![Page 1: P. Romanos , E. Voumvoulakis , C. N. Markides N. Hatziargyriou · Conclusions • TES-ORCs can play an important role for increasing the Flexibility of Power Stations and to contribute](https://reader034.vdocuments.site/reader034/viewer/2022042219/5ec4c07c8a2a33572e313c5b/html5/thumbnails/1.jpg)
P. Romanos1, E. Voumvoulakis2, C. N. Markides3, N. Hatziargyriou1,2
1 National Technical University of Athens, School of Electrical and Computer Engineering, Athens, Greece
2 Hellenic Electricity Distribution Network Operator, Athens, Greece
3 Clean Energy Processes (CEP) Laboratory, Department of Chemical Engineering, Imperial College London, London, UK
September 2019
![Page 2: P. Romanos , E. Voumvoulakis , C. N. Markides N. Hatziargyriou · Conclusions • TES-ORCs can play an important role for increasing the Flexibility of Power Stations and to contribute](https://reader034.vdocuments.site/reader034/viewer/2022042219/5ec4c07c8a2a33572e313c5b/html5/thumbnails/2.jpg)
Atherinolakkos Power Station
Crete, Maximum Electrical Power Consumption: 700 MW
Crete, Wind Parks installed: 200 MW
Crete, PV Parks installed: 100 MW
Crete, 3 X Thermal Power Stations: 708 MW
Transmission Power System of Greece
![Page 3: P. Romanos , E. Voumvoulakis , C. N. Markides N. Hatziargyriou · Conclusions • TES-ORCs can play an important role for increasing the Flexibility of Power Stations and to contribute](https://reader034.vdocuments.site/reader034/viewer/2022042219/5ec4c07c8a2a33572e313c5b/html5/thumbnails/3.jpg)
Annual Cost of Energy Production in Crete & TES-ORCs Optimal Scheduling
Minimise:
Total Fuel Consumption: 177 M€
+
Start Up Cost of Local Units: 4.1 M€
+
Energy Not Supplied: 1.5 M€
![Page 4: P. Romanos , E. Voumvoulakis , C. N. Markides N. Hatziargyriou · Conclusions • TES-ORCs can play an important role for increasing the Flexibility of Power Stations and to contribute](https://reader034.vdocuments.site/reader034/viewer/2022042219/5ec4c07c8a2a33572e313c5b/html5/thumbnails/4.jpg)
Efficiency 39.2%
Thermal Input 123 MW
Electrical Power 50 MW
![Page 5: P. Romanos , E. Voumvoulakis , C. N. Markides N. Hatziargyriou · Conclusions • TES-ORCs can play an important role for increasing the Flexibility of Power Stations and to contribute](https://reader034.vdocuments.site/reader034/viewer/2022042219/5ec4c07c8a2a33572e313c5b/html5/thumbnails/5.jpg)
Efficiency 10.6%
Thermal Input 123 MW
Electrical Power 13 MW
![Page 6: P. Romanos , E. Voumvoulakis , C. N. Markides N. Hatziargyriou · Conclusions • TES-ORCs can play an important role for increasing the Flexibility of Power Stations and to contribute](https://reader034.vdocuments.site/reader034/viewer/2022042219/5ec4c07c8a2a33572e313c5b/html5/thumbnails/6.jpg)
Oil-Fired Power Station Flexibility with and without TES-ORCs
![Page 7: P. Romanos , E. Voumvoulakis , C. N. Markides N. Hatziargyriou · Conclusions • TES-ORCs can play an important role for increasing the Flexibility of Power Stations and to contribute](https://reader034.vdocuments.site/reader034/viewer/2022042219/5ec4c07c8a2a33572e313c5b/html5/thumbnails/7.jpg)
Oil-Fired Electrical Energy Production & Electrical Energy Production using TES-ORCs
![Page 8: P. Romanos , E. Voumvoulakis , C. N. Markides N. Hatziargyriou · Conclusions • TES-ORCs can play an important role for increasing the Flexibility of Power Stations and to contribute](https://reader034.vdocuments.site/reader034/viewer/2022042219/5ec4c07c8a2a33572e313c5b/html5/thumbnails/8.jpg)
Derating Plant versus Steam Extraction
![Page 9: P. Romanos , E. Voumvoulakis , C. N. Markides N. Hatziargyriou · Conclusions • TES-ORCs can play an important role for increasing the Flexibility of Power Stations and to contribute](https://reader034.vdocuments.site/reader034/viewer/2022042219/5ec4c07c8a2a33572e313c5b/html5/thumbnails/9.jpg)
Thermal Energy Storage versus NetGenerator Output
![Page 10: P. Romanos , E. Voumvoulakis , C. N. Markides N. Hatziargyriou · Conclusions • TES-ORCs can play an important role for increasing the Flexibility of Power Stations and to contribute](https://reader034.vdocuments.site/reader034/viewer/2022042219/5ec4c07c8a2a33572e313c5b/html5/thumbnails/10.jpg)
Heat Rate Input versus Steam Extraction
![Page 11: P. Romanos , E. Voumvoulakis , C. N. Markides N. Hatziargyriou · Conclusions • TES-ORCs can play an important role for increasing the Flexibility of Power Stations and to contribute](https://reader034.vdocuments.site/reader034/viewer/2022042219/5ec4c07c8a2a33572e313c5b/html5/thumbnails/11.jpg)
Rankine Cycle Efficiency versus Steam Extraction
![Page 12: P. Romanos , E. Voumvoulakis , C. N. Markides N. Hatziargyriou · Conclusions • TES-ORCs can play an important role for increasing the Flexibility of Power Stations and to contribute](https://reader034.vdocuments.site/reader034/viewer/2022042219/5ec4c07c8a2a33572e313c5b/html5/thumbnails/12.jpg)
Transmission Power System of Greece
Atherinolakkos Power Station
Crete, Maximum Electrical Power Consumption: 700 MW
Crete, Wind Parks installed: 200 MW
Crete, PV Parks installed: 100 MW
Crete, 3 Thermal Power Stations: 708 MWAC Interconnection Athens-Crete: 150 MW
![Page 13: P. Romanos , E. Voumvoulakis , C. N. Markides N. Hatziargyriou · Conclusions • TES-ORCs can play an important role for increasing the Flexibility of Power Stations and to contribute](https://reader034.vdocuments.site/reader034/viewer/2022042219/5ec4c07c8a2a33572e313c5b/html5/thumbnails/13.jpg)
Unit Commitment – Economic Dispatch Optimisation of TES-ORCs
![Page 14: P. Romanos , E. Voumvoulakis , C. N. Markides N. Hatziargyriou · Conclusions • TES-ORCs can play an important role for increasing the Flexibility of Power Stations and to contribute](https://reader034.vdocuments.site/reader034/viewer/2022042219/5ec4c07c8a2a33572e313c5b/html5/thumbnails/14.jpg)
Typical Daily Operation of the Oil-Fired Power Station in Atherinolakkos
![Page 15: P. Romanos , E. Voumvoulakis , C. N. Markides N. Hatziargyriou · Conclusions • TES-ORCs can play an important role for increasing the Flexibility of Power Stations and to contribute](https://reader034.vdocuments.site/reader034/viewer/2022042219/5ec4c07c8a2a33572e313c5b/html5/thumbnails/15.jpg)
Average Annual Daily Operation of the Oil-Fired Power Station in Atherinolakkos
![Page 16: P. Romanos , E. Voumvoulakis , C. N. Markides N. Hatziargyriou · Conclusions • TES-ORCs can play an important role for increasing the Flexibility of Power Stations and to contribute](https://reader034.vdocuments.site/reader034/viewer/2022042219/5ec4c07c8a2a33572e313c5b/html5/thumbnails/16.jpg)
TES-ORCs Optimal Scheduling in Atherinolakkos
![Page 17: P. Romanos , E. Voumvoulakis , C. N. Markides N. Hatziargyriou · Conclusions • TES-ORCs can play an important role for increasing the Flexibility of Power Stations and to contribute](https://reader034.vdocuments.site/reader034/viewer/2022042219/5ec4c07c8a2a33572e313c5b/html5/thumbnails/17.jpg)
TES-ORCs Cost –Benefits Analysis
Installation cost: 20 M€ + 3.5 M€/Hour of Storage
![Page 18: P. Romanos , E. Voumvoulakis , C. N. Markides N. Hatziargyriou · Conclusions • TES-ORCs can play an important role for increasing the Flexibility of Power Stations and to contribute](https://reader034.vdocuments.site/reader034/viewer/2022042219/5ec4c07c8a2a33572e313c5b/html5/thumbnails/18.jpg)
TES-ORCs Discounted Payback Periods with Autonomous and Interconnected Transmission Power System of Crete
ORC-TES Discounted Payback Period
Autonomous With Interconnection
3.5 Years 10 Years
![Page 19: P. Romanos , E. Voumvoulakis , C. N. Markides N. Hatziargyriou · Conclusions • TES-ORCs can play an important role for increasing the Flexibility of Power Stations and to contribute](https://reader034.vdocuments.site/reader034/viewer/2022042219/5ec4c07c8a2a33572e313c5b/html5/thumbnails/19.jpg)
Conclusions• TES-ORCs can play an important role for
increasing the Flexibility of Power Stationsand to contribute to Economic Dispatch
• In Atherinolakkos Oil-Fired Power Station, theFlexibility increases from 27-50 MW to 13-70MW
• 3.5 years pay-back period for theAutonomous Power System of Crete
• 10 years pay-back period for theinterconnected Power System of Crete
![Page 20: P. Romanos , E. Voumvoulakis , C. N. Markides N. Hatziargyriou · Conclusions • TES-ORCs can play an important role for increasing the Flexibility of Power Stations and to contribute](https://reader034.vdocuments.site/reader034/viewer/2022042219/5ec4c07c8a2a33572e313c5b/html5/thumbnails/20.jpg)
Acknowledgments• Mr. George Kafiris with ELECTROMEC S.A.
• Mr. Alexios Sotiropoulos with Public PowerCorporation S.A. (PPC)
• Mr. James Bowers with Scottish and SouthernElectricity Networks (SSE)
• Mr. Richard Drew with Uniper
• Mr. Dimitrios Tsintzilonis with Salfo andAssociates S.A.
• Dr. Nikos Soultanis with Independent PowerTransmission Operator S.A. (ADMIE)
![Page 21: P. Romanos , E. Voumvoulakis , C. N. Markides N. Hatziargyriou · Conclusions • TES-ORCs can play an important role for increasing the Flexibility of Power Stations and to contribute](https://reader034.vdocuments.site/reader034/viewer/2022042219/5ec4c07c8a2a33572e313c5b/html5/thumbnails/21.jpg)
Thank you for your Attention!
Dr.-Ing. P. Romanos