Page 1: Organise dop’s in the building chain

DoP’s in the building chain

Chris Hamans

Okt. 2012

Page 2: Organise dop’s in the building chain
Page 3: Organise dop’s in the building chain
Page 4: Organise dop’s in the building chain

Supplying a DoP is a logisitic problem

Page 5: Organise dop’s in the building chain

Supplying a DoP is a logisitc problem

Page 6: Organise dop’s in the building chain

from factory

Page 7: Organise dop’s in the building chain

from factory

per packaging unit

Unpacked into many single units

Page 8: Organise dop’s in the building chain

xyz123

Impossible to CE-mark the

product

Page 9: Organise dop’s in the building chain

xyz123

Impossible to CE-mark the

product

Page 10: Organise dop’s in the building chain

?

?

Page 11: Organise dop’s in the building chain

Bordereau de livraison

Delivery note

Lieferschein

Vrachtbrief

Incl.

Page 12: Organise dop’s in the building chain

CPR 305/2011

1-7-2013+ DoPDeclaration of Performance

Page 13: Organise dop’s in the building chain

DoP: ult. per 1-7-2013

Page 14: Organise dop’s in the building chain
Page 15: Organise dop’s in the building chain

Bordereau de livraison

Delivery note

Lieferschein

Vrachtbrief

Incl.

++

Page 16: Organise dop’s in the building chain

Bordereau de livraison

Delivery note

Lieferschein

Vrachtbrief

Incl.

++ the paper flow

Page 17: Organise dop’s in the building chain

DoPxxxxxabbc 123 pqr

+?

??? ??

Page 18: Organise dop’s in the building chain

DoPxxxxxabbc 123 pqr

+?

??? ??

the paper flow

Page 19: Organise dop’s in the building chain

xyz123

DoP no. ......

Page 20: Organise dop’s in the building chain

Bordereau de livraison

Delivery note

Lieferschein

Vrachtbrief

Incl.DoP no. ......

Page 21: Organise dop’s in the building chain

A paper based solution will not work

Page 22: Organise dop’s in the building chain

A paper based solution will not work

An electronic solution: the information amount to a product only can be managed via

electronic data exchange.

Page 23: Organise dop’s in the building chain

A server filled with DoP

DoP no. ......

Page 24: Organise dop’s in the building chain

A paper based solution will not work

An electronic solution: the information amount to a product only can be managed via

electronic data exchange.

Question: a data server per manufacturer?

Page 25: Organise dop’s in the building chain

A paper based solution will not work

An electronic solution: the information amount to a product only can be managed via

electronic data exchange.

Question: a data server per building merchant?

Page 26: Organise dop’s in the building chain

A server filled with DoPa DoP-server with

each builders merchant ?

a DoP-server with each

product manufacturer ?

Page 27: Organise dop’s in the building chain

A paper based solution will not work

An electronic solution: the information amount to a product only can be managed via

electronic data exchange.

Question: a central European dataserver?

Page 28: Organise dop’s in the building chain

From a manufacturer’s point of view:

Page 29: Organise dop’s in the building chain

From a manufacturer’s point of view:

Paper based DoP impossible to handle in printing, packaging and distributing

Electronic communication via manufacturer’s server or assigned server; Instructions or URL on delivery note and/or

CE-marking on the product

direct delivery to end-user

Page 30: Organise dop’s in the building chain

DoP no. ......

A server filled with DoP

The manufacturer

Page 31: Organise dop’s in the building chain

From a manufacturer’s point of view:

If all builders merchants will have their own server and communication system for distributing the DoP’s

delivery via builders merchants .................

..................... to end-user

Different systems and server templates will be impossible to handle

Page 32: Organise dop’s in the building chain

A server filled with DoP

Manufacturer1

2 3

n

DoP no. ......

Page 33: Organise dop’s in the building chain

From a builders merchant’s point of view:

Page 34: Organise dop’s in the building chain

From a builders merchant’s point of view:

If all manufacturers supply their DoP’s or specify the source of DoP’s.

An enormous administrative burden for merchants chanelling DoP’s or DoP-source

Page 35: Organise dop’s in the building chain

A server filled with DoP

Manufacturer 1

Manufacturer 2

Manufacturer 3

Page 36: Organise dop’s in the building chain

DoP no. ......

A server filled with DoP

Manufacturer 1

Manufacturer 2

Manufacturer 3

DoP no. ......

DoP no. ......

Page 37: Organise dop’s in the building chain

A server filled with DoP

DoP no. ......

A Common European DoP Access Point ??

Page 38: Organise dop’s in the building chain

A Common European DoP Access Point – What is the point and how could it work

Page 39: Organise dop’s in the building chain

39

MotivationWhy a common DoP-Access Point?

Why an industry controlled DoP-Access Point?

• Centralised-channelled data exchange

• Efficiency

• Compliance

• Greater strength

• Traceability

• Greater potential for future tasks

• Supports a Common Market

Page 40: Organise dop’s in the building chain

PRINCIPLE

Page 41: Organise dop’s in the building chain

Common access point

DoP – Access Codeor

Page 42: Organise dop’s in the building chain

Common access point

DoP – Access Code

Manufacturer server

Association server

or

Page 43: Organise dop’s in the building chain

Common access point

DoP – Access Code

Central server

Manufacturer server

Association server

or

Page 44: Organise dop’s in the building chain

Approach A: Re-Direction

Product - ID

Common access pointresponsibility responsibility responsibility

Product - ID

Page 45: Organise dop’s in the building chain

Approach A: Re-Direction

Product - ID

Common access point

only requires an identifiable product-id low cost for the consortium almost no maintenance cost

each participant has to run his own system each system has to comply with the criteria (to be) set by

the Commission each operator has to store data for > 10 a each operator has to take care of the language issue higher risk of errors over all higher costs

responsibility responsibility responsibility

Product - ID

Page 46: Organise dop’s in the building chain

46

Approach B: Synchronised data

Product - ID Product - ID

Common access point

Server

Database+ Interface

Database+ Interface

Page 47: Organise dop’s in the building chain

47

Approach B: Synchronised data

Product - ID Product - ID

Common access point

Server

Database+ Interface

Database+ Interface

only requires an identifiable product-id low cost for the user (manufacturers) system compliance with Commission criteria to be

demonstrated only once for all language version included storage > 10 a provided manufacturer can cut the link to the platform without

loosing data over all lower costs lower risk of errors

higher costs for consortium

Page 48: Organise dop’s in the building chain

48

Approach C: Outsourced data

Common access point

Server

Product - ID

Web interface

Page 49: Organise dop’s in the building chain

Approach D: all-in-one

Product - ID Product - ID

Server

Common access point

Product - ID

Web interface

Product - ID Product - ID

Common access point

ServerDatabase+ Interface

Database+ Interface

Page 50: Organise dop’s in the building chain

The European Common Access Point

• Is an initiative of a group of leading European producers of construction products.

• A confederation is established (in establishment)

– Seat: Maastricht , the Netherlands– All (public registered) European manufacturers of construction products

can apply as member.– DoP data remain full responsability of the producer

• Timeline – Goal setting: – per February 2013 uploading DoP possible– per 1-7-2013 DoP (free) downloadable

Page 51: Organise dop’s in the building chain

we invite construction product manufacturers - small, medium, big –

joining the project

Page 52: Organise dop’s in the building chain

Ir. Chris [email protected] – tel: +31 648 60 63 63

Interested? More info? contact:

Project management of the European Common Access Point