Page 1: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Orient Integrated Development Consultants, Inc. (OIDCI)

Page 2: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project Loan No. 2465 – PHI

Department of Agrarian Reform – Autonomous Region in Muslim Mindanao

Project Contract Completion Report

Prepared by the

Special Management Team

October 2014

Page 3: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Project Location Map: Autonomous Region in Muslim Mindanao

Page 4: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t i | P a g e

T a b l e o f C o n t e n t s Acronyms .......................................................................................................................................... iii Executive Summary .......................................................................................................... ES-1 1.0 Introduction ................................................................................................................. 1 2.0 Regional Context, Project Objectives and Scope ......................................................... 1

2.1 The Autonomous Region in Muslim Mindanao ............................................................. 1 2.2 Project Objectives .......................................................................................................... 2 2.3 Scope of SMT Contract................................................................................................... 3

3.0 SMT Organization ......................................................................................................... 7

3.1 Special Management Team ........................................................................................... 7 3.2 Structure and Relationships ......................................................................................... 10

4.0 Accomplishments ....................................................................................................... 12

4.1 Community-Driven Development ................................................................................ 12 4.1.1 ARC Planning and Project Development ......................................................... 12 4.1.2 ARCDP Integration into LGU Plans .................................................................. 13 4.1.3 Support to LGU-ARC Clusters .......................................................................... 14 4.1.4 Strengthening LGU Governance through the PBGS ........................................ 14 4.1.5 Strengthening LGU Participation in Rural Infrastructure ................................ 15

4.2 Agricultural Enterprise Development .......................................................................... 16 4.2.1 Improving ARC Productivity ............................................................................ 16 4.2.2 Financial Linkages for ARBOs .......................................................................... 18 4.2.3 Investment Promotion in ARCs ....................................................................... 19

4.3 Rural Infrastructure...................................................................................................... 19 4.4 Project Management ................................................................................................... 25

4.4.1 Systems, Skills and Knowledge Sharing with the ARMM Team ...................... 25 4.4.2 Engaging Network of Support, Mobilization of Resources and Policy

Development ................................................................................................... 26 4.4.3 Report Preparation and Conduct of Studies/ Policy Briefs ............................. 28

4.5 Overall Summary of Accomplishments ........................................................................ 29 5.0 Major Issues and Challenges ...................................................................................... 31

5.1 Prohibitive LGU Counterpart Equity ............................................................................ 32 5.2 Limited Local Capacities and Resources for Project Management .............................. 33 5.3 Inconsistency in the Subproject Review and Approval Process .................................. 34 5.4 Inadequate Harmonization of Institutional Mechanisms ............................................ 35 5.5 Unrealistic Targets ....................................................................................................... 36 5.6 Unsuitability of SMT's Output-based Contract and Deliverables to the

Conditions of the Project ............................................................................................. 37 6.0 Recommendations ..................................................................................................... 38

6.1 On Ensuring Continued Project Implementation Post-SMT and Sustaining the Project Gains .......................................................................................................... 38

6.2 On Lightening the LGU Equity Burden and Securing Continued LGU Commitment .... 39

Page 5: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t ii | P a g e

6.3 On Strengthening the Subproject Development Process ............................................ 40 6.4 On Simplifying, Standardizing and Disseminating Subproject Monitoring

Requirements and Processes ....................................................................................... 40 6.5 On Enhancing Capacities for Project Implementation ................................................. 40 6.6 On Possible Project Extension and Capacity Development Support to ARMM ........... 41

Tables Table 2.1 Community-Driven Development Deliverables under the SMT Contract ......................... 3 Table 2.2 Agri-Enterprise Development Deliverables under the SMT Contract ................................ 4 Table 2.3 Rural Infrastructure Deliverables under the SMT Contract ............................................... 4 Table 2.4 Project Management Deliverables under the SMT Contract ............................................. 5 Table 2.5 SMT Payment Structure ..................................................................................................... 6 Table 4.1 Distribution of ARCs and LGUs Assisted in ARC Planning and Project Development ...... 12 Table 4.2 List of LGUs Assisted in their Agrarian Reform Community Development Plan .............. 13 Table 4.3 List of LGUs with Initial PBGS Documentary Submissions ............................................... 14 Table 4.4 Summary of RI Accomplishments (as of June 2014) ........................................................ 20 Table 4.5 Status of Approved Subprojects (as of June 30, 2014)a ................................................... 20 Table 4.6 LP Fund Releases and Disbursement (as of 30 June 2014) .............................................. 21 Table 5.1 Total Cost and LGU Equity Contribution of Approved Subprojects by Province. ............ 33 Figures Figure 3.1 Special Management Team Summary of Staff Deployment by Category (2011-2014) .... 8 Figure 3.2 Summary of SMT Staff Deployment by Category and Office Posting (December 2012) .. 9 Figure 3.3 ARCP II ARMM Implementation and Management Structure ........................................ 11 Figure 4.1 Number of Approved Rural Infrastructure Subprojects, per Semester (2010-2014) ..... 21 Figure 4.2 Value of Approved Rural Infrastructure Subprojects, per Semester (2010-2014) ......... 22 Annexes Annex 1 List of Approved Subprojects Annex 2 LGU Equity Requirement for Agrarian Reform Communities Project II Annex 3 Proposed PBGS Guidelines for ARMM ARCP II Annex 4 ARMM ARCP II Capacity Development Plan Annex 5 AED Capacity Development Plan Annex 6 Coffee Value Chain Study for Sulu Province Annex 7 Status of Project implementation in ARMM Annex 8 Status of Rural Infrastructure Subproject Implementation in ARMM and

Recommended Strategies Annex 9 ARCP II Required Documents with Template as of February 3, 2012 Annex 10 Status of Rural Infrastructure Subproject Implementation in ARMM and

Recommended Next Steps by Subproject

Page 6: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t iii | P a g e

Acronyms ACSP - Agriculture Credit Support Program ADB - Asian Development Bank AED - Agricultural and Enterprise Development AIP - Annual Investment Plan APCP - Agricultural Production Credit Program ARBO - Agrarian  Reform  Beneficiaries’  Organization ARBs - Agrarian Reform Beneficiaries ARCCESS - Agrarian Reform Community Connectivity and Economic Support Services ARCDP - Agrarian Reform Community Development Plan ARCP - Agrarian Reform Communities Project ARCs - Agrarian Reform Communities ARG - Autonomous Regional Government ARMM - Autonomous Region in Muslim Mindanao BBL - Bangsamoro Basic Law BTA - Bangsamoro Transition Authority CAB - Comprehensive Agreement on Bangsamoro CARP - Comprehensive Agrarian Reform Project CBO - Community-Based Organization CDD - Community-Driven Development CDO - Community Development Officer COA - Commission on Audit CSF - Common service facility DAF - Department of Agriculture and Food DAP - Disbursement Acceleration Program DAR - Department of Agrarian Reform DARPO - DAR Provincial Office DBM - Department of Budget and Management DBP - Development Bank of the Philippines DENR - Department of Environment and Natural Resources DF - Development Facilitator DILG - Department of Interior and Local Government DOF - Department of Finance DSWD - Department of Social Welfare and Development FMR - Farm-to-Market Road HFI - Hineleban Foundation Inc. IDC - Iranun Development Council IQMDS - Infrastructure Quality Monitoring and Durability System JICA - Japan International Cooperation Agency JV - Joint Venture KFI - Kennemer Foods International LAED - Localized Agricultural and Enterprise Development LBP - Land Bank of the Philippines LCE - Local Chief Executive LGU - Local Government Unit LP - Loan Proceeds LPO - Local Project Office LTI - Land Tenure Improvement

Page 7: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t iv | P a g e

MARO - Municipal Agrarian Reform Office MDFO - Municipal Development Fund Office MILF - Moro Islamic Liberation Front MNLF - Moro National Liberation Front MPB+SD - Multi-Purpose Buildings with Solar Dryers MPP - Multi-Purpose Pavements MRDP - Mindanao Rural Development Project NAPA - Notice of Advance Procurement Activities NGALGU - National Government Assistance to Local Government Units NOL - No Objection Letter NPCO - National Project Coordination Office NSAC - National Subproject Approval Committee OFID - OPEC Fund for International Development OIDCI - Orient Integrated Development Consultants, Inc. OISCA - Organization for Industrial, Spiritual and Cultural Advancement, International OPAPP - Office of the Presidential Adviser on the Peace Process OSCC - Office of the Southern Cultural Communities PBGS - Performance Based Grant System PCCR - Contract Completion Report PDAF - Philippine Development Assistance Fund PIM - Project Implementation and Management POW - Program of Work PPMS - Project Performance Monitoring System PRDP - Philippine Rural Development Project RI - Rural Infrastructure ROW - Right-of-way RPDO - Regional Planning and Development Office RPO - Regional Project Office RSAC - Regional Subproject Approval Committee SC - Supreme Court SLAM - Southern Ligwasan Association of Municipalities SMT - Special Management Team SPPP - Strategic Participatory Planning Process UN - United Nations WFP - World Food Programme

Page 8: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t ES-1 | P a g e

Executive Summary

Project Background The Agrarian Reform Communities Project II (ARCPII) is a multi-year project financed by the Asian Development Bank (ADB) and the OPEC Fund for International Development (OFID). The goal of ARCPII is to alleviate poverty among the agrarian reform beneficiaries (ARB) and bring about sustained improvements in their incomes and quality of life. This is to be realized through an integrated and complementary package of interventions in: (i) community-driven development (CDD), (ii) agricultural and enterprise development (AED), (iii) sustainable rural infrastructure (RI) development, and (iv) project implementation and management (PIM). The project identified 150 agrarian reform communities (ARC) for support and assistance, 30 of which are targeted in ARMM.

The ADB and OPEC loans financing ARCP II will be completed by end-2014. The OFID loan amounts to $30 million and is meant only for the Autonomous Region in Muslim Mindanao (ARMM). Overall project implementation for ARCP II is managed by the Department of Agrarian Reform (DAR) with the National Project Coordination Office (NPCO) as the responsible unit in-charge for its day-to-day operations. In view of delays in the implementation of ARCP II in DAR ARMM, DAR decided to create a Special Management Team (SMT) to provide the required technical assistance for the project. The contracted SMT was the joint venture of Orient Integrated Development Consultants, Inc. and Hineleban Foundation Inc. The contract of SMT was performance-based, that is, payments were tied to a set of deliverables and outputs as agreed with DAR. SMT’s contract was for the period July 2011 to June 2014. The SMT was headed by a Regional Project Management Advisor with the support of a field-based Area Manager/Team Leader and specialists in agricultural enterprise and development, community development and rural infrastructure, and LGU-based staff. The SMT directly reported to the Regional Secretary of DAR-ARMM, who is also the Regional Project Manager. The   SMT’s   role   focused   on   providing   direct   assistance   to   the  DAR-ARMM Regional Project Office (RPO) and five Provincial Offices (PO) as well as the partner LGUs in the area of project development, procurement and civil works monitoring. With DAR-ARMM Regional and Provincial Offices, SMT engineers and specialists conducted coaching and mentoring on the requisites for every stage of the subproject development process. With the LGUs and DARPO, SMT also worked towards capacitating the target ARBs. The SMT established its offices in Cotabato City, Zamboanga City, and Davao City. At the height of project implementation (2012), SMT had a total staff complement of 13 technical specialists and eight Community Development Officers. OIDCI and HFI staff provided administrative support to the SMT.

Page 9: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t ES-2 | P a g e

Key Accomplishments Community-Driven Development. Of the 30 target LGUs, 26 LGUs were assisted in the formulation of ARC Development Plans (ARCDPs). The SMT innovated and developed a methodology for community participation in ARC development planning and subproject prioritization, aptly-called Strategic Participatory Planning Process. Technical guidance was provided to LGUs to ensure that the projects identified were incorporated and prioritized in LGU Annual Investment Plans, which served as basis for annual budget allocation. With the expansion of ARMM sites, SMT was provided the opportunity to engage more LGUs in planning and subproject development. At the end of the contract period, the Project had concrete engagement with 44 ARCs in 43 LGUs. Agricultural and Enterprise Development. The SMT supported DAR-ARMM in designing and preparing 14 proposals for ARMM ARBOs   under   DAR’s   ARCCESS   program.     Through an integrative planning process for AED, localized AED priorities and activities were identified for each of the LGUs, ARCs and ARBOs, especially those with approved RI subprojects. The AED approach had two tracks: the food security track with rice and corn farming as anchors, and the strategic agriculture and investment track. Opportunities through investment mobilization and partnership with the private sector were explored for the latter. Interested ARCs were linked with Kennemer Foods for cacao production and marketing and with the Land Bank of the Philippines for financing. Sustainable Rural Infrastructure Development. In September 2011, ARCPII in ARMM only had four LGUs participating in the RI component with six approved subprojects worth PhP56.8 million and loan proceeds of PhP22.9 million. With SMT support, performance was extensively improved. By the end of the second quarter of 2014, the number of participating LGUs with approved subprojects had risen to 43 with 132 approved subprojects worth PhP2.4 billion and loan proceeds of PhP1.1 billion. The most dominant type of support infrastructure selected by LGUs was farm-to-market road. Three rural roads subprojects in Sulu, Basilan and Tawi-Tawi amounting to PhP32.9 million have been completed. There are 109 subprojects that are in various stages of construction or procurement. The   influx   of   subprojects   was   facilitated   by   SMT’s   extensive   efforts   to convince LGUs to pursue RI subproject development. This was enhanced by the introduction in early 2012 of the National Government Assistance to Local Government Units (NGALGU) for RI Development from the Office of the President. However, in 2013, the existing SMT sites appeared unable to support additional subprojects primarily due to equity constraints. In early 2012, SMT had proposed for inclusion into the Project of additional LGUs and ARCs. It was only in 2013 that such site expansion, through the NPCO and RPO-led Roadshow, was realized. The belated expansion of the Project areas meant that majority of the SPs were approved only in 2013 and most SPs entered the procurement stage only recently. They are expected to be issued contract awards and construction can only commence within the latter half of 2014. Project Implementation and Management. SMT instituted an internal monitoring system to track the status of subprojects from development to approval to implementation, and to account for SMT efforts on the ground for specific deliverables that could show its

Page 10: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t ES-3 | P a g e

performance. Through such monitoring system, NPCO and DAR-ARMM management were regularly apprised and engaged in dialogue on project implementation concerns. The SMT envisioned the development of a model for multi-agency collaboration and complementation in rural development in a post-conflict context. Hence, the SMT undertook several policy, networking and partnership building initiatives for the Project, DAR-ARMM and the LGUs to further local cooperation, especially in generating financial support for project  implementation.    SMT’s study on the rationalization of the national government-local government  cost  sharing  supported  DAR’s  efforts  to  shape  its  equity  policy.  SMT  was  able  to  obtain and formalize the commitment of UN WFP to support the project though its Food-for-Work Program. This resulted in the generation of PhP170 million in in-kind equity for 18 subprojects in 15 LGUs. SMT initiated the development of an ARMM ARCPII Capacity Development Plan, which underscored capacity building as an integral component of the project and providing funds for its operationalization. It studied the level of compliance of   partner   LGUs   to   DILG’s  Performance-Based Grants System (PBGS) and advocated for a PBGS that is responsive to the unique socio-cultural conditions and governance make-up of ARMM, in order to attain good governance and at the same time help ease the cash equity requirement under ARCP II. (The PBGS Technical Committee eventually ruled out any special modification for the ARMM LGUs.) By the end of June 2014, loan proceeds have been released to 25 subprojects. From the amount of loan proceeds transferred to the accounts of the local governments, the reported cumulative disbursement as of end of the second quarter of 2014 was PhP58 million (US$1.3 million). Another PhP15.8 million (US$352,061) in disbursements are in process, making the total disbursements on the loan proceeds PhP74 million (US$1.64 million).

Challenges Over the course of implementing the Project, the SMT encountered difficulties related to the technical and resource limitations in project management, monitoring and supervision. There were weaknesses in rural infrastructure design and proposal packaging. The LGUs had limited experience managing contracted works as most of their infrastructure is done by the administration. They also have limited capacity to manage the procurement process as prescribed in this procurement law (Republic Act 9184). Available local expertise often struggled to adhere to the financial reporting requirements of a foreign-funded project like ARCP II. This local deficiency in financial management expertise has impinged on the timeliness, accuracy and acceptability of financial reports from the LGUs, and this became a continuing challenge for the DARPOs and RPO to facilitate. The SMT exerted efforts to mitigate the lack of expertise in these areas by providing coaching, supervision, and technical assistance sessions from the Local Project Office to the DARPOs, up to the RPO (DAR-ARMM). Another challenge to the SMT was the prohibitive LGU counterpart equity requirement for ARCPII subprojects, which constrained LGU participation in the project, especially given the availability of cheaper financing through other donor funded projects. The augmentation of the LGU equity through the NGALGU was a major factor that led to the spurt in the number of  RI  subprojects.  DAR’s  decision  to  ease  the  equity  sharing  from  50%-50% LGU-NG to 10% in cash, 15% in-kind equity and 25% from NGALGU further increased LGU interest in ARCP II.

Page 11: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t ES-4 | P a g e

However,  the  government’s Disbursement Acceleration Program – from where the NGALGU funds were sourced – has been stopped. Even with a low 10% cash equity, there is no assurance that the LGUs will come up with the required amount given limitations on how much of the in-kind components the LGUs can generate, the extremely limited scope for applying the Performance-Based Grant System in ARMM, and the limited applicability of Food-for-Work Program of the WFP. Inconsistencies in the subproject review and approval process were noted, especially when the fast-tracked process for project approval that was initiated by the NPCO was implemented for the RI component. Deferring critical technical and financial requirements and social and environmental safeguards was successful in getting more SPs approved. While corrective measures and the necessary follow-up activities can still be undertaken to ensure project compliance, there is no guarantee that approved SPs that are the product of fast-tracking processes will in fact get implemented faster. In the experience of the ARMM, there were fast-tracked SPs that are going through critical procurement delays due to lacking documentary requirements during the approval process. Inadequate harmonization of institutional mechanisms has contributed to the delay of recording disbursement  transactions  for  the  OFID  funds.    Despite  the  SMT’s  initial  efforts  to  harmonize and align the reporting and coordination processes, procedures, protocol and requirements of the various agencies, there have been observable and critical breakdown in subproject development (i.e., delineation of responsibilities for the SMT, RPO, and NPCO in assisting LGUs on RI development) and procurement (i.e., ambiguity in procurement requirements between RA 9184, NPCO and ADB). The unrealistic project targets and the unsuitability of its output-based contract and deliverables to the conditions of the Project challenged the smooth operations of the SMT. Among the unrealistic targets were on Land Tenure Improvement that were hindered by the following factors: a) land titling being a function not only of DAR, but also of DENR; b) the initial mapping of land for titling is under the jurisdiction of DENR, and far from the direct influence   of   SMT’s   activities;   and   c)   the   special   peace-and-order and conflict-related consideration in ARMM. Other targets for the AED component have also been challenging due to the limited Project scope and resource allocation on AED activities thus funding for training and capacity-building activities have to be sourced elsewhere, and the absence of Project-level strategy in leveraging for improved individual access to credit and savings facilities. A major challenge for the SMT and NPCO was how to make the output-based payment scheme work efficiently so project operations could proceed smoothly. While there were clear agreements on the cost and payment structure at the beginning of the contract, as early as the beginning of 2012, the SMT started to encounter difficulties in implementing its output-based contract. Notwithstanding, the SMT continued on delivering best efforts for the achievement of Project objectives as much as the situation allowed. The SMT was likewise faced with the challenging task of orienting each new set of leadership in DAR-ARMM, which had five changes in Regional Secretaries within the duration of the SMT’s   contract.     Coupled  with   a   new   leadership   and   staff   was   the   need   to   establish   new  strategies and agreements.

Page 12: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t ES-5 | P a g e

Overall, despite the above-cited challenges and the low disbursement of the OFID loan, the SMT has made significant contribution to ARCPII. Project development efforts led to the approval of subprojects that were packaged ready for implementation. Through the technical   assistance   provided   by   SMT   at   the   field   level,   LGU’s have been capacitated in procurement and project management. SMT efforts to reach out to LGUs generated renewed interest and commitment to contribute their resources for the project. On the policy aspect, SMT,  with  DAR’s  support  has  been  instrumental  in  sensitizing the decision makers to be open to policy adjustments.

Recommendations The SMT puts forward the following recommendations:

On ensuring continued project implementation post-SMT and sustaining the project gains. Immediate next steps have been proposed for specific RI projects, the details of which are in Annex 10 of this report.

Lightening the LGU equity burden and securing continued LGU commitment. Currently, the RPO is addressing this concern by discussing the implication of the new cost arrangement with each LGU and the absence of NGALGU support. Most of the LGUs responded positively, indicating their agreement on the revised and higher equity arrangement. In the immediate term, the Project should validate the LGU equity contribution in the LGU Annual Investment Plan and in its Annual Budget as this will ensure the full commitment of the LGU to subproject implementation. In the design of future projects, equity requirements must be aligned with those of other projects so that it can be equally attractive for LGUs as a fund source for their projects.

Strengthening the subproject development process. Identified gaps in the process should be completed such as linking the subproject approval to the LGU budget process. Communities should be made to understand their roles and counterparts in the subproject implementation, by reviewing the ARCDPs and linking the subproject to existing or potential agriculture production areas. Compliance with national regulations and, social and environmental safeguards should be observed at the onset of subproject development to ensure the smooth procurement and implementation these projects.

Simplifying, standardizing and disseminating subproject monitoring requirements and processes. The RPO should constantly and regularly push the LGUs in complying with the monthly reportorial requirements for on-going projects. This can be done with the presence of the regional technical staff hired to complement the regular DAR-ARMM staff designated in the project. Regular monthly subproject monitoring, scheduled and unscheduled, should be conducted as what the SMT has done particularly for the subprojects in Lanao Sur and Maguindanao. Also critical is the proper dissemination of standardized and accepted Procurement and Financial Manuals.

Enhancing capacities for project implementation. Cognizant that the ARMM has special and urgent needs for capacity building along the lines of governance, agriculture and economic development, peace and security, among others, the SMT in 2012 formulated the   “Capacity   Development   Plan   for   Sustainable   Livelihood   Improvement   in   ARMM”  (CapDev Plan). It is proposed that the Project management review and validate the CapDev Plan for possible adoption of still relevant components and activities within the remaining period of the project and in future ARC projects.

On possible project extension and capacity development support to ARMM. The slated ARCPII Joint Mid-Term Review involving both ADB and OFID should look into the potential for Project extension and the review of the Project design and scope based on

Page 13: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t ES-6 | P a g e

the   SMT’s   experience.     The   continued   implementation   of   ARCPII,   given   an   extension,  would help the new Bangsamoro Government sustain the momentum for rural development. The SMT further believes that Project extension would be good because a significant amount of OFID funds remain undisbursed; expansion to other LGUs should be further explored.

Project extension should also take into account the proportion of resources deployed to the various Project components (i.e., CDD, AED, RI and PM). Since it has been a well-documented and long-standing experience that LGU equity for RI subprojects is difficult to secure, a re-allocation of funds to other components that have a more direct effect on rural development (e.g., AED) should be considered. Considerations on stakeholder capacities, external constraints and the sufficiency of Project resources should be made in setting realistic performance targets for the Project. It is further recommended that the Project Management consider sub-contracting the consulting and technical assistance to the RPO, PPOs and LPOs – much like the set-up of the SMT.  However,  it  is  recommended  that  a  “cost-plus”  contract  be  considered  under  the  new  sub-contracting arrangement. Sub-contracting to a third party is recommended to maximize and sustain support to DAR-ARMM. This is especially relevant in light of information that, as of writing of this report, all of the Project staff hired by DAR-ARMM have already resigned. This is an unfortunate development as these individuals have already been trained and have significant experience on the workings of the Project. This depletion in institutional knowledge can be averted through the sub-contracting of a dedicated service provider. At this point, it is important to emphasize that the DAR-ARMM, and the ARMM Government as a whole, should recognize the role of ARCP II in helping to achieve peace through the implementation of much needed infrastructure projects in the Bangsamoro. Notwithstanding all the operational challenges and constraints in counterpart funding, it is indeed worthwhile for ARCP II to have an extension given the momentum that has been set for the project.

Page 14: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 1 | P a g e

1.0 Introduction In October 2008, Asian Development Bank (ADB) and the OPEC Fund for International Development (OFID) approved two loans to the Government of the Philippines to finance the Agrarian Reform Communities Project II (ARCP II). The loans were declared effective in March 2009 and are expected to be completed by 31 December 2014. The OFID loan, amounting to $30 million, was meant only for the Autonomous Region in Muslim Mindanao (ARMM). The ADB loan for $70 million covered ARMM and five other administrative regions of the country. The goal of ARCP II is to alleviate poverty among the agrarian reform beneficiaries (ARB) and bring about sustained improvements in their incomes and quality of life. The main purpose of the Project includes improved capabilities and well-being of the poor and marginalized groups in the target communities. This is to be realized through an integrated and complementary package of interventions in: (i) community-driven development (CDD), (ii) agricultural and enterprise development (AED), (iii) sustainable rural infrastructure (RI) development, and (iv) project implementation and management (PIM). Out of the 150 Agrarian Reform Communities (ARC) identified for support and assistance under ARCP II, 30 are in ARMM. Overall project implementation was managed by the Department of Agrarian Reform (DAR) with the National Project Coordination Office (NPCO) as the responsible unit in-charge for its day-to-day operations. Two years into the project, the activities have barely come off the ground in ARMM, prompting DAR to engage a service contractor to provide the required technical assistance for the project. Recognizing the delays in the implementation of the Project, particularly the absence of disbursements against the OFID-funded component meant for ARMM, a Special Management Team (SMT) was introduced for the ARMM component. The SMT was formally contracted on 1 July 2011 to joint venture (JV) partners, Orient Integrated Development Consultants, Inc. (OIDCI) and Hineleban Foundation Inc. (HFI). The SMT contract period was for 36 months, i.e., until June 2014. The contract for the SMT was performance-based, which meant that all payments to the contractor were based on specific deliverables against which the SMT could charge for its services. This was regardless of any overhead costs or cost of operations of the SMT. Despite the challenges such arrangement would warrant, OIDCI and HFI entered into the contract with DAR in good faith, with the view to exercise best efforts in delivering on the contract, and in the hope that if difficulties arise, the Joint Venture would be given the opportunity to bring these difficulties to the attention of DAR and ADB for them to consider some degree of adjustments in the contract. OIDCI/HFI immediately organized a team headed by a Regional Project Management Advisor with the support of a field-based Area Manager/Team Leader and specialists in agricultural enterprise and development, community development and rural infrastructure, and LGU-based   staff.   The   SMT’s   role   focused   on   providing   direct   assistance to the DAR-ARMM Regional Project Office and five Provincial Offices as well as to partner LGUs in the areas of project development, procurement and civil works monitoring. With the LGUs and DARPO, SMT worked towards capacitating the target ARBs. The SMT established its offices in the cities of Cotabato (the seat of the Autonomous Regional Government or ARG and DAR-

Page 15: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 2 | P a g e

ARMM), Zamboanga City (to cover the island provinces of Basilan, Sulu and Tawi-Tawi), and Davao City (capital of Mindanao with easy access to some of the locations in mainland ARMM). The detailed plan for implementing ARCP II in ARMM was laid out in the Inception Report, prepared in consultation with the Project’s   stakeholders   and   partners   at   the   national   and  field level and submitted to DAR, DAR-ARMM and ADB in September 2011. The Inception Report was thoroughly discussed between DAR, NPCO, DAR–ARMM, SMT and the identified participating LGUs. Consultations were conducted with stakeholders, particularly the LGUs and DAR-ARMM, in Zamboanga, Cotabato and Davao Cities to explore the appropriate mix of project implementation strategies cognizant of the socio-cultural particularities and capacities of the ARCs. Subsequently, activities of the SMT were reported in quarterly and annual reports to DAR and ADB and further elucidated upon, including the operational issues and implementation problems, in the Interim Report and the Mid-term Report submitted in November 2012 and June 2013, respectively. This Project Contract Completion Report (PCCR) discusses the milestones achieved in ARMM over the past three years as well as the issues and challenges experienced in engaging the partners and stakeholders in ARCP II implementation. Recommendations for the Project implementers are likewise outlined in this Report with the end in view of putting forward implementation options for the remaining time of ARCP II in ARMM (or if loan extension is granted given that a substantial loan amount still remains to be disbursed) and considering the resources and level of capacity of the stakeholders concerned.

Page 16: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 1 | P a g e

2.0 Regional Context, Project Objectives and Scope

2.1 The Autonomous Region in Muslim Mindanao The ARMM1, comprising the mainland provinces of Maguindanao and Lanao del Sur including Marawi City, and the three island provinces of Basilan (excluding Isabela City), Sulu and Tawi-Tawi, is one of the poorest regions with all the five provinces belonging to the poorest provinces in the country. The region covers approximately 23,566 square kilometers and has a population of around four million predominantly Muslim inhabitants, most of whom identify themselves  as  “Bangsamoro”  – Bangsa (Nation) of Moro (Muslim) people of Mindanao. The ethnic groups in ARMM consist of 13 ethno-linguistic Bangsamoro peoples. There are four to six dominant tribes that represent the major territorial groupings within ARMM. They are the Maranao (in Lanao), the Maguindanao (in the former province of Cotabato), Tausug (in the Sulu Archipelago), the Sama (in the Archipelago of Tawi-Tawi), the Yakans (in Basilan), and the Iranun (in the former Sharif Kabunsuan Province). The Bangsamoro peoples constitute about 20% of the inhabitants of Mindanao. Unlike the other administrative regions in the country, the ARMM is governed by a different administrative set-up with the Autonomous Regional Government (ARG) at the helm. The ARG is composed of an executive department headed by a Regional Governor and the Regional Cabinet and a Regional Legislative Assembly as the embodiment of an autonomous region. In theory, the regional government is supposed to enjoy executive and legislative powers not only in local affairs but also in all devolved line agencies. In practice, however, over the many years of its existence, there is little evidence of the ARG actually being able to exercise autonomy fully. Hence, there has been a continuing struggle for   the   “Right   to   Self  Determination”  by the Bangsamoro people, demanding greater self-reliance and control over its assets, revenues and resources. It is worth noting that the divisions and loyalties within the three Liberation Fronts in the ARMM are largely identified with and tied to the three major ethno-linguistic groupings that have shaped the Bangsa identities throughout the centuries. The Moro National Liberation Front (MNLF) is identified with the Tausugs (Islanders); the MNLF Reformists associate with the Maranaos, and the Moro Islamic Liberation Front (MILF) with the Maguindanaos. On 27 March 2014, the Government of the Philippines and the MILF signed the Comprehensive Agreement on Bangsamoro (CAB), the final peace agreement that culminates the effort of President Benigno Aquino III’s  administration to end the long impasse on peace and development in the region. The agreement seeks to replace the ARMM, which according to the incumbent administration has  been  “a  failed  experiment.”  With  the  signed  CAB,   it   is  expected that a basic law will be drafted and passed into law by both Houses of Congress.

1ARMM was created by the Government of the Philippines (the Government) in 1989 through the enactment of RA 6734 (The Organic Act of the ARMM) in pursuance of the constitutional provision recognizing Moro autonomy which in turn represents the Government interpretation of the Tripoli Agreement signed with the Moro National Liberation Front (MNLF) in 1976. The law was later amended by RA 9054 in compliance with the provisions of the Final Peace Accord (FPA) in 1996 between the Government and the MNLF. The Philippine Constitution recognizes the autonomy and the devolution of powers given to the ARMM.

Page 17: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 2 | P a g e

Both   parties’   goal is to have the Bangsamoro Transition Authority established by 2015, serving as the interim Bangsamoro government until the elections in mid-2016, which is expected to clear the way for the establishment of the new Bangsamoro government. The transition from ARMM to the new Bangsamoro government would need to be borne in mind in the event that the Project completion period is extended beyond December 2014.

2.2 Project Objectives The implementation of ARCP II in ARMM with consulting and technical services from the SMT followed the same overall framework as the ARCP II in the rest of the country. ARCP II is designed to support the implementation of the Comprehensive Agrarian Reform Project (CARP). The implementation design of ARCP II involves a holistic support to CARP by facilitating the access of target ARCs to essential support services and markets in approximately 152 ARCs and 11 ARC clusters in 18 of the poorest provinces of Southern Philippines, including the ARMM. For the ARMM, the Project covered all five provinces, with the original target of 30 ARCs in 29 LGUs and 3 LGU Clusters. The Project seeks to facilitate the transformation of the target communities from subsistence producers toward agri-business development. It includes both ARBs and other segments of the rural poor in the ARCs and ARC clusters in target municipalities. Community-driven development (CDD) strategies are adopted to reach out to large segments of the rural poor in the target areas to strengthen their social capital. ARCP  II’s  specific  objectives  are:

a. Substantially expand the rural production base by assisting the rural poor in the target areas to break out of subsistence production, diversify their livelihood activities, and increase their marketable surplus;

b. Raise production and distribution efficiency in Project areas to improve quality and competitiveness;

c. Improve  the  position  of  small  farmers’  vis-à-vis the larger markets; d. Improve employment opportunities for landless households in the target areas; and e. Promote equitable distribution of production and productivity gains among all segments

of the rural poor in the target areas. The four Project components are:

a. Community Driven Development (CDD) – focuses on strengthening the capacities of the LGUs and ARCs in participatory, accountable and transparent ARC development planning and the overall management of the Project at the local project office level.

b. Agriculture and Enterprise Development (AED) – focuses on community formation and strengthening towards increased productivity, crop profitability, land tenure improvement, access to savings and credit services, and increased investments in the ARCs.

c. Rural Infrastructure (RI) – aims to (i) reduce transportation time and haulage costs of rural produce; (ii) reduce cost of farm inputs; (iii) increase availability of irrigation to enhance crop production; (iv) promote crop diversification; (v) increase cropping intensity and improving yields; (vi) reduce post-harvest losses and transport damage; and

Page 18: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 3 | P a g e

(viii) minimize whole life asset costs including the maintenance burden over the design life.

d. Project Implementation and Management (PIM) – comprises SMT’s overall consultant advisory services related to project management, CDD, safeguard policies, fiduciary responsibility, agri-enterprise development, micro finance and rural credit promotion, quality assurance, infrastructure development, monitoring and evaluation, extension training, gender and development and environment management, among others.

The deliverables under each of the components followed the performance-based contract for the SMT. For this, SMT had to come up first with a rather elaborate system of accounting for their efforts on the ground under each specific deliverable item, against which the SMT could show its performance and claim for the costs incurred and deliverables accomplished. Details of specific SMT deliverables are discussed in the section below.

2.3 Scope of SMT Contract The SMT contractual obligation called for the delivery of the following:

a. Well implemented CDD. The SMT will 1) organize communities for social capital participation and participatory detailed ARC/LGU planning; 2) improve LGU capacity for better governance; 3) facilitate ARC/LGU access to grants rewards allocated by the national government for their participation in policy reform; and 4) assist them in developing their network with other co-financiers to enhance equity contribution. Specific targets under the CDD component are shown in the table below.

Table 2.1 Community-Driven Development Deliverables under the SMT Contract

Description Target Units ARC Planning linked to the Project 30 ARCs LGU Plans incorporated ARCs' plans linked to the Project 30 LGUs LGUs participating in performance-based grant system (PBGS) 30 LGUs LGUs get 20% refund of their equity contribution 30 LGUs LGUs participation in RI component 30 LGUs LGUs participation in AED component 30 LGUs LGU/ARC staff (40% women) trained in planning 150 persons

Page 19: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 4 | P a g e

b. Well established AED. The SMT will capacitate the beneficiaries of the AED in enhancing the productivity and profitability of various agricultural commodities, particularly in the areas of: 1) improving linkages between the private sector and ARC organizations to increase investments in rural areas for growth; 2) mobilizing community-based savings and lending groups; and 3) completing land tenure improvement. Physical targets for the AED component are shown in the matrix below.

Table 2.2 Agri-Enterprise Development Deliverables under the SMT Contract

Description Target Units ARCs participating in improving crop profitability 30 ARCs Subdivided land titles to individual ARBs 22,000 hectares ARBs/non-ARBs access to credit and savings facilities 3,000 households Total agricultural investment to ARB/non-ARBs 3 US$ million Increased profitability of agricultural products 15 % Direct beneficiaries (50% women) of AED 3,000 persons Cooperatives/AED community-based organizations (CBOs) formed and strengthened

30 CBOs

Registered members (50% women) of CBOs 3,000 members

c. Rural Infrastructure. The SMT will assist the government staff in managing the rehabilitation and/or construction of the following investments: 1) critically needed inter-barangay or farm-to-market roads (FMR) and their associated structures; 2) small-flow communal irrigation schemes, water impounding projects, farm reservoirs, shallow tube wells, and drip irrigation schemes for high-value crops, 3) post-harvest facilities, warehouses and solar driers; 4) potable water supply system; and 5) other infrastructure such as multi-purpose building, school rooms, day care centers, barangay health stations, and small-scale flood protection works. Table 2.3 lists down the specific investment areas.

Table 2.3 Rural Infrastructure Deliverables under the SMT Contract

Description Target Units Rural Roads 823 kms Bridges 923 lms Flood Protection Works 1,767 lms Communal Irrigation Facilities 5,288 has Solar Driers 34 units Warehouses 20 units Potable Water System 214 units Public building na units

Page 20: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 5 | P a g e

d. Effective Project Management. The SMT will act as an additional resource to support the existing government management structure, which will be fully mainstreamed at the regional, provincial and local levels. Each SMT consultant will be assigned to work closely with a government staff as his/her direct counterpart. To the extent possible, the Team will work closely with all project implementation and management structures that have been established within existing government institutions. The Team will assist the regular staff of DAR, MDFO and other stakeholders in the overall project implementation. The key targets for project management are detailed in Table 2.4.

Table 2.4 Project Management Deliverables under the SMT Contract

Description Target Units Satisfactory skill and knowledge sharing to the assigned government staff to work with the ARMM team (50% women)

50 staff

On time satisfactory completion of RI subprojects 100 % On time submission of quarterly and other reports 100 % Quarterly Progress Reports 16 report Annual Report 4 report Special Report 2 report Project Completion Report (PCR) 1 report

Under an output-based contractual arrangement, the payment structure to SMT was based on the following cost structure to be reimbursed upon delivery of the required outputs:

Page 21: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 6 | P a g e

Table 2.5 SMT Payment Structure

Description Target Units Reimbursable Cost

% Cost per Unit Total

Enhanced Implementation of Community-Driven Development 3,838,946 100

ARC Planning linked to the Project 30 ARCs 38,389 1,151,684 30 LGU Plans incorporated ARCs' plans linked to the Project 30 LGUs 38,389 1,151,684 30 LGUs participating in performance-based grant system (PBGS) 30 LGUs 12,796 383,895 10

LGUs get 20% refund of their equity contribution 30 LGUs 12,796 383,895 10 LGUs participation in RI component 30 LGUs 6,398 191,947 5 LGUs participation in AED component 30 LGUs 6,398 191,947 5 LGU/ARC staff (40% women) trained in planning 150 persons 2,559 383,895 10 Improved Agriculture and Enterprise Development 17,915,079 100 ARCs participating in improving crop profitability 30 ARCs 59,717 1,791,508 5 Subdivided land titles to individual ARBs 22,000 hectares 326 7,166,032 40 ARBs/non-ARBs access to credit and savings facilities 3,000 households 896 2,687,262 15 Total agricultural investment to ARB/non-ARBs 3 US$ million 298,585 895,754 5 Increased profitability of agricultural products 15 % 5 Direct beneficiaries (50% women) of AED 3,000 persons 896 2,687,262 15 Cooperatives/AED community-based organizations (CBOs) formed and strengthened 30 CBOs 29,858 895,754 5

Registered members (50% women) of CBOs 3,000 members 59,717 1,791,508 10 Sustained Rural Infrastructure Development Rural Roads 823 kms Bridges 923 lms Flood Protection Works 1,767 lms Communal Irrigation Facilities 5,288 hectares Solar Driers 34 units Warehouses 20 units Potable Water System 214 units Public building na units

29,532,935 69,000,000 < Subprojects | @unit cost = share per PhP1million SP cost > per 1 PhP million 71,400 98,532,935 50,000

Strengthened and Capacitated Project Management 7,677,891 100 Satisfactory skill and knowledge sharing to the assigned government staff to work with the ARMM team (50% women)

50 staff 15,356 767,789 10

On time satisfactory completion of RI subprojects 100 % 767,789 767,789 10 On time submission of quarterly and other reports 100 % 6,142,313 80 Quarterly Progress Reports 16 report 57,584 921,347 15% Annual Report 4 report 230,337 921,347 15% Special Report 2 report 1,228,463 2,456,925 40% Project Completion Report (PCR) 1 report 1,842,694 1,842,694 30%

Page 22: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 7 | P a g e

3.0 SMT Organization The SMT represented an additional resource to support the existing government management structure, to be fully mainstreamed at the regional, provincial, and local levels in ARMM. The overall perspective was for the SMT to support the Regional Project Office (RPO), as embodied by DAR-ARMM, in the implementation of the Project and complement its existing manpower resource. The   Project’s   full   implementation thus relied on a strong collaborative relationship between the SMT, DAR-ARMM and the LGUs concerned. As indicated in the Inception Report, the SMT would take the lead in the coordination and management of the Project, particularly as it pertained to the deliverables contained in the DAR-Joint Venture (JV) contract. Project management functions would be coordinated with DAR at both the national and regional levels; project implementation concerns would be coordinated at provincial and LGU levels. Furthermore, the SMT, with DAR-ARMM, would maintain close coordination with the Office of the Regional Governor and the Executive Secretary of ARMM since the successful implementation of the Project and sustaining its gains required the active involvement and cooperation of several regional government agencies.

3.1 Special Management Team The SMT was composed of the following:

(a) Advisory and Operational Support Services for Program Management, headed by the Regional Project Management Advisor;

(b) Administrative Services, headed by a Program Administration Director; (c) Team Leader/Area Manager, reporting to the Regional Advisor and ensuring coordinated

efforts on the ground among the team members placed at various locations and offices of the SMT;

(d) Sector Specialists in the areas of engineering, agriculture, economics, environment and social safeguards, procurement, financial management and information technology related to needs of the main Project components;

(e) Community Development Officers (CDOs), acting as front liners and constantly liaising with the ARCs and LGUs; and

(f) Support Staff. The Regional Project Management Advisor was nominated by the JV partners as the Managing Director reporting directly to the JV Executive Committee (Execom) on the progress of the Project, a task deemed essential given the need to closely track revenues and expenses under a challenging output-based contract, ensure contract viability and provide substantial guidance and advice on policy issues and operational matters to the entire SMT. For the duration of its contract, the SMT hired core specialists and CDOs assigned in the target LGUs and ARCs. The schedule of deployment is shown in Figure 3.1.

Page 23: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 8 | P a g e

Figure 3.1 Special Management Team Summary of Staff Deployment by Category, 2011-2014

For CDD, the CDOs facilitated Project orientations as well as led in engaging the ARCs and LGUs in the formulation and/or refinement of ARC Development Plans (ARCDPs). For RI, the Project development team composed of various sector specialists and CDOs supported the LGU local project office (LPO) in developing subprojects. Meanwhile, the SMT engineers coached the LPOs in completing the pre-engineering works, including the preparation and review of the detailed engineering design and program of works required for each subproject. The CDOs facilitated the submission of certificates and other related documentary requirements. The environment and social safeguard specialists provided technical assistance in completing the environment and social safeguard compliance, including the certificate of non-coverage   from  the  DENR’s  EIS  system  and   the  certificate  of  non-overlap of ARCs to ancestral domain claims issued by the Office of the Southern Cultural Communities (OSCC). The economist provided guidance in the economic feasibility assessment of the various subprojects. The SMT Procurement and Financial Management Specialist extended an individualized and hands-on approach to procurement and financial management training that resulted in the acceleration of procurement activities and contracting beginning in the second semester of 2012. As can be inferred from Figure 3.1, the pattern of staff deployment followed the changing needs  of   the  SMT’s   key  partners  on   the  ground.   For   instance,   in   the  early   stages  of   SMT’s  operations where Project orientations and initial engagements at the LGU level were in full swing, the deployment of CDOs, the frontline staff of SMT, reached a maximum number of nine persons, spread across the five provinces of ARMM. These CDOs were tasked to: (1) orient the local chief executives (LCEs) and other members of the LGUs on the components, features and requirements of the Project; (2) initiate and facilitate the various ARC planning sessions; (3) facilitate the identification and development of comprehensive rural and community infrastructure subprojects for subproject approval; (4) assist in the community

Page 24: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 9 | P a g e

and enterprise development activities of the ARCs; and (5) constantly liaise with the various DAR and ARMM offices involved in the Project (i.e., DARPOs, DAR-ARMM, DENR-ARMM). The nine CDOs were guided and assisted by two CDD Coordinators/Specialists, one assigned to cover the mainland provinces and the other, the islands. As the maximum number of ARCs and LGUs were already engaged and participating in the Project by early 2013 and as the RI subproject development began to taper for various reasons2, by design, the CDOs were gradually reduced while more engineers were hired, both on full-time and on output basis. This change in SMT staff deployment in mid-2013 mirrored the transition from a focus on CDD in the early stages of the Project to RI and financial coaching and monitoring as the ARCs identified and implemented subprojects. By the second half of 2013, the SMT Specialists remained as lead in the areas of financial management, procurement, agri-business development, agri-financing and investment linkages, subproject implementation and monitoring, subproject development and packaging, and were directly coordinating with the RPO, DAR Provincial Offices (DARPOs) and LGUs. The engineers assisted the LGUs in developing new RI subprojects and supported them in construction supervision and monitoring. Both the SMT engineers and economist were tasked to assist their respective counterparts at the regional, provincial and municipal LGU levels on subproject development and monitoring. The Procurement and Financial Management Specialist supported and capacitate the RPO, DARPOs and LGUs on procuring and contracting services for the completion of the subprojects, as well as on the financial documentation that was required for the implementation, monitoring and reporting of the approved subprojects.

Figure 3.2 Summary of SMT Staff Deployment by Category and Office Posting (December 2012)

2It was observed by the SMT and then DAR-ARMM Secretary Sajili that a typical ARMM LGU, given its financial limitations, could only fund one major RI subproject and a few small community infrastructure. The expansion of the Project areas to include other ARMM ARCs/LGUs was then considered as a strategy to increase RI performance. As early as mid-2012, SMT appealed to ARCP II management to allow it to include other ARCs/LGUs (i.e., Barira, Buldon, Paglat, Wao, Upi, Sultan Mastura, etc).

1 11

5

25

1

1

5

3

0

1

2

3

4

5

6

7

8

9

10

Cotabato City Davao City Quezon City Zamboanga City

Post

No

of P

erso

ns

Management Technical/ Specialist Admin/ Finance CDOs

Page 25: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 10 | P a g e

The number of staff deployed in SMT offices in the key cities of Cotabato, Davao and Zamboanga was at its highest in December 2012. The most number of staff were posted in the SMT office in Zamboanga City to cover the island provinces of Basilan, Sulu and Tawi-Tawi (Basulta). This was at a time when RI subprojects from Basulta started pouring in, hence the high number of Technical Staff/Specialists (RI Engineers) posted in that office. Cotabato City had the most number of CDOs primarily because there were ten target LGUs in Maguindanao; the other four ARMM provinces had only five LGUs each. Davao City, which served as the center of operations of SMT in Mindanao, was the base of the SMT Area Manager/Team Leader and a significant number of Technical Staff/Specialists in AED, local governance, and IT. The Quezon City office served as the main liaison office to DAR and national offices and the base of the OIDCI-HFI Joint Venture, SMT Managing Director (also the Regional Project Management Advisor), Finance and Procurement Specialist, and Economist.

3.2 Structure and Relationships Central  to  the  achievement  of  the  SMT’s  deliverables and Project objectives in ARMM is the interdependent execution of activities and strong coordination between the SMT and DAR-ARMM. However, this had been particularly challenging for the SMT because DAR-ARMM, since the inception of SMT, has had five changes in Regional Secretaries. With each change of Regional Secretary, the SMT has had to orient the new leadership, as well as their respective staff on the Project and its status, and establish new Project strategies and agreements. In response to DAR-ARMM’s  petition and in cognizance of the emerging need to delineate the roles and responsibilities of participating agencies and offices at the project implementation level, especially nuanced into the unique governance identity of the offices in ARMM, the SMT initiated an ongoing dialogue with the national and local DAR offices. As a result, the overall Project implementation structure/framework was agreed upon between DAR-NPCO and DAR-ARMM in early 2013 as illustrated in Figure 3.3. The SMT directly reported to the Regional Secretary of DAR-ARMM, who is also the Regional Project Manager. Parallel reporting to and coordination with the Provincial Project Manager was also carried out by the SMT.

Page 26: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 11 | P a g e

Figure 3.3 ARCP II ARMM Implementation and Management Structure

Page 27: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 12 | P a g e

4.0 Accomplishments

4.1 Community-Driven Development

4.1.1 ARC Planning and Project Development The SMT strongly adopted the ARCP II’s community development approach anchored on a strong and dynamic participation of ARCs in the analysis of community priorities and in the development and implementation of subprojects. The fundamental step in ensuring community participation in ARC development was through the formulation or review of ARCDPs. SMT innovated and developed a methodology for community participation in ARC development planning and in subproject prioritizing. Utilizing the aptly-called Strategic Participatory Planning Process (SPPP) module, the SMT in  tandem  with  the  DAR’s  Municipal Agrarian Reform Officer (MARO) and Development Facilitators (DF) commenced ARC community work through the review and validation of community concerns, leading to the formulation of strategic priorities in the ARCDP. Due largely to the surge in the partner-ARCs brought by the intensive Project expansion during the mid-2014 RPO-led Roadshow, the SMT was able to assist more than the targeted 30 ARCs. By  the  end  of  SMT’s  contract, the Project had concrete engagement in 44 ARCs in 43 LGUs. The distribution of ARCs and LGUs assisted per province is presented in Table 4.1. The SMT was actually able to support 59 ARCs in 56 LGUs in the review or formulation of their ARCDPs but 15 ARCs did not pursue subproject development for funding assistance from ARCP II. The LGUs covering these ARCs voluntary dropped from the list principally because of limited capability to raise the required project equity.

Table 4.1 Distribution of ARCs and LGUs Assisted in ARC Planning and Project Development

Province No of LGUS

No of ARCS Remarks

Maguindanao 6 6 Does not include the 7 ARCs in Datu Odin Sinsuat, Datu Saudi, Talayan, Gen. SK Pendatun, Sultan sa Barongis, Paglat and Pagalungan

Lanao del Sur 16 16 Does not include the ARC in Wao Basilan 6 6 Does not include the other ARC in Lamitan, 2 other ARCS in Sumisip

and the ARC in Lantawan Sulu 8 8 Does not include the ARC in Baguingui (formerly Tongkil) Tawi-Tawi 7 8 Does not include the 2 ARCs in Panglima Sugala and Languyan Total 43 44 Additional 15 ARCs (in 13 LGUs) initially engaged by SMT but did not

translate into RI subprojects

Page 28: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 13 | P a g e

The SMT spearheaded the community-based planning exercises that enjoined the ARCs to be actively involved in crafting their respective development plans. The planning process started with  the  beneficiaries  coming  together  to  assess  the  community’s  problems  and  constraints,  its resources and development potentials, and subsequently identify and prioritize the projects and interventions needed to address them. Embodied in each ARCDP were the enterprise development options that the community can participate in and the support infrastructure that will propel the achievement of the desired outcomes. The SMT provided guidance in identifying the infrastructure subprojects using the ARCP II development framework. The 24 LGUs that were provided full assistance to formulate their ARCDPs are listed in Table 4.2. In LGUs where ARCDPs had already been formulated, the SMT organized and conducted the review and validation of the plans as part of the process for project prioritization. The review and validation culminated in the preparation of the priority rural infrastructure subprojects proposed by the LGUs and ARCs. SMT did not carry out any ARCDP formulation exercises for the LGUs comprising the expansion areas engaged by DAR in 2013.

Table 4.2 List of LGUs Assisted in their Agrarian Reform Community Development Plan

Province Assisted LGUs Maguindanao Datu Paglas

Kabuntalan Parang

Matanog Talayan Datu Abdulah Sangki

Lanao del Sur Marantao Poona Bayabao Bumbaran

Ganassi Tagoloan

Basilan Lamitan Sumisip Tipo-tipo

Ungkaya Pukan Maluso

Sulu Siasi Pandami

Maimbung Panamao

Tawi-Tawi Bongao Sibutu

Languyan Panglima Sugala

4.1.2 ARCDP Integration into LGU Plans After the completion of community-level planning, a critical activity in the CDD process was the mainstreaming of the community plans into formal LGU plans and investment programs. Technical guidance was provided to the LGU, particularly to the LPO and Local Finance committee, to ensure that the projects identified in the ARCDPs were incorporated into the LGU plans and prioritized in the Annual Investment Plans (AIP), which served as basis for LGU annual budgets. All these were carried out in close coordination with municipal planning officers and DAR, with some private sector and NGO involvement. Eventually, approved RI subprojects proposed under ARCP II were provided counterpart funds by the LGUs.

Page 29: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 14 | P a g e

4.1.3 Support to LGU-ARC Clusters In an effort to facilitate ARC cluster development in the ARMM, the SMT promoted an innovation in the DAR strategy by involving existing LGU alliances in the ARMM. Three LGU clusters were mobilized for this purpose – the Southern Ligawasan Association of Municipalities (SLAM) and the Iranun Development Council (IDC) in Maguindanao, and the Wao-Bumbaran cluster in Lanao del Sur. At the start of the cluster development process, the SMT facilitated a workshop in the last quarter of 2012 with the concerned LGUs focusing on the role of the LGUs in ARC development. The LGU alliance approach would have served as a model for undertaking integrated community development anchored on a road project traversing the partner LGUs. By the end of the workshop, the LGU clusters agreed to pursue an integrated area development process with ARCP II as a core program, particularly in the development of rural infrastructure and agriculture. Cluster planning and prioritization activities were conducted following the consultations. Site validation of the identified access roads was undertaken. These initiatives, however, were eventually deferred because of the huge equity requirement to pursue cluster projects and considering that each of the individual LGUs were also pursuing their individual projects. Initially, it was agreed that the needed equity would be divided equally among the LGU cluster members. In the first quarter of 2014, the NPCO continued the process of cluster development with the LGUs involving the SLAM, IDC and the Unayan Cluster in Lanao del Sur. An ARC cluster development plan is currently being formulated with NPCO as facilitator.

4.1.4 Strengthening LGU Governance through the PBGS LGUs were encouraged to participate in the Performance-Based Grants System (PBGS) not only as an avenue to attain good governance but also to benefit from the fund that can ease the cash equity requirement under ARCP II. Compliance to PBGS requirements had been challenging and this was more so in ARMM. SMT conducted consultations, orientation and coaching to potential LGU participants. Subsequently, several LGU partners signified their intent to participate in PBGS and initiated the compilation of documents to support their application. Eleven LGUs submitted initial pre-qualification documents. But until the end of June 2014, none of the LGUs in ARMM was able to submit complete PBGS documentary requirements; hence, none was awarded PBGS support.

Table 4.3 List of LGUs with Initial PBGS Documentary Submissions

Province LGU Maguindanao Datu Paglas

Kabuntalan Lanao del Sur Bumbaran

Ganassi Poona Bayabao Tagoloan

Basilan Lamitan Maluso Sumisip Tipo-tipo Ungkaya Pukan

Sulu Maimbung Pandami Panamao

Tawi-Tawi Bongao

Page 30: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 15 | P a g e

At the onset, the SMT recognized that PBGS guidelines were not responsive to the unique socio-cultural conditions and governance make-up of ARMM. Thus, upon  SMT’s  inception,  an  inventory was conducted involving the 30 partner LGUs to determine their current level of compliance with existing PBGS guidelines. Initial results showed that less than 15% of the LGUs can fully comply with the enrolment requirements and the minimum conditions for capital and capacity development grants. The SMT, with support of DAR-ARMM and NPCO, then initiated a dialogue with the LGUs, the League of Municipalities and the MDFO on customizing the PBGS guidelines in the context of ARMM.3 The proposal was for a graduated or phased-in approach for the ARMM LGUs to demonstrate improvement in accomplishing PBGS performance measures (Annex 3). The PBGS Technical Committee eventually ruled out any special modification for the ARMM LGUs. This was deemed unfortunate since the purpose of the PBGS was to provide an incentive to LGUs to improve their governance performance and the Project had bannered the PBGS as an incentive scheme to attract the participation of covered municipalities.

4.1.5 Strengthening LGU Participation in Rural Infrastructure The LGUs’ role in subproject development and implementation is crucial to the successful completion of the RI component. Under ARCP II, LGUs are expected to support the infrastructure support needs of ARCs from project development and procurement to implementation and final turnover. SMT’s  commitment was to equip the LGUs’  LPO  with the necessary knowledge and skills to perform their assigned tasks. With the DAR-ARMM Regional and Provincial Offices, SMT engineers and specialists conducted coaching and mentoring on the requisites for every stage of the RI process: project development, procurement, implementation and monitoring. Capability building included formal training on environmental compliance, financial management and infrastructure quality monitoring and durability system (IQMDS). Follow-on one-on-one sessions were held with the municipal accountants, engineers, and other LPO members. A focus area of the technical assistance to LGUs was the procurement process and documentary compliance as these were persistent bottlenecks to completing the contracting process. In 2012, lecture-type procurement and contract management orientations were done almost quarterly with several LGUs in attendance while one-on-one on-site coaching sessions were conducted for each LGU quarterly. In 2013 and 2014, however, only three lecture-type, multiple-LGU orientations were conducted while one-on-one on-site coaching sessions were intensified and became more frequent, averaging 60 times per annum per LGU or five times per month. As a result of these efforts, the LGUs became more knowledgeable of procurement criteria and financial reporting procedures and requirements and have started complying with these.

3 Essentially hinged on three governance parameters: (1) to strengthen existing national and local (regional and provincial, city and municipal LGUs) initiatives and mechanisms for promoting local autonomy, performance management, participation, transparency and accountability; (2) to link and synchronize performance such as health, education, peace, etc.; and (3) to promote and sustain local peace initiatives and incentives to ARMM governance reform initiatives (social economic development, governance, peace and security) and to ensure convergence of rural infrastructure projects with other sectoral projects (Refer to PBGS Guidelines for ARMM).

Page 31: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 16 | P a g e

Also part of the effort to strengthen LGU participation in the RI component is the mobilization of equity counterpart to augment LGUs’   resources.   A   major   source   of  counterpart particularly for mainland ARCs and LGUs is the WFP. SMT facilitated the involvement of the WFP in the project development process to efficiently maximize its counterpart in certain areas. Please refer to the section on Project Management in this report for a more detailed discussion.

4.2 Agricultural Enterprise Development The AED component was a vital element of ARCP II. Through this component, the productivity and profitability of various agricultural commodities were to be improved, market linkages established and access to rural finance provided. These are critical in ensuring that land tenure improvements will be sustainable. This component, however, had no funding to support actual agri-enterprise development. A significant part of the AED funding allocation was earmarked for the subdivision of land titles to individual ARBs, a task that was definitely outside the scope   of   SMT’s  services. Given this limitation, the SMT focused on activities that mobilized various stakeholders and third party support to help achieve AED objectives.

4.2.1 Improving ARC Productivity

Support to ARCCESS The SMT supported DAR-ARMM in designing and preparing proposals for the ARBOs under the ARCCESS program of DAR. For this purpose, the SMT sponsored a training in February 2012 for ARCCESS project development participated by DAR-ARMM and NPCO. The ARCCESS project proposals were intended for implementation in each legislative district of the five ARMM provinces. These included the following:

a. Lanao del Sur Taliogon ARC, Ganassi – Common service facility (CSF) for corn production enhancement Bumbaran ARC, Bumbaran – Mechanized rice and corn production and marketing SAKUDO ARC, Marantao - Mechanized rice and corn production and marketing OISCA ARC, Poona Bayabao - Mechanized rice and corn production and marketing

b. Maguindanao

Bunawan ARC, Datu Paglas – CSF support for integrated rice-duck enterprise Matilak ARC, Kabuntalan – CSF for rice production United Timbangan ARC, Parang – CSF for rice and corn enterprise

Page 32: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 17 | P a g e

c. Basilan SCARBIDC, Lamitan – CSF for rubber production and trucking facility MARBEDCO, Sumisip – Farm tractor TIPARBECO, Ungkaya Pukan – CSF for rubber production and trucking facility TARBADECO, Tipo-tipo – CSF for rubber production and trucking facility

d. Sulu

Gulangan Farmers Association, Maimbung – CSF for cassava production and marketing People’s  Alliance  for  Progress  MPC,  Panamao  – CSF for coffee production and marketing

e. Tawi-Tawi

Tandubanak ARC and Tongehat ARC, Sibutu – Provision of support facilities for mariculture The common service facilities (CSFs) requested by the ARCs were eventually procured by DAR ARCCESS and have been distributed to the concerned ARCs as of April 2013. To prepare the respective ARBOs for the operations and management of the CSFs, the SMT provided technical and management training support to the recipient ARBOs, particularly for the formulation of operating policies and guidelines for CSF management. The SMT was also no longer involved in subsequent activities related to the implementation of ARCCESS projects in ARCP II communities in ARMM.

AED Planning To ensure that the LGUs were onboard and supportive of the respective AED initiatives of ARBs, an integrative planning process for AED was conducted in March and April 2013 with the  intent  of  identifying  and  initiating    “Localized”  AED  (or  LAED)  priorities  and  activities  for  each of the LGUs, ARCs and ARBOs, especially those with approved RI subprojects. Representatives of ARCs, the DARPOs and the RPO participated in the planning activity. Inputs were provided by leading businesses and investors in Mindanao, Land Bank of the Philippines, Development Bank of the Philippines and regional agencies involved in the promotion of economic development. As a result of the planning, the SMT recommended to DAR-ARMM a two-pronged approach in the AED development for the ARCs in ARMM. The first approach is the pursuit of the food security track in AED development with rice and corn farming as anchors. This track is to be undertaken with support from the regional Department of Agriculture and Food. For this purpose, the SMT arranged several follow through meetings between the DA and RPO to roll-out the strategy with specific project proposal to be initiated by DARPOs on behalf of the ARBOs. The second approach is the exploration of strategic agriculture and investment opportunities in the ARCs through investment mobilization and partnership with the private sector. This strategy yielded partnerships between the ARCs in Lamitan, Basilan and Poona Bayabao, Lanao del Sur and the Kennemer Foods Inc. (KFI) for cacao production and marketing. Other areas for investment explored by the SMT were in banana, rubber, and palm oil.

Page 33: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 18 | P a g e

Technical Assistance and Training As strategy to improve productivity, the SMT initiated cross-learning activities in March 2013, particularly for rice- and corn-farming ARCs from Maguindanao and Lanao del Sur to areas and institutions that promote organic agriculture technology. Nine ARBOs as well as the AED specialists and key staff from the RPO and DARPO Maguindanao and Lanao del Sur visited the Don Bosco Organic Center in Makilala. The Center introduced to the ARBOs and DAR-ARMM practices relating to organic rice production, livestock production, rubber plantation development, vegetable production and export banana production technologies. The Center is currently exporting black rice to the Middle East and Hong Kong. The ARBOs and DARPOs were also introduced and exposed to the sustainable agriculture initiatives of LGU Magsaysay in Davao del Sur. The participants were given an orientation on the approaches and strategies on local agriculture planning, particularly in organic rice production, rubber plantation and livestock development. Also introduced to the ARMM ARBOs were the importance of a partnership between the LGU and local cooperatives in achieving sustainable agriculture objectives. The ARBOs and DARPO were introduced and linked to a small but progressive community in Braulio Dujali municipality in Davao del Norte. The municipality has produced national awardees in sustainable and integrated agriculture production (rice, banana and inland fishery). The municipality highlighted how it transformed communities into productive centers despite being vulnerable to perennial flooding and other natural disasters. All the inputs and learning received by the ARBOs and the DARPOs were integrated into the list of priorities identified by the ARBOs and LGUs for implementation within the year.

4.2.2 Financial Linkages for ARBOs With the identified AED priorities, the SMT indicated in early 2013 the areas of support and resources it will provide for their implementation. On top of the list is securing support from financial institutions mandated to provide financial and credit assistance to ARCs. The SMT invited the Land Bank of the Philippines (LBP) and the Development Bank of the Philippines (DBP) to share with the ARBOs their respective programs that can be accessed by the communities. Presented were the processes and requirements for accessing the funding and credit programs of the banks, including the priority industries. In addition, the SMT invited the Agriculture Credit Support Program (ACSP), a credit program funded by the Japan International Cooperation Agency (JICA) and implemented through LBP, to present its programs to the ARBOs. Signifying their intention to access the credit programs, the ARBOs proposed to hold community-level consultation with all their members to deliberate on who may avail of the financial services. The ARBOs requested for other modalities of financial assistance as interest-bearing credit is prohibited in Muslim communities. During the first quarter of 2014, the ARBO OISCA (Organization for Industrial, Spiritual and Cultural Advancement) in Poona Bayabao in Lanao del Sur (170 members) filed a loan application with the LBP-Agricultural Production Credit Program (APCP) for PhP125 million to fund its five-year 2,500-hectare development plan. The initial request of OISCA was for PhP25

Page 34: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 19 | P a g e

million to cover 500 hectares. The LARBECO ARC in Lamitan likewise filed a loan application with LBP Zamboanga City.

4.2.3 Investment Promotion in ARCs As a strategy to strengthen the institutional linkage of the ARCs with the private and business sector to provide the necessary impetus for AED at the local level, the SMT engaged the participation of key partners, both from the public and private sectors as potential investors in the ARCs covered by ARCP II. Potential private sector partners include the Unifrutti, GrainPro, Mars, Kennemer Foods International (KFI), and Development Finance International, Inc. As a result of these consultations and linkage-building effort, three ARCs have signified their intent to partner with the KFI for cacao production. These communities are in Datu Paglas in Maguindanao with some 20 hectares of cacao plantation; Poona Bayabao in Lanao del Sur with 50 hectares; and LARBECO ARC in Lamitan, Basilan with at least 300 hectares. By the end of 2013, the ARBO in Datu Paglas had signed a production and marketing agreement with KFI for the production of cacao. The ARBO OISCA in Poona Bayabao in Lanao del Sur and LARBECO are waiting for the approval of their loan applications with LBP. Recently, the SMT also coordinated the linkage between the RPO, on behalf of the ARCs, and the Franklin Baker Oil Milling Company for coconut trading. Franklin Baker will provide both technical and financial assistance to organized communities in the trading and marketing of coconut at an agreed competitive price. It will provide ARBOs with capital funds for their coconut buy and sell business, and capacity support assistance to strengthen their business management capabilities.

4.3 Rural Infrastructure In September 2011, ARCP II in ARMM only had four LGUs participating in the RI component with six approved subprojects worth PhP56.8 million and loan proceeds of PhP22.9 million. With the support of the SMT over a three-year period, the project extensively improved its performance. By the end of the second quarter of 2014, the number of participating LGUs with approved subprojects has risen to 43 with 132 approved subprojects worth PhP2.4 billion and loan proceeds of PhP1.1 billion. The list of approved subprojects is shown in Annex 1. As designed, one of the major outputs of this Project is the construction of support infrastructure that is expected to trigger economic development in the area, trickling down to the communities and ultimately improving their well-being. The most dominant type of support infrastructure selected by LGUs is farm-to-market

Page 35: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 20 | P a g e

road (FMR). By the end of the second quarter of 2014, the Project covered 32.5% of the targeted 823 kilometers of FMRs or rural roads. The rate of accomplishment as of mid-2014 for the rest of the targeted rural infrastructure is presented in Table 4.4.

Table 4.4 Summary of RI Accomplishments (as of June 2014)

Key Investment Indicators Unit Targets Accomplishment (Approved Subprojects)

Rural Roads Km 823 267.49 Bridges Lm 923 30.00 Flood Protection Works Lm 1,767 - Communal Irrigation Facilities Ha 5,288 4.00 Solar Dryers* unit 34 30 Warehouses unit 20 8 Potable water system unit 214 4 Public building unit n/a 54 *Includes multi-purpose pavements (MPPs), multi-purpose buildings with solar dryers (MPB+SD), and warehouse with solar dryers (WHSD), or combinations thereof. To date, of the total 132 approved subprojects in ARMM, three subprojects amounting to PhP32.9 million (US$733,0004) have been completed in Panamao, Sulu, Tipo-tipo, Basilan and Sibutu, Tawi-Tawi (see Box 1 in page 23). The remaining 109 subprojects are in the various stages of construction or procurement (Table 4.5), including the Tamburong-Bunawan FMR which is now 60% complete (see Box 2 in page 24). The rest of the subprojects (20) are either for NSAC re-approval, confirmation for continuation by the LGUs, awaiting availability of OFID funds, or for delisting. The three subprojects marked for delisting are those that the LGU opted to be financed by other donors that require smaller equity.

Table 4.5 Status of Approved Subprojects (as of June 30, 2014)a

Status No. of SPS

% of SPS

Approved Subproject Cost/As Bid Cost Loan Proceeds LGU Equity Total

Completed 3 2% 13,438,281.83 19,508,960.15 32,947,241.97 With on-going construction (50 - 99% physical accomplishment) 18 14% 101,357,104.82 124,002,806.48 225,359,911.29

With on-going construction (25% - 49% physical accomplishment) 4 3% 65,968,801.06 89,891,494.79 155,860,295.85

With on-going construction (less than 25% physical accomplishment) 7 5% 83,447,004.36 155,062,177.41 238,509,181.76

SPs with NOL to Award Issued-for Contracting (As Bid POW) 5 4% 2,805,132.44 4,045,770.56 6,850,903.01

On various stages of the procurement process 56 42% 404,740,500.85 423,666,836.74 828,407,337.66

For re-bidding 9 7% 153,018,769.26 153,018,769.26 306,037,538.54 With NAPA but without advertisement 10 8% 116,643,591.76 118,388,390.87 235,031,982.64

For NSAC re-approval 4 3% 52,871,118.30 52,871,118.30 105,742,236.60 For confirmation with LGU 11 8% 85,927,316.06 85,927,316.06 171,854,632.15 For delisting 3 2% 13,947,647.03 32,544,451.22 46,492,098.25 Approved but subject to availability of OFID funds 2 2% 38,324,614.41 38,324,614.41 76,649,228.81

132 100% 1,132,489,882.16 1,297,252,706.24 2,429,742,588.53

4At PhP44.974 : US$ 1.00 exchange rate

Page 36: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 21 | P a g e

By the end of June 2014, there were 32 subprojects with ongoing implementation. Loan proceeds have been released to 25 subprojects. From the amount of loan proceeds transferred to the accounts of the local governments, the reported cumulative disbursement as of end of the second quarter of 2014 was PhP58 million (US$1.3 million) and another PhP15.8 million (US$352,061) in disbursements are in process, making the total disbursements on the loan proceeds PhP74 million (US$1.64 million). It is noted that disbursements by the LGUs have exceeded the LP releases by 16%. Table 4.6 shows the status of LP fund releases and disbursements.

Table 4.6 LP Fund Releases and Disbursement (as of 30 June 2014)

Status No. of Subprojects

Amount PhP US$*

Total LP Releases 25 63,804,430.55 1,418,695.93 LP Disbursement submitted to NPCO/MDFO (SORD) 11 58,144,450.63 1,292,845.88 LP Disbursement for submission to NPCO 15 15,833,604.65 352,061.29 Total Disbursement as of June 30, 2014 23 73,978,055.28 1,644,907.17 *At PhP44.974: US$1.00 exchange rate Of the US$1.64 million in actual subproject disbursements, US$135,000 (8%) has been reflected as official OFID disbursement as of 6 March 2014. The actual disbursements (US$1.64 million) of the OFID fund for rural infrastructure in ARMM stand at 5.5% of the target US$30 million.

Figure 4.1 Number of Approved Rural Infrastructure Subprojects, per Semester (2010-2014)

- - - 1 6 4 2

9

-1

- - 1

3 9

26

11

- - -1

5 3

4

- - 1

4

1 4

4

15 2

1

12

-

5

10

15

20

25

30

35

40

45

Jan-Jun Jul-Dec Jan-Jun Jul-Dec Jan-Jun Jul-Dec Jan-Jun Jul-Dec Jan-Jun

2010 2011 2012 2013 2014

No

of S

Ps

Maguindanao Lanao del Sur Basilan Sulu Tawi-Tawi

Inception of NGALGU (Sept 2011)

Inception of ARCP II Expansion Sites & ARCP II Roadshow

(mid-2013)

Page 37: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 22 | P a g e

RI subproject approvals increased upon entry of the SMT in July 2011, as illustrated in Figure 4.1 and 4.2. The pace of subproject approval gradually improved and significantly picked up in 2012. The influx of subprojects was facilitated  by  SMT’s  extensive  efforts  in  promoting  the  Project and convincing LGUs to pursue RI subproject development. This was further enhanced by the introduction of the National Government Assistance to Local Government Units (NGALGU) for RI Development from the Office of the President (effective September 2011), which started implementation at the tail end of the first quarter of 2012. This revived the participation and commitment of the LGUs, which had been lukewarm in 2010. In 2013, the existing SMT sites appeared unable to support additional subprojects primarily due to equity constraints. As early as 2012, SMT had anticipated the situation and indicated this in its reports, requesting for the consideration of additional LGUs (and ARCs) for inclusion into the Project. It was only in 2013 that site expansion, through a NPCO and RPO-led Roadshow, was realized. A change in the policy on subproject cost-sharing coincided with the expansion, resulting in an upsurge in subproject proposals and the number and value of approved subprojects from new LGUs and ARCs. In mid-2013, the ARCP II to LGU equity ratio was brought down to 50:50. Before this, the LGU equity was always higher than the loan component. In fact, in the second half of 2012, the LGU share on the approved SPs from ARMM was 85% higher than the ARCP II contribution. On average, the actual cost-sharing between ARCP II and the LGU before 2013 was 31:59. The belated expansion of the Project areas meant that majority of the SPs were approved only in 2013 and most SPs entered the procurement stage only recently. They are expected to be issued contract awards and construction can only commence within the latter half of 2014.

Figure 4.2 Value of Approved Rural Infrastructure Subprojects, per Semester (2010-2014)

44.51 0

12.85

189.73

367.63

265.11

30.73

1,064.56

377.97

-

200

400

600

800

1,000

1,200

Jan-Jun Jul-Dec Jan-Jun Jul-Dec Jan-Jun Jul-Dec Jan-Jun Jul-Dec Jan-Jun

Tota

l SP

Cost

(PhP

mill

ions

)

ARCP II LGU Equity

Inception of NGALGU (Sep 2011)

Inception of ARCP II Expansion Sites & ARCP

II Roadshow (mid-2013)

Page 38: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 23 | P a g e

Time Motion Analysis from Project Development to Procurement to Implementation Moving the approved subprojects to procurement and to implementation took longer than designed. On average, it took at least six months to complete a project contract and its various support documents. Signing a contract does not signify the start of actual project implementation; LGUs still had to wait for fund transfer from Loan Proceeds and NGALGU before project contractors mobilize equipment and start construction. In most cases, fund transfer took longer than six months. A host of factors outside the control of the SMT contributed to the slow process of implementation. Foremost is the limited capacity of the LGUs to manage the procurement process prescribed in the procurement law (RA 9184) that often led to a lack in transparency in procurement-related dealings and processes.

TARBADECO and TIPARBECO FMRs provide better access to rubber plantations Rubber is a major industry in the island province of Basilan and its communities. Large tracks of rubber plantation formerly owned and managed by multi-national companies have been subjected to CARP and were distributed to agrarian reform beneficiaries. The beneficiaries have organized into cooperatives for them to collectively manage and run the CARP-covered lands as plantation areas. Among the major cooperatives in the province are the TARBADECO in Tipo-Tipo and TIPARBECO in Ungkaya Pukan. These cooperatives are the major beneficiaries of the farm-to-market road constructed by the respective local government units with assistance from the ARCP II. In Tipo-Tipo municipality, the 4.7 km TARBADECO FMR network traverses four barangays namely: barangay TIpo-Tipo proper, Magkaaw, Limbu-pas and Guinanta. Total project cost is Php32 million. Now fully completed, the road provides direct access to 555 household of the ARC (population: 4,609), of which 107 households are agrarian reform beneficiaries. In Ungkaya Pukan, concreting of the 4.0 km Phil-Am Buhepahu FMR will benefit the members of TIPARBECO particularly the 154 agrarian reform beneficiaries. The road connects the ARC’s   rubber plantation in Barangay Cabangalan and Buhe-Pahu. The completed road amounted to P35 million. Both the Tipo-tipo and Ungkaya Pukan FMR projects allows the ARBs to haul rubber cup lumps from the rubber plantations to the processing centers in the province faster and at lesser cost. Both roads directly link the communities to the Basilan circumferential road, the main road network in the province.

Page 39: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 24 | P a g e

Tamburong-Bunawan farm-to-market road project: Emerging results The Bunawan Agrarian Reform Community and its surrounding communities are already benefitting from the concretized six-kilometer Tamburong-Bunawan farm-to-market road in Datu Paglas. The road project was implemented and funded by the municipal government of Datu Paglas, Maguindanao with support from ARCP II. The Tamburong-Bunawan FMR is a strategic road project for the Bunawan ARC as it connects the ARC to the Makilala-Tacurong City Highway that leads to Davao City in the west and to the cities of Tacurong, Koronadal and General Santos in the east. Apart from 282 ARBs and three barangays comprising the Bunawan ARC, the road also benefits the interior communities of Tulunan, North Cotabato and Columbio, Sultan Kudarat as it serves as an alternative road connecting these communities to Datu Paglas. Mayor Mohamad Paglas, Sr. noted increased traffic and heightened community activities even while the road concreting project was still underway. The Bunawan ARC primarily produces rice and corn in 490 hectares of farm lands, supplying 30% or 15,400 kilograms of the total annual production volume for these crops in Datu Paglas. They also produce mongo, banana, and coconut. The new FMR has reduced the cost of transporting their produce to the markets; more public transport services now ply the Bunawan road. Moreover, community access to basic social services such as education, health and social welfare has also improved with the completion of the road project.

Page 40: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 25 | P a g e

4.4 Project Management The SMT was organized to provide technical assistance in operationalizing the CDD, AED, and RI components. As an additional resource for the ARCP II implementation in ARMM, the SMT worked with all three levels of the Project’s  organizational  structure  –NPCO, DAR-ARMM and the DARPOs.

4.4.1 Systems, Skills and Knowledge Sharing with the ARMM Team The SMT instituted an internal monitoring system to track the status of the SPs from project development to project approval. The monitoring system served as reference with which the NPCO and DAR-ARMM management were regularly apprised and engaged in dialogue on project implementation concerns. As the system provided the status of each subproject at a given time, necessary follow-through support needed from the NPCO and RPO was immediately conveyed. Apart from regular meetings and dialogue with NPCO and DAR-ARMM, the SMT had conducted regular updating and discussion with the DARPOs to update the Provincial Agrarian Reform Officers (PAROs) and resolve certain operational issues. During the first semester of the project, management systems and processes were developed and implemented by the Team. Among these were:

1. Project Finance and Administration Guidelines The guidelines covered the administrative and financial operations of the Project. It provided the rules regarding attendance and submission of timesheets, travels, cash advances and liquidation, monthly reporting, staff hiring, and performance incentives. It also included protocols and procedures for communication within and outside of the SMT. Internal meetings were held with members of the Team in Davao City, Cotabato City and Zamboanga City to clearly explain the objectives and goals of the Project and lay down the rules of engagement for the Team. 2. Project Performance Monitoring System The Project Performance Monitoring System (PPMS) is an integrated planning, monitoring and evaluation system that was adopted by the SMT to cover the processes in project planning, monitoring and reporting. The system is closely linked to the SMT performance reporting to the NPCO and ADB. The system was developed as an on-line system for easy access by all members of the team. Project specialists and CDOs fill up data capture forms periodically to record their activities and accomplishments.

The PPMS was introduced to the DAR NPCO in early 2011 so it will have an appreciation of the SMT system. The possibility of linking the PPMS with the NPCO Project M&E system, Performance-based Rural Infrastructure Subproject Monitoring (PRISM) System, which in early 2012 was being developed by NPCO, was also explored. Initial exchanges between NPCO’s  M and E staff and SMT’s IT Specialist on possible collaboration were held, such as the SMT extending advisory services in developing PRISM. The initiative unfortunately did not prosper.

Page 41: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 26 | P a g e

Apart from building management systems, the SMT productively engaged other key agencies and the ADB to keep them abreast of the developments in the project and to leverage resources, especially for AED and RI. Various consultation workshops and meetings were conducted with key government agency partners that included DOF, DBM, OPAPP, and DILG from 2011 to 2012. The consultations were conducted for the purpose of mobilizing resources to augment the equity requirement of the LGUs that stood at a minimum of 50% during this period. Frequent turn-over in the DAR-ARMM leadership, however, caused delays in some field activities particularly in relation to project communication and coordination, which affected implementation of Project components. The new leadership had to be oriented on the Project,   the   nature   of   the   SMT’s   role   under   a   performance-based contract, and its status; SMT often had to adjust and/or adopt new project management approaches to accommodate the changes in the leadership. The re-organization of the Regional Project Office (RPO) and subsequent strengthening of the Regional Subproject Approval Committee (RSAC) facilitated in providing more focus to DAR-ARMM operations. During the period April-June 2012, the RPO facilitated the meeting of the RSAC that paved the way for the approval of 16 community-level subprojects in that quarter. An additional 12 community-level subprojects were approved on October 2012. Various training sessions and mentoring activities of SMT provided the opportunity for the regional and provincial staff of DAR-ARMM and partner LGUs to acquire skills and knowledge on project implementation. Training and coaching activities were conducted on development planning, AED project proposal development, procurement, and financial management. Participants to these capacity-building interventions included planning officers, accounting and budget officers and staff, engineers and community development staff. Although the SMT contract only targeted 50 staff members, total training participants reached 532. About 39% of the participants were women, a proportion that is below the contract target of 50%. This is explained by the fact that the ARMM bureaucracy is dominated by males.

4.4.2 Engaging Network of Support, Mobilization of Resources and Policy Development

To support the LGUs’ and the ARCs’ compliance with the required equity in subprojects, the SMT undertook several policy, networking and partnership building initiatives. Apart from delivering its contractual obligations, the SMT envisioned the development of a model for multi-agency collaboration and complementation in rural development in a post-conflict context. Hence, the SMT endeavoured and explored numerous possible options and partnerships for the Project, DAR-ARMM and the LGUs to further local cooperation, especially in generating financial support for the Project. The  SMT,  with  DAR’s  support,  has been instrumental in sensitizing the decision makers to be open to policy adjustments.

Study and Policy Dialogue: Bridging the LGU Equity Gap At the start of SMT’s   operations, a policy paper highlighting the mismatch in the policy of requiring LGUs to put in project equity based on income class was prepared and distributed to regional and national policy makers (Annex 2 - LGU Equity Requirement for Agrarian Reform Communities Project II). Several meetings and dialogues were undertaken by the

Page 42: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 27 | P a g e

SMT and DAR NPCO with members of Congress (House of Representatives and Senate) for the purpose of amending the project equity policy and to generate more resources. At the regional level, SMT initiated discussions with the regional political leaders including the Regional Governor, the Vice Governor and the Regional Legislative Assembly (RLA) to discuss the policy and how the regional government could help the LGUs and ARCs implement the priority projects. Apart from technical and financial commitment, the regional government also endorsed a regional policy recommendation addressed to the DAR and NEDA for the review of the equity policy and called for the mobilization of financial resources to maximize the benefit of the OFID funds. The policy recommendation was initiated by the Regional Economic Development Policy Board (REDPB), the highest policy-making body of the regional government. All these initiatives supported the efforts of DAR in shaping project implementation policy that eventually contributed to the eventual suspension of the equity policy. In addition, SMT’s  study on the rationalization of the national government-local government cost sharing was used by DAR management in lobbying for national government support through access of the NGALGU, which provided for 25% national government funds from the Office of the President as counterpart to each of the approved subprojects.

Customizing the Performance-Based Grants System (PBGS) for ARMM With the imprimatur of the DILG, the SMT proposed, by way of a special study, the customization of the PBGS in ARMM (Annex 3 – Proposed PBGS Guidelines for ARMM ARCP II) according to the governance condition in most of the LGUs in ARMM. The proposal does not intend to lower the bar of governance standards required in the PBGS but rather to allow for lighter enrolment criteria in order to encourage more ARMM LGUs to participate in the program in the hope that the ARMM LGUs would be motivated to implement their governance performance contract and their respective subprojects as they look forward to the performance incentives.

Other Resource Mobilization Initiatives Coordination and discussion with national and regional agencies were undertaken to design integrated and complementary project implementation schemes with ARCP II, particularly those in common implementation areas. Efforts of the SMT to continue dialogue with the UN WFP resulted in the formalization of its commitment to fund the unskilled labor cost of agriculture-related RI subprojects in the ARMM provinces of Maguindanao and Lanao del Sur, through its Food-for-Work Program. This has resulted in the generation of PhP170 million in in-kind equity for 18 subprojects in 15 LGUs. Among the agencies engaged to help address the equity gap for LGUs were the Mindanao Committee of the House of Representatives, particularly the members from ARMM, the Office of Senator Teofisto Guingona III, the Transition and Investment Support Program under DILG, and the Office for the Presidential Adviser on the Peace Process (OPAPP). At the regional level, discussion meetings with the Office of the Regional Governor headed by Regional Governor Mujiv Hataman, DSWD-ARMM, DILG-ARMM, Regional Planning and Development Office (RPDO), among others, were also conducted to define possible

Page 43: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 28 | P a g e

collaboration activities with the end-view of reducing the equity requirements of the LGUs to the subprojects. No definitive results were generated in these activities but they were part of the task of exerting best efforts to achieve the targets and objectives of the Project.

4.4.3 Report Preparation and Conduct of Studies/ Policy Briefs The SMT prepared and submitted quarterly and annual reports containing the progress of activities, implementation strategies adopted in the field, and issues and operational concerns. Support to NPCO and DAR-ARMM was also provided during the conduct of ADB Missions. Substantial assistance was extended by the SMT to Project managers during project reviews and special ADB missions, particularly during the November-December 2012 ADB Project Review Mission and the September 2013 Joint ADB-OFID Review Mission. For the former, the SMT supported the NPCO and ADB through the formulation of a comprehensive issue paper on the status of Project implementation in ARMM (Annex 7). For the latter joint review mission, SMT assistance was extended to RPO (DAR-ARMM) through the review of Status of Rural Infrastructure Subproject Implementation in ARMM and Recommended Strategies (Annex 8), as well as by the overall facilitation of mission-related consultations in ARMM. The SMT likewise developed other special reports that were aimed at enhancing overall Project implementation, which included: 1. The ARMM ARCP II Capacity Development Plan In the first quarter of 2012, the ARMM ARCP II Capacity Development Plan (Annex 4) was formulated and submitted to the NPCO for review. This initiative also underscored the importance of considering capacity building as an integral component of the project and providing funds for its operationalization. The Plan was approved in principle by the NPCO through the office of the Undersecretary Jerry Pacturan. Unfortunately, due to the limitations   of   SMT’s   contract,   the   Capacity   Development   Plan   did   not   progress   to  implementation. The plan nonetheless remained as a reference for the SMT in engaging other stakeholders in ARMM, particularly in relation to capacity development and governance.

2. AED CapDev Study The AED CapDev Study/Plan (Annex 5) represented the aspirations of beneficiaries and their communities, and aligned perceptions and attitudes towards enhanced entrepreneurship as a means to maximize benefits from the lands awarded to them. The plan considered other resources provided to ARCs like the common service facilities under ARCCESS, and partnerships with relevant organizations (NGOs, CSOs, LGUs) and other development agencies. It takes off from the achievements under the CDD component and capitalizes on the organized community, strengthened ARBOs and formulated ARCDPs to further capacitate the ARCs on agri-enterprise development. Recommended approaches for AED development were put forward for DAR’s   consideration. Initially, the SMT spearheaded the implementation of focused intervention in cacao, coconut and industries, which were coordinated  with  ARMM’s  Department  of  Agriculture  and Food and WFP.

Page 44: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 29 | P a g e

3. Value Chain Analysis of the Coffee Industry in Sulu province The Value Chain Analysis of Coffee in Sulu (Annex 6) describes the full range of activities required to bring Sulu coffee through the different phases of production, processing and delivery to proposed final consumers. It was intended to support the coffee-producing ARCs under the Project, particularly the Panamao ARC in Sulu. The study was submitted to NPCO for dissemination. 4.5 Overall Summary of Accomplishments The following table summarizes the overall SMT accomplishments under this contract.

Description Target Units Accomplish ment Remarks % Cost

Enhanced Implementation of Community-Driven Development 100

ARC Planning linked to the Project 30 ARCs 26 Including 2 ARCs which participated in the initial planning activities through the SPPP

30

LGU Plans incorporated ARCs' plans linked to the Project 30 LGUs 23 30

LGUs participating in performance-based grant system (PBGS) 30 LGUs 11 10

LGUs get 20% refund of their equity contribution 30 LGUs 0 10

LGUs participation in RI component 30 LGUs 31 5 LGUs participation in AED component 30 LGUs 21 5

LGU/ARC staff (40% women) trained in planning 150 Persons 532 39% women 10

Improved Agriculture and Enterprise Development 100

ARCs participating in improving crop profitability 30 ARCs 25 This indicator is linked to the “Increased profitability of agricultural products”

5

Subdivided land titles to individual ARBs 22,000 hectares 0 40

ARBs/non-ARBs access to credit and savings facilities 3,000 households 545 15

Total agricultural investment to ARB/non-ARBs 3 US$ million 2.7 5

Increased profitability of agricultural products 15 % - 5

Direct beneficiaries (50% women) of AED 3,000 persons 3,355 Composed of unskilled labor and member beneficiaries of AED projects

15

Cooperatives/AED community-based organizations (CBOs) formed and strengthened

30 CBOs 18 18 groups organized; 7 registered/ trained

5

Registered members (50% women) of CBOs

3,000 members 26,592 8% women 10

Page 45: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 30 | P a g e

Description Target Units Accomplish ment Remarks % Cost

Sustained Rural Infrastructure Development

Rural Roads 823 kms 267.49 SPs approved Bridges 923 lms 30.00 SPs approved

Flood Protection Works 1,767 lms -

Communal Irrigation Facilities 5,288 hectares 4.00 SPs approved

Solar Driers 34 units 30 SPs approved

Warehouses 20 units 8 SPs approved

Potable Water System 214 units 4 SPs approved

Public building na units 54 SPs approved

69,000,000

< Subprojects | @unit cost = share per PhP1million SP cost >

per 1 PhP million

50,000

Strengthened and Capacitated Project Management 100

Satisfactory skill and knowledge sharing to the assigned government staff to work with the ARMM team (50% women)

50 staff 50

10

On time satisfactory completion of RI subprojects 100 %

Monitoring of completion of RI subprojects is subsumed by the indicator  “On  time  submission of quarterly and other  report”  

10

On time submission of quarterly and other reports 100 % 80

Quarterly Progress Reports 16 report 11 15

Annual Report 4 report 4 15

Special Report 2 40

Interim Report (Baseline Survey) 1 report 1 Baseline Study was replaced with “Interim  Report”

Impact Assessment 1 report

Special Studies 12 12 special studies including the Midterm Report

Project Completion Report (PCR) 1 report 1 30

Page 46: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 31 | P a g e

5.0 Major Issues and Challenges ARCP II Project Completion Date is currently set for December 2014. Going into the final stretch of the ARCP II implementation under the loan agreements between the Government, ADB and OFID, the Project is faced with a similar set of issues and concerns that hampered its operations from the onset. A number of key issues were addressed by DAR in 2011 that resulted in the resurgence of LGU interest in the Project. Among the measures adopted by the Project included the constitution of the SMT in July 2011 to help DAR-ARMM and the LGUs implement and manage the Project; the provision in late 2011 of considerable support from the NGALGU to lessen the burden of LGU counterpart equity requirement in 2012 and the continuous streamlining of project processes to rationalize project execution and related documentary requirements. After the Joint ADB-OFID project review mission in October 2013, the Project was opened up to other LGUs outside of the original coverage areas of LGUs and ARCs. For this, the equity policy was further relaxed at 50% LGU and 50% NG equity sharing. In an effort to further reduce the LGU equity burden and be more comparable to the equity sharing schemes of other bilateral programs in ARMM, the 50% LGU equity counterpart was further augmented by the 25% NGALGU, reducing the LGU equity requirement of 15% in-kind equity and 10% in cash. The revival of interest of the LGUs in the Project was highlighted by a huge jump in subproject approvals from a very minimal amount to PhP800 million. After the ADB-OFID joint project review mission, additional subprojects were approved, raising the total subproject cost approval to PhP1.8 billion for over 100 subprojects, of which the OFID share is PhP854 million or about 70% of the US$30-million OFID loan. However, the revival in interest of LGUs has once again been put to test with recent developments with respect to the availability of NGALGU and related concerns regarding project implementation and management. The discussion below describes pressing issues and concerns that continue to hamper implementation, probably well beyond June 2014 when the SMT exits the scene, and thus require urgent and sincere attention by the authorities both in Manila and Cotabato City. Attention to these is considered vital given the ongoing success of the peace process initiated by President Aquino III between the MILF and the Government, and the foreseen establishment of the Bangsamoro Transition Authority (BTA) by early 2015. It would be the responsibility of DAR and DAR-ARMM to hand over the Project, if any extension beyond end-2014 is in fact granted/approved by government and ADB/OFID, to the New Bangsamoro Political Entity in a functioning condition, with more clarity to the issues that have hounded it during Phase II, for the achievement of the economic benefits originally intended by the Project.

Page 47: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 32 | P a g e

5.1 Prohibitive LGU Counterpart Equity The spurt in project development from practically zero (that is, no project implementation since not a single project was bidded out) some three years back to its current level is attributed mainly to two factors: (i) the augmentation of LGU equity through the NGALGU; and (ii) the expansion to other LGUs outside of the original 30 LGUs targeted by the Project. This expansion to other LGUs was carried out as part of the policy recommendations made by the SMT and agreed on during the ADB-OFID Joint Project Mission in October 2013. The LGU expansion policy was further highlighted by the freezing of the Project equity sharing at 50%-50% LGU-NG, regardless of income class. The new LGU equity is clearly stipulated as follows: 10% in cash, 15% in-kind equity and 25% from NGALGU. This arrangement was accepted and applauded by the LGUs. It is generally comparable to the cost-sharing agreement of the World Bank-funded Mindanao Rural Development Project and its successor project Philippine Rural Development Project, which have a 10%-90% LGU-NG project counterpart arrangement. The afore-mentioned developments took place before the fiasco of Philippine Development Assistance Fund (PDAF) erupted. The government’s   Disbursement   Acceleration   Program  (DAP) – from where the NGALGU funds were sourced – was questioned at the Supreme Court (SC) for its constitutionality. As of the last SC hearing, the DAP, as far as the government is concerned, no longer exists as a disbursement strategy. This development raises serious concerns in respect of the completion of the Project. It has also put the recent subproject approvals, particularly for the new/expansion LGUs/ARCs, in uncertainty given limited capacity to generate and mobilize the equity requirement. Immediately, the reaction from the NPCO was to come up with a new formula to re-compute the equity portion of subprojects that have already been approved but have yet to be allocated the NGALGU. The re-computation is based on a new formula that allows for zero NGALGU counterpart from the Government, although the LGU equity portion remains at 50%, but with only 10% cash equity. The balance of 40% is re-allocated as in-kind equity including project supervision and management. The 10% cash equity is surely an attractive offer particularly for the higher income LGUs. Other LGUs, however, would still be hard put in sourcing the 40% in-kind component of the counterpart. SMT re-computed the amount required by LGUs to fund their respective equity for 130 approved SPs (i.e., excluding two subprojects approved subject to OFID funds availability). The table below shows the indicative results of the calculation. The total cost of the 130 subprojects is PhP2.3 billion. Of this amount, the LGUs need to put up PhP1.26 billion in equity. Deducting the 25% NGALGU from the LGU equity (amounting to PhP285 million), which will now be in-kind equity, and counterpart assistance from WFP and some private donors, and the mandated pre-engineering costs (estimated at PhP311 million), the cash equity of LGUs will be a minimum of PhP660 million. There is no assurance that the LGUs will come up with the required amount since: (i) there are limitations on how much of the in-kind components allowed by DAR can possibly contribute towards LGU equity; (ii) the scope for applying the Performance-Based Grant System in ARMM is extremely limited; and (iii) the Food-for-Work Program of the WFP is not applicable for the island provinces of ARMM. Hence, not all of the LGUs may be able to

Page 48: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 33 | P a g e

financially support their involvement in ARCP II to meet their infrastructure needs, especially given cheaper financing being made available to them through the government and/or multilateral and bilateral sources. Nonetheless, it is recognized that DAR continues to extend efforts to close the equity gap through discussions and consultations with the LGUs and mobilization of resources, particularly for Basilan LGUs.

Table 5.1 Total Cost and LGU Equity Contribution of Approved Subprojects by Province.

Province No. of SPs

Approved Project Counterparts LGU Equity Sources

Total OFID Fund Counterpart

LGU Counterpart

Estimated ARMM -NGALGU

Estimated LGU Cash Equity

Lanao del Sur 51 1,008,273,458 473,751,224 534,522,234 110,804,912.48 272,476,302.82

Maguindanao 22 279,564,212 139,206,011 140,358,201 27,398,731.34 71,024,837.86

Basilan 13 433,181,685 189,665,247 243,516,438 104,524,801.09 94,919,344.38

Sulu 10 324,668,874 147,138,622 177,530,252 30,195,588.05 97,242,071.36

Tawi-Tawi b 34 301,745,091 141,574,143 160,170,947 12,079,010.45 124,780,290.34

Total 130 2,347,433,320 1,091,335,248 1,256,098,072 285,003,043.40 660,442,846.76 a Estimated LGU net equity after deducting NGALGU share (25%) and pre-engineering and counterpart assistance from WFP and private sector donors. b Excluding the two conditionally approved SPs (subject to OFID funds availability) in Tawi-Tawi

5.2 Limited Local Capacities and Resources for Project Management Administrative processes aside, the subproject implementation on the ground are affected by a host of factors, particularly the capacity of the LGUs to manage SPs given technical and resource limitations in project management, monitoring and supervision. On subproject development, there is a lack of technical expertise on rural infrastructure design and proposal packaging. This is further compounded by the limited experience of LGUs in managing contracted works as most of their infrastructure are done by administration. As was earlier discussed, LGUs have limited capacity to manage the procurement process prescribed in the procurement law (RA 9184). This insufficiency of experience and practice in going through the rigid government procurement process has left the subproject procurement process open to mishandling and failure. Capacities and local expertise on financial management, appropriate to a foreign-funded project such as ARCP II, was found to be lacking as well. This local deficiency in financial management expertise has impinged on the timeliness, accuracy and acceptability of financial reports from the LGUs, and has become a continuing challenge for the DARPOs and RPO to facilitate. As technical support team to DAR-ARMM, the SMT exerted efforts to mitigate the lack of expertise in the areas of subproject development (including engineering and economic analysis), procurement and financial management by providing coaching, supervision, and technical assistance sessions in all Project management levels from the Local Project Office to the DARPOs, up to the RPO (DAR-ARMM).

Page 49: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 34 | P a g e

5.3 Inconsistency in the Subproject Review and Approval Process At   the   beginning   of   SMT’s   engagement, the entire subproject cycle from review and approval, procurement, implementation and turn-over was laid out and the requirements made clear through a checklist of requirements for every stage within the subproject cycle (Annex 9 - ARCP II Required Documents with Template as of February 3, 2012). These requirements, identified on the principles of establishing subproject technical soundness; financial, economic and social viability; community ownership; and sustainability served  as  the  SMT’s  and  LGU’s  bases for the technical assistance and mentoring activities and support to the LGUs, DARPOs and RPO. In earlier Project Review Missions (2012), the subproject cycle was documented and re-engineered by the NPCO, with the intent of improving efficiency and fast-tracking RI implementation. Subsequently, in the interest of speeding up the commitment of the remaining OFID loan amount/funds for subprojects through a "fast-tracked" approval process, fundamental subproject requirements on the following were deferred:

community preparation and project ownership; completeness of subproject design; LGU commitment and certification to finance and implement the subprojects, once

approved; social safeguards, especially the right-of-way (ROW) acquisition; and environmental safeguards.

The amendment by NPCO of the subproject approval requirements was timed with the afore-mentioned NPCO and RPO-led roadshow in mid-2013. As a result, priority assistance was given to the technical processes of subproject development (i.e., preparation of engineering designs and program of work) while CDD processes were given less attention. Environmental and social compliance requirements, including the proper documentation for the critical right-of-way (ROW) acquisition were not immediately required from LGUs prior to project approval. The level of community participation, consultation and planning, which was originally carried out through the process of ARCDP formulation or review (in cases where the ARCDPs have already been formulated) was brought down as well. This is contrary to the approach that was required of and followed by the SMT since the beginning of its contract in assisting the various LGUs. While it took longer to process the SPs to approval stage, the original process developed strong ownership of the SPs by the ARCs and ensured compliance with social and environmental safeguards. Deferring critical technical and financial requirements and safeguards was successful in getting more SPs approved. While corrective measures and the necessary follow-up activities can still be undertaken to ensure project compliance, there is no guarantee that approved SPs that are the product of fast-tracking processes will in fact get implemented faster. In the experience of the ARMM, there were fast-tracked SPs that are going through critical procurement delays due to lacking documentary requirements during the approval process.

Page 50: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 35 | P a g e

5.4 Inadequate Harmonization of Institutional Mechanisms Given the multi-faceted and multi-stakeholder nature of the Project and implementation arrangements that involve various levels of the government (barangays, municipal local governments, provincial and regional executive offices), coordination has indeed been a challenge. Harmonization would have been the key in bringing together all actors and stakeholders in the Project. Unfortunately, initial efforts to harmonize and align the reporting and coordination processes, procedures, protocol and requirements of the various agencies, including those of the donor agencies, did not progress. There have been observable and critical breakdown in the understanding of the following areas:

Subproject development: o Roles and responsibilities between SMT, RPO, and NPCO in assisting LGUs on RI SP

development o Land acquisition (for ROW) requirements between DENR and LGUs o Transmittal of copies of ARCDPs from the DARPOs to the LGUs

Procurement:

o Procurement requirements under RA 9184, and of NPCO and ADB o Roles and responsibilities between SMT, RPO, and NPCO in assisting LGUs on SP procurement o Fund releases and liquidation o Technical and financial reporting requirements between MDFO, NPCO and ADB

As a result, as of date, only 25 SPs have been contracted out and funded, amounting to US$1.2 million in OFID funds released to the LGUs’ account. The LGUs, meanwhile, have forwarded liquidation for around US$1.3 million with appropriate reports submitted to the NPCO. However, OFID fund release officially recorded in the MDFO and ADB disbursement records systems is only US$135,000. This is attributed to the differences in the accounting standards/requirements among the institutions involved in the Project namely, the MDFO, DAR and ADB. These differences contribute to the delay of recording disbursement transactions for the OFID funds. On subproject development and procurement, the confusion on the roles of SMT and NPCO in engaging and assisting LGUs (when ARMM-based consultants were deployed by NPCO) have resulted in the complication  in  attribution  of  efforts  and  output  as  embodied  in  SMT’s  performance-based reimbursement claims.

Page 51: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 36 | P a g e

5.5 Unrealistic Targets Even  at  the  early  stages  of  SMT’s  operations,  it was already recognized and articulated by the Team that several Project targets given to SMT would be very difficult to achieve considering the limitations on Project resources, activities and responsibilities. Among these unrealistic targets were on Land Tenure Improvement (LTI) which were hindered by the following factors:

Land titling is a function not only of DAR, but also of DENR; The initial mapping of land for titling is under the jurisdiction of DENR, and far from the

direct  influence  of  SMT’s  activities; and The special peace-and-order and conflict-related consideration in ARMM.

In  the  context  of  ARMM  and  SMT’s  level  of  engagement,  where it could only coordinate and follow up with the respective agencies on the status of implementation of LTI-related activities, SMT was very much hard-pressed to deliver on its LTI deliverables. This challenge was recognized by NPCO. Hence, mid-2012, discussions ensued on how to adjust the SMT LTI deliverables   to   be  more   reflective   of   SMT’s   role   in   the   process.  Unfortunately,   these   talks  were discontinued in 2013. Other targets for the AED component have also been challenging due to the following considerations:

Limited Project scope and resource allocation on AED activities thus funding for training and capacity-building activities have to be sourced elsewhere;

There were barely any funds on AED that can be used to leverage other funding sources; Absence of Project-level strategy in leveraging for improved individual access to credit

and savings facilities.

Under the CDD component, the PBGS-related targets of SMT (LGU participation on PBGS and 20% Refund on Equity) were likewise deemed unattainable because, as often cited, the capacities of LGUs in ARMM were still far from those of LGUs in other regions. Hence, most LGUs were unqualified for PBGS. In an effort to support the LGUs and bring them closer to the possibility of qualifying in the PBGS and availing of equity refunds, SMT led discussions on customization of the PBGS requirements for a ladderized-scheme of qualification in the ARMM. Unfortunately, despite the considerable efforts of SMT, DAR-ARMM, NPCO and DILG, the proposal was not realized. To date, none of the LGUs in ARMM have completed the requirements for PBGS.

Page 52: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 37 | P a g e

5.6 Unsuitability of SMT's Output-based Contract and Deliverables to the Conditions of the Project

With the SMT in place, ARCP II activities were rigorously pursued particularly in consulting, encouraging and prodding the target LGUs/ARCs to participate in the project, most especially in the RI component. This is clearly evidenced by the significant increase in subprojects approvals and a slow but steady improvement in the implementation and disbursement process. Under an output-based contractual arrangement, the SMT was to be reimbursed upon delivery of the required outputs. The major challenge for the SMT and NPCO was how to make the output-based reimbursement scheme work efficiently so project operations could proceed smoothly. While there were clear agreements on the cost and payment structure at the beginning of the contract, as early as the beginning of 2012, the SMT started to encounter difficulties in implementing its output-based contract and alerted the NPCO on this. There was difficulty in moving the subproject approval into actual contracts and fund requests as many of the activities and reports relied on the cooperation and accountability of the staff working in the municipal offices. Specific SMT deliverables could not be brought to fruition without having the necessary documentation or reports from the LGUs or DAR provincial offices concerned. The bottlenecks in Project implementation that affected the SMT’s   outputs   were in the simple (but important RI subproject) requirements such as absence of bank guarantees from contractors to the absence of cash equity in the required bank account of LGUs (to fund RI subprojects). Security and governance capacity issues also continued to remain key concerns in project operations. Delays related to these affected SMT’s  performance  on  producing  key project deliverables and caused financial constraints in its operations. The uncertainties under this contracting arrangements posed a major challenge to the SMT in terms of contracting and deployment of staff that would maximize the overall level of effort (LOE) of the SMT. Ultimately, SMT decided to match the output based contract with output based deployment. Notwithstanding these difficulties, the SMT has taken all these issues in stride, and have continued on delivering best efforts for the achievement of Project objectives as much as the situation allowed. The last three months of its operation were devoted to handing over the project management and ensuring smooth transition of project management to DAR-ARMM. In this regard, a transition work-plan has been discussed with the RPO and NPCO to guide operations and secure the proper exit of the SMT.

Page 53: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 38 | P a g e

6.0 Recommendations The following are the recommended actions to address the concerns enumerated above:

6.1 On Ensuring Continued Project Implementation Post-SMT and Sustaining the Project Gains

To ensure the momentum of RI subproject procurement and implementation, immediate next steps are proposed for specific IR projects. These recommendations are discussed in detail in Annex 10 - Status of Rural Infrastructure Subproject Implementation in ARMM and Recommended Next Steps by Subproject. The summary of recommendations are as follows:

Final inspection by the appropriate ARCP II Inspectorate Team, together with COA Technical Audit Specialist, of SPs with physical accomplishment of 100% (Panamao FMR, the Tipo-Tipo FMR and one Sibutu CI).

Pre-final inspection by appropriate ARCP II Inspectorate Team of subprojects with physical accomplishment of 95% and above.

Follow up on submission of request for extension for subprojects with expired contract. The request for extension should be supported with revised implementation schedule or catch up program (with provision for additional equipment and manpower) and performance security to cover the extension.

Determine subprojects with significant negative slippage and request concerned LGUs to require submission by concerned contractors of revised construction schedule with provision for additional equipment and manpower, to catch up on delay. Note that some LGUs committed to provide equipment and labor (through World Food Programme).

Provide assistance to LGUs on the conduct of procurement activities to ensure that procurement of rural infrastructure subprojects is in accordance with ADB procurement guidelines and following the procedures of RA 9184. A procurement orientation may not be enough to capacitate the local bids and awards committee (BAC) on procurement. This has to be followed with interventions such as training/workshop on the procurement process, on-the-job coaching, consultation and problem-solving sessions.

With NPCO, resolve issues and concerns on non-compliance by LGUs with the requirement of RA 9184 on publication in Philgeps website and with the ADB requirement on availability of bidding documents for at least 28 calendar days. It must be understood by them that Philgeps publication is a LEGAL requirement of RA 9184. The experience of other LGUs (e.g., Buldon, Sitangkai) in resolving difficulties in accessing Philgeps website should be highlighted.

Provide assistance to LGUs Poona Bayabao, Tagoloan and Bumbaran on preparation of disbursement/liquidation reports and request for second LP release. These LGUs need to be coached in preparing the required documents.

Follow up with LGU Bumbaran on submission of request for variation and supporting as-stake plan (resulting from pre-construction survey).

Page 54: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 39 | P a g e

Follow up with NPCO on NGALGU fund release for LGU Marantao subproject. Please note that NPCO issued NGALGU CAF (No. 12-1212-29-2011) for the subproject and a contract was finally awarded to the contractor on the basis of the NOL issued by NPCO to LGU. Contract and fund request documents for LP release, except for the document on NGALGU deposit, were submitted to NPCO on October 8, 2013.

Follow up with NPCO on NSAC re-approval of LGU Sibutu FMRs. These subprojects were already issued NGALGU CAF and the LGU already received NGALGU cash for one of these subprojects.

Provide assistance to LGUs on bid evaluation and post-qualification and on preparation and submission of bid evaluation report. Review BER prior to submission to NPCO.

Follow up with LGUs on the procurement schedule and assist in the preparation of bidding documents and in posting of invitation to bid in Philgeps website. (e.g. Luuk, Pata, Talipao, Languyan and Lantawan)

Follow up on:

o Submission of contract, request for LP fund releases and disbursement/liquidation reports;

o Submission of CAF requirements by LGUs and issuance of CAF by MDFO; o Submission by LGUs of statement of receipts and disbursements (SORD) for pre-

implementation and construction supervision. Provide assistance to LGUs on preparation of documents; and

o Completion and submission of revised POW.

Conduct regular monitoring of subprojects with ongoing construction. Provide advice in addressing issues and concerns.

Confirm with LGUs Butig, South Ubian, Parang (for its CIS) and Kabuntalan (for its CIs) on its final decision to implement the subprojects.

6.2 On Lightening the LGU Equity Burden and Securing Continued LGU Commitment

Equity remains the strategic concern of the Project. Currently, the RPO is addressing this concern by discussing the implication of the new cost arrangement with each LGU and the absence of NGALGU support. Subproject program of work (POWs) were revised and explained to the LGU for their concurrence. Most of the LGUs responded positively, indicating their agreement on the revised and higher equity arrangement. In the immediate term, the Project should validate the LGU equity contribution in the LGU Annual Investment Plan and in its Annual Budget. This will ensure that the LGU is fully committed to the equity prior to the publication of the subproject for procurement. Within the remaining project period and in future ARC projects, DAR-ARMM should continue to explore possible counterpart funding from various sources. This should include regional and provincial governments, other donor-funded projects with similar undertakings and objectives, other national programs, and existing partners such as the WFP. In the design of future projects, equity requirements must be aligned with those of other projects so that  it  can  be  equally  “attractive”  for  LGUs as a fund source for their projects.

Page 55: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 40 | P a g e

6.3 On Strengthening the Subproject Development Process There is a need for the Project to review its project development process, particularly covering the recently-approved subprojects. The identified gaps should be completed such as linking the subproject approval to the LGU annual investment planning and budgeting process to ensure the full commitment of the LGU to subproject implementation. Communities should be made to understand their roles and counterparts in the subproject implementation, by reviewing the ARCDPs and linking the subproject to existing or potential agriculture production areas. Compliance with national regulations and, social and environmental safeguards should be observed at the onset of subproject development to ensure the smooth procurement and implementation these projects. Environmental safeguards should recognize the presence of protection and conservation areas in ARMM and of areas that are highly susceptible to landslides and flooding.

6.4 On Simplifying, Standardizing and Disseminating Subproject Monitoring Requirements and Processes

The RPO should constantly and regularly push the LGUs in complying with the monthly reportorial requirements for on-going projects. This can be done with the presence of the regional technical staff hired to complement the regular DAR-ARMM staff designated in the project. Regular monthly subproject monitoring, scheduled and unscheduled, should be conducted as what the SMT has done particularly for the subprojects in Lanao Sur and Maguindanao. The monitoring visit should be instituted as part of the subproject contract management support to the LGUs. At the national level, the NPCO and MDFO should settle the differences in the accounting standards/requirements for subprojects to facilitate compliance and recording of transactions, particularly for the OFID funds. This is where the proper dissemination of a standardized and accepted (by all parties: NPCO, ADB, MDFO and COA) Procurement and Financial Manuals is critical.

6.5 On Enhancing Capacities for Project Implementation Cognizant that the ARMM has special and urgent needs for capacity building along the lines of governance, agriculture and economic development, peace and security, among others, the SMT in 2012 formulated   the   “Capacity   Development   Plan   for   Sustainable   Livelihood  Improvement   in   ARMM”   (CapDev   Plan).   Anchored   on   the   capacity   building   needs   of   the  Project, the CapDev Plan promotes the integration and harmonization of capacity building interventions related to rural development in ARMM. It also aims to improve the capacities of the ARCs, supported by accountable and transparent local and regional governments, and a network of CSOs and NGOs to take a more proactive role in rural poverty reduction.

Page 56: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 41 | P a g e

Beyond training, the CapDev Plan addresses the need for capacity development by taking a longer-term perspective on competency-building and by utilizing practical and effective approaches to capacity development on:

1. Improving service delivery through meaningful community participation and greater transparency and accountability among key governance institutions;

2. Engaging the private sector and provide business development services for rural livelihood improvement; and

3. Enhancing the prospects for peace and development by promoting social development management and incorporating the perspectives of peace, gender balance and environmental sustainability.

With a detailed list of sites and stakeholders, identified impact areas, description of approaches and methodologies, the CapDev Plan proposed a comprehensive list of capacity building activities and interventions on CDD, RI, AED, PM and cross-cutting themes of peace, gender balance and environmental sustainability, with an indicative budget. It is proposed that the Project management review and validate the CapDev Plan for possible adoption of still relevant components and activities within the remaining period of the project and in future ARC projects.

6.6 On Possible Project Extension and Capacity Development Support to ARMM

The ARCP II Joint Mid-Term Review involving both ADB and OFID has long been overdue. Should the Mid-Term Review push through within the third quarter of 2014, the following major items should be considered and discussed:

Potential for Project extension; and Review of the Project design and scope.

SMT recognizes the need for Project extension in ARMM. The Project is made more relevant and fortuitous in view of what is happening in the Bangsamoro, especially so in 2015, when the Bangsamoro Basic Law (BBL) – which sets the governance mechanisms of the new Bangsamoro government – is expected to be passed by the Philippine Congress. The continued implementation of ARCP II, given an extension, would help the new Bangsamoro government sustain the momentum for rural development. SMT further believes that Project extension would be good because a significant amount of OFID funds remain undisbursed. This undisbursed funds, specifically intended for ARMM, should be optimized and, if possible, targeted for full disbursement under the extension period. Expansion to other LGUs should be further explored. Project extension should also take into account the proportion of resources deployed to the various Project components (i.e., CDD, AED, RI and PM). Since it has been a well-documented and long-standing experience that LGU equity for rural infrastructure subprojects is difficult to secure, a re-allocation of funds to other components that have a more direct effect on rural development (e.g., AED) should be considered. Considerations on stakeholder

Page 57: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P r o j e c t C o n t r a c t C o m p l e t i o n R e p o r t 42 | P a g e

capacities, external constraints and the sufficiency of Project resources should be made in setting realistic performance targets for the Project. Should Project management decide to engage another third party partner to facilitate land titling in ARMM, it is recommended that more appropriate targets and deliverables be set that are more reflective of the level of effort and limitations of any third party non-government entity on the process of land titling. It is also further recommended that the Project Management consider sub-contracting the consulting and technical assistance to the RPO, PPOs and LPOs – much like the set-up of SMT. However,   it   is  recommended  that  a  “cost-plus”  contract  be  considered  under   the new sub-contracting arrangement. Sub-contracting of the consulting and technical assistance services on project management to a third party is recommended to maximize and sustain support to DAR-ARMM. This is especially relevant in light of information that, as of writing of this report, all of the Project staff hired by DAR-ARMM have already resigned. This is an unfortunate development as these individuals have already been trained and have significant experience on the workings of the Project. This depletion in institutional knowledge can be averted through the sub-contracting of a dedicated service provider. Lastly, the SMT recommends the review and consideration of the SMT-developed policy paper  “ARMM  ARCP II Capacity Development Plan”  for  strategies to ensure a multi-faceted comprehensive capacity development of DAR-ARMM, the DARPOs, and LGUs on the Project.

Page 58: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported
Page 59: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s i | P a g e

Table of Contents ANNEX 1. List of Approved Subprojects ................................................................................... 1 ANNEX 2. LGU Equity Requirement for Agrarian Reform Communities Project II .................. 2 ANNEX 3. PBGS Guidelines for ARMM ARCPII .......................................................................... 8 ANNEX 4. ARMM ARCPII Capacity Development Plan ........................................................... 19 ANNEX 5. AED Capacity Development Plan ............................................................................ 36 ANNEX 6. Coffee Value Chain Study for Sulu Province .......................................................... 44 ANNEX 7. Status of Project Implementation in ARMM .......................................................... 52 ANNEX 8. Project Implementation in ARMM and Formulation of Recommended

Strategies ................................................................................................................ 54 ANNEX 9. ARCP II Required Documents with Template as of February 3, 2012 .................... 56 ANNEX 10. Status of Rural Infrastructure Subproject Implementation in ARMM and

Recommended Next Steps by Subproject .............................................................. 64

Page 60: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 1 | P a g e

ANNEX 1. List of Approved Subprojects The first table is based on the report provided by RPO to NPCO. The second one is based on the worksheet provided by RPO but with updates from LGUs and SMT’s review and observations.

SUMMARY STATUS OF APPROVED RURAL INFRASTRUCTURE SUBPROJECTS As of June 30, 2014

Status No. of SPs %

Subproject Cost LP LGU Equity Total

Completed Subprojects (As Bid POW) 2 1.52% 12,141,356.64 18,212,034.97 30,353,391.61 B.1 (50-99% Physical Accomplishment) 18 13.64% 92,345,540.65 101,246,589.84 193,592,130.48 B.2 (25% - 49% Physical Accomplishment) 4 3.03% 58,153,876.84 95,821,223.04 153,975,099.88 B.3 (0% - 24% Physical Accomplishment) 7 5.30% 86,774,724.81 138,662,307.02 225,437,031.82 SPs with NOL to Award Issued-for Contracting (As Bid POW) 6 4.55% 17,600,825.56 38,569,054.52 56,169,880.09

SPs under Bid Evaluation 47 35.61% 425,250,540.34 444,176,876.24 869,427,416.58 SPs with Published ITB & RFQW Issued - Procurement of Civil Works (Bidding Period) 12 9.09% 71,270,435.41 71,270,435.41 142,540,870.91

SPs for Procurement of Civil Works (with NAPA) 20 15.15% 230,753,004.42 232,497,803.52 463,250,807.95

SPs POW for LGU concurrence (Revised POW unsigned & no NAPA) 5 3.79% 46,744,330.82 46,744,330.82 93,488,661.63

SPs for delisting (accdg to LGU) 9 6.82% 53,130,632.28 71,727,436.47 124,858,068.77 SPs NSAC Approved, subject for availability of funds 2 1.52% 38,324,614.41 38,324,614.41 76,649,228.81

Total 132 100.00% 1,132,489,882.16 1,297,252,706.24 2,429,742,588.53 Note: Subtotals and Totals were corrected

SUMMARY STATUS OF APPROVED RURAL INFRASTRUCTURE SUBPROJECTS As of June 30, 2014

Status No. of SPs %

Subproject Cost LP LGU Equity Total

Completed 3 2.27% 13,438,281.83 19,508,960.15 32,947,241.97 With ongoing construction (50% - 99.99%) 18 13.64% 101,357,104.82 124,002,806.48 225,359,911.29 With ongoing construction (25% - 49.99%) 4 3.03% 65,968,801.06 89,891,494.79 155,860,295.85 With ongoing construction (0% - 24.99%) 7 5.30% 83,447,004.36 155,062,177.41 238,509,181.76 with NOL 5 3.79% 2,805,132.44 4,045,770.56 6,850,903.01 with ongoing procurement 56 42.42% 404,740,500.85 423,666,836.74 828,407,337.66 for re-bidding 9 6.82% 153,018,769.26 153,018,769.26 306,037,538.54 with NAPA but without advertisement 10 7.58% 116,643,591.76 118,388,390.87 235,031,982.64 for NSAC re-approval 4 3.03% 52,871,118.30 52,871,118.30 105,742,236.60 for confirmation with LGU 11 8.33% 85,927,316.06 85,927,316.06 171,854,632.15 for delisting 3 2.27% 13,947,647.03 32,544,451.22 46,492,098.25 approved but subject to availability of OFID funds 2 1.52% 38,324,614.41 38,324,614.41 76,649,228.81

Total 132 100.00% 1,132,489,882.16 1,297,252,706.24 2,429,742,588.53 Note: This is based the worksheet provided by RPO. The totals in the RPO worksheet are not accurate.

Page 61: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 2 | P a g e

ANNEX 2. LGU Equity Requirement for Agrarian Reform Communities Project II

- Draft Position Paper for Discussion -

Matter for Consideration Since the implementation of the zero-grant policy, the number of LGUs availing of Official Development Assistance (ODA) loans over the past years to complement their traditional Internal Revenue Allotment (IRA) as the main financial resource had been declining. One major factor is the fact that LGUs are financially cash strapped to put up the required capital contribution apart from the perceived inadequate capacity to wade through the complex processes associated with accessing the funds. The   LGU’s   equity   problems   have   practically delayed and slowed down the implementation of several infrastructure and other development projects across the country. This scenario fortunately has been recently taken by the national government as an opportunity to revisit its cost-sharing policy. Accordingly, in response to the apparent inability of the LGUs to provide upfront the required counterpart resources for development projects, the Aquino administration has issued in September 2011 Memorandum Order 24, Series of 2011, otherwise known as the “Temporary  Suspension  and  Rationalization  of  the  National  Government-Local Government Unit Cost-Sharing   Policy,”   which suspends ad interim the national government -LGU cost-sharing policy until the approval and issuance of a rationalized sharing scheme. A joint Technical Working Group (TWG) has been constituted to study a rationalized sharing scheme composed of a representative from National Economic Development Agency (NEDA) as chair, and representatives from the Department of Budget and Management (DBM), Department of Finance (DoF) and Department of the Interior and Local Government (DILG), as members. The Special Management Team (SMT) of ARCPII for DAR-ARMM, which has been put in place in July 2011 to assist DAR-ARMM to implement the ARCP II in ARMM, has taken the liberty of preparing this position paper with the end view, while being cognizant of the fact that the cost-sharing policy is under review, of providing the TWG grounded perspectives in the course of revising the guidelines on cost-sharing scheme in the context of LGU equity issue confronting the ARCPII implementation in ARMM in particular. The result of this initiative for ARCPII may also benefit other ODA funded projects under the management of DAR and other agencies by way of example of this Project. The Secretary of DAR-ARMM and some of his core officers were consulted in the preparation of this position paper and the recommendations articulated herein have their full support.

Page 62: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 3 | P a g e

Introduction The ARCPII for ARMM was designed to support the holistic implementation of the Comprehensive Agrarian Reform Program (CARP) in the region by facilitating the access of target communities to essential support services and markets in terms of substantially expanding the rural production base, raising production and distribution efficiency, improving the competitive advantage of small farmers, improving employment opportunities, and promoting equitable distribution of production and productivity gains. The achievement of these goals hinges on the effective  and  efficient  delivery  of  the  Project’s  four  core components: (1) community-driven development, (2) agriculture and enterprise development, (3) rural infrastructure development, and (4) project implementation and management. Among these, rural infrastructure development is a critical component for enhancing the ability of ARCs and ARC clusters to participate in market-oriented agri-business promotion. As such, rural infrastructure captures approximately 77% or $23 million of the loan of $30 million to the national government that is funded by the OPEC Fund for International Development (OFID) and channelled through the Asian Development Bank (ADB). {The total loan amount to national government is $100 million. Of this amount, ADB part of total Project amounts to $70 million) and covers five other regions of the country}. The implementation mechanism of rural infrastructure development revolves around five building blocks: (1) participatory planning, (2) subproject preparation, (3) equity sharing, (4) contract management, and (5) strengthening funds flow arrangement. The availability of an equity contribution from the LGUs to finance subprojects is a key and critical criterion in the readiness to start subproject implementation. Depending on their income class, the LGU equity ranges from 50% to 70% of the total cost of the subprojects. It is one of the most difficult criteria for LGUs to comply with and in the experience of ARCPII so far, this is a major constraint that has slowed down project implementation and disbursements. Many of the LGUs belonging to the lower tier have indeed expressed their strong interest to implement a subproject but cannot afford to borrow the required loan amount or even put up the required equity out of their current revenues. Based on the findings of the ARCPII-ARMM inception report (prepared by the SMT in September 2011 and discussed with DAR – ARMM and National, and ADB), the criteria developed for the LGUs/ARCs to qualify to take on subproject implementation elicited negative feedback from the targeted clients. It was reported by the PAROs that certain LGUs/ARCs officially selected by DAR had already withdrawn and others intend to officially withdraw from participating in the Project because of their uncertainty to comply with the pre-requisites for subproject implementation, chief of which is the cost-sharing criterion. A general sentiment from the LGUs echoes that the equity contribution appears too high and that the degree of difficulty to generate it within the annual planning and budgeting cycle poses major challenges to them. To  mitigate   the  negative   impact  of   the  LGU’s  equity  problem  on   the  Project’s   implementation,  the SMT is exploring other innovative modalities to augment fund resources of participating LGUs while at the same time tying capital grants to policy or structural reforms. One approach is to encourage LGUs to enrol in the Performance Based Grants System (PBGS) of the DAR/DOF to recover a portion of their equity contributions but more importantly to enhance governance processes relating to agrarian reform initiatives. The other one is the Performance Challenge Fund (PCF) for LGUs currently being managed by the DILG which can be rationally linked with PBGS through parallel financing. The PCF is an incentive fund for LGUs in the form of counterpart

Page 63: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 4 | P a g e

funding for high-impact capital investment projects in the Annual Investment Program (AIP) and funded out of the 20% Local Development Fund. As briefly discussed above, the two performance-based mechanisms could be important additional sources of external funds for the LGUs but they do not directly address the equity problems of the LGUs by frontloading additional funds. The PCF, for instance, is a fund matching scheme where the LGU has to allocate equal counterpart fund for the available PCF subsidy. The PBGS, on the other hand, will benefit the participating LGU upon the fulfillment of its “performance   contract”  with   DAR/DOF   towards   the   end   of   the   project   engagement.   Hence,   a  review on the existing guidelines and a policy change to rationalize the cost-sharing formula currently applied by government entities lending to LGUs for locally funded projects is indeed compelling and that specific recommendations and actions to rectify the current situation have to be put forward as articulated in the section below on Recommendations.

Situational Analysis As noted above, in the series of consultations made by SMT of ARCPII-ARMM with the LGU partners, national line agencies, CSOs and other local stakeholders in the ARCs, a major concern continuously raised and articulated to the SMT is the level of difficulty for the ARMM LGUs to provide their equity contribution to the project within the context of their budget availability and annual planning and budgeting cycles, i.e., the use of the 20% development fund. The problem is essentially deeply rooted in the fiscal management practices of ARMM LGUs particularly in the budgeting and actual fund utilization that commonly raised issues pertaining to fund adequacy, such as insufficiency of funding support for infrastructure and other development projects. The actual distribution of funds in ARMM LGUs since the creation of ARMM as a political body indicates poor efficiency and effectiveness in terms of fund use. For instance, some two-thirds of the LGU funds are allocated for personnel services, which confirm that only a small amount of funds is left for operational expenses, capital outlay, and infrastructure investments. Based on the study conducted by INCITEGov (Towards Strengthening the Fiscal Capabilities of ARMM), covering the period of 2001 to 2005 only 10.40% or PhP8 billion out of the PhP76 billion provided to ARMM went to infrastructure and a measly 3% was spent in agriculture, agrarian reform and fisheries. The education sector got the biggest share of 28% and bulk of the funds went to general overhead. Given the personnel base and overhead burden, the funds intended for developmental purposes would hardly be sufficient for ARMM LGUs. It is therefore imperative for ARMM LGUs to demonstrate improvements in fund utilization capabilities to shift spending bias to development programs. This desired reform in local public financial management is still a long shot, and is unlikely to be realized within the term of ARCPII which is expected to end by 2014. In the current list of 28LGUs that will be covered by ARCPII in ARMM, approximately 30% are 1st and 2nd income class municipalities requiring 70% LGU counterpart out of the total project cost. These set of LGUs has an average annual IRA of about PhP90 million. Another 33% are 3rd and 4th class municipalities requiring 60% equity. This class of LGUs has an average annual IRA of PhP35 million. The remaining 37% of the LGU are 5th and 6th and are required to contribute 50% of the project cost for their identified sub projects. This lower class LGUs has average annual IRA of approximately PhP20 million. Based on initial calculations, this sharing scheme, while could bridge the financial limitations of the local governments, is not feasible and does not provide the necessary incentives for the LGUs

Page 64: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 5 | P a g e

to prioritize investments for ARCs which are normally located in the rural areas. Assuming that each   LGUs  will   get   the   “nominal   ceiling”   of   $1.0  million,  or  PhP44  million,   from   the  ARCPII, a 5th/6th class LGU will therefore raise another PhPP44 million in equity in the next 3 years or roughly PhP14 million every year. This amount is way above the minimum 20% development fund required of each LGUs which is about PhP4 million for the 5th and 6thclass LGUs. In sum, as presented in the table below, for the $30 million OFID grant, nearly $50 million in equity will have to be mobilized by the LGU, comprising both in-kind equity contribution and in-cash equity. Initial SMT calculations for the equity distributed based on existing sub-project requirements, in-kind equity which includes community contribution in terms of unskilled labor, LGU owned materials, and pre-engineering support could reach $ 19.3 million. But the biggest share would still be the in-cash equity which is about $30 million or $ 3 million annually in the next 3 years or about PhP440 million annually. For the ARMM LGUs, the 20% development fund leaves minimal flexibility given the tremendous diversity and extent of needs from all sectors in local governments, including assistance to internally  displaced  communities.  ‘Competing’  programs  which  offer  lower  equity,  e.g.,  Mindanao  Rural Development Program (MRDP) or no equity at all, e.g., ARMM Social Fund, makes the Project as the least priority for tapping by the LGUs. Another form of competition is the financial charges being assessed by the different lending facilities like MDFO, DBP, and LBP where the interest rates vary across these facilities. Other ODA funding sources like JICA, WB, and ADB also impose different rates apart from the hidden costs the LGUs have to deal with in terms of processing time, documentary requirements, and access to fund officers, among others.

Table 1. LGU Equity Requirement for ARCPII

Income Class % of Total LGUs

Projected OFID Available

Grant, in US$

Equity based on Current Policy

Projected LGU Equity

Projected Distribution of Equity Projected Total Project Cost, in

US$

Projected LGU Equity (In-Cash) Requirement, in

US$

Projected LGU Equity (In-Kind) Requirement, in

US$ 1st & 2nd Class LGUs

30 9,000,000 70% 22,830,000 14,430,000 8,400,000 31,830,000

3rd & 4th Class LGUs

33 9,900,000

60%

14,850,000 8,910,000 5,940,000 24,750,000

5th & 6th Class LGUs

37 11,100,000 50% 11,610,000 6,660,000 4,950,000 22,710,000

Grand Total 100 30,000,000 49,290,000 30,000,000 19,290,000 79,290,000

The policy of zero-grant to the LGU articulates that the maximum allowable grant should not be more than 50% of the total sub-project cost particularly for the poor LGUs. This cost-sharing policy has inadvertently affected the interest and capacity of LGUs to participate and put up the required equity contribution for identified priority projects. ARCPII, in particular, is being affected by the lack of LGU equity as a major problem in project implementation. This issue certainly will be magnified at the level of ARMM LGUs on the basis that minimal resources are allocated for development projects compared to non-autonomous LGUs. To cite in particular the experience of World Bank funded project for the Mindanao Rural Development Program 2 under the Adaptable Program Loan (APL) portfolio of the World Bank, the Program Director Lealyn A. Ramos (Published in SunStar Davao- http://tiny.cc/cyec2) shared that the major bottleneck of the project implementation has always been the provision of the equity share of the LGUs. The 50-50 cost-sharing arrangement in their Rural Infrastructure component of the project that requires the program to shoulder half of the total project cost and the other

Page 65: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 6 | P a g e

half by the proponent LGU has not been so successful given that majority of their client LGUs belong to the 4th and 6th income classes who cannot realistically put up the required equity. To address such pressing issue, Secretary Proceso Alcala of the Department of Agriculture (the executing agency for the project) committed to shoulder at least 40% of the LGUs equity share. Under the new scheme the LGU is only required to shoulder 10% equity contribution, which will effectively allow the LGU to fund other identified priority projects. Alternative sources of equity will be mobilized by the Project as part of the immediate solutions to the equity limitations, but this would require time and effort in leveraging locally available funds such as those as from congressional contributions, provincial and potentially regional government contributions, and support from other donor programs, among others. Sourcing out these funds, while certainly a strategic option, may potentially delay subproject preparation and therefore, slow down project disbursements and consequently its completion.

Recommendations The strategic solution, therefore, is to usher in a policy change that promotes equity reduction for the LGUs/ARCs. The policy advocacy may involve the following courses of action:

The policy framework for national government assistance for the financing of local government projects issued by the Investment Coordination Committee (ICC) of the NEDA Board, the body that approves all foreign-assisted projects, can identify specific grounds   for   national   government   intervention   concerning   “equity   considerations.”   The  policy framework could articulate the cost-sharing principles that the national government intervention is warranted when the LGU is faced with tight budgetary constraints and unable to provide the basic services to its constituents. The national government assistance in this particular case can be purposively directed to supporting LGU’s   for   closing the resource gap in order to meet the cost-sharing requirements to implement priority development projects.

While the ARCPII for ARMM can significantly lead the LGUs to enrol in the performance-based schemes, such as the PCF and PBGS, to recoup future capital investments, DAR as the national implementing agency of ARCPII has to pursue the initiative of putting up a fund to “frontload”  for LGU equity contribution, thus reducing the LGU equity share and enabling the LGU to meet cost-sharing requirements. This proposed initiative is consistent with the cost-sharing principles of the LGU grant-financing framework.

The national government support to equity reduction and the capital grant subsidy in general can to be tied to major policy, administrative or structural reforms. The type of governance and economic reforms LGUs can undertake include, but are not limited to, improved policies and procedures on procurement of goods and services; strengthened financial controls and management; fiscal management reform; public administration reform of agencies or departments concerned with rural development; policies related to gender and development, and indigenous peoples; encouragement of regional cooperation and development, such as through the promotion of ARC clusters; support for enhancing the environmental sustainability of rural development projects, such as through the National Greening Program; support for augmenting agribusiness enterprise development, such as through the provision of post harvest schemes; technical and managerial aspects of rural infrastructure development and management; and public disclosure involving the provision of adequate access to information.

Page 66: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 7 | P a g e

Both the DAR – National and ARMM, and the SMT should work individually and

collectively for a high level advocacy for a policy change concerning LGU equity in the Project to avert possible LGU withdrawal from project implementation and delisting of subprojects.

Involve the ARMM Regional Government (ARG), as a local government enabler, to support the policy changes toward a better and accountable local autonomy. Similarly, ARG can help promote the ARCP II to other ARMM agencies and departments for partnering in ARCP II and help mobilize funding for parallel activities that can provide greater synergies with the objectives of ARCP II, and thereby enabling bigger impact on the ARCs.

Raise the point about the nature of the OFID funds which are allocated for the exclusive use of the ARMM project areas. It may be noted that the LGUs and the ARCs in ARMM have repeatedly pointed to the fact that the OFID funds are carry more concessional terms compared to the regular ADB loan assistance (that are meant for other regions of the country under ARCP II, and thus the ARMM component should be covered by a different set of policy for equity to allow ARMM to get the benefit from OFID funds allocated at lower interest rate.

The policy change can also be positioned as a confidence building measure by the national government to facilitate putting in-place the ARMM transitional administration and as an incentive for the on-going peace talks between the national government and ARMM political factions concerned. In this context, the national government may also wish to use funds being allocated to ARMM as part of the mini marshal plan/reform program for reducing the burden of equity for ARMM LGUs, toward enhancing good governance and alleviating poverty in ARMM.

Page 67: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 8 | P a g e

ANNEX 3. PBGS Guidelines for ARMM ARCPII

Introduction The Performance Based Grant System (PBGS) was formulated as the implementation mechanism of the Performance Based Incentive Policy (PBIP), an incentive framework to rationalize the National   Government’s   intergovernmental   fiscal   transfers   to   Local   Government   Units   (LGUs)  towards improving overall LGU performance in governance. The PBGS is the first performance-based incentive mechanism being implemented in the country. The Agrarian Reform Communities Project II (ARCPII) is one of the Investment Coordination Committee (ICC) approved projects with PBGS components. By design the ARCPII does not have specific governance component, thus the national government recommended to pilot test the multi-sectoral approach of the PBGS in ARCPII including the Autonomous Region in Muslim Mindanao (ARMM) as one of the six regions covered by the project. The implementation of the system is expected to provide information about capacity development areas in dire need of improvement and the relevant incentives to reward better performance. The current PBGS guidelines, however, is not responsive to the unique conditions of ARMM as an autonomous government operating in a dynamic and diverse socio-cultural, demographic and governance make-up. The DAR-ARMM ARCPII through the Special Management Team (SMT) conducted an inventory involving 30 LGUs covered by the project to determine their level of compliance or non-compliance with the existing PBGS guidelines. The initial results showed that less than 15% of the LGUs can fully comply with the enrolment requirements and both for the corresponding minimum conditions for capital and capacity development grants. This is unfortunate since the purpose of PBGS is to provide an incentive to LGUs towards improving governance performance and that ARCP2 has bannered the PBGS as an incentive scheme to attract the participation of covered municipalities. In order to live with its mandate – to provide an incentive to LGUs toward improving governance in the ARMM ARCPII areas, what is needed is to simplify the eligibility requirements to what is achievable within a short term period at the same time slowly bring the LGUs to move toward the direction of improving local governance, transparency, accountability, and peace and development. The objectives for customizing the PBGS guidelines in the context of ARMM conditions is essentially hinged on three governance parameters: (1) to strengthen existing national and local (regional and provincial, city and municipal LGUs) initiatives and mechanisms for promoting local autonomy, performance management, participation, transparency and accountability; (2) to link and synchronize performance incentives to ARMM governance reform initiatives (social economic development, governance, peace and security) and to ensure convergence of rural infrastructure projects with other sectoral projects such as health, education, peace, etc.; and (3) to promote and sustain local peace initiatives. Cognizant of the timeframe of the project and the absorptive capacity of the client LGUs to implement governance reforms within the ambit of the PBGS mandate, the DAR-ARMM ARCP2-SMT is proposing to introduce and build a graduated or phase-in approach as a mechanism for raising the bar, for the LGUs to demonstrate improvement to substantially and meaningfully accomplish the performance measures they agreed to deliver.

Page 68: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 9 | P a g e

This paper is presented in two parts. Part A is a commentary on the existing guidelines on the PBGS from the perspective of ARMM (i.e., what does or does not work in the current governance structure and capacity of the region), the underlying recommendations, and the summary of the current and the proposed ARMM PBGS guidelines in a matrix. Part B1 is the proposed two-year Performance Contract derived from the situational analysis of the conditions peculiar to ARMM as presented in Part A. The performance contract will include the minimum conditions that must be achieved within year 1 or during subproject implementation and the performance requirements that must be attained in the second year or after subproject implementation.

Part A: An Assessment of PBGS Guidelines from the Perspective of ARMM and Recommendations 1. On the Objectives of PBGS:

Under the Core Objectives of PBGS, include the theme on Peace Promotion as one of the key governance reform areas.

The Core Objectives of PBGS should include peace promotion as a cross-cutting theme, thus it should read:

“Encourage   strong   performance   of   LGUs   by   linking   the   access   and   size   of   the   grants  against the LGU performance in predefined functional areas. This should focus on cross-cutting areas such as planning, budgeting, revenue mobilization, financial management and budget execution, procurement and resource mobilization, transparency, plus agriculture  and  agrarian  reform  sector  development,  and  peace  promotion.”

2. On Who are Qualified:

LGU partners of DAR under the ARCP2 who have at least one subproject approved for PBGS enrolment.

3. On Eligibility (Pre-Qualification) Requirements:

Condition #1: Letter of Intent; No recommended change. Condition#2: Authorization from LGU for MDFO to access the Local Government

Performance Management System (LGPMS) and Local Government Finance Monitoring System (LGFMS) through SB resolution o LGU LGPMS governance reports are already accessible for download and printing of online

users. Therefore, the need for authorization from LGU for MDFO to have direct access to their LGPMS database is absolutely unnecessary. Giving out the access code to a third party user is a breach of the security feature of LGPMS.

Recommendation:

Completed annual on-line data entry of LGPMS (on the year of LGU subproject application) and a Confirmation Letter of the Local Chief Executive to establish and/or maintain an official LGU Webpage

1 The original PBGS performance measures include the five areas of governance, resource allocation and utilization, financial management, human resource, and agriculture and agrarian reform. The revised guidelines, however, cover only three performance measures such as governance, financial management, and agriculture and agrarian reform, which this paper correspondingly adopts for consistency purposes.

Page 69: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 10 | P a g e

Condition #3: BLGF Certified True Copy of the Statement of Receipts and Expenditures (SRE) o In ARMM, the DOF office is inexistent, thus, the SRE Reports of ARMM LGUs are submitted to

the DOF Region 9 for Island LGUs (Basilan, Sulu and Tawi-Tawi) and to DOF Region 12 for Lanao del Sur and Maguindano LGUs. These SRE reports are submitted quarterly and accessible electronically to both DOF and BLGF.

Recommendation:

Bureau of Local Government Finance (BLGF) Certified True copy of the previous year’s   Statements   of   Receipt   and   Expenditures   (DOF Region 9 for Basilan Sulu and Tawi-Tawi LGUs and DOF Region 12 for Lanao del Sur and Maguindanao)

Condition #4: COA Audited Financial Report

o No recommended change

Absence of one document disqualifies the LGU as one of the beneficiaries of the PBGS

Recommendation:

In  the  case  of  a  “poor”  LGU  but identified partner of DAR-ARCP2, who have at least one approved subproject for assistance and cannot meet one of the pre-qualification requirements, should not be outright disqualified from participating in the PBGS. It should be viewed rather as an opportunity for the National Government to enhance the  governance  performance  of  such  “poor”  LGU  through  relevant  capability  building  support.

Poor LGU is qualified as LGU with greater share of poor population, which does not necessarily correspond to LGU with low income classes considering that the classifications are based on LGU revenue instead of poverty indicators. It is premised that by strengthening the weakly capacitated LGUs will enable them to improve performance thereby addressing compelling poverty issues.

4. On Minimum Conditions for Capacity Development Grant (CDG)

The minimum conditions for CDG have to be complied with by the LGU within the first year or during the subproject implementation.

Condition #1: Sanggunian approved organizational chart and updated staffing summary

This is not necessary considering that the organization and functional chart of the LGU is a given already, however, this document can be required for posting in the LGU webpage.

Recommendation:

An operating Webpage with the following uploaded documents: 1. Local   Ordinance   approving   the   current   year’s   budget   and   all   details   of   the   approved  

budget compliant with budgetary requirements and general limitations including equity allocation for ARCP2 projects

2. Current  year’s  Annual Investment Plan (AIP) approved by the Local Sanggunian 3. Organizational Chart with plantilla positions approved by the Sanggunian 4. Annual Procurement Plan 5. Previous  year’s  Statement  of  Receipts  and  Expenditures  (SREs) and detailed Expenditure

of the  previous  year’s  20%  Development  Fund

Page 70: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 11 | P a g e

Condition #2: Sanggunian Approved Capacity Development Agenda

o The CDG, as designed, supports the organizational and institutional development of the LGU. The CapDev Agenda, on the other hand, is the larger capacity building program of the LGU which requires a set of competencies, including human resource development and institutional  arrangements  that  should  be  in  place  within  the  LGU.  To  ensure  that  the  LGU’s  absorptive capacity as well as its capacity to manage programs and projects are systematically addressed, the CapDev Plan should be framed toward addressing development priorities in the areas of sustainable agriculture, natural resource management, environmental protection, social service delivery, fiscal management and revenue generation, and participatory governance including transparency and accountability.

o In line with this, the ARCPII-ARMM SMT is formulating a capacity development framework and strategy that aims to address specific improvements in governance and peace promotion that will essentially complement the reforms in the local governments that the PBGS intends to achieve. The governance reform framework of the SMT shall focus on fiscal management, procurement, sustainable rural infrastructure, environmental sustainability, and gender.

o Further, the capability building program for LGUs should include support to establishing local peace building mechanism or local conflict resolution mechanisms (LCRMs) for barangays identifying members coming from the barangay council, inter-faith members and Civil Society organization and providing funds thereof.

o Capacity  being  defined  as  ”the  abilities,   skills,  understanding,  attitude,  values,   relationships,  behaviours, motivations, resources and conditions that enable the individuals, organizations, networks  and  broader  social  systems  to  carry  out  functions  and  objectives  over  time.”

Recommendation

Approved Capacity Development (CAPDEV) Plan addressing development priorities in the areas of governance and peace promotion

Condition #3: A duly designated focal person for human resource development (HRD)

(certification from the Mayor) o The presence of a designated focal person for HRD will not address Capacity Gaps in the

ARMM  LGUs  through  LCE’s  certification.  The  governance structure of ARMM is quite different from the administrative LGUs elsewhere in the country: in ARMM devolution stops at the regional level. The service delivery functions, mechanisms, programs and personnel are not fully devolved to the LGUs (province, city or municipality) which is part of the reason for the dismal performance in the delivery of basic services to their constituents.

o The appropriate approach would be to strengthen the service delivery systems, mechanisms and establish dedicated resources in the areas of (a) agriculture, natural resources and agrarian reform; (b) environmental governance; (c) local economic development; (d) health and/or education services; and (e) fiscal reform and revenue generation, to ensure better performance and service delivery of programs and services to the communities.

o Highlight the dimension of peace promotion as part of the PBGS core objective in the CDG minimum conditions by ensuring that local peace building mechanisms are organized and functional. This means that the LGU proactively partners with NGOs, CSOs, POs and community organizations for the advancement of peace.

Recommendation:

Organized/reactivated the required Local Special Bodies (LSBs) in accordance with laws particularly the Local Development Council and the Local Peace and Development Council, as minimum

Page 71: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 12 | P a g e

Established Personnel Management Committees (Personnel Development, Grievance and

Appeals, PRAISE and Promotion and Selection) o Inclusive form of leadership and Islamic governance (compose of elders, political leaders,

religious and community leaders) has to be explored in light of the existing leadership style of Moro leaders that ventures toward paternalistic leadership where decisions are made by the leader on behalf of the constituents. Thus, rewards, career growth, and grievance settlement in   the   organization   is   subjective   upon   the   leader’s   own   assessment.   Moreover,   plantilla  positions approved by the Sanggunian and the Civil Service Commission have to be complied with religiously.

5. Proposed Utilization of the Capacity Development Grant

1) A maximum of 30% for IT Equipment, Software, and Staff 2) A maximum of 15% for communication, publication, peace promotion, and community

consultations 3) The remaining 55% for CapDev support to institutional development (governance,

financial management, service delivery, peace initiatives, etc.) 6. On Governance Conditions for the Capital Grant (CG)

The minimum conditions for CG have to be complied with by the LGU within the first year upon signing of the performance contract and the performance measures at the end of subproject implementation.

Planning Capacity

o Annual Investment Program approved by the Sangguniang Bayan (SB) (Joint Memo Circular No.1, S.2007 compliant). Included as part of the eligibility requirements.

o Comprehensive Land Use Plan (CLUP) with Agrarian Reform Community Development Plan (ARCDP) approved by the SB

1. The Agrarian Reform Community Development Plan (ARCDP) should not be incorporated

in the CLUP because the latter is a spatial plan or planning document of the LGU that rationalizes the allocation and proper use of land resources while the former is a master development plan of the ARC or cluster of ARCs which essentially follows the barangay development planning process that covers the five development sectors (social, economic, infrastructure, environmental management, and institutional).

2. The appropriate LGU planning document to integrate ARCDP is either in the

Comprehensive Development Plan (CDP) being the multi-sectoral plan or the Executive and Legislative Agenda (ELA) - a term-based sectoral plan. The CDP and ELA both follow a bottom-up and participatory formulation process.

Recommendation:

Comprehensive Land Use Plan (CLUP) that has undergone local consultation or the Comprehensive Development Plan (CDP) of the Municipality developed with the participation of local civil society groups/organization incorporating agriculture, agrarian reform and peace building initiatives

Comprehensive Development Plan (CDP) approved by Sangguniang Panlalawigan (SP) or Executive and Legislative Agenda (ELA) adopted and approved

Page 72: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 13 | P a g e

1. The approved CDP or ELA should incorporate the elements of ARCDP as articulated above so that when the plan is translated into local development investment (LDIP) and annual investment plan, the prioritized PPAs of ARCDP are proactively considered in the process of investment programming and budgeting.

Recommendation:

Approved Executive and Legislative Agenda (ELA) incorporating ARC development plan and programs

Budgeting

o Budget approved in compliance with budgetary requirements and general limitations 1. The LGC provides the general limitations clause on the budget that the LGU total

appropriations for personal services for one fiscal year must not exceed 45% in the case of first to third class LGUs and 55% for the fourth to sixth class LGUs. In the case of ARMM LGUs, appropriations for personal services reach more than 80% of its budget.

Recommendation:

Budget approved with clear expense items in compliance with budgetary requirements and general limitation

Financial Management Capacity

o No adverse audit report in the latest available audit report

Recommendation:

This will be part of the Performance Contract

Procurement Capacity o Bids and Awards Committee (BAC) established and functional (current year) thru certification

from the Mayor>To be retained.

Recommendation

Annual Procurement Plan

Monitoring and Evaluation o Published State of Local Governance Report (SLGR)>To be retained.

Recommendation:

Monitoring team for ARCPII projects through the creation of LPO

Revenue Generation o Updated Local Revenue Code (within the last 5 years)

1. LGUs in ARMM do not, in most cases, update their Local Revenue Code once every five years because they are overly dependent on the national government transfers in the form of IRA. Three out of every five ARMM municipalities on the average derived less than 1% of their total income from the collection of local taxes.

o Real Property Assessment Report (Real Property Assessment Increment) o Positive revenue increment(from Statement of Receipt and Expenditures)

Page 73: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 14 | P a g e

1. Does   the   positive   increment   refer   to   the   IRA   or   to   the   increase   in   “own-source”   of  revenues or locally generated revenues from taxes, fees and receipts?

o Real Property Tax Accomplishment (from SRE) o On Revenue Generation, in general, the LGU will be required to prepare a Revenue Collection

Plan with clear targets, structure and mechanisms to increase local revenue by at least 10 percent  based  on  previous  year’s  revenue  collection target.

Equity contribution for PBGS included in the Budget> to be retained.

Recommendations:

Revenue Collection Plan as a minimum condition A 10 percent increase in the local revenue collection based on the implementation of

the plan to be reflected in the performance contract. 7. Proposed Utilization of the 20% Capital Grant

The PBGS guideline currently stipulates that the cash incentive may be used only for subsequent infra projects, whether under the ARCP II or other development programs of the LGU, after the completion of the Performance Contract

Recommendation

The 20% Capital Grant be given upfront for use in the first subproject of the LGU. In the event the LGU is unable to carry out the Performance Contract will mean the return or refund of the 20% Capital Grant. Failure to remit the required amounts will result  in  the  intercept  of  the  LGU’s  IRA.

8. Sub-Committees of the PBGS Technical Committee

The Assessment Group o The Assessment Group tasked to gather information and evaluate LGUs on compliance with

the governance conditions and performance is composed mostly of members from the National Government Agencies (DOF-MDFO-BLGF, DILG-BLGS, NEDA-RDCS, DENR, League member, etc). For ARMM, the Regional Line Agency counterpart (DILG-ARMM, RPDC, DENR-ARMM, etc) of these NGAs must constitute the members of the Assessment Group in collaboration with DOF-MDFO and DOF-BLGF.

Recommendation:

The Assessment Group as designed shall remain as an inter-agency mechanism but shall be composed largely by the Regional Line Agencies (RLAs) of ARMM such as the DILG-ARMM, DENR-ARMM, RPDO, and DOF-Region 9 for Island LGUs and DOF-Region 12 for mainland LGUs. The national government agencies/ bureaus such as the DILG-BLGS, NEDA-RDC, and MDFO have the option to participate in the evaluation activity based on their availability. It is recommended that DILG-ARMM should be the lead agency of the Assessment Group given its supervisory mandate over local governments.

Page 74: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 15 | P a g e

9. Annex B: List of Performance Measures

Information Availability and Transparency o Database on CBMS used as input to planning, decision making, project identification

- The CBMS as a poverty monitoring tool is not fully implemented in ARMM. As of 2010, reportedly only 12 ARMM LGUs (to be verified) had adopted and implemented CBMS. Of the 30 LGUs covered by ARCPII in ARMM, only three LGUs (Bongao, Panglima Sugala and Marantao) have implemented the CBMS.

10. Summary of the Current and Proposed PBGS Guidelines for ARMM ARCPII

Current PBGS Guidelines Proposed PBGS Guidelines for ARMM ARCPII I. Eligibility Requirements

1) Letter of Intent 1) Letter of Intent 2) Authorization from LGU for MDFO to access the

Local Government Performance Management System (LGPMS) and Local Government Finance Monitoring System (LGFMS) with SB Resolution

2) Completed annual on-line data entry of LGPMS and a confirmation Letter of the Local Chief Executive to establish and/or maintain an official LGU Webpage

3) BLGF Certified True Copy of the Statement of Receipts and Expenditures

3) Bureau of Local Government Finance (BLGF) Certified  True  copy  of  the  previous  year’s  Statements of Receipt and Expenditures (DOF Region 9 for Basilan Sulu and Tawi-Tawi LGUs and DOF Region 12 for Lanao del Sur and Maguindanao)

4) COA Audited Financial Report 4) COA Audited Financial Report

II. Minimum Conditions for Capacity Development Grant Sanggunian approved organizational chart and

updated staffing summary An operating Webpage with the following uploaded

documents: o Local Ordinance approving the current  year’s  budget  and  

all details of the approved budget compliant with budgetary requirements and general limitations including equity allocation for ARCP2 projects

o Current  year’s  Annual  Investment Plan (AIP) approved by the Local Sanggunian

o Organizational Chart with plantilla positions approved by the Sanngunian

o Annual Procurement Plan o Previous  year’s  Statement  of  Receipts  and  Expenditures  

(SREs)  and  detailed  Expenditure  of  the  previous  year’s  20% Development Fund

Sanggunian approved Capacity Development Agenda

Reactivated the mandated Local Special Bodies (LSBs) in accordance with laws particularly the Local Development Council and the Local Peace and Order Council, as minimum

A duly designated focal person for human resource development (certification from the Mayor)

Approved Capacity Development (CAPDEV) Plan addressing development priorities in the areas of agriculture, service delivery, revenue generation, participatory governance & transparency

Established Personnel Management Committees

(Personnel Development, Grievance and Appeals, PRAISE and Promotion and Selection)

Page 75: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 16 | P a g e

Current PBGS Guidelines Proposed PBGS Guidelines for ARMM ARCPII III. Minimum Conditions for the Capital Grant

Annual Investment Program approved by the Sangguniang Bayan (SB) (Joint Memo Circular No.1S2007 compliant)

Comprehensive Land Use Plan (CLUP) that has undergone local consultation OR the Comprehensive Development Plan (CDP) of the Municipality developed with the participation of local civil society groups/organization incorporating agriculture, agrarian reform and peace building initiatives

Comprehensive Land Use Plan (CLUP) with Agrarian Reform Community Development Plan (ARCDP) approved by the SB

Approved Executive and Legislative Agenda (ELA) incorporating ARC development plan and programs

Comprehensive Development Plan (CDP) approved by Sangguniang Panlalawigan (SP) or Executive and Legislative Agenda (ELA) adopted and approved

Annual Procurement Plan

Budget approved in compliance with budgetary requirements and general limitations

Budget approved with clear expense items in compliance with budgetary requirements and general limitation

No adverse audit report in the latest available audit report

Monitoring Team for ARCP2 projects or the Local Project Office through EO

Bids and Awards Committee (BAC) established and functional (current year) thru certification from the Mayor

BAC established and functional with CSO participation

Published State of Local Governance Report (SLGR) Published State of Local Governance Report (SLGR) Updated Local Revenue Code (within the last 5

years) A Revenue Collection Plan

Real Property Assessment Report (Real Property Assessment Increment)

Equity contribution for PBGS included in the budget

Positive revenue increment(from Statement of Receipt and Expenditures)

Real Property Tax Accomplishment (from SRE) Equity contribution for PBGS included in the

budget

Page 76: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 17 | P a g e

Part B: Proposed Performance Measures and Contract (draft)

Performance Measures

Performance Indicators

Remarks/Grants Minimum Conditions

(within Year1 and/or during SP implementation)

Performance Requirement (Year 2 or after SP implementation)

Governance Planning Structures and Plans

LDC and its sectoral committees constituted and functional

Local Peace and Order Council functional

CDP approved by Sanggunian with EO CLUP approved by LGU/HLURB Capacity Development Agenda ELA approved by Sanggunian and Annual Investment Plan

BAC established and functional with CSO participation (current year) through certification from the LCE

Information Availability and Transparency

Operating LGU Webpage Publication and posting on the webpage of LGU plans (CLUP, CDP, ELA, AIP, ARCDP, Procurement Plan), financial statements, and actual project status vs. plans and targets

Legislation Local Ordinance passed by the current Sanggunian creating a local peace building mechanism (LCRMs)

Performance Monitoring and Feedback

Publication of State of Local Governance Report (SLGR)

Monitoring Team for ARCP2 projects and/or the Local Project Office (LPO) established

Public/Community Participation

Participation of NGO/POs/ARBOs members of LDC

Conduct of public hearing during LGU planning and budget process

Financial Accountability Budgeting of Cash Availability

Budget approved with clear expense items in compliance with budgetary requirements and general limitation

Cashflow Management System in place

Internal Control System of Internal Control and Audit in place Segregation of duties Internal audit independent from

the accounting functions Production of IA reports Evidence of follow-up on IA

reports/actions by the management

COA Findings % of Disbursements with negative

Page 77: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 18 | P a g e

Performance Measures

Performance Indicators

Remarks/Grants Minimum Conditions

(within Year1 and/or during SP implementation)

Performance Requirement (Year 2 or after SP implementation)

Prudent Spending COA findings % size of disbursements with negative COA findings compared to size

Audit Findings Major Issues in the most recent COA report are being addressed in Sanggunian and in the administration

LGU Expenditure and Revenue Collection

A Revenue Collection Plan to increase local revenue

A 10% increase in the local revenue collection based on the implementation of the plan

Financial Management Systems

Computerized or manual financial management systems are in place

Procurement Approved Annual Procurement Plan Manuals and procurement proceedings are documented and made available to the public (abstract of bids for civil works, procurement of goods & services, bid results, contracts awarded, etc)

Publications Annual financial statements are updated and submitted on time to COA, and made available to public by posting in public places and on the LGU webpage

Agriculture and Agrarian Reform Support to ARCP implementation & sustainability

ARCDP formulated/updated and incorporated in the CDP/ELA/AIP

Functional LPO established ATs assigned in ARC

LGU investments in agriculture (budget allocated and actually used as planned)

Page 78: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 19 | P a g e

ANNEX 4. ARMM ARCPII Capacity Development Plan

CAPACITY DEVELOPMENT PLAN FOR SUSTAINABLE RURALLIVELIHOOD IMPROVEMENT IN ARMM

(as of 17 April 2012) A. BACKGROUND AND RATIONALE The Autonomous Region in Muslim Mindanao (ARMM) has long been seen as an area where governance, managerial and technical capacities, especially in the context of rural agriculture and livelihood development, need to be strengthened substantially. Among development professionals, there is the recognition that the ARMM has special and urgent needs for capacity building along the lines of governance, agriculture and economic development, peace and security, among others. Beyond training, this need for enhanced capacities should be addressed by taking a longer-term perspective on competency building and by utilizing practical and effective approaches to capacity development. This need is further amplified by the current political situation of the ARMM where it is undergoing a phase of transition. From January 2012 until May 30, 2013, the ARMM, under the leadership of a OIC Regional Governor, would be implementing the ARMM Transition and Investment Support Plan, which is dubbed as the governance reform program, to begin implementing reforms in key economic and social sectors, build the capacity of institutions concerned within the Regional Government, and jumpstart economic and livelihood development initiatives. The ARMM Transition and Investment Support Plan, also known as the ARMM Mini-Marshall Plan2, aims to solve severe poverty, high rate of unemployment, poor health conditions, poor basic education and weak governance in ARMM. Given this new leadership and its direction, and drawing the good experiences of the past from initiatives undertaken by Government agencies and development partners, there is a short but critical window for engaging the OIC Regional Government and helping it to lay the foundations for capacity development. The Department of Agrarian Reform (DAR) places heavy emphasis on capacitating the communities and respective governance institutions, and aims to augment the support services to enable the communities to make optimum use of the lands being provided to them under the Comprehensive Agrarian Reform Program (CARP). Another important  facet  of  DAR’s  strategy is to build the capacity of individual personnel and institutions working on the CARP -- meaning DAR and the regional line agencies (RLAs), such as the Department of Interior and Local Government (DILG), Department of Agriculture (DA), Department of Environment and Natural Resources (DENR), Department of Social Welfare and Development (DSWD), Department of Education (DepED), and the Department of Health (DOH). There are also important considerations being given to enhancing the culture of peace and for institutionalizing the peace lens approach3within the context of community planning and development. Hence, agencies such as the Office of the 2 The ARMM Transition and Investment Support Plan (or the ARMM Mini-Marshall Plan) is a governance reform roadmap to be implemented in ARMM from now until June 30, 2013. The components for this plan are: Improving service delivery performance; Creating an enabling environment for public-private partnerships towards equitable growth; Improving public safety and security; Reforming and strengthening governance capacities; Cleansing the electoral system; and Improving the legal framework for governance, peace and economic growth.- From   the   Office   of   the   President’s   Official   Gazette   at  http://tinyurl.com/7wq2bm6 3A Peace Lens Approach - looking for opportunities for building peace, peace trends, zones of conflict, early warning signs of conflict, barriers to peace, key peace actors and how peace is construed when talking about security and the potential impact of policies (Source: http://www.wilpf.org.au/stay-informed/253-2/)

Page 79: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 20 | P a g e

Presidential Adviser on the Peace Process (OPAPP) are seen as partners in the peace building and capacity development process. Furthermore, the Local Government Code (LGC) in 1991 and its adoption in ARMM through the Muslim Autonomy Act No. 25 on September 13, 1995 mandates the devolution of functions from the national government agencies to the Local Government Units (LGUs), thereby acknowledging the critical role of LGUs in local economic and social development. The LGUs are expected to encourage the participation of the poorer sectors and marginalized groups in the provision of local infrastructure and essential support services. However, capacity building efforts for LGUs to enhance their service delivery mechanism in the Agrarian Reform Communities (ARCs) especially in the ARMM are inadequate. The Agrarian Reform Communities Project, second phase (ARCPII), financed by the Asian Development Bank and the OPEC Fund for International Development, has been designed to support the implementation of the CARP essentially by capacitating the LGUs and ARCs as well as other provincial and regional stakeholders. The implementation design of the Project involves a holistic support to CARP by facilitating the access of target communities to essential support services and markets in selected ARCs and ARC clusters eventually facilitating the transformation of target communities from subsistence producers toward agribusiness development. The Project includes both agrarian reform beneficiaries (ARBs) and other segments of the rural poor in the ARCs and ARC clusters (comprising a group of ARCs) in target municipalities. ARCPII adopts community-driven development strategies to reach out to large segments of the rural poor in the target areas to strengthen their physical and social capital. The Project serves as an anchor for implementing the capacity development initiatives which in turn will also facilitate in effective implementation of the Project itself, it can be used as a vehicle to engage the state and non-state actors at various levels (local, provincial and regional), and the resources deployed for Project (through loan proceeds, technical assistance for project management, and corresponding training and development support) can also be used as a leverage to mobilize additional resources from other development partners including government departments and interested aid agencies. A systematic capacity development effort with coherent outcomes and impact will clearly require drawing up an appropriate plan that would promote the integration and harmonization of capacity building interventions that will strengthen the capacity of key stakeholders involved more generally in pursuing rural development in ARMM and those specifically engaged in the Project. It will also need close coordination with the national and regional governments, non-governmental organizations (NGOs), civil society organizations (CSOs), aid agencies and the academe for drawing on the good lessons of the past, carrying out the necessary analytical work, and mobilizing funds.

Page 80: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 21 | P a g e

B. OBJECTIVES AND SCOPE OF WORK Objectives The overall objective of this Capacity Development for Sustainable Rural Livelihood Improvement in ARMM (CapDev Plan) is to improve the capacities of the Agrarian Reform Communities (ARCs) as supported by accountable and transparent local governments and responsive autonomous regional government, and a network of CSOs and NGOs to take a more proactive role in rural poverty reduction and to sustain improvements in income and quality of life. With ARCP II as the anchor program, this CapDev Plan shall specifically build capacities needed to:

1. Improve service delivery through meaningful community participation and greater transparency and accountability among key governance institutions;

2. Engage the private sector and provide business development services for rural livelihood

improvement; and

3. Enhance the prospects for peace and development by promoting social development management and incorporating the perspectives of peace, gender balance and environmental sustainability.

Levels of Engagement The CapDev Plan shall establish engagements with the Agrarian Reform Communities (ARCs) and a core of enabling institutions within the ARMM governance structures, as follows:

1. Agrarian Reform Communities Component – shall focus on community organization and individual capacities for: a. Farm and enterprise management; b. Marketing management; c. Promotion and utilization of sustainable agriculture technologies; d. Rural finance management; and e. Peace.

2. Local Government Component – shall focus on organizational capacities of local

governments (e.g., barangay, municipal and provincial LGUs) to be able to: a. Improve service delivery performance especially in agriculture and enterprise

development in the ARCs; b. Improve community participation, transparency and accountability particularly in

implementing projects intended for ARCs; c. Strengthen local peace promoting initiatives and conflict resolutions especially

involving agrarian communities; and d. Improve climate change adaptation in project development.

3. Regional Government Component – shall focus on creating and improving regional

enabling environment toward: a. Increased public-private partnership (PPP) initiatives in ARCs; b. Improved regional and local development coordination and monitoring for ARC

development; c. Improved LGU oversight for governance reform;

Page 81: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 22 | P a g e

d. Reforming and strengthening governance capacities; and e. Improved policy development and linkages for agrarian reform development.

This plan also aims to contribute to the reform and development agenda of the ARMM by strengthening the capacities of the various stakeholders in sustainable rural livelihood development, particularly in taking a more proactive role in rural poverty reduction and to sustain improvements in income and quality of life, good governance and peace. This would involve a social-inclusive approach to engage Agrarian Reform Beneficiaries (ARBs) and their organizations (ARBOs), ARCs, LGUs, the DAR Provincial and Regional structures and the Regional Government of ARMM. Geographic Coverage and Stakeholders The principal areas to be covered by the CapDev Plan shall are the areas covered by ARCPII. Specifically the Plan will be implemented in the following LGUs and ARCs: Table 1. List of Covered Areas by the CapDevPlan

PROVINCE LGU Name of ARC No. of ARC

Brgys. Name of Barangays Covered

Maguindanao

Kabuntalan Matilak ARC 4 Matilak, Maiting, Pened, Liong Datu Odin Sinsuat MRP 3 ARC 2 Labungan&Kibucay Parang (IRANUN Alliance) Macarimbang ARC 4 GT Biruar, Gadungan,

Orandang&Samberen Matanog (IRANUN Alliance)

Langkong ARC 2 Langkong&BayangaNorte

Datu Saudi Salbu ARC 1 Salbu Talayan Barrio Muslim ARC 3 Tamar, Marader, Fukol DatuPaglas (SLAM Alliance)

Bunawan ARC 3 Bunawan, Kalumenga, Napok

Datu Abdullah Sangki Tukanalogong ARC 2 Tukanaloging& Kaya-Kaya Gen. SK Pendatun* (SLAM Alliance)

SLAM Cluster Tbd to be finalized

Sultan saBarongis* (SLAM Alliance)

Mileb ARC 5 Mileb, Barurao, Sampao, Kulambong, Panadtaban

Paglat* (SLAM Alliance) Kadayunan ARC 1 Ramcor Pagalungan* (SLAM Alliance)

SLAM Cluster Tbd to be finalized

Barira* (IRANUN Alliance)

MRP 2 ARC 9 Tugaig, Nabalawag, Barira, Liong, Lipa, Marang, Gadung, Bualan, Ruminimbang

Buldon* (IRANUN Alliance)

MRP 1 ARC 4 Nuyo, Dinganen, Edcor, Batatawan

Number of LGUs 14 Number of barangays in ARCs

21

Lanao del Sur

Bumbaran Bumbaran 7 Sumugot, Franfort, Lambanogan, Punud, Comara, Apartfort, Mansilao

Tagoloan Malinao-Cadayonan 10 Kingan, Little Marawi, Inudaran, Mimbaguiang, Cadayonan, Sigayan, TagoloanPoblacion, Malinao, Bagua-ingund; Kianibong

Poona-bayabao Ragayan 16 Bangon, Bubong-Dimunda, Bugaran, Bualan, Cadayonan, Calilangan-Dicala, Calupaan, Dimayon, Dilausan, Dongcoan, Gadungan, Poblacion,

Page 82: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 23 | P a g e

PROVINCE LGU Name of ARC No. of ARC

Brgys. Name of Barangays Covered

Liangan, Lumbac, LumbacaIngud, Madanling

Marantao Marantao 9 CamaligBubong, CamaligPoblacion, Bandar Ingud, Tacub, BangaPantar, CawayanLinuk, CawayanKalaw, InudaranLoway, Cawayan

Ganassi Taliogon 10 Barorao, Taganonok, Barit, Panggawalupa, Taliogon Proper, SogodMadaya, Tabuan, Para-aba, Masolun, Campong a-raya

Wao* Milaya ARC 6 Barangays Milaya, Amoyong, Kadilingan, Bout, and Cebuano

Number of LGUS 6 Number of barangays in ARCs

58

Basilan

Tipo-tipo TARBADECO 1 Tipo-Tipo Proper Ungkaya-Pukan TIPARBECO 2 Cabangalan&BohehPahuh Lamitan City SCARBIDCI 9 Sta. Clara, Tumakid, Maloong San

Jose, Maloong Canal, Balagtasan, Bohenage, Baugos, Panunsulan

LARBECO For validation Sumisip TARBIDCI 1 Tumahaubong

CATARBEDECO For validation MARBEDCO For validation

Maluso CARBADECO 1 Cahas Lantawan TARBAMC For validation Number of LGUs Covered

6 Number of barangays in ARCs

14

Sulu

Maimbung Maimbung ARC 7 TubigSamin, Matatal, RatagLimbun, Kandang, Gulangan, Patao, Ipil

Pandami Pandami ARC 4 ParianDakula, Lahi, Malanta, Sibaud Proper

Panamao Sultan JamalulKiram ARC 3 Suuh, KanUkol, Kandayok Banguingui (formerly Tongkil)

Calaycay ARC 3 Danao, TambonBobo, Kahikukuk

Siasi Tulling ARC 5 to be finalized Number of LGUs Covered

5 Number of barangays in ARCs

22

Tawi-tawi

Sibutu

Ungusungus - Tongehat ARC

4 HadjiMoctar, Ungus-ungus, Tongehat, Tandouwak

Tandubanak ARC 4 Tongsibao, Sheik Makdum, Tandubanak, Taungo

Bongao Lakit-lakitMandulan ARC 3 TubigBasa, Lakit-Lakit, Mandulan PanglimaSugala Buan-Karaha ARC 2 Karaha, Boan Languyan TubigDakulah -

Basnunuk-Sikullis ARC 3 to be finalized

Sitangakai “Sitangkai  ARC” For validation Number of LGUs Covered

5 Number of barangays in ARCs

16

Total LGUs covered in ARMM

36 Total ARCs: 40 Indicative number of barangays covered

131

Page 83: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 24 | P a g e

The main targets of the CapDev plan are the households and the Agrarian Reform Beneficiary Organizations (ARBOs) within the target ARCs and ARC Clusters. However, in order to achieve the objectives of agrarian reform in general and of ARCPII in particular, the CapDev plan will also deliver a purposive capacity building support to local governments for them to be able to institute and sustain service delivery initiatives to ARCs and the regional government led by the DAR-ARMM for it to be able to provide an effective enabling environment that would support policies and program on inclusive development in agrarian communities and transparent, participative and accountable governance. Impact Areas Cognizant that the key components of ARCP II are Community-Driven Development (CDD), Agriculture and Enterprise Development (AED), Rural Infrastructure (RI) Development, and Project Implementation and Management, this CapDev Plan foresees the need for significant capacity development in the following areas:

1. Farm and enterprise management for improve productivity-as a social justice program, a major objective of agrarian reform is not only the distribution of lands but making sure that lands distributed became an instrument for farm productivity and enterprise development. This capacity development plan therefore endeavour to achieve these objectives by introducing sustainable agriculture technologies, farm productivity and value adding schemes to complement the rural infrastructure investments of the ARCPII.

2. Participatory Planningand Management– Integrated in all processes of ARCP II,

participatory planning is done to ensure community and LGU ownership and sustainability of every undertaking;

3. Fiscal Management – Over and above compliance with fiduciary requirements of the

Donor Agency and the National Government, the CapDev Plan aims to promote sound fiscal management as a driver for fiscal stability. Capacity development interventions would include bringing the principles of transparency and stewardship to budget planning, controlling spending and improving expenditure efficiency and oversight within ARBOs and LGUs; and

4. Procurement - Albeit, part of fiscal management, procurement is given emphasis as a

capacity development impact area of the Plan for its significance in the realization of rural infrastructure projects. Also considered as one of the key governance areas by the National Government, for its inclusion as one of the criteria in the Performance Based Grant System (PBGS), the improved capacity of LGUs to conduct their respective procurement processes in a transparent, timely manner that adheres to the governing procurement policies of the National Government and donor agencies (if any) is aimed.

Cross-Cutting Themes and Safeguards Compliance Vital to any well-managed program is its compliance with set environmental and social safeguards (ESS). ARCP II shall strictly adhere to the ESS requirements set by the Donor Agency and the National Government, especially on the areas of environmental sustainability, resettlement and protection of Indigenous Peoples (IPs).

Page 84: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 25 | P a g e

Apart from the impact areas and compliance to safeguards, sustainable rural development in ARMM also calls for cross-cutting capacities to be built in the following themes:

1. Peace – this CapDev Plan gives the distinct importance of the dimension of peace in ARMM. With this, activities for this theme would include mainstreaming peace and ensuring that processes are Conflict-Sensitive and Peace Promoting (CSPP) in LGU and ARC planning, Culture of Peace Program and application of peace lens in all phases of project management;

2. Gender Balance – Mainstreaming of gender lens in all activities of the plan shall be done

to   ensure   that   women’s   participation   is   strengthened   in   leadership   and management, service delivery, participatory governance and peace building; and

3. Environmental Sustainability–Not only shall this theme involve the mainstreaming of

environment protection and conservation in all planning activities such as the Strategic Participatory Planning Process (SPPP), it shall also endeavour to incorporate climate change adaptation (CCA) and disaster risk reduction and management (DRRM) elements, particularly in planning and implementation of RI subprojects and AED activities.

These impact areas and themes, along with the technical capacities needed to deliver the rural development targets on Rural Infrastructure (RI), Agriculture and Enterprise Development (AED), and Project Implementation and Management (PIM), comprise the core elements of the CapDevPlan for Sustainable Rural Livelihood Improvement in ARMM. C. APPROACH AND METHODOLOGY Capacity Development Approach Capacity development may   be   defined   as   “the   process   whereby   individuals,   organizations,  institutions and systems increase their ability to perform their functions, fulfil their mandate and achieve   their   goals”.   Aside   from   the   transfer   of   technical   competencies,   the   emphasis   of   this CapDev Plan is on empowering communities and the local and regional institutions to develop and implement their rural livelihood improvement initiatives themselves, thereby decreasing their dependency on external organizations and donor agencies. Critical to the empowerment of all stakeholders is a participatory approach across all processes in capacity development. Hence, at the outset, a capacity development assessment to identify the specific capacity development needs of the stakeholders shall be conducted in a consultative and participative manner. Donor agencies shall also be consulted to draw their insights and take on the competency building needs of these stakeholders as well. To facilitate this process, support to the broad stakeholdership of rural livelihood improvement in ARMM, following a systematic process of capacity development that leads to longer-term sustainability, utilizing effective delivery methodologies shall be provided. Competency building support shall be provided to other stakeholders such as NGOs, the DAR-ARMM Regional Office, and Regional Government of ARMM as well. Moreover, competencies related to cross-cutting themes (CCTs) to enhance the sustainability of project gains are infused into the CapDev Plan.

Page 85: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 26 | P a g e

Participatory Capacity Development Methodologies This CapDev Plan will use participatory methodologies in the design, development, implementation and evaluation across all capacity development activities. Adult learning and capacity development studies have shown that delivery methodologies for capacity development activities are most effective when there is an emphasis on learning-by-doing, demonstration projects, locally based hands-on training approaches, broad participation of stakeholders, built-in public communication strategies, and direct application of new skills to the local situation. As such, Participatory Learning Approach (PLA) tools and methodologies including mentoring and coaching, shadowing and learning-by-doing, replication of best practices aside from the traditional training method would be used in this Plan. Mainstreaming shall also be a key strategy to ensure that concerns related to a specific issue or theme is considered within this central decision-making arena. With the mainstreaming strategy the CapDev Plan foresees a more responsive government and better service provision taking into account special issues of the stakeholders. Phasing and Timing of Activities In the context of ARCP II, where interventions are mainly packaged around RI and agriculture and enterprise subprojects identified and formulated using a community driven development approaches, capacity development activities should be critically timed along with the progress of each of the ARCP II subprojects. Hence, in the development and conduct of capacity development activities, the following phases shall be observed:

Phase 1: Consensus Building–Involves agreement about the need to enhance capacity in order to improve governance and promote peace and identification of what capacities and whose capacities to develop. It is prelude to detailed ARC development planning through effective community mobilization. Communities are sensitized on the critical need to incorporate the essential cross cutting themes, and identifying priorities for rural infrastructure, agriculture and social development sub projects;

Phase 2: Planning/Pre-Implementation–This phase generally happens at the initial planning

stage for each of the ARCs/ARC Clusters when their respective ARC Development Plans (ARCDPs) are formulated or validated. Subsequently, RI subprojects are conceptualized and prioritized. It is by far the most considerable phase in capacity development,   as   stakeholders’   individual and organizational competencies, processes, structures and systems have to be identified and strengthened in order to carry out the technical, financial and institutional requisites for subproject development, approval and implementation.

Phase 3: Implementation/Application– Competencies needed at this phase would involve

improved implementation of processes, as well as enhance monitoring and evaluation of structures and systems to ensure good performance; and

Phase 4: Completion/Institutionalization– Capacity development needs for the completion

and institutionalization of subprojects would include: outcomes and impact evaluation, regulatory support for new systems; culture of continuous improvement internalized; increased ability of the enabling environment to support and sustain development.

Page 86: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 27 | P a g e

Linkages, Partnerships and Leveraging ARCP II is viewed as a vehicle for capacity development and identifying opportunities for further expanding the coverage of the capacity development initiatives through the identification of complementary activities and projects from other national government and donor agencies. Academic institutions shall be tapped by the Plan as well. Indicative areas where these academic institutions could initially support and participate in include pre-implementation activities, particularly on pre-engineering works for RI subprojects. Furthermore, when available, Resource Persons for training and workshops may be drawn from DAR-ARMM, DAR national, other regional and national line agencies (i.e., OPAPP, DENR, DILG) for the conduct of the identified interventions in the Plan. The Quality Assurance Firm sub-contracted by the National Program Coordinating Office (NPCO) shall also play a role as a resource for RI capacities, especially on Design Quality Review, Infrastructure Quality Monitoring and Durability System (IQMDS), and Quality Operation and Maintenance. ARCP II shall use its total fund of PhP 32 Million for the CapDev Plan to leverage support from other donor agencies and projects. Hence, it is also important to also capacitate the Project Management Staff and other stakeholders on resource mobilization.

Page 87: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 28 | P a g e

Table 2.Potential Areas of Intervention and Activities for the CapDev Plan

COMPONENT / IMPACT AREA PROGRAM PHASES

Consensus Building Planning and Pre-Implementation Implementation/Application Completion/Institutionalization Community Driven Development Participatory Planning and Management

Community Consultations to Formulate/ Validate / Review ARC Development Plans (ARCDPs) through the Strategic Participatory Planning Process (SPPP)

Strengthening of ARC Role in Local Development Planning

Strengthening the Local Project Office

Strategic Development Planning for ARBOs

Project Monitoring and Evaluation Training for ARBOs and Barangay Agrarian Reform Committees

Strengthening the Local Development Councils (LDCs)

Development of a management information system at the level of ARBOs, LGUs, and DAR-ARMM

Human Resource Development CapDev for ARBOs

Developing a Subproject Sustainability Plan

Technical assistance to design and produce IEC materials, social marketing and advocacy campaigns

Institutionalisation support to strengthen representation of ARBOs in the LSD or LDC

Rural Infrastructure Fiscal Management Leadership and Management CapDev ARBOs Resource Mobilization and

Management CapDev for ARBOs Financial Management CapDev for

ARBOs Networking and Alliance Building for

ARBOs

Institutionalisation support to ensure regular publication of Financial Statements

Customizing the PBGS for ARMM LGU Orientation on the PBGS for ARMM

Creation and strengthening of the ARMM PBGS technical working group

Fiduciary training/workshop for Municipal and DARPO Accountants on disbursement, liquidation and reporting RI subproject costs

Internal control system capacity support

Procurement Development of the Harmonized ARMM ARCP II Procurement Guidelines based on the Philippines’  RA  9184  and  ADB’s  Procurement Policies

Strengthening and Reconstitution of  LGUs’  Bids  and  Awards  Committees (BAC)

Procurement Capacity Support for all LGUs with subprojects

Monitoring of Execution of Contracts Evaluation of the Conduct of the Procurement Process for All Subprojects

Rural Infrastructure Project Development, Implementation and Management

Technical Assistance and Advisory Services in the preparation of Detailed Engineering Design (DED), Program of Work (POW), Site Validation Survey and Feasibility Study Preparation

Courses on the Infrastructure Quality Assurance System

Orientation on the Infrastructure

Strengthening Quality Operation and Maintenance Procedures, Policies and Subproject Evaluation/Rating System

Page 88: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 29 | P a g e

COMPONENT / IMPACT AREA PROGRAM PHASES

Consensus Building Planning and Pre-Implementation Implementation/Application Completion/Institutionalization Contract Management and Supervision Development of Operation and Maintenance Plan (O&M)

Quality Monitoring and Durability System (IQMDS)

Participation in the formulation of the O&M Quality System by the ARCPII Quality Assurance Firm

Agriculture and Enterprise Development Improving farm productivity and organizational capability for AED

Strengthening of anchor organizations for ARCCESS

Orientation on AED Technical Assistance on

Productivity Improvement Coordination with Micro-Finance

Institutions for Rural Finance Services

Technical Assistance on Business Planning

Implementation of agriculture and enterprise development projects (ARCCESS and other modes)

Facilitation of the formation of mechanisms at the LGU and ARC for knowledge sharing of best practices in agriculture and agribusiness

Facilitation of donor and Investment Forum to expand market linkages

Capital Formation on PPP as strategy to attract investments in agriculture

Evaluation of extension of agricultural and enterprise development services to ARCs

Project Implementation and Management

Project Coordination and Monitoring and Evaluation

Training Needs Assessment for all Key Stakeholders

Training on Design and Module Development (for Training Programs on RI, AED, PIM, Impact Areas and Cross-Cutting Themes)

Strengthening the Local Project Offices (LPOs)

Training of Trainers (TOT) for Community Development Officers, LPOs, DARPOs and selected DAR/ARMM Staff on selected component-based courses

Competency Building on Monitoring and Evaluation of CDOs, LPOs, DARPOs & selected DAR/ARMM Staff

Progress & Evaluation Reports Writeshops

Crosscutting Themes Peace Identification of convergence areas

between ARCP II and PAMANA Internalizing the Conflict-Sensitive

and Peace Promoting (CSPP) lens in the context of the ARCDP Planning and identification of social and physical infrastructures that will complement the PAMANA program

Peace and conflict impact assessment

Monitoring and evaluation of peace initiatives through the peace and development council

Institutionalization of a peace perspective using the peace lens tool in the project cycle and M&E

Page 89: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 30 | P a g e

COMPONENT / IMPACT AREA PROGRAM PHASES

Consensus Building Planning and Pre-Implementation Implementation/Application Completion/Institutionalization Gender Balance Integrating Gender Balance and

Women’s  Participation  Targets  into  SPPP

Capital Formation on Gender and Development (GAD) and Strengthening  Women’s  Participation for Sustainable Rural Development

Monitoring  of  GAD  and  Women’s  Participation Targets through the peace and development council

Evaluation of Performance against GAD  and  Women’s  Participation Targets

Environmental Sustainability Mainstreaming Environmental Sustainability Targets in ARCDPs and SPPP

Orientation/Workshop on Climate Change Adaptation (CCA) and Disaster Risk Reduction and Management (DRRM) for Sustainable Rural Development

Courses on Compliance to Environmental Safeguards

Orientation and Coaching on Establishing Disaster-Resilient Subprojects

Monitoring of Environmental Safeguard Targets through the peace and development council

Evaluation of Performance against Environmental Safeguard Targets

Page 90: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 31 | P a g e

Table 3. List of Activities in the CapDev Plan.

COMPONENT / ACTIVITY

A. ARCs 1. Community Driven Development

1.1 Participatory Planning and Management 1.1.1 Strengthening of ARC Role in Local Development Planning 1.1.2 Strategic Development Planning for ARBOs 1.1.3 Human Resource Development for ARBOs 1.1.4 Development of a management information system

1.2 Project Management 2. Agriculture and Enterprise Development and Management

2.1 Fiscal Management 2.1.1 Resource Mobilization and Management for ARBOs 2.1.2 Financial Management for ARBOs

2.2. Networking and Alliance Building for ARBOs 2.3 Strengthening of anchor organizations for ARCCESS

2.3 1 Orientation on AED 2.3.2 Technical Assistance on Productivity Improvement

2.4 Micro-Finance Institutions for Rural Finance Services 2.4.1 Coordination with Micro-Finance Institutions for Rural Finance Services

2.5 Technical Assistance on Business Planning 2.6 Implementation of agriculture and enterprise development projects (ARCCESS and other modes)

3. Project Management 3.1 Project Implementation and Management 3.2 Project Monitoring and Evaluation Training for ARBOs and Barangay Agrarian Reform Committees 3.3 Leadership and Management for ARBOs

4. Cross-Cutting Themes for ARCs 4.1 Peace

4.1.1 Internalizing the Conflict-Sensitive and Peace Promoting (CSPP) lens in the context of the ARCDP

4.1.2 Institutionalization of a peace perspective using the peace lens tool in the project cycle and M&E

4.2 Gender Balance 4.2.1 Integrating  Gender  Balance  and  Women’s  Participation  Targets  into  SPPP 4.2.2 Capital  Formation  on  Gender  and  Development  (GAD)  and  Strengthening  Women’s  

Participation for Sustainable Rural Development 4.2.3 Valuation  of  Performance  against  GAD  and  Women’s  Participation  Targets

4.3 Environmental Sustainability 4.3.1 Mainstreaming Environmental Sustainability Targets in ARCDPs and SPPP 4.3.2 Orientation/Workshop on Climate Change Adaptation (CCA) and Disaster Risk Reduction

and Management (DRRM) for Sustainable Rural Development 4.3.3 Orientation/ Training on Compliance to Environmental Safeguards 4.3.4 Orientation and Coaching on Establishing Disaster-Resilient Subprojects 4.3.5 Evaluation of Performance against Environmental Safeguard Targets

Page 91: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 32 | P a g e

COMPONENT / ACTIVITY

B. Local Government 1. Community Driven Development

1.1 Participatory Planning and Management 1.1.1 Community Consultations to Formulate/ Validate / Review ARC Development Plans

(ARCDPs) and Strategic Participatory Planning Process (SPPP) 1.1.2 Strengthening the Local Development Councils (LDCs) 1.1.3 Development of a management information system

2. Agriculture and Enterprise Development (AED) 2.1 Farm system management, enterprise development and extension services 2.2 Facilitation of the formation of mechanisms at the LGU and ARC for knowledge sharing of best

practices in agriculture and agribusiness 2.3 Facilitation of donor and Investment Forum to expand market linkages 2.4 Capital Formation on PPP as strategy to attract investments in agriculture 2.5 Evaluation of extension of agricultural and enterprise development services to ARCs

3. Rural Infrastructure 3.1 Fiscal Management

3.1.1 LGU Orientation on the PBGS for ARMM 3.1.2 Fiduciary training/workshop for Municipal and DARPO Accountants on disbursement,

liquidation and reporting RI subproject costs 3.2 Internal Control Systems Training 3.3 Regular publication of Financial Statements 3.4 Procurement

3.4.1 Development of the Harmonized ARCP II for ARMM Procurement Guidelines using the Philippines’  RA  9184  and  ADB’s  Procurement  Policies  

3.4.2 Strengthening  and  Reconstitution  of  LGUs’  Bids  and  Awards  Committees  (BAC) 3.4.3 Procurement Training/ Re-Orientation for all LGUs with subprojects 3.4.4 Monitoring of Execution of Contracts 3.4.5 Evaluation of the Conduct of the Procurement Process for All Subprojects

3.5 Project Development, Implementation and Management 3.5.1 Technical Assistance and Advisory Services in the preparation of Detailed Engineering

Design (DED), of Work (POW), Site Validation Survey and Feasibility Study Preparation 3.5.2 Contract Management and Supervision 3.5.3 Development of Operation and Maintenance Plan (O&M) 3.5.4 Infrastructure Quality Assurance System 3.5.4 Orientation on the Infrastructure Quality Monitoring and Durability System (IQMDS) 3.5.5 Training on Quality Operation and Maintenance Procedures, Policies and Subproject

Evaluation/Rating System 3.5.6 Participation in the formulation of the O&M Quality System by the ARCPII Quality

Assurance Firm 4. Project Management

4.1 Participatory Planning and Management 4.1.1 Strengthening the Local Project Offices (LPOs) 4.1.2 Developing a Subproject Sustainability Plan 4.1.3 Training assistance to design and produce IEC materials, social marketing and advocacy

campaigns

Page 92: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 33 | P a g e

COMPONENT / ACTIVITY

4.1.4 Training Needs Assessment for all Key Stakeholders 4.1.5 Training on Design and Module Development (for Training Programs on RI, AED, PIM,

Impact Areas and Cross-Cutting Themes) 4.1.6 Training of Trainers (TOT) for Community Development Officers, LPOs, DARPOs and

selected DAR/ARMM Staff 4.2 Competency Building on Monitoring and Evaluation of CDOs, LPOs, DARPOs & selected

DAR/ARMM Staff 4.2.1 Progress & Evaluation Reports Writeshops

5. Cross cutting themes for the LGUS 5.1 Gender Balance

5.1.1 Monitoring  of  GAD  and  Women’s  Participation  Targets  through  the  peace  and  development council

5.2 Environmental Sustainability 5.2.1 Orientation/Workshop on Climate Change Adaptation (CCA) and Disaster Risk Reduction

and Management (DRRM) for Sustainable Rural Development 5.2.2 Orientation and Coaching on Establishing Disaster-Resilient Subprojects 5.2.3 Monitoring of Environmental Safeguard Targets through the peace and development

council C. Regional Government

1. Project Management and Coordination 1.1 Customizing the PBGS for ARMM 1.2 Creation and strengthening of the ARMM PBGS technical working group 1.3 Identification of convergence areas between ARCP II and PAMANA 1.4 Planning and identification of social and physical infrastructures that will complement the

PAMANA program 1.5 Competency Building on Monitoring and Evaluation of CDOs, LPOs, DARPOs & selected

DAR/ARMM Staff 1.6 Progress & Evaluation Reports Writeshops

2. Crosscutting Themes for the Regional Government 2.1 Peace

2.1.1 Peace and conflict impact assessment 2.1.2 Monitoring and evaluation of peace initiatives through the peace and development

council 2.2 Environmental Sustainability

2.2.1 Orientation/Workshop on Climate Change Adaptation (CCA) and Disaster Risk Reduction and Management (DRRM) for Sustainable Rural Development

2.3 Project coordination and monitoring and evaluation

Page 93: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 34 | P a g e

Table 4. Indicative CapDev Plan Budget per Component

COMPONENT / SUB-COMPONENT ALLOCATION

Total Amount Percentage (inPhP)

A. ARCs 65%

22,425,000 1. Community Driven Development

1.1 Participatory Planning and Management 10% 2,242,500 2. Agriculture and Enterprise Development

2.1 Fiscal Management 10% 2,242,500 2.2 Agriculture and Enterprise Development (AED)

(demo farms, technology transfer, etc) 62% 13,903,500 3. Project Management

3.1 Project Implementation and Management 7% 1,569,750 4. Crosscutting Themes for ARCs

4.1 Peace 4% 672,750 4.2 Gender Balance 4% 897,000 4.3 Environmental Sustainability 4% 897,000 B. Local Government 25%

8,625,000

1. Community Driven Development 1.1 Participatory Planning and Management 10% 862,500

2. Agriculture and Enterprise Development 2.1 Farm system management, enterprise

development and management extension support 10% 862,500

3. Rural Infrastructure 3.1 Fiscal Management 10% 862,500

3.2 Procurement 25% 2,156,250 3.3 Project Supervision & construction management 20% 1,725,000 4. Project Management

4.1 Agriculture and enterprise management 10% 862,500 4.2 Project Monitoring and evaluation 7% 603,750 5. Crosscutting Themes for LGUs

5.1 Gender Balance 4% 345,000 5.2 Environmental Sustainability 4% 345,000 C. Regional Government 10%

3,450,000

1. Project Management 1.1 Project supervision and regional coordination 50% 1,725,000

1.2 Planning, Monitoring and Evaluation, and Reporting 30% 1,035,000

2. Crosscutting Themes for Regional Government 2.2 Peace 10% 345,000

2.3 Environmental Sustainability 10% 345,000 OVERALL TOTAL 100% 34,500,000

Page 94: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 35 | P a g e

Table 5. Indicative CapDev Work Plan.

CAPDEV LEVEL / COMPONENT / ACTIVITY SCHEDULE

2012 2013 2014 1st Sem 2nd Sem 1st Sem 2nd Sem 1st Sem 2nd Sem

A. Agrarian Reform Communities 1. Community Driven Development

1.1 Participatory Planning and Management

2. Agriculture and Enterprise Development 2.1 Fiscal Management 2.2 Farm management and enterprise

development 3. Project Implementation and Management

3.1 Project Implementation and Management

4. Crosscutting Themes at the ARC Level 3.1 Peace 3.2 Gender Balance 3.3 Environmental Sustainability

B. Local Government 1. Community Driven Development

1.1 Participatory Planning and Management

2. Agriculture and Enterprise Development 2.1 Agriculture and Enterprise

Development (AED) 3. Rural Infrastructure 3.1 Fiscal Management

3.2 Procurement 4. Project Management

4.1 Participatory Planning and Management

4.2 Project Implementation and Management

5. Crosscutting Theme at the LGU Level 5.1 Gender Balance 5.2 Environmental Sustainability C. Regional Government

1. Project Management 1.1 Fiscal Management

1.2 Project coordination and Monitoring and Evaluation

2. Crosscutting Theme at the Regional Level 2.2 Peace

2.3 Environmental Sustainability

Page 95: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 36 | P a g e

ANNEX 5. AED Capacity Development Plan

Operationalizing Agriculture and Enterprise Development (AED) in the Autonomous Region in Muslim Mindanao

A Capacity Development Framework

for Agrarian Reform Communities in ARMM

Agrarian Reform Community Project II (ARCPII) Background and Rationale The Department of Agrarian Reform recognizes the importance of capacitating the Agrarian Reform Communities (ARCs) and the concerned local governance institutions to enable them optimize the use of the lands provided to the communities under the CARP. The Agrarian Reform Community Project (ARCP II) was designed to essentially build capacities of LGUs, ARCs and other local stakeholders to facilitate the access of select ARCs to essential support services and markets, which shall aid them transform from subsistence producers toward enterprise development. ARCP II adopts community-driven development strategies to reach out to large segments of the rural poor in the ARCs to strengthen their physical and social capital. The Agrarian Reform Beneficiaries in most areas covered by ARCP II have been provided with important production resources namely the - LAND, some common service facilities among others but using them to be productive and profitable still are wanting.

The main premise to the Agrarian Reform Beneficiaries Capacity Development Plan is the LAND (or the car or automobile in the analogy in the above box). The ARB-CapDev Plan may actually be referred to as the core objective of development interventions whether the focus is on technology transfer on agriculture / rural development, health, water and sanitation, governance and others. The CapDev Plan may involve various methods, processes and strategies that focus on individuals and organizations vis a vis their desired outcomes. The critical components are the methods comprising the appropriate assessment mechanisms to identify gaps in attaining development or

For illustration purposes, we may consider them as top of the line automobiles. To use them efficiently, one needs to know how to drive them. The required skills to drive may vary for manual and automatic transmission. Maybe a few would be able to drive them. They should be familiar with which fuel to use-diesel or gasoline. Further, knowledge on maintenance both preventive and troubleshooting should be learned for the unit. These and many more skills and knowledge could spell the life cycle of the unit and safety of the operator and riders, pedestrians and others on the road. Driving skills alone without the courtesy and knowledge of traffic rules are other concerns like when to use / engage 4 x 4 especially in off road and muddy roads.

Page 96: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 37 | P a g e

the desired outcomes. The ARCP II in ARMM selected ARCs through the Special Management Team or SMT share the visions of the Program and the Department of Agrarian Reform- “The   Project   is   aimed to reduce poverty and thus improve the socio-economic status of the identified communities in selected ARCs and ARC clusters. Specifically, the Project aims to increase the income of the ARBs and other farmers in the Project areas and to contribute to improved quality of life in the ARCs in a sustainable manner. The Project is expected to achieve the following outcomes: (i) improved access to livelihood assets by the rural poor including the landless farm workers; (ii) developed sustainable livelihoods, agribusinesses and long lasting improvements in the well-being of the poor and marginalized groups  in  the  target  communities.” As stated in the Project Document the outcomes desired are as follows: Outputs To achieve the outcomes of poverty reduction and sustainable livelihoods, the Project will support the following outputs:

(i) CDD consisting of (a) social capital formation for community organizing and participation, (b) participatory detailed ARC planning, (c) organizational development of community organizations, and (d) improved LGU capacity for better governance.

(ii) Agriculture and enterprise development including

(a) transfer of technology, (b) entrepreneurship development among ARC organizations, (c) improved linkages between the private sector and ARC organizations leading to increased

investments into rural areas for growth, (d) community-based savings and lending groups, and (e) land tenure improvement.

(iii) Rural infrastructure development.

(iv) Project implementation and management.

The CapDev Plan particularly for the AED Component, relative to the Business Development Services of the SMT and DAR-ARMM for the ARBs / ARCs would embody the aspirations of beneficiaries and their communities, aligned perceptions and attitudes towards enhanced entrepreneurship as a means to maximize benefits from the fruits of their efforts and their awarded lands including other resources provided like the common service facilities under ARCCESS, establishing partnerships with relevant organizations (NGOs, CSOs, LGUs and other Development Agencies. The CapDev Plan is developed as a sequel to the milestones attained through the Community Driven Development Component that achieved community organizing, participatory ARC planning and organizational development activities with the community organizations like the ARBOs in the covered ARCs in ARMM.

Page 97: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 38 | P a g e

Objectives The overall objective of the CapDev Plan for ARCs is to develop capacities of the Agrarian Reform Beneficiaries (ARBs) and the Agrarian Reform Beneficiary Organizations (ARBOs) to develop and manage sustainable livelihoods to increase incomes and quality of life through the following impact areas:

(a) Agriculture Enterprise Development (AED) for improve productivity and profitability of distributed lands through the introduction of sustainable agriculture technologies, farm productivity, and value adding activities.

(b) Agrarian Reform Beneficiary Organization that adopts new technologies, techniques, systems, processes, structures, and mechanisms supportive of sustainable enterprise development.

Approach and Methodology Methods: Developing capacities of the ARBs and their organizations (ARBOs) is not only about technology transfer or enterprise development. It covers a wide array of complexities and realities faced by the subjects and objects of interventions. It is a process of developing capacities to address problems and constraints perceived / experienced by the ARBs. It is important for them to enhance their respective involvements in their own concerns and those of their organizations and design common solutions that would benefit them. Prior to any intervention, it is important to generate a purposeful diagnosis to identify the desire for change, the local context and the GAPS. The method should be to the extent possible –participatory as a means to ensure that the CapDev design is built on firm foundation to trigger local ownership and commitment, and develop working partnership and relationship. Further, attitudes are considered a major factor when considering which methods to employ. The method should endeavor to instill their appreciation of reciprocity between parts and whole to understand individual roles vis-à-vis their organization and their community as a whole. This method takes-off from the accomplishments made under the CDD. Strategies: Capacity development strategies are based on assumptions and gaps identified to deal with identified concerns / constraints and the means to address them. The desired outcomes of increasing incomes and the quality of life of ARBs are seen to be the general objective of their strategies. The strategies would consider the dynamics and sensitivities of individual beneficiaries, their organization and the community at large. Improved technologies to ensure productivity and profitability are only components of a broader objective for capacity development. Socio-political, environmental concerns are integral parts of the capacity development strategies. Discipline among the ARBs relative to identified and agreed strategies to overcome perceived problems may be used as a measure to evaluate capacities developed.

Page 98: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 39 | P a g e

Processes: Process techniques such as participatory institutional assessments, action planning workshops, conflict and dispute resolution and team building are the key of any approach to strategy implementation. Capacity development encompasses changes and innovation for the future of the ARBs, ARBOs and their communities at large to attain the desired outcomes. Emphasis on process should shape the design of interventions that must go beyond the conventional activities of training, advisory services and equipment supply. Capacity Development Planning Framework

Activities will be undertaken to assist the ARBs in establishing systems (including running their farming / fishing as a sustainable enterprise), strengthening the ARB organizations, and supporting human resource development in enhancing rural economies and societies, including technical cooperation projects and or partners from the NGA, CSOs, and others.

Page 99: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 40 | P a g e

Working as an organized unit in the communities, the ARBOs can address a particular concern or constraint facing the Agrarian Reform Beneficiaries in generating economies of scale to be able to effectively and efficiently compete in the formal markets. Like in most of the successful organizations, trust should be developed and earned by the respective ARBs and their organizations to be able to attain the apex of ensuring strategic collaboration in the ARBOs and ARCs.

Page 100: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 41 | P a g e

Goal setting by the ARBOs would be clearer when relationships between and among the ARBs, ARBOs and the broader society or community are developed.

The above box is an example of commodity and process flow enterprise activities on coffee where ARBs deliver their ripe coffee cherries to the ARBOs or their federation who aside from consolidating, provides other services / equipment like those from ARCCESS (with schedule of fees) and further assist them in generating higher value products from the coffee delivered by ARBs. The illustration shows the outcome desired on addressing or providing solution to the concerns on economies of scale. This would augur well with the objective of attaining better market arrangements among others. The Role of the Local Government Unit The local government unit (LGU) is at the forefront to provide the enabling mechanisms for agriculture and economic enterprise development as mandated by the local government code and the Organic Act of ARMM. In the context of agrarian reform communities (ARCs) development in the agriculture sector, the delivery of land tenure improvement must be integrated with the holistic provision of support services. The goal to achieve food security and increased incomes under the overall objective of Competitive and Sustainable Agriculture and Fisheries, which seeks to transform agrarian reform beneficiaries into viable entrepreneurs as articulated in the Philippine Development Plan (PDP) has to be localized by engaging the full power and authority of the local government units. The need for contextualizing the agricultural development in ARCs with respect to local initiatives is the more appropriate way to go forward. This will call for more effective enterprise-based agricultural development with the active involvement of stakeholders in local agricultural planning and management. Thus, the role of the LGU  shifts  from  being  “facilitator”  to  becoming  an  “enabler”  through  the  provision  of  a  conducive  environment for the development of agriculture enterprise in ARCs.

Page 101: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 42 | P a g e

The main strategy in the provision of support services to beneficiaries is contained in the ARC Development Plan (ARCDP), which incorporates all the development requirements like land tenure improvement, capacity development, organizational strengthening, agri-enterprise, access to credit, physical infrastructures, basic services, farm productivity enhancement, and gender and development. The ARCDP will serve as the basis in the formulation of agri-enterprise development plan and implementation based on the identified industry or commodity priorities.

CapDev Plan Implementation Consultations The implementation of the CapDev plan for the ARBOs rest on the assumption that most, if not all, all of them are organized. Some are registered as associations and others as cooperatives recognized by the Cooperative Development Authority (CDA). The organizational maturity of these organizations, however, widely varies along the CapDev continuum whose members are former employees and assumed to have finished college on one hand and on the other extreme, farmer members who have not finished secondary and or collegiate level education. Key to the implementation is a thorough ARB organizational consultation and communication process to impart to them the AED CapDev Plan which becomes the basis for the roadmap of interventions. The ideal construct is where possible, the LGU, NGOs and other partners including members of the broader community. Discussions would also cover their previous individual and group livelihood and or enterprises and potential sustainable enterprises including investment decisions from endogenous and exogenous sources, mobilizing also the culture of savings and other relevant aspects. The desired outcome from this phase of the activities is the acceptance and support of the leaders and members of the ARBOs and ARC to link the sense of need to a vision of the future, own and take responsibility for the change process, and demonstrate willingness to partner with other stakeholders. The activity should be participative and illustrations and discussions should be  as  local  can  be  and  endeavor  to  establish  “ownership”  of  the  ideas  and  plans.   Technical Inputs When   the   “landscape   has   been   prepared”   where   trust   among   the   members   shall have been addressed and gained, other component inputs shall be introduced like Appropriate Enterprise Development and Technical Inputs for desired sustainable individual or collective (to generate economies of scale among others) livelihood or business. Experts from different fields would be asked to provide a menu of potential commodities based on market demands, agro-ecological characteristic of the areas, technologies required to produce market needs, efficient consolidation mechanisms and maximize economies of scale to be competitive.  It  is  imperative  to  ensure  a  “strategic  fit”  of  factors  /  interventions  to  generate  the  desired outcomes. Credit / rural finance could also be tapped not necessarily through external financing but by enhancing the savings culture from within to secure equity requirements of the project and sustain its financial needs.

Page 102: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 43 | P a g e

Rural Infrastructure shall also be considered particularly to improve transport and minimize costs of bringing their produce to the markets. Other experts could also provide a menu for possible value adding potentials of their targeted commodities. Separate trainings would be implemented for the leaders who may be responsible in managing the ARBO projects, those responsible in handling the financial /accounting of the organizations – basic accounting and bookkeeping, technicians – with improved cropping systems / livestock husbandry. These are some of the list of trainings for enhanced AED CapDev Plan. All these combinations lead towards Agrarian Reform  beneficiaries’  productivity  and  profitability. These are also seen to accomplish the desired outcomes of better incomes and quality of life of the ARBs in the DAR –ARCP II covered ARCs in ARMM. Agrarian Reform Community Connectivity and Economic Support Services (ARCCESS) With the advent of probable releases soon of approved ARCCESS proposals of the SMT covered ARBOs in ARMM, it would, to some extent reflect appropriate interventions to enhance capabilities of ARBOs to establish sustainable enterprises particularly with:

the provision of professional services to ARBOs, the provision of common service facilities, procurement requirements, the provision of ancillary services

These interventions are not seen to establish project but are designed to support   the   ARBOs’  core projects, e.g. Tractors – to improve efficiency and better land preparation operations to enhance their corn production and marketing projects. As implied, the ARBOs should be able to establish what they want and what do they need to decide and embark on the projects under ARCCESS. Also as the name reflects, it is not the core project instead used as support to agricultural productivity and profitability.

Page 103: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 44 | P a g e

ANNEX 6. Coffee Value Chain Study for Sulu Province

I. Industry Situation Coffee is one beverage that is almost always present on the table every day. Almost all people have drunk at least a cup of the beverage in their lives. Coffee producing countries, on the average, consume only 20-25% of their produce. The rest are exported to industrial countries. In the world market, coffee is the second most traded product in dollar terms, next only to petroleum. In the Philippines, 80 percent of Filipinos drink coffee with a consumption rate of about five cups per day. Nestle Corporation, the biggest buyer of coffee beans in the country, correlates coffee drinking of Filipinos to income. The company observed that when Filipino farmers have good harvests, the sale of instant coffee increases. Coffee producers in the country cultivate green coffee beans, the varieties of which are Robusta, Excelsa, Liberica (Philippine Barako)  and  Arabica.  Robusta  makes  up  around  90%  of  the  country’s  total coffee production because it is the most suitable variety in the Philippine soil and climatic conditions. Roasted/ground coffee are also produced and sold to institutional outlets like hotels, coffee shops and restaurants. Instant or soluble coffee is also manufactured in the form of either fine powder or granules using the hot air drying method. Coffee was introduced to the Philippines in 1740 by Franciscan monk who brought three gantas of Arabian   coffee   beans.     By   1880,   Philippines   became   the   world’s   fourth   largest   exporter   of  coffee. Thus, coffee production is not a new industry in the Philippines. Based on the National Coffee   Development   Board   (NCDB)   report,   the   country’s   coffee   consumption   reached   55,000  metric tons in 2004 with domestic production for the same period placed at 27,000 metric tons only, a shortfall of almost half of the demand. Prospects for the industry are generally positive and it is the best time to rejuvenate the industry particularly in the province of Sulu. Farm gate price of dried berries has increased from P20/kg to P30/kg due to the decrease in global coffee yield and increasing consumer demand as coffee drinking has become an avenue for social gathering. The  Province  of  Sulu  has  had  a  “coffee  culture”  for  several  centuries.  Until  today,  coffee  is  still  an  important commodity in the province. Several interventions from government agencies like the Department of Agriculture, and the Provincial Government through the Provincial Agriculturist Office, separately and/or collaboratively with the private sector were implemented to support the industry. The province has around 2,000 hectares planted to coffee based on the report of Sulu Kahawa Sug Task Force. A large part of this coffee production area is concentrated in the municipal towns of Parang, Panglima Estino, Patikul and Indanan although there are also smaller areas in seven other municipalities. Current productivity in Sulu is considered low because coffee trees are mostly old and therefore already low yielding, a situation aggravated by low maintenance adopted by coffee farmers. Yield is estimated to average only about 350 kg/hectare. This is way below the production output of major exporting countries such as Brazil and Colombia pegged at more than two metric tons per hectare. Meanwhile, poor post-harvest handling methods and facilities produce low quality beans that fetch lower buying price.

Page 104: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 45 | P a g e

Technology and inputs for production are not sufficient both for organic or traditional management. Post-harvest facilities and systems are still wanting. The ready-to-brew output is still insufficient for the markets. However, Sulu coffee has a distinct flavor. It has developed its own market niche, however, supply has always been lacking and does not meet the demand. This is one market opportunity for the coffee industry in the province to take advantage of. Increasing productivity, improved post-harvest facilities and practices and better processing equipment and systems could provide even more opportunities to the coffee stakeholders. Value chain is considered as a business model to improve the existing industry situation in the province and to optimize participation of key players at each stage of the chain. It involves all key stakeholders   from   the   production   input   stage   of   a   commodity   down   to   the   “transformed”  finished product for the consumers. A number of interrelationships among key players and reflects various linkages both horizontal and vertical. The paramount concern in the value chain is how to increase the profits of each player as they work towards the taking advantage of market opportunities  to  satisfy  the  consumers’ demand for with quality products, thus this study is was undertaken.

II. Relevance of Coffee in Sulu Around  1,600  farmers  work   in  Sulu’s  2,000  hectares  of   land  plated  to  coffee.  The  potentials  for  value adding by doing the different recommended mechanisms to transform the harvested coffee cherries could offer opportunities to Sulu coffee growers. Coffee production is largely concentrated in the four municipalities mentioned earlier with a volume of production of around 3,408 MT or 90% of the total production in the province. Production yield per hectare is low due to poor maintenance and harvesting practices, and inefficient and inadequate post-harvest handling and facilities resulting in low quality beans (Table 1). The traditional process of coffee production and marketing is still being practiced in Sulu. Farmers are not equipped to process coffee beans efficiently; sometimes it would take them a month before they can finally deliver processed coffee beans or powder to the market. Given this extended period, the coffee berries would undergo a process that compromises their quality. The traditional form of harvesting where farmers do not choose mature cherries from the immature ones has been observed. On the drying method, the farmers prefer to dry the cherries along the roads where vehicles literally run over them. The farmers prefer this because they believe that this improves the quality and taste of their coffee.

Page 105: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 46 | P a g e

Table 1. Coffee Production in Sulu

LGU Area Planted

(Hectares) Area Harvested Production (MT)

Yield (MT/Hectare)

No. of Farmers

Patikul 1,570 1,570 2,747.5 1.75 157 Parang 260 260 343.2 1.32 520 P.Estino 160 160 120 0.75 320 Talipao 104 104 83.2 0.80 104 Luuk 89 85 45 0.53 135 Indanan 82 82 196.8 2.40 82 K.Caluang 55 55 35 0.55 55 P.Tahil - - - 0.80 - Panamao 35 35 19.25 0.50 70 Maimbung 10.75 10.75 8.6 1.55 32 Pandami 2 2 1 2.25 6 Pangutaran 5 5 7.75 3.15 10 Lugus 15 15 33.75 2.25 30 Siasi 50 50 157.5 1.55 50 Tapul 4 4 9 3.00 12 Pata 2 2 3.1 1.56 20 Banguingui 1.5 1 3 0.55 15 TOTAL 2,445.25 2,440.75 3,813.65 0.80 1,618 Department of Agriculture – Sulu Kahawa Sug Task Force For each hectare, an average of five farm hands is employed to harvest and process the coffee cherries to beans. Thus, at least about 12,000 people are directly benefiting from the industry. The Kahawa Sug (Coffee) Task Force has highlighted poor crop maintenance and the wasteful harvesting system as the major causes of the low productivity of coffee. This situation is perpetuated by the current practice of compensating harvesters based on the volume (measured in cans). The workers would harvest as many cherries as possible including green immature cherries which, if allowed to mature, would increase the yield several folds. Surprisingly, almost every household in coffee producing farms have year round supply of homemade coffee brew. It is believed that because the green beans cannot be sold competitively, they are kept by growers for household use rather than marketing them at low prices. To save the coffee culture in the province, the Kahawa Sug Task Force, the group tasked to directly help the coffee farmers of Sulu, came up with a comprehensive program and appropriate intervention in collaboration with ODA programs of CIDA and UNDP, the business sector and local coffee producers and stakeholders. The coffee industry development plan was formulated to essentially revive the coffee industry. It is one of the priorities in the proposed Sulu Provincial Agro-Fishery Master Plan. The larger goal was to improve the socio-economic status of Sulu farmers engaged in coffee production and to specifically enable them to earn higher revenues from coffee production. Three-pronged strategies were identified so that coffee farmers can derive greater economic benefits, namely: (1) rejuvenating the productivity of coffee trees, (2) improving the quality of coffee beans produced, and (3) enhancing product marketing. A key element in improving the economic benefits from coffee farming in Sulu is the restoration and enhancement of the productivity of existing coffee trees. This would mainly entail rejuvenation coupled with improving cultural management practices, and nutrient and pest management to increase yields. Second is raising the quality of the coffee beans they produce

Page 106: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 47 | P a g e

through utilization of better post-harvest handling technologies for coffee farmers to realize higher revenues. The use of mechanical coffee hullers will reduce labor costs while increasing quality of beans derived from mature, red cherries. Lastly,   coffee   producers’   revenues  will   be  enhanced if they are able to get better marketing terms for their crop which can be achieved through the a distinctive brand identity for Sulu coffee. The establishment of consolidation centers either solely for coffee or in combination with other focused commodities was considered to further reduce costs and other address marketing constraints of small coffee growers.

III. Markets There are a number of coffee processors and institutional buyers in the country (e.g., Nestle and CFC) and a local producer in Davao City. Nestle, however, is the leading buyer of green coffee with a total market share of 90%. Seventy-five percent of this is used to produce Nescafe classic. The firm has five factories in the country, which require 75,000 kilograms of green coffee per day. Table 2 below shows the supply and distribution requirement for coffee of Nestle Philippines.

Table 2. Supply and Distribution Requirements of Nestle

Year Volume in Kilogram 1992 38 million 1998 78 million 2012 100 million Distribution of Requirements Robusta 85% Arabica 5% Excelsa and Liberica 10%

Nestle has established coffee satellite buying stations but Sulu coffee farmers could hardly meet its stringent quality requirements and standards. Most, if not all, coffee outputs of Sulu are consumed locally or sold in adjacent and nearby provinces in Zamboanga peninsula through the traditional supply chain such as the collector or processor. The coffee produced in the province, however, has limited export markets although with proper technologies, it is very possible to consider niche markets.

IV. Coffee Value Chain Analysis The value chain describes the full range of activities which are required to bring a product or service from conception, through the different phases of production (involving a combination of physical transformation and the input of various producer services), delivery to final consumers, and final disposal after use.4 Value Chain Analysis has been used by development/donor agencies to map out the qualitative and quantitative aspects aside from tracing the flow and transformation of the products and services from inputs stage to its final forms to users or consumers.

4 Kaplinsky and Morris, 2000

Page 107: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 48 | P a g e

Table 3 below shows a comparison between value chain and traditional business which indicates how the value chain contrasts with traditional business relationships. Relationships also include dynamics among firms, access to learning and innovation and distribution of benefits. Value chain offers a new way to view the mechanisms to enhance incomes by actors or key players while satisfying market opportunities.

Table 3. Value Chain and Traditional Business Relationships

Value Chain Traditional Communication Extensive Little or none Value Focus Value/Quality Cost/Price Product Differentiated product Commodity System Driver Consumer Pull Production Push Organizational Structure Interdependant Independant Business Relationships Collaborative Adversarial Source of Supply Known and Traceable Anonymous Source of Risk Relationships Market and Price

Source: Value Chain Manitoba Initiative The value chain study considers the set of specific and interrelated activities as shown in Table 4 which shall be subject to further validation and consultation among the key players in Sulu. As far as the ARCP2-ARMM is concerned, the VC study is relevant to the ARC in Panamao, Sulu handled by  the  Peoples’  Alliance  for  Progress  MPC.

Table  4.  Perceived  Value  Chain  of  Sulu’s  Coffee  Industry

Value Chain

PRODUCTION Primary Product

PROCESSING Primary Intermediate

PROCESSING Primary Intermediate

CONSUMPTION Final Product

Product Coffee cherries (red-ripe)

Green coffee beans Roasted Ground Coffee Blending

Kahawa Sug / Royal Coffee (Brands)

Coffee Powder Flavored Ground Coffee

for brew and specialty coffee shops

Process Coffee seeds/seedling Planting, maintenance Harvesting, post harvest

Dry milling Wet milling

Final Sorting Quality Control

Grinding Blending

Inputs

Coffee seeds Planters Nutrient and Soil

Ameliorants Pest and Disease

control mechanisms

Red-ripe coffee cherries

Dry & Wet milling equipment and facilities

Drying facilities

Quality green coffee beans dried to 12% MC

Coffee Roaster Coffee grinder

Water proof and air tight packs

Kahawa Sug / Royal Coffee packages in Abaca bags

Major Actors Farmer Growers Financial Institutions,

(formal and informal) Transport facilities Input Suppliers Technology providers

Farmers Contract Processors /

Workers

Coffee Processors Coffee Buyers and

consolidators

Kahawa Sug/Royal Coffee Wholesalers and Retailers Specialty Coffee Shops Institutional Coffee

Buyers (Nestle and others)

Support Services

Technology - DAF ARMM, PA of Sulu, Nestle, Mindanao Coffee Board, Phil Coffee Board, Academe SSC & MSU, Land Bank, other Financial Institution, LGUs

DTI, DOST, TESDA, Mindanao Coffee Board, Land Bank, LGUs

Coffee Processors, Coffee Shops, DTI, LGUs, DOST

BFAD, DTI, Packaging Center, Abaca Weavers, FIDA, LGUs

Page 108: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 49 | P a g e

Currently, the coffee outputs are in the form of green coffee beans (GCB) done mostly using the dry process. The objective is to consider expanding the wet processed coffee since aside from the shorter time from harvest to green coffee beans, it is priced higher. The value chain would be considering a number of outputs from semi processed to fully processed coffee. Initially, focus would be made on wet processed green coffee beans which are sold in larger quantities. The study would also validate potentials for roasted coffee beans which are priced higher – more than 200% than the GCB. Finally, the study would validate and consider the actors and process/product transformation to the end product – ready-to-brew ground coffee. The study would endeavor to show the value adding activities by various actors involved in the commodity flow and its transformation from GCB to higher valued products like the ready-to-brew ground coffee. The study is designed to be done in Sulu, however, it is envisioned to be replicated in other ARCs that have sizable coffee plantings.

Table 5. Coffee Value Chain System

Harvested mature red cherries

Wet processed GCB

Assuming @ Php100 per kilo for traditionally processed green coffee beans, the probable price for the wet processed beans could be about 15% higher

Roasted coffee Usually priced @ Php 300 per kilo at retail stores

Ground coffee Pricing would be higher than roasted and depending on brand promotion / acceptance

V. Constraints Analysis A. Production

1. Policy The   coffee   industry   has   not   been   “managed”   following   a   policy   that   could   provide   a   better  direction for the industry stakeholders until recently when the Provincial Government forged an active role in the industry by organizing a task force to oversee and ensure critical supports and assistance to the industry. This intervention was made through Executive Order #03, Series of 2008, creating and organizing the Sulu Provincial Coffee Industry Development Task Force for the purpose of enhancing and facilitating the implementation of the coffee industry development plan of the Province of Sulu. The Executive Order  is  a  manifestation  of  Government’s  appreciation  on  the  impact  of  the  industry  to  the  stakeholders  and  the  province’s  economy.

Page 109: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 50 | P a g e

2. Technical assistance A number of technical assistance was provided by development programs/agencies, national and regional government of ARMM through the Provincial LGU and partners which provided a “stimulus  fund”  to  enhance  the  industry.  The  focus  was  both  on  (1)  ensuring  improved  yields  of  the coffee farms; and (2) putting in place facilities/equipment to further process the coffee cherries and or green coffee beans into higher value outputs.

3. Pests and diseases Pest and diseases which damage the coffee berry and twig borers are being looked into by the Provincial Agriculturist Office and DAF-ARMM. These may be controlled by traditional interventions, that is, through sanitation and pruning but the most effective method of controlling them is through the application of pesticides, particularly the safer organic pesticides.

B. Processing Equipment such as coffee pulpers and hullers, solar dryers (greenhouse dryer), roasters and grinders are now being procured. Depending on market needs and prices, the industry could offer quality green coffee beans, packed roasted coffee beans and ready-to-brew powdered coffee. Training needs of the farmers/growers are also being addressed.

VI. Recommendation To sustain the gains of the province in its effort to revive the coffee industry, the provincial government has to tap and mobilize resources, both external and internal, to fully implement the coffee industry development plan. The master plan has to be fully supported with sufficient budget   in  order   to  meet  the   industry’s  overarching  objectives  of   improving  the  socio-economic status of Sulu coffee farmers and to earn high revenues from coffee production. The Sulu Kahawa Sug Task Force mandated to develop and implement comprehensive programs and interventions to support the development of the coffee industry has to proactively coordinate and link with the national government agencies, the private sector, NGOs, POs and farmers’   cooperatives   and   organizations,   in   terms   of   securing   access   to   production   and   post-harvest technologies, linkages to the market, support facilities and other sectoral concerns. On the production aspect, farmer growers and other informal coffee producers groups require consistent access to quality coffee seeds and production inputs. The task force may coordinate with the Philippine Coffee Board and institutional buyers for technical support and tap its network to access appropriate technology for nursery development and rejuvenation technology for old trees to become productive again. To optimize land availability for coffee production expansion, intercropping coffee with coconut trees or vegetables for cash crops can be introduced by the government agencies. Nursery establishment in the major coffee producing municipalities of Parang, Patikul, Panglima Estino and Indanan is necessary to sustain access to quality seedlings, which will also benefit its neighboring towns.

Page 110: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 51 | P a g e

On post-harvest technology, a modified drying facility that follows the principle and effects of a green house is more appropriate. It is also portable and so it can be transported where it is most needed. These low cost, practical and mature technologies will ensure increased productivity and income for the farmers. It is a time saver and ensures better quality coffee beans. On primary processing, the task force has to continue promotion of and expand the use of a simple and practical technology that fits the condition of the coffee farmers of the island province. For instance, the use of wooden coffee depulping machine produces quality beans since the beans remain whole and undamaged while the pulp is being peeled-off. To ensure continuing support to the development of better practices and low cost technologies applicable on the ground, the task force has to forge partnership with academic institutions such as the Sulu State Polytechnic College for the establishment of demonstration farms and conduct of other relevant researches.

Page 111: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 52 | P a g e

ANNEX 7. Status of Project Implementation in ARMM

LP Fund Releases and Disbursements As of June 30, 2014

Municipality Subproject Physical

Accomplishment

Estimated Amount of LP

Request Outstanding

Total LP Releases

LP Disbursement Submitted to NPCO/MDFO

LP Disbursement

Still with LGUs/for

Completion of SORD

Total Disbursement by LGUs, June

30, 2014

Under- (over-) Utilization of LP Fund Releases, June 30, 2014

Ungkaya Pukan

Concreting of Phil-Am-Buhe-Pahu FMR 86.46% 2,840,840.79 8,272,022.38 10,845,419.34 10,845,419.34 (2,573,396.96)

Tipo-Tipo Concreting of TARBADECO ARC Road Network 100.00% 4,815,053.87 2,827,760.32 5,835,619.34 5,835,619.34 (3,007,859.02) Sumisip Rehabilitation of 9.98km Tumahubong ARC Farm to Market Road 51.15% 6,185,093.61 5,272,810.05 5,272,810.05 (5,272,810.05) Ganassi Construction of Barit-Taliogon-Tabuan FMR 70.05% - 5,164,695.72 5,164,695.72 5,164,695.72 - Poona Bayabao

Concreting and Rehabilitation of Bubong-Ragayan-Gadongan FMR 22.65% - 3,721,408.44 3,721,408.44

Tagoloan Concreting of Kinggan-Tagoloan Poblacion FMR 27.77% - 4,922,008.65 4,922,008.65 Bumbaran Concreting and Rehabilitation of Sumogot FMR 38.80% - 3,695,958.36 3,695,958.36 Ganassi Concreting/Rehabilitation of Taganonok-Taliogon-Paraaba FMR 5.00% 5,764,024.45 - Kabuntalan Const. of Ganta-Gambar FMR 95.00% 1,597,708.35 4,736,425.06 6,360,349.00 6,360,349.00 (1,623,923.94) Datu Paglas Concreting of Tamborong-Bunawan Road 60.24% 3,662,664.20 8,701,267.76 7,530,592.34 7,530,592.34 1,170,675.42 Matanog Concreting of Langkong-Bayanga Norte Road 35.83% - 5,379,377.15 6,287,852.04 6,287,852.04 (908,474.89) Panamao Rehabilitation of Suuh-Kandayok-Kan-Ukol Road 100.00% 1,255,624.45 734,847.81 720,000.00 720,000.00 14,847.81 Pandami Concreting of Parian-Dakula-Lahi-Malanta Farm to Market Road 41.39% 5,645,049.24 5,645,049.24 9,616,579.01 9,616,579.01 (3,971,529.77) Maimbung Concreting of Patao Junction-Ipil Farm-to-Market Road 88.24% 6,682,396.41 4,049,612.40 4,999,971.71 1,115,692.60 6,115,664.31 (2,066,051.91) Maimbung Concreting of Pantao Junction-Kandang Gulangan-Ratag Limbun

FMR 80.95% 3,059,621.49 1,829,961.62 1,258,414.12 571,547.50 1,829,961.62 -

Maimbung Concreting of Tubig Samin Junction-Tambuan FMR 63.44% 1,570,451.50 926,820.90 540,000.00 386,820.90 926,820.90 - Siasi Concreting of Buan, Ratag, Siowing Sipanding and Duggo FMR 0.00% 4,438,707.94 - Sibutu Construction of 3-Unit Classroom School Building (Brgy.

Tandubanak) 99.55% - 362,745.14 970,977.11 970,977.11 (608,231.97)

Sibutu Construction of 3-Unit Classroom School Building (Brgy. Ungus-Ungus) 100.00% - 363,431.85 972,693.89 972,693.89 (609,262.04)

Sibutu Construction of 3-Unit Classroom School Building (Brgy. Taungoh) 98.45% - 362,745.14 712,049.88 712,049.88 (349,304.74)

Sibutu Construction of 3-Unit Classroom School Building (Brgy. Tongehat) 96.04% - 363,431.85 972,693.89 972,693.89 (609,262.04)

Page 112: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 53 | P a g e

Municipality Subproject Physical

Accomplishment

Estimated Amount of LP

Request Outstanding

Total LP Releases

LP Disbursement Submitted to NPCO/MDFO

LP Disbursement

Still with LGUs/for

Completion of SORD

Total Disbursement by LGUs, June

30, 2014

Under- (over-) Utilization of LP Fund Releases, June 30, 2014

Sibutu Construction of 3-Unit Classroom School Building (Brgy. Ungus-Ungus) 99.24% - 362,745.14 972,693.89 972,693.89 (609,948.75)

Sibutu Construction of 3-Unit Classroom School Building (Brgy. Tongsibalo) 96.92% - 363,431.85 712,049.88 712,049.88 (348,618.03)

Sibutu Construction of Barangay Ungus-Ungus Health Station 96.50% - 189,454.90 236,642.57 236,642.57 (47,187.67) Sibutu Construction of Barangay Tongsibalo Health Station 96.19% - 189,454.90 511,801.25 511,801.25 (322,346.35) Sibutu Construction of Barangay Tongehat Health Station 96.04% - 189,454.90 511,801.25 511,801.25 (322,346.35) Sibutu Construction of Barangay Taungoh Health Station 66.58% - 260,864.17 325,842.01 325,842.01 (64,977.84) Sibutu Construction of Barangay Tandubanak Health Station 97.67% - 189,454.90 572,445.99 572,445.99 (382,991.09) Total 47,517,236.29 63,804,430.55 58,144,450.63 15,833,604.65 73,978,055.28 (10,173,624.73) 100% 91.13% 24.82% 115.95% -15.95%

Municipality Subproject Physical

Accomplishment

Estimated Amount of LP

Request Outstanding

Total LP Releases

LP Disbursement Submitted to NPCO/MDFO

LP Disbursement

Still with LGUs/for

Completion of SORD

Total Disbursement by LGUs, June

30, 2014

Under- (over-) Utilization of LP Fund Releases, June 30, 2014

28 Subprojects with ongoing implementation 25 Total LP Releases 63,804,430.55 11 LP Disbursement submitted to NPCO/MDFO (SORD) 58,144,450.63 15 LP Disbursement for submission to NPCO 15,833,604.65 23 Total Disbursement as of June 30, 2014 73,978,055.28

Under(Over) utilization of LP Funds (10,173,624.73)

Page 113: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 54 | P a g e

ANNEX 8. Project Implementation in ARMM and Formulation of Recommended Strategies

Page 114: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 55 | P a g e

Page 115: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 56 | P a g e

ANNEX 9. ARCP II Required Documents with Template as of February 3, 2012

Required Documents with Template

REMARKS (For Submission and other Information)

I . Checklist of Requirements for Subproject Appraisal and Approval (Prior to NSAC/RSAC Approval) 1. Letter of Intent from the Mayor √ 1- original copy signed by the mayor 2. MPDC Certification √ 1- original copy signed by the mayor and

noted by the MPDC - The proposed subproject is included in the ARCDP - The proposed subproject is not covered by any

financing assistance from any local or foreign projects

- The proposed subproject is included in the Municipal Development Plan and Annual Investment Plan

3. SB Resolution from LGU indicating: √ 1-Original Copy & 1-LGU Certified True Copy, signed by all the signatories as prescribed by Barangay Council/IA or Coop Board of Directors indicating the three specified conditions

- intention to participate in ARCP 2 - willingness to provide the required equity - giving authority to the Mayor to sign MOA, SPA & AU

4. Barangay/IA/ Coop Resolution expressing commitment to √ 1-Original Copy & 1-LGU Certified True Copy, signed by all the signatories as prescribed by Barangay indicating the three specified conditions

- assist in the negotiation/settlement of Right of Way (ROW) issue

- put up required equity be it in kind and/or cash - operate and maintain the subproject(s) upon turn-over

in accordance with prescribed O&M guidelines/ standards (for all barangays covered by the subproject)

5. Updated Certification from the Local Finance Committee (LCF) on the availability of equity and that the proposed subproject(s) are included in the annual budget of the LGU for the current and ensuing fiscal year(s).Certification should Specify the budget allocation per subproject

√ 1-Original Copy and 1-LGU Certified True Copy, signed by all the signatories as required by the Local Finance Committee and noted by the Mayor

6. LFC Amount 7. Copy of Executive Order Creating Local Project Office

(LPO) √ 1 original copy signed by the mayor

8. Initial site visit report of the RPO/PPO (validation form) √ 9. Copy of Feasibility Study per Subproject Proposal (Using

prescribed format and reviewed/validated by the Regional Economist). Also include location maps of existing roads and other infrastructure facilities, businesses and residential centers as well as service areas and pictures of typical sections captured before, at the start, middle and end of actual construction

√ electronic copy and 1 printed copy

10. Program of Work including Detailed Estimate, Quantification and Abstract of Canvass (using prescribed format and reviewed/validated by the the Regional Rural Infra Engineer)

√ electronic copy and 1 printed copy

11. Detailed Engineering Design including Plans, Profile, Sections and Details (using prescribed format and reviews/validated by the Regional Rural Infra Engineer)

12. Potability Test for Water Supply Subprojects 1-original copy 13. Result of Hydraulic Study Showing availability of water

(for waters supply subproject whose source is ground water)

1-original copy

14. For Water Supply and Irrigation Subprojects, copy of Application for Water Permit filed and received by the office of DPWH District Engineer, the NIA Provincial Irrigation Officer or any deputized agency by the NWRB within the province

1 original copy

Page 116: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 57 | P a g e

Required Documents with Template

REMARKS (For Submission and other Information)

15. Boring Test to determined the capability of Soil to determined the strength and properties of required building foundation

1 original copy

16. Environmental and Social Safeguards Requirements A. ENVIRONMENTAL SAFEGUARDS

1. Initial Environmental Examination (IEE) for the whole ARC

√ 1 original copy or photocopy

2. Environmental Management and Monitoring Plan (EMMP) per subproject

√ 1 original copy or photocopy

3. LGU Application for Environmental Clearance (Environmental Compliance Certificate or Certificate of Non-Coverage) with the DENR

(a) copy of receiving copy of application prior to subproject approval, (b) copy of environmental clearance (ECC or CNC) prior to subproject construction

4. Other related clearances required (Permit to cut trees, water permit, etc)

photocopy

B. INVOLUNTARY RESETTLEMENT 1. LGU Certification on the completeness and accuracy

of submitted documents original copy/certified true photocopy from

the LGU 2. Resettlement Plan (RP) Full RP or Short RP ,

Summary Discussion on Resettlement (SDR) √ original copy/photocopy

3. Documentary requirements/Attachments: 3.1 Locational Map e-copy/original copy 3.2 Masterlist of PAPs √ photocopy 3.3 Summary of Affected Land and

Improvements/Livelihood √ photocopy

3.4 Legal Documents √ original copy/certified true copy from the LGU 3.5 Minutes of Meeting with attendance sheet original copy/certified true copy from the LGU

4. Right of Way Valuation Table 4.1 Proof of Sale, BIR Zonal Valuation, Provincial

Assessor's Valuation Table, Land Bank Certification

photocopy

Others: MAO Certification, CENRO Cert on Value of Trees, Bill of Materials, etc

original copy/certified true copy from the LGU

C. IP 1. LGU Application for NCIP Certification (Certification

Precondition or Certificate of Non-Overlap). For ARCs with IPs include an IP Chapter in the ARCDP

(a) copy of receiving copy of application prior to subproject approval, (b) copy of NCIP Certification prior to subproject construction

II . REQUEST FOR ISSUANCE OF CERTIFICATE OF AVAILABILITY OF FUNDS (CAF) A. Financial Requirements

1. Letter Request from LGU endorsed by NPCO √ 1-Original Copy signed by the Mayor 2. Signed MOA with Sangguniang Bayan (SB) Resolution √ PPO to prepare five (5) original copies. PPO to

facilitate signing of concerned parties at the LGU and submit to NPCO thru RPO. All pages must be signed including attached SB Resolution by the prescribed signatories. Full signature on the last page bearing the printed name of the signatories and all other pages with initial. After signing by NPC and PIO - FAPsO, NPCO will facilitate the notarization of the document and distribution:

2 original copies - NPCO 1 original copy - LGU 2 original copies - Notary Public 1 Certified True Copy - RPO 1 certified true copy - PPO

3. Signed SPA with Annexes and Schedules √ For NSAC approved SPs, NPCO to prepare and forward to LGU thru RPO/PPO for signing. For RSAC approved SPs, RPO will prepare SPA. All pages must be signed including annexes and

Annex A - National/Regional Subproject Approval Committee (NSAC/RSAC ) Resolution

Sched 1 (a) - Subproject Profile

Page 117: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 58 | P a g e

Required Documents with Template

REMARKS (For Submission and other Information)

Sched 1 (b) - Approved Program of Work (POW) schedules. Full signature on the last page bearing the printed name of the signatories and all other pages with initial. After signing at the LGU, PPO thru RPO to submit all five (5) original copies to NPCO. After signing by NPC and PIO-FAPsO, NPCO will facilitate notarization of the documents and distribution:

Sched 1 (c) & 1 (d) - Construction Schedule, S-Curve and Subproject Cash Flow

Sched 2 (a) & 2 (b) - LPO Structure and & LPO Functions and Responsibilities

2 original copies - NPCO

Sched 3 - Condition for Fund Release 1 original copy - LGU Sched 4 - Rural Infrastructure Financing Scheme 2 original copies - Notary Public Sched 5- SB Resolution Authorizing the Municipal

Mayor to sign the SPA, MOA and AU 1 certified true copy - RPO

1 certified true copy - PPO 4. Signed Accession Undertaking (AU) with Annexes √ For NSAC approved subprojects, NPCO to

prepare five (5) original copies and forward to LGU thru RPO/PPO for signing. For RSAC approved subprojects, RPO to prepare AU. Full signature on the last page bearing the printed name of the signatories and all other pages with initial. After signing by the Mayor and other concerned parties, LGU to facilitate notarization of the documents and distribution. LGU to forward two (2) original copies to NPCO thru PPO/RPO. And LGU to furnished one (1) certified true copy each for RPO and PPO.

Annex A - Subproject (SP) Description - prepared and signed by MPDC or ME noted by the Mayor Annex B - SP Implementation Schedule prepared by ME noted by the Mayor Annex C - Documentary Requirements for Fund Releases Annex D - Pro-forma SORD/CSF and SSAF/Audit Certificate, Model Audit Report Annex E- LGU certified true copy of SB Resolution

5. NSAC/RSAC Resolution √ - duly signed by all members of the committee

- annexed to SPA - RPO to submit certified true copy of RSAC

resolution to NPCO B. Technical Requirements

6. Approved Program of Work (NSAC/RSAC Approved) √ For NSAC approved SPs, NPCO to prepare POW and forward to LGU thru RPO/PPO for signing. For RSAC approved SPs, RPO will prepare POW. After signing at the LGU, PPO thru RPO to submit all five (5) original copies to NPCO. After signing by NPC and PIO-FAPsO, NPCO will facilitate distribution:

2 original copies - NPCO 1 original copy - LGU 1 certified true copy - RPO 1 certified true copy - PPO

C. Legal and Safeguards Requirements 7. Endorsement by the Designated Agency of LGU

application for water rights to National Water Resource Board (NWRB)-for PWS and Irrigation subproject

Initially, Certified True Copy of LGU Application received by NWRB for PWS/Irrigation Project. Upon approval, submit the certified true copy of approved application.

Note: The above date states when NPCO submitted to MDFO the Required Documents.

III . PROCUREMENT PLAN √ 1 original copy signed by all the signatories and approved by the mayor

1.Transmittal Memorandum of CAF Addressed to RD, Attention PARO and CC: Mayor

To be prepared by NPCO-Finance & Admin. upon issuance of CAF by MDFO and to be sent at the same time to RD, PARO and Mayor with information for publication of Invitation to Bid (i.e. in National Newspapers, Posting in (1) http://www.adb.org and (2)

Page 118: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 59 | P a g e

Required Documents with Template

REMARKS (For Submission and other Information)

http://www.philgeps.net and posting at any conspicuous place (in the LGU premises).

NPCO to attached original copy of CAF in the memo to be sent to PPO. PPO will transmit the same to the LGU. The attachment for the memo for PPO and LGU will be certified photocopy of the CAF

2. Pre-Procurement Conference √ This can be conducted while waiting the issuance of the CAF in order to prepare all documents for procurement

3. Date Advertise/Publish or Request for Price Quotation (Shopping)

√ Activities 3-17 shall be established and agreed upon by the LGU-BAC during the conduct of pre-procurement conference. Another output of the conference shall be the bid documents that will be used in the procurement process in accordance with the requirements of ADB Procurement Guidelines/Loan Agreement and the Revised IRR of RA 9184. RPO/PPO to provide NPCO-RID signed copies of procurement plans at least one week before publication date.

4. Date of Pre-Bid Conference 5. Date of Opening of Bids/Price Quotation 6. Bid Evaluation and Post-Qualification √ 7. Submission of BER & Draft Resolution of Award √ 8. Issuance of ADB/NPCO NOL to Award

9. Notice to Proceed With Award of SP to the Winning Bidder by RPO

10. Issuance of Notice of Award to Contractor NOTE Activity 8: For the first five type of SPs (access, irrigation, PHF, PWS & Social Infra.), NOL for award shall be from ADB. Succeeding issuance of NOL shall be from the NPCO.

11. Contractor's Performance Security 12. Award of Contract/Contract Signing √ 13. Issuance of Notice to Commence 14. Conduct of Pre-Construction Conference √ NOTE: Activity 14: Details of EMMP will be

discussed by the ESS counterpart or Specialist during the pre-construction conference

15. Ground Breaking Activities 16. Day One (1) SP Implementation 17. Target SP Completion Date NOTE: All activities are for NCB & Shopping

except for Item No. 4 IV. REQUEST FOR INITIAL RELEASE For all requests for releases, the ARCP 2-PPO

Accountant shall be the point person to assist the LGU in the preparation of documentary requirements.

A. Financial Requirements

1.Letter Request from LGU endorsed by NPCO for initial release of funds for Loan Proceeds

√ 2 original copies signed by the Mayor

2. Statement of Receipts and Disbursements (SORD) √ 3- Original copies signed by all required signatories. Includes certification from the LPO of in-kind equity contribution as cost-out based on the Contract attachment.

- for the Pre-Implementation Cost incurred by the LGU

3. Bank Certification of two (2) trust account opened exclusively for ARCP 2 Loan Proceeds and LGU Equity respectively

at least 3 original copies

4. Machine validated bank certification of LGU Special Trust Fund Account (STFA) duly noted by the Treasurer and Indicating deposit equivalent to 10% equity requirement

at least 3 original copies

5. Approved/Perfected Contract including conditions/terms of the Contract

at least 3 original copies

6. Approved Bids and Awards Committee (BAC) resolution of Award

√ 2-Original Copies and 2 LGU Certified True Copies, signed by all BAC members (all pages initialed)

7. Appropriation ordinance appropriating the total sub-project cost

Page 119: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 60 | P a g e

Required Documents with Template

REMARKS (For Submission and other Information)

B. Technical Requirements 8. Notice to Commence Work from the LGU and

Acceptance by the Contractor/Appropriation Ordinance appropriating the total subproject cost

√ 2- Original Copy, 1 NPCO Certified True Copy

9. Performance Security (together w/ the official receipts) in the form of

1-RPO Certified True Copy

a. Cash or check (5% of the total contract cost) b. Bank Guarantee (10% of the total contract cost)

10. Notice of Award with Acceptance from the Contractor √ 1-LGU Certified True Copy 11. Approved "as Bid Program of Work" √ 4 sets prepared by NPCO for NSAC approved

SPs and 4 sets prepared by RPO for RSAC approved SPs; all original copies shall be signed by the required signatories Approval of POW : RSAC Approved SPs : for approval by RD and notation by NPC NSAC Approved SPs: for approval by NPC

12. Notice of ADB/NPCO concurrence for Award (NOL) from NPCO

3 - NPCO Certified True copies

13. Contractor's all risk insurance (CARI) 1 - LGU Original copy and 2 LGU Certified True Copies

C. Legal and Safeguards Requirements 14. Certification that ROW is 100% negotiated and legal

documents has been executed (c/o NPCO - ESS Specialist)

2 - Original Copies, Certification to be prepared by the NPCO-ESS and to be signed by the National Project Coordinator

15. Environmental Compliance Certificate (ECC)/Certificate of Non Coverage (CNC)

2 - Original copies and 1-LGU Certified True Copy

16. Certificate of Completion from the LGU that the DED has been completed and validated by NPCO

2-Original Copies and 1-LGU Certified True Copies, signed by the MPDC and ME, noted by the Mayor. NPCO to issue corresponding confirmation.

V. REQUEST FOR SECOND RELEASE

A. Financial Requirements: (all liquidation papers shall be dully verified by the resident Auditor) 1. Letter request from LGU endorsed by NPCO for the

second release of funds for Loan Proceeds √ 2-Original Copies signed by the Mayor and 1 -

LGU Certified True Copy 2. Statement of Receipts and Disbursements (SORD) √ 3- Original copies signed by all required

signatories. Includes certification from the LPO of in-kind equity contribution as cost-out based on the Contract attachment.

- SORD for Civil Work Contract - SORD for Construction Supervision by the LGU

3. Certificate of Status of Funds (CSF) which requires at least 50% liquidation of Initial Release of Funds for Loan Proceeds

√ 3- Original copies signed by all required signatories.

4. Machine validated bank certification of Additional Equity Deposit together with the deposit slips, (additional 30% for more than 3.5M and 50% for less than 3.5M)if equity was not yet fully deposited

1 original copy and 2 Certified true Copies

5. Summary of Expenditures (SOE) √ 3- Original copies signed by all required signatories.

6. Monthly Cost Summary Report (MCSR) √ 3- Original copies signed by all required signatories.

7. Bank Reconciliation Report with RCI & Bank Statement 3- Original copies signed by all required signatories. For Bank Statement, add'l 3-certified true copies

8. Trial Balance-Audited Year End Report √ 3- Original copies signed by all required signatories.

9. Duly authenticated photocopy of DVs including Attachments (DV attachments: Contractors Billing, Check Issued, Official Receipts from Contractor and

3-LGU Certified True Copy

Page 120: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 61 | P a g e

Required Documents with Template

REMARKS (For Submission and other Information)

Bank Guarantee for mobilization) B. Technical Requirements

10. Monthly Physical Progress/Accomplishment Report with at least 25% Physical Accomplishment

2-Original Copies and 2-LGU Certified True Copies,signed by all required signatories

11. Contractor's Statement of Work Accomplished 2-Original Copies and 1-LGU Certified True Copies,signed by all required signatories

12. Summary Report of Materials Quality Control (MQC) test results including attachments

2-Original Copy and 1-LGU Certified True Copy including test results

13. Pictorials of the sections/stations subject for payment 1-set hard copy, submit e-copy of pictures C. Legal and Safeguards Requirements

14. NCIP Certification (Certification Precondition or Certification of Non-Overlap

2-LGU Certified True Copy

VI. REQUEST FOR THIRD RELEASE

A. Financial Requirements: (all liquidation papers shall be dully verified by the resident Auditor) 1. Letter request from LGU endorsed by NPCO for the

second release of funds for Loan Proceeds √ 2-Original Copies signed by the Mayor

2. Statement of Receipts and Dibursements (SORD) √ 3- Original copies signed by all required signatories. Includes certification from the LPO of in-kind equity contribution as cost-out based on the Contract attachment.

- SORD for Civil Work Contract - SORD for Construction Supervision by the LGU

3. Certificate of Status of Funds (CSF) which requires at least 50% liquidation of Initial Release of Funds for Loan Proceeds

√ 3- Original copies signed by all required signatories.

4. Machine validated bank certification of 20% Additional LGU Equity deposit together with deposit slip (for more than 3.5M) if equity was not yet fully deposited

1 original copy and 2 Certified true Copies

5. Summary of Expenditures (SOE) √ 3- Original copies signed by all required signatories.

6. Monthly Cost Summary Report (MCSR) √ 3- Original copies signed by all required signatories.

7. Bank Reconciliation Report with RCI & Bank Statement 3- Original copies signed by all required signatories. For Bank Statement, add'l 3-certified true copies

8. Trial Balance-Audited Year End Report √ 3- Original copies signed by all required signatories.

9. Duly authenticated photocopy of DVs including Attachments (DV attachments: Contractors Billing, Check Issued, Official Receipts from Contractor and Bank Guarantee for mobilization)

3-LGU Certified True Copy

B. Technical Requirements 10. Monthly Physical Progress/Accomplishment Report

with atleast 75% Physical Accomplishment 2-Original Copies and 2-LGU Certified True

Copies, signed by all required signatories 11. Contractor's Statement of Work Accomplished 2-Original Copies and 2-LGU Certified True

Copies, signed by all required signatories 12. Summary Report of Materials Quality Control (MQC)

test results including attachments 1-Original Copy and 1-LGU Certified True Copy

including test results 13. Pictorials of the sections/stations subject for payment 1-set hard copy, submit e-copy of pictures

VII. REQUEST FOR FINAL RELEASE A. Financial Requirements: (all liquidation papers shall be dully verified by the resident Auditor)

1. Letter request from LGU endorsed by NPCO for the final release of funds for Loan Proceeds

√ 2-Original Copies signed by the Mayor and 1 Certified True Copy

2. Statement of Receipts and Disbursements (SORD) √ 3- Original copies signed by all required signatories. Includes certification from the LPO of in-kind equity contribution as cost-out based on the Contract attachment.

- SORD for Civil Work Contract - SORD for Construction Supervision by the LGU

3. Certificate of Status of Funds (CSF) requires 100% liquidation of Initial Release and succeeding releases

√ 3- Original copies signed by all required signatories.

Page 121: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 62 | P a g e

Required Documents with Template

REMARKS (For Submission and other Information)

4. Summary of Expenditures (SOE) √ 3- Original copies signed by all required signatories.

5. Monthly Cost Summary Report (MCSR) √ 3- Original copies signed by all required signatories.

6. Bank Reconciliation Report with RCI & Bank Statement 3- Original copies signed by all required signatories. For Bank Statement, add'l 3-certified true copies

7. Trial Balance-Audited Year End Report √ 3- Original copies signed by all required signatories.

Bank Certification that Additional Equity deposit was made together with the deposit slip, (final 20% LGU Equity Requirements for all Subprojects regardless of Total Subproject cost), if equity was not fully deposited

2- Original copies signed by all required signatories.

COA Inspection Report 3 Original Copies and 2 Certified True copies Bank Certification that trust account exclusively for

O&M was opened

B. Technical Requirements 11. Monthly Physical Progress/Accomplishment Report (at

100% completed) 2-Original Copies and 2-LGU Certified True

Copies, signed by all required signatories 12. Contractor's Statement of Work Accomplished (100%

completed) 2-Original Copies and 2-LGU Certified True

Copies,signed by all required signatories 13. LGU Inspection Report

-as built plan -corrected final punch list

14. Final Inspection Report by ARCP 2 inspectorate team 2-Original Copies and 2-LGU Certified True Copies, signed by all required signatories

15. Certificate of Subproject Turn-Over issued by the LGU & accepted by the Bgry. or proponent ARC community PO the Contractor and acceptance by the LGU

1-Original Copy and 2-LGU Certified True Copies,signed by all required signatories

16. Implementation Completion Report (ICR) 2-Original Copies and 2-LGU Certified True Copies, signed by all required signatories

17. Construction Forms 1-LGU Certified True Copy -Logbook -Weather Chart used -Straight Line Diagram & PERT/CPM used -Site Instruction and Work Request Issued -As-Built Plan -Certificates of Materials Test Result

18. Pictorial of the sub-project completed 1-set hard copy, submit e-copy of pictures 19.Certificate of Subproject Completion √ 1-Original Copy and 2-LGU Certified True

Copies, signed by all required signatories 20. Certification that O & M fund has been

appropriated/budgeted 1-Original Copy and 2-LGU Certified True

Copies, signed by all required signatories 21. Operation & maintenance plan of the sub-project 1-Original Copy and 2-LGU Certified True

Copies, signed by all required signatories 22. COA inspection report signed by TAS and Regional

Director/PARO 2-LGU Certified True Copies, signed by all

required signatories VIII. OTHER RELEVANT DOCUMENTS 1. Memorandum on Preparation of Approved Budget for the

Contract Addressed to ARCP 2 Regional Project

Managers/Provincial Project Managers 2. DPWH Department Order No. 12 S.2011 Preparation of Approved Budget for the

Contract 3. Sample Program of Work (POW) 4. SGD Minutes of Meeting on Computation of Taxes,

contractor's profit and Overhead, Contingencies and Maintenance (OCM)

Prepared by Dir. Homer Tobias and Approved by Asec Herminia Fe B. San Juan and Asec Felix Perry A. Villanueva

5. National Budget Circular No. 259 dated February 21, 2011 Guidelines for Release of Funds Chargeable Against the Priority Development Assistance Fund for FY 2011

Page 122: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 63 | P a g e

Required Documents with Template

REMARKS (For Submission and other Information)

6. DPWH Department Order No. 29 S.2011 dated May 16, 2011 Revised Guidelines on the Preparation of Approved Budget for the Contract

7. SB Resolution giving the authority to mayor to enter into loan agreement with MDFO

√ 1 LGU certified true copy signed by all the signatories

8. Templates of Requirements for Provincial LGU Implementation

Page 123: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 64 | P a g e

ANNEX 10. Status of Rural Infrastructure Subproject Implementation in ARMM and Recommended Next Steps by Subproject As of June 30, 2014

Municipality Subproject P.A. Status Immediate Next Steps LGU DARPO RPO Others

MAGUINDANAO Datu Paglas Concreting of 6.0-km

Tamborong-Bunawan FMR

60.24% Contract expired; No approved time

extension submitted; LP fund received,

PhP8,701,267.76 LP disbursements

reported by LGU, PhP7,530,592.34;

Request for 3rd LP release submitted to NPCO.

Submit request for time extension

Require the contractor to submit a catch-up plan backed up with additional manpower, equipment and other resources to speed up implementation;

Require the contractor to submit performance security to cover the extended period of implementation without prejudice to imposing liquidated damages.

Advise LGU to submit catch-up plan;

Ensure that performance security is submitted;

Ensure that liquidated damages is imposed;

Closely monitor subproject implementation.

Follow up with NPCO on request of LGU for 3rd LP release.

Datu Paglas Construction of Warehouse with Solar Dryer @ BrgyKalumenga

0.00% Revised and LGU-signed POW submitted to NPCO on May 30, 2014;

No CAF requirements submitted;

With NAPA.

Conduct pre-procurement activities – preparation of tentative procurement plan and shopping documents;

Submit CAF requirements.

Assist LGU on pre-procurement activities;

Follow up with LGU on submission of CAF requirements.

Follow up with NPCO on approval of revised POW;

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

LGU should be coached on the procurement process for shopping.

Datu Paglas Construction of Warehouse with Solar Dryer @ BrgyNapok

0.00% Revised and LGU-signed POW submitted to NPCO May 30, 2014;

No CAF requirements submitted;

With NAPA.

Conduct pre-procurement activities – preparation of tentative procurement plan and shopping documents;

Submit CAF requirements.

Assist LGU on pre-procurement activities;

Follow up with LGU on submission of CAF requirements.

Follow up with NPCO on approval of revised POW;

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

LGU should be coached on the procurement process for shopping.

Page 124: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 65 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others Datu Paglas Spring Development

Level 2 @ Brgy Napok 0.00% Revised and LGU-signed

POW submitted to NPCO May 30, 2014;

No CAF requirements submitted;

With NAPA.

Conduct pre-procurement activities – preparation of tentative procurement plan and shopping documents;

Submit CAF requirements.

Assist LGU on pre-procurement activities;

Follow up with LGU on submission of CAF requirements.

Follow up with NPCO on approval of revised POW;

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

LGU should be coached on the procurement process for shopping.

Kabuntalan Construction of 3.0-km Ganta-Gambar FMR

82.66% on-going; with 95% physical

accomplishment as reported by LGU;

LP releases, PhP4,736,425.06;

LP disbursements submitted to NPCO, PhP6,360,349.00;

Request for 3rd LP release submitted to NPCO.

Set schedule of pre-final inspection;

Send invitation to members of Inspectorate Team from DARPO, RPO and NPCO for the pre-final inspection.

Follow up with LGU on schedule of pre-final inspection;

Participate on pre-final inspection.

Participate on pre-final inspection;

Follow up with NPCO on request of LGU for 3rd LP release.

NPCO chairs the Inspectorate Team for pre-final and final inspections.

Kabuntalan Construction of Multi-Purpose Pavement - Liong

0.00% Revised POW not signed by LGU;

LGU lacks budget for the equity.

Decide on whether to pursue subproject implementation or not ASAP;

Advice NPCO thru DARPO on its decision.

Meet with LGU and resolve issue on lack of equity;

Follow up with LGU on completion of revised POW;

Follow up with LGU on budget for equity.

Provide assistance to DARPO in resolving issue with LGU on lack of equity.

Kabuntalan Construction of Multi-Purpose Pavement - Maitong

0.00% Revised POW not signed by LGU;

LGU lacks budget for the equity.

Decide on whether to pursue subproject implementation or not ASAP;

Advice NPCO thru DARPO on its decision.

Meet with LGU and resolve issue on lack of equity;

Follow up with LGU on completion of revised POW;

Follow up with LGU on budget for equity.

Provide assistance to DARPO in resolving issue with LGU on lack of equity.

Page 125: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 66 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others Kabuntalan Construction of Multi-

Purpose Pavement - Matilak

0.00% Revised POW not signed by LGU;

LGU lacks budget for the equity.

Decide on whether to pursue subproject implementation or not ASAP;

Advice NPCO thru DARPO on its decision.

Meet with LGU and resolve issue on lack of equity;

Follow up with LGU on completion of revised POW;

Follow up with LGU on budget for equity.

Provide assistance to DARPO in resolving issue with LGU on lack of equity.

Kabuntalan Construction of Multi-Purpose Pavement - Pened

0.00% Revised POW not signed by LGU;

LGU lacks budget for the equity.

Decide on whether to pursue subproject implementation or not ASAP;

Advice NPCO thru DARPO on its decision.

Meet with LGU and resolve issue on lack of equity;

Follow up with LGU on completion of revised POW;

Follow up with LGU on budget for equity.

Provide assistance to DARPO in resolving issue with LGU on lack of equity.

Parang Construction of 2-Classroom School Building w/ CR and Wash Area (GT Biruar)

0.00% Procurement was issued NOL by RPO;

BER submitted to NPCO; LP CAF requirements

forwarded to DARPO May 29, 2014.

Prepare draft contract documents and other requirements for initial LP release.

Provide assistance to LGU on preparation of contract documents and requirements for initial LP release, while waiting for the release of CAF from MDFO.

Follow up with DARPO or NPCO on LP CAF.

Parang Rehabilitation of Libuan CIS

0.00% LGU lacks budget provision for the subproject;

Subproject not preferred by LGU.

Decide on whether to pursue subproject implementation or not ASAP;

Advice NPCO thru DARPO on its decision.

Meet with LGU to address once and for all the issues on lack of budget and others.

Prepare revised POW for presentation and confirmation with LGU;

Barira Rehabilitation of Gadung CIS

0.00% For bid evaluation; Revised POW for

concurrence by LGU;

Submit bid evaluation report to NPCO thru DARPO and RPO.

Assist LGU on completion of bid evaluation and other procurement documents.

Follow up on submission of bid evaluation report and other procurement documents;

Review bid evaluation report before submission to NPCO.

Page 126: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 67 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others Barira Concreting of Marang-

Gadung Farm to Market Road

0.00% For bid evaluation; Revised POW for

concurrence by LGU.

Conduct procurement activities in accordance with ADB Procurement Guidelines and following the procedures of RA 9184.

Provide assistance to LGU on the conduct of procurement activities.

Monitor procurement activities of LGU and provide advice to DARPO and LGU in addressing existing and emerging issues and concerns on procurement;

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184;

Meet with NPCO to resolve issues on non-compliance by LGU with legal requirement on advertisement.

The invitation to bid was not published in Philgeps;

SMT recommends that procurement be repeated for failure of LGU to comply with LEGAL REQUIREMENT on advertisement;

LGU should be coached on the conduct of procurement activities; A mere procurement orientation is not enough to capacitate LGU on the procurement process;

Determine status of submission of CAF requirements.

Buldon Concreting of 8 km Dinganen-Nuyo FMR

0.00% Scheduled pre-bid conference on July 4, 2014 and opening of bids on July 18, 2014;

No CAF requirements submitted.

Conduct procurement activities in accordance with ADB Procurement Guidelines and following the procedures of RA 9184.

Follow up with LGU on submission of CAF requirements;

Provide assistance to LGU on the conduct of procurement activities.

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

LGU should be coached on the conduct of procurement activities; A mere procurement orientation is not enough to capacitate LGU on the

Page 127: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 68 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others procurement process.

Buldon Construction of 2-storey MPB

0.00% Scheduled pre-bid conference on July 4, 2014 and opening of bids on July 18, 2014;

No CAF requirements submitted.

Conduct procurement activities in accordance with ADB Procurement Guidelines.

Follow up with LGU on submission of CAF requirements;

Provide assistance to LGU on the conduct of procurement activities.

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

LGU should be coached on the conduct of procurement activities; A mere procurement orientation is not enough to capacitate LGU on the procurement process.

Matanog Concreting of 5.6142-km Langkong-Bayanga Norte FMR

20.56% On-going; 35.83% physical

accomplishment as reported by LGU and concurred by DARPO;

Request for Initial LP was submitted to NPCO on May 29, 2013 but LP fund was received only from MDFO on May 21, 2014, PhP 5,379,377.15;

Disbursement and liquidation reports and request for 2nd LP release are almost ready for submission.

Conduct daily inspection of on-going subproject and ensure that works are carried out in accordance with approved plans and specifications;

Submit disbursement and liquidation reports and request for 2nd LP release.

Conduct regular monitoring and supervision on subproject implementation

Ensures that payments are made based on duly validated physical accomplishment report or statement of work accomplished (SWA);

Follow up with LGU on submission of disbursement and liquidation reports and request for 2nd LP release.

Monitor subproject implementation and provide advice to DARPO and LGU in addressing issues and concerns;

Follow up on submission of disbursement and liquidation reports and request for 2nd LP release;

Review submitted documents prior to submission to NPCO.

Matanog Rehabilitation of Baslay-Lawaan CIS

0.00% Scheduled opening of bids on July 10, 2014.

Conduct procurement activities in accordance with ADB Procurement Guidelines and following the procedures of RA 9184.

Provide assistance to LGU on the conduct of procurement activities.

Monitor the conduct of procurement by LGU;

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

Determine status of submission of CAF requirements.

Page 128: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 69 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others Matanog Construction of Langkong

MPB w/ Solar Drier 0.00% Scheduled opening of

quotations on July 1, 2014;

Revised POW at NPCO.

Conduct procurement activities in accordance with ADB Procurement Guidelines.

Provide assistance to LGU on the conduct of procurement activities.

Monitor the conduct of procurement by LGU;

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184;

Follow up with NPCO on review of revised POW submitted by LGU.

Determine status of submission of CAF requirements.

Matanog Construction of Central Langkong MPB w/ Solar Drier

0.00% Scheduled opening of quotations on July 1, 2014.

Conduct procurement activities in accordance with ADB Procurement Guidelines.

Provide assistance to LGU on the conduct of procurement activities.

Monitor the conduct of procurement by LGU;

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

Determine status of submission of CAF requirements.

Matanog Construction of Sapad MPB w/ Solar Drier

0.00% Scheduled opening of quotations on July 1, 2014.

Conduct procurement activities in accordance with ADB Procurement Guidelines.

Provide assistance to LGU on the conduct of procurement activities.

Monitor the conduct of procurement by LGU;

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

Determine status of submission of CAF requirements.

Matanog Construction of Bayanga Norte MPB w/ Solar Drier

0.00% Scheduled opening of quotations on July 1, 2014.

Conduct procurement activities in accordance with ADB Procurement Guidelines.

Provide assistance to LGU on the conduct of procurement activities.

Monitor the conduct of procurement by LGU;

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

Determine status of submission of CAF requirements.

Page 129: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 70 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others Matanog Construction of Bayanga

Sur MPB w/ Solar Drier 0.00% Scheduled opening of

quotations on July 1, 2014.

Conduct procurement activities in accordance with ADB Procurement Guidelines.

Provide assistance to LGU on the conduct of procurement activities.

Monitor the conduct of procurement by LGU;

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

Determine status of submission of CAF requirements.

LANAO DEL SUR Ganassi Construction of 6.1-km

Barit-Taliogon-Tabuan FMR

70.05% On-going; LP releases,

PhP5,164,695.72; LP disbursements

submitted to NPCO, PhP5,164,695.72;

Request for 2nd and 3rd LP releases submitted to NPCO.

Conduct daily inspection of on-going subproject and ensure that works are carried out in accordance with approved plans and specifications;

Require the contractor to submit a catch-up plan backed up with additional manpower, equipment and other resources to speed up implementation.

Conduct regular monitoring and supervision on subproject implementation.

Monitor subproject implementation and provide advice in addressing issues and concerns;

Ask NPCO for clarification on the documents being requested;

Advise NPCO to refer to as bid POW and compute for the required cash deposit;

Also advise NPCO that in-kind equity is not deposited but is put in place as implementation progresses.

Follow up with NPCO on request of LGU for 2nd and 3rd LP releases.

NPCO is requiring submission of certificate of cash deposit and/or in-kind equity;

There is no need for additional cash deposit; LGU equity is all in kind.

Ganassi Concreting/Rehabilitation of Taganonok-Taliogon-Paraaba FMR

5.00% On-going; With request for initial

LP release

Conduct daily inspection of on-going subproject and ensure that works are carried out in accordance with approved plans and

Conduct regular monitoring and supervision on subproject implementation.

Follow up with NPCO on request for initial LP release submitted by LGU;

Monitor subproject implementation and

Page 130: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 71 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others specifications;

Require the contractor to submit a catch-up plan backed up with additional manpower, equipment and other resources to speed up implementation.

provide advice in addressing issues and concerns.

Ganassi Construction of Masolun-Taganonok-Taliogon FMR

0.00% Bid evaluation in progress;

With CAF.

Complete the bid evaluation process including post-qualification and submit documents to NPCO thru DARPO and RPO.

Assist LGU on bid evaluation and post-qualification;

Review and endorse BER to RPO.

Follow up with DARPO and LGU on submission of BER and other procurement documents;

Review BER before submission to NPCO.

Ganassi Construction of Campongaraya Water System L-II

0.00% Bid evaluation in progress;

With CAF.

Complete the bid evaluation process including post-qualification and submit documents to NPCO thru DARPO and RPO.

Assist LGU on bid evaluation and post-qualification;

Review and endorse BER to RPO.

Follow up with DARPO and LGU on submission of BER and other procurement documents;

Review BER before submission to NPCO.

Ganassi Construction of BaritPotabale Water System II

0.00% Bid evaluation in progress;

With CAF.

Complete the bid evaluation process including post-qualification and submit documents to NPCO thru DARPO and RPO.

Assist LGU on bid evaluation and post-qualification;

Review and endorse BER to RPO.

Follow up with DARPO and LGU on submission of BER and other procurement documents;

Review BER before submission to NPCO.

Ganassi Concreting of Campongaraya-Barorao-Panggawalupa-Barit FMR

0.00% Bid evaluation in progress;

With CAF.

Complete the bid evaluation process including post-qualification and submit documents to NPCO thru DARPO and RPO.

Assist LGU on bid evaluation and post-qualification;

Review and endorse BER to RPO.

Follow up with DARPO and LGU on submission of BER and other procurement documents;

Review BER before submission to NPCO.

Page 131: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 72 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others Ganassi Construction of

Panggawalupa Pre-Stress Concrete Girder (PSCG) Bridge

0.00% Bid evaluation in progress;

With CAF.

Complete the bid evaluation process including post-qualification and submit documents to NPCO thru DARPO and RPO.

Assist LGU on bid evaluation and post-qualification;

Review and endorse BER to RPO.

Follow up with DARPO and LGU on submission of BER and other procurement documents;

Review BER before submission to NPCO.

Ganassi Construction of Barangay Health Center @ BrgyCampongraya

0.00% RPO issued NOL on June 18, 2013 without CAF;

CAF requirements fully complied as of April 16, 2014.

Revised POW still not signed by LGU.

Submit duly signed POW to NPCO thru DARPO and RPO.

Follow up with LGU on completion of revised POW.

Follow up with NPCO on issuance of CAF by MDFO.

Ganassi Construction of Multi-Purpose Building @ BrgyBarorao

0.00% RPO issued NOL on June 18, 2013 without CAF;

CAF requirements fully complied as of April 16, 2014.

Revised POW still not signed by LGU.

Submit duly signed POW to NPCO thru DARPO and RPO.

Follow up with LGU on completion of revised POW.

Follow up with NPCO on issuance of CAF by MDFO.

Ganassi Construction of Multi-Purpose Building @ BrgyTaliogon

0.00% RPO issued NOL on June 18, 2013 without CAF;

CAF requirements fully complied as of April 16, 2014.

Revised POW still not signed by LGU.

Submit duly signed POW to NPCO thru DARPO and RPO.

Follow up with LGU on completion of revised POW.

Follow up with NPCO on issuance of CAF by MDFO.

Ganassi Construction of Warehouse with Solar Dryer @ BrgyBarit

0.00% RPO issued NOL on June 18, 2013 without CAF;

CAF requirements fully complied as of April 16, 2014.

Revised POW still not signed by LGU.

Submit duly signed POW to NPCO thru DARPO and RPO.

Follow up with LGU on completion of revised POW.

Follow up with NPCO on issuance of CAF by MDFO.

Tagoloan oncreting/Rehabilitation of Kinggan-Tagoloan Poblacion FMR

27.77% on-going, LP releases,

Conduct daily inspection of on-going subproject and ensure

Conduct regular monitoring and supervision on

Monitor subproject implementation and provide advice in

LGU should be coached in preparing

Page 132: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 73 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others PhP4,922,008.65;

LP fund long overdue for liquidation.

that works are carried out in accordance with approved plans and specifications;

Require the contractor to submit a catch-up plan backed up with additional manpower, equipment and other resources to speed up implementation;

Prepare and submit liquidation report of 1st LP release and request for 2nd LP release.

subproject implementation;

Follow up with LGU on completion and submission of disbursement and liquidation reports and request for 2nd LP release.

addressing issues and concerns.

disbursement and liquidation reports and request for 2nd LP release.

Bumbaran Concreting of 4.205-km Sumogot FMR

38.80% Ongoing; With request for

variation; Request for initial LP

release submitted to NPCO on October 16, 2013but LP fund was received onlyon May 21, 2014, Php3,695,958.36.

Conduct daily inspection of on-going subproject and ensure that works are carried out in accordance with approved plans and specifications;

Complete and submit to NPCO thru DARPO and RPO the request for variation.

Conduct regular monitoring and supervision on subproject implementation;

Follow up with LGU on submission of request for variation;

Monitor subproject implementation and provide advice in addressing issues and concerns;

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184;

Follow up with LGU thru DARPO on submission of request for variation

Physical accomplishment of 38.80% is based on proposed variation;

The request for variation should be supported with as-stake plan resulting from the pre-construction survey conducted by contractor, LGU and DARPO;

LGU should be coached in preparing disbursement and liquidation reports and request for 2nd LP release;

Page 133: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 74 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others Sultan Dumalondong

Concreting of Dinganun-Pagalongan-Bacayawan-Lumbac FMR

0.00% Bid evaluation in progress;

No CAF requirements submitted.

Conduct procurement activities in accordance with ADB Procurement Guidelines and following the procedures of RA 9184.

Follow up with LGU on CAF requirements.

Meet with NPCO to resolve issues on non-compliance by LGU with legal requirement on advertisement.

Advertisement published in newspaper and in Philgeps website is incorrect. Although, an attempt by LGU was made to correct the error thru bid bulletin, the same was not appropriately and successfully posted in Philgeps.

SMT recommends that procurement be repeated;

LGU should be coached on the conduct of procurement activities; A mere procurement orientation is not enough to capacitate LGU on the procurement process.

Sultan Dumalondong

Construction of MPB w/ Solar Dryer(Pagalongan)

0.00% Procurement or re-publication in Philgeps was repeated;

For bid evaluation; No CAF requirements

submitted by LGU.

Conduct procurement activities in accordance with ADB Procurement Guidelines.

Provide assistance to LGU on bid evaluation and post-qualification;

Follow up with LGU on CAF requirements.

Monitor the conduct of procurement activities;

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

LGU should be coached on the conduct of procurement activities; A mere procurement orientation is not enough to capacitate LGU on

Page 134: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 75 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others the procurement process;

Sultan Dumalondong

Construction of MPB w/ Solar Dryer (Dinganun)

0.00% Procurement or re-publication in Philgeps was repeated;

For bid evaluation; No CAF requirements

submitted by LGU.

Conduct procurement activities in accordance with ADB Procurement Guidelines.

Provide assistance to LGU on bid evaluation and post-qualification;

Follow up with LGU on CAF requirements.

Monitor the conduct of procurement activities;

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

LGU should be coached on the conduct of procurement activities; A mere procurement orientation is not enough to capacitate LGU on the procurement process.

Sultan Dumalondong

Construction of MPB w/ Solar Dryer (Malalis)

0.00% Procurement or re-publication in Philgeps was repeated;

For bid evaluation; No CAF requirements

submitted by LGU.

Conduct procurement activities in accordance with ADB Procurement Guidelines.

Provide assistance to LGU on bid evaluation and post-qualification;

Follow up with LGU on CAF requirements.

Monitor the conduct of procurement activities;

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

LGU should be coached on the conduct of procurement activities; A mere procurement orientation is not enough to capacitate LGU on the procurement process.

Sultan Dumalondong

Construction of MPB w/ Solar Dryer (ButaSumalindao)

0.00% Procurement or re-publication in Philgeps was repeated;

For bid evaluation; No CAF requirements

submitted by LGU.

Conduct procurement activities in accordance with ADB Procurement Guidelines.

Provide assistance to LGU on bid evaluation and post-qualification;

Follow up with LGU on CAF requirements.

Monitor the conduct of procurement activities;

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

LGU should be coached on the conduct of procurement activities; A mere procurement orientation is not enough to capacitate LGU on the procurement process.

Sultan Dumalondong

Construction of MPB w/ Solar Dryer(Bacayawan)

0.00% Procurement or re-publication in Philgeps was repeated;

Conduct procurement activities in accordance with ADB Procurement

Provide assistance to LGU on bid evaluation and post-qualification;

Monitor the conduct of procurement activities;

Ensure that

LGU should be coached on the conduct of

Page 135: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 76 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others For bid evaluation; No CAF requirements

submitted by LGU.

Guidelines. Follow up with LGU on CAF requirements.

procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

procurement activities; A mere procurement orientation is not enough to capacitate LGU on the procurement process.

Sultan Dumalondong

Construction of MPB w/ Solar Dryer(Tagoranao)

0.00% Procurement or re-publication in Philgeps was repeated;

For bid evaluation; No CAF requirements

submitted by LGU.

Conduct procurement activities in accordance with ADB Procurement Guidelines.

Provide assistance to LGU on bid evaluation and post-qualification;

Follow up with LGU on CAF requirements.

Monitor the conduct of procurement activities;

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

LGU should be coached on the conduct of procurement activities; A mere procurement orientation is not enough to capacitate LGU on the procurement process.

Sultan Dumalondong

Construction of MPB w/ Solar Dryer(Lumbac)

0.00% Procurement or re-publication in Philgeps was repeated;

For bid evaluation; No CAF requirements

submitted by LGU.

Conduct procurement activities in accordance with ADB Procurement Guidelines.

Provide assistance to LGU on bid evaluation and post-qualification;

Follow up with LGU on CAF requirements.

Monitor the conduct of procurement activities;

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

LGU should be coached on the conduct of procurement activities; A mere procurement orientation is not enough to capacitate LGU on the procurement process.

Taraka Concreting of BuadiDiamangga-BuadiOngcalo FMR (Segment 1)

0.00% Bid evaluation in progress;

CAF requirement submitted to NPCO on June 4, 2014.

Conduct procurement activities in accordance with ADB Procurement Guidelines and following the procedures of RA 9184.

Provide assistance to LGU on the procurement process.

Follow up with NPCO on issuance of CAF by MDFO;

Monitor the conduct of procurement activities by LGU;

Ensure that procurement of LGU is

Availability of bidding documents as published in Philgeps website started on April 13, 2014 (which is Sunday) and

Page 136: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 77 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others in accordance with ADB procurement guidelines and following the procedures of RA 9184;

Meet with NPCO to resolve issues on non-compliance by LGU with ADB requirement on availability of bidding documents.

ended on May 9, 2014. This does not comply with the ADB requirement of 28 calendar days of availability of bidding documents;

SMT recommends that procurement be repeated for failure of LGU to comply with ADB REQUIREMENT.

Taraka Concreting of Cadayonan FMR (Segment 2)

0.00% Bid evaluation in progress;

CAF requirement submitted to NPCO on June 4, 2014.

Conduct procurement activities in accordance with ADB Procurement Guidelines and following the procedures of RA 9184.

Provide assistance to LGU on the procurement process.

Follow up with NPCO on issuance of CAF by MDFO;

Monitor the conduct of procurement activities by LGU;

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184;

Meet with NPCO to resolve issues on non-compliance by LGU with ADB requirement on availability of bidding documents.

Availability of bidding documents as published in Philgeps website started on April 13, 2014 (which is Sunday) and ended on May 9, 2014. This does not comply with the ADB requirement of 28 calendar days of availability of bidding documents;

SMT recommends that procurement be repeated for failure of LGU to comply with ADB REQUIREMENT.

Page 137: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 78 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others Taraka Construction of

MPB(Brgy. BuadiAmunud) 0.00% Bid evaluation in

progress; CAF requirement

submitted to NPCO on June 4, 2014.

Conduct procurement activities in accordance with ADB Procurement Guidelines.

Provide assistance to LGU on the procurement process

Provide assistance to LGU on BER preparation.

Follow up with NPCO on issuance of CAF by MDFO;

Monitor the conduct of procurement activities by LGU;

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

LGU should be coached on the conduct of procurement activities; A mere procurement orientation is not enough to capacitate LGU on the procurement process.

Taraka Construction of MPB(Brgy. Sundig)

0.00% Bid evaluation in progress;

CAF requirement submitted to NPCO on June 4, 2014.

Conduct procurement activities in accordance with ADB Procurement Guidelines.

Provide assistance to LGU on the procurement process

Provide assistance to LGU on the BER preparation.

Follow up with NPCO on issuance of CAF by MDFO;

Monitor the conduct of procurement activities by LGU;

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

LGU should be coached on the conduct of procurement activities; A mere procurement orientation is not enough to capacitate LGU on the procurement process.

Taraka Construction of MPB(Brgy. MoriataoLuksadato)

0.00% Bid evaluation in progress;

CAF requirement submitted to NPCO on June 4, 2014.

Conduct procurement activities in accordance with ADB Procurement Guidelines.

Provide assistance to LGU on the procurement process

Provide assistance to LGU on the BER preparation.

Follow up with NPCO on issuance of CAF by MDFO;

Monitor the conduct of procurement activities by LGU;

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

LGU should be coached on the conduct of procurement activities; A mere procurement orientation is not enough to capacitate LGU on the procurement process.

Page 138: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 79 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others Taraka Taraka Pump Communal

Irrrigation Project 0.00% No CAF requirements yet

CAF with DARPO; Conduct procurement

activities in accordance with ADB Procurement Guidelines and following the procedures of RA 9184.

Provide assistance to LGU on the procurement process

Provide assistance to LGU on the BER preparation.

Follow up with DARPO on CAF submitted by LGU.

Monitor the conduct of procurement activities by LGU;

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

Availability of bidding documents as published in Philgeps website started on April 13, 2014 (which is Sunday) and ended on May 9, 2014. This does not comply with the ADB requirement of 28 calendar days of availability of bidding documents;

SMT recommends that procurement be repeated for failure of LGU to comply with ADB REQUIREMENT.

Kapatagan Concreting of sultan

BarudiBansil FMR 0.00% BER submitted to RPO;

BER reviewed by SMT; CAF requirements for

completion by LGU; Advertisement not

posted in Philgeps.

Conduct procurement activities in accordance with ADB Procurement Guidelines and following the procedures of RA 9184.

Follow up with LGU on completion of CAF requirements;

Provide assistance to LGU on the procurement process.

Monitor the conduct of procurement activities by LGU;

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184;

Meet with NPCO to resolve issues on non-compliance by LGU with legal requirement on advertisement and ADB

SMT recommended that procurement be repeated because of failure of LGU to comply with LEGAL and ADB requirements;

LGU should be coached on the conduct of procurement activities; A mere

Page 139: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 80 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others requirement on availability of bidding documents.

procurement orientation is not enough to capacitate LGU on the procurement process.

Kapatagan Construction of Multi-purpose Building w/ Solar Dryer (Brgy. Proper Kapatagan)

0.00% BER submitted to RPO; BER reviewed by SMT; CAF requirements for

completion by LGU; Advertisement not

posted in Philgeps website.

Conduct procurement activities in accordance with ADB Procurement Guidelines and following the procedures of RA 9184.

Follow up with LGU on completion of CAF requirements;

Provide assistance to LGU on the procurement process.

Monitor the conduct of procurement activities by LGU;

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184;

Meet with NPCO to resolve issues on non-compliance by LGU with legal requirement on advertisement .

SMT recommended that procurement be repeated because of failure of LGU to comply with LEGAL requirement on advertisement;

LGU should be coached on the conduct of procurement activities; A mere procurement orientation is not enough to capacitate LGU on the procurement process.

Kapatagan Construction of Multi-purpose Building w/ Solar Dryer (Brgy. Daguan)

0.00% BER submitted to RPO; BER reviewed by SMT; CAF requirements for

completion by LGU.

Conduct procurement activities in accordance with ADB Procurement Guidelines and following the procedures of RA 9184.

Follow up with LGU on completion of CAF requirements;

Provide assistance to LGU on the procurement process.

Monitor the conduct of procurement activities by LGU;

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184;

Meet with NPCO to resolve issues on non-compliance by LGU with

SMT recommended that procurement be repeated because of failure of LGU to comply with LEGAL requirement on advertisement;

LGU should be coached on the conduct of

Page 140: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 81 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others legal requirement on advertisement .

procurement activities; A mere procurement orientation is not enough to capacitate LGU on the procurement process.

Kapai Concreting of Pindolonan-Pantao-Macadar FMR

0.00% BER submitted to RPO BER reviewed by SMT; CAF requirements

returned to LGU for correction.

Conduct procurement activities in accordance with ADB Procurement Guidelines and following the procedures of RA 9184;

Complete and re-submit CAF requirements.

Follow up with LGU on resubmission of BER;

Provide assistance to LGU on completion of CAF requirements.

Advise LGU to revise BER;

Review revised BER prior to submission to NPCO;

Follow up with LGU thru DARPO on resubmission of CAF requirements.

Observations, comments and recommendations of SMT be discussed with LGU for appropriate actions;

LGU should be coached on the conduct of procurement activities; A mere procurement orientation is not enough to capacitate LGU on the procurement process.

Kapai Construction of Multi-purpose Building w/ Solar Dryer (Brgy. Parao)

0.00% Bid evaluation in progress;

CAF requirements returned.

Conduct procurement activities in accordance with ADB Procurement Guidelines;

Complete and submit CAF requirements.

Provide assistance to LGU on completion of bid evaluation and post qualification;

Provide assistance to LGU on completion of CAF requirements.

Monitor completion and submission of BER;

Review BER prior to submission to NPCO;

Follow up with LGU thru DARPO on re-submission of CAF requirements.

LGU should be coached on the conduct of procurement activities; A mere procurement orientation is not enough to capacitate LGU on the procurement process.

Page 141: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 82 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others Kapai Construction of Multi-

purpose Building w/ Solar Dryer (Brgy. Macadar)

0.00% Bid evaluation in progress;

CAF requirements returned.

Conduct procurement activities in accordance with ADB Procurement Guidelines.

Complete and submit CAF requirements.

Provide assistance to LGU on completion of bid evaluation and post qualification;

Provide assistance to LGU on completion of CAF requirements.

Monitor completion and submission of BER;

Review BER prior to submission to NPCO;

Follow up with LGU thru DARPO on submission of CAF requirements.

LGU should be coached on the conduct of procurement activities; A mere procurement orientation is not enough to capacitate LGU on the procurement process.

Butig Concreting of sandab-Ragayan FMR

0.00% Failure of bidding; no bids were received from bidders;;

No CAF requirements submitted.

Conduct procurement activities in accordance with ADB Procurement Guidelines and following the procedures of RA 9184;

Prepare, complete and submit CAF requirements.

Provide assistance to LGU on procurement;

Provide assistance to LGU on completion of CAF requirements.

Ensure that procurement is in accordance with ADB Procurement Guidelines and following the procedures of RA 9184;

Follow up with LGU thru DARPO on submission of CAF requirements.

LGU should be coached on the conduct of procurement activities; A mere procurement orientation is not enough to capacitate LGU on the procurement process.

Butig Construction of MPB with Solar Dryer (Bayabao Poblacion)

0.00% Failure of bidding; no bids were received from bidders;;

No CAF requirements submitted.

Decide on whether to pursue subproject implementation or not;

Advice NPCO thru DARPO and RPO on it decision ASAP

Follow up with LGU on its decision to withdraw approved subproject for implementation.

Follow up with LGU on its decision to withdraw approved subproject implementation.

Butig Construction of MPB with Solar Dryer (Brgy. Ragayan)

0.00% Failure of bidding; no bids were received from bidders;;

No CAF requirements submitted.

Decide on whether to pursue subproject implementation or not;

Advice NPCO thru DARPO and RPO on it decision ASAP

Follow up with LGU on its decision to withdraw approved subproject for implementation.

Follow up with LGU on its decision to withdraw approved subproject implementation.

Poona Bayabao Concreting and Rehabilitation of 4.395 km Bubong-Ragayan-

22.65% On-going; LP releases,

PhP3,721,408.44;

Conduct daily inspection of on-going subproject and ensure

Provide assistance to LGU on completion of physical

Advise the LGU thru DARPO to submit signed physical

The LGU needs to be coached on preparation of

Page 142: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 83 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others Gadongan FMR LP fund for liquidation. that works are carried

out in accordance with approved plans and specifications;

Require the contractor to submit a catch-up plan backed up with additional manpower, equipment and other resources to speed up implementation.

accomplishment report. accomplishment report; Follow up with LGU on

disbursement/liquidation reports thru DARPO.

disbursement and liquidation reports and request for 2nd LP release.

Poona Bayabao Construction of Day Care Center @ BrgyLumbaca-Ingud

0.00% BER forwarded/endorsed to NPCO (April 4, 2014);

With lacking documents for CAF.

Complete and submit CAF requirements.

Provide assistance to LGU on completion of CAF requirements.

Follow up with LGU thru DARPO on lacking CAF requirements.

Poona Bayabao Construction of Day Care Center @ BrgyGadongan

0.00% BER forwarded/endorsed to NPCO (April 4, 2014);

With lacking documents for CAF.

Complete and submit CAF requirements.

Provide assistance to LGU on completion of CAF requirements.

Follow up with LGU thru DARPO on lacking CAF requirements.

Poona Bayabao Construction of Warehouse with Solar Dryer @ BrgyGadongan

0.00% BER forwarded/endorsed to NPCO (April 4, 2014);

With lacking documents for CAF.

Complete and submit CAF requirements.

Provide assistance to LGU on completion of CAF requirements.

Follow up with LGU thru DARPO on lacking CAF requirements.

Poona Bayabao Construction of Warehouse with Solar Dryer @ BrgyPantao

0.00% BER forwarded/endorsed to NPCO (April 4, 2014);

With lacking documents for CAF.

Complete and submit CAF requirements.

Provide assistance to LGU on completion of CAF requirements.

Follow up with LGU thru DARPO on lacking CAF requirements.

Marantao Construction of 6.420 km CamaligBandaraingud-LowayInodaran FMR

0.00% Contract was awarded on the basis of the NOL issued by NPCO;

With NGALGU CAF but without fund release from NPCO;

Follow up with NPCO thru DARPO and RPO on NGALGU fund release.

Follow up with NPCO thru RPO on NGALGU fund release.

Follow up with NPCO on NGALGU fund release. Please note that NPCO issued NGALGU CAF (CAF N0.12-1212-29-2011) for the subproject in

Page 143: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 84 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others Contract documents and

request for initial LP release were submitted to NPCO on October 8, 2013, except for the NGALGU deposit.

2011.

LumbacaUnayan Concreting of Bangon-Lumbac&Dimapok FMR

0.00% Bid evaluation in progress.

Conduct procurement activities in accordance with ADB Procurement Guidelines and following the procedures of RA 9184.

Provide assistance to LGU on the conduct of procurement activities.

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184;

Meet with NPCO to resolve issues on non-compliance by LGU with ADB requirement on availability of bidding documents.

Advertisement in Philgeps website was made for a very short period of time: May 6 – 14, 2014. With this, the effective period of availability of bidding documents is only 9 calendar days, which falls short of the ADB requirement of 28 calendar days. Although the deadline of submission and receipt of bids was extended to May 21, 2014, the period of availability of bidding documents considering the extension is still short of the required 28 calendar days;

Page 144: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 85 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others SMT recommends

that procurement be repeated for failure of LGU to comply with ADB REQUIREMENT.

Determine status of submission of CAF requirements.

Lumbayanague Concreting of Pitatangalan-WagoKabasaran&Wago-Miniros FMR

0.00% For bid evaluation. Conduct procurement activities in accordance with ADB Procurement Guidelines and following the procedures of RA 9184;

Prepare and submit bid evaluation report to NPCO thru DARPO and RPO.

Provide assistance to LGU on bid evaluation and post-qualification.

Follow up with LGU thru DARPO on submission of bid evaluation report for review before submission to NPCO.

Determine status of submission of CAF requirements.

Balindong Concreting of Brgy. Dado Poblacion-SitioMatampayBagoingud FMR

0.00% For bid evaluation. Conduct procurement activities in accordance with ADB Procurement Guidelines and following the procedures of RA 9184;

Prepare and submit bid evaluation report to NPCO thru DARPO and RPO.

Provide assistance to LGU on bid evaluation and post-qualification.

Follow up with LGU thru DARPO on submission of bid evaluation report for review before submission to NPCO.

Determine status of submission of CAF requirements.

Balindong Concreting of Dado ARC PWS L-II

0.00% For bid evaluation. Conduct procurement activities in accordance with ADB Procurement Guidelines and following the procedures of RA 9184;

Prepare and submit bid evaluation report to

Provide assistance to LGU on bid evaluation and post-qualification.

Follow up with LGU thru DARPO on submission of bid evaluation report for review before submission to NPCO.

Determine status of submission of CAF requirements.

Page 145: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 86 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others NPCO thru DARPO and RPO.

Bubong Construction of Health Center Building (Brgy. Polayagan)

0.00% Scheduled opening of quotations on June 30, 2014.

Conduct procurement activities in accordance with ADB Procurement Guidelines.

Provide assistance to LGU on bid evaluation and post-qualification.

Monitor procurement activities of LGU thru DARPO;

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

Determine status of submission of CAF requirements.

Bubong Construction of Multi-purpose Building w/ Solar Dryer (Brgy. Salipongan)

0.00% Scheduled opening of quotations on June 30, 2014.

Conduct procurement activities in accordance with ADB Procurement Guidelines.

Provide assistance to LGU on bid evaluation and post-qualification.

Monitor procurement activities of LGU thru DARPO;

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

Determine status of submission of CAF requirements.

Lumbatan Rehab./Concreting of Makadar-Dalama ARC FMR

0.00% For bid evaluation Conduct procurement activities in accordance with ADB Procurement Guidelines and following the procedures of RA 9184;

Prepare and submit bid evaluation report to NPCO thru DARPO and RPO.

Provide assistance to LGU on bid evaluation and post-qualification.

Follow up with LGU thru DARPO on submission of bid evaluation report for review before submission to NPCO;

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

Determine status of submission of CAF requirements.

Lumbatan Rehab./Concreting of Makadar-Lalapung ARC FMR

0.00% For bid evaluation. Conduct procurement activities in accordance with ADB Procurement Guidelines and following the

Provide assistance to LGU on bid evaluation and post-qualification.

Follow up with LGU thru DARPO on submission of bid evaluation report for review before

Determine status of submission of CAF requirements.

Page 146: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 87 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others procedures of RA 9184;

Prepare and submit bid evaluation report to NPCO thru DARPO and RPO.

submission to NPCO; Ensure that procurement

of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

Marogong Concreting of Marogong Proper-Bolawanun-Balut-Piangologan FMR

0.00% Bid evaluation in progress.

Conduct procurement activities in accordance with ADB Procurement Guidelines and following the procedures of RA 9184;

Prepare and submit bid evaluation report to NPCO thru DARPO and RPO.

Provide assistance to LGU on bid evaluation and post-qualification.

Follow up with LGU thru DARPO on submission of bid evaluation report for review before submission to NPCO;

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

Determine status of submission of CAF requirements.

BASILAN Lamitan City Rehabilitation of 8.0-km

Sta. Clara-Bohenange FMR

0.00% Contract and fund request for submission to NPCO thru DARPO and RPO.

Complete and submit contract and fund request documents.

Provide assistance to LGU on completion of contract and fund request documents.

Follow up with LGU thru DARPO on submission of contract and fund request documents.

Lamitan City Concreting of 2.94-km SCARBIDC FMR

0.00% Contract and fund request for submission to NPCO thru DARPO and RPO.

Complete and submit contract and fund request documents.

Provide assistance to LGU on completion of contract and fund request documents.

Follow up with LGU thru DARPO on submission of contract and fund request documents.

Sumisip Concreting of 5.415-km Tumahubong ARC FMR

0.00% For bid evaluation. Conduct procurement activities in accordance with ADB Procurement Guidelines and following the procedures of RA 9184;

Prepare and submit bid evaluation report to

Provide assistance to LGU on bid evaluation and post-qualification.

Follow up with LGU thru DARPO on submission of bid evaluation report for review before submission to NPCO;

Ensure that procurement of LGU is

Determine status of submission of CAF requirements;

LGU should be coached on bid evaluation and post-qualification.

Page 147: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 88 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others NPCO thru DARPO and RPO.

in accordance with ADB procurement guidelines and following the procedures of RA 9184.

Sumisip Construction of Tumahubong Water Supply System

0.00% For bid evaluation. Conduct procurement activities in accordance with ADB Procurement Guidelines and following the procedures of RA 9184;

Prepare and submit bid evaluation report to NPCO thru DARPO and RPO.

Provide assistance to LGU on bid evaluation and post-qualification.

Follow up with LGU thru DARPO on submission of bid evaluation report for review before submission to NPCO;

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

Determine status of submission of CAF requirements;

LGU should be coached on bid evaluation and post-qualification.

Sumisip Rehabilitation of 9.98-km Tumahubong ARC FMR Package 2

51.15% Ongoing; LP fund releases,

PhP0.00; LP disbursements

submitted to NPCO, PhP5,272,810.05;

Request for 1st & 2nd tranches forwarded to MDFO last March 12, 2014.

Conduct daily inspection of on-going subproject/s and ensure that works are carried out in accordance with approved plans and specifications.

Conduct regular monitoring and supervision on subproject implementation.

Monitor subproject implementation and provide advice in addressing issues and concerns.

Sumisip Concreting of Lukketon-Tumahubong ARC FMR to Market Road

0.00% For bid evaluation. Conduct procurement activities in accordance with ADB Procurement Guidelines and following the procedures of RA 9184;

Prepare and submit bid evaluation report to NPCO thru DARPO and RPO.

Provide assistance to LGU on bid evaluation and post-qualification.

Follow up with LGU thru DARPO on submission of bid evaluation report for review before submission to NPCO;

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

Determine status of submission of CAF requirements;

LGU should be coached on bid evaluation and post-qualification.

Page 148: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 89 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others Sumisip Concreting of 3.0 km

Limbocandis-Mangal FMR 0.00% For bid evaluation. Conduct procurement

activities in accordance with ADB Procurement Guidelines and following the procedures of RA 9184;

Prepare and submit bid evaluation report to NPCO thru DARPO and RPO.

Provide assistance to LGU on bid evaluation and post-qualification.

Follow up with LGU thru DARPO on submission of bid evaluation report for review before submission to NPCO;

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

Determine status of submission of CAF requirements;

LGU should be coached on bid evaluation and post-qualification.

Tipo-Tipo Concreting of 4.143-km TARBADECO ARC Road Network

100.00% For final inspection; LP fund releases,

PhP2,827,760.32; LP disbursements

submitted to NPCO, PhP5,835,619.34;

Request for second and third LP releases is long overdue.

Set date for final inspection;

Send request for final inspection to DAR (PPO, RPO and NPCO);

Participate in final inspection.

Participate in final inspection;

Coordinate with Regional COA on availability of COA Technical Audit Specialist.

Ungkaya Pukan Concreting of 4.0-km Phil-Am-Buhepahu FMR

86.46% Ongoing; LP fund releases,

PhP8,272,022.38; LP disbursements

submitted to NPCO, PhP10,845,419.34;

Request for 3rd release LP release is long overdue.

Conduct daily inspection of on-going subproject and ensure that works are carried out in accordance with approved plans and specifications;

Prepare for pre-final inspection.

Conduct regular monitoring and supervision on subproject implementation.

Monitor subproject implementation and provide advice in addressing issues and concerns.

Ungkaya Pukan Concreting of the 4.96 km Phil-Am-BuhePahu TIPARBECO ARC FMR

0.00% Scheduled opening of bids on July 7, 2014.

Conduct procurement activities in accordance with ADB Procurement Guidelines and following the procedures of RA 9184.

Provide assistance to LGU on procurement activities.

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

Determine status of submission of CAF requirements.

Page 149: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 90 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others Maluso Concreting of 5.26-km

CARBADECO ARC FMR 0.00% Awarded to contractor

but no movement since NGALGU no longer exist,

LGU cannot afford to shoulder the counterpart equity.

For contract termination due to failure of contractor to mobilize;

For re-bidding.

Advise contractor (through formal letter) on termination of contract for failure of contractor to mobilize;

Conduct procurement activities in accordance with ADB Procurement Guidelines and following the procedures of RA 9184.

Provide assistance to LGU on termination of contract;

Provide assistance to LGU on procurement activities.

Follow up with LGU thru DARPO on termination of contract between LGU and contractor;

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

Maluso Multi-Purpose Building @ BrgyCalangCanas

0.00% Revised POW with NPCO;

For procurement.

Conduct procurement activities in accordance with ADB Procurement Guidelines and following the procedures of RA 9184.

Provide assistance to LGU on procurement activities.

Follow up with NPCO on approval of revised POW;

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

Determine status of submission of CAF requirements.

Lantawan Concreting of Baungis-Tairan ARC FMR

0.00% POW for concurrence of LGU.

Conduct procurement activities in accordance with ADB Procurement Guidelines and following the procedures of RA 9184.

Provide assistance to LGU on procurement activities.

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

Determine status of submission of CAF requirements.

SULU Panamao Rehabilitation of 2.4-km

Suuh-Kandayok-Kan-Ukol FMR

100.00% For final inspection; LP releases,

PhP734,847.81; LP disbursements

submitted to NPCO, PhP720,000.00;

2nd and 3rd LP request submitted to MDFO March 14, 2014.

Send request for final inspection to DAR (PPO and RPO).

Participate in final inspection.

Participate in final inspection;

Coordinate with Regional COA on availability of COA Technical Audit Specialist.

Page 150: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 91 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others Maimbung Concreting of 4.5-km

Patao Junction-Ipil FMR 88.24% On-going ;

LP releases, PhP4,049,612.40;

LP disbursements submitted to NPCO, P4,999,971.71;

LP disbursements still not reported, PhP1,115,692.60

Second and 3rd LP request submitted to NPCO.

Conduct daily inspection of on-going subproject and ensure that works are carried out in accordance with approved plans and specifications;

Prepare for pre-final inspection.

Conduct regular monitoring and supervision on subproject implementation.

Monitor subproject implementation and provide advice in addressing issues and concerns.

Maimbung Concreting of 2.0-km Patao Junction-KandangGulangan-RatagLiimbun FMR

80.95% On-going; LP releases,

PhP1,829,961.62; LP disbursements

submitted to NPCO, PhP1,258,414.12;

LP disbursements still not reported, PhP 571,547.50;

Second and 3rd LP request submitted to NPCO.

Conduct daily inspection of on-going subproject and ensure that works are carried out in accordance with approved plans and specifications.

Conduct regular monitoring and supervision on subproject implementation.

Monitor subproject implementation and provide advice in addressing issues and concerns.

Maimbung Concreting of 1.0-km Tubig-Samin Junction-Tambuan FMR

63.44% On-going; LP releases,

PhP926,820.90; LP disbursements

submitted to NPCO, PhP540,000.00;

LP disbursements still not reported, PhP386,820.9.

Second and 3rd LP request submitted to NPCO.

Conduct daily inspection of on-going subproject and ensure that works are carried out in accordance with approved plans and specifications.

Conduct regular monitoring and supervision on subproject implementation.

Monitor subproject implementation and provide advice in addressing issues and concerns.

Page 151: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 92 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others Siasi Concreting of 7.151-km

LumagunlungBuanRatagSipanding and Duggo FMR (Package 1)

0.00% Contract and fund request documents submitted to NPCO.

Conduct daily inspection of on-going subproject/s and ensure that works are carried out in accordance with approved plans and specifications;

Complete the liquidation report and request for 2nd LP release.

Conduct regular monitoring and supervision on subproject implementation;

Provide assistance to LGU on completion of liquidation reports and fund request;

Follow up with LGU on completion of liquidation reports and request for 2nd LP release.

Monitor subproject implementation and provide advice in addressing issues and concerns;

Follow up with NPCO on request for initial LP release.

Pandami Concreting of 7.5-km ParianDakula-Lahi-Malanta FMR

41.39% LP releases, PhP5,645,049.24;

LP disbursements submitted to NPCO, PhP9,616,579.01;

Financial documents submitted to DARPO.

Conduct daily inspection of on-going subproject and ensure that works are carried out in accordance with approved plans and specifications;

Require the contractor to submit a catch-up plan backed up with additional manpower, equipment and other resources to speed up implementation.

Conduct regular monitoring and supervision on subproject implementation.

Monitor subproject implementation and provide advice in addressing issues and concerns;

Follow up with NPCO on request for 2nd LP release.

Luuk Concreting of Brgy. Kanmindus-TandoBato FMR

0.00% With NAPA, for procurement.

Conduct procurement activities in accordance with ADB Procurement Guidelines and following the procedures of RA 9184.

Provide assistance to LGU on procurement.

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

LGU should be coached on the conduct of procurement activities from pre-procurement conference to award of contract.

Determine status of submission of

Page 152: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 93 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others CAF requirements.

Luuk Concreting of Brgy. TandoBato FMR

0.00% With NAPA, for procurement.

Conduct procurement activities in accordance with ADB Procurement Guidelines and following the procedures of RA 9184.

Provide assistance to LGU on procurement.

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

LGU should be coached on the conduct of procurement activities from pre-procurement conference to award of contract.

Determine status of submission of CAF requirements.

Pata Concreting of Saimbangun-Pisak-Kayawan FMR

0.00% With NAPA, for procurement.

Conduct procurement activities in accordance with ADB Procurement Guidelines and following the procedures of RA 9184.

Provide assistance to LGU on procurement.

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

LGU should be coached on the conduct of procurement activities from pre-procurement conference to award of contract.

Determine status of submission of CAF requirements.

Talipao Concreting of Kahawa-

Tampakan FMR 0.00% With NAPA, for

procurement. Conduct procurement

activities in accordance with ADB Procurement Guidelines and following the procedures of RA 9184.

Provide assistance to LGU on procurement.

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

LGU should be coached on the conduct of procurement activities from pre-procurement conference to award of contract.

Determine status of submission of CAF

Page 153: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 94 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others requirements.

Indanan Concreting of Pasil - Langpas FMR

0.00% NSAC approved subject to availability of funds.

Follow up with NPCO thru DARPO and RPO on final approval of subproject.

Follow up with NPCO thru RPO on final approval of subproject.

Follow up with NPCO on final approval of subproject.

LP Funds intended for Bongao, Butig, South Ubian subprojects and Parang CIS may be allocated for this subproject.

Indanan Concreting of Kuppong -Kagay FMR

0.00% NSAC approved subject to availability of funds.

Follow up with NPCO thru DARPO and RPO on final approval of subproject.

Follow up with NPCO thru RPO on final approval of subproject.

Follow up with NPCO on final approval of subproject.

LP Funds intended for Bongao, Butig, South Ubian subprojects and Parang CIS may be allocated for this subproject.

TAWI TAWI Bongao Construction of 2 -

Classroom School Building (Tubig-basag)

0.00% Delisted? Meet with NPCO for final delisting of Bongao subprojects and to provide funds for the Indanan subprojects

Bongao Concreting of 3.1-km TubigBasag - LakitLakit FMR

0.00% Delisted? Meet with NPCO for final delisting of Bongao subprojects and to provide funds for the Indanan subprojects

Bongao Concreting of 3.0-km LakitLakit - Mandulan FMR

0.00% Delisted? Meet with NPCO for final delisting of Bongao subprojects and to provide funds for the Indanan subprojects

Sibutu Concreting of 4.958-km Tandubanak FMR (Section 1)

0.00% With failed bidding; Request for revision of

POW due to price changes for NSAC approval;

With LP CAF; With NGALGU CAF No.

08-864-17-2012.

Follow up with NPCO thru DARPO and RPO on NSAC approval of revised POW.

Follow up with NPCO thru RPO on NSAC approval of revised POW.

Follow up with NPCO on NSAC re-approval.

The policy of NPCO of 20% cap on price increase is not reasonable. The provision of RA 9184 being referred to by

Page 154: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 95 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others DPWH and MDFO representatives when the NSAC was deliberating on the proposed cost adjustments on Sibutu subprojects, which was made as the basis of NPCO policy, is not applicable. NSAC members were referring to Section 53.1 wherein negotiated procurement is allowed after two failed biddings provided, among others, that the ABC should not be increased by more than 20%. LGU Sibutu is proposing revision of POW due to price increases and does not intend to apply negotiated procurement.

Sibutu Concreting of 1.02-km Tandubanak FMR (Section 2)

0.00% With failed bidding; Request for revision of

POW due to price changes for NSAC approval;

Follow up with NPCO thru DARPO and RPO on NSAC approval of revised POW.

Follow up with NPCO thru RPO on NSAC approval of revised POW.

Follow up with NPCO on NSAC re-approval.

The policy of NPCO of 20% cap on price increase is not reasonable. The provision of

Page 155: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 96 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others With LP CAF; With NGALGU fund

release of P1,664,803.53.

RA 9184 being referred to by DPWH and MDFO representatives when the NSAC was deliberating on the proposed cost adjustments on Sibutu subprojects, which was made as the basis of NPCO policy, is not applicable. NSAC members were referring to Section 53.1 wherein negotiated procurement is allowed after two failed biddings provided, among others, that the ABC should not be increased by more than 20%. LGU Sibutu is proposing revision of POW due to price increases and does not intend to apply negotiated procurement.

Page 156: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 97 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others Sibutu Concreting of 3.68-km

Tandubanak FMR (Section 3)

0.00% With failed bidding; Request for revision of

POW due to price changes for NSAC approval;

With LP CAF; With NGALGU CAF No.

08-843-17-2012.

Follow up with NPCO thru DARPO and RPO on NSAC approval of revised POW.

Follow up with NPCO thru RPO on NSAC approval of revised POW.

Follow up with NPCO on NSAC re-approval;

The policy of NPCO of 20% cap on price increase is not reasonable. The provision of RA 9184 being referred to by DPWH and MDFO representatives when the NSAC was deliberating on the proposed cost adjustments on Sibutu subprojects, which was made as the basis of NPCO policy, is not applicable. NSAC members were referring to Section 53.1 wherein negotiated procurement is allowed after two failed biddings provided, among others, that the ABC should not be increased by more than 20%. LGU Sibutu is proposing revision of POW due to price increases and does not intend to apply

Page 157: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 98 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others negotiated procurement.

Sibutu Construction of 1.970-km Tongehat FMR (4 sections)

0.00% With failed bidding; Request for revision of

POW due to price changes for NSAC approval;

With LP CAF; With NGALGU CAF

No.08-845-17-2012;.

Follow up with NPCO thru DARPO and RPO on NSAC approval of revised POW.

Follow up with NPCO thru RPO on NSAC approval of revised POW.

Follow up with NPCO on NSAC re-approval.

The policy of NPCO of 20% cap on price increase is not reasonable. The provision of RA 9184 being referred to by DPWH and MDFO representatives when the NSAC was deliberating on the proposed cost adjustments on Sibutu subprojects, which was made as the basis of NPCO policy, is not applicable. NSAC members were referring to Section 53.1 wherein negotiated procurement is allowed after two failed biddings provided, among others, that the ABC should not be increased by more than 20%. LGU Sibutu is proposing revision of POW due to price increases

Page 158: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 99 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others and does not intend to apply negotiated procurement.

Sibutu Construction of 2-Unit Classroom School Building (MohtarSulayman)

0.00% With NGALGU fund release of P389,759.07;

With advertisement in Philgeps website.

Conduct procurement activities in accordance with ADB Procurement Guidelines.

Provide assistance to LGU on procurement.

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

Determine status of submission of LP CAF requirements.

Sibutu Construction of 2-Classroom School Building (Sheik Makdum)

0.00% With NGALGU fund release of P389,759.07;

With advertisement in Philgeps website.

Conduct procurement activities in accordance with ADB Procurement Guidelines.

Provide assistance to LGU on procurement;

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

Determine status of submission of LP CAF requirements.

Sibutu Construction of BrgyTanduowak Health Station

0.00% With NGALGU fund release of P275,434.58;

With advertisement in Philgeps website.

Conduct procurement activities in accordance with ADB Procurement Guidelines.

Provide assistance to LGU on procurement.

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

Determine status of submission of LP CAF requirements.

Sibutu Construction of 3-Classroom School Building (ES)(Tandubanak)

96.95% 99.55% PA as reported by LGU;

LP release, PhP362,745.14;

LP disbursements to be reported by LGU, PhP970,977.11.

Complete and submit liquidation reports and request for 2nd and 3rd LP releases;

Initiate the conduct of pre-final and final inspections.

Provide assistance to LGU on completion of liquidation reports and request for 2nd and 3rd LP releases;

Participate in the conduct of pre-final and final inspections.

Follow up with LGU thru DARPO on submission of liquidation reports and request for 2nd and 3rd LP releases;

Ensures that pre-final and final inspections are conducted by duly designated inspectorate teams and that COA Technical Audits Specialist is invited for the final inspection.

For pre-final inspection.

Page 159: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 100 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others Sibutu Construction of 3-

Classroom School Building (MSU-CHS)

97.01% 100% PA as reported by LGU;

LP release, PhP363,431.85;

LP disbursements to bereported by LGU, PhP972,693.89.

Complete and submit liquidation reports and request for 2nd and 3rd LP releases;

Initiate the conduct of pre-final and final inspection.

Provide assistance to LGU on completion of liquidation reports and request for 2nd and 3rd LP releases;

Participate in the conduct of pre-final and final inspections.

Follow up with LGU thru DARPO on submission of liquidation reports and request for 2nd and 3rdLP releases;

Ensures that pre-final and final inspections are conducted by duly designated inspectorate teams and that COA Technical Audits Specialist is invited for the final inspection.

For final inspection.

Sibutu Construction of 3-Classroom School Building (Taungoh)

91.67% 98.45% PA as reported by LGU;

LP release, PhP362,745.14;

LP disbursements to be reported by LGU, PhP712,049.88.

Complete and submit liquidation reports and request for 2nd and 3rd LP releases;

Initiate the conduct of pre-final and final inspections.

Provide assistance to LGU on completion of liquidation reports and request for 2nd and 3rd LP releases;

Participate in the conduct of pre-final and final inspections.

Follow up with LGU thru DARPO on submission of liquidation reports and request for 2nd and 3rd LP releases;

Ensures that pre-final and final inspections are conducted by duly designated inspectorate teams and that COA Technical Audits Specialist is invited for the final inspection.

For pre-final inspection.

Sibutu Construction of 3-Classroom School Building (Tongsibalo)

76.08% 96.92 PA as reported by LGU;

LP release, PhP363,431.85;

LP disbursements to be reported by LGU, PhP712,049.88.

Complete and submit liquidation reports and request for 2nd and 3rd LP releases;

Initiate the conduct of pre-final and final inspections.

Provide assistance to LGU on completion of liquidation reports and request for 2nd and 3rd LP releases;

Participate in the conduct of pre-final and final inspections.

Follow up with LGU thru DARPO on submission of liquidation reports and request for 2nd and 3rd LP releases;

Ensures that pre-final and final inspections are conducted by duly designated inspectorate

For pre-final inspection

Page 160: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 101 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others teams and that COA Technical Audits Specialist is invited for the final inspection.

Sibutu Construction of 3-Classroom School Building (Tongehat)

98.73% 96.04% PA as reported by LGU;

LP release, PhP363,431.85;

LP disbursements to be reported by LGU, PhP972,693.89.

Complete and submit liquidation reports and request for 2nd and 3rd LP releases;

Initiate the conduct of pre-final and final inspections.

Provide assistance to LGU on completion of liquidation reports and request for 2nd and 3rd LP releases;

Participate in the conduct of pre-final and final inspections.

Follow up with LGU thru DARPO on submission of liquidation reports and request for 2nd and 3rd LP releases;

Ensures that pre-final and final inspections are conducted by duly designated inspectorate teams and that COA Technical Audits Specialist is invited for the final inspection.

For pre-final inspection.

Sibutu Construction of 3-Classroom School Building (Ungus-Ungos)

95.48% 99.24% PA as reported by LGU;

LP release, PhP362,745.14;

LP disbursements to be reported by LGU, PhP972,693.89.

Complete and submit liquidation reports and request for 2nd and 3rd LP releases;

Initiate the conduct of pre-final and final inspections.

Provide assistance to LGU on completion of liquidation reports and request for 2nd and 3rd LP releases;

Participate in the conduct of pre-final and final inspections.

Follow up with LGU thru DARPO on submission of liquidation reports and request for 2nd and 3rd LP releases;

Ensures that pre-final and final inspections are conducted by duly designated inspectorate teams and that COA Technical Audits Specialist is invited for the final inspection.

For pre-final inspection.

Sibutu Construction of Barangay Health Station (Tandubanak)

72.43% 97.67% PA as reported by LGU;

LP release, PhP189,454.90;

LP disbursements to be reported by LGU,

Complete and submit liquidation reports and request for 2nd and 3rd LP releases;

Initiate the conduct of pre-final and final

Provide assistance to LGU on completion of liquidation reports and request for 2nd and 3rdLP releases;

Participate in the

Follow up with LGU thru DARPO on submission of liquidation reports and request for 2nd and 3rd LP releases;

For pre-final inspection.

Page 161: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 102 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others PhP572,445.99. inspections. conduct of pre-final and

final inspections. Ensures that pre-final

and final inspections are conducted by duly designated inspectorate teams and that COA Technical Audits Specialist is invited for the final inspection.

Sibutu Construction of Barangay

Health Station (Taungoh) 66.58% LP release,

PhP260,864.17; LP disbursements to be

reported by LGU, PhP325,842.01.

Complete and submit liquidation reports and request for 2nd and 3rd LP releases;

Initiate the conduct of pre-final and final inspections.

Provide assistance to LGU on completion of liquidation reports and request for 2nd and 3rd LP releases;

Participate in the conduct of pre-final and final inspections.

Follow up with LGU thru DARPO on submission of liquidation reports and request for 2nd and 3rd LP releases;

Ensures that pre-final and final inspections are conducted by duly designated inspectorate teams and that COA Technical Audits Specialist is invited for the final inspection.

Physical accomplishment for validation.

Sibutu Construction of Barangay Health Station (Tongsibalo)

72.38% 96.19% PA as reported by LGU;

LP release, PhP189,454.90;

LP disbursements to be reported by LGU, PhP511,801.25.

Complete and submit liquidation reports and request for 2nd and 3rd LP releases;

Initiate the conduct of pre-final and final inspections.

Provide assistance to LGU on completion of liquidation reports and request for 2nd and 3rd LP releases;

Participate in the conduct of pre-final and final inspections.

Follow up with LGU thru DARPO on submission of liquidation reports and request for 2nd and 3rd LP releases;

Ensures that pre-final and final inspections are conducted by duly designated inspectorate teams and that COA Technical Audits Specialist is invited for the final inspection.

For pre-final inspection.

Page 162: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 103 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others Sibutu Construction of Barangay

Health Station (Tongehat) 66.92% 96.04% PA as reported

by LGU; LP release,

PhP189,454.90; LP disbursements to be

reported by LGU, PhP511,801.25.

Complete and submit liquidation reports and request for 2nd and 3rd LP releases;

Initiate the conduct of pre-final and final inspections.

Provide assistance to LGU on completion of liquidation reports and request for 2nd and 3rd LP releases;

Participate in the conduct of pre-final and final inspections.

Follow up with LGU thru DARPO on submission of liquidation reports and request for 2nd and 3rd LP releases;

Ensures that pre-final and final inspections are conducted by duly designated inspectorate teams and that COA Technical Audits Specialist is invited for the final inspection.

For pre-final inspection.

Sibutu Construction of Barangay Health Station (Ungus-Ungos)

70.92% 96.50% PA as reported by LGU;

LP release, PhP189,454.90;

LP disbursements to be reported by LGU, PhP236,642.75.

Complete and submit liquidation reports and request for 2nd and 3rd LP releases;

Initiate the conduct of pre-final and final inspections.

Provide assistance to LGU on completion of liquidation reports and request for 2nd and 3rd LP releases;

Participate in the conduct of pre-final and final inspections.

Follow up with LGU thru DARPO on submission of liquidation reports and request for 2nd and 3rd LP releases;

Ensures that pre-final and final inspections are conducted by duly designated inspectorate teams and that COA Technical Audits Specialist is invited for the final inspection.

For pre-final inspection.

Sitankai Concreting of 7.0 km Tongusong-Tongmageng FMR

0.00% Scheduled pre-bid conference on July 9, 2014 and opening of bids on July 21, 2014.

Conduct procurement activities in accordance with ADB Procurement Guidelines and following the procedures of RA 9184.

Provide assistance to LGU on procurement.

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

The LGU needs to be coached in the conduct of procurement activities and in preparation of bid evaluation report;

Determine status of submission of CAF requirements.

Page 163: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 104 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others Simunul Construction of Multi-

Purpose Center (Maruwa) 0.00% Scheduled pre-bid

conference on July 2, 2014 and opening of quotations on July 14, 2014.

Conduct procurement activities in accordance with ADB Procurement Guidelines.

Provide assistance to LGU on procurement.

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

The LGU needs to be coached in the conduct of procurement activities and in preparation of bid evaluation report;

Determine status of submission of CAF requirements.

Simunul Construction of Multi-Purpose Center (SokahBulan)

0.00% Scheduled pre-bid conference on July 2, 2014 and opening of quotations on July 14, 2014.

Conduct procurement activities in accordance with ADB Procurement Guidelines.

Provide assistance to LGU on procurement.

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

The LGU needs to be coached in the conduct of procurement activities and in preparation of bid evaluation report;

Determine status of submission of CAF requirements.

Simunul Construction of Multi-Purpose Center (Tonggusung)

0.00% Scheduled pre-bid conference on July 2, 2014 and opening of quotations on July 14, 2014.

Conduct procurement activities in accordance with ADB Procurement Guidelines.

Provide assistance to LGU on procurement.

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

The LGU needs to be coached in the conduct of procurement activities and in preparation of bid evaluation report;

Determine status of submission of CAF requirements.

Simunul Construction of Multi-Purpose Center (Tampakan)

0.00% Scheduled pre-bid conference on July 2, 2014 and opening of quotations on July 14, 2014.

Conduct procurement activities in accordance with ADB Procurement Guidelines.

Provide assistance to LGU on procurement.

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the

The LGU needs to be coached in the conduct of procurement activities and in

Page 164: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 105 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others procedures of RA 9184. preparation of bid

evaluation report; Determine status

of submission of CAF requirements.

Simunul Construction of Multi-Purpose Center (PanglimaMastul)

0.00% Scheduled pre-bid conference on July 2, 2014 and opening of quotations on July 14, 2014.

Conduct procurement activities in accordance with ADB Procurement Guidelines.

Provide assistance to LGU on procurement.

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

The LGU needs to be coached in the conduct of procurement activities and in preparation of bid evaluation report;

Determine status of submission of CAF requirements.

Simunul Construction of Multi-Purpose Center (Mongkay)

0.00% Scheduled pre-bid conference on July 2, 2014 and opening of quotations on July 14, 2014.

Conduct procurement activities in accordance with ADB Procurement Guidelines.

Provide assistance to LGU on procurement.

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

The LGU needs to be coached in the conduct of procurement activities and in preparation of bid evaluation report;

Determine status of submission of CAF requirements.

Simunul Construction of Multi-Purpose Center (Pagasinan)

0.00% Scheduled pre-bid conference on July 2, 2014 and opening of quotations on July 14, 2014.

Conduct procurement activities in accordance with ADB Procurement Guidelines.

Provide assistance to LGU on procurement.

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

The LGU needs to be coached in the conduct of procurement activities and in preparation of bid evaluation report;

Determine status of submission of CAF requirements.

Page 165: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 106 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others Simunul Construction of Multi-

Purpose Center (Maruwa-Tonggusung)

0.00% Scheduled pre-bid conference on July 2, 2014 and opening of quotations on July 14, 2014.

Conduct procurement activities in accordance with ADB Procurement Guidelines.

Provide assistance to LGU on procurement.

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

The LGU needs to be coached in the conduct of procurement activities and in preparation of bid evaluation report;

Determine status of submission of CAF requirements.

South Ubian Post Harvest Facilities (PHF) - West TubigDayang

0.00% Revised POW for confirmation/ signature by LGU;

LGU prefers FMR than PHF.

Decide on whether to pursue subproject implementation or not ASAP;

Advice NPCO thru DARPO on its decision.

Follow up with LGU on submission of revised POW.

Follow up with LGU on its decision to withdraw approved subproject for implementation.

South Ubian Post Harvest Facilities (PHF) - TampakanDampong

0.00% Revised POW for confirmation/ signature by LGU;

LGU prefers FMR than PHF.

Decide on whether to pursue subproject implementation or not ASAP;

Advice NPCO thru DARPO on its decision.

Follow up with LGU on submission of revised POW.

Follow up with LGU on its decision to withdraw approved subproject for implementation.

Sapa-Sapa PHF - Baldatal Revised POW for confirmation / signature by LGU

For publication in local newspaper.

Conduct procurement activities in accordance with ADB Procurement Guidelines.

Provide assistance to LGU on procurement.

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

LGU needs to be advised that the subproject should be published in Philgeps website;

The LGU needs to be coached in the conduct of procurement activities and in preparation of bid evaluation report;

Determine status of submission of CAF requirements.

Page 166: Orient Integrated Development Consultants, Inc. (OIDCI)hineleban.org/cura/wp-content/uploads/Project-Completion-Report.pdf · Agricultural and Enterprise Development. The SMT supported

Second Agrarian Reform Communities Project (ARCP II) – Special Management Team for ARMM

P C R A n n e x e s 107 | P a g e

Municipality Subproject P.A. Status Immediate Next Steps

LGU DARPO RPO Others Languyan Concreting of

TubigDakula - Kuala Baru FMR

0.00% No advertisement in Philgeps as of June 30, 2014.

Conduct procurement activities in accordance with ADB Procurement Guidelines and following the procedures of RA 9184.

Provide assistance to LGU on procurement;

Ensure that procurement of LGU is in accordance with ADB procurement guidelines and following the procedures of RA 9184.

The LGU needs to be coached in the conduct of procurement activities and in preparation of bid evaluation report;

Determine status of submission of CAF requirements.