organization profile - primove...

82

Upload: others

Post on 02-Oct-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming
Page 2: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Organization Profile

About PriMove: PriMove Infrastructure Development consultants Pvt. Ltd. is a consulting company working in the field of development planning, rural and urban infrastructure development and capacity building. The promoters have been working in water sector since 1991. PriMove’s motif is engineering growth for facilitating sustainable development. Our vision is to be First choice of clients, partners and professionals in the Infrastructure sector. End to end services for water projects is our specialization. Based at Pune in Maharashtra state of India, the organization has been promoted and managed by professionals to provide support services to the Government, Multilateral and bilateral agencies, NGOs, Corporate, Urban Local Bodies (Municipal Governments) and Rural Local Bodies. It has provided services in Maharashtra, other states of India and also internationally. PriMove has also worked in African countries. We have provide services for water sector projects to cities with current population ranging from 3.5 million to small rural habitations with population of few thousands. We have also provided services to the regional water supply schemes covering multiple rural and urban habitations. PriMove provides services in the field of Water Supply, Sewage, Storm Water Management, Environmental Sanitation, Master plan, Water Resource Development & Management and Rural Development. PriMove provide technical services for preparation of Detailed Project Reports and Project Management services for both rural and urban infrastructure development projects. PriMove services also include appraisals, project design, development of capacity building and project implementation strategies, delivery of capacity building components through training of trainers, development of tools, process design; management and monitoring systems, project evaluations and development of knowledge products. Environmentally responsible and socio economically viable project design and implementation management is the core strength of PriMove team. We have robust and intensive experience of operationalizing demand led water & sanitation projects in rural areas based on firm foundation of participatory approach involving multiple stakeholders ranging from local women groups in the villages to the highest level decision makers at program and policy level. We have been closely working with Irrigation, Water Supply, Sanitation, Rural development department of various governments at policy, program and project level. We also partner with agencies like UNICEF, the World Bank, GIZ, Plan India for implementing various water sector projects. PriMove has a multidisciplinary team of professionals who on one hand has strong technical capabilities, robust cutting edge level experience and on the other have insights into program and policy development. The group members are from various disciplines like civil engineering, electro mechanical engineering, environmental engineering and hydrogeology, project management, development planning, sanitation, water quality, geology, agriculture economics, information technology, sociology, geographical information system, institution development and capacity building. The team members have worked at various levels in their sectors and have contributed from policy level to the project implementation level. We also have a well-trained support staff for field investigations and piloting of tools. In last two years water infra projects worth around 400 million USD designed by PriMove have been approved and are under implementation. Primove team has developed a protocol for Water use efficiency in urban & rural water supply schemes of various sizes & also specializes in providing assistance in converting intermittent water supply to continuous (24X7). We have also supported Ground Water Survey and Development Agency, Government of Maharashtra (GSDA) for assisting Village Level Water safety and Security program in Maharashtra.

Page 3: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Currently we working with GSDA as project management consultants for implementation of aquifer management project funded by The World Bank. We have also worked for rolling out VWSS in National Thermal Power Corporation (NTPC) project villages as technical support agency. PriMove has been a technical support agency to Plan India for development of VWSS process module, its roll out, designing WASH country strategic plan (2015-2020) and assessment of training programs conducted by WASH institute, Kodaikanal. For SRTT, PriMove has also done assessment of impact on community health through drinking water supply & sanitation project under Himmothan Pariyojana Phase I, in Uttarakhand. We have also developed Implementation Strategy for Mission Swacch Jal for Drinking Water and Sanitation Program in Gujarat and Uttarakhand for SRTT. PriMove has also worked with agencies like National Rain fed Agriculture Authority set up by Government of India under Planning Commission for carrying out studies on the water resources related subjects. PriMove is empanelled with agencies like GSUDA, Ministry of Rural Development and Panchayati Raj, Government of India; Rural Development Department, Government of Maharashtra; horticulture mission, Maharashtra Pollution Control Board, Maharashtra state agriculture marketing board and Plan India for providing capacity building, management and technical support services in RD, water sanitation and NRM sector. Along with Bear Valley Ventures Limited, UK, PriMove has been doing research on Tiger Toilet Technology, an innovative on-site sanitation system, based on vermifilteration. The technology neutralizes waste within 24 hours. The technology has also been successfully implemented in various schools. . PriMove has built around 4,000 Tiger Toilets so far. We have also developed a Tiger Bio filter a low cost, environmentally responsible technology for waste water treatment and is already implemented in Pune city and for various private clients. PriMove has a multidisciplinary team of professionals who have robust grass root level experience of working on community based WASH projects and also play a vital role in advocating community led water sanitation management processes at the state and central government level. The group members are from various disciplines like civil engineering (WATSAN), development planning, environmental & sanitation science, water quality, geology, agriculture economics, information technology, sociology, institution development & capacity building, management sciences, environmental engineering and hydrogeology, community mobilization and communication. The team members have worked at various levels in their sectors and have contributed at policy level. We have a well-trained support staff for field investigations and piloting of tools. The robust implementation management team is one of our core strengths. The experience and understanding gained by the team from the various assignments done in the past have contributed to planning of various development programs in Maharashtra, other states of India and also abroad. Thus, over the years, the company has accumulated understanding of the grassroots reality and deep understanding of issues at higher decision making levels.

Page 4: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Sectors: Water Availability of dependable and affordable water is non-negotiable condition for any infrastructure development. Wise water solutions are needed in the current context of competition for access to water. We specialize in developing water solution to various types of infrastructure.

Rural Water Supply

Urban water Supply

In urban areas the service standards for water supply are high and is a crucial factor affecting the urban development. Consistency, quality and quantity are equally important in urban water supply. Environmentally responsible planning for appropriate water management is desired by all the stakeholders. We specialize in designing such urban water systems.

We undertake the situation assessment, demand articulation, option evaluation, strategy development, technical designs, estimation, project management and risk analysis for the urban water supply schemes.

Demand responsive rural water supply ensuring water source and system sustainability, appropriate water quality with access to all rural households is a mission for all the governing agencies. We design and support implementation of such rural water supply solutions owned by the user communities. We engineer sustainable rural water supply solutions through multidisciplinary teams comprising of engineers, sociologists, institution development and capacity building specialists as per the situation requirements.

Page 5: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Rainwater Harvesting:

In urban areas water supplied by urban local bodies is becoming very costly and limited in quantity. It’s become a necessity to increase the ground water level to avoid insufficiency of Water. There is a need to conserve and collect the rain water from roofs as well as open spaces and effectively put in to daily uses such as washing vehicles, gardening & flushing toilets etc. We provide Turnkey solutions in designing and building these Rain Water Harvesting systems of various scales, such as Single household to Multiple buildings & Townships. This is also been very well implanted in Commercial & Industrial setups.

The developing world continues to be in the intermittent drinking water supply systems which are vulnerable for contamination of water during distribution. We have competent team for modelling the distribution networks and developing continuous 24X7 water supply systems. The efficiencies in the water supply system are low in most of the developing world. 40 to 50 % of the system water input is Non-Revenue Water (NRW). Most of it is also physical leakage. We specialise in the systematic program implementation for efficiency improvements in water supply systems, which lead them towards sustainability.

Page 6: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Storm Water Management

Water Resources Development and Management

In the urban areas efficient storm water management is vital for ensuring proper functioning and designed life of roads and other infrastructure. It also contributes to environmentally sensitive planning and quality of life in the city areas. The storm water management for the cities cannot be effectively addressed with piece meal approach. Integrated planning of storm water management based on the principles of urban watershed management helps in ensuring quality and life of infrastructure and overall quality of life. It also enhances the capability of a city to reduce the flood disaster risks caused due to high intensity rains. It requires experienced team of hydrologists, engineers and environmentalists. We specialize in preparing the storm water management master plans, detailed engineering reports and implementation management.

Optimal utilization of available natural resources using eco-logic along with robust technical inputs on engineering, hydrology, geology and environment are key ingredients of sustainable water resource development and management. We specialize in developing such water resources for various purposes like irrigation, industry, townships and small marginalize communities. We design, manage implementation of specific projects and also develop programs and policies at regional and national level.

Page 7: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Sewage & Sanitation Appropriate management of sewage and sanitation is of critical importance for sustained quality of life and environmental health. Effective sanitation and sewage management can have positive impact on the economic productivity of the communities. It also forms a part of diligent water resource management as the bad management of sanitation constrains the water availability

Sewage

In the urban areas the population density is high and in many cases land availability is constrained. In many urban centres the centralized sewerage systems exist in parts, which affect the quality of environment and people’s life. It also generates the waste water affecting the quality of life of many settlements downstream. We design master plans for sewage and waste water management of cities. Water reuse strategies and technologies are part of the overall master planning. We prepare the detailed project reports of sewerage systems and also specific interventions like sewage treatment plants and water reuse plans. We also develop the projects to use sewage for the energy production.

Page 8: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Rural Sanitation

Roads

The sanitation in rural areas has many challenges. They range from identification of socio culturally acceptable solutions to promoting appropriate technology. Implication of poor sanitation on the health and the economic productivity of rural population are cause of concern for many developing countries.

We facilitate development of socio culturally acceptable rural sanitation solutions in terms of technology and behaviour change. We also undertake capacity building and training for promoting rural sanitation and environmental health.

Connectivity by all-weather good quality roads is precondition for any development. The road infrastructure decides the value of any development may it be a life style project in the countryside, the rural households or urban neighbourhoods. We design roads in any types of terrains, in urban and rural settings. We prepare master plans and detailed engineering reports for the road projects.

Page 9: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Industrial & Residential Townships

Natural Resources Management

Renewable Energy

In country like India the policy environment is supporting the development of independent townships and residential areas. These townships and special economic zones are emerging as building blocks of economic development. We provide technically sound and sustainable infrastructure solutions for such development units. It can be a flood management solution, integrated water- waste water solutions, roads, water resource development, geological stability analysis and roads. We also prepare infrastructure master plans for such units.

Integrated management of natural resources like water, soil, agriculture, forests, bio mass has a potential to contribute to the sustainable livelihoods of millions of rural families. The approaches like ‘watershed based land use planning and management of natural resources’ can substantially contribute towards decentralized development in many parts of the world. The natural resource management is not just linked to technical expertise in various subjects but it also requires ability to design capacity building strategies and appropriate institutional arrangements to ensure sustainability. We specialize in designing of natural resource management projects and programs and support the implementation. We design the NRM solutions for different development units starting from a small village to a regional level and national level.

Decentralized energy solutions based on renewable sources through climate friendly technologies contribute to reduction of green House Gas and bridging demand – supply gap. Considerable amount of bio waste is generated from agriculture, dairy, sewage systems etc. We design projects and prepare detailed project report to use bio gas to produce electrical power.

Page 10: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Agriculture

Services:

Feasibility studies and Project Development PriMove provides services for situation assessment, challenge definition, strategy development and action planning for various infrastructure development projects. We undertake techno- economic and social feasibility studies and design the projects.

Master Planning PriMove provides services for developing master plans for basic infrastructure in urban and rural areas. The range of service varies from basin wise master plan for Water, to infrastructure master plans for private industrial and residential townships. Our ability and experience of working at both national policy level and grass root levels gives us a unique perspective to provide complete solution to our clients.

Preparation of Detailed Project Reports Supported by a large pool of experts, PriMove provides services for developing detailed project reports for water infrastructure projects. The services include population projections, topographical and geotechnical surveys, detailed designs and hydrolic modelling, quantity survey, estimations, developing project reports to seek finance, pretender activities as well as detailed engineering and construction level detailing to help effective execution.

Project Management Services PriMove provides Project Management on infrastructure projects. Out team ensure that projects are executed as per milestones with proper quality checks in place. The service includes construction quality management, time and cost management, measurements and records along with reporting as per client and project needs. PriMove has managed implementation of water supply, storm water, sewerage and sanitation, highways, tunnels, and urban road projects

In countries like India still more than 70 % people depend on agriculture for their livelihoods and subsistence. Similar scenario exists in many developing countries. In current context of food insecurity this sector becomes more important. We provide services to plan the agriculture projects which include technology transfer, farming system development, farmer’s capacity building and linkage development. We undertake feasibility studies, business planning, detailed engineering reports, and resource mobilization and implementation management for agribusiness projects.

Page 11: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Capacity Building, Training &Institution Development PriMove provides capacity building services to strengthen the abilities of individuals and organizations to effectively perform their tasks. We provide services to develop capacity building strategy and action plans, tailor made for specific projects and organizations. We undertake training needs assessment, design and deliver trainings, develop systems and tools for project implementation and also provide hand holding support.

Evaluation, Monitoring PriMove provides evaluation and monitoring services for various development projects. Based on the evaluations and monitoring, we develop knowledge products to inform policy and project development. Development of participatory monitoring and evaluation systems for development projects is one of the strong areas of PriMove

Rehabilitation and Resettlement PriMove provides services to assess the impact of the development projects, identify the project affected persons and develop rehabilitation action plans to mitigate the adverse impacts and enhance the positive impacts of the project. We adopt participatory process to develop the action plans in the framework of the relevant R&R policies and guidelines.

Our Clients:

Government of India

Government of Maharashtra

Government of Gujarat

Government of Punjab

Ministry of Urban Development (Public Health Department)

Rural and Urban local government agencies in India

Pune Municipal Corporation

Mira Bhyander Municipal Corporation,

Mumbai Metropolitan Regional Development Authority (MMRDA)

Chandrapur Municipal Corporation

Nanded Municipal Corporation

Kolhapur Municipal Corporation

Sangli Municipal Corporation

Thane Municipal Corporation

Solapur Municipal Corporation

Osmanabad Municipal Council

Page 12: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Navi Mumbai Municipal Corporation

Pune Metropolitan Region Development Authority (PMRDA).

Pimpri Chinchwad New Town Development Authority, Pune

Maharashtra Agricultural Competitiveness Project (MACP), Pune

UNICEF

KFW

The World Bank

German Technical co-operation (GTZ), Germany, formerly Known as GIZ

Agricultural Finance Corporation Ltd.

Power Finance Corporation Ltd.

Local and International NGOs

Tamilnadu Water Investment Co. Ltd, India

Corporate in India

Infrastructure Leasing & Finance Services (IL & FS) India

Government of Lesotho

Department for International Development (DFID), UK

OXFAM GB

Defence Research Development Organisation (DRDO), Pune

National Thermal Power Corportion (NTPC) of India

Sir Ratan Tata Trust (SRTT)

Our Empanelment’s:

Ministry of Urban Development (PHE Section), Government of India

Ministry of Urban Development (Smart City), Government of India

National Institute of Urban Affairs for ‘HRIDAY’ Scheme of MoUD, GoI.

National Key Resource Centres (KRCs), Ministry of Drinking Water Supply & Sanitation,

Goverment of India.

Principal Key Resource Centres, Water Supply & Sanitation Dept. Government of Maharashtra.

Department of Urban Development, Housing & Local Self Government, Government of

Rajasthan.

Punjab Municipal Infrastructure Development Company, Government of Punjab

Goa State Urban Development Agency, Government of Goa

Madhya Pradesh Jal Nigam Maryadit, Government of Madhya Pradesh

Uttarakhand Payjal Nigam, Government of Uttarakhand

Page 13: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Odisha Urban Infrastructure Development Fund, Government of Orissa

Maharashtra Jeevan Pradhikaran, Ahmednagar, Government of Maharashtra

Pune Municipal Corporation

Bhivandi Nizampur city Municipal Corporation

Kolhapur Municipal Corporation

Navi Mumbai Municipal Corporation

Yashvantrao Chavan Academy of Development Administration (YASHADA), Government of

Maharashtra.

Our Key Personnel:

No Name of the Staff Qualification Area of Expertise Experience

A. Board of Directors:

1. Ajit Phadnis BE (Civil) Capacity building and Water Supply and Sanitation expert at national and international level

26 years

2. Ajeet Oak BE (Civil) Water supply sanitation Engineer project management at Nation & International level

26 years

3. Neelesh Kulkarni BE (Ele.) Electronics Engineer Expert in Water Management, Capacity Building and natural resource management

25 years

4. S.L. Bhingare BE (Civil) ME (EQ Engg.)

Expert in irrigation project design and construction management Retired Executive Director, Irrigation Department, Government of Maharashtra

45 years

B. Staff members:

1. Pradeep Gokhale M. E Environmental Engg, MBA LLB

Sewerage and continuous 24X7 water system development. Retired Superintending Engineer (MJP)

45 Years

2. S.D. Kulkarni BE (Civil) Expert in planning, designing, execution and maintenance of water supply & sewerage schemes

36 years

3. Anuya Bhide M.Tech-Environment

Expert in Designing of Sewerage and Water supply schemes

05 years

4. Vishal Ujagare BE (Civil) Expert in project management 18 years

5. Mangesh Gupte M. E. Environment Expert in Design & Hydraulic modelling of Water & Sewerage Schemes, CSR activities and Sanitation Research.

25 years

6. Deepak Muley B.E. Civil Expert in Estimation 08 years

Page 14: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

7. Sunil Warade D.C.E. Expert on water supply and watershed development

22 years

8. P.V. Kulkarni D. C. E Hydraulic engineer Expert in RCC & Estimation of Infrastructure projects

35 years

9. Sushilkumar Chakrupe

BE Civil Expert in Execution of Infrastructure Projects

08 years

10. Veerdhaval Pawar BE Civil ME C&M

Expert in Execution of Infrastructure Projects

05 years

11. Vishal Chougule ME Environment BE-Environment

Expert in Designing of Sewerage and Water supply schemes

06 years

12. Shital Kole D.C.E. Expert in water supply and Storm water 22 years

13. Mahesh Badure GIS Expert Expert Auto CAD and GIS software 10 years

14. Pratibha Jangade ITI-Draughstman Expert Auto CAD and GIS software 10 years

15. Sunil Sapte M. Sc. Geoinformatics

Expert Auto CAD and GIS software 10 years

16. Anand Andhare BE Civil Expert in Execution of Infrastructure Projects

06 years

17. Rohit Patankar B.E. (Environmental) Sewerage new technology development and testing

07 years

18. Rohit Walvekar ME-Environmental Expert in Water, Sewarage & Storm water Design & DPR Preparation

03 years

19. Yogesh Borawake Diploma in GIS BA (Geo)

Auto CAD and GIS software 06 years

20. Dattatray Shingate D.A. E Auto CAD and GIS software 11 years

21. Eknath Saste BSC Chemistry Expert in water quality, capacity building, process management

20 years

22. Jitendra Naik MSC Agriculture Expert in Sustainable and Community Development

13 years

23. Laxmikant Shinde BSC Zoology (TNA, DoT, DTS, EoT) certified by DoPT.

Expert in Training Science and SAT Cycle, capacity building, process management

25 years

24. Mahesh Kodgire MSW

Expert in Community development, sanitation expert, capacity building

16 years

25. Ramesh Petkar D.C.E Expert in water resource management 14 years

26. Sachin Hattalge MSW Expert in Community Mobilisation, sanitation expert, capacity building

13 years

27. Ashwini Kotasthane M A Economics Project Coordination and documentation, gender expert

18 years

28. Sachinkumar Supekar

MBA-Rural Management

Expert in Water & Sanitation. 16 years

29. Pravin Kamble MSW Expert in Community development, water supply sanitation.

16 years

30. Gajanan Aspat MSW Expert in Community development 15 years

Page 15: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

31. Nandini Raghuthaman

B.Com Expert in Accounting & Finance 25 years

32. Pankaj Bole MBA HR Expert in HR & administration 10 years

C. Consultants:

1. Jonnalagadda V. Ramana Murty

Masters in Urban and Regional Planning, Masters in International Rural Development & Planning, University of Guelph, Canada

Management of community led processes and capacity building

25 years

2. Chandrapkant Terkhedkar

MSc (Agri) Expert in Agronomy, Research & Capacity Building

22 years

3. Madhuri Newale Masters in Management Sciences

Expert in Natural Resource Management and community led approaches

22 years

4. Dr. Manohar Sawant M. Sc. Agri Ph.D Expert in Agronomy, Research & Capacity Building

45 years

5. Raosaheb Gaikwad BE (Civil) M. E (Hydrology)

Expert in Hydrology, Water Resources Planning, Integrated River Basin Planning & Management.

45 years

6. V. Krishnamurty M.Sc. Geology Expert in Geology & Geo Hydrology 44 years

7. Nitin Inamdar C.A.

Expert in Finance Management CA by professional

22 years

8. Prasad Oak BE (Construction) Structural Engineer 18 years

9. K D Karhale D.C.E. Expert in surveying of watershed, roads, water supply and drainage systems.

23 years

Page 16: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Organizational Structure

PriMove is governed by board of directors. It operates through three division’s namely technical services division, development planning division and capacity building division.

Along with the in house teams there is also a roster of professionals who have been working on various projects with PriMove. These are senior level experts with specific specialization as required for the range of projects undertaken by PriMove.

The divisions are supported by Admin- HR, finance and business development teams.

BOD

Technical Division

Capacity

Building

Division

Development

planning

Division

Project

Manager Training

Support

Services Project

Manager PMC

Project Manager

Design DPR

PM Development

Planning

PM

Support Services

Multidisciplinary Project Team Comprising Team Leader, Team Members and Assistants

Integration of local / National teams

Ro

aste

r o

f Co

nsu

ltan

ts

Page 17: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments-On-going

Sr.

No.

Name of the Project Name of the

Employer’s

Address of the

Employer’s

Duration of the

assignment

Description of the Assignment/Services

From

(Date)

To

(Date)

1. Design,

Construction,

Supply, Installation,

Testing and

Commissioning of

10 KLD capacity

Faecal Sludge

Treatment Plant

based on Tiger Bio

Filter Technology,

Thrissur, Kerla

UNICEF-India

UNICSF India

73, Lodhi Estate,

New Delhi

Aug

2019

Ongoing Preparation of Detailed Project Report for the project, which

includes designing and Estimation of Waste Water Collection

Network and Selection of Appropriate Technology for Treatment.

Providing Technical Support and expertise for Installation of

Technology. Providing Project Management Services for Execution of

project including testing and trial run of various components of

Treatment Plant.

2. Preparation of

Master Plan & PMC

for Sewerage

Scheme for Pune

City and Newly

merged 11 villages

Pune Municipal

Corporation

Pune Municipal

Corporation

Shivaji Nagar,

Pune

Jan

2017

Ongoing Study of the existing collection system ; Topographical survey of

collection system ; Population forecasting ; Hydraulic design of

collection system; checking adequacy of existing trunk sewer in

nallas ; collection & study of data of existing and proposed Pumping

Stations (PS) & Sewage Treatment Plants (STP) and suggesting new

technologies for STP ; suggesting potential recycling proposals along

with proper conveyance and distribution system. Preparation of

block costing of various components, preparation of DPR including

preparation of tender documents, support in tendering process,

providing post tendering and project management support for

tendered works.

Page 18: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments-On-going

Sr.

No.

Name of the Project Name of the

Employer’s

Address of the

Employer’s

Duration of the

assignment

Description of the Assignment/Services

From

(Date)

To

(Date)

3. Preparation of

Storm Water Master

Plan For Yevlewadi

& Newly Merged 11

Villages In Pune City

Pune Municipal

Corporation

Pune Municipal

Corporation

Shivaji Nagar,

Pune

Mar

2017

Ongoing

Collecting Village maps, DP or Regional Planning map from with

Pune Municipal Corporation and toposheets from respective

government department

Preparation of base map This will include existing roads, natural

streams, village maps and important landmarks etc

Topographical survey by using total station of all existing roads,

adjacent property boundaries and natural streams (nalla)

Creating sub-watersheds (Basins) based on topography of the

project area and outfalls of natural streams (nalla)

Marking proposed storm water drainage network and nodes within

the sub-watersheds (basins) by identifying the existing roads and

natural streams (nalla), which will carry the storm water to the

outfall of natural stream.

Historical Rainfall data collection from the nearest rain-gauge station

of Indian Meteorological department, rainfall analysis and

generating Intensity-Duration-Frequency (IDF) curve for 2 years

return period by using step method as per CPHEEO manual.

Identifying frequently flooding spots and encroachment of natural

streams and recommend appropriate measures to solve the problem

of water stagnation at these spots.

1) Showing storm water network in GIS map with attributes like

estimated runoff, proposed sizes of drains etc.

2) Block costing of proposed storm water drainage components

Page 19: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments-On-going

Sr.

No.

Name of the Project Name of the

Employer’s

Address of the

Employer’s

Duration of the

assignment

Description of the Assignment/Services

From

(Date)

To

(Date)

4. Strategic Consultant

for PPP design and

transaction support

for Interception &

Diversion works

(I&D) and Sewage

Treatment Plants

(STPs) in Agra in

Uttar Pradesh

National Mission

for Clean Ganga

1st Floor, Major

Dhyan Chand

National

Stadium, India

Gate, New Delhi

Mar

2019

Ongoing Designing, Structuring, and Executing PPP Contracts for Setting up

Sewage / Effluent treatment plants and associated Infrastructure .

Requirement Assessment: The Consultant shall undertake a rapid

commercial assessment of the current and proposed projects by

making site visits and assess city wise STP/I&D/network

development requirements

Project Technical Evaluation: The consultant shall undertake a rapid

plant assessment, using the available reports and field visits, of the

current and proposed plants / infrastructure projects to assess

current plant status, residual life, and high level estimates of Capital

and O&M costs for each of the projects.

PPP Concession Structuring and Model Contract Design: The

consultant shall use the inputs from requirements analysis and

project evaluation reports to develop a strategy and Concession

packages for tendering out current and new plants.

Financial Plan and Projection : The Consultant shall conduct the

following to determine the financing plan for the PPP.

Tender Document Preparation: The Consultant should undertake

detailed review and revision of Request for Proposal (RFP) and

Concession agreement by providing inputs and developing the

documents along with NMCG

Support on Regulations and Policies

Support in running tendering process

Page 20: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments-On-going

Sr.

No.

Name of the Project Name of the

Employer’s

Address of the

Employer’s

Duration of the

assignment

Description of the Assignment/Services

From

(Date)

To

(Date)

5. Project

Management

Consultancy

Services including

Urben Designing

Services for

Balewadi Roads

Package of

18m,24m,30m wide

and total length

16.5Km road/

street/ footpath/

junction/ related

utilities on project

sites in Pune city

under Smart City

Project.

Project Cost: 195.22

Cr

Pune Smart City

Development

Corporation Ltd

Pune Smart City

Development

Corporation Ltd

Shivajinagar,

Pune

Jan

2018

Ongoing Pre - Tender Activities: -

Topographical Survey, Traffic Survey, Soil Investigation.

Preparation Tender documents & BOQ, Estimates

Designing of Road, typical cross sections, Major and Minor

Structures.

Evaluation of Tender documents.

Post Tender Activities:

Monitor the progress of project and prepare various reports such as

monthly progress report, quarterly progress reports etc & submit to

client.

Supervision and quality monitoring during execution of works.

Checking quality of materials, execution of works as per IS standards.

Certification of quantities of executed works and bills of contractors.

Co-ordination between contractor and Client.

All other works and activities required for the progress of the

project.

Page 21: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments-On-going

Sr.

No.

Name of the Project Name of the

Employer’s

Address of the

Employer’s

Duration of the

assignment

Description of the Assignment/Services

From

(Date)

To

(Date)

6. Appointment of

Consultants for

Project

Management

Consultancy for

Storm Water

Management works

in Pune City

Project Cost:

Approx. 300 Cr

Pune Municipal

Corporation

Pune Municipal

Corporation

Shivaji Nagar,

Pune

May

2016

Ongoing Preparation of Tender documents, B.O.Q and specifications of items

to be executed.

Monitor the progress of project and prepare various reports such as

monthly progress report, quarterly progress reports etc & submit to

PMC & funding agency.

Supervision and quality monitoring during execution of works.

Checking quality of materials, execution of works as per IS standards.

Certification of quantities of executed works and bills of contractors

on behalf of P.M.C.

Co-ordination between contractor and Pune Municipal Corporation.

All other works and activities required for the progress of the

project.

Page 22: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments-On-going

Sr.

No.

Name of the Project Name of the

Employer’s

Address of the

Employer’s

Duration of the

assignment

Description of the Assignment/Services

From

(Date)

To

(Date)

7. Appointment of

Project

Management

Consultancy

/Associate for

(Scheme

Preparation and

/Execution)of

Umarkhed Water

Supply Scheme

(Laying of Raw

Water Raising Main

From Isapur Dam to

Belkhed Jackwell)

Under Maharashtra

Suvarn Jayanti

Nagarotthan

Mahaabhiyan

(MSJNM)

Project Cost: 52.05

Cr

Umerkhed

Municipal Council

Umerkhed Dist.

Yavatmal

India

Dec

2017

Ongoing To carry out the topographical and geotechnical survey wherever

needed.

Design, Engineering for Raw Water pipeline from Isapur Dam to

existing Jackwell/WTP. Preparation of drawings & estimates. Design,

Development of cross sections, longitudinal sections, etc

To prepare the DPR and Detailed Cost Estimates.

To get the proposal Technical and Administrative approval to

project.

Preparation of Tender documents and details Boq.

To monitor the progress of work and quality.

To co-ordinate between the contractor and municipal council.

Checking and approval of RA bills, Quality of work.

Page 23: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments-On-going

Sr.

No.

Name of the Project Name of the

Employer’s

Address of the

Employer’s

Duration of the

assignment

Description of the Assignment/Services

From

(Date)

To

(Date)

8. Appointment of

Consultant for

Preparation of DPR

including Technical

Sanction, Tender

documents and

execution of work

for Palus Water

Supply scheme.

Project Cost: 32.50

Cr

Palus Municipal

Council

Palus, Dist.

Sangli

India

Aug

2017

Ongoing To carry out the topographical and geotechnical survey wherever

needed.

Design, Engineering for pipeline, distribution network, WTP and

other components of scheme. Preparation of drawings & estimates.

Design, Development of cross sections, longitudinal sections, etc

To prepare the DPR and Detailed Cost Estimates.

To get the proposal Technical and Administrative approval to

project.

Preparation of Tender documents and details Boq.

To monitor the progress of work and quality.

To co-ordinate between the contractor and municipal council.

Checking and approval of RA bills, Quality of work.

Page 24: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments-On-going

Sr.

No.

Name of the Project Name of the

Employer’s

Address of the

Employer’s

Duration of the

assignment

Description of the Assignment/Services

From

(Date)

To

(Date)

9. Providing

consultancy services

and preparation of

preliminary survey,

Design, preparation

of DPR, Tender

Document and

Project

management/Super

vision for sewerage

network, Sewage

Pumping station and

Sewage treatment

plant Preferably

based on Sequential

Batch Reactor/Cyclic

Activated Sludge

Process

Centralized/Decentr

alized as feasible to

the Cantonment

Board Kamptee

Project Cost: 48 Cr

Cantonment

Board Kamptee

Office of the

Cantonment

Board

Chhaoni

Parishad

Karyalaya

Kamptee,

Nagpur

Aug

2016

Ongoing Preparation of Detail Project Report which includes- Collection of

population data for forecasting future population growth, study the

existing sewerage infrastructure; preparation of base map for

existing sewerage system; Conducting survey and preparation of

survey drawings; preparation of master plan report of new sewerage

system ; carryout detail engineering design for hydraulic, electrical

and mechanical components, preparation of BOQ, cost estimations;

rate analysis, vetting of estimates from govt. authority; preparation

of tender document, tender evaluation.

Project Management & Construction Supervision, quality control,

contractor’s work certification.

Page 25: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments-On-going

Sr.

No.

Name of the Project Name of the

Employer’s

Address of the

Employer’s

Duration of the

assignment

Description of the Assignment/Services

From

(Date)

To

(Date)

10. Providing

Consultancy

Services and

Preliminary Survey,

Design, Preparation

of DPR, Tender

document and

Project

Management/

Supervision for

Sewerage Network,

Sewerage Pumping

Station and

Sewerage

Treatment Plant

Based on Sequential

Batch Reactor

/Cyclic Activated

Sludge Process for

Civil Population of

Dehuroad.

Project Cost: 45 Cr

Cantonment

Board, Dehuroad

Office of the

Cantonment

Board

Near Dehuroad

Rly Station, Dehu

Road, Pune

May

2017

Ongoing Preparation of Detail Project Report which includes- Collection of

population data for forecasting future population growth, study the

existing sewerage infrastructure; preparation of base map for

existing sewerage system; Conducting survey and preparation of

survey drawings; preparation of master plan report of new sewerage

system ; carryout detail engineering design for hydraulic, electrical

and mechanical components, preparation of BOQ, cost estimations;

rate analysis, vetting of estimates from govt. authority; preparation

of tender document, tender evaluation.

Project Management & Construction Supervision, quality control,

contractor’s work certification.

Page 26: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments-On-going

Sr.

No.

Name of the Project Name of the

Employer’s

Address of the

Employer’s

Duration of the

assignment

Description of the Assignment/Services

From

(Date)

To

(Date)

11. Support

development of

training capacity in

institutions and the

roll out of trainings

on rural sanitation

with focus on

communities

through CLTS and

CATS for SBM-G

UNICEF, India UNICSF India

73, Lodhi Estate,

New Delhi

Feb

2019

Ongoing The main purpose of the assignment is to create a pool of

competent human resource to cater to the capacity building needs

of GPs in a cascading mode to sustain ODF environment and

implement the agenda of ODF + to realise the dream of Swachh

Bharat. The specific objectives of the assignment are to: Identify,

assess and build capacities of 270 Master trainers on various aspects

of rural sanitation; Review and use existing knowledge and

documents to develop (i) 4-day TOT module and manual and (ii) 3-

day FT training Module and manual covering various aspects of rural

sanitation; Conduct FOUR Sub regional 1-day Workshops for 200

state Government representatives; TEN 4- day Training of Trainers

(TOT for 270MTs) programs, and TEN 2-day Refresher trainings;

Provide hand-holding support to the MTs, in improving their training

skills; Assist each State sanitation department in development of

State roll out plans for the cascading trainings; Assist each State

sanitation department prepare a Strategic deployment of training

resources plan; Update KRC dashboard with information about use

and deployment of the MTs

Page 27: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments-On-going

Sr.

No.

Name of the Project Name of the

Employer’s

Address of the

Employer’s

Duration of the

assignment

Description of the Assignment/Services

From

(Date)

To

(Date)

12. Building and

operation of Tiger

Toilet.

Individual

households

Village Gram

Panchayats

Town

municipalities

CSR of corporates

- January

2015

Ongoing The Tiger Toilet is an advancement in fecal treatment technology. It

uses the novel Tiger Technology of worms and microorganisms for

effective on-site fecal treatment. Its unique design offers a flush-

and-forget experience to users. It is natural, modular and highly

efficient at treating waste.

The Tiger Toilet consists of a toilet superstructure attached to an

underground biodigester.

The Toilet is compact and has a modular design. It can be

constructed in a small space. Its on-site treatment feature eliminates

the need to construct septic tanks or twin-pit latrines. This makes it

suitable for hilly and isolated areas.

Further, Tiger Toilet system is chemical- and odour-free and

completely safe because the treatment process is aerobic. This leads

to rich compost being generated periodically, which increases

fertility of soil.

Apart from sales, PriMove also provides full assistance in the

construction, operation and maintenance of the Tiger Toilet. A Tiger

Toilet kit costs Rs 24,000 including purchase of materials, assembly

of the toilet, and charging of the digester.

Page 28: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

1. Augmentation to Solapur water Supply scheme. Project Cost: 1241 Cr

Solapur Municipal Corporation

Solapur Municipal Corporation, Solapur, Park Chowlk, Solapur Dist: Solapur, Maharashtra (India)

Dec

2013

Aug

2014

Scope of work for the above scheme is to prepare the DPR for the Design period of 30 years to include the following works, Aerial Survey of Water Systems. Studying of the existing system and its functioning. Gap analysis based on the standard service level Benchmarks. Developing the techno-economical and reliable source potential for design period. Population projection up to 2046 Hydraulic modeling of the entire network using Water Gems software for existing and projected Demands Development of DMA based management system Metering from source to consumer with pressure and level transducers and AMR consumer meters to make the system amenable for continuous water supply. SCADA system for Monitoring and controlling

Page 29: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

2. Preparation of DPR for Water Supply & Sewerage schemes under Jalswarajya-II for Satara & Chandrapur District. (World Bank Funded)

RSPMU, Water Supply & Sanitation Department, GoM

RSPMU, Water Supply & Sanitation Department, GoM CIDCO Bhavan, Navi Mumbai.

Mar

2015

Mar

2016

preparation of DPRs for Peri-Urban Water supply and Sullage Management Schemes in 12 districts under Jalswarajaya - 2 Programme prefeasibility study report including various alternative options along with present status of WSS/Sewerage/ODEP Undertake performance assessment of existing assets and prepare rehabilitation proposals Conducting detailed engineering survey, detailed field survey, geo technical investigations, Consumer Survey for house connection, Prepare village road maps on GIS with contours Designs of economical size of pumping main with surge analysis. Preparation of detailed engineering hydraulic designs of proposed water supply scheme with population forecast, service level, storage capacity, residual pressure etc. Preparation of various O & M options and O & M estimate. SCADA System Preparation of Bid Documents, BOQ.

Page 30: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

3. Preparation of DPR for the RRWS for 97 Tribal villages in Shahpur Taluka, Dist. Thane, Maharashtra State. Project Cost: 191 Cr

Thane Zilla Parishad

Thane Zilla Parishad, Thane

Nov

2015

Feb

2016

The services included- Preparation of detailed project report including Collection/Studying of the data of existing water supply scheme and its functioning. Carrying out survey using total station & GPS. Getting administrative approval from Water & Sanitation Dept, Govt. Of Maharashtra. Detailed survey & Strata Explorations: Carry out detail survey of water components using total station. Preparation of plans & L-section using CAD software. Carrying out contour survey of all structural components. Design of water components viz. WTP (35 MLD), raw water gravity mains, pure water conveyance mains, storage reservoirs (MBR, ESR/GSR). Hydraulic modelling of 250 kms proposed gravity system using WaterGEMS software. Detailed design of Automation of Bulk metered water supply system including SCADA . Prepare detail estimates Preparation of Detailed Project Report..

Page 31: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

4. Consultancy services for preparation of Detailed Project Report to prepare group water supply scheme based on canal to provide surface water for conjunctive use to quality affected villages (45 Nos.) In Block Nurpur Bedi, District Rupnagar of Punjab Project Cost: 21.08 Cr

Punjab Water Supply & Sanitation Department

Water Supply & Sanitation Div. No-1, Rupnagar, at Anandpur Sahib. Punjab

Dec

2013

Mar

2014

Preparation of Detailed Project Report for group water supply scheme based on canal to provide surface water for conjunctive use to quality affected villages (45 Nos.) In Block Nurpur Bedi, District Rupnagar of Punjab. The villages have current water supply from tube wells and have quality problems due to high concentrations of iron, TSS and alkalinity. The project aims at augmenting the supply with water from a surface source (canal water). The scope of work involves working out dilution quantities, systems for dilution and supply of bulk water to villages, optimization of scheme, preparation of Detailed Project report and tender documents. Draft final report has been prepared, tender packages have been worked out and some tender packages have been floated.

Page 32: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

5. Preparing Designing Costing and preparing DPR, Tender papers and Project Management Consultancy for SCADA system for drinking water supply management and control, Consumer water metering on EPC/BOT/PPP options. Project Cost: 63.77 Lakhs

Osmanabad Municipal Council

Osmanabad Municipal Council, Osmanabad, Maharashtra (India)

Oct

2013

March

2015

Understanding the existing water supply scheme. Design of SCADA and communication system. To develop different alternatives models of the SCADA & metering system. Estimating Instrumentation/PLC/SCADA & Communication system cost. Preparing specification for the system. Developing the tender documents. Metering and instrumentation in water supply network. Project Management Consultancy.

Page 33: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

6. Preparation of Customisable framework of performance improvement planning for water supply and sewerage services at Bhokar Project Cost: 19.86 Cr

Fortress Infrastructure Advisory Services for Bhokar water supply

Fortress Infrastructure Advisory Services, Mumbai

May 2012

Nov 2012

Preparation of layout of proposed water supply scheme. Detailed design of various components of water supply scheme. Preparation of DPR consisting of raw water intake in dam, raw water conveyance pipelines of 450 mm dia., Raw water pumping machinery 100HP, WTP of 12 MLD, Construction of RCC ESR, Construction of RCC GSR of capacity 0.85 ML & 2.7 ML resupply.

7. Preparation of DPR for the water supply system of Chandrapur city, Maharashtra, India Project Cost: 143.86 Cr

Chandrapur Municipal Council, India

Chandrapur Municipal Council, Maharashtra India

Nov 2007

Aug 2008

Preparation of DPR including detailed design, GIS base data, technical specifications, bill of quantities, rate analysis and cost estimates, Preparation of bid document, support for evaluation of bids, Project management services during execution including project scheduling, quality management, bill certification and on the site technical support. Project of 60 MLD capacity consisted of raw water intake, pumps, conveyance by 900 mm pipes, 60 MLD WTP, 110 HP pumps for treated water, 8 nos. ESRs of 1.65 to 4 ML capacity, Distribution network of 100 to 600 mm, 14.22 Km length.

Page 34: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

8. Improvement to water supply to Pune city Project Cost: 522 Cr

Studio Galli Ingeneria (SGI)

Studio Galli Ingeneria (SGI) Shivajinagar, Pune

Dec 2011

Nov 2012

Pune city has a population of 3.5 million. The work completed till date includes following- survey of 5000 domestic and commercial consumer connections, GIS based updation of entire water network and assets which included procurement of satellite image, digitization & network updation for 2450 Kms of distribution, 400 Kms of transmission system,7 WTPs, Service Reservoirs. Actual implementation in 5 Pilot DMA Population projection up to 2047 Hydraulic modeling of the entire network using Water Gems and EPANET softwares for existing and projected population Development of DMA based management system Metering from source to consumer with pressure and level transducers and AMR consumer meters to make the system amenable for continuous water audit. SCADA system for Monitoring and controlling Community Awareness

Page 35: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

9. Third Party Technical Audit for Buildings, Water Supply, Sewerage in public health engineering department Project Cost: Approx. 300 Cr

Navi Mumbai Municipal Corporation

C.B.D. Belapur, Navi Mumbai

Mar

2012

Mar

2014

Independent third party verification of implementation of quality assurance manual, extent of controls exercised by contractors and supervisory staff/technique. Third party verification on AMR metering and water scheme works of the Navi Mumbai, a town of 2 Million population

10. Augmentation and improvement in Distribution system for 24X7 Supply and Reduction of Non-revenue Water through 100% Metering and Operation & Maintenance of Water Supply System for Lonavala City (Maharashtra) on PPP Modality

Crisil Risk & Infrastructure Solutions ltd

Crisil House, Central Avenue, Hiranandani Business Park, Pawai, Mumbai

Sept 2013

Dec 2013

Primary and Secondary data collection on existing situation of water supply in the LMC and assessing the impact of the proposed project. Consultations with stakeholders viz. LMC (its various departments), Maharashtra Urban Development Department, prominent Civil society/ NGOs active in urban infrastructure including potential developers etc Review of project including the assessment of present water conditions to develop: a. base case project costs for capital investment, b. timelines for implementation and operation. C. inputs for operation and maintenance costs over the life of the project Value for Money (VFM) Analysis. Development of Financial plan, Financial Model, Economic model, Customer Service framework. Recommended PPP option, Market Consultation exercise & Request for qualification documents

Page 36: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

11. Preparation of Detailed Engineering and route finalization, pipe selection and survey for water supply pipeline From Nagaothane to JSW ISPAT, Dolvi & Hetwane To JSW ISPAT, Dolvi

JSW ISPAT Steel Limited

JSW ISPAT STEEL LTD, Dolvi, Pen, Raigad, Maharashtra

May 2013

June 2013

Preparation of DPR including detailed design, Geographic Survey, bill of quantities, rate analysis and cost estimates, Preparation of bid document, support evaluation of bids, Project management services during execution including project scheduling, quality management, bill certification and on the site technical support

12. Reform Work under Sujal Nirmal Abhiyan for Indapur NagarPalika , Pune Dist.

Infraplan Engineering Services Pvt. Ltd.

109, Raoji Complex, Shahupuri, First lane, Kolhapur – 416001, Maharashtra

June 2012

Dec

2013

Carrying out consumer survey to collect details of consumption of water usage, fixing of EMF, US, and mechanical meters for carrying out water audit by studying the losses in DMA’s. Supply and Installation of International standard software for single user for Hydraulic designing and modeling, Modeling and calibration of Hydraulic model of existing and proposed water supply scheme. Comprehensive Maintance of flow meters for one year. Supply and installation of GIS software, procurement of quick bird. Digitization of satellite image, Asset mapping, physical survey and contour mapping of the town. Providing and installing computer etc.

Page 37: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

13. Water Audit, Energy Audit Hydraulic modeling in the Reform Work under Sujal Nirmal Abhiyan for Vadagaon Municipal Council, Kolhapur Dist., Maharashtra, India.

Vadgaon, Municipal Council

Vadgaon Municipal Council, Dist: Kolhapur

June

2012

March

2014

Carrying out consumer survey to collect details of consumption of water usage, fixing of EMF, US, and mechanical meters for carrying out water audit by studying the losses in DMA’s. Supply and Installation of International standard software for single user for Hydraulic designing and modeling, Modeling and calibration of Hydraulic model of existing and proposed water supply scheme. Comprehensive Maintenance of flow meters for one year. Supply and installation of GIS software, procurement of quick bird. Digitization of satellite image, Asset mapping, physical survey and contour mapping of the town. Providing and installing computer etc.

Page 38: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

14. Preparation of DPR and PMC for Storm water drainage master plan of Pune Under JNNURM Phase-II Project Cost: 461.73 Cr

Pune Municipal Corporation

Pune Municipal Corporation, ShivajiNagar, Pune

April

2013

Mar

2016

Pretender Activities: Carrying out reconnaissance survey, topographic surveys of Nallas & Road side drainages, cross drainages, calves in selected basins under the project. Preparation of Hydraulic designs of storm water drains as per CPHEEO manual norms. Follow up and obtaining approval from PMC, Govt of Maharashtra, Govt of India & other funding agencies. Preparation of Tender documents, B.O.Q and specifications of items to be executed. Post-Tender Activities: Monitor the progress of project and prepare various reports such as monthly progress report, quarterly progress reports etc & submit to PMC & funding agency. Supervision and quality monitoring during execution of works. Certification of quantities of executed works and bills of contractors on behalf of P.M.C. Co-ordination between contractor and Pune Municipal Corporation. All other works and activities required for the progress of the project.

Page 39: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

15. Preparation of DPR and Pretender activities for Storm water drainage master plan of Pune Under JNNURM Project Cost: 399 Cr

Tamil Nadu Water Investment Company Ltd. (TWIC) which is a group company of Infrastructure Leasing & Financial Services Ltd. (IL& FS)

IL&FS Ltd. Bandra Kurla Complex , Mumbai

Nov 2007

Apr 2008

Developing a detailed project report for execution of storm water drainage project for Pune City (3.7 Million populations) – with an area of 300 sq. km. Preparation of detailed drawings, designs, GIS base data, estimates, tender documents and follow up with JNNURM for funding.

16. Feasibility & Design services for providing storm water drainage arrangement for Diva village in Thane City Project Cost: 47.94 Cr

Thane Municipal Corporation.

Thane Municipal Corporation. Mahanagarpalika Bhava, Dr.Almeda Road, Panchpakhadi, Thane – 400 602.

Feb

2011

Sept.

2012

Preparing alternative augmentation schemes and checking their feasibility. Carrying out Cost/Benefit analysis of various schemes. Recommending Best Suited Scheme to Thane Municipal Corporation for approval. Detail Report on the rehabilitation of people residing nearby Natural drain area. Preparing detailed hydraulic designs of the augmentation scheme. Finalizing formation levels of the road and nearby developing properties.

Page 40: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

17. Preparation of DPR and Pretender activities for Storm water drainage master plan Under JNNURM for Mira Bhanyandar Under MMRDA Project Cost: 220 Cr

Mira Bhayandar Municipal Corporation

Mira Bhayandar Municipal Corporation

June 2007

July 2009

Developing a detailed project report for execution of storm water drainage project for Mira Bhayandar City (0.8 Million population) – with an area of 79.4 sqkm. Preparation of detailed drawings, designs, GIS base data, estimates, and tender documents and follow up with JNNURM for funding.

18. Preparation of DPR for Strom Water Management System in Kolhapur City Project Cost: 200 Cr

Kolhapur Municipal Corporation, Kolhapur

Kolhapur Municipal Corporation, Kolhapur

Dec 2009

March 2013

Developing a detailed project report for execution of storm water drainage project for Kolhapur City (0.5 Million population). Preparation of detailed drawings, designs, GIS base data, estimates, tender documents and follow up for funding.

Page 41: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

19. Preparation of DPR and Strom Water Management System in Sangli, Miraj and Kupwad City Municipal Corporation Project Cost: 198.56 Cr

Sangli Municipal Corporation, Sangli

Sangli Municipal Corporation, Sangli

Mar

2011

March

2013

Developing a detailed project report for execution of storm water drainage project for Sangli City. Preparation of detailed drawings, designs, GIS base data, estimates, tender documents and follow up for funding.

20. Project Management Consultancy for Storm Water Drainage Project, Basin (M) – Wadgaon Seri for Pune City under JNNURM Project Cost: 54.43 Cr

Pune Municipal corporation, Pune

Pune Municipal corporation, Pune

Aug

2010

June

2013

Project Management Consultancy for Infrastructure Projects under JNNURM in Pune – Basin (M). Includes post tender activity – keeping upto date record of measurements required for billing, preparation and checking, carrying all necessary quality checks as per tender specifications. Project management for storm water drainage system, preparation of GIS base data. Submission of work completion report, records and drawings etc.

Page 42: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

21. Preparation of DPR for Storm Water, landscape, beautification of nallas system in PCNTDA AREA. Project Cost: 26.70 Cr

Pimpri Chinchwad New Town Development Authority, Pune

Pimpri Chinchwad New Township Development Authority (PCNTDA) Nigadi Pune 411 044

July 2008

Nov 2011

Includes design pre-tender and project management for storm water drainage system and landscape development including bridges, lake development, theme parks, water supply system etc. Includes post tender activity – keeping upto date record of measurements required for billing, preparation and checking, carrying all necessary quality checks as per tender specifications. Project management for storm water drainage system, Submission of work completion report, records and drawings etc.

22. Rain Water Harvesting at Shirine Garden Society

Shirine Garden Co-operative Housing Society

Shirine Garden Society, Aundh, Pune

May 2013

Aug 2013

Roof Top Rain Water Harvesting Existing Borewell flashing Construction of Recharge pit. Rain Water Piping works (Trunkey Project)

23. Rain Water Harvesting & Water shed Management at Sun Vally, At. Jambhulpada, Tal: Pen Dist: Raigad

Fortress Infrastructure Advisory Services

Fortress Infrastructure Advisory Services, Marine line Mumbai

June 2012

June 2014

Water Shed Management Construction of CCT, Loose bolders, Cement bunds, KT Wier, FSC & construction of wells. Digging of borewells & Construction of Recharge pit

Page 43: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

24. Design, Construction, Supply, Installation, Testing and Commissioning of 10 KLD capacity Faecal Sludge Treatment Plant based on Tiger Bio Filter Technology at Kalpetta, Waynad District, Kerala

Unicef- New Delhi District Collector, Waynad. Kerala

UNICEF, New Delhi 71 Lodi Estate, New Delhi

Jan

2019

May

2019

Preparation of detailed Design, drawing from FSTP as per site condition and inlet parameter of faecal sludge, Construction, Supply, Installation, Testing and Commissioning of 10 KLD capacity Faecal Sludge Treatment Plant based on Tiger Bio Filter Technology. Execution of project including testing and trial run of various components of Treatment Plant. One year operation and maintenance of faecal sludge treatment plant.

Page 44: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

25. Building and Operation of the Tiger Biofilter Sewage Treatment Plan

Completed Tiger Biofilter STP at the Bagul Udyan in Pune for the PMC.

Pune Municipal Corporation, Shivajinagar, Pune Different Locations in Maharashtra

Aug 2018

July 2019

The Tiger Biofilter is a product developed to treat wastewater. The TBF is based on the Tiger technology, which uses a unique combination of worms and microorganisms to dispose of sludge and sewage and recycle nearly 95% of wastewater. The Tiger Biofilter is assembled in three stages: a sewage sump, leading to the biofilter (loaded with layers of waste treating biomedia and earthworms) where the wastewater is treated, and tertiary pressure sand and activated carbon filters. The unique set-up of the treatment plant introduces a "trickling" action of the wastewater as it passes through the biomedia, which dissolves oxygen into it. The inorganic waste in the water is removed by physical filtration. The organic waste matter is digested and metabolised by the earthworms and microorganisms. The Tiger Technology used in the Tiger Biofilter makes it modular in design. Individual components of the TBF can be customised for best results. Further, the treatment system is self-regulating and can treat various levels of sludge

Page 45: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

26. Building and operation of Tiger Toilet. More than 4000 Tiger Toilets have been constructed across 9 states in India.

Individual households Village Gram Panchayats Town municipalities CSR for corporates

- January 2015

Mar 2019

The Tiger Toilet is an advancement in fecal treatment technology. It uses the novel Tiger Technology of worms and microorganisms for effective on-site fecal treatment. Its unique design offers a flush-and-forget experience to users. It is natural, modular and highly efficient at treating waste. The Tiger Toilet consists of a toilet superstructure attached to an underground biodigester. The Toilet is compact and has a modular design. It can be constructed in a small space. Its on-site treatment feature eliminates the need to construct septic tanks or twin-pit latrines. This makes it suitable for hilly and isolated areas. Further, Tiger Toilet system is chemical- and odour-free and completely safe because the treatment process is aerobic. This leads to rich compost being generated periodically, which increases fertility of soil.

Apart from sales, PriMove also provides full assistance in the construction, operation and maintenance of the Tiger Toilet. A Tiger Toilet kit costs Rs 24,000 including purchase of materials, assembly of the toilet, and charging of the digester.

Page 46: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

27. Consultancy For Central Sewage Treatment Plant(STP) at GE (Jorhat) And GE 869 EWS (Leimakhong) Under Chief Engineer Shillong

Chief Engineer, Military Engineering Services.

HQ Chief Engineer Shillong Zone Spread Eagle Falls Shillong-793011

Oct

2015

Mar

2016

DPR for collection and treatment of sewerage of Military Station Luchibari, Jorhat, Assam & Leimakhong (Pocket-1), Manipur. Design of sewerage collecting mains throughout the area. The work consists of 8km & 5km of collection system of variable diameter. Design and detailing of 2 STPs of 0.5 MLD capacities with different technology like MMBR, MBR, FBBR etc. 1) Creating a base map of the project area showing major building units and elevation. 2) Preparing the network for sewerage collection from first manhole based on this base map. 3) Designing the best suitable sewage treatment technology based on the sewerage generation quantity and its chemical properties. 4) Providing the Detailed Project Report for both the locations comprising specifications of RCC, electro-mechanical, tendering for contractor, Operation & maintenance of the STP.

28. Consultancy for Rishikesh Comprehensive Municipal Waste Water Project Project Cost: 430.60 Cr

Uttarakhand Peyjal Sansadhan Vikas evam Nirman Nigam

Office of GM, Construction Circle (Ganga), Haridwar

Sept

2015

Mar

2017

Preparation of DPR including conducting topographic and detailed engineering survey, zone finalization, preparation of design, drawings, feasibility study, rate analysis and cost estimation and specification of various infrastructural services. Preparation of Tender document, evaluation of tenders. Present technical aspect of the project, approval of project/ sanctioning of grant etc.

Page 47: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

29. Preparation of DPR for collection and treatment of sewerage of Pune City Project Cost: 674 Cr

Maharashtra Jeevan Pradhikaran Development Division, Pune

Maharashtra Jeevan Pradhikaran Development Division, Pune-411001

Oct

2010

March

2013

Collection of 100% sewerage of Pune city and treatment of it. Augmentation of existing STPs and intermediate Pumping stations. Design of sewerage collecting mains throughout the Pune city and collection system of Baner and Balewadi. The work consist of 113.5 Km of collection system of dia 450 to 1800 mm. design and detailing of 9 STPs ranging from 8 MLD to 125 MLD with different technology like ASP, Modified ASP, Extended aeration, SBR MMBR, MBR etc. DPR submitted to Government of India for financing under NRCP

30. Preparation of DPR for Pollution Abetment of Indrayani River at Alandi under NRCP Project Cost: 122 Cr

Alandi Municipal Council

Alandi Municipal Council, Alandi, Tal- Khed, Dist - Pune

Sept

2014

Jan

2015

Carrying out reconnaissance survey, topographic surveys of project area and River, Natural drains etc. Preparation of feasibility report for Sewerage scheme, Solid waste management, Community sanitation, River front Development and other allied works under the guidelines of NRCP Preparation of Hydraulic designs of sewage collection network as per CPHEEO manual norms by use of SewerGEMS, Preparation detailed design of Solid Waste Management in the project area as per CPHEEO manual norms and preparation of detailed conceptual plan and drawings of the River front development and allied works Preparation of detailed cost estimates and BOQ as per latest CSR Submission & sanctioning of DPR from Alandi Municipal council, State level nodal agency, State Government & Central Government To take the technical sanctioning of the DPR from the concerned authority Follow up and obtaining approval from AMC, Government of Maharashtra, Government of India & other funding agencies

Page 48: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

31. Detailed Project Report for Sewerage Collection and Treatment system in Domestic Tariff Area ( DTA ) of Khed city Taluka – Khed Dist - Pune

Khed Economic Infrastructure Pvt Ltd, Pune

Pride Parmar Galaxy First Floor, CTS no 10,10A,Behind Parmar Trade Centre ,Cannought road Pune 411001

Sept

2014

Nov

2014

Collect & review of available data. Details of type industry Location, type of waste. Sewage chemical report and analysis. Residential population and projected population forecast . Projected year and water supply. Sewerage line alignment. Sewage treatment plant design and layout. Detail Project report.

32. Preparation of Master Plan & DPR for sewerage System of Pune City. Project Cost: 232 Cr

Pune Municipal Corporation, Pune

Pune Municipal Corporation, ShivajiNagar, Pune

Sept

2008

July

2009

Prevent untreated sewage from entering natural water bodies such as Nallas and rivers etc. Augment the collection system of sewage to tap and transport all the sewage generated in the city. Augment existing sewage treatment facilities and construct new sewage treatment facilities to treat all the sewage generated in the city. Use of technologies that will efficiently treat the sewage to achieve required effluent haracteristics Preparation of master plan of sewerage system for pune city. Preparation of detailed project report for sewage system phase II for submission of JNNURM, consisting design of STPS and pumping stations.

Page 49: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

33. Preparation of master plan and DPR for the sewerage system of Chandrapur city (Area 56.4 sq. KM) Project Cost: 96.16 Cr

Chandrapur Municipal Council

Chandrapur Municipal Council

Jan 2007

Mar 2007

Preparation of DPR including detailed design, technical specifications, GIS base data, bill of quantities, rate analysis and cost estimates, Preparation of bid document, support for evaluation of bids, Project management services during execution including project scheduling, quality management, bill certification and on the site technical support. The project consisted of sewer system 179 Km of diameters ranging from 150 to 1200 mm. Two STPs of 25 and 45 MLD capacity

34. Preparation of Detailed Project Report for Sewerage system in Shegaon City, Maharashtra, India Project Cost: 46.29 Cr

Fortress Infrastructure Advisory Services

Fortress Infrastructure Advisory Services for Shegaon Tirthkshetra Development Plan. Shegaon, Maharashtra,

April 2010

June 2010

Preparation of DPR including conducting topographic and detailed engineering survey, zone finalization, preparation of design, drawings, feasibility study, rate analysis and cost estimation and specification of various infrastructural services. Preparation of Tender document, evaluation of tenders. Present technical aspect of the project, approval of project/ sanctioning of grant etc. Project management services during execution including supervision of works. Post tender activities. The project consist of 61.42 Km of sewers from 150 to 700 mm dia., STP of capacity 9.67 MLD

Page 50: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

35. Project Management Consultant for Underground Drainage System in Malkapur Nagar Panchayat under UIDSSMT Project Cost: 40.97 Cr

Malkapur Nagar Panchayat

Malkapur Nagar Panchayat, Malkapur, Tk: Karad, Dist: Satara

Mar

2014

Sept

2018

Preparation of tender documents and evaluation of tenders received. Finalization of contractor, award of work to the selected contractor after approval from Council. Site supervision, checking layouts and working drawings, quality control, scrutinize and certify ongoing work and certification of bills of contractor. Preparation of project completion report, compilation of as built drawings and technical data.

36. Project Management Consultancy for Underground Drainage System in Karad under Maharashtra Nagarotthan Maha abhiyan Project Project Cost: 43.22 Cr

Karad Municipal Council

Karad Municipal Council, Karad, Dist. Satara, Maharashtra

Oct

2012

May

2016

Preparation of tender documents and evaluation of tenders received. Finalization of contractor, award of work to the selected contractor after approval from Council. Site supervision, checking layouts and working drawings, quality control, scrutinize and certify ongoing work and certification of bills of contractor. Preparation of project completion report, compilation of as built drawings and technical data.

Page 51: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

37. Designing Sewerage Treatment Plant of 0.20 MLD capacity with connected civil works services at Defence R & D Org. (DRDO), Pune

Defence R & D Org. (DRDO),

Defence R & D Org. (DRDO), GoI, Post Box No. 1, Armament Post, Pashan, Pune – 411 021

March 2008

July 2008

Design of 0.20 MLD capacities Sewerage Treatment Plant with connected civil works. Conducting study of various STP and preparation of preliminary scheme. Finalization of details with CCE (R & D), West, Pune. Development of approved scheme and submission of tender documents. Preparation of detailed technical specifications for the work. Approval of design.

38. Preparation of DPR for Liquid and Solid waste Management in 39 Villages and Prefeasibility Report for 135 villages in Panchganga River basin Causing pollution

Project Cost: 139.94 Cr

Rural Water Supply Division, Zilla Parishad, Kolhapur

Zilla Parishad Kolhapur, Nagala Park,Kolhapur

Jan 2013

Dec 2013

Preliminary visit Categorization of villages – Villages polluting the river/ villages not polluting the river Flow measurement at all the outfalls Sewage Sample Testing from Laboratory Land requirement assessment for solid and liquid waste treatment plants Suggesting proper technology for liquid and solid waste management Topographical survey Preparing detailed project report

Assistance to Kolhapur Zilla Parishad in sourcing funds for the project

Page 52: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

39. Carrying out detailed physical survey, T.S. Measurement, Drone Survey, Demarcations & Preparation of site plan, superimposing on CTS tikka sheeta and MCGM DP plans, village plan, supplying drawings for Metro line 6 i.e. Swami Samarth Nagar-Jogeshwari-Vikroli

Mumbai Metropolitan Region Development Authority

Mumbai Metropolitan Region Development Authority BKC Complex, Bandra (E), Mumbai

Dec

2017

Feb

2019

Carrying out Surveys, Land Measurements with Dereferencing super imposing Tikka Sheet plan. Utility Mapping. Carrying out drone surveys using digital aero triangulation and GPS. Preparation of various survey drawings. Preparation of 2D & 3D Models. Preparation of animation film using rendered models and actual videos. Preparation of documentary film.

40. Carrying out various Road Surveys using Unmanned Aerial Vehicles (UAV/Drones) Total Length surveyed: More than 100 Kms.

Various Employers (i.e. MSRDC, AECOM, Eurostudios, Mechafree etc)

Various Employers (i.e. MSRDC, AECOM, Eurostudios, Mechafree etc)

April

2016

May

2016

Carrying out various Road surveys using Unmanned Aerial Vehicles (UAV/Drones). Data collection using high definition imaginary. Data processing using high end software’s & generation of desired digital elevation models. Creation of 2D, 3D & contour data. Carrying out surveys in inaccessible areas like. Tunnel, Mountainous areas.

Page 53: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

41. Consultancy Services for preparation of Feasibility Study and Detailed Project Report of Access Controlled Nagpur-Mumbai Super Communication Expressway.-Nagpur Revenue Division (Package-I) 89.41 Kms Project Cost: Approx. 3600 Cr

Maharashtra State Road Development Corporation Ltd.

Maharashtra State Road Development Corporation Ltd. Bandra Mumbai

April

2016

Dec

2017

Fixing of alignment and its approval. Aerial Survey using (Drone) for green field alignment of 90km, Processing the data on software’s. Traffic surveys and demand assessment Engineering surveys and investigations. Location and Proposals for revenue generation by commercial exploitation along the corridor. Study, analysis, economics of different land pooling/procurement models for expressway project Location and layout of toll plazas, Trauma Centre Location and layout of truck lay byes Location and layout of bus bays and bus shelters Social impact & Environment impact assessment Preliminary designs of road, bridges, interchanges, VUPs, PUPs, ROBs, RUBs, structures, etc. Mapping of existing and proposed utilities in the form 2D CAD Drawing and 3D CAD models. Preparation of Land Plan Schedules and Utility Relocation Plans Preparation of indicative BOQ and Detailed Cost Estimates .

Page 54: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

42. Preparation of DPR of selected stretches/corridor of Road networks in Sate of Maharashtra for Package No. 5 (Tembhurni To Latur) 165.49 Kms Project Cost: Approx. 1100 Cr

Maharashtra State Road Development Corporation Ltd.

Maharashtra State Road Development Corporation Ltd. Bandra Mumbai

June

2016

Nov

2017

PriMove is in association with S.N Bhobe & Associates for this work. Topographical Survey of alignment, Prepration of contour drawings for existing alignments. Collection of land plans/village maps, 7/12, Geo-referencing of village maps. Prepration of Land acquisition proposals.

43. Preparation of DPR of selected stretches/corridor of Road networks in Sate of Maharashtra for Package No. 16 (Phaltan To Mhaisal) 155.93 Kms Project Cost: Approx. 1085 Cr

Maharashtra State Road Development Corporation Ltd.

Maharashtra State Road Development Corporation Ltd. Bandra Mumbai

June

2016

Nov

2017

PriMove is in association with S.N Bhobe & Associates for this work. Topographical Survey of alignment, Prepration of contour drawings for existing alignments. Collection of land plans/village maps, 7/12, Geo-referencing of village maps. Prepration of Land acquisition proposals.

Page 55: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

44. Preparation of DPR for Two lane with paved shoulder for costal road MSH4 from Jaigad to Khakshita thita in Maharashtra 133.77 Kms Project Cost: Approx. 1000 Cr

S. N. Bhobe & Associates

S. N. Bhobe & Associates Navi Mumbai

Aug

2016

Dec

2017

Topographical Survey of alignment, Prepration of contour drawings for existing alignments. Collection of land plans/village maps, 7/12, Geo-referencing of village maps. Prepration of Land acquisition proposals. Feasibility of various suitable alignments. Prepration of DPR, Estimates, BoQ’s, Tenders for Road Network, Bridges, Creek bridges,

45. Preparation of DPR for Pune Ring Road (Westerly Section) 66.1 Kms

S. N. Bhobe & Associates

S. N. Bhobe & Associates Navi Mumbai

Aug

2016

June

2017

Topographical Survey of alignment, Prepration of contour drawings for existing alignments. Collection of land plans/village maps, 7/12, Geo-referencing of village maps. Prepration of Land acquisition proposals. Feasibility of various suitable alignments.

Page 56: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

46. Project Management consultants for Road projects in Pune City (7 Ring Road projects) More than 50 Kms Project Cost: Approx. 60 Cr

Pune Municipal Corporation, Pune

Pune Municipal Corporation, ShivajiNagar, Pune

Jan

2007

Dec

2007

Project management consultants on new and resurfacing of roads in a total of 7 different packages (Seven different projects) Quality Checking, Inspection Project Monitoring & Report Preparation Co-ordination between Pune Municipal Corporation and Contractors

47. Project management consultancy and Preparation of DPR for South Nanded Road development Project Project Cost: Approx. 35 Cr

Nanded Municipal Corporation

Nanded Municipal Corporation Nanded

Oct

2006

Nov

2008

Finalisation of road alignments based on the development plan & transferring it on the ground, Preparation of land acquisition proposal is government prescribed format , Preparation of DPR including detailed design, GIS Base data, technical specifications, bill of quantities, rate analysis and cost estimates, Preparation of bid document, support evaluation of bids, Project management services during execution including project scheduling, quality management, bill certification and on the site technical support

Page 57: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

48. Preparation of DPR for Mahur Road Development Project for Department of Tourism & Culture, Govt. of Maharashtra Project Cost: Approx. 40 Cr

Fortress Infrastructure Advisory Services

Fortress Infrastructure Advisory Services Daryanagar House, Maharashi Karve Road, Marine Lines, Mumbai

Feb

2010

Dec

2010

Total survey of entire road. Preparation of detailed design, estimate and specification of various infrastructures. Preparation and evaluation of tender document. Supervision of work, post tender activities of Mahur Road (Hilly Terrain) project

49. Project Management consultancy and preparation of DPR for Shegaon BT & concrete Road development including Parikrama Project. Project Cost: Approx. 36 Cr

Fortress Infrastructure Advisory Services for Department of Tourism and Culture, Govt. of Maharahstra

Fortress Infrastructure Advisory Services Daryanagar House, Maharashi Karve Road, Marine Lines, Mumbai

April

2010

Nov

2010

Total survey of entire road (15.5 KM BT road) and 3 KM (concrete) Parikrama Marg. Preparation of detailed design, estimate and specification of various infrastructures. Preparation and evaluation of tender document. Supervision of work, post tender activities of Shegaon Road development including Parikrama Marg Project.

Page 58: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

50. Project Management Consultants (PMC) for Aquifer Level Ground Water Management Project in 97 villages from seven districts of Maharashtra Project Cost: Approx. 40 Cr.

RSPMU, Water Supply & Sanitation Department, GoM

RSPMU, Water Supply & Sanitation Department, GoM CIDCO Bhavan, Navi Mumbai

Aug 2017

May 2019

To prepare project roll out plan for facilitating implementation work at various levels in effective and efficient manner by - Developing capacity of SOs and government officials for strengthening VWSC, GWMA, CBOs, GP through meetings, trainings, working sessions etc and provide handholding support. Extending process management support to GSDA, SOs, for execution of supply and demand side interventions. Encouraging villagers through SOs for adopting appropriate supply and demand management practices / technologies to accomplish the project objectives. Establishing monitoring mechanism at all levels for tracking project implementation progress, identifying challenges / issues, giving timely feedback and developing action plan. Documentation of best practice, learning’s, and results.

Page 59: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

51. Consultancy for

Restoration of

Storage/Percolation

Tanks and other Soil

and Water

Conservation

Structures in

Buldana District

Bhartiya Jain

Sanghatana (BJS)

Bhartiya Jain

Sanghatana (BJS)

S. B. Road, Pune

Jan

2018

Sept

2018

Rapid Assessment of Desilting And Other Works Involved in

Restoration

Helping in Selection and Prioritization of Tanks and Other Structures

Fitting the Treatment Proposed

Helping in Obtaining Statutory Clearances

Capacity Building of BJS Staff and Volunteers

Suggesting Appropriate Machinery Mobilization for Each

Intervention (Dozers, Loaders/Excavators, Transportation

Equipment)

Identification of Desilting Zones and Sequence of Desilting

Endorsing of Approach and Exit Routes

Structured Reporting in consultation with BJS

Assistance for Impact Assessment

Submission of Completion Report

Page 60: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

52. Technical feasibility assessment for pipe line project from Narmada Main Canal to Karannagar

Crisil Risk and Infrastructure Solutions Ltd.

Crisil Risk and Infrastructure Solutions Ltd. Crisil House, Hiranandani Business Park, Powai, Mumbai

June

2010

Dec

2010

Technical Feasibility assessment for pipe line project from Narmada main canal to Karannagar including feasibility study, survey report, project design and specifications, impact assessment studies (environmental and social etc), operation and maintenance plan, performance standards, implementation plan/ timeline

Page 61: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

53. Technical feasibility assessment for pipe line project from Narmada Main Canal to Dharoi Reservoir Project

Crisil Risk and Infrastructure Solutions Ltd.

Crisil Risk and Infrastructure Solutions Ltd. Crisil House, Hiranandani Business Park, Powai, Mumbai

June

2010

Jan

2011

Technical Feasibility assessment for pipe line project from Narmada main canal to Dharoi reservoir Project including feasibility study, survey report, project design and specifications, impact assessment studies (environmental and social etc), operation and maintenance plan, performance standards, implementation plan/ timeline.

Page 62: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

54. Preparation of Master Plan for Integrated Development and Management of Resources of Terna, Lendi and Manar sub-basins

Water Resources Department

Water Resources Department, Sinchan Bhavan Jalna Road, Aurangabad

Sept

2008

Dec

2012

Preparation of a Master Plan for integrated Development and Management of Water resources of Terna, Lendi and Manar Sub–basins. To identify and set priorities for promoting water resources development projects in each sub-basin. Short and long term action plan consistent with finance allocations and priorities of the state Govt. in each sub-basin.

Page 63: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

55. 3D Remote sensed Minor Irrigation Modeling & Crop Suitability Atlas for West Bengal Accelarated Development of Minor Irrigation Project

The World Bank The World Bank New Delhi

Jan

2015

April

2015

Image Classification to prepare Land use & Land cover maps from 1990 to 2015 (Pre monsoon and Post monsoon). The image classification of Pre Monsoon & Post Monsoon images of Landsat 7 or LISS 3 images which are freely available on NRSC website for year 1990 to 2000 and latest images (2014-2015) will be procured from NRSC for both districts (Bankura & West Midnapur). Change Detection study will be done by using classified images , field visit (ground verification) & Google earth images Base map preparation from topo sheets & Digitization of Soil Maps for two districts. DEM (Digital Elevation Model) Generation i-e Surface Generation from imagery Image Classification to prepare Land use land cover maps for 1990 -1991 and 2000 for two districts (Bankura & West Midnapur)

56. Preparation of Environmental Development Plan of 10 Villages in Tal: Malshiras, Pandharpur & Madha in Solapur District

Zilla Parishad, Solapur

Collector office campus, Solapur

Sept 2014

Aug 2015

Defining the project area

Collection of base line data / information to understand the present

status of the village

Preparation of the base map and other theme maps

Preparation various Environmental action plans

Development of vision for the process and plan.

Identification of techno-economically viable projects

Page 64: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

57. Consultancy for Preparation of Capacity Building Plan & Modules under Jalswarajya-Phase II (World Bank Funded)

RSPMU, Water Supply & Sanitation Department, GoM

RSPMU, Water Supply & Sanitation Department, GoM CIDCO Bhavan, Navi Mumbai.

May

2015

Dec

2017

Identifying capacity building requirements at various levels (Needs assessment) Assessing and improving the existing Maharashtra State Training Policy of the sector Developing a five year capacity building plan for Maharashtra State including resources requirement (internal/ external) Developing a Capacity building Implementation Plan for Maharashtra State Developing standard modules for key trainings to be imparted Develop a framework for monitoring the effectiveness of implementation of capacity building plan and its outcomes, Train the Master Trainers

Page 65: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

58. Development of Communication Training Package on SWAJAL-Community Management of Rural Drinking Water Supply System

UNICEF, Delhi

UNICEF, Delhi Lodi Road, New Delhi

July 2018

Sept 2019

1. Preparation of SWAJAL training packages To undertake a review of training modules on different aspects of community approaches to drinking water supply in rural areas, used in India to identify the key content, approaches and methods. To develop Three modules on SWAJAL on each for Master Trainers (5days), Trainers (3-4 days) and Implementing stakeholders (3days) such as PRIs, VWSC members and village level water frontline worker/motivator in six identified areas of 1. HR and Institutional Arrangements, 2. Technical and skills development, 3. Community Management and behaviour change, 4. Operation, maintenance and Water Safety, 5. Research and Development and 6. Monitoring. 1day orientation modules for state/district level officials/implementing departments. 2days refresher training module for state/direct level implementing partners.

2. Implementation framework Provided insight/recommended how these tools can be integrated in the current curriculum (training programs/modules) for strengthening capacity building within government institutions (KRCs). Develop and implementation framework for the deployment of the training package within a NRDWP programme context. Organize one validation workshop for key partners including Ministry of Drinking Water and Sanitation. Creation of Master trainers at Regional levels for all states 5 days training of master trainers at regional level conduct around 7 trainings to create a resource pool of around 200 master trainers.

Page 66: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

59. Technical Support for post ODF sustainability at State level and 10 districts of Maharashtra State

UNICEF, Maharashtra

UNICEF, Maharashtra B-Wing, R2, Technopolis Building, Andheri (East), Mumbai.

Feb 2018

Mar 2019

Provide facilitation support for implementation of State level guideline on ODF sustainability informed by the national guideline, focusing on Swachatagrahi and Nigrani Samiti with allocation of Budget. Formulation of ToR and procurement policy for engagement of KRCs for concurrent monitoring and learning framework focusing on district level RALU. Preparation of training modules on ODF sustainability, SLRM and FSM, submission of Technology options and suggested way forward including technology options for Water for sanitation in water stressed areas. Development of skilled State and District level terms and KRCs regarding ODF plus planning and its implementation focusing on SLRM, FSM and construction quality assurance framework of IHHL construction in 10 districts. Preparation of budgeted district ODF sustainability plan along with ODF S and ODF plus models for 10 districts. Support districts to sustain skilled grass root level teams for ODF sustainability in every ODF GP of model districts. Monitoring, review and reporting system to track IEC expenditures for IPC, Nigrani Samitis and Swachhta Grahs are in place in 10 districts with a system to scale up in all the 34 districts. Develop a system to assess the impact of IEC expenditure on sustainability of ODF communities are in place for 10 districts.

Development of monitoring framework of ODF plan of model districts.

Page 67: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

60. To Provide Capacity Building and Handholding Support for community led Village Water Safety and Security (VWSS) approaches in Madhya Pradesh through National Resource Agency.

UNICEF, Madhya Pradesh

UNICEF, Madhya Pradesh UN House, Plot No:-41-42, Polytechnic Colony, Shyamla Hills, Bhopal

Aug 2018

Mar 2019

A. Capacity Building 5 days Training of Master Trainers (State/Zonal level-5 days training), Training includes brief orientation on status of WASH in MP, recent restructuring of NRDWP guideline and its impact on state water programming, community led village water safety and security planning process including key components of Water supply scheme augmentation, water quality management, O & M plans and sustainability. 3days refresher workshop.

B. Handholding Support Handholding support to SRG and DRGs for demonstrating VWSS in selected villages and development of VWSS plans for 2 DWSM Support in rolling out VWSS approach along with monitoring framework to track implementation progress of district plans.

Page 68: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

61. Facilitation of Trainings as National Key Resource Centres (KRC) for SBM Gramin, Ministry of Drinking Water & Sanitation, Government of India.

Ministry of Drinking Water & Sanitation, Government of India

Ministry of Drinking Water & Sanitation, Government of India Paryavarn Bhawan, CGO Complex, Lodhi Road, New Delhi

July 2017

Mar 2019

Preparation of Training Modules, manuals and Guidelines on Sanitation i.e. Sustainability, ODF plus, SLRM, FSM etc. Provide induction training, in-service-training, orientation and capacity development on various issues and challenges in terms of leadership, managerial, administrative, technical, socio-economic, attitudinal, financial, contractual and legal issues etc. Build capacity of different stakeholders regarding appropriate and cost effective technologies and implementation mechanisms that promote community participation and source sustainability. Provide knowledge support to the stakeholders on the latest innovations, tools and best practices that promote effective and efficient delivery of services and monitoring. Support Technical knowledge at State level for development of resources for various levels. Preparation of process documentations, case studies, success stories and training reports. Designing, facilitation and assessment of ToT programs.

Page 69: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

62. Capacity Building & Handholding support for Community based village Water Safety & Security (VWSS) approach in Madhya Pradesh.

United Nations Children's Fund (Unicef)

Unicef, UN House, Plot No:-41-42, Polytechnic Colony, Shyamla Hills, Bhopal

July 2017

Dec 2017

5 days training of Master Trainers (State level-5 days training on Orientation on status of WASH in MP, community approaches water safety and security, detail description of community level processes VWSS. 3 days workshop for newly recruited sub-engineers on community led water safety and security planning. 3 divisional workshops of Madhya Pradesh divisions namely Jabalpur and Gwalior on brief orientation on community approaches for water safety and security processes, convergence from various line department and preparation & implementation of VWSS plans in respective districts. Handholding support by resource persons for preparation and implementation of community led VWSS plans. Handholding support to trained Master trainers and district level PHED team in piloting the VWSS approaches in 10 villages in 2 districts. Guidance on implementation process, reviews, cross learning events, onsite capacity building of tem, communication with block and district level officials and presentation of key learnings in DWSM. Preparation of action plan on key actions, capacity building plans.

Page 70: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

63. Support services for Capacity Building on Community Led Village Water Safety Security (VWSS) in Uttar Pradesh

United Nations Children's Fund (Unicef)

United Nations Children's Fund (Unicef) 3/194 Vishal Khand, Gomti Nagar Lucknow

July 2017

Dec 2017

3 days training of Master Trainers on community approaches water safety and security, detail description of community level processes VWSS. 1 day orientation training on community approaches for water safety and security processes, convergence from various line department and preparation & implementation of VWSS plans in respective GPs. 2 Nos of refresher trainings of one day each at regular intervals. Capacity building of government officials on fluoride mitigation in one legislative consultancy. Handholding support by resource persons for preparation and implementation of community led VWSS plans in pilot GPs. Adapt knowledge products (training manuals for officials and community, Guidelines/SoP on VWSS, O & M standards for hand pumps and piped water supply for learning and advocacy. Suggest and demonstrate models of integrated fluoride mitigation. Preparation of monitoring framework for water safety planning roll out. Preparation of VWSS plans, training reports, training methodology, IEC tools, Key actions plans.

Page 71: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

64. Support services for demonstration and roll out of Village Drinking Water Safety and Security Plan in Maharashtra

Water and Sanitation Support Organisation, Water Supply and Sanitation Department, Govt. of Mahrashtra,

Water and Sanitation Support Organisation, Water Supply and Sanitation Department, Govt. of Mahrashtra, CIDCO Bhavan, South Wing, 1st Floor,, CBD Belapur Navi Mumbai, Mumbai, Maharashtra

Aug 2017

Feb 2018

Capacity Building of district level officials

Orientation meeting for district officials

A state level orientation meeting with water quality consultants

from all districts will be organized to share the concept and

methodology for VDWSS. The criteria of Village Selection will be

finalised.

Preparation of VDWSP Plans

A 3 day participatory VDWSS process will be conducted in selected one GP from 34 districts. Training on convergence for the district officials

Three trainings of three days each on convergence for

implementation of VDWSS plan will be conducted for district

officials. The officials will be oriented on implementation of plan

through convergence and also its roll out.

Preparation of VDWSS Action Plan Format and guidance note on

District VWSS Plan

Based on the 6 pilot VDWSS action plans, a format for preparation of VDWSS Action

Page 72: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

65. To Prepare State Policy for O&M, Metering and Tariff setting for RWS in Maharashtra state And Recommend Technology options and framework for metering

Water Supply & Sanitation Department Government of Maharashtra

Water Supply & Sanitation Department Government of Maharashtra CIDCO Bhawan, CBD Belapur, Navi Mumbai

June

2017

Dec

2017

Study, review all crucial issues such as; service delivery status, institutional responsibility at various tiers, capacity for O&M/ supporting villages for O&M, tariff setting, financing through different sources, contracting process, monitoring of O&M etc. Review national/ international good practices (policies, programs, institutional arrangements, financing, monitoring etc.) Study the current approaches/ practices in adopting metering in RWS schemes in the state (rural, peri-urban and suitable urban areas –World Bank projects in Punjab and Kerala. Interim report including i) review of existing state and district experiences ii) international/national practices and iii) emerging issues and proposed directions for new policies Draft Final report including: i) review of existing state and district experiences ii) international/national practices, and iii) draft policy document on: a) O&M, b) metering and c) tariff setting Final report including the above as well as all supporting documentation and tools (procurement framework for meters/technology selection, tools for tariff setting, etc.)

Page 73: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

66. Technical Support to bring sanitation to scale in Latur and Chandrapur ZP (Maharashtra) with focus on thematic capacity building and institutional strengthening at state level

UNICEF , Mumbai

UNICEF, 19, Parsi Panchayat Road, Andheri (East), Mumbai

April 2014

Mar 2016

Development of state level operational manual of district water safety plan implementation Development of State operational manual for NBA Designing and facilitation of state level TOTs on ODEP Support to development of Chandrapur district water safety plan District level support to bring sanitation at scale in Chandrapur and Latur

Sharing Knowledge Products/Experiences

67. Evaluation /Assessment of capacity building programs conducted by WASH Institute.

Plan India, New Delhi

E-12 Kailash Colony, New Delhi 110048

May

2014

Dec

2014

Assignment understanding through the briefing meeting with

client and WASHI

Review of documents

Designing of Training evaluation framework and finalization of

study tools

Conduct consultative workshop

Conduct Training assessment exercise in 7 states and 1 UT

Documentation of best practices showing training impact.

Conduct interview with state department officials

Consultation with the officials from Ministry of Drinking Water

Supply and Sanitation, GoI

Data Analysis and reporting

Sharing assessment findings with the officials from Plan India, WASHI, MDWSS, GoI

Page 74: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

68. Rolling out of Village Water Safety and Security Module, in Jharkhand state

Child in Need Institute (CINI)

Plot No. 441 A, Road No.5 Ashok Nagar, Ranchi

April

2014

Feb

2015

Organize and facilitate Orientation training for professionals and filed workers of the partner NGOs

VWSS Planning Demonstration in 3 GP

Visits and support to remaining PUs during VWSS planning process

Organize and support during quarterly Review meetings and monitoring with each PU

Preparation of process document capturing learning based on the basic documentation done by local partners.

Preparation and submission of Report

Page 75: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

69. Support Services to Latur and Chandrapur Zilla Parishad to implement village water safety and security and community led open defecation free villages programme under Nirmal Bharat Abhiyan (NBA) & National Rural Drinking Water Programme (NRDWP)

UNICEF, Maharashtra

UNICEF, Maharashtra B-Wing, R2, Technopolis Building, Andheri (East), Mumbai.

Mar

2013

Feb

2014

Under the project, planning protocol was developed in both the districts, for villages selected under the flagship programs and also for overall planning of the district project cycle. In both the districts, villages and district functionaries accepted the process guideline. The plans were prepared, consolidated and are under implementation. Apart from the planning process related interventions, various capacity building initiatives were undertaken like identifying capacity needs for implementation of NBA and NRDWP at all levels, training of the staff, review meetings, developing formats for planning, plan consolidation, monitoring, etc. A template for Capacity Needs Assessment of BRCs is prepared and a BRCs survey on similar lines has been conducted in all districts by WSSO and UNICEF. A calendar of activities at village, block and district levels is prepared to enable the functionaries to plan for activities in advance. Comprehensive Behavior Change Communication Plans have been developed in both the districts.

A village level monitoring format for streamlining the reporting system is prepared in consultation with DWSM Cells in Latur and Chandrapur. Knowledge products and process guidelines have been developed and the best practices of NBA implementation have been documented. The district level achievements were continuously shared with the state level stakeholders and some of them were used by WSSO in other districts as well.

Page 76: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

70. Conduct Social Assessment for Sustainable Groundwater Management in Pilot Aquifers in parts of Satara, Beed, Jalna and Amravati districts under Maharashtra Water Sector Improvement Project.

Ground water Survey and Development Agency (GSDA), Govt. of Maharashtra

Ground water Survey and Development Agency (GSDA), Govt. of Maharashtra Shivajinagar, Pune

June 2007

Feb 2008

Approach and research design, designing of questionnaires and

checklists, data collection by sample household survey, group

discussions for all stakeholders, data analysis and report.

The report describes findings from each district separately including data for base line indicators. It further gives suggestions for possible institutional arrangements, IEC strategy and community mobilization strategy and strategy for involvement of deprived communities.

Page 77: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

71. Capacity Building Support to Implement Reforms in Rural Water Supply and Sanitation Sector in Nanded and Raigad districts.

RSPMU, Water Supply and Sanitation Department, Government of Maharashtra

RSPMU, Water Supply and Sanitation Department, Government of Maharashtra, CIDCO Bhavan, CBD Belapur, Mumbai

Jan

2003

Dec

2003

Socio economic assessment of the Watsan situation in districts through baseline survey and participatory appraisals. Identification and articulation of necessary capacity building inputs for NGO functionaries, VWSC members and DSU members. The aim of the capacity building programme was to enable the grassroots level functionaries (GO and NGO) To identify and design appropriate drinking water supply schemes in a participatory way. To provide support and ensure technical and financial management of the scheme during and after its implementation. Development of appropriate teaching material. Experts developed a set of about 15 booklets in vernacular. These booklets were easy to understand and addressed ground realities. Each booklet addressed a particular aspect. These booklets were distributed amongst all participants. Imparting training to all identified stakeholders in two districts. Several exerts were involved in this endeavor. During this endeavor, it was acknowledged that the NGO and GO participants were experts in their own fields and were experienced in working at the grassroots level. Hence a participatory way of teaching based on field visits providing ample scope for self-learning was developed. While imparting training to VWSC members, ground realities and actual problems faced by the VWSC members were seriously considered. The training was designed to address their specific needs. Implementing sector reforms approach in two selected villages. PriMove facilitated implementation of drinking water supply schemes in two villages with the new sector reforms approach.

Page 78: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

72. Capacity Building of District resource Agencies under Integrated Watershed Management Programme (IWMP)

YASHADA Yashada Rajbhavan Complex, Baner Road, Pune

June

2010

May

2016

The aim of the assignment is to build the capacity of representatives from District Resource Organization, Project Training Organization and Agriculture department for effective planning and implementation of IWMP. This is ongoinig assignment. To complete above task, PriMove undertake in depth TNA of potential trainees from three agriculture division i.e. Pune, Nashik and Thane. Further team involved in preparing training modules and manuals on livelihood action planning, social mobilization, project finance and monitoring etc .and facilitated designed 5/10 day trainings.

Under this assignment so far PriMove has facilitated around

twenty trainings for 660 members of DRO, PTO and officials from

Agriculture department in Pune, Nashik and Thane agriculture

division of Maharashtra.

73. Training on ‘Community Led Open Defecation Elimination Action Planning Process with focus on IPC’ For Key Resource Canters (KRCs)

Water and Sanitation Support Orgnisation (WSSO)

1st Floor, South Wing, CIDCO Bhawan, CbdBelapur, Navi Mumbai

Mar

2015

Dec

2017

Develop modules and manuals

Organise capacity building activities for state, district and block

level functionaries.

Develop knowledge bank and disseminate technical knowledge to

district and block.

To evaluate activities at various stages of the program, impact

analysis study, monitor district level activities and share

experiences with state.

Page 79: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

74. Consulting services for linking Producer Groups (PGs) to forward Market linkage and formation of Producer Associations (PAs) & establishment of Farmer Common Service Centres (FCSC) for Konkan Region (World Bank Funded)

Maharashtra Agriculture Competitiveness Project, Department of Agricultural, GoM

Market Yard, Gultekadi, Pune

Nov

2016

Sept

2018

Assessment of the Existing / Newly formed Producer Groups for adopting them for PAs formation. raining Needs Assessment (TNA) on market linkages and agribusiness of selected PGs. Assisting PAs for collection of share capital.

Identification of Business activities and prepare commercially viable

& bankable Business Plan for PAs, Formation of Procurement

Committee.

Identification & capacity building of Community Resource Persons

(CRP).

Assist the Producers Associations (PAs) to develop and strengthen

the linkages for marketing with other stakeholders, Hand holding

support and oversight for operation and management of business

plans (with documentary evidence of establishment of PAs).

Hand holding support and oversight for operation and management of business plans (with documentary evidence of successful & sustainable PAs). Final Report on achievements regarding developing commercially viable successful FCSCs by documenting the entire activities and results thereof.

Page 80: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

75. Consulting services for linking Producer Groups (PGs) to forward Market linkage and formation of Producer Associations (PAs) & establishment of Farmer Common Service Centres (FCSC) for Pune & Solapur Dist. (World Bank Funded)

Maharashtra Agriculture Competitiveness Project, Department of Agricultural, GoM

Market Yard, Gultekadi, Pune

Nov

2014

Nov

2017

Assessment of the Existing / Newly formed Producer Groups for adopting them for PAs formation. raining Needs Assessment (TNA) on market linkages and agribusiness of selected PGs. Assisting PAs for collection of share capital.

Identification of Business activities and prepare commercially viable

& bankable Business Plan for PAs, Formation of Procurement

Committee.

Identification & capacity building of Community Resource Persons

(CRP).

Assist the Producers Associations (PAs) to develop and strengthen

the linkages for marketing with other stakeholders, Hand holding

support and oversight for operation and management of business

plans (with documentary evidence of establishment of PAs).

Hand holding support and oversight for operation and management of business plans (with documentary evidence of successful & sustainable PAs). Final Report on achievements regarding developing commercially viable successful FCSCs by documenting the entire activities and results thereof.

76. Training on “Preparation of Water safety and security action plans using PRA approach and tools”

Groundwater Surveys and Development Agency (GSDA)

Groundwater Surveys and Development Agency (GSDA) Shivajinagar, Pune

July 2008

March 2010

Under this assignment PriMove extended services to train the GSDA staff and Unicef Partner NGOs working in IPD districts on concept of water safety and security plan of a particular village and also to develop their skill for preparing water safety and security plan using participatory approach. The method mainly consists of the different PRA tools and techniques. The training results with preparation of 3-action plans viz. (1) Village water management plan (2) O & M of water facilities (3) water quality action plan.

Page 81: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Selected Relevant Assignments – Completed

Sr. No.

Name of the Project Name of the Employer’s

Address of the Employer’s

Duration of the assignment

Description of the Assignment/Services

From (Date)

To (Date)

77. Provide capacity Development Experts in “AaplePani” project for Pune district

KfW funded project, Local and state government of Maharashtra, India

RSPMU, Water Supply and Sanitation Department, Government of Maharashtra, Mumbai

Dec 2009

Dec 2009

Under this assignment, PriMove formulated district capacity building plan in association with ZP and RSPMU after detailed TNA exercise and conducted various in-house and practical trainings for NGOs, district teams and villagers referring phases of the project. Besides above PriMove extended support for preparing DPR, quality monitoring and preparing progress report. PriMove also extended services for establishing settlement of community monitoring and monthly reporting

78. Development & Testing of Modules for Training of Trainers and Capacity Building Managers under public programme for watershed management

German Technical Corporation (GTZ)

GTZ, JorBaug, New Delhi

April 2008

Mar 2009

Identification of stakeholders in the implementation of water shed management program from the states. Assessment of the functions of the various stakeholders, identification of required and existing competencies, assessment of the training needs to bridge the capacity gaps. Review of existing modules and identification of gaps in modules. Design a training of trainers based on training needs assessment and module review. Deliver the designed module

Page 82: Organization Profile - PriMove Indiaprimoveindia.com/PriMove_profile/PriMove_Organisation_Profile.pdfRainwater Harvesting: In urban areas water supplied by urban local bodies is becoming

Infrastructure Development

Consultants Pvt. Ltd C-3,304 B, Saudamini Complex, Bhusari Colony, Paud Road, Kothrud, Pune -4311038. Maharashtra, INDIA +91 20 25280200/01 [email protected] ; www.primoveindia.com