City of Alexandria, Virginia Oronoco Outfall Remediation Project Progress Report March 5, 2018

Upload: others

Post on 18-Aug-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Oronoco Outfall Remediation Project Progress Report...Backfilling of clean sand in progress. Dredge and Capping Project 7 Reactive cap to be installed around the Oronoco St. storm

City of Alexandria, Virginia

Oronoco Outfall Remediation Project

Progress Report

March 5, 2018

Page 2: Oronoco Outfall Remediation Project Progress Report...Backfilling of clean sand in progress. Dredge and Capping Project 7 Reactive cap to be installed around the Oronoco St. storm

Alexandria Town Gas Site

2

1930s

Oronoco St. today

Oronoco OutfallAt foot of Oronoco St.

Page 3: Oronoco Outfall Remediation Project Progress Report...Backfilling of clean sand in progress. Dredge and Capping Project 7 Reactive cap to be installed around the Oronoco St. storm

Area Overview

3

Lee St. SquareFormer ATG site

Robinson Terminal

Oronoco Outfall

Page 4: Oronoco Outfall Remediation Project Progress Report...Backfilling of clean sand in progress. Dredge and Capping Project 7 Reactive cap to be installed around the Oronoco St. storm

Voluntary Remediation Program

(VRP)

4

-Boom installed at the Oronoco St. storm sewer outfall.

-Free Product Recovery wells installed

-Oronoco St. Storm Sewer Pipe relined

-BioSparge Groundwater Treatment System installed

-Dredging and Capping project.

Page 5: Oronoco Outfall Remediation Project Progress Report...Backfilling of clean sand in progress. Dredge and Capping Project 7 Reactive cap to be installed around the Oronoco St. storm

Dredge and Capping Project

5

▪ 3000 CY of contaminated sediment

dredged and removed.

Page 6: Oronoco Outfall Remediation Project Progress Report...Backfilling of clean sand in progress. Dredge and Capping Project 7 Reactive cap to be installed around the Oronoco St. storm

Dredge and Capping Project

6

▪ Backfilling of clean sand in progress.

Page 7: Oronoco Outfall Remediation Project Progress Report...Backfilling of clean sand in progress. Dredge and Capping Project 7 Reactive cap to be installed around the Oronoco St. storm

Dredge and Capping Project

7

▪ Reactive cap to be installed around the

Oronoco St. storm sewer outfall.

Page 8: Oronoco Outfall Remediation Project Progress Report...Backfilling of clean sand in progress. Dredge and Capping Project 7 Reactive cap to be installed around the Oronoco St. storm

Storm Sewer Pipe Repair

8

Page 9: Oronoco Outfall Remediation Project Progress Report...Backfilling of clean sand in progress. Dredge and Capping Project 7 Reactive cap to be installed around the Oronoco St. storm

Anticipated to be completed in March, 2018.

Project Schedule

9

Page 10: Oronoco Outfall Remediation Project Progress Report...Backfilling of clean sand in progress. Dredge and Capping Project 7 Reactive cap to be installed around the Oronoco St. storm

Contacts:

Tafesse T. Gyes, P.E.

Department of Project Implementation

City of Alexandria, Virginia

703.746.4051

Lisa Goldberg

Office of Environmental Quality

City of Alexandria, Virginia

Telephone: 703. 746.4076

Questions

10