owner - louisiana transportation research center design build... · owner fhwa la dotd ... asme...
TRANSCRIPT
Owner
FHWA
LA DOTD
LPA Group
Design Builder
Boh Bros.
Volkert, Inc.
Evans-Graves Engineers
Tolunay-Wong
James Construction Group
Terracon
Sizing the Cranes (Kenny Solis)
Existing Structure Suitability (Patrick Ledet)
Stability Analysis (Neil Hickok)
Analysis and Review Process
HDR, Engensus, SDR
LPA/DOTD
KCS
CFRP Strengthening at LaCrete Ln. and Rail Spur
Girder Analysis References
AISC 13th Edition
AASHTO Guide Design Specs. for Bridge Temporary Works
ASME B30.20-2010
ASME BTH-1-2011
ASCE Design Loads on Structures During Construction
Analysis Software IES Shape Builder
IES Visual Analysis
Girder Analysis
Determined girder cross section properties
Established max allowable bending moment
iaw AISC 13th edition – Section F4
Strong axis bending due to self weight
Weak axis bending due to wind load
Full length of girder as Lb
Analyzed girders for max bending moments
Established pick point and shoring locations
Determined temporary cross bracing requirements
Lift Plans
Modeling
2D -AutoCAD 2012
3D-Autodesk Inventor 2010
Sight Constraints
KCS rail road
Power Line
I-10 Traffic
Access road to precast yard
Staging and Assembly
Erection
Phase 3 Girder Erection Complete
Phase 3 Deck Pours began in January 2013
Project completion in Spring 2013.
Boh Bros. field Supervisors, Foremen, and Craftsman that made execution of project possible
Owners
Design Team Members
AFCO Steel
Boykin Bros.