AMBER ELECTROTECH LTD. Organization at a glance Profile Head Office : F-3/3, Okhla IndI. Area, Phase I, New Delhi 110 020 Phone No. : 011- 2681 4026, 2671 9404 Fax No. : 011 - 2681 9406 Email id. : [email protected] Branch Office : 601, Casablanca, Plot no. 45, Sector 11, C.B.D. Belapur, Navi Mumbai - 400 614 Phone No. : 022 - 61379300 Fax No. : 022 - 61379301 Email id. : [email protected]

Upload: hoangque

Post on 16-Mar-2018

221 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way

AMBER ELECTROTECH LTD.

Organization at a glance

Profile

Head Office : F-3/3, Okhla IndI. Area, Phase I, New Delhi 110 020

Phone No. : 011- 2681 4026, 2671 9404

Fax No. : 011 - 2681 9406

Email id. : [email protected]

Branch Office : 601, Casablanca, Plot no. 45, Sector 11,

C.B.D. Belapur, Navi Mumbai - 400 614

Phone No. : 022 - 61379300

Fax No. : 022 - 61379301

Email id. : [email protected]

Page 2: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way

Introduction

Annexure - 1 Evolution

Annexure - 2 Organization Strength

Annexure - 3 Approvals with Prestigious

Architects & Consultants

Annexure - 4 Partial List of Valued projects

Executed

Annexure - 5 Current Commitments

Annexure - 6 Testimonials

Annexure - 7 Financial Credentials

Annexure - 8 Execution Resources

Annexure - 9 Statutory Compliances

Annexure - 10 Notes

Page 3: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way

Amber Electrotech Limited

Profile Evolution

ANNEXURE-1

EVOLUTION

AMBER ELECTROTECH LTD. is backed by almost five decades of extensive

experience, having been founded by our founder chairman Shri Surinder Singh

way back in the year 1958, with an humble beginning in the field of electrical

contracting under the name and style of Amber Electronics.

With a vision of growing at an exponential scale, by means of exceeding customers

expectations, the organization evolved from an electrical contracting agency into a turn

key solution provider with activities ranging from Substation, Internal & External

electrification for conventional as well as Intelligent Fire Alarm System, CCTV, PA

System, BAS, Telephone and Data Networking.

In the visualized stride for growth and to further augment our professional working the

organization transformed itself into a limited company to be able to further consolidate

volumes and efficiency.

Today, we have some of the most prestigious Projects to feel pride of. The organization

successfully executed varied projects ranging from Hospitals, Hotels, Industrial,

Townships, Commercial Complexes & Farm Houses.

Our spectacular achievements can be attributed to the efforts of our large team of

motivated professionals. Ours is a Group of Engineers, which stays ahead by setting itself

still higher standards, every next time.

Page 4: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way

10. S

ub Contra

ctor &

Labour C

ontra

ctor

07. C

ables, W

ire suppliers.

09. S

witch Gear M

anufacturers and Suppliers.

08. H

T/LT Switch Boards M

anufacturers and Suppliers

01. D

G M

anufacturers and Suppliers, T

ransform

er S

uppliers,In

stallation & Commissioning Agencies

Associates with excellent support &

solidarity

in term

s

TECHNICIANS

TESTING & COMMISSIONING

TECHNICIANS

INSTALLATION

EXECUTION T

EAM:-

MANAGING DIRECTOR

VICE

GENERAL M

ANAGER

(PROJECTS)

HEAD M

ARKETING

& CUSTOMER

(BUSINESS DEVELOPMENT)

GENERAL MANGER

DESIGN

ENGINEER

TENDERING

ENGINEER

EXECUTIVE

B.D.

MARKETING

TEAM

CARE TEAM

CUSTOMER

INCHARGE

PERSONNEL &

INCHARGE

ADMINISTRATION

FINANCE

INCHARGE

ACCOUNT &

(MATERIALS)

INCHARGE

INCHARGE

(STORE&

HRD

CUSTOMERS

02. F

ire Alarm

System Solution Providers

04. T

elecommunication Solutions Providers

03. B

MS Solution Providers

05. P

A System Solution Providers

06. S

ecurity

System Solution Providers

TEAM

PLANNING

PRESIDENT

CARE

STRATEGY

TEAM

ELECTRICIAN

WIRE MEN

GITTI M

EN

HELPERS

FOREMEN

CARE

COMMISSIONING TEAM:-

ASSOCIATES:-

QUALITY

SYSTEM

of d

elivery and commercial te

rms

INCHARGE

SAFETY& QUALIT

Y

INCHARGE

PROJECT

ASSURANCE

SAFETY

ENGINEER

QUALITY

ENGINEER

Communication Escalation Stre

am

MIS Stre

am

Chain of C

ommand

Stra

tegy Team

Planning Team

Operation Team

Facilita

tors & Catalysts

Safety & Quality

Assurance

Descrip

tion

Symbol

Legend:-

(COMMERCIAL)

VICE

QUALITY

ENGINEER

STORE

KEEPER

STORE

KEEPER

PRESIDENT

EXECUTIVE

DESIG

N

11. S

pecial A

pplication Suppliers & Sub Contra

ctors

12. S

pecialized Testing & Commissioning Agencies.

ENGINEER

PROJECT

CO-O

RDINATION

INCHARGE

I.T

GENERAL M

ANAGER

(PROJECTS)

DESIGN

ENGINEEREXECUTIVE

DESIG

N

EXECUTIVE

DESIG

N

EXECUTIVE

DESIG

N

ACCOUNT

ASST.

ACCOUNT

ASST.

MANAGER

PROJECTS

PROJE

CTS

MANAGER

OPERATION

TEAM-1

TYPICAL

GENERAL M

ANAGER

(PROJECTS)

TEAM-1

BOARD OF DIRECTORS

DEPUTY GENERAL

MANAGER(PROJECTS)

COORDINATION

DEPUTY GENERAL

MANAGER(DESIGN)

PROJECT

ENGINEER

EXECUTION

TEAM

COMMISSIONG

TEAM

PROJECT

ENGINEER

EXECUTION

TEAM

COMMISSIONG

TEAM

PROJECT

ENGINEER

EXECUTION

TEAM

COMMISSIONG

TEAM

PROJECT

ENGINEER

EXECUTION

TEAM

COMMISSIONG

TEAM

PROJECT

ENGINEER

EXECUTION

TEAM

COMMISSIONG

TEAM

PROJECT

ENGINEER

EXECUTION

TEAM

COMMISSIONG

TEAM

PROJECT

ENGINEER

EXECUTION

TEAM

COMMISSIONG

TEAM

PROJECT

ENGINEER

EXECUTION

TEAM

COMMISSIONG

TEAM

PROJECT

ENGINEER

EXECUTION

TEAM

COMMISSIONG

TEAM

SUPER

VISOR

STORE

KEEPER

TRAINEE

ENGINEER

PROJECT

ENGINEER

EXECUTION

TEAM

COMMISSIONG

TEAM

SUPER

VISOR

STORE

KEEPER

TRAINEE

ENGINEER

PROJECT

ENGINEER

EXECUTION

TEAM

COMMISSIONG

TEAM

PROJECT

ENGINEER

EXECUTION

TEAM

COMMISSIONG

TEAM

PROJECT

ENGINEER

EXECUTION

TEAM

COMMISSIONG

TEAM

SUPER

VISOR

STORE

KEEPER

TRAINEE

ENGINEER

PROJECT

ENGINEER

EXECUTION

TEAM

COMMISSIONG

TEAM

SUPER

VISOR

STORE

KEEPER

TRAINEE

ENGINEER

PROJECT

ENGINEER

EXECUTION

TEAM

COMMISSIONG

TEAM

SUPER

VISOR

STORE

KEEPER

TRAINEE

ENGINEER

PROJECT

ENGINEER

EXECUTION

TEAM

COMMISSIONG

TEAM

SUPER

VISOR

STORE

KEEPER

TRAINEE

ENGINEER

MANAGER

PROJE

CTS

PROJE

CTS

MANAGER

DEPUTY GENERAL

MANAGER(PROJECTS)

INCHARGE

MARKETING

SUPER

VISOR

STORE

KEEPER

TRAINEE

ENGINEER

SUPER

VISOR

STORE

KEEPER

TRAINEE

ENGINEER

SUPER

VISOR

STORE

KEEPER

TRAINEE

ENGINEER

SUPER

VISOR

STORE

KEEPER

TRAINEE

ENGINEER

SUPER

VISOR

STORE

KEEPER

TRAINEE

ENGINEER

SUPER

VISOR

STORE

KEEPER

TRAINEE

ENGINEER

SUPER

VISOR

STORE

KEEPER

TRAINEE

ENGINEER

SUPER

VISOR

STORE

KEEPER

TRAINEE

ENGINEER

SUPER

VISOR

STORE

KEEPER

TRAINEE

ENGINEER

SUPER

VISOR

STORE

KEEPER

TRAINEE

ENGINEER

TEAM

EXECUTION

TEAM-3

OPERATION

TEAM-2

OPERATION

TEAM-1

TEAM-2

DEPUTY GENERAL

MANAGER(PURCHASE)

TEAM-1

TEAM-2

PURCHASE

ASSISTANT

PURCHASE

ASSISTANT

PURCHASE

ASSISTANT

MANAGER

(PURCHASE)

&IN

VETERY)

TEAM-1

(OPERATIONS)

EXECUTIVE

B.D.

Page 5: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way

Amber Electrotech Limited

Profile Approvals & Association 1 of 3

ANNEXURE-3

APPROVALS & ASSOCIATION A. PRESTIGIOUS ARCHITECTS Akshaya Jain & Raka Chakravarty, New Delhi.

Kapoor & Associates, New Delhi

Consulting Engineering Services (I) Pvt. Ltd., New Delhi.

Arcop Associates, Gurgaon, Haryana.

A.G. Krishna Menon, New Delhi

Creative Group, New Delhi.

Garg & Associates, New Delhi.

P.G. Patki & Associates

G. Prasad & Associates, New Delhi.

Manchanda Associates, Delhi.

Raj Rewal & Associates, New Delhi.

C.P. Kukreja & Associates, New Delhi.

R.K. & Associates, New Delhi.

School of Planning & Architecture, Noida.

Planners Group Pvt. Ltd., Gurgaon.

Raja Aederi Consultants Pvt. Ltd., New Delhi.

Gherzi Eastern Ltd., New Delhi.

Kanvinder Rai & Chawdhary, New Delhi.

Design Co-Operation, New Delhi.

Chopra & Associates, New Delhi.

N.Goyal & Associates, New Delhi.

Kothari Associtates

Arch. Vinod Gupta.

Mahimtora Consultants Pvt. Ltd.

Arch. Carl Vehsania

Page 6: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way

Amber Electrotech Limited

Profile Approvals & Association 2 of 3

B. LEADING ELECTRICAL CONSULTANTS V.S. Kukreja & Associates Pvt. Ltd., New Delhi.

Engineering Services Consultants, New Delhi.

J.V. of Peddle Thorp, Melbourne and Kapoor & Asso., Delhi.

Mani Chowfla, New Delhi.

Spectral Consultants Services Pvt. Ltd., Mumbai.

Spectral Services Consultants Pvt. Ltd., Noida, U.P.

Consulting Engineering Services (I) Pvt. Ltd., New Delhi.

Gherzi Eastern Ltd., New Delhi.

Electrical Consulting Engineers., New Delhi

Kanwar Krishan & Associates, New Delhi.

Sanelec Consultants Pvt. Ltd., New Delhi

Ener Save Consultants Pvt, Ltd.,New Delhi.

Electro Consultants, New Delhi.

Becon Engineering, New Delhi.

G.R. Electrical Consultants, New Delhi.

KCB Associates Pvt. Ltd., New Delhi.

C. Government & Public Sector Undertaking

CPWD

PWD

NDMC

Power Grid Corporation of India Ltd.

NTPC Ltd.

HSCC (I) Ltd.

Indian Oil Corporation Ltd.

Gas Authority of India Ltd.

Airport Authority of India.

NBCC Ltd.

Sports Authority of India.

Ministry of Health & Family Welfare Government of India

Maharashtra Sales Electricity Distribution Co. Ltd.

Page 7: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way

Amber Electrotech Limited

Profile Approvals & Association 3 of 3

D. LEADING PROJECT MANAGEMENT CONSULTANTS Cushman & Wakefield, New Delhi

DFX Services Consultants, Mumbai

New Millennium Co. Ltd., New Delhi.

E. CIVIL CONTRACTORS JMC Projects Ltd., Ahmedabad

Unity Infra Projects Ltd., Mumbai

H.S. Nag & Associates, Delhi

Nagarjuna Construction Ltd., Gurgaon

Era Infra Engineering Ltd., Delhi

Simplex Projects Ltd., Delhi & Kolkata

United Builders Pvt. LTd., Kathmandu

Ahuja Builder ,Delhi.

C.S. Chamankar & Associates, Mumbai.

Chitwon Co-E Nepal (P) Ltd., Kathmandu

Pratibha Industries Ltd.,Mumbai

Kitano Construction Co., Tokyo

Rattan Singh Builders Pvt. Ltd. Delhi.

Larsen & Tourbo Ltd., New Delhi.

Arora Construction Company Pvt. Ltd., Faridabad.

Dewan Chand, Delhi.

Jaypee Infratech Ltd.

Imperia Structures Ltd. Delhi.

Swadeshi Construction Co. Delhi.

Consolidated Construction Consortium Ltd. Delhi.

C&C Constructions Ltd. Delhi

Page 8: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way

Amber Electrotech Limited

Profile Partial list of Valued Projects Executed 1 of 4

ANNEXURE – 4

PARTIAL LIST OF VALUED PROJECTS EXECUTED

S.N. CLIENT / PROJECT DESCRIPTION

ARCHITECTS /

CONSULTANTS /

PROJECT MANAGEMENT

CONSULTANTS

TOTAL

PROJECT

COST IN

INR (Lacs)

1. Construction of Thayagraj Stadium at New Delhi

Internal, External & Substation Works

J.V. of Peddle Thorp. Melbourne and Kapoor &

Kapoor Asso. 1872

2.

Construction of Indira Gandhi Stadium Complex

for Common Wealth

Games 2010.

Internal, External & Substation Works

Consulting Engineering Services (India) Pvt. Ltd.

1500

3.

Nepal- Bharat Maitri 200 Beded Emergency & Troma

Centre for BIR Hospital at Kathmandu, Nepal

Internal, External

Electrical & Sub-station Works

HSCC India Ltd. 1125

4.

Up gradation, renovation and

new construction for

commonwealth games 2010 at IGI Stadium, New Delhi.

External Lighting Consulting Engineering

Services (India) Pvt. Ltd. 1000

5. Construction of Talkatora Stadium at New Delhi

Internal Electrification work

Raja Aederi Cons. Pvt. Ltd. / Spectral Services Cons. Pvt.

Ltd.

900

6.

Vardhman Mahavir Medical College at Safdurjung Hospital

New Delhi

Internal , External Electrical & Sub-station

Works

HSCC India Ltd.

863

7. Wrestling Stadium, Indira

Gandhi Stadium at New Delhi Internal Electrical

Works Consulting Engineering Services (India) Pvt. Ltd.

750

8. Ram Manohar Lohia Hospital,

New Delhi

Internal , External

Electrical & Sub-station Works

HSCC India Ltd. 620

9.

Aman Bagh, 5 Star Resort

Heritage at Ajabgarh, Rajashthan

Internal, External

Electrical and Sub-station Works

Gherzi Eastern Ltd., 612

10. Nissin Brake India Pvt. Ltd. at

Neemrana

Internal, External &

Substation Works

CPKA/Kitano Constructions

Corp. Japan 520

Page 9: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way

Amber Electrotech Limited

Profile Partial list of Valued Projects Executed 2 of 4

S.N. CLIENT / PROJECT DESCRIPTION

ARCHITECTS /

CONSULTANTS /

PROJECT MANAGEMENT

CONSULTANTS

TOTAL

PROJECT

COST IN

INR (Lacs)

11(a) Power Welfare Organization,

Sector-43, Gurgaon

Internal , External

Electrical & Sub-station Works

CP Kukreja & Asso. 525

11(b)

Township for Power Grid Corporation of India Ltd., at

Sector-43, Gurgaon

Internal Electrical Works

NBCC Ltd. 410

11(c)

Office for Power Grid

Corporation of India Ltd., at

Sector-29, Gurgaon

Internal Electrical

Works CP Kukreja & Asso. 100

12(a) Jaipur Golden Hospital, phase-I & II at Rohini, New Delhi

Internal, External

Electrical & Sub-station Works

Planners Group Pvt. Ltd., 415

12(b) Jaipur Golden Hospital, phase-

III at Rohini, Delhi Internal & External Electrical Works

Planners Group Pvt. Ltd., 65

13. Sir Ganga Ram

Hospital at New Delhi Internal & External Electrical Works

CP Kukreja & Associates 322

14.

Construction of Energy Technology Centre at Greater

Noida

Internal, External &

Substation Works NTPC Ltd. 275

15. AWHO at Gurgaon Internal Electrical

Works

Garg & Associates / VS

Kukreja & Associates Pvt. Ltd. 275

16.

Married Accommodation

Project at Mahipalpur, New Delhi

Internal & External

Electrical Works

CES Ltd. 240

17. Modular Expansion of

Amritsar Airport

Internal Electrical

Works

Airport Authority of India /

DFX Systems Pvt. Ltd 240

18.

Up-gradation, renovation and new Construction for

Commonwealth Games 2010 at KSSR Stadium, New Delhi.

External Lighting Consulting Engineering

Services (India) Pvt. Ltd. 225

19. IFSOWO at Greater Noida External Electrical & 33 KV Sub-station Works

New Millennium Co. Ltd., 225

20. IFSOWO at Greater Noida Internal Electrical

Works

G. Prasad & Asso. /New

Millennium Co. Ltd. 200

21.

Development of Wrestling

Training Venue for Commonwealth Games 2010

at Ludlow Castle School-2,

Delhi.

Internal & External Electrical Works

AG Krishna Menon /

Engineering Services Consultants

205

Page 10: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way

Amber Electrotech Limited

Profile Partial list of Valued Projects Executed 3 of 4

S.N. CLIENT / PROJECT DESCRIPTION

ARCHITECTS /

CONSULTANTS /

PROJECT MANAGEMENT

CONSULTANTS

TOTAL

PROJECT

COST IN

INR (Lacs)

22.

Construction of Service Station

at Bahadurgarh, Haryana for M/s L&T Ltd.

Internal, External

Electrical & Sub-station Works

Gherzi Eastern Ltd.

152

23.

National Institute of Open School, Noida

Internal & External Electrical Works

School of Planning & Architecture

141

24(a) 305 Flats & Allied Bldg. at

CGEWHO, Chandigarh

Internal & External

Electrical Works RK & Associates 140

24(b) CGEWHO at Khargar,

Mumbai Internal Electrical

Works Consulting Engineering

Services 100

25.

Corporate Office at Sector 125,

Noida for M/s Havells India Ltd.

Internal & External

Electrical Works CP Kukreja & Associates 183

26(a) Management Development

Institute at Gurgaon

Internal, External Electrical & Sub-station

Works

GR Electrical Consultant 140

26(b) Management Development

Institute at Gurgaon

Internal Electrical

Works Adharshila 112

27.

Institute of Human Behaviour & Allied Sciences at Sahadara,

Delhi

Internal & External

Electrical Works CP Kukreja & Asso. 140

28. Vishwarma Bhawan Building

at Wing-A, IIT-TIF AC

Internal & External

Electrical Works Spectral Services Consultants 133

29(a) Township for GAIL at Guna Internal & External

Electrical Works CP Kukreja & Asso. 125

29(b) Gas Training Institute &

Hostel Block at Noida

Internal, External Electrical & Sub-station

Works

Raj Rewal & Associates 85

30. Rajiv Gandhi Cancer Institute

at Delhi

Internal Electrical

Works Planners Group Pvt. Ltd., 115

31. Stock Exchange Association at

Ludhiana

Internal , External

Electrical & Sub-station Works

CP Kukreja & Asso. 110

32. Nuclear Power Corporation of

India Ltd.,at Tarapur Internal Electrical

Works CEC India 100

33. Nurses Hostel at

Shrinivashpuri, New Delhi Internal & External Electrical Works

HSCC 100

Page 11: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way

Amber Electrotech Limited

Profile Partial list of Valued Projects Executed 4 of 4

S.N. CLIENT / PROJECT DESCRIPTION

ARCHITECTS /

CONSULTANTS /

PROJECT MANAGEMENT

CONSULTANTS

TOTAL

PROJECT

COST IN

INR (Lacs)

34. Commercial Complex at

Sector-18, Noida Internal & External Electrical Works

Sanelac Consultant 85

35.

Auditorium for Dr. Ram Manohar Lohia Trust at

Etawah

Internal & External Electrical Works

Gherzi Eastern Ltd., 80

36. Delhi Electrical Supply

Undertaking

Assembly, Erection, Testing &

Commissioning of 100

MVA Transformer at

various sites

DESU (MCD) 65

37. Honda Showroom at Gurgaon Internal & External Electrical Works

Gherzi Eastern Ltd., 65

38.

Nature & Waste Management Institute (I) Pvt. Ltd.,New

Delhi

Internal, External Electrical & Sub-station

Works CP Kukreja & Asso. 60

39. Lall Bazar, Gangtok Internal & External

Electrical Works NBCC 60

40.

MGF Mall near Netaji Subhash Place Metro Station,

New Delhi

Internal & External Electrical Works

Enersave Consultants Pvt. Ltd.,

30

41. Ware House at Sahibabad for

M/s Havells India Ltd.

Internal Electrical

Works CP Kukreja & Associates 18

42. NTPC at Mandola

Assembly, Erection, Testing &

Commissioning of 315

MVA Transformer at Mandola

NTPC 16

Page 12: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way

Amber Electrotech Ltd.

Co. Profile Current Commitments 1 of 3

ANNEXURE ‘5’

PARTIAL LIST OF CURRENT COMMITMENTS

S.N. PROJECT DESCRIPTION CLIENT ARCHITECTS / CONSULTANT

TOTAL PROJECT COST IN

INR (Lacs)

1. Construction of A.I.I.M.S.

Hospital Complex at Bhopal, Madhya Pradesh

Internal, External & Substation

Works

Ministry of Health & Family

Welfare Government of

India

Prem Chaudhary & Associates Pvt. Ltd.

3855

2. Construction of CBI

Headquarter at New Delhi Internal & External

Electrical Works NBCC Ltd.

Raja Aederi Cons. Pvt. Ltd. / KCB Asso.

1574

3. Construction of A.I.I.M.S.

Hospital Complex at Rishikesh, Uttrakhand

Internal, External & Substation

Works

Ministry of Health & Family

Welfare Government of

India

Surinder Sawhney Associates

1481

4. Construction of New Building

for Indian Embassy at Kathmandu, Nepal.

Internal, External & Substation

Works

Ministry of External Affairs Govt. of India

Akshaya Jain & Raka Chakravarty / Engineering

Services Consultants 1428

5. Construction of Manyavar

Kanshiram Medical College at Saharanpur (U.P.).

Internal Electrical Works

Uttar Pradesh Rajykiya Nirman

Nigam

Midas Arch. / Consummate Engineering

Services (P) Ltd.

1421

6.

Construction of Expandable

Modular New Terminal Building at Raipur Airport.

Internal, Extenal & Substation Works

Airport Authority of

India

Creative Group / VS Kukreja & Associates Pvt.

Ltd. 1270

7.

Construction, Completion & Maintenance of 6 Gardens at area in Haiteen Block 2 & 3,

Siddiq Block 5 &6 , South Doha Block 1 & Surrah Block 1,

Kuwait

Electrical works & Low Voltage

Works State of Kuwait El- Enma’A Real Estate Co. 1260

8

All India Institute of

Ayurveda (AIIA) including AMC for one year at Sarita

Vihar, New Delhi.

Internal, External & Substation

Works HSCC HSCC 1165

9. Construction of Office Building at Jaypee Greens, Sector-128,

Noida (U.P.)

Internal, External & Substation

Works

Jaypee Infratech Ltd.

Arcop Asso. Pvt. Ltd. / MKG Consultants

1010

10.

Construction of Super Specialty at NIMS at Hyderabad

Internal & External Electrical Works

HSCC India Ltd. Manchanda Asso. /V.S.

Kukreja & Associates Pvt. Ltd.

915

Page 13: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way

Amber Electrotech Ltd.

Co. Profile Current Commitments 2 of 3

S.N. PROJECT DESCRIPTION CLIENT ARCHITECTS / CONSULTANT

TOTAL PROJECT COST IN

INR (Lacs)

11.

Construction of Subsidiary Training Centre (STC) for BSF at Chakur,

Maharashtra.

External Electrical Works

NBCC NBCC 825

12. Construction of Three Building

of HIMSR Project at Jamia Hamdard University Delhi.

Internal, External Electrical & Sub-

station Works Jamia Hamdard

Manish Saini Consulting Arch. / Nous Hospital Consultants Pvt. Ltd

800

13.

New Maharashtra Sadan at New

Delhi

Complete Electrical Works

PWD P.G. Patki & Asso /

Spectral Services Cons. Pvt. Ltd.

800

14. Mahavitran Infraplan Phase-II,

Chiplun,Ratnagiri

33 KV,11 KV HT Distribution Line &

Allied Works

Godrej & Boyce Mfg. Co. Ltd

MSEDCL 649

15. Construction of Indira

Paryavaran Bhawan at Aliganj, Jorbagh Road, New Delhi.

Internal Electrical Works

CPWD CPWD 563

16. Jaipuria Group Housing Project

at Kathmandu, Nepal Internal

Electrification Chitawon Co -E Nepal (P) Ltd.

Mani Chowfla 465

17.

Construction of Civil Services Officers Institute at Vinay Marg

New Delhi

Internal & External Electrical Works

NBCC NBCC 409

18. Construction of Shivaji Stadium,

New Delhi

Internal, External Electrical & Sub-

station Works NDMC NDMC 393

19.

Construction of Conventional Under Ground Multilevel Car Parking (Hauz Khas, Munirka

Market, Gandhi Nagar and Model Town)

Internal External Electrical

MCD Meinhardt (singapore) Ptd.

Ltd. 360

20. Construction of A.I.I.M.S.

Hospital Complex at Jodhpur, Rajasthan.

Internal Electrical Works

Ministry of Health & Family

Welfare Government of

India

Mathur & Kapre Asso. Pvt. Ltd.

313

21. Construction of Jawaharlal

Nehru Bhawan at Janpath, New Delhi.

Façade Landscape & Area Lighting

CPWD V.S. Kukreja & Associates

Pvt. Ltd. 221

22.

Construction of Additional Hospital Block

at Jaipur Golden Hospital, Rohini, New Delhi

Substation Work Jaipur Golden

Planners Group Pvt. Ltd. 185

Page 14: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way

Amber Electrotech Ltd.

Co. Profile Current Commitments 3 of 3

S.N. PROJECT DESCRIPTION CLIENT ARCHITECTS / CONSULTANT

TOTAL PROJECT COST IN

INR (Lacs)

23. Construction of Residency at IT

Imperia at Greater Noida Internal Electrical

Works Imperia

Structures Ltd. Imperia Structures Ltd. 170

24.

Outlet Mall & Serviced

Apartments at Manesar Gurgaon for M/s Ascot Hotels & Resorts

Ltd.

Internal & External Electrical Works

Ascot Hotels & Resorts Ltd.

CP Kukreja & Associates 186

25. Construction of Lecture Hall

(Mathematical Science Building) University of Delhi

Internal, External Electrical & Sub-

station Works CPWD Rites Ltd. 130

26.

Construction of Additional

Hospital Block at Jaipur Golden Hospital, Rohini, New Delhi

Internal Electrical Works

Jaipur Golden

Planners Group Pvt. Ltd. 97

27. Construction of I.T School Building at I.I.T., Delhi.

Internal Electrical Works

CPWD Rites Ltd. 82

28. Crescent Smoke House, Lado

Sarai, New Delhi Internal Electrical

Works

Perform Projects Management

Pvt. Ltd.

Perform Projects Management Pvt. Ltd.

17

Page 15: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way
Page 16: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way

Executive Engineer (E)CGED-II,CP'''D, IGI Stadium, New Delhi - 110002.Phone No. 011-23724042, Fax No. 011-23724043

No. 23(W)/2010-EE(E)/CGED-lIlf?f Dated: /§-/6 '-"'""m

TO WHOM IT MAY CONCERN

It is certified that Mls Amber Electrotech Ltd., F 3/3, Okhla Industrial Area, Phase - I,New Delhi-110020 has been awarded the work of Internal E.I. through compositetripartite agreement between Mls JMC Projects (India) Ltd., Mls Amber Electrotech Ltd.and CPWD, as per following details»

Name of Work : Up-gradation, renovation and new construction at Indira GandhiStadium Complex for Commonwealth Games-2010 [SH: Up-gradation of structure and new finishing works for existing indoorstadium ilc structural retrofitting and repair] - (E & M works.).

Agreement No.Agreement AmountStipulated Date of StartStipulated Date of CompletionTime AllowedStatus of WorkUpto date PaymentTotal value of work done

20/EE(E)/CGED-II/2008-09Package B1, Internal E.1.- Rs. 15,49,02,804/-04.12.200803.12.200912 MonthsCompletedPackage B1, Internal E.1.- Rs.13,10,25,148/-Package B1, Internal E.1.- Rs. 15 Crore (Approx.) - Finalbill under process

The firm has carried out the work as per specifications and the performance of the firmis satisfactorily .

. ... -.' This Certificate is being issued on the request of Mls Amber Electrotech Ltd .

.~'"' k'., ..-:<.,:;.

,.-

,.. :'

[Er. Sunil Yadav]Executive Engineer (E)

Commonwealth Games Electrical Division-IICPWD, IGI Stadium Complex, New Delhi-110002

..., .

Page 17: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way
Page 18: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way

Executive Engineer (E)CGED-II, CPWD, IGI Stadium, New Delhi -110002.Phone No. 011-23724042, Fax No. 011-23724043

No. 23(W)/201 O-EE(E)/CGED-III 7'36' Dated: / f'--la ----j0

TO WHOM IT MAY CONCERN

It is certified that Mls Amber Electrotech Ltd., F 3/3, Okhla Industrial Area, Phase - I,New Delhi-11 0020 has been awarded the work of External Lighting through agreementMls Amber Electrotech Ltd. and CPWD, as per following details:-

Name of Work : Up gradation, Renovation and New Construction for CommonwealthGames 2010 at IGI Stadium, New Delhi. (SH: Providing ExternalLighting for the IGI Complex).

Agreement No.

Agreement AmountStipulated Date of StartStipulated Date of CompletionTime AllowedStatus of WorkUpto date PaymentTotal value of work done

04/EE(E)/CGED-11/2009-10Rs. 3,62,27,204/-08.05.200902.01.2010240 DaysCompletedRs. 7,64,18,504/-Rs. 10 Crore (Approx.) - Final bill under process

The firm has carried out the work as per specifications and the performance of the firmis satisfactorily.

This Certificate is being issued on the request of Mls Amber Electrotech Ltd.

[Er. SU~daVlExecutive Engineer (E)

Commonwealth Games Electrical Division-IICPWD, IGI Stadium Complex, New Delhi-11 0002

Page 19: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way
Page 20: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way
Page 21: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way
Page 22: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way
Page 23: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way
Page 24: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way
Page 25: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way
Page 26: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way
Page 27: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way
Page 28: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way
Page 29: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way
Page 30: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way
Page 31: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way
Page 32: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way
Page 33: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way
Page 34: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way
Page 35: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way

Amber Electrotech Ltd.

Year Amount in Lacs

Order Book Outlook 32500000000.00

Orders In Hand 19500000000.00

Targeted Turnover 12500000000.00

ANNEXURE - '7'

FINANCIAL CREDENTIALS

PERFORMANCE STATISTICS

32500.00

19500.00

12500.00

10000

15000

20000

25000

30000

35000

(Am

ou

nt

In -

INR

La

cs)

Bankers : Indian Overseas Bank Ltd. A/C No. 900188

HS-31, Kailash Colony Mkt.,

New Delhi.

Credit Line with Bankers :

CC Limit `̀̀̀ 400 Lacs.

B G Limit. ` ` ` ` 800 Lacs.

( 2010-2011 )

0

5000

10000

Order Book Outlook Orders In Hand Targeted Turnover

Profile Financial Credentials

Page 36: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way

Amber Electrotech Limited

Profile Execution Resources 1 of 2

ANNEXURE-8

EXECUTION RESOURCES

A. TOOLS-PARTIAL LIST QTY.

1. 2. 3. 4. 5. 6. 7. 8. 9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

Chase Cutting Machines Chain Pulley Blocks Gas Welding Set Stove Concrete Drilling M/c. Drill Machines Melting Pot Hand Kits Vacuum Blower Angle Cutter Grinder Blow Lamp Brushes Solders Dividers Files Set Dowell’s Crimping M/C (Hydraulic) Dowell’s Crimping M/C (Manual) Cable Jointing Kit Complete Welding Machine

20 3 2 10 12 18 10 20 4 6 4 10 12 12 10 18 4 9 6 2

Page 37: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way

Amber Electrotech Limited

Profile Execution Resources 2 of 2

TESTING & MEASURING INSTRUMENTS:

B. TESTING EQUIPMENTS QTY.

1. 2. 3. 4. 5. 6. 7. 8. 9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

Dehydration M/c . Transformer Oil Testing kit H.V.D.C. Tester Earth Tester Megger 1 KV Megger 2.5 KV Megger 5 KV Relay Testing Kits Resistance Testers Tong Tester Power Factor Meter KWH Meter Continuity Tester Phase Sequence Indicator Millimeter Digital Clam On Tester Verneir Calipers Screw Gauge Battery Tester DB Meter

2 1 1 5 5 4 2 1 1 6 2 2 8 2 10 10 5 2 2 2

Page 38: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way

Amber Electrotech Limited

Profile Statutory Compliances

ANNEXURE-9

STATUTORY COMPLIANCES

1) Electrical Contractor Licence (EC NO-891 upto 22-3-2011, since 1967) 2) PF Registration No. DL-12607 3) Excise Registration No. Ex-Range No. AAFCA5305CXDOO1 3) Sales Tax/VAT Delhi TIN 07590249195 Haryana TIN 06371822721 Punjab TIN 03722028897 Rajasthan TIN 08810702678 Utter Pradesh TIN 09566104221 Andhra Pradesh TIN 28807762722 Chhattisgarh TIN 22051104348

Maharashtra TIN 27710742335 B&C

4) Service Tax No. AA FCA 5305C ST 001 DL-II/ST/CS/CZI/CE/927/AEL/RX11/06 5) PAN No. AA FCA 5305C

Page 39: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way
Page 40: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way
Page 41: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way
Page 42: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way
Page 43: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way
Page 44: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way
Page 45: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way
Page 46: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way
Page 47: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way
Page 48: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way
Page 49: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way
Page 50: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way
Page 51: Organization at a glance Profile - Amber · PDF file · 2016-07-13Organization at a glance Profile Head Office: F-3/3, Okhla IndI. Area, ... 2 Organization Strength Annexure ... way

Amber Electrotech Limited