Page 1: Oslo Data Center Location at Hønefoss, Norway – A part of the Oslo

Oslo Data Center LocationDMS 60o12.1’N 10o14.3’EFollummoveien, Hønefoss, Norwaywww.oslodclo.com

Oslo Data Center Location at Hønefoss, Norway– A part of the Oslo region.

Page 2: Oslo Data Center Location at Hønefoss, Norway – A part of the Oslo

Substation420 kV OO 132 kV

3x Substations132 kV OO 22 kV

Cooling water1 000 l / sec

Hydropower28 MW

Hydropower6 MW

Substation300 kV OO 132 kV

Hydropower17 MW

25 km

OSLO

CITY 60 km �

� OSL 70 km

Oslo Data Center LocationHønefoss, NorwayDMS 60o12.1’N 10o14.3’E

SITE

POWER LINES

E16 / HIGHWAY

SUBSTATION

HYDROPOWER

CONNECTIVITY

COOLING WATER

1 km / 0.621 miles

Page 3: Oslo Data Center Location at Hønefoss, Norway – A part of the Oslo

SITE CHARACTERISTICS.

O Up to 100 ha of flat land on stable and well drained compact gravel soil.

O Zoned for industrial use.

O The site is largely greenfield with some internal roads and infrastructure.

O New and extended zoning in progress to be completed within 2017 in order to include new areas.

O Municipality offers fixed time plans for detailed zoning and building permit approval.

SITE ACCESS AND DISTANCES.

O Direct access from national highway E16 along 2-lane paved local road, 0 – 2 km.

O Oslo International Airport is 70 km / 60 minutes away.

O Oslo city is 60 km / 60 minutes away (1 million inhabitants including suburbs).

O The town of Hønefoss is 3 km away (19 000 inhabitants).

O Drammen harbour is 65 km / 60 minutes away.

POWER SUPPLY.

O Idle capacity of more than 100 MW is available at 22 kV adjacent to site.

O Additional dedicated 132 kV/200+MW substation can be constructed on site.

O 3 independent 132 kV substations 1 km away, supplied from two High Voltage TSO substations, 420 kV and 300 kV.

O Additionally, 3 hydropower stations in river Begna adjacent to site with an accumulated power of 50 MW.

COOLING.

O Up to 1 000 l / sec of filtered river water available for cooling.

O Excess heat dump to district heating grid may be possible.

O Cool Nordic climate.

CONNECTIVITY.

O Redundant dark fibre available adjacent to site. O Can be offered from several providers.

The locationO

Oslo – 60 km Hønefoss – 3 km

Substation420 kV OO 132 kV

3x Substations132 kV OO 22 kV

Cooling water1 000 l / sec

Hydropower28 MW

Hydropower6 MW

Substation300 kV OO 132 kV

Hydropower17 MW

25 km

OSLO

CITY 60 km �

� OSL 70 km

Page 4: Oslo Data Center Location at Hønefoss, Norway – A part of the Oslo

PowerOSpaceO

O POWER SUPPLYOslo Data Center Location is located at a strong node and interconnection point of the national (TSO/420 kV), regional (DSO/132 kV, and local (22 kV) power grids. This can be supplemented with approximately 50 MW of local hydro power generation in adjacent river Begna.

The local utility, Ringeriks-Kraft Nett AS, has permits and ability to deliver up to 100 MW at the site within 12 months from order / investment decision.

O TECHNICAL PROPOSAL FOR 100 MWA 2,6 km 22 kV cable can be constructed from the Follum substation utilizing an idle 80 MVA transformer and adjacent 80 + 60 MVA transformers to 100 MW capacity.

Power redundancy solutions can be provided as indicated in the map to the right.

10 MW is already available at site to be provided during construction.

O EXTENSIONS UP TO 300 MWThe power supply can be extended with an additional 200 MW by constructing a dedicated 132 / 22 kV substa-tion at the site.

Such extensions will be established by the regional grid operator (DSO / 132 kV) Glitre Energi Nett AS in collabo-ration with the national TSO Statnett SF (300 – 420 kV).

O FOLLUMMOENThe land covers a total area of 130 Ha. Excluding the necessary space for public roads, green belts, buffer zones and the existing rail road and 300 kV power lines, it is expected that the buildable flat area should be in the order of 60 Ha on the upper level (155 ± 5 m.a.s.), and 18 Ha on two separate lower levels (approx. 125 m.a.s.).

The development is directed by the municipality, provid-ing a generic industrial zoning plan which is taking into account the specific needs of a typical hyper scale datacenter.

O GEOTECHNICAL STATUSThe area consists of stable and dry gravel to a depth of roughly 15–50 metres above solid bedrock.

Geotechnical analysis shows that the site is suitable for industrial development.

Buildings with a ground pressure up to 200 – 300 kPa can be constructed practically anywhere in the area.

O ENVIRONMENTAL IMPACT ANALYSISOnsite visits and public records show no environmental issues in conflict with the purpose of building large scale data centres.

The soil is well suited for surface water management and drainage, even following extensive hard surface construction.

No cultural heritage or archeological sites are recorded in the area.

O ZONING PLANThe borders of the zoning plan are according to the map on page 2.

The further process will progress according to the following milestones in the zoning plan preparation are expected: Formal startup mid October 2016 Municipal Council First political evaluation January 2017 Municipal Council Final approval June – Sept 2017 Municipal Council

Page 5: Oslo Data Center Location at Hønefoss, Norway – A part of the Oslo

PowerO

80 MVA132 / 22 / 5 kV

80 MW 20 MW

Overhead line / underground cables

New switchgear

New under-ground cables

Customer 100 MW

80 MVA132 / 22 / 5 kV

60 MVA132 / 22 kV

Hydroelectric28 MW

Hydroelectric17 MW

Hydroelectric6 MW

132

kV22

kV

Page 6: Oslo Data Center Location at Hønefoss, Norway – A part of the Oslo

ConnectivityO

O DARK FIBRE MAPSeveral dark fibre and wavelength carriers are present at the Oslo Data Center Location site or immediately adjacent to the site.

Easy Fibre is one of the companies present with dark fibre capacity.

illustration / map: easyfibre.se

Page 7: Oslo Data Center Location at Hønefoss, Norway – A part of the Oslo

Ringerike

is a district in Norway,

consisting of the municipalities

Hole, Jevnaker and Ringerike

ConnectivityO

RingerikeO

NATIONAL BUSINESS ENVIRONMENT

LOCAL GOVERNMENT

O THE MUNICIPALITY OF RINGERIKE

adm. centre The town of Hønefoss (19 000 inhabitants)total area 1 970 km2

total population 43 000country Norwaycounty Buskerud Part of Oslo Business Region

O Norway is fully integrated in the EU single market by the European Economic Area agreement. National law is based on EU directives. O Norway is a safe and business friendly country. According to the publication ”Ease of doing business 2014” from the IFC and World Bank, Norway ranks 7th among the 189 countries listed. O The parliament holds a broad majority across the party spectrum in support of the datacenter industry. O The energy tax for datacentres is 0,0048 NOK  / kWh, about 0,5 € / MWh, the same as other strategic industries.

PUBLIC INFRASTRUCTURE

O Ringerike has large areas that are zoned for industry and a significant local renewable energy generation O Proximity to both Oslo City (60 km) and OSL, Oslo International Airport at Gardermoen (70 km), ensures efficient access to workforce and supplies O High quality hospital (9 km), police station (6 km) and fire department with industrial capacity (8 km) all located in the vicinity of Oslo Data Center Location.

EDUCATION, SCIENCE AND RESEARCH

O Norway has a vital and growing IT industry O The University of Oslo is the largest and most diverse university in Norway

O The university campus in Hønefoss (University College of Southeast Norway) provides education and research locally O Several secondary and vocational schools provide a highly competent and dynamic workforce.

"In Ringerike we focus on facilitating for development and growth.

The district's mayors welcome new establishments to one of Norway’s

most expansive business regions. Basing your business in Ringerike

will give your company and employees great opportunities for

further growth and development."

corporate partners

ringerike kommune mayor | Kjell B. Hansen

Page 8: Oslo Data Center Location at Hønefoss, Norway – A part of the Oslo

Copyright © Free Vector Maps.com

TECHNICAL / COMMERCIAL ISSUES:

Dr. Rolf Jarle Aabergceo follum eiendom as

(+47) 977 08 138

[email protected]

Postal addressOslo Data Center LocationC/O University College of Southeast Norway,PO BOX 164 Sentrum,N-3502 Hønefoss Visiting addressFollumveien 100, N-3515 Hønefoss

BUSINESS / HOSPITALITY:

Mr. Jørgen Moe Jr.ceo ringerike utvikling as/ director regional development (+47) 930 33 907 [email protected]

Mr. Pelle Gangeskarchief business development (+47) 911 13 636 [email protected] Postal addressOslo Data Center LocationC/O University College of Southeast Norway,PO BOX 164 Sentrum,N-3502 Hønefoss Visiting addressBredalsveien 14,N-3502 Hønefoss

LOCAL GOVERNMENT:

Mrs. Gunn Edvardsendirector general of strategic development (+47) 934 07 021 gunn.edvardsen@ ringerike.kommune.no Postal addressRingerike Kommune,PO BOX 123 Sentrum,N-3502 Hønefoss Visiting addressTown Hall,Osloveien 1, N-3502 Hønefoss

Oslo International Airport

N O R W A Y

S W E D E N

F I N L A N D

R U S S I A

B E L A R U S

U . K .N O R T H

S E A

T H E N O R D I CR E G I O N

B A L T I C S E A

E S T O N I A

L A T V I A

L I T H U A -N I A

D E N .

Oslo

www.oslodclo.comSpaceo Powero Connectivityo