Other ConsiderationsProposed Staffing
Oral Technical PresentationCEI Services for SR 80 at US 27 New Interchange and SR 776 at San Casa
DriveFM No's 408286-7-62-01 and 416087-1-62-01
December 9, 2010
Other ConsiderationsProposed Staffing
Introduction Awareness/Approach of project
issues Proposed staffing Other considerations Questions & Answers
Agenda
Agenda
Other ConsiderationsProposed Staffing
Introduction
Awareness/Approach to Project
Providing CEI service for 25 years Primary service is CEI – “It’s What
We Do” Serve as extension of District 1 –
eyes & ears “Pro-Active” approach – manage
change Serve as a catalyst to the
construction process Exercise independent professional
judgment Partnering – formal or informal Always learning & listen
Other ConsiderationsProposed Staffing
Introduction Awareness/Approach to project
Understanding of scope Identification of unique project issues Innovative concepts
Proposed staffing Other considerations Questions & Answers
Awareness/Approach to Project
Awareness/Approach to Project
Other ConsiderationsProposed Staffing
Understanding of Scope of Project Key elements of the project
Interchange Safety enhancement
High Speed 35% Truck Traffic Signalized elevated T-intersection.
Bridge Retaining walls
Awareness/Approach to Project
Awareness/Approach to Project
Other ConsiderationsProposed Staffing
Understanding of Scope of Project Key elements of the project (cont.)
Drainage Earthwork Asphalt Signalization and lighting
Hybrid project - SR 776 at San Casa Drive
Awareness/Approach to Project
Awareness/Approach to Project
Other ConsiderationsProposed Staffing
Understanding of Scope of Project Key elements of the project (cont.)
Interchange
Awareness/Approach to Project
Awareness/Approach to Project
Other ConsiderationsProposed Staffing
Understanding of Scope of Project Key elements of the project (cont.)
Bridge over US 27 196 feet long
Awareness/Approach to Project
Awareness/Approach to Project
Other ConsiderationsProposed Staffing
Understanding of Scope of Project Key elements of the project
Retaining walls 1.8 miles of wall Settlement Phasing
Awareness/Approach to Project
Awareness/Approach to Project
Other ConsiderationsProposed Staffing
Understanding of Scope of Project Key elements of the project
Drainage 5,448 feet of storm drainage 5 Ponds Bypass ditches Box culvert extension Outfalls
Awareness/Approach to Project
Awareness/Approach to Project
Other ConsiderationsProposed Staffing
Understanding of Scope of Project Key elements of the project
Earthwork 210,352 CY regular excavation 362,919 CY embankment
Awareness/Approach to Project
Awareness/Approach to Project
Other ConsiderationsProposed Staffing
Understanding of Scope of Project Key elements of the project
Asphalt Temporary pavement Milling / resurfacing Superpave traffic level D Friction course
Awareness/Approach to Project
Awareness/Approach to Project
Other ConsiderationsProposed Staffing
Understanding of Scope of Project Key elements of the project
Signalization and lighting New signal – elevated T-intersection 109 40’ light poles Temporary lighting
Hybrid project – SR 776 at San Casa Drive Intersection improvement project
New signalization Widening with associated asphalt, concrete,
drainage
Awareness/Approach to Project
Awareness/Approach to Project
Other ConsiderationsProposed Staffing
Understanding of Scope of Project CEI Scope of work
Preconstruction Constructability review Bid-ability review Bid tabulations Preconstruction conference Schedule pre-services meeting Schedule Final Estimates meeting Schedule District Compliance meeting Schedule meeting with materials office Schedule Environmental meeting
Awareness/Approach to Project
Awareness/Approach to Project
Other ConsiderationsProposed Staffing
Understanding of Scope of Project CEI scope of work
Preconstruction (cont.) Prepare and submit computer access
requests Attend Site Manager/ EDMS information
meeting Partnering meeting / DRB Videotape pre-construction conditions Pre-construction survey Office set-up Review contractor’s CPM schedule Review contractor’s QC plan Set up field books, office files, and
documentation
Awareness/Approach to Project
Awareness/Approach to Project
Other ConsiderationsProposed Staffing
Understanding of Scope of Project CEI scope of work
During construction MOT review Inspection of contractor’s work Materials sampling Density testing Environmental monitoring Measurement of pay item quantities Contract administration
Awareness/Approach to Project
Awareness/Approach to Project
Other ConsiderationsProposed Staffing
Understanding of Scope of Project CEI scope of work
During construction (cont.) CPM reviews Contractor quality control (CQC) Project photographs Project video Pipe video Emphasis on INSPECTION!
Awareness/Approach to Project
Awareness/Approach to Project
Other ConsiderationsProposed Staffing
Understanding of Scope of Project CEI scope of work
Post construction Final estimate Permit closeout As-builts Issues and Claims
Awareness/Approach to Project
Awareness/Approach to Project
Other ConsiderationsProposed Staffing
Identification of Unique Issues Utility coordination Right of way Maintenance of traffic Environmental concerns
Contamination Endangered or threatened species
Hybrid project – SR 776 at San Casa Drive
Awareness/Approach to Project
Awareness/Approach to Project
Other ConsiderationsProposed Staffing
Identification of Unique Issues Utility coordination (Deborah Barnhill –
FDOT) Century Link
NOT Bill Fetterhoff Norm Burvurt
Glades Electric Cooperative Bruce Taylor
Level 3 Communications Clint Hinish
South Shore Water Association Chris Carrol Tommy Perry – Johnson Pruitt
Awareness/Approach to Project
Awareness/Approach to Project
Other ConsiderationsProposed Staffing
Identification of Unique Issues Right of Way (Tom Small – FDOT)
Greg Bohde (FDOT) Right-of-Way has NOT yet been acquired,
however all agreements are in place and all Orders of Taking should be cleared prior to project start.
Awareness/Approach to Project
Awareness/Approach to Project
Other ConsiderationsProposed Staffing
Identification of Unique Issues Maintenance of traffic
Phase I NB/SB US 27 construction Construction bridge Ramp C Bypass ditch Portion of ramp for SR 80 Drainage Portion of ponds 1A, 2, 3, and 75
Awareness/Approach to Project
Awareness/Approach to Project
Other ConsiderationsProposed Staffing
Identification of Unique Issues (10 Points) Maintenance of Traffic
Phase I
Awareness/Approach to Project
Awareness/Approach to Project
Other ConsiderationsProposed Staffing
Identification of Unique Issues Maintenance of traffic
Phase II Connect NB US 27 to ramp C Temporary drainage and outfall structures Remove overhead truss signs
Awareness/Approach to Project
Awareness/Approach to Project
Other ConsiderationsProposed Staffing
Identification of Unique Issues (10 Points)
Awareness/Approach to Project
Awareness/Approach to Project
Other ConsiderationsProposed Staffing
Identification of Unique Issues Maintenance of traffic
Phase III Construct SB US 27 mainline Ramp B Relocate intersection of existing flashing
signal Complete pond 1A
Awareness/Approach to Project
Awareness/Approach to Project
Other ConsiderationsProposed Staffing
Awareness/Approach to Project
Awareness/Approach to Project
Other ConsiderationsProposed Staffing
Identification of Unique Issues Maintenance of traffic
Phase IV Ramp A Remove temporary pavement Install new signal Place friction course asphalt Final signing/striping
Awareness/Approach to Project
Awareness/Approach to Project
Other ConsiderationsProposed Staffing
Awareness/Approach to Project
Awareness/Approach to Project
Awareness/Approach to Project
Other ConsiderationsProposed StaffingAwareness/Approach to Project
CPM schedule goes here
Awareness/Approach to Project
Other ConsiderationsProposed StaffingAwareness/Approach to Project
CPM schedule goes here
Awareness/Approach to Project
Other ConsiderationsProposed StaffingAwareness/Approach to Project
CPM schedule goes here
Awareness/Approach to Project
Phasing Duration Sheet 379 Duration Calculated Utilizing 570 days
Eisman & Russo Schedule Duration
Phase I 90 day 71 days 280 days*Phase II 270 days 214 days 109 daysPhase III 270 days 214 days 129 daysPhase IV 90 days 71 days 52 days
Totals 720 Days 570 Days 570. day
*Includes mobilization to job
Other ConsiderationsProposed Staffing
Identification of Unique Issues Environmental (Brian Monkelbaan – FDOT)
Contamination (Ray Nottingham – FDOT) Permits (general and specific conditions) Stormwater Pollution Prevention Plan NPDES
Notice of Intent Contractor/subcontractor certification forms Inspection reports
Endangered Species Gopher Tortoise Caracara bird Burrow Owl Eastern Indigo Snake Florida Scrub Jay
Awareness/Approach to Project
Awareness/Approach to Project
Other ConsiderationsProposed Staffing
Identification of Unique Issues Hybrid project – SR 776 at San Casa
Drive New mast arms and controller cabinet New camera detection equipment Widening SW quadrant for improved
turning radius New pedestrian signals Drainage
Awareness/Approach to Project
Awareness/Approach to Project
Other ConsiderationsProposed Staffing
Awareness/Approach to Project
Awareness/Approach to Project
Leadership Decision Making Two Professional Engineers Take Ownership of the Project Partnering Preconstruction Meeting
Other ConsiderationsProposed Staffing
Awareness/Approach to Project
Awareness/Approach to Project
Public Involvement Public contact log Tracker letters FDOT Public Information office Project website
Other ConsiderationsProposed Staffing
Awareness/Approach to Project
Awareness/Approach to Project
Communication FDOT Project Manager Contractor Utilities Project stakeholders Public Media
Other ConsiderationsProposed Staffing
Awareness/Approach to Project
Awareness/Approach to Project
Timely Completion Budget
Value engineering Elimination of unnecessary work Management of CEI contract Troubleshooting Problem-solving ability
Other ConsiderationsProposed Staffing
Awareness/Approach to Project
Awareness/Approach to Project
Documentation Daily reports of
construction Controlling items of work MOT reports Summary of daily
reports Weekly engineer’s
reports EDMS / Hummingbird Drawing control logs Issues and RFI logs
Field books Density log books Pile logs Jobsite photographs Site Manager LIMS Meeting minutes CPPR
Other ConsiderationsProposed Staffing
Awareness/Approach to Project
Awareness/Approach to Project
Change Orders, Claims and Unforeseen Work Proactive claims avoidance Supplemental agreements Engineer’s estimate / entitlement
analysis
Other ConsiderationsProposed Staffing
Awareness/Approach to Project
Awareness/Approach to Project
Public Safety MOT Project hazards Advance warning Emergencies
Other ConsiderationsProposed Staffing
Awareness/Approach to Project
Awareness/Approach to Project
Quality Review Schedule At project start up
Quality Assurance Plan submitted to FDOT within 30 days after Notice to Proceed.
Initial QA Review within first 60 days Six-month QA reviews Written report to FDOT PM, Tim
Hendrix, P. E. within 14 days after review.
InspectorSenior
Inspector
Project Administra
tor
Senior Project
Engineer
Corporate Quality
Assurance Manager
Contract Support
Specialist
Other ConsiderationsProposed Staffing
Awareness/Approach to Project
Awareness/Approach to Project
Innovative Concepts Project operation plan
Developed prior to project start FDOT job guide schedule FDOT guidelists Traffic phase sign checklist
Critical Item Timeline Public Relations
Website updates Facebook/Twitter
Other ConsiderationsProposed Staffing
Awareness/Approach to Project
Awareness/Approach to Project
Innovative Concepts (10 Points) Dailies summary spreadsheet
Activities
Date Cont
ract
Day
Wea
ther
No
Wor
k - H
olid
ay
No
Wor
k - O
ther
Tim
e Ex
tens
ion
Road
Tim
e Ex
tens
ion
Brid
ge
Description of Activities Prim
e Co
ntra
ctor
Subc
ontr
acto
r 1
Subc
ontr
acto
r 2
Subc
ontr
acto
r 3
Utility Comments Comments/Delays/ Issues9/29/2003 1 Prime began mobilizing equipment.9/30/2003 2 1 No work10/1/2003 3 Construction warning signs placed.10/2/2003 4 1 No work10/3/2003 5 1 No work10/4/2003 6 1 No work10/5/2003 7 1 No work10/6/2003 8 Prime began mobilizing materials 410/7/2003 9 Began Clear & Grubbing, and staked silt fence installation. 810/8/2003 10 Continued clear& grub and staked silt fence inst. ,barricades delivered. 910/9/2003 11 Continued clear & grub and staked silt fence inst. , relocating Rdwy signs. 9
10/10/2003 12 Continued clear & grub 910/11/2003 13 1 No work10/12/2003 14 1 No work
10/13/2003 15Installing Stabilized Subgrade for Phase 1 temp. detour, conti. Silt fence install, (Night) Attempted to place HMA for temp. detour. 17 8 Locating FM&WM
Prime stopped paving operation due to yielding subgrade.
10/14/2003 16Brdg. Crew preparing for temp. barrier wall placement(Imp.rv.brdg.) . Rd. crew inst. Temp. base for detour 1, and conti. Silt fence inst. 13
Repairing washouts (Lt. sta. 1280+00~130+00)
Prime hauled in base rock to correct problem with yielding
10/15/2003 17Conti. Inst. Of temp. base inst for detour, clear & grub, and silt fence inst. (Night) - Conti temp base inst , and resumed HMA inst for detour. 18 8
Cont washout repair. Locate FM & WM (RT STA
WorkersContract Time Comments
Other ConsiderationsProposed Staffing
Awareness/Approach to Project
Awareness/Approach to Project
Innovative Concepts CPM Snapshot
Other ConsiderationsProposed StaffingAwareness/Approach to Project Proposed Staffing
Proposed Staffing
Proposed Staffing Quantity Proposed Availability of Staff Qualifications/Certifications of Staff Quality/Experience on Similar Projects Team’s Past Performance on Similar
Projects
Other ConsiderationsProposed StaffingAwareness/Approach to Project Proposed Staffing
Proposed Staffing
Other ConsiderationsProposed StaffingAwareness/Approach to Project Proposed Staffing
Proposed Staffing
Subconsultants Allied Engineering & Testing (DBE) – Materials
testing and asphalt plant inspection Cella Molnar & Associates (DBE) – Public
involvement E.F. Gaines Surveying Services (DBE) – Survey Foundation & Geotechnical Engineering (DBE) –
Geotechnical T.Y. Lin International – Inspection support
E&R commits to a minimum of 14% DBE participation.
Other ConsiderationsProposed StaffingAwareness/Approach to Project Proposed Staffing
Proposed StaffingAvailability of Proposed Staff
Qualifications/Certifications
Other ConsiderationsProposed StaffingAwareness/Approach to Project Proposed Staffing
Proposed StaffingQuality/Experience on Similar Projects
Other ConsiderationsProposed Staffing
Communication Abilities Cell phones Email – Laptops, air cards – mobile
office Project website
Facebook Twitter
Dailies summary CPM snapshot – brings the job to you Communication with all project
stakeholders
Other Considerations
Agenda Other ConsiderationsAwareness/Approach to Project
Other ConsiderationsProposed Staffing
Commitment to Satisfy Department Needs History of success
Innovation Customer satisfaction
Dependability Attention to stakeholders’ needs Fiscally responsible
Timeliness RFIs Change orders/work orders Field changes
Local staff
Other Considerations
Agenda Other ConsiderationsAwareness/Approach to Project
Other ConsiderationsProposed Staffing
Why Eisman & Russo ?
Committed to District 1
Responsive to Departments Needs
Provide Experience at all levels
Take ownership of projects
“CEI is what we do”
Other ConsiderationsProposed Staffing
Questions