Page 1: Our End State Culture News... · Metering Information (now optional for 2016 Applications) Information Details Comment Metering Assessment Questions to establish if the Settlement

Place your chosen

image here. The four

corners must just cover

the arrow tips. For

covers, the three

pictures should be the

same size and in a

straight line.

Capacity Market

Registration & Prequalification webinar – Aug 2016

Page 2: Our End State Culture News... · Metering Information (now optional for 2016 Applications) Information Details Comment Metering Assessment Questions to establish if the Settlement

Webinar Etiquette

Questions via chat function

2 MM

Page 3: Our End State Culture News... · Metering Information (now optional for 2016 Applications) Information Details Comment Metering Assessment Questions to establish if the Settlement

Todays Webinar

End to end process

including 2016 Rule

and Regulation

changes;

Common reasons for

Application rejection

from last year; and

What the team will be

doing during

Prequalification.

3 MM

Page 4: Our End State Culture News... · Metering Information (now optional for 2016 Applications) Information Details Comment Metering Assessment Questions to establish if the Settlement

The Process

Key aspects of Registration and Prequalification

4

Register a company Set up users Add details to a

company and set up a CMU

Create and save an application

Submit an application

Results

1 2 3

4 5 6

MM

Page 5: Our End State Culture News... · Metering Information (now optional for 2016 Applications) Information Details Comment Metering Assessment Questions to establish if the Settlement

Prequalification Overview

Prequalification required to “verify” that potential

sources of capacity are genuine physical resources

Three key considerations for an Application:

1. Applicant must be either the Legal Owner of the asset

or its Despatch Controller (with agreement from the

Legal Owner)

2. Accompanied by declarations signed by two directors

or officers of the Applicant

3. Submitted by the end of the Prequalification Window

(via the EMR portal) by 17:00 on Friday 26 August

5

Page 6: Our End State Culture News... · Metering Information (now optional for 2016 Applications) Information Details Comment Metering Assessment Questions to establish if the Settlement

Prequalification Process

Prequalification

process is user

driven

System is designed

to guide parties

through the process

We can answer

queries about the

prequalification portal

We can’t give

“advice” about how a

project should be

presented into

prequalification

No contact with us

during the

assessment window

6 6 MM…TS

Page 8: Our End State Culture News... · Metering Information (now optional for 2016 Applications) Information Details Comment Metering Assessment Questions to establish if the Settlement

Register a company

High Level Principles

All Companies will need to

register

Other “company users” may be

added to the portal

Companies previously

registered will not need to re-

register

A single Registration allows

applications for all three

auctions

Audit Trail – anything that

happens is traceable

NG cross-checks company

details against public record

Each Company needs to

nominate at minimum;

Company Secretary/Director

(Authorised Person) –

somebody recognisable in

the public domain

Proposed “Main Administrator”

– somebody who will fill in

the application

Copy of registration form must

be printed on company letter

head and signed by a director

or company secretary

All log-ins are password and

PIN protected - important that

email and mobile numbers are

accurate to issue passwords

and PINs

8 TS

Page 9: Our End State Culture News... · Metering Information (now optional for 2016 Applications) Information Details Comment Metering Assessment Questions to establish if the Settlement

Set up users

The Main Administrator can register additional users to log-in to their

Company's area of the Admin System and carry out specific roles

Each of these users must be given "privileges" to carry out specific roles

for the Main Company or any Sub-Company.

Quick Link: EMR Company Registration and User Management user guide

9 TS

Page 10: Our End State Culture News... · Metering Information (now optional for 2016 Applications) Information Details Comment Metering Assessment Questions to establish if the Settlement

Adding details to a company

Basic company information created through a company registration

process

Upload the following where it is required

A copy of the company’s Certificate of Incorporation

Prequalification Certificate

Certificate of Conduct

If the Applicant is part of a Group – the name of its direct Holding

Company – this is not provided in the system – PLEASE DETAIL

THIS ON THE PREQUALIFICATION CERTIFICATE IF

APPLICABLE

Where applicable, confirmation of an interconnection licence

Legal Opinion & Bank Account details – these items were removed in

2015 but are still present in the system, they do not need to be filled in

10 2016 Rule change TS

Page 11: Our End State Culture News... · Metering Information (now optional for 2016 Applications) Information Details Comment Metering Assessment Questions to establish if the Settlement

Set up CMU

Type & Classification

If CMRS CMU

Existing Generating CMU

Existing Interconnector CMU

New Build Generating CMU

New Build Interconnector CMU

Refurbishing Generating CMU

Refurbishing Interconnector CMU

If Non- CMRS

Existing Generating CMU

New Build Generating CMU

Refurbishing Generating CMU

Proven DSR CMU

Unproven DSR CMU

CMU Type is defined in

the Regulations and the

Rules (Rule 3.2)

You must select the

correct CMU Type as

you will be assessed as

the type you select & this

cannot be changed

This drives the rest of the

application

11 TS

Page 12: Our End State Culture News... · Metering Information (now optional for 2016 Applications) Information Details Comment Metering Assessment Questions to establish if the Settlement

CMU Data Requirements

CMU Data

All

Connection Capacity & Tech. Class

Contact Details for Secondary Trading

Metering Information (now optional for 2016

applications

Nomination relating to the CMU and CMU

Component

Primary Fuel Type

Existing

Generating

Connection Agreements

Transmission Connected:

Distribution Connected For Private Network

connections

New Build

Generating

Connection Agreement

Construction Plan

Credit Support

Planning Consents

Refurbishing

Generating

Additional Information to cover both possible states

of the CMU or submit an “Opt-Out Declaration for the

“Pre-Refurbishment CMU” if it is a “Mandatory CMU”: 12 2016 Rule change TS

Page 13: Our End State Culture News... · Metering Information (now optional for 2016 Applications) Information Details Comment Metering Assessment Questions to establish if the Settlement

CMU Data Requirements

CMU Data

Proven DSR

Business Model

DSR Test Certificate

Permitted On-Site Gen Units

Unproven DSR

Business Plan

Credit Support

DSR Test Certificate

Metering Assessment

Existing

Interconnector

Connection Agreements

Interconnector Licence

Technical Data

New Build

Interconnector

Connection Agreement

Construction Plan

Credit Support

Planning Consents

Technical Data

Application / Opt-

Out

Bulk of all data required is set up against a CMU and,

when completing the Application / Opt-out

Notification,

The system will copy all of the appropriate CMU and

company data into the Application / Opt-out.

13 2016 Rule change TS

Page 14: Our End State Culture News... · Metering Information (now optional for 2016 Applications) Information Details Comment Metering Assessment Questions to establish if the Settlement

All CMUs Data Requirements

14

Information Details Comment

Nomination

relating to the

CMU Component

Description of and location of the CMU

component

MPAN numbers and other relevant meter

numbers

BMU ID or Balancing Services ID (if

applicable)

Data to be entered

in Prequalification

System

Connection

Capacity & Tech.

Class

Connection Capacity or DSR Capacity of

a component

Technology Class of a component

(The system

aggregates these

to give CMU

Connection

Capacity)

Nomination

relating to the

CMU

Name of CMU

Type of CMU – which sets the Additional

Information Required

System generated

Drop-Down Box

TS

Page 15: Our End State Culture News... · Metering Information (now optional for 2016 Applications) Information Details Comment Metering Assessment Questions to establish if the Settlement

All CMUs Data Requirements

15

Contact Details for Secondary Trading

Information Details Comment

Email Address

& Telephone

No.

Email Address and Telephone Number that can

be used by a person wishing to discuss

secondary trading in relation to the CMU

This is not provided

in the system –

DETAILS FOR HOW

TO FOLLOW

Metering Information (now optional for 2016 Applications)

Information Details Comment

Metering

Assessment

Questions to establish if the Settlement Body will need to carry

out a further detailed check of metering arrangements

Metering Info Line Diagrams and other data on the CMU’s metering set-up

Metering Config. Confirmation of CMU’s Approved Metering Configuration

Information Details Comment

Primary Fuel

Type

For Generating CMUS only, the Primary Fuel Type

intended for the CMU at the time the Application

is made

OCGT & reciprocating engines – gas, diesel, & other

Please choose from

the drop down menu

in the CM Type

2016 Rule change(s) TS

Page 16: Our End State Culture News... · Metering Information (now optional for 2016 Applications) Information Details Comment Metering Assessment Questions to establish if the Settlement

Existing Generating CMU

16

Regulation 4 – An Existing Generating Unit (or combination of two of more units) which provides

electricity, is capable of being controlled independently from any other generating unit, net output is

measured by half-hourly meters and has a connection capacity not less than the minimum capacity

threshold (2MW).

Information Details Comment

Connection

Agreements

Transmission Connected:

Copy of one or more Grid Connection Agreement for

at least the De-rated capacity for the relevant Delivery

Year

Distribution Connected – one of:

Copy of one or more Distribution Connection

Agreement for at least the de-rated capacity for the

relevant Delivery Year

Copy of one or more Distribution Connection Offer for

at least the de-rated capacity for the relevant Delivery

Year

For Private Network connections – a letter from the

owner of that private network confirming the full output

that CMU is able to export to the network and that the

owner of the Private Network has a Distribution

Connection Agreement or Offer.

This must be

uploaded in

electronic copy

TS

Page 17: Our End State Culture News... · Metering Information (now optional for 2016 Applications) Information Details Comment Metering Assessment Questions to establish if the Settlement

New Build Generating CMU

17

Regulation 4 – a Prospective Generating Unit (or combination of 2 or more units) which, when

commissioned, will be capable of being controlled independently from any other generating unit, net

output is measured by half-hourly meters and has a connection capacity not less than the minimum

capacity threshold (2MW). A Prospective Generating Unit means a generating unit or proposed

generating unit that has not been commissioned.

Information Details Comment

Planning

Consents

Legal right to use the land and all Relevant

Planning Consents obtained (or able to

defer declaration to 22 Days before auction)

Documentary evidence of Planning

Consents

Additional Planning Consent requirements:

• If Planning Consent “time limited” evidence

that the end date of the consent is after the

expiry of any future Capacity Agreement

• If the MW capacity granted by the planning

consent is less than the connection

capacity of the CMU evidence justifying the

difference

Declaration, evidence of

Consents, and confirmation of

right of use of land.

2016 Rule changes TS

Page 18: Our End State Culture News... · Metering Information (now optional for 2016 Applications) Information Details Comment Metering Assessment Questions to establish if the Settlement

New Build Generating CMU

18

Information Details Comment

Construction

Plan

Brief description of the works

Schedule identifying :

Signing of EPC/equivalent Major Contract

Start of construction works

Main Foundations Complete

Gas/Steam Turbine Delivery

Back-feed Milestone

First Firing

Substantial Completion Milestone

Amount of Capital Expenditure proper to be

incurred within 77 months of the commencement

of the Delivery Year.

That the expected Capital Expenditure exceeds 3

or 15 year thresholds (£130/kw and £255/kw)

Capital Expenditure not previously considered in

respect of any CMU which has a Capacity

Agreement

Extended Years Criteria

Data to be entered

directly in

Prequalification

System

2016 Rule changes TS

Page 19: Our End State Culture News... · Metering Information (now optional for 2016 Applications) Information Details Comment Metering Assessment Questions to establish if the Settlement

New Build Generating

19 2016 Rule changes

Information Details Comment

Connection

Agreement

Transmission Connected:

Copy of one or more Grid Connection Agreement for at least the

De-rated capacity for the relevant Delivery Year(s)

Distribution Connected – one of:

Copy of one or more Distribution Connection Agreement for

at least the de-rated capacity for the relevant Delivery Year(s)

Copy of one or more Distribution Connection Offer or at least

the de-rated capacity for the relevant Delivery Year(s)

Declare the CMU will have such a connection offer at least 18

months prior to start of Delivery Year (6 months prior for the

Early Auction)

For private wire connections

Confirmation that the owner of the Private Network will have

an agreement with the relevant DNO at least 18 months prior

to the start of the Delivery Year. (6 months prior for the Early

Auction)

Soft copy to be

uploaded with

application

Credit

Support

Credit support to cover Termination Fee(s) and Draw Downs

Unless Credit Cover remains in place for the same CMU from a

previous auction – this must be declared in the Application using

any of the free text boxes and flagged to the Settlements Body.

Follows after

Prequalificatio

n Results Day

TS

Page 20: Our End State Culture News... · Metering Information (now optional for 2016 Applications) Information Details Comment Metering Assessment Questions to establish if the Settlement

Refurbishing Generating

20

CM Rules and Regulation 4 – an Existing Generating Unit which is the subject of an Application as

a Prospective Generating CMU by virtue of an improvements programme that will be completed

prior to the commencement of the first Delivery Year.

Information Details Comments

Additional Information to

cover both possible

states of the CMU or

submit an “Opt-Out

Declaration for the “Pre-

Refurbishment CMU” if

it is a “Mandatory CMU”:

Exceptions

Planning Consents

declaration not needed if

no further consents

required – please state if

this is the case

Construction Plan need

not specify a “Back-

Feed Milestone”

Capital Expenditure

allowed is that spent

from Auction Results

Day to start of Delivery

Year

Must also make additional statement in

Prequalification Certificate if multi-year

agreement is needed to undertake the

refurbishment

TS…TG

Page 21: Our End State Culture News... · Metering Information (now optional for 2016 Applications) Information Details Comment Metering Assessment Questions to establish if the Settlement

Proven DSR

21

Regulation 5 - A DSR CMU for which a DSR test has been carried out. The DSR provider must, in

relation to each component, be the DSR customer, own the DSR customer or have contractual

control over the DSR Customer.

Information Details Comment

DSR Test

Certificate

DSR Test or Joint DSR Test required to be completed

prior to the commencement of the Prequalification

Window – successful completion of which will see a

DSR Test Certificate being issued

Upload of scanned

document

Permitted On-

Site Gen Units

Details of all such generating units and their electrical

connections to the site where DSR Capacity is being

provided

Data to be entered

directly in

Prequalification System

Business

Model

Data to be entered

directly in

Prequalification System

Please note the new

declarations

Print and Fill 2016 Rule changes

TG

Page 22: Our End State Culture News... · Metering Information (now optional for 2016 Applications) Information Details Comment Metering Assessment Questions to establish if the Settlement

Unproven DSR

22

Regulation 5 - A DSR CMU for which a DSR test has not been carried out. The DSR provider must,

in relation to each component, be the DSR customer, own the DSR customer or have contractual

control over the DSR Customer.

Information Details

Business

Plan

Print and Fill

TG

Page 23: Our End State Culture News... · Metering Information (now optional for 2016 Applications) Information Details Comment Metering Assessment Questions to establish if the Settlement

Unproven DSR

23

Information Details Comment

DSR Test

Certificate

Confirmation that the a DSR Test will be completed prior

to the start of the relevant Delivery Year

Metering

Assessment

Confirmation the a Metering Assessment will be

completed and if necessary a Metering Test will be

completed in each case prior to the start of the relevant

Delivery Year

Credit Support

Credit support to cover Bid Bond

To be provided to Settlement Body

Unless Credit Cover remains in place for the same

CMU from a previous Auction – this must be

declared in the Application using one of the free text

boxes

2016 Rule changes TG

Page 24: Our End State Culture News... · Metering Information (now optional for 2016 Applications) Information Details Comment Metering Assessment Questions to establish if the Settlement

Existing (Opt In) Interconnector

24

Regulation 5A – An Interconnector that has been commissioned, has a connection capacity greater

than 2MW and the net output is measured by one or more half hourly meters.

Information Details Comment

Interconnector

Licence

Declare whether the Applicant holds an

Interconnector Licence at time of applying.

Connection

Agreements

Provide copy of Connection Agreement (Grid

Connection Agreement(s) or Distribution Connection

Agreement(s) or letter from DNO) confirming that

they permit the Generating Unit in the CMU in

aggregate to export at least the Anticipated De-rated

Capacity of the CMU

This must be

uploaded in

electronic copy

Technical Data

- Technical specifications of the Interconnector

- Country interconnector connects to GB

- Forecast technical reliability for the relevant

Delivery Year

Data to be entered

directly in

Prequalification

System

TG

Page 25: Our End State Culture News... · Metering Information (now optional for 2016 Applications) Information Details Comment Metering Assessment Questions to establish if the Settlement

New Build Interconnector

25

Regulation 5A – an electricity interconnector or prospective interconnector which is not yet

commissioned and, when commissioned, will have a connection capacity greater than 2MW and the

net output is measured by one or more half hourly meters.

Information Details Comment

Planning

Consents

Legal right to use the land and all Relevant

Planning Consents obtained (or able to defer

declaration in 2015 to 22 days before auction)

Documentary evidence of Planning Consents

Additional Planning Consent requirements:

• If Planning Consent “time limited”

evidence that the end date of the

consent is after the expiry of any future

Capacity Agreement

• If the MW capacity granted by the

planning consent is less than the

connection capacity of the CMU

evidence justifying the difference

Declaration, evidence of

Consents, and confirmation of

right of use of land.

Technical

Data

- Technical specifications of the

Interconnector

- Country interconnector connects to GB

- Forecast technical reliability for the relevant

Delivery Year

Data to be entered directly in

Prequalification System

2016 Rule changes TG

Page 26: Our End State Culture News... · Metering Information (now optional for 2016 Applications) Information Details Comment Metering Assessment Questions to establish if the Settlement

New Build Interconnector

26

Information Details Comment

Construction

Plan

Brief description of the works

Schedule identifying :

a) Signing of EPC/equivalent Major Contract

b) Start of construction works

c) Main Foundations Complete

d) Commencement of Cable Laying*

e) Back-feed Milestone

f) First Test Connection Date*

g) Substantial Completion Milestone

The Total Project Spend for the construction of the New

Build Interconnector CMU. Capital Expenditure not

previously considered in respect of any CMU which

has a Capacity Agreement

Data to be entered

directly in

Prequalification

System

* - These items are

worded as per the

generation

equivalents in the

Portal

Connection

Agreement

A copy of one or more Grid Connection Agreements with

sufficient Transmission Entry Capacity for at least the

De-Rated capacity secured by the start of the Delivery

Year

Soft Copy to be

uploaded into

Auction System

Credit Support

Credit support to cover Non-Completion Fee @

£5,000/MW

To be provided to Settlement Body

Unless Credit Cover remains in place for the same

CMU from a previous auction – this must be declared

in the Application using one of the free text boxes &

flagged to the Settlements Body.

Follows after

Prequalification

Results Day

2016 Rule changes TG

Page 27: Our End State Culture News... · Metering Information (now optional for 2016 Applications) Information Details Comment Metering Assessment Questions to establish if the Settlement

Application / Opt-Out

Bulk of all data required is set up against a CMU and,

when completing the Application / Opt-out Notification,

the system will copy all of the appropriate CMU and

company data into the Application / Opt-out.

This data once set-up can be reused each year if it has

not changed.

If some data changes then the new data can be

updated without having to upload all of the unchanged

data again.

27 TG…TS

Page 28: Our End State Culture News... · Metering Information (now optional for 2016 Applications) Information Details Comment Metering Assessment Questions to establish if the Settlement

Create and Save an Application

28

Information Details Comment

If the Application is from a

company acting as the

Despatch Controller or

Joint Owner for the CMU

then an Applicant

Declaration signed by

Directors of both the Legal

Owner and the Despatch

Controller / Joint Owners

is required

Previous Performance

(Existing Generating

CMUs, Existing

Interconnector CMUs or

pre-refurbishing element

of Refurbishing CMUs

only)

Identify 3 Settlement Periods of highest metered output in two most

recent calendar years of operation (up to 1 month before the start of

the Prequalification Window) when de-rated capacity was delivered

Confirmation of output and optional line loss factor methodology

applied for non-CMRS generating CMUs in letter from Supplier, or

evidence that output provided via balancing service

If a plant has been

mothballed, then this

could be in the last two

years of operation, but it

is key that the dates are

identified for National

Grid.

STOR Declaration

Applicant must also declare that either:

a) It is not the subject of a Relevant STOR Contract or

b) It is the subject of a Relevant STOR Contract but irrevocably

undertakes to withdraw from the contract should it be awarded a

Capacity Agreement

Tick Box Declarations in

Application

Low Carbon Exclusions - Declarations relating to Low Carbon Exclusions and Low Carbon

Grants

Tick Box Declarations in

Application

2016 Rule change TS

Page 29: Our End State Culture News... · Metering Information (now optional for 2016 Applications) Information Details Comment Metering Assessment Questions to establish if the Settlement

Create an Opt-Out Notification

29

Information Details Comment

Status Details

Must declare whether and provide

reason for:

Will be permanently non-operational

by the start of the Delivery Year

Will be temporarily non-operational

for all the Winter of the Delivery Year

Will remain operational for the

Delivery Year

Data to be

entered directly

in

Prequalification

system

For an Opt-Out Declaration a CMU must be created and CMU Component

data submitted (as if for an Existing CMU) before its Opt-Out Status is

confirmed

TS

Page 30: Our End State Culture News... · Metering Information (now optional for 2016 Applications) Information Details Comment Metering Assessment Questions to establish if the Settlement

Submit an application

Applicants who wish to enter the same CMU in multiple Auctions

will need to submit one application per auction

You can withdraw a submitted application, make changes and

submit again till 5 p.m. on 26/08/2016. You will not be able to

withdraw your application after this deadline.

Click the ‘Submit’ button only once else it will generate multiple

applications

The Delivery Body will assess only the latest application if more

than one applications are submitted for the same CMU for the

same Auction

30

Finally a set of declarations must be completed within the

application

This is the last step!

TS…TG

Page 31: Our End State Culture News... · Metering Information (now optional for 2016 Applications) Information Details Comment Metering Assessment Questions to establish if the Settlement

Results

National Grid will provide

a notification to each

party that submitted an

Application informing

them if they have

prequalified, conditionally

prequalified or rejected

The Capacity Market

Register will also be

published containing the

information specified in

chapter 7 of the Capacity

Market Rules 31

Notice of Prequalification success

Prequalification Decision Prequalified or Conditionally Prequalified

Applicant Applicant xxxa

Identity of CMU CMU xx1

Type of CMU CMU Type

De-rated Capacity XMW

Whether the unit is currently prequalified as a Price-Maker or Price-Taker

Price-Maker/ Taker

If successful at Auction is the CMU subject to a Metering Test

Metering test required/not required

Whether Prequalification is conditional on providing credit support pursuant to Rule4.5.1 (b) (ii) or 4.5.1 (b) (iii) or 4.5.1 (b) (iv)

Conditional – Please provide [the required amount of collateral] to the Settlement Body.

Whether Prequalification is conditional on providing Planning Consents requirement of Rule 4.7

Conditional - Planning consent declaration required

The Maximum Obligation Period of the Capacity Agreement it may bid for

Agreement duration x years

Additional Information Any other pertinent information.

Notice of Prequalification Rejection

Prequalification Decision

Rejected

Applicant Applicant xxxa

Identity of CMU CMUxx1

Type of CMU CMU Type

De-rated Capacity XMW

Additional Information The reasons for rejection

TG

Page 32: Our End State Culture News... · Metering Information (now optional for 2016 Applications) Information Details Comment Metering Assessment Questions to establish if the Settlement

Common reasons for rejection

Application Declarations

Company Address

Company Documents (e.g. PQ

Cert, Cert of Conduct etc)

Connection Agreement

Construction Plan Declaration

Credit Cover Elexon Receipt

Details of Total Project Spend

Historic Output Data

Extended Years Criteria

Metering Documents

Method used to calculate the

Connection Capacity

Planning Consents -

declaration/documents

Price Maker / Taker Status

Provide OS Grid reference

Sign and date certificates for the

company

STOR Declaration

Supplier/DNO Letter - make sure

the Supplier letter breaks down the

CMU output into the individual

component outputs

Three highest historic outputs

not each in excess of the de-

rated capacity

32 TG…MM

Page 33: Our End State Culture News... · Metering Information (now optional for 2016 Applications) Information Details Comment Metering Assessment Questions to establish if the Settlement

Prequalification Key Dates

33

Aug Sept Oct Nov Dec Jan Feb Mar

01/08/2016 - Pre-qualification Submission Window Opens 09:00

26/08/2016 Pre-qualification Submission Window Closes 17:00

30/08/2016 Pre-qualification Assessment Window Opens

23/09/2016 Pre-qualification Assessment Window Closes / Results Day

26/09/2016 Tier 1 Disputes Window Opens

30/09/2016 Tier 1 Disputes Window Closes

14/10/2016 Pre-qualification Results Register Update 17:00

06/12/2016

T-4 Auction Starts

31/01/2017

Early Auction Starts

22/03/2017

Transitional Auction Starts

Only Applicants

informed of their results

in 2016

2016 Rule change MM

Page 34: Our End State Culture News... · Metering Information (now optional for 2016 Applications) Information Details Comment Metering Assessment Questions to establish if the Settlement

What is the team is doing …

Administering the process Logging common queries

Continuing Agreement

Management Handling customer queries

Developing subject matter

experts

Building knowledge of rules

and regulations

Follow us on Twitter @EMRDeliveryBody

34 MM

Page 35: Our End State Culture News... · Metering Information (now optional for 2016 Applications) Information Details Comment Metering Assessment Questions to establish if the Settlement

The CM team

35

Capacity Mechanism Manager

Matthew Magill

EMR Delivery Manager

Laura Brock

EMR Delivery Manager

Ian Nicholas

Senior EMR Analyst Neil Morgans

Auction Analyst Vikas Garg

Auction Analyst Tim Dart

Customer Team Leader

David Williams

Senior EMR Analyst Richard Griffiths

Customer Team Leader

Faye Purchase

Senior EMR Analyst Angela Hodgson

Capacity Market Account Manager

Tushar Singh

Capacity Market

Customer Lead

Emily Hirst

EMR Analyst Tim Gregory

EMR

Pre-Qualification

Team

Customer Team

Rules & Regulations Team

AuctionTeam

Page 36: Our End State Culture News... · Metering Information (now optional for 2016 Applications) Information Details Comment Metering Assessment Questions to establish if the Settlement

Reminder: Capacity Market Notices

System Operator responsible for communicating CMNs

CMNs are not an operational dispatch tool

Operational messages will continue to appear on BMRS

2016/17 Transition Period is an opportunity to learn

Particular interest in 4hr and 500MW (threshold) constants

System Stress Event confirmation follows SO analysis

Subscribable website launched for CMNs, Stress Events mid-Sept

MM

Page 37: Our End State Culture News... · Metering Information (now optional for 2016 Applications) Information Details Comment Metering Assessment Questions to establish if the Settlement

Key Messages from today…

Understand the process for your company and CMU type

Read the related rules and regulations and guidance information

Think about what this means for you

We are here to support you and Good Luck!

Next Steps

Slides available later today

Telephone / 121s on 10, 11, 17 and 18 August booked by emailing

[email protected]

Please include your CMU type / short description of query in the

subject heading

Your thoughts about todays webinar using the poll

37 MM

Page 38: Our End State Culture News... · Metering Information (now optional for 2016 Applications) Information Details Comment Metering Assessment Questions to establish if the Settlement

APPENDIX

38 MM

Page 40: Our End State Culture News... · Metering Information (now optional for 2016 Applications) Information Details Comment Metering Assessment Questions to establish if the Settlement

Ref. CMU Classification

40

CMRS CMUs Non CMRS CMUs

Transmission CMU

A Generating or Interconnector

CMU, each Unit of which Exports

to the Transmission Network. The

Metering System for the

corresponding BMU is registered

in the Central Meter Registration

Service in accordance with the

BSC.

Or

CMRS Distribution CMU

A Generating or Interconnector

CMU, each Unit of which Exports

to a Distribution Network. The

Metering System for the

corresponding BMU is registered

in the Central Meter Registration

Service in accordance with the

BSC.

Non-CMRS Distribution CMU

A Generating Unit, each

Generating Unit of which supplies

Electricity to a Distribution

Network. The Metering System is

not registered with the Central

Meter Registration Service.

Proven DSR CMU

A DSR CMU for which a DSR test

has been carried out.

Unproven DSR CMU

A DSR CMU for which a DSR test

has not been carried out.