162bc550346895dd34773/html5/thumbnails/7.jpg)
V00035- Router Support Plate
![Page 8: P14311: Gate Review](https://reader035.vdocuments.site/reader035/viewer/2022062323/568162bc550346895dd34773/html5/thumbnails/8.jpg)
V00036- Router Support Brackets
![Page 9: P14311: Gate Review](https://reader035.vdocuments.site/reader035/viewer/2022062323/568162bc550346895dd34773/html5/thumbnails/9.jpg)
V00010- Vacuum Table Assembly
Made from aluminum13 x 13 grid patternHoles are ½” spacingSupport brackets inside of table to ensure a flat
surfaceUse RTV sealer during assembly to prevent leaks
![Page 10: P14311: Gate Review](https://reader035.vdocuments.site/reader035/viewer/2022062323/568162bc550346895dd34773/html5/thumbnails/10.jpg)
V00010- Vacuum Table Assembly
![Page 11: P14311: Gate Review](https://reader035.vdocuments.site/reader035/viewer/2022062323/568162bc550346895dd34773/html5/thumbnails/11.jpg)
Registration System
Originally Plan: User defined pin locations
Problems with vacuum hole interference
Revised system includes pre-set pin hole locations
![Page 12: P14311: Gate Review](https://reader035.vdocuments.site/reader035/viewer/2022062323/568162bc550346895dd34773/html5/thumbnails/12.jpg)
V00064- Milling Machine Assembly
![Page 13: P14311: Gate Review](https://reader035.vdocuments.site/reader035/viewer/2022062323/568162bc550346895dd34773/html5/thumbnails/13.jpg)
V00011- Vacuum System
Shop-Vac 5895400 model Fits nicely into our system design Provides more CFM and Power than Vacuum used for testing Low cost(~ $70)
Purchased: Shop-Vac
Test Vacuum: Rigid
CFM 170 110
HP 4.5 5
Size(gallons) 4 4
Air Watts 290 167
![Page 14: P14311: Gate Review](https://reader035.vdocuments.site/reader035/viewer/2022062323/568162bc550346895dd34773/html5/thumbnails/14.jpg)
Vacuum Table Ducting
Rigid components supplying vacuum comprised of 1 ½” Schedule 40 PVC pipe and fittings
Adapters from PVC to ¾” NPT to connect to 1” flexible ducting
Flexible ducting attached to vacuum table using ¾” NPT components
PVC and Brass fittings from Home DepotFlexible ducting from anver.com
![Page 15: P14311: Gate Review](https://reader035.vdocuments.site/reader035/viewer/2022062323/568162bc550346895dd34773/html5/thumbnails/15.jpg)
Debris Vacuum Ducting
Ridgid Components made from off the shelf 1 ½” Schedule 40 PVC pipe and fittings
Adapters from PVC to ¼” NPT to connect to ¼” flexible ducting
Flexible ducting attached mill head to collect debris
PVC and Brass fittings from Home DepotFlexible ducting from anver.com
![Page 16: P14311: Gate Review](https://reader035.vdocuments.site/reader035/viewer/2022062323/568162bc550346895dd34773/html5/thumbnails/16.jpg)
V00014-Air Solenoid V00026- Pressurized Air Tubing
![Page 17: P14311: Gate Review](https://reader035.vdocuments.site/reader035/viewer/2022062323/568162bc550346895dd34773/html5/thumbnails/17.jpg)
Safety Devices: V00018- Interlock Circuit
Interlock will stop power to the following devices when door is opened:• Router• Stepper Motors and Drivers• Vacuum• Air Pressure Solenoid
All Logic Systems will remain on
![Page 18: P14311: Gate Review](https://reader035.vdocuments.site/reader035/viewer/2022062323/568162bc550346895dd34773/html5/thumbnails/18.jpg)
Safety Devices: V00022- E-Stop
When pressed, E-stop will stop power to all devices requiring power except PC
![Page 19: P14311: Gate Review](https://reader035.vdocuments.site/reader035/viewer/2022062323/568162bc550346895dd34773/html5/thumbnails/19.jpg)
V00046/47- Electronic Controls Box
Mounted on outside of enclosure for maintenance access
Includes: Controller PCBA I/O Interface Board Motor Drivers PCBA (3) Cooling Fans
![Page 20: P14311: Gate Review](https://reader035.vdocuments.site/reader035/viewer/2022062323/568162bc550346895dd34773/html5/thumbnails/20.jpg)
V00024- Electrical Box Cooling Fans
From calculations, Determined we need ~18CFM to keep box under 100°F.
Selected 2 Comair Rotron 19032622A.10 CFM0.256 in H2O static pressure.$10.50 each
![Page 21: P14311: Gate Review](https://reader035.vdocuments.site/reader035/viewer/2022062323/568162bc550346895dd34773/html5/thumbnails/21.jpg)
User Interface Assembly
![Page 22: P14311: Gate Review](https://reader035.vdocuments.site/reader035/viewer/2022062323/568162bc550346895dd34773/html5/thumbnails/22.jpg)
V00019- Mach3 Interface
Open Source software solution
Fully customizable GUI Allows direct import of DXF,
BMP, JPG, and HPGL files through LazyCam
Router Speed Control Video Display of machine Wide variety of wizards
available Supports large files
(10,000,000 lines) Widely used with online
support
![Page 23: P14311: Gate Review](https://reader035.vdocuments.site/reader035/viewer/2022062323/568162bc550346895dd34773/html5/thumbnails/23.jpg)
Bill of Materials & Budget Analysis
Go to Spreadsheet for Ease of Viewing
![Page 24: P14311: Gate Review](https://reader035.vdocuments.site/reader035/viewer/2022062323/568162bc550346895dd34773/html5/thumbnails/24.jpg)
Remaining DDR Action Items to Review (add slides where applicable)
Further review of Router support (if necessary)Power SchematicPower Consumption TableI/O Schematic ReviewI/O Signal TableStepper Motor VoltageLow Voltage Power Supply SelectionPressure SensorRelayLimit SwitchesDrawings/Test Plans
![Page 25: P14311: Gate Review](https://reader035.vdocuments.site/reader035/viewer/2022062323/568162bc550346895dd34773/html5/thumbnails/25.jpg)
Team Improvements for MSD II
Problem: Setting deadlines
Actions for Improvement:• Integrate Project
Schedule into every meeting
• Discipline teams develop “building blocks” (aka schedule work elements)during break, input into MS Project schedule
• Start every meeting with project schedule review to determine if we are on schedule with all tasks
Problem: Communication across disciplines
Actions for Improvement:• Interface Managers will
have more frequent meetings outside of class time to talk about discipline crossover
• Notes will be taken at every meeting, and all team members are required to review notes from a meeting they were not present at prior to next full team meeting
Problem: Poor utilization of MSD Class time
Actions for Improvement:• Streamline meeting
process so only 1-1 ½ hours used on full group meeting
• Continue using agendas • Team members come
prepared for discussions and complete items by deadline
![Page 26: P14311: Gate Review](https://reader035.vdocuments.site/reader035/viewer/2022062323/568162bc550346895dd34773/html5/thumbnails/26.jpg)
Break Action Items
1. Develop Schedule Work Elements for Master Schedule
2. Complete Purchase Drawings for all remaining Purchase parts
3. Source remaining non-critical items4. Finish refining Test Plans