overview post treatment in northrhine westfalia symposium/7 victor mertsch... · kläranlage bad...

29
Overview post treatment in Northrhine Westfalia Horstermeer 21.11.2013 Dr. Viktor Mertsch – MKULNV NRW Quelle: Grontmij GmbH und WBD AÖR

Upload: doantu

Post on 03-Feb-2018

225 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Overview post treatment in Northrhine Westfalia symposium/7 Victor Mertsch... · Kläranlage Bad Sassendorf Kläranlage Duisburg Vierlinden Quelle: Abwasserverband „Obere Lutter“

Overview post treatment in Northrhine WestfaliaHorstermeer 21.11.2013

Dr. Viktor Mertsch – MKULNV NRW

Quelle: Grontmij GmbH und WBD AÖR

Page 2: Overview post treatment in Northrhine Westfalia symposium/7 Victor Mertsch... · Kläranlage Bad Sassendorf Kläranlage Duisburg Vierlinden Quelle: Abwasserverband „Obere Lutter“

Wastewater treatment – current status

645 municipal wastewater treatment works 83,0000 small sewage works and 8,500

septic tanks 1,200 direct industrial dischargers and

approx. 40,000 indirect dischargers More than 8,000 stormwater holding tanks

and spillways Approx. 70,000 km public sewers,

an estimated 200,000 km of private sewers, approx. 3M domestic connections

High standards in NRW when compared to national and international benchmarks

Page 3: Overview post treatment in Northrhine Westfalia symposium/7 Victor Mertsch... · Kläranlage Bad Sassendorf Kläranlage Duisburg Vierlinden Quelle: Abwasserverband „Obere Lutter“
Page 4: Overview post treatment in Northrhine Westfalia symposium/7 Victor Mertsch... · Kläranlage Bad Sassendorf Kläranlage Duisburg Vierlinden Quelle: Abwasserverband „Obere Lutter“

The Initiative „reine Ruhr“-Background: 50 Million organic compounds 5,000 potentially harmful substances

(German Advisory Council on the Environment)

Improved analytical methods make detection of lower concentrations possible (e.g. pharmaceuticals)

In an industrialized world, the use of anthropogenic substances is indispensable!

Importance for NRW Abstraction of drinking water by bank filtration High industrial density High population density High level of soil sealing High average age of the population

Page 5: Overview post treatment in Northrhine Westfalia symposium/7 Victor Mertsch... · Kläranlage Bad Sassendorf Kläranlage Duisburg Vierlinden Quelle: Abwasserverband „Obere Lutter“

Status quo: micropollutants(Detection of contamination of surface water, raw water and/or drinking water) Volatile halogenated hydrocarbons

1,1,1-Trichlorethane Flame retardants

Phosphoric acid-tris-(2-chlorpropyl)ester Pharmaceuticals

Carbamazepine and diclofenac X-ray contrast medium

Amidotrizoic acid and iopamidol Perfluorinated surfactants (PFT) Complexing agents EDTA and DTPA TOSU (2,4,8,10-Tetraoxaspiro[5.5]-undecane) Sulfolane (organic solvent)

Page 6: Overview post treatment in Northrhine Westfalia symposium/7 Victor Mertsch... · Kläranlage Bad Sassendorf Kläranlage Duisburg Vierlinden Quelle: Abwasserverband „Obere Lutter“

Basis: MNQ!

Example: diclofenac (Project Material Flow Modelling)

Page 7: Overview post treatment in Northrhine Westfalia symposium/7 Victor Mertsch... · Kläranlage Bad Sassendorf Kläranlage Duisburg Vierlinden Quelle: Abwasserverband „Obere Lutter“

Water treatment works

Amidotrizoic acid,cprofloxacin,diclofenac,antibiotics,

Bisphenol A,PFT,

TCPP,MTBE,

Carbamazepine,diclofenac,metoprolol,

Glyphosate,mecoprop,

cloridazone,Iiopurone,

Biocides,…

Possible discharge routes for micropollutants

Misch- und Schmutz-wasserkanal

Tosu,PFT,

MTBE,…

KAKKK AK AKA Surface water

Page 8: Overview post treatment in Northrhine Westfalia symposium/7 Victor Mertsch... · Kläranlage Bad Sassendorf Kläranlage Duisburg Vierlinden Quelle: Abwasserverband „Obere Lutter“

Research and Development

Call for proposals MUNLV NRW 12/2008

10 research topics focusing on the elimination of pharmaceuticals and organic micropollutants: Development of concepts and innovative, economical treatment options

€ 5M

Page 9: Overview post treatment in Northrhine Westfalia symposium/7 Victor Mertsch... · Kläranlage Bad Sassendorf Kläranlage Duisburg Vierlinden Quelle: Abwasserverband „Obere Lutter“

Incentives:Funding – Investment scheme Abwasser NRW

Municipal wastewater treatment works Elimination of harmful substances

70 % of investment costs

Elimination of pathogens 50% of investment costs

Industrial wastewater treatment(production-integrated environmental protection)

Page 10: Overview post treatment in Northrhine Westfalia symposium/7 Victor Mertsch... · Kläranlage Bad Sassendorf Kläranlage Duisburg Vierlinden Quelle: Abwasserverband „Obere Lutter“

Institution of the German State of Northrhine-Westphalia promote national and international exchange of

experiences aggregate competences from science, public

authorities, economy and existing knowledge

In Cooperation with the DWA Regional Group NRW and the Cluster Umwelttechnologien.NRW.

www.masterplan-wasser.nrw.dewww.umweltcluster-nrw.de

Kompetenzzentrum Mikroschadstoffe.NRW

Page 11: Overview post treatment in Northrhine Westfalia symposium/7 Victor Mertsch... · Kläranlage Bad Sassendorf Kläranlage Duisburg Vierlinden Quelle: Abwasserverband „Obere Lutter“

Source control - Examples

Industry: prevent or reduce use of pollutants through product-integrated or production-integrated environmental protection

Hospitals, nursing homes, pharmacies, households: raise awareness on proper disposal of pharmaceuticals

Agriculture:Authorization/ban of herbicides and pesticides

Page 12: Overview post treatment in Northrhine Westfalia symposium/7 Victor Mertsch... · Kläranlage Bad Sassendorf Kläranlage Duisburg Vierlinden Quelle: Abwasserverband „Obere Lutter“

Humpert company: Ion exchange recirculation unit 1/2 with integrated active carbon filter

Page 13: Overview post treatment in Northrhine Westfalia symposium/7 Victor Mertsch... · Kläranlage Bad Sassendorf Kläranlage Duisburg Vierlinden Quelle: Abwasserverband „Obere Lutter“

Perstorp company: Tosu

Page 14: Overview post treatment in Northrhine Westfalia symposium/7 Victor Mertsch... · Kläranlage Bad Sassendorf Kläranlage Duisburg Vierlinden Quelle: Abwasserverband „Obere Lutter“

Observed Substances PFT Fire protection agent Complexing agent TOSU Sulfola

Technologies Installation of activated carbon filters in industrial

companies Installation of anion exchangers

Commissioning of vaporizers

R&D-Projects on micropollutants - Industry

Source: Fa. Perstrop „Tosu-Umkehrosmose“Source : Fa. Humpert

„Ionenaustauscher“

Source: Fa. Humbert „Vakuumverdampfer“

Page 15: Overview post treatment in Northrhine Westfalia symposium/7 Victor Mertsch... · Kläranlage Bad Sassendorf Kläranlage Duisburg Vierlinden Quelle: Abwasserverband „Obere Lutter“

WWTW for hospital wastewater (Marienhospital Gelsenkirchen)

• 650 Beds• 70,000 patients per year• Potable water needs: 60,000 m³/a

• Various treatment options• Preferred treatment option:- 100% active carbon- Recirculation via ozone unit

depending on hydraul. capacity MBR

- MBR + O3/PAC - approx. 1.600 pe (Ntot)- approx. 3.100 pe (BSB5)- Qmax: 20 m3/h- tts = 25 d incl. denitr.- Ozone ratio: 5 - 20 mg/l- Active carbon ratio: 10 – 20 mg/l

• Invest.: approx. € 1.6M • Funding 50% EU• Commissioning: End 2010

Page 16: Overview post treatment in Northrhine Westfalia symposium/7 Victor Mertsch... · Kläranlage Bad Sassendorf Kläranlage Duisburg Vierlinden Quelle: Abwasserverband „Obere Lutter“

Investment costs

Separation stormwater 446,000 € Conversion water supply in hospital 106,000 € Conversion of sewage network 276,000 € Construction of stormwater holding tanks 64,000 €

Construction additional treatment 320,000 €Total construction work: 2,100,000 €

Construction wastewater treatment (MBR) 1,400,000 € Civil engineering 449.000 € Mechanical engineering 590.000 € Control technologiy 361.000 €

Total (incl. planning): 2,500,000 €NRW Funding (80%): approx. 2,000,000 €

Page 17: Overview post treatment in Northrhine Westfalia symposium/7 Victor Mertsch... · Kläranlage Bad Sassendorf Kläranlage Duisburg Vierlinden Quelle: Abwasserverband „Obere Lutter“

R&D Projects – Micropollutants from HospitalsReinier de Graaf Klinik, NLKreiskrankenhaus

WaldbrölMarienhospital

Gelsenkirchen (EU Projekt Pills)

Source: Pharmafilter

Source: RWTH Aachen Source: EGLV

Basic Data :- 650 beds- Q= 60.000 m³/aTechnology :- Various combination of

techniques- Biological membrane filtration- Ozonation- Activated carbon adsorption- Sand filtration

Basic Data:- 600 beds- Q= 16.000 m³/aTechnology: - Pharmafilter

- Membrane bioreactor - Ozonation- Activated carbon

adsorption- Industrial scale

Basic Data:- 340 beds- Q= 40.000 m³/aTechnology:- Membrane bioreactor - Ozonation- Activated carbon adsorption- Reverse osmosis and

nanofiltration

Marienhospital Gelsenkirchen

Page 18: Overview post treatment in Northrhine Westfalia symposium/7 Victor Mertsch... · Kläranlage Bad Sassendorf Kläranlage Duisburg Vierlinden Quelle: Abwasserverband „Obere Lutter“

R&D Projects Micropollutants - Wastewater Treatment plants

Source: RuhrverbandSource: EGLV

Duisburg-Vierlinden (Wirtschaftsbetriebe Duisburg

AÖR)

Bad Sassendorf (Lippeverband)

Schwerte (Ruhrverband)

Source: Grontmij GmbH and WBD AÖR

Basic Data:- 50.000 E- Qmax= 1.152 m³/hTechnology:- Ozonation and / or- Activated carbon adsorption- Recirculation possible with both ozone stream and powdered activated carbon stream C t € 1 4 t

Basic Data :- 12.000 E

and 1.200 beds (6 clinics)- Qmax= 650 m³/hTechnology:- Ozone dosage strategies

- in proportion to quantities- based on SAK

Costs: approx. € 0,98 m net

Basic Data:- 30.000 E- Qmax= 400 m³/hTechnology:- Ozonation

- 1 diffuser system- 1 injection system- biological post-treatment

Costs: approx. € 1,5 m net

Page 19: Overview post treatment in Northrhine Westfalia symposium/7 Victor Mertsch... · Kläranlage Bad Sassendorf Kläranlage Duisburg Vierlinden Quelle: Abwasserverband „Obere Lutter“

Wastewater-treatment plant BarntrupBosman Fuzzy Filter (15.000 pe)

Page 20: Overview post treatment in Northrhine Westfalia symposium/7 Victor Mertsch... · Kläranlage Bad Sassendorf Kläranlage Duisburg Vierlinden Quelle: Abwasserverband „Obere Lutter“

R&D Projects Micropollutants - Wastewater Treatment plants

Obere Lutter(Abwasserverband „obere

Lutter“)

Basic Data:- 380.000 E- Qmax= 400 m³/hTechnology:- Activated carbon adsorption

- 5 adsorbers- Maturation pond

Costs: approx. € 390.000 net

Source: Abwasserverband „Obere Lutter“(AOL)

Page 21: Overview post treatment in Northrhine Westfalia symposium/7 Victor Mertsch... · Kläranlage Bad Sassendorf Kläranlage Duisburg Vierlinden Quelle: Abwasserverband „Obere Lutter“

46. ESSENER TAGUNG für Wasser- und Abfallwirtschaft „Ressourcenschutz als interdisziplinäre Aufgabe“13. bis 15. März 2013

Page 22: Overview post treatment in Northrhine Westfalia symposium/7 Victor Mertsch... · Kläranlage Bad Sassendorf Kläranlage Duisburg Vierlinden Quelle: Abwasserverband „Obere Lutter“

46. ESSENER TAGUNG für Wasser- und Abfallwirtschaft „Ressourcenschutz als interdisziplinäre Aufgabe“13. bis 15. März 2013

Expansion of wastewater treatment plants Bad Sassendorf Duisburg Vierlinden Schwerte (pilot plant) Obere Lutter Gütersloh (partial operation) Dülmen (call for tender) Dülken (planning) Bad Oeynhausen (planning) Harsewinkel (planning) Aachen-Soers (planning) grant application Resa in July 2013)

Page 23: Overview post treatment in Northrhine Westfalia symposium/7 Victor Mertsch... · Kläranlage Bad Sassendorf Kläranlage Duisburg Vierlinden Quelle: Abwasserverband „Obere Lutter“

46. ESSENER TAGUNG für Wasser- und Abfallwirtschaft „Ressourcenschutz als interdisziplinäre Aufgabe“13. bis 15. März 2013

Summary of Investment costs of implemented large-scale projects

Treatment WWTW Civilengineering

Mechanicalengineering

Controltechnology

Additional costs

Total costs

[€ net] [€ net] [€ net] [€ net] [€ net]

NRWOzone Duisburg Vierlinden 535,475 481,784 319,225 200,000 1,536,484 Ozone Bad Sassendorf 331,733 275,187 126,789 248,739 982,448 Ozone and PAC Schwerte 441,000 758,000 232,000 1,431,000

GAC Obere Lutter (5 Adsorber) 282,400 46,200 61,400 390,000

Baden‐WürttembergPAC (decoloration)

Albstadt-Ebingen (no details available)

PAC (decoloration)

Lautlingen (no details available)

PAC (decoloration)

Hechingen (no details available)

PAC Mannheim 360,000 850,000 240,000 - 1,450,000 PAC Böblingen Sindelfingen 2,510,000 613,000 207,000 619,580 3,949,580 PAC Ravensburg (no details available)PAC Kressbronn-Langenargen (no details available (0.08  ‐ 0.09 €/m³ wastewater) ~ 2,400,000 PAC Stockacher Aach (no details available (0.07 – 0.08 €/m³ wastewater) ~ 2,200,000PAC Steinhäule Ulm (no details availble, total costs including filtration) 42,000,000

SwitzerlandOzone Regensdorf 396,000 864,600 59,400 1,320,000 23

Page 24: Overview post treatment in Northrhine Westfalia symposium/7 Victor Mertsch... · Kläranlage Bad Sassendorf Kläranlage Duisburg Vierlinden Quelle: Abwasserverband „Obere Lutter“

46. ESSENER TAGUNG für Wasser- und Abfallwirtschaft „Ressourcenschutz als interdisziplinäre Aufgabe“13. bis 15. März 2013

Operational costs of active carbon filtration and ozonation

24

y = 0,036x + 27729R² = 0,988

y = 0,0147x + 46081R² = 0,9949

0,00

0,50

1,00

1,50

2,00

2,50

3,00

0,00 10,00 20,00 30,00 40,00 50,00 60,00 70,00 80,00

Betri

ebsk

oste

n net

to [M

io. €

/a]

Gesa

mt

Jahresabwassermenge [Mio. m³/a]

PAK Anlagen OzonanlagenNRW O3 Duisburg-Vierlinden NRW O3 Bad SassendorfBaWü PAK Mannheim BaWü PAK Böblingen SindelfingenSchweiz O3 Regensdorf GAK KA LageGAK KA Obere Lutter Linear (PAK Anlagen)Linear (Ozonanlagen)

Treatment Cost function in [€/a]

x in m³ treated wastewater

WWTW extension

50,000 pe[M €/a]

WWTW extension

100,000 pe[M €/a]

WWTW extension

250,000 pe[M €/a]

Ozone  y=0,0147∙x+46.081 0,10 0,20 0,30PAC y=0,036∙x+27.729 0,17 0,40 0,65WWTW 50,000 pe with an annual wastewater quantity of m³ 3.8 M

WWTW 100,000 pe with an annual wastewater quantity of m³ 10.3 M

WWTW 250,000 pe with an annual wastewater quantity of m³ 17.2 M

Page 25: Overview post treatment in Northrhine Westfalia symposium/7 Victor Mertsch... · Kläranlage Bad Sassendorf Kläranlage Duisburg Vierlinden Quelle: Abwasserverband „Obere Lutter“

46. ESSENER TAGUNG für Wasser- und Abfallwirtschaft „Ressourcenschutz als interdisziplinäre Aufgabe“13. bis 15. März 2013

Annual costs (AC) == Σ (annuities resulting from investment costs (IC)

+ operational costs (OC) Annuities based upon the following assumptions:

Reporting period 30 years Service lives

Civil engineering 30 years Mechanical engineering 15 years => 1 reinvestment during

reporting period Control technology 10 years => 2 reinvestments during

reporting period Additional costs 30 years

Interest 3 %

Annual costs (AC)

25

Page 26: Overview post treatment in Northrhine Westfalia symposium/7 Victor Mertsch... · Kläranlage Bad Sassendorf Kläranlage Duisburg Vierlinden Quelle: Abwasserverband „Obere Lutter“

46. ESSENER TAGUNG für Wasser- und Abfallwirtschaft „Ressourcenschutz als interdisziplinäre Aufgabe“13. bis 15. März 2013

Specific annual costs per m³ fresh water for ozonationand active carbon filtration

26

y = 30,645x-0,456

R² = 0,7761

y = 10,981x-0,403

R² = 0,9655

0,00

0,10

0,20

0,30

0,40

0,50

0,60

0,70

1.000 10.000 100.000 1.000.000

spez

ifisc

he J

ahre

skos

ten

nett

o [€

/m³ F

risc

hwas

ser]

angeschlossene Einwohnerwerte [EW]

PAK Anlagen OzonanlagenNRW O3 Duisburg-Vierlinden NRW O3 Bad SassendorfBaWü PAK Mannheim BaWü PAK Böblingen SindelfingenSchweiz O3 Regensdorf GAK KA LageGAK KA Obere Lutter Pot.(PAK Anlagen)Pot.(Ozonanlagen)

Page 27: Overview post treatment in Northrhine Westfalia symposium/7 Victor Mertsch... · Kläranlage Bad Sassendorf Kläranlage Duisburg Vierlinden Quelle: Abwasserverband „Obere Lutter“

46. ESSENER TAGUNG für Wasser- und Abfallwirtschaft „Ressourcenschutz als interdisziplinäre Aufgabe“13. bis 15. März 2013

Costs of the various settings

Unit WWTW GK IV + V

393 WWTW

WWTW Filtration

107 WWTW

WWTW Filtration GK IV + V 98 WWTW

Investment costs M € 886 367 352

Operational costs M €/a 77.9 36.3 35.9

Annual costs M €/a 143.8 62.1 60.6

27

Page 28: Overview post treatment in Northrhine Westfalia symposium/7 Victor Mertsch... · Kläranlage Bad Sassendorf Kläranlage Duisburg Vierlinden Quelle: Abwasserverband „Obere Lutter“

Various large-scale treatment plants and studies/publications provide the data required for performing an economic cost analysis. sufficient data for estimating the investment costs of wastewater

ozonation differentiated consideration of filtration units lack of long-time experiences concerning operational costs

Aim of the project: „consistent assessment of costs“ based on first operational experiences

Result: Costs of 10-15 ct/m³ fresh water (100,000 p)

Summary

28

Page 29: Overview post treatment in Northrhine Westfalia symposium/7 Victor Mertsch... · Kläranlage Bad Sassendorf Kläranlage Duisburg Vierlinden Quelle: Abwasserverband „Obere Lutter“

Thank you for your attention

Kreiskrankenhaus Waldbröl

Quelle: RWTH Aachen

Quelle: Ruhrverband

Kläranlage Schwerte

Quelle: EGLV

Kläranlage Bad Sassendorf

Kläranlage Duisburg Vierlinden

Quelle: WBD AöR, GrontmijQuelle: Abwasserverband „Obere Lutter“ (AOL)

Kläranlage Obere Lutter

Quelle: Detmolder Abwasser GmbH

Zentralklärwerk Detmold

Quelle: Wupperverband

Kläranlage Buchenhofen

Quelle: Atemis GmbH

Klärwerkes Gütersloh-Putzhagen