OU-LE3/GC-SWG 22.03.12 Euclid Consortium Interaction between SWG and SGS-OUs Fabio Pasian & Marc Sauvage (EC SGS Project Office) The presented document is Proprietary information of the Euclid Consortium. This document shall be used and disclosed by the receiving Party and its related entities (e.g. contractors and subcontractors) only for the purposes of fulfilling the receiving Party's responsibilities under the Euclid Project and that identified and marked technical data shall not be disclosed or retransferred to any other entity without prior written permission of the document preparer .

Upload: jasmin-scott

Post on 11-Jan-2016

217 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: OU-LE3/GC-SWG 22.03.12 Euclid Consortium Interaction between SWG and SGS-OUs Fabio Pasian & Marc Sauvage (EC SGS Project Office) The presented document

OU-LE3/GC-SWG 22.03.12

EuclidConsortium

Interaction between SWG and SGS-OUs

Fabio Pasian & Marc Sauvage

(EC SGS Project Office)

The presented document is Proprietary information of the Euclid Consortium. This document shall be used and disclosed by the receiving Party and its related entities (e.g. contractors and subcontractors) only for the purposes of fulfilling the receiving Party's responsibilities under the Euclid Project and that identified and marked technical data

shall not be disclosed or retransferred to any other entity without prior written permission of the document preparer.

Page 2: OU-LE3/GC-SWG 22.03.12 Euclid Consortium Interaction between SWG and SGS-OUs Fabio Pasian & Marc Sauvage (EC SGS Project Office) The presented document

OU-LE3/GC-SWG 22.03.12

EuclidConsortiumRationale

The SWG and the SGS will constantly interact throughout the mission phases.

During the development of the SGS, the SWGs set requirements on the algorithmic objectives and defines the validation testing of the pipeline module.During operations, the SGS systems produce the data products that form the basis of the SWG work.

The science objectives of Euclid are quite ambitious, and require a complex data processing system.

The interface between the SGS and the SWGs must be clearly defined to avoid biasing the SGS products, or overlap and/or duplication of work between the SGS and the SWGs.

Page 3: OU-LE3/GC-SWG 22.03.12 Euclid Consortium Interaction between SWG and SGS-OUs Fabio Pasian & Marc Sauvage (EC SGS Project Office) The presented document

OU-LE3/GC-SWG 22.03.12

EuclidConsortiumDocumentation flow-down

Science Management

Plan(SMP)

Science Operations

Concept(SOCD)

Science ImplementationRequirements

(SIRD)

Science Requirements

Document(SciRD)

Payload Elements

Requirements (PERD)

Mission Requirements

Document (MRD)

Data Processing

Requirements(GDPRD)

SOC Science Implementation

Plan (SOC SIP)

EC Science Implementation

Plan (EC SIP)

EC SGS WPBreakdown and

Description (WPBD)

EC SGS Documentation

Tree

input from EC SWGs

EC SGS

Science Analysis

Implementation(SAID)

SWGs-SGS Interface

Control Doc

Legacy Data Processing

Requirements(LDPR)

EC SWGs

Page 4: OU-LE3/GC-SWG 22.03.12 Euclid Consortium Interaction between SWG and SGS-OUs Fabio Pasian & Marc Sauvage (EC SGS Project Office) The presented document

OU-LE3/GC-SWG 22.03.12

EuclidConsortiumRequirements flow-down

Science Management

Plan(SMP)

Science Operations

Concept(SOCD)

Science ImplementationRequirements

(SIRD)

Science Requirements

Document(SciRD)

Payload Elements

Requirements (PERD)

Mission Requirements

Document (MRD)

Data Processing

Requirements(GDPRD)

SOC Science Implementation

Plan (SOC SIP)

EC Science Implementation

Plan (EC SIP)

EC SGS WPBreakdown and

Description (WPBD)

EC SGS Documentation

Tree

Science Analysis

Implementation(SAID)

SWGs-SGS Interface

Control Doc

Legacy Data Processing

Requirements(LDPR)

Page 5: OU-LE3/GC-SWG 22.03.12 Euclid Consortium Interaction between SWG and SGS-OUs Fabio Pasian & Marc Sauvage (EC SGS Project Office) The presented document

OU-LE3/GC-SWG 22.03.12

EuclidConsortium

SR/ADSR/AD

DDDD

URUR

TRTR

OMOM

OU Inputs

SPMPSCMP

SVVP/Reviews,

URDSVVP/ST Plan/IT Plan

SSD

SVVP/ST specCODE

SUM

Software System

STD

SDC DevelopmentUR phase - Definition of the user requirements

SR phase - Definition of the software requirements AD phase - Definition of the architectural design

DD phase - Detailed design and production of the codeOM phase - Operations and maintenance

SDC DevelopmentUR phase - Definition of the user requirements

SR phase - Definition of the software requirements AD phase - Definition of the architectural design

DD phase - Detailed design and production of the codeOM phase - Operations and maintenance

CVCV

SURSURScience Inputs

GDPRDLDPRD

Proof of concept

OU DevelopmentCV phase – Concept validation

TR phase - Transfer of the software to operations

OU DevelopmentCV phase – Concept validation

TR phase - Transfer of the software to operations

AT plan

MethodPublication

MethodPublication

POStandard

Document

POStandard

Document

SPMP - Software Project Management PlanSCMP - Software configuration management procedures

SVVP - Software Verification and Validation PlanAT Plan - Acceptance Test ST Plan - System Test Plan

IT Plan - Integration Test Plan URD - User Requirements Document

DPRD - Data Processing Requirements DocumentSSD - Software Specification Document

SUM - Software User ManualSTD - Software Transfer Document

SPMP - Software Project Management PlanSCMP - Software configuration management procedures

SVVP - Software Verification and Validation PlanAT Plan - Acceptance Test ST Plan - System Test Plan

IT Plan - Integration Test Plan URD - User Requirements Document

DPRD - Data Processing Requirements DocumentSSD - Software Specification Document

SUM - Software User ManualSTD - Software Transfer Document

Next Cycle

from the EC SIP 2.2 draft

SWG DevelopmentSUR phase - Definition of the science user requirements

Page 6: OU-LE3/GC-SWG 22.03.12 Euclid Consortium Interaction between SWG and SGS-OUs Fabio Pasian & Marc Sauvage (EC SGS Project Office) The presented document

OU-LE3/GC-SWG 22.03.12

EuclidConsortiumSWGs-SGS ICD

Science Management

Plan(SMP)

Science Operations

Concept(SOCD)

Science ImplementationRequirements

(SIRD)

Science Requirements

Document(SciRD)

Payload Elements

Requirements (PERD)

Mission Requirements

Document (MRD)

Data Processing

Requirements(GDPRD)

SOC Science Implementation

Plan (SOC SIP)

EC Science Implementation

Plan (EC SIP)

EC SGS WPBreakdown and

Description (WPBD)

EC SGS Documentation

Tree

Science Analysis

Implementation(SAID)

SWGs-SGS Interface

Control Doc

Legacy Data Processing

Requirements(LDPR)

Page 7: OU-LE3/GC-SWG 22.03.12 Euclid Consortium Interaction between SWG and SGS-OUs Fabio Pasian & Marc Sauvage (EC SGS Project Office) The presented document

OU-LE3/GC-SWG 22.03.12

EuclidConsortiumThe SWGs-SGS ICD

The ICD originates from discussions between OU-LE3 and the SWGs.

Draft 0.5, distributed to the OU+SDC leads, and SWG coords was iterated inside the SGS PO.

Comments are expected and welcome.

It's short (only 7 pages of meaningful text)!

Page 8: OU-LE3/GC-SWG 22.03.12 Euclid Consortium Interaction between SWG and SGS-OUs Fabio Pasian & Marc Sauvage (EC SGS Project Office) The presented document

OU-LE3/GC-SWG 22.03.12

EuclidConsortiumThe interface entities

The ground segment Organization Group:The SGS PO (manager, scientist, system team lead + support team).The OU leads.The SDC managers.

The Science Working Groups coordinatorsThe leads of the two primary cosmology probes SWGs (4 persons).2 rotating representatives for leads of the legacy, theory and simulation SWGs.

These two representative bodies are in charge of taking care of the interface issues. See the EC Management Plan for names (wiki).

Page 9: OU-LE3/GC-SWG 22.03.12 Euclid Consortium Interaction between SWG and SGS-OUs Fabio Pasian & Marc Sauvage (EC SGS Project Office) The presented document

OU-LE3/GC-SWG 22.03.12

EuclidConsortiumEC SGS Management

Page 10: OU-LE3/GC-SWG 22.03.12 Euclid Consortium Interaction between SWG and SGS-OUs Fabio Pasian & Marc Sauvage (EC SGS Project Office) The presented document

OU-LE3/GC-SWG 22.03.12

EuclidConsortiumA key concept: avoid confirmation bias

How? try to maintain cosmology "independence" and/or "blindness" in the SGS pipeline.

SGS codes should refrain from relying on cosmology assumptions ("independence"), and their validation should not be done against a given cosmology ("blindness").Requests to depart from that, (e.g. use or produce absolute quantities) should be made known to the Organization Group, to be discussed with the SWG coords, and use the reference cosmology maintained by the SWG coords.This is/will be a highly debated item in discussions between the SGS and the SWG. Is it enough to avoid a confirmation bias? likely not.

Page 11: OU-LE3/GC-SWG 22.03.12 Euclid Consortium Interaction between SWG and SGS-OUs Fabio Pasian & Marc Sauvage (EC SGS Project Office) The presented document

OU-LE3/GC-SWG 22.03.12

EuclidConsortiumRequirement driven development

General principle for SGS data processing pipeline development:

SWG formulates requirement for the production of data with specified properties, as well as tests that have to be run to validate that part of the SGS pipeline.OU researches algorithms that fulfill the requirement, and once the SWG has accepted that the algorithm is an acceptable candidate, passes to the SDC-Dev the algorithm description and a test "plan" for verification and validation.OU algorithms suggestions can only be refused by SWG because they do not meet the requirement.

Each SGS WP should be connected, directly or through other WPs to a requirement on the SGS.

"Free-floating" SGS WP could be a worry and should be tracked down.

However. WPs are management tools. Management WPs, or finer-grained

subdivision of work (e.g. across countries) are a matter of SGS decision.

Page 12: OU-LE3/GC-SWG 22.03.12 Euclid Consortium Interaction between SWG and SGS-OUs Fabio Pasian & Marc Sauvage (EC SGS Project Office) The presented document

OU-LE3/GC-SWG 22.03.12

EuclidConsortiumCode practice

No coding standards at OU levelOUs are not required to produce code at all (algorithms, prototypes + test data)

Coding standards/uniformity required at SDC levelcodes need to be scalable, maintainable, moveable.codes will adhere to some form of GPL, but intellectual "property" should be maintained by applying to the codes rules similar to publications (policy to be set).

Request by SWG to use the SDC to run their codes should be handled by the SGS organization group.

The primary mission of the SDCs is to develop and run the SGS pipeline.SWG SAID is a good read for SGS to anticipate these demands.

Page 13: OU-LE3/GC-SWG 22.03.12 Euclid Consortium Interaction between SWG and SGS-OUs Fabio Pasian & Marc Sauvage (EC SGS Project Office) The presented document

OU-LE3/GC-SWG 22.03.12

EuclidConsortiumData access

Question: is it always harmless to use Euclid data to develop SGS modules?

Data access should stay compatible with the primary missions of the SGS.

Some issues remain to be cleared out, e.g. regarding simulated data produced by the SGS.

Page 14: OU-LE3/GC-SWG 22.03.12 Euclid Consortium Interaction between SWG and SGS-OUs Fabio Pasian & Marc Sauvage (EC SGS Project Office) The presented document

OU-LE3/GC-SWG 22.03.12

EuclidConsortiumConclusions

Currently, the SWGs-SGS ICD is a living document. Feedback is needed.

SWGs-SGS interrelations are important, key to the success of the mission.

ICDs are built to define the interfaces between groups.

Interrelations ≠ Interfaces

IMPORTANT: let’s not build useless/harmful fences between (virtual) groups!

Page 15: OU-LE3/GC-SWG 22.03.12 Euclid Consortium Interaction between SWG and SGS-OUs Fabio Pasian & Marc Sauvage (EC SGS Project Office) The presented document

OU-LE3/GC-SWG 22.03.12

EuclidConsortium