1 Clean Environment Commission - January 2003 Overview Presentation Winnipeg’s Wastewater Pollution Prevention Plan Overview Presentation Winnipeg’s Wastewater Pollution Prevention Plan Presented to the Clean Environment Commission January 27, 2003 City of Winnipeg – Water and Waste Department

Upload: others

Post on 01-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Overview Presentation Winnipeg’s Wastewater Pollution ...(Stage Ia) - SCADA, Demo, Weirs $ 14 2003 2005 (Stage Ib) - Integrate with BFR $ 26 2005 2043 (Stage II) - In line storage

1Clean Environment Commission - January 2003

Overview PresentationWinnipeg’s Wastewater Pollution

Prevention Plan

Overview PresentationWinnipeg’s Wastewater Pollution

Prevention Plan

Presented to the Clean Environment Commission

January 27, 2003

City of Winnipeg – Water and Waste Department

Page 2: Overview Presentation Winnipeg’s Wastewater Pollution ...(Stage Ia) - SCADA, Demo, Weirs $ 14 2003 2005 (Stage Ib) - Integrate with BFR $ 26 2005 2043 (Stage II) - In line storage

2Clean Environment Commission - January 2003

Overview of Plan Overview of Plan

OutlineIntroductionPlan to Improve Wastewater Treatment

DisinfectionAmmonia reductionNutrients CSO control

Financial Impact and Options

Page 3: Overview Presentation Winnipeg’s Wastewater Pollution ...(Stage Ia) - SCADA, Demo, Weirs $ 14 2003 2005 (Stage Ib) - Integrate with BFR $ 26 2005 2043 (Stage II) - In line storage

3Clean Environment Commission - January 2003

Overview of PlanOverview of Plan

IntroductionMajor considerations

Address the issuesProvide a scientific basis for action.Provide a schedule of implementation.Provide for the operation, maintenance and eventual replacement of assets.Provide the required financial resources to carry out the plan.

Page 4: Overview Presentation Winnipeg’s Wastewater Pollution ...(Stage Ia) - SCADA, Demo, Weirs $ 14 2003 2005 (Stage Ib) - Integrate with BFR $ 26 2005 2043 (Stage II) - In line storage

4Clean Environment Commission - January 2003

Overview of PlanOverview of Plan

IntroductionExisting Systems

5 Interceptor Sewer systems3 Pollution Control Centres79 CSO locations231 Land drainage outlet

101 to Red and Assiniboine

2 Major Rivers

Page 5: Overview Presentation Winnipeg’s Wastewater Pollution ...(Stage Ia) - SCADA, Demo, Weirs $ 14 2003 2005 (Stage Ib) - Integrate with BFR $ 26 2005 2043 (Stage II) - In line storage

5Clean Environment Commission - January 2003

Overview of PlanOverview of Plan

IntroductionRoutine River Monitoring done by City of WinnipegYear-round bi-weekly sampling on the Red and Assiniboine Rivers since 1977 at 11locations.

N

Red

Cook's Cr.

Parkdale Cr. Lockport

RiverGrassmere Cr.

RED

RIV

ER

River

FLO

ODW

AY

Assiniboine River

Headingley

WinnipegCity Limits

WEWPCC

SEWPCC

NEWPCC

Sturgeon

Cr.

Omand'sCr.

Bunn's Cr.

Seine

Red

LaSa

lle R

.

SELKIRK

0 10

Approximate Scale

km

RedwoodBridge

NorwoodBridge

Fort GarryBridge

West PerimeterBridge

MainStreetBridge

Floodway ControlStructure

Sampling Location

North PerimeterBridge

St. AndrewsLock & Dam

S. PerimeterBridge

AssiniboinePark Bridge

Page 6: Overview Presentation Winnipeg’s Wastewater Pollution ...(Stage Ia) - SCADA, Demo, Weirs $ 14 2003 2005 (Stage Ib) - Integrate with BFR $ 26 2005 2043 (Stage II) - In line storage

6Clean Environment Commission - January 2003

Overview of PlanOverview of Plan

IntroductionScientific Basis:

The Red and Assiniboine Rivers Ammonia - Criteria Study, November 2002.The Combined Sewer Overflow Management Study, November 2002.The Nitrification Technical Study, November 2002.Executive Summary: Ammonia Reduction in City of Winnipeg Wastewater Effluent, November 2002.Nutrient Characterization of Discharges from WinnipegEffluent Discharges Limits for Winnipeg’s Water Pollution Control Centres

Page 7: Overview Presentation Winnipeg’s Wastewater Pollution ...(Stage Ia) - SCADA, Demo, Weirs $ 14 2003 2005 (Stage Ib) - Integrate with BFR $ 26 2005 2043 (Stage II) - In line storage

7Clean Environment Commission - January 2003

Overview of PlanOverview of Plan

Plan to ImproveA near- and long-term implementation plan has been developedSupported by Environmental Projects Reserve (EPR) fund.Does not include costs for other system or treatment plant upgrades that might be needed during the same timeframeCosts are in 2002 dollars and no inflation allowance has been included.Approved by City Council December 11, 2002

Page 8: Overview Presentation Winnipeg’s Wastewater Pollution ...(Stage Ia) - SCADA, Demo, Weirs $ 14 2003 2005 (Stage Ib) - Integrate with BFR $ 26 2005 2043 (Stage II) - In line storage

8Clean Environment Commission - January 2003

Overview of PlanOverview of Plan

Approximately $75 Million to be supported by EPR in next 10 years

Plan to ImproveComponent Capital $

(Million)Year Started Year Completed

NEWPCC Disinfection $ 15 2003 2004

Centrate Ammonia Treatment at NEWPCC $ 10 2003 2004

CSO Control Program

(Stage Ia) - SCADA, Demo, Weirs $ 14 2003 2005

(Stage Ib) - Integrate with BFR $ 26 2005 2043

(Stage II) - In line storage $ 50 2028 2033

(Stage III) - Additional storage $ 181 2033 2050

WEWPCC Disinfection $ 3 2050 2051

Effluent Nutrient Control

NEWPCC $ 127 2019 2022SEWPCC $ 47 2022 2025

WEWPCC $ 7 2025 2026

Sub-Total $480 Biosolids Program

(Stage I) - Pelletization and Storage $ 30 2007 2010

(Stage II) - Thermophilic conversion $ 20 2012 2014

TOTAL $530

Page 9: Overview Presentation Winnipeg’s Wastewater Pollution ...(Stage Ia) - SCADA, Demo, Weirs $ 14 2003 2005 (Stage Ib) - Integrate with BFR $ 26 2005 2043 (Stage II) - In line storage

9Clean Environment Commission - January 2003

Overview of PlanOverview of Plan

Plan to Improve.Elements:

Disinfection and ammonia reduction (centrate) are priorities.Disinfection at the WEWPCC can be deferred indefinitely.Allows for long-term nutrient control.Long-term CSO control strategy to achieve a target of 4 overflows.Allows for a new biosolids management system.45 to 50 year program must be flexible to deal with major uncertainties with future program.Additional research, studies, monitoring, dialogue with the Regulator, and public consultation to be conducted in next 10 years to better assess needs, timing, and costs of future actions.

Page 10: Overview Presentation Winnipeg’s Wastewater Pollution ...(Stage Ia) - SCADA, Demo, Weirs $ 14 2003 2005 (Stage Ib) - Integrate with BFR $ 26 2005 2043 (Stage II) - In line storage

10Clean Environment Commission - January 2003

Overview of PlanOverview of Plan

Plan to ImproveFinancial Considerations

Capital funding from EPR, $7 million/year for first 10 yearsPreserves “pay-as-you-go” as much as possible for first 10 yearsWastewater improvements will not delay water treatment plant Increase to the EPR will be necessary after ten yearsNeed to add inflation to meet timeframes

Annual EPR Timeframe(Millions) (Years)

$7.0 2003 to 2012$14.0 2013 to 2022$21.0 2023 to 2032

Page 11: Overview Presentation Winnipeg’s Wastewater Pollution ...(Stage Ia) - SCADA, Demo, Weirs $ 14 2003 2005 (Stage Ib) - Integrate with BFR $ 26 2005 2043 (Stage II) - In line storage

11Clean Environment Commission - January 2003

Overview of the PlanOverview of the Plan

DisinfectionIn place at the SEWPCCNot required at the WEWPCCRFP out for NEWPCCIn place for May 1, 2005

Page 12: Overview Presentation Winnipeg’s Wastewater Pollution ...(Stage Ia) - SCADA, Demo, Weirs $ 14 2003 2005 (Stage Ib) - Integrate with BFR $ 26 2005 2043 (Stage II) - In line storage

12Clean Environment Commission - January 2003

Overview of PlanOverview of Plan

Ammonia ReductionAmmonia (NH3), a natural by-product of decomposing human and animal waste, is in the treated wastewater (effluent) released to the rivers.Ammonia can be toxic to fish at high concentrationsStudies undertaken to:

Understand rationale of existing and evolving regulationsUnderstand abundance, distribution, behavior and health of aquatic lifeDetermine toxicity of ammonia to local aquatic speciesExplore treatment options and costs

Page 13: Overview Presentation Winnipeg’s Wastewater Pollution ...(Stage Ia) - SCADA, Demo, Weirs $ 14 2003 2005 (Stage Ib) - Integrate with BFR $ 26 2005 2043 (Stage II) - In line storage

13Clean Environment Commission - January 2003

Overview of PlanOverview of Plan

Ammonia ReductionApplication of Ammonia Criteria

Involves several important science-based and site-specific considerations

Allowable ammonia concentration

Exposure

Flow allocation

Period of Record for Design Flow

Page 14: Overview Presentation Winnipeg’s Wastewater Pollution ...(Stage Ia) - SCADA, Demo, Weirs $ 14 2003 2005 (Stage Ib) - Integrate with BFR $ 26 2005 2043 (Stage II) - In line storage

14Clean Environment Commission - January 2003

Overview of PlanOverview of Plan

Ammonia ReductionCity Proposal to Meet Protective Criteria

NEWPCCIn longer term, additional treatment to further reduce ammonia may be required

10-year will meet City’s proposed criteriaImplement Centrate Treatment (2005)

$10 MillionMonitor

Potential additional treatment$0 to 122 Million

WEWPCCContinue use of polishing ponds for ammonia removal

Potential modification$4 Million

SEWPCCContinue secondary treatment process

Monitor: Plant performanceRiver QualityWastewater flows

Potential additional treatment$0 to 33 Million

Page 15: Overview Presentation Winnipeg’s Wastewater Pollution ...(Stage Ia) - SCADA, Demo, Weirs $ 14 2003 2005 (Stage Ib) - Integrate with BFR $ 26 2005 2043 (Stage II) - In line storage

15Clean Environment Commission - January 2003

Overview of PlanOverview of Plan

NutrientsWinnipeg’s contribution to Lake Winnipeg is:

~ 6.3% of annual phosphorous (P) load**~ 5.2% of annual nitrogen (N) load**

The plan includes $181 million for nutrient control.The City recommends that limits for N and P not be established until:

Province completes basin-wide Nutrient Management Study, andProvince conducts stakeholder and public consultations

Fair and equitable plan involvingMunicipalIndustrialAgricultureCottage OwnersUpstream Neighbours

Page 16: Overview Presentation Winnipeg’s Wastewater Pollution ...(Stage Ia) - SCADA, Demo, Weirs $ 14 2003 2005 (Stage Ib) - Integrate with BFR $ 26 2005 2043 (Stage II) - In line storage

16Clean Environment Commission - January 2003

Nutrient CharacterizationNutrient Characterization

Nutrient Removal at All Winnipeg WPCCs $181 Million

05,000

10,00015,00020,00025,00030,00035,00040,00045,00050,00055,00060,00065,00070,00075,000

Province's Estimates Province's Estimatesw/BNR at WPCCs

Nitr

ogen

(ton

nes/

year

)

Winnipeg (WPCC,sCSOs, LDS)

Atmospheric Loads

Brokenhead River

Dauphin River

Saskatchewan River

Winnipeg River

Red River w/oWinnipeg

0500

1,0001,5002,0002,5003,0003,5004,0004,5005,0005,5006,0006,5007,000

Province's Estimates Province's Estimatesw/BNR at WPCCs

Phos

horu

s (to

nnes

/yea

r)

3.8 % Reduction260 tonnes/year

3.1 % Reduction2200 tonnes/year

Page 17: Overview Presentation Winnipeg’s Wastewater Pollution ...(Stage Ia) - SCADA, Demo, Weirs $ 14 2003 2005 (Stage Ib) - Integrate with BFR $ 26 2005 2043 (Stage II) - In line storage

17Clean Environment Commission - January 2003

Overview of PlanOverview of Plan

Combined Sewer Overflow (CSO) ControlCombined Sewers Separate Sewers

Older parts of the City (pre 1960)Approximately 30% of City has combined sewersCSO – dilute mixture of sewage and land drainageThe major impact is a temporary increase in fecal coliform levels in the rivers above objectives

Page 18: Overview Presentation Winnipeg’s Wastewater Pollution ...(Stage Ia) - SCADA, Demo, Weirs $ 14 2003 2005 (Stage Ib) - Integrate with BFR $ 26 2005 2043 (Stage II) - In line storage

18Clean Environment Commission - January 2003

Overview of PlanOverview of Plan

CSO Control: Cost/Benefit Trade-off

Page 19: Overview Presentation Winnipeg’s Wastewater Pollution ...(Stage Ia) - SCADA, Demo, Weirs $ 14 2003 2005 (Stage Ib) - Integrate with BFR $ 26 2005 2043 (Stage II) - In line storage

19Clean Environment Commission - January 2003

Overview of PlanOverview of Plan

$0 $100 $200 $300 $400 $500 $600 $700 $800 $900 $1,0000%

20%

40%

60%

80%

100%

Estimated Cost (Millions)

Compliance with Fecal Coliforms Objective of 200 organisms/100mL for Different Control Scenarios

Perc

ent C

ompl

ianc

e w

ith O

bjec

tive

for R

ecre

atio

n Se

ason

(May

1 to

Sep

t 30)

$1,100 $1,200 $1,300 $1,400 $1,500

Minimum Compliance - Typical Year at North Perimeter Bridge

CSO Control Options

Dis

infe

ctio

n at

WPC

Cs

Ava

ilabl

e In

-line

Sto

rage

In-li

ne S

tora

ge p

lus

Dis

trib

uted

Stor

age

and

Tran

sfer

s

In-li

ne S

tora

ge p

lus

Dis

trib

uted

Stor

age

and

Tran

sfer

spl

us O

ff-Li

ne S

tora

ge

Tunn

el S

tora

ge (Z

ero

over

flow

s)

Com

plet

e Se

wer

Sep

arat

ion

Page 20: Overview Presentation Winnipeg’s Wastewater Pollution ...(Stage Ia) - SCADA, Demo, Weirs $ 14 2003 2005 (Stage Ib) - Integrate with BFR $ 26 2005 2043 (Stage II) - In line storage

20Clean Environment Commission - January 2003

Overview of PlanOverview of Plan

Combined Sewer Overflow (CSO) Control:Long-term CSO control program be adopted in principle to reduce overflow events

City-wide average of 4 events per summer recreation season (reduced from 18 events)Within a 45 to 50 year timeframeEstimated capital cost: $270 Million

Page 21: Overview Presentation Winnipeg’s Wastewater Pollution ...(Stage Ia) - SCADA, Demo, Weirs $ 14 2003 2005 (Stage Ib) - Integrate with BFR $ 26 2005 2043 (Stage II) - In line storage

21Clean Environment Commission - January 2003

Overview of PlanOverview of Plan

Effluent LimitsBase on the existing secondary treatment performance for:

5-day Carbonaceous Biochemical Oxygen Demand (CBOD5), Total suspended solids (TSS)

Ammonia limit based on science and site specific flow allocations to allow for future developmentLimits for fecal coliform be established to protect summer recreational use of Rivers.

Page 22: Overview Presentation Winnipeg’s Wastewater Pollution ...(Stage Ia) - SCADA, Demo, Weirs $ 14 2003 2005 (Stage Ib) - Integrate with BFR $ 26 2005 2043 (Stage II) - In line storage

22Clean Environment Commission - January 2003

Overview of PlanOverview of Plan

Systems ReliabilityRisk/Criticality Assessments

City will respond to recommendations for design and operational changes at the NEWPCCCity will undertake Risk and Criticality Assessments at the three WPCCs

Assess reliability and backup capability of treatment systemsEstimate mitigation costs, and develop risk reduction planImplement mitigation measures to prevent discharge of untreated sewage12-month study, to be complete in 2004

Page 23: Overview Presentation Winnipeg’s Wastewater Pollution ...(Stage Ia) - SCADA, Demo, Weirs $ 14 2003 2005 (Stage Ib) - Integrate with BFR $ 26 2005 2043 (Stage II) - In line storage

23Clean Environment Commission - January 2003

Overview of PlanOverview of Plan

Financial Impact and OptionsPollution prevention plan to be supported by the current annual EPR funding at $7 M for next 10 yearsFinancial uncertainties

Actual costs of projects versus estimatesInflation over extensive time periodsOther infrastructure costs

Page 24: Overview Presentation Winnipeg’s Wastewater Pollution ...(Stage Ia) - SCADA, Demo, Weirs $ 14 2003 2005 (Stage Ib) - Integrate with BFR $ 26 2005 2043 (Stage II) - In line storage

24Clean Environment Commission - January 2003

Overview of PlanOverview of Plan

Financial Impact and OptionsA commitment to a higher (or lower) degree of control for:

AmmoniaCSOsNutrients

Make improvements at a faster (or slower) rateIncrease EPR sooner to $14 or $21 million per year