ORDINARY MEETING OF COUNCIL
CONDOBOLIN
20 FEBRUARY, 2013
COMMENCING AT 9.00AM
This is Page No.2 of the Business Paper of Lachlan Shire Council to be held 16 January, 2013 in the
Council Chambers, Molong Street, Condobolin
Lachlan Shire –The Heart of NSW
Our Vision:
For the Lachlan Shire to be a resilient community
providing economic and social growth, through
evolving, agricultural, business and mineral activities
Mission:
To engage the community, providing and delivering
progressive services whilst implementing a long term
strategic plan leading to the social and economic
benefit of the community
This is Page No.3 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
OORRDDIINNAARRYY MMEEEETTIINNGG 20 February, 2013
AGENDA
1.0 CONFIRMATION OF THE MINUTES ................................................................................................................... 5
2.0 LEAVE OF ABSENCE ......................................................................................................................................... 5
3.0 MAYORAL MINUTE ............................................................................................................................................ 6
4.0 PUBLIC FORUM................................................................................................................................................ 7
5.0 DISCLOSURE OF INTEREST ............................................................................................................................... 8
6.0 COMMITTEE REPORTS .................................................................................................................................... 9
6.1 CORPORATE & COMMUNITY SERVICES COMMITTEE ...................................................................................... 9
6.1.1 LEAVE OF ABSENCE ............................................................................................................................................. 10
6.1.2 DISCLOSURE OF INTEREST ............................................................................................................................. 10
6.1.3 CPG QUARTERLY REPORT ON INVESTMENTS TO 31ST DECEMBER 2012........................................................ 11
6.1.4 RECENT GRANT APPLICATIONS STATUS ...................................................................................................... 12
6.1.5 ELECTED MEMBER SEMINARS ON DISCLOSURE RESPONSIBILITIES ................................................................... 15
6.1.6 MODEL CODE OF CONDUCT REVIEW ............................................................................................................... 16
6.1.7 CORPORATE & COMMUNITY SERVICES CAPITAL WORKS UPDATE ................................................................................ 20
6.2 TECHNICAL SERVICES COMMITTEE MEETING ................................................................................................ 22
6.2.1 LEAVE OF ABSENCE ....................................................................................................................................... 23
6.2.2 DISCLOSURE OF INTEREST ............................................................................................................................. 23
6.2.3 ROADS WORKS PROGRAM ............................................................................................................................... 24
6.2.4 PARKES & RESERVES WORKS PROGRAM ........................................................................................................... 42
6.2.5 COMMUNITY IMPROVEMENT PROGRAM ......................................................................................................... 47
6.2.6 TECHNICAL SERVICES MISCELLANEOUS WORKS PROGRAM ............................................................................... 49
6.2.7 WATER AND SEWER WORKS PROGRAM ........................................................................................................... 50
6.2.8 LAKE CARGELLIGO FOOTPATH CAPITAL WORKS ................................................................................................ 63
6.2.9 CONDOBOLIN WATER TREATMENT PLANT ....................................................................................................... 65
6.3 ENVIRONMENTAL SERVICES COMMITTEE MEETING ..................................................................................... 68
6.3.1 LEAVE OF ABSENCE ............................................................................................................................................. 69
6.3.2 DISCLOSURE OF INTEREST ............................................................................................................................. 69
6.3.3 PREPARATION OF INTERIM DEVELOPMENT CONTROL PLAN (DCP) ................................................................... 70
6.3.4 CLOSED SESSION ............................................................................................................................................. 73
NOTICE OF INTENTION TO DEAL WITH MATTERS IN CLOSED SESSION ........................................................................ 73
7.1 GENERAL MANAGER .................................................................................................................................. 75
7.1.1 REPORT TO COUNCIL ON PROGRESS WITH INCOMPLETE RESOLUTIONS ....................................................... 75
7.1.2 DELIVERY PROGRAM QUARTERLY REPORT .................................................................................................. 76
7.2 ENVIRONMENTAL SERVICES ............................................................................................................................. 77
7.2.1 DEVELOPMENT APPLICATIONS APPROVED DURING JANUARY 2013 ............................................................. 77
7.2.3 MINUTES OF LACHLAN SHIRE COUNCIL CRIME PREVENTION COMMITEE MEETING HELD 1PM WEDNESDAY 6
FEBRUARY 2013 ....................................................................................................................................................... 79
7.2.4 ENVIRONMENTAL SERVICES AND PLANNING – QUARTERLY STATUS REPORT ON CAPITAL PROJECTS ................. 80
7.2.5 NEW MEDICAL CENTRE CONDOBOLIN – CAPITAL EXPENDITURE REVIEW ..................................................... 81
7.2.6 YOUTH SERVICES - WESTERN PLAINS REGIONAL DEVELOPMENT – FINANCIAL REPORT ON 2011/12 YOUTH
SERVICES PROGRAM ................................................................................................................................................ 84
This is Page No.4 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
7.2.7 CONTINUATION OF SUPPORT FOR BUSH BURSARY (STUDENT DOCTOR) PROGRAM ..................................... 85
7.3 TECHNICAL SERVICES .................................................................................................................................... 86
7.3.1 TOWN WATER SUPPLY CONSUMPTION REPORT PERIOD ENDING 31ST
JANUARY 2013........................................... 86
7.3.2 SECURING TOWN WATER SUPPLY FOR LAKE CARGELLIGO MERRI ABBA BORE WATER SUPPLY PIPELINE PROJECT – PROGRESS
REPORT PERIOD ENDING 7TH FEBRUARY 2013 ..................................................................................................................... 90
7.3.3 LACHLAN SHIRE TRAFFIC COMMITTEE .............................................................................................................. 97
7.3.4 GUM BEND LAKE ADVISORY COMMITTEE ............................................................................................................... 98
7.3.5 WEST WEIR ADVISORY COMMITTEE ...................................................................................................................... 99
7.4 CORPORATE AND COMMUNITY SERVICES...................................................................................................... 100
7.4.1 FINANCE AS AT 31ST JANUARY 2013 ................................................................................................................ 100
7.4.2 REPORT – RECENT GRANT APPLICATIONS ....................................................................................................... 103
7.4.3 CONDOBOLIN SPORTS PROMOTION REQUEST~IN-KIND ASSISTANCE ................................................................ 105
7.4.4 QUARTERLY BUDGET REVIEW AS AT 31ST DECEMBER 2012 .............................................................................. 106
8.0 DEPUTATIONS ................................................................................................................................................ 110
9.0 MEETINGS AND FUNCTIONS ATTENDED BY THE MAYOR................................................................................ 111
10.0 NOTICES OF MOTION ................................................................................................................................... 112
11. 0 DELEGATES REPORTS ................................................................................................................................ 113
12.0 CORRESPONDENCE ...................................................................................................................................... 115
12.1 TOTTENHAM WAR MEMORIAL EARLY CHILDHOON CENTRE ...................................................................... 115
12.2 FINANCIAL ASSISTANCE GRANTS ........................................................................................................................ 115
12.3 CONDOBOLIN PONY CLUB ........................................................................................................................ 115
12.4 DAY LIGHT SAVING ................................................................................................................................... 115
12.5 CONDOBOLIN CLOTHING .......................................................................................................................... 115
13.0 COMMON SEAL ........................................................................................................................................... 116
14. 0 QUESTIONS OF WHICH NOTICE HAS BEEN GIVEN...................................................................................... 116
15.0 MATTERS RULED URGENT BY THE MAYOR ................................................................................................... 116
This is Page No.5 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
1.0 CONFIRMATION OF THE MINUTES
Recommendation
That the Minutes of the Council Meeting held 16 January, 2013 be received and noted.
2.0 LEAVE OF ABSENCE
Recommendation
That leave of absence be granted for Councillors.
This is Page No.6 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
3.0 MAYORAL MINUTE
3.1 DONATION FROM PROGRESS PRINT
It was with great pleasure on Wednesday I met Jeremy Voss and Steve Bigg at Gum Bend Lake
where they presented me with a cheque for $2,000 to assist with replacing an older BBQ at Gum
Bend Lake.
The funds were received from advertising sales for the Condobolin Business Directory and as such,
Progress Print thought it fitting to give something back to the community.
Recommendation
That Council note the correspondence and send a letter of thanks for the donation.
This is Page No.7 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
4.0 PUBLIC FORUM
This is Page No.8 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
5.0 DISCLOSURE OF INTEREST
The provision of Chapter 14 of the NSW Local Government Act 1993 and Council’s Code of
Conduct regulate the way in which councillors and staff of Council conduct themselves to ensure that
there is no conflict between their private interests and their public trust.
The Act prescribes that where an official of Council (or a Committee of Council) has an interest in a
matter to be considered at a meeting of the Council (or Committee), that interest must be disclosed as
soon as practicable after the start of the meeting and the reasons for declaring such interest.
Recommendation
That Councillors and staff now disclose any interest in the matters under consideration at this
meeting, describe the nature and type of interest, and in the case of ‘less than significant on
pecuniary interests’ the reasons why they consider the interest to be non significant.
This is Page No.9 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
6.0 COMMITTEE REPORTS
6.1 CORPORATE & COMMUNITY SERVICES COMMITTEE
MINUTES OF THE CORPORATE & COMMUNITY SERVICES COMMITTEE MEETING
HELD 06 FEBRUARY, 2013 COMMENCING AT 8.30AM
Attendees
Mayor, Councillor Des Manwaring, Councillors Brady (Chairperson) Medcalf, Nelson, Saunders,
Scott, Ridley, Hall
General Manager (L Collyer), Director of Corporate & Community Services (B Tickle), Manager
Finance (D Thorpe), Manager Economic Development (R Patton), Grants Officer ( M Clark)
Quorum of six Councillors is required
6.1.1 Leave of Absence
6.1.2 Disclosure of Interest
6.1.3 CPG Quarterly Report on Investments to 31st December 2012
6.1.4 Recent Grant Applications Status
6.1.5 Elected Member Seminars on Disclosure Responsibilities
6.1.6 Model Code of Conduct Review
6.1.7 Administration Capital Works Update
This is Page No.10 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
6.1.1 LEAVE OF ABSENCE
Nil.
6.1.2 DISCLOSURE OF INTEREST
The provision of Chapter 14 of the NSW Local Government Act 1993 and Council’s Code of
Conduct regulate the way in which councilors and staff of Council conduct themselves to ensure that
there is no conflict between their private interests and their public trust.
The Act prescribes that where an official of Council (or a Committee of Council) has an interest in a
matter to be considered at a meeting of the Council (or Committee), that interest must be disclosed as
soon as practicable after the start of the meeting and the reasons for declaring such interest.
Recommendation
That Councillors and staff now disclose any interest in the matters under consideration by
Council at this meeting, describe the nature and type of interest, and in the case of ‘less than
significant on pecuniary interests’ the reasons why they consider the interest to be non
significant.
Nil.
This is Page No.11 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
6.1.3 CPG QUARTERLY REPORT ON INVESTMENTS TO 31ST DECEMBER 2012
Community
Strategic Plan
Goal 4 BUILD CIVIC LEADERSHIP AND PRIDE
Strategic
Outcome
4.7 Strong effective Council.
Delivery
Program
4.7.1 Council is financially sustainable and provides services at a level
expected by the community.
Operational
Plan
Council’s long term financial plan is sustainable.
Summary
This report is to provide Council with the analysis of investments from its independent advisors for
the period to 31st December 2012.
Committee Recommendation
That the CPG report on investments for the quarter ended 31st December 2012 be noted.
(Scott/Saunders)
Background
The report provides Council with a portfolio review including recommendation regarding current and
future investments. The report also provides Council with a review to ensure the current investment
portfolio is in line with Councils investment policy. In summary, the four main indicators are:
Credit Quality – Is strong with more than 66% of investments with ‘A’ rated institutions or better.
Counterparty Risk – is materially consistent and overall the portfolio is well diversified. Council
has no overweight position to any one institution.
Term to Maturity – Is in line with the Investment Policy. Council has a highly liquid situation with
40% of the portfolio maturing within 3 months and an additional 19% maturing within 12 months.
Asset Class – Council currently has 76% of its investment portfolio in fixed investments (Term
Deposits) 14% consists of Floating Rate Notes and 10% is held at call.
Financial Implication
Income to date from investing is consistent with the 2012/2013 operational plan.
This is Page No.12 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
6.1.4 RECENT GRANT APPLICATIONS STATUS
Community
Strategic Plan
Goal 4 BUILD CIVIC LEADERSHIP AND PRIDE
Strategic
Outcome
4.2 Successful Grant funding
Delivery
Program
4.2.1 Seek grant funding for community initiatives and projects
Operational
Plan
Engage with State and Federal Government agencies and
develop partnerships to deliver projects in the shire
Summary
This report is to inform Council of the outcome of recent Grant applications.
Committee Recommendation
That Council notes the report.
(Hall/Saunders)
History
Program Project Funding
sought
Total
Project
Cost
Council
Contributi
on
QBR
adjust
ment
require
d if
success
ful
Outcome
1 NSW Crown
Lands Division
Pest and Feral Animal
Program 2012/13
Eradication program
$18,000 Current
Budget
No Pending
Announcement
date not advised
2 NSW Country
Passenger Scheme
Taxi Stand upgrade $40,000 Nil No Successful
3 NSW Country
Passenger Scheme
Bus Stop upgrade $20,000 Nil No Successful
4 Environmental
Restoration &
Rehabilitation
Program
Sedge pathway over three
years
$60,000 Nil No Pending
Announcement
date not advised
5 Department Sport
& Recreation
Participation and
Rugby League ground
amenities Condobolin
$50,000 $50,000 Yes Unsuccessful
This is Page No.13 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Facilities Program
6
NSW Community
Building
Partnership
Dubbo Electorate –
Sealing of Waste Transfer
Tip face and entry at
Derriwong
$15,000
$15,000
Yes Pending
Announcement
March 2013
7
NSW Community
Building
Partnership
Barwon Electorate –
Replacement of starting
blocks Tottenham Pool
$8,000
$8,000
Yes Pending
Announcement
March 2013
8 NSW Community
Building
Partnership
Murrumbidgee Electorate
– Renovation of the
Memorial Park toilet block
Condobolin
$20,070
$20,070
Yes Pending
Announcement
March 2013
9 Local Govt Shires
Assoc
Ageing Population Grant
$25,000
$28,000
Yes Unsuccessful
10
Regional
Development
Australia
Round 3 – Pat Timmins
Oval Facilities, Ground
Improvement and
Irrigation
$500,000
$623,300
Yes Pending
Announcement
14th Feb 2013
11 Regional
Development
Australia
Round 4 – Completion of
the Hillston to Eumungerie
Roadlink
$875,000
$875,000
Yes Pending
Announcement
14th Feb 2013
12 Tourism
Infrastructure
Regional Funding
– Federal Funding
Completion of Stage 2
Lake Walkway;
Development of the
walkways around Gum
Bend Lake and into
Condobolin; Project title -
Walk the Talk - Wiradjuri
$200,000
$200,000
No
Pending
Announcement
date not advised
This is Page No.14 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Financial Implications
Some projects as listed, if successful, will require an adjustment to the quarterly budget.
Experience
This is Page No.15 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
6.1.5 ELECTED MEMBER SEMINARS ON DISCLOSURE RESPONSIBILITIES
Community
Strategic Plan
Goal 4 BUILD CIVIC LEADERSHIP AND PRIDE
Strategic
Outcome
4.7 Strong effective Council.
Delivery
Program
4.7.3 Council decision making is equitable and ethical.
Operational
Plan
Council’s decision making and operational activities meet regulation
and community expectations.
Summary
This report is to remind Councillors of their responsibilities in relation to their disclosure obligations.
Committee Recommendation
That Council requests a seminar on the obligations under the Election Funding, Expenditure
and Disclosure Act 1981.
(Medcalf/Scott)
Background
The Election Funding, Expenditure and Disclosure Act 1981 confers obligations on elected members
in the area of disclosure and lodgment of returns. The Election Funding Authority is proposing to
hold seminars for elected members regarding obligations such as:
Disclosure obligations for the period ending 30.6.2013
Ongoing disclosure obligations
The appointment and role of Official Agents
Campaign accounts
Political donations and electoral expenditure
The seminars are to be held in April and May of this year and are expected to take about 1 hour. The
authority is asking if Councillors are interested in having the EFA conduct a seminar at Council.
If there is interest in the seminar the EFA requires a preferred date and time during April/May and an
alternative date & time to allow for flexibility.
Financial Implications
The seminar is free of charge.
This is Page No.16 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
6.1.6 MODEL CODE OF CONDUCT REVIEW
Community
Strategic Plan
Goal 4 BUILD CIVIC LEADERSHIP AND PRIDE
Strategic
Outcome
4.7 Strong effective Council.
Delivery
Program
4.7.1 Council decision making is equitable and ethical
Operational
Plan
Council’s decision making and operational activities meet regulation
and community expectations.
Summary
This report advises Council of the development of a new model code of conduct which has been
prepared by the Division of Local Government, and the proposed date for commencement of the new
model code of conduct is the 1 March 2013 Recommendation
Committee Recommendation
The Council:
1. Notes the report on the model code of conduct;
2. Adopts the Model Code of Conduct and procedures;
3. Appoints Director of Corporate Services and Manager of HR to act as a complaints
coordinator and alternate complaints coordinator before 1 March 2013;
4. Ensures panels of conduct reviewers, appointed using the selection process prescribed
under the new procedures, are in place by 30 September 2013;
5. Notes the training for Councillors to be held in May 2013 and a training program for
staff will also be held and completed. (Hall/Scott)
Background
The Model Code of Conduct for Local Councils in NSW (“the Model Code of Conduct”) is made for
the purposes of section 440 of the Local Government Act 1993 (“the Act”). Section 440 of the Act
requires every council to adopt a code of conduct that incorporates the provisions of the Model Code.
THIS NEW CODE REPLACES THE PREVIOUS CODE OF CONDUCT WHICH WAS
ADOPTED BY COUNCIL ON THE 23 JULY, 2008.
A better conduct guide has also been developed to assist councils to review and enhance their codes of
conduct. This guide supports this code and provides further information on the provisions in the code.
The key features of the new code framework include:
This is Page No.17 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Greater flexibility to resolve non-serious complaints, minimising costs to councils
Improved complaints management, with complaints about councillors and the general
manager managed from start to finish by qualified and independent conduct reviewers
Greater fairness and rigour in the investigation process through clearer procedures
Stronger penalties for ongoing disruptive behaviour and serious misconduct to more
effectively deter and address such behaviour, allowing councils to get on with the business of
serving their communities.
The following transitional arrangements will apply:
Complaints made or yet to be finalised before 1 March 2013 are to be dealt with under the
current Model Code of Conduct and Procedures.
Complaints received after 1 March 2013 but where the alleged conduct occurred prior to this
date are to be assessed against the standard prescribed under the current Model Code but dealt
with under the new Procedures.
Complaints relating to alleged conduct that occurred after 1 March 2013 are to be assessed
against the new Code and Procedures.
The Division of Local Government will provide further information in early 2013 to assist
councils to implement the new code and procedures.
Issues
1 Implications for Council
The code and procedures are supported by new provisions in the Local Government Act 1993 to more
effectively deal with serious or repeated breaches of the Code through expanded and strengthened
penalties.
Councillors, administrators, members of staff of council, independent conduct reviewers, members of
council committees including the conduct review committee and delegates of the council must
comply with the applicable provisions of council’s code of conduct in carrying out their functions as
council officials. It is the personal responsibility of council officials to comply with the standards in
the code and regularly review their personal circumstances with this in mind.
Failure by a councillor to comply with the standards of conduct prescribed under this code constitutes
misconduct for the purposes of the Act. The Act provides for a range of penalties that may be
imposed on councillors for misconduct, including suspension or disqualification from civic office.
Failure by a member of staff to comply with council’s code of conduct may give rise to disciplinary
action.
2 Training
This is Page No.18 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Following the adoption of the new Code all staff will receive training in its implementation. This will
take the form of formal advice from the General Manager of the codes adoption, induction training
for new staff and ongoing annual training on the code by its inclusion in the roles and responsibility
training provided to staff.
A consultant will visit Council on the 21, 22 & 23 May 2013 to deliver training on the new code to
Staff and Councillors. This training is part of the compulsory training of Councillors required by the
Minister for Local Government.
3 Administrative Framework
The establishment of a panel of conduct reviewers
3.1 The council must by resolution establish a panel of conduct reviewers.
3.2 The council may by resolution enter into an arrangement with one or more other councils to
share a panel of conduct reviewers.
3.3 The panel of conduct reviewers is to be established following a public expression of interest
process.
3.4 An expression of interest for members of the council’s panel of conduct reviewers must, at a
minimum, be advertised locally and in the Sydney metropolitan area.
3.5 To be eligible to be a member of a panel of conduct reviewers, a person must, at a minimum,
meet the following requirements:
a) an understanding of local government, and
b) knowledge of investigative processes including but not limited to procedural fairness
requirements and the requirements of the Public Interest Disclosures Act 1994, and
c) knowledge and experience of one or more of the following:
1. investigations,
2. or law, or
3. public administration, or
4. public sector ethics, or
5. alternative dispute resolution, and
d) meet the eligibility requirements for membership of a panel of conduct reviewers
under clause 3.6.
3.6 A person is not be eligible to be a member of the panel of conduct reviewers if they are
a) a councillor, or
b) a nominee for election as a councillor, or
c) an administrator, or
d) an employee of a council, or
e) a member of the Commonwealth Parliament or any State Parliament or Territory
Assembly, or
f) a nominee for election as a member of the Commonwealth Parliament or any State
Parliament or Territory Assembly, or
g) a person who has a conviction for an indictable offence that is not an expired
conviction.
This is Page No.19 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
3.7 A person is not precluded from being a member of the council’s panel of conduct reviewers if
they are a member of another council’s panel of conduct reviewers.
3.8 A panel of conduct reviewers established under this Part is to have a term of up to four years.
3.9 The council may terminate the panel of conduct reviewers at any time by resolution.
3.10 When the term of the conduct reviewers concludes or is terminated, the council must establish
a new panel of conduct reviewers in accordance with the requirements of this Part.
3.11 A person who was a member of a previous panel of conduct reviewers established by the
council may be a member of subsequent panels of conduct reviewers established by the
council.
The appointment of complaints coordinators
3.12 The general manager must appoint a member of staff of the council to act as a complaints
coordinator. Where practicable, the complaints coordinator should be a senior and suitably
qualified member of staff.
3.13 The general manager may appoint other members of staff to act as alternates to the complaints
coordinator.
3.14 The general manager must not undertake the role of complaints coordinator.
3.15 The person appointed as complaints coordinator or alternate complaints coordinator must also
be a nominated disclosures coordinator appointed for the purpose of receiving and managing
reports of wrongdoing under the Public Interest Disclosures Act 1994.
3.16 The role of the complaints coordinator is to:
a) coordinate the management of complaints made under the council’s code of conduct,
b) liaise with and provide administrative support to a conduct reviewer or conduct review
committee,
c) liaise with the Division of Local Government, and
d) arrange the annual reporting of code of conduct complaints statistics.
Copies of the new code and the procedures for the Administration of the Model Code of Conduct for
Local Councils in NSW are included in the attachments.
This is Page No.20 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
6.1.7 CORPORATE & COMMUNITY SERVICES CAPITAL WORKS UPDATE
Community
Strategic Plan
Goal 4 BUILD CIVIC LEADERSHIP AND PRIDE
Strategic
Outcome
4.7 Strong effective Council.
Delivery
Program
4.6.2 Council is financially sustainable and provides services at a level
expected by the community.
Operational
Plan
Council’s long term financial plan is sustainable.
Summary
This report outlines the status of capital works in the Corporate and Community Services area for the
period to 31st December 2012.
Committee Recommendation
That Council notes the report on the Corporate and Community Services Capital Works
Program and status of current major projects as at 31st December 2012 and that the balance
of funds in Item 7 be used for other directional / tourism signage.
(Saunders/Scott)
Background
Works Status Summary table:
No. Job No. Description Source of
funds
Budget Exp To date
including
commitments
To
Date
%
1 WO 920 Communications
Upgrade
Revenue $9,000.00 0.00 0.00%
2 WO 920 Server Replacement Revenue $5000.00 0.00 0.00%
3 WO 920 Computer
Replacements
Revenue $39,200.00 $33,416.99 85%
4 3100.355 Chambers
Computer/IT
Revenue $4,000.00 $778.18 19.5%
5 WO 965 Library Special
Projects
State Library
Grant
$53,563.00 $Nil 0.00%
6 WO 965 Library
Refurbishment Grant
State Library
Grant
$16,000.00
This is Page No.21 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
No. Job No. Description Source of
funds
Budget Exp To date
including
commitments
To
Date
%
7 WO 964 Signage – Welcome
and Directional
Revenue/Grant $5,373.00 $2,681.00 49.9%
8 WO 964 Tourism-Datatrax
touch screens
Revenue $4,000.00 0.00 0.0%
Financial Implications
All items covered by allocations in 2012/2013 Operational Plan.
This is Page No.22 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
6.2 TECHNICAL SERVICES COMMITTEE MEETING
MINUTES OF THE TECHNICAL SERVICES COMMITTEE MEETING HELD 06
FEBRUARY, 2013 IN THE COUNCIL CHAMBERS COMMENCEING AT 10.02AM
Attendees
Mayor, Councillor Des Manwaring, Councillors Phillips (Chairperson), Medcalf, Nelson, Saunders,
Brady, Scott, Ridley, Frankel and Hall.
General Manager (L Collyer), Director of Technical Services (K Smith), Manager Operations (K
Dawe), Manager Utilities (B Falconer)
Quorum of six Councillors is required
Agenda
6.2.1 Leave of Absence
6.2.2 Disclosure of Interest
6.2.3 Roads Works Program
6.2.4 Parkes & Reserves Works Program
6.2.5 Community Improvement Program
6.2.6 Technical Services Miscellaneous Works Program
6.2.7 Water and Sewer Works Program
6.2.8 Lake Cargelligo Footpath Capital Works
6.2.9 Condobolin Water Treatment Plant
This is Page No.23 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
6.2.1 LEAVE OF ABSENCE
Leave of absence was granted for Councillors Phillips and Frankel
(Ridley/Scott)
6.2.2 DISCLOSURE OF INTEREST
The provision of Chapter 14 of the NSW Local Government Act 1993 and Council’s Code of
Conduct regulate the way in which councilors and staff of Council conduct themselves to ensure that
there is no conflict between their private interests and their public trust.
The Act prescribes that where an official of Council (or a Committee of Council) has an interest in a
matter to be considered at a meeting of the Council (or Committee), that interest must be disclosed as
soon as practicable after the start of the meeting and the reasons for declaring such interest.
Recommendation
That Councillors and staff now disclose any interest in the matters under consideration by
Council at this meeting, describe the nature and type of interest, and in the case of ‘less than
significant on pecuniary interests’ the reasons why they consider the interest to be non
significant.
Nil
This is Page No.24 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
6.2.3 ROADS WORKS PROGRAM
Community
Strategic Plan
Goal 3 BUILD AND MAINTAIN COMMUNITY INFRASTRUCTURE
AND SYSTEMS
Strategic
Outcome
3.1 Efficient transport networks that meet community and business needs
Delivery Program 3.1.1
3.1.4
Implement road maintenance, renewals and improvements in accordance
with asset management plan
Progressively widen MR231
Operational Plan 3.1.1
3.1.4
Complete annual maintenance, renewals and improvements program
Complete reconstruction and widening of segments as a progressive
program
Summary
This report outlines the Works Program for roads and advises Council of progress made with works
to date. Most projects that continued from 2011/12 have been completed.
The March 2012 flood damage claim has been finalised with an allocation of $7,221,617. Success
rates were 95% on regional roads and 75% on local roads, which is a good result based on hard work
preparing detailed information for the assessor. Approx $1.7M has been spent so far – only $5.5M to
go in 14 months. This requires additional resources as flagged in the November 2012 Technical
Services Committee report.
Currently up to 5 graders are working on flood damage works and the remainder are on normal
maintenance activities.
The 2 new graders arrive on 4th
February. This will temporarily take council’s fleet up to 11 graders.
The Roads to Recovery Program is temporarily halted pending the outcome of current discussions
with the Federal Government on the annual returns.
Water for roadworks is becoming more difficult to acquire, so that measures flagged in November
will be further considered shortly for implementation to keep the roads program going.
The subdivisions are completed except for electricity and telephone cabling in the Lake Cargelligo
residential estate scheduled for March.
Councillor Frankel arrived at 9.50am.
Recommendation
That Council notes information on the Roads Program as at 29th
January 2013.
(Scott/Medcalf)
This is Page No.25 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Background
Works Program Status Summary table as at 29 January 2013 of actual expenditures only, i.e.
excluding committed costings, but including adopted carry over amounts.
Work
Order No.
Description Source
of funds
Budget YTD
Exp $
Comment
FLOOD DAMAGE REPAIRS:
GL3346.540
W/O 1158 -
1279
Dec 10 Flood
Damage Local
Roads
RMS
Paid in
full to
30/6/12
by RMS
– LSC
spend
balance
asap
2012/13
214,163
Revised
estimate
191,187
Scope & allocation
changed due to
overlap with March
2012 floods.
At 29 Jan 2013:
2012/13 exp
$191,187
2011/12 exp
$1,602,837 revis
2010/11exp
$68,000
Spent so far
$1,862,024
RMS full paid
$1,885,000
Balance
22,976
Work is
COMPLETED,
adjust against FAG
or R2R for nil
balance.
This is Page No.26 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
3347.540
W/O 1222 -
1324
Mar 11 Flood
Damage Local
Roads
RMS 1,539,000
income
incl some
for
2011/12.
Works
budget
1,397,058
817,646
Various roads, south
only.
Extension to March
2013 approved.
Revised program
amount 2,739,000
with $1.2M paid
previous year, with
$1.539M to go.
Actual exp at 30 June
2012 was $1,341,942
with difference
claimed in 2012/13.
At 29 Jan 2013:
2012/13 exp
$817,646
2011/12 exp
$1,341,942
Spent so far
$2,159,588
Revised alloc
$2,739,000
Balance to spend
$579,412
GL 03341 Mar 2012
Flood Damage
Regional
Roads
RMS 888,195
(budget
to be
adjusted)
48,204 Finalised in late
November at 95% of
claim.
Allocation
$1,111,094
2011/12
$246,516
2012/13 bal
$864,578
RMS pd 2011/12
$300,000
This is Page No.27 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
GL 03349 Mar 2012
Flood Damage
Local Roads
RMS
LSC
contrib
5,856,296
-29,000
5,827,296
(Adjust
+$2,639)
159,712 Claim finalised in
November at 75% of
amount sought. Will
need to prioritise for
best effect.
Allocation:
$6,139,523
Less LSC contrib.
29,000
RMS contrib.
$6,110,523
Less 2011/12 exp
$280,588
Bal to spend:
$5,829,935
RMS pd 2011/12
$280,000
Includes:
emergency works Mar-
May
$20K share of Urban
roads
$43,629 for Nov 11
flood consolidated into
March 12.
Note, $395,375
booked to local roads
maintenance to be
added, plus approx
$0.6M gravel costs to
be processed.
STATE ROADS MAINTENANCE:
3370 Henry Parkes
Way - MR61E
Routine
Maintenance
RMCC 44,420 11,778 RMS reimburses
actual expenses.
7370 Henry Parkes
Way - MR61E
Work Orders
RMCC 100,000 11,371 RMS reimburses
expenses on agreed
projects.
This is Page No.28 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
LOCAL ROADS MAINTENANCE:
3330.0540 Town Roads
Maintenance
FAG 250,000 71,524 Exp is low so far
3360.0540 Unsealed
Rural Roads
Maintenance
FAG 1,545,000 1,168,902
-395,375
773,527
Less Mar 12 flood
damage to journal out
50% exp is on target
3350.0540 Sealed Rural
Roads
Maintenance
FAG 133,900 38,631 29% is low so far.
Total Local
Roads
Maintenance
FAG 1,928,900 883,530 46% exp is just
below parity
COUNCIL SUBDIVISION PROJECTS (CAPITAL):
(Note $1.3M carried forward to 2011/12 to complete the 4 subdivisions. Unexpended balance
carried forward to 2012/13)
W791
W1441
Lake
Cargelligo
Industrial
Estate, West
Street
2012/13
bal
132,674 211,617 COMPLETED.
Total cost
$252,943.35
W789
W1439
Condobolin
Residential
Estate Randall
Place
2012/13
bal
60,250 11,528 COMPLETED.
Total cost
$274,138.45
W792
W1442
Condobolin
Industrial
Estate, Boona
Road
2012/13
bal
73,667 124,258 Subdivision
COMPLETED. Total
cost $285,591.36.
Area drainage works
to be undertaken.
This is Page No.29 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
W790
W1440
Lake
Cargelligo
Residential
Estate,
Yelkin/Walker
Streets
2012/13
bal
257,829 240,867 Sealed. Electricity
tender awarded.
Work to commence
in March 2013.
Telstra cables going
in same trench.
2011/12 cost
$35,170.86
Total 2012/13 524,420 588,270 Overall budget will
be reviewed after
deducting rates
charged against
capital development.
LOCAL ROADS CAPITAL (non R2R):
(moved from maintenance Feb & April 2012)
W1127 &
W1427
Unsealed
roads
Resheets
2012/13
Other
SR230
Lachlan V
Way
FAG
297,034
-75,296
221,738
0
26,584
FAG 12/13 Budget &
carryover
Less 2011/12 FAG
Adjustment
Budgets available,
but will review as
needed to balance
other projects
WO1435 Brooks Lane
construction
FAG 100,000
136,221 From 2011/12.
COMPLETED.
WO1428 SR11 Moira
Vale Road
widening
construction
FAG
210,000
110,613 From 2011/12. See
also R2R project
W1105.
COMPLETED.
WO1430 SR230
construction
FAG 200,000 210,302 From 2011/12.
COMPLETED.
This is Page No.30 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Various
WOs.
GL
07350.0741
Rural Roads
Reseals
FAG 250,000 0 To be programmed.
Considering a batch
of town streets due to
heavy workload on
rural roads.
W1543 Island Creek
bridge
reconstruction
Reserve 297,620 0 Design is underway.
W???? Kerb & gutter
reconstruction
FAG 30,000 0
W1545 William St
reconstruction
Bathurst St to
bridge
FAG 120,000 0 Mainly where centre
carriageway has
failed and Lachlan St
intersection
Rural Local
Roads
Renewals
Total
2012/13 1,429,358 483,720
This is Page No.31 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
ROADS TO RECOVERY (LOCAL ROADS CAPITAL):
W1104 SR11 Moira Vale Road patch
resheet
R2R
2011/12
2012/13
bal
117,000
-2,287
114,713
98,335
COMPLETED.
Continued from
2011/12.
W1105 SR11 Moira Vale Rd
reconstruct 3km.
R2R
2011/12
2012/13
bal
(FAG
Flood)
206,000
-184,853
21,147
(210,000
215,606)
85,561
COMPLETED.
Continued from
2011/12.
(FAG exp
reported in Non
R2R list above.
Flood damage exp
included in overall
$ reported above)
W1109 SR11 Moira Vale Rd resheet
shoulders
R2R 36,000 22,244 COMPLETED.
Gravel exp to be
added.
W1110 SR5 Lansdale Road resheet
shoulders
R2R 56,000 49,141 COMPLETED.
Gravel exp to be
added.
W1111 SR3 Tabratong Crossing
Road resheet shoulders
R2R
32,000
29,516 COMPLETED.
Gravel exp to be
added.
W1112 SR1169 Bobadah Road
resheet shoulders
R2R 40,000 28,199 COMPLETED.
Gravel exp to be
added.
W1113 SR10 Meadowview Road
resheet shoulders
R2R 40,000 30,797 COMPLETED.
Gravel exp to be
added.
W1114 SR185 Yelkin Road resheet
shoulders
R2R 72,000 0 Start soon when
soon after program
resumes and
resources are
available
This is Page No.32 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
W1126 Condobolin Tip access road -
seal
R2R 120,000 0 Start soon when
soon after program
resumes and
resources are
available
W847
W1124
SR10 Meadowview Road -
causeway/culv
R2R
2011/12
C/f bal
85,000
-20,990
64,010
0 COMPLETED.
Partly allocated
elsewhere, R2R
project closed.
Balance to offset
over exp
elsewhere.
W1101 SR25 Kerriwah Road
causeways & culverts
R2R 36,000 0 C/f from 2010/11
& 2011/12.
W1102 SR23 Jumble Plains Road
causeways & culverts
R2R 17,000 0 C/f from 2010/11
& 2011/12.
W1529 Drainage improvements
Tullibigeal
R2R 100,000 0
W1530 SR342 Worthington Lane
seal 1.5km Jones Lane to
SR45
R2R 150,000 0 Program soon
after program
resumes subject to
other workload
W1531 SDR341 Jones Lane seal
1km
R2R 120,000 0 As above
W1532 SR19 Middlefield Road
concrete causeway & 1
culvert
R2R 55,000 0 As above
W1533 SR37 Yambora road concrete
causeway (top up flood
damage)
R2R 25,000 0 As above
W1534 SR37 Yambora Road
upgrade culvert (add 2 cells)
R2R 20,000 0 As above
This is Page No.33 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
W1535 SR1347 Albert Road resheet
Melrose end
R2R 213,190 0 Revised locations
in R2R program.
Frequent grading
required due to
mine traffic. High
priority to start
when program
resumes.
W1536 SR144 Burgooney Road
patch resheet 10km
R2R 150,000 21,741 COMPLETED.
Gravel exp to be
added.
W1537
W1538
SR34 Wilmatha Road resheet R2R 76,000 0
38,631
COMPLETED.
Gravel exp to be
added.
W1522 SR67 Wilga Ridge Road
resheet
R2R 110,000 51,431 COMPLETED.
Gravel exp to be
added.
W1539
W1540
SR1006Brotheroney/Begargo
Road resheet
R2R 100,000 55,935
57,147
COMPLETED.
Gravel exp to be
added.
W1542 SR408 Deacons Road R2R 35,000 0 COMPLETED by
flood damage
repairs.
Reallocate.
This is Page No.34 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Total R2R 2012/13
Program
Must
defer
1,770,660
1,550,190
220,470
568,678 Nominal annual
portion of program
is $1,550,191.
Adjust later for
actual
expenditures &
any program
variations. Some
projects will be
deferred to
accommodate
carry over projects
from 2011/12.
Catch up $1-2M in
final year of
current 5 year
R2R program in
2013/14.
This is Page No.35 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
REGIONAL ROADS CAPITAL:
W869
W1327
MR231 Wyalong
Road widening –
completion of
Black Spot
program
2012/13
Supplementary
Block Grant
131,000
5,889 Completion of project
commenced 2011/12.
4.7km sealed.
Aim to widen a
segment east from
SR147 in original
scope of Black Spot
project. Also need to
reconstruct a failing
section west of
SR147. No carry over
funds, revue scope.
Follow up repairs
required at soft spots
– rained during and
after pavement
construction.
Widening
W1129
Culverts
W1388
MR231 Wyalong
Road -
Reconstruct &
widening, Weja -
Tullibigeal
Block Grant
0
4606 In conjunction with
Black Spot project.
2011/12 REPAIR
grant expended.
Reconstructed and
widened edge strips
and sealed.
Now tidy up
shoulders and repair
wet spots – offset
within program. Then
reseal full width to
minimise water entry
problems at joints.
W1131
W1567
MR7513 Lake
Cargelligo Rd
shoulder resheet
Supplementary
Block Grant
100,000
0
37,869
Crouch’s Hill section
done before
Christmas. More to
do at the Lake
Cargelligo end.
This is Page No.36 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
3340.0540
W177.142
Regional Road
Reseals
RMS Block
Grant
350,000
+200,000
*550,000
0
MR231 to follow up
widening. Any
balance will then be
determined.
*Possibly top up
$200K from deferred
culvert projects, if
don’t seal MR57N by
May.
W1326
W1095
Regional Road
Resheets
RMS Block
Grant
100,000
49,147
2113
51,260
MR57N as it requires
more work due to
increased traffic.
W???? Regional Road
culvert renewals
RMS Block
Grant
100,000 0 Aim to install
previously purchased
culverts on MR57S
The Gipps way, south
of Condo. Then
continue an ongoing
renewal program as
many old culverts are
corroded or too small.
W???? MR57S The
Gipps Way
shoulder resheet
RMS Block
Grant
120,000 0 Follow up temporary
repairs. Reduce scope
as March 2012 flood
damage repairs are
underway – reallocate
balance to MR57N
seal or MR231 repairs
W???? MR61N Henry
Parkes Way
shoulder resheet
RMS Block
Grant
50,000 28,238 COMPLETED.
Gravel exp to be
added.
W???? MR371 Rankins
Springs Road
shoulder resheet
RMS Block
Grant
50,000 0 Also flood damage
funds for section at
Naradhan Creek.
W???? MR371 Rankins
Springs Road
reconstruction
RMS Block
Grant
150,000 0
This is Page No.37 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
W???? MR57N Fifield
Road - acquire
land at SR67,
SR69 & SR71
corners &
construct
REPAIR
RMS Block
Unallocated
Total available
400,000
535,000
935,000
79,000
1,014,000
0
Acquire lands to
realign road south of
Fifield & construct –
process commenced.
REPAIR applic stated
$1.10M – could top
up allocation from
savings elsewhere but
more likely to build
drainage & pavement
in 2012/13 and seal in
spring in 2013/14.
W???? MR57S The
Gipps Way raise
Smyths Corner
causeway
RMS Block
Grant
100,000
-70,000
*30,000
0 Reduce flood closures
without creating a
barrier in big floods.
* Defer due to high
workload generally &
for culvert gang.
Leave $30K for
design & start
purchasing materials.
Reallocate $70K to
reseals or MR57N if
able to seal before
winter.
W???? MR371 Rankins
Springs Road
culverts & reno
mattresses
RMS Block
Grant
50,000 0 Reduce future flood
damage.
W???? MR7513 Lake
Cargelligo Road
at Nillsons Lane
RMS Block
Grant
150,000
-100,000
* 50,000
0 Raise road & enlarge
culverts to reduce
flood closures.
* Defer due to high
workload generally &
for culvert gang.
Leave $40K for
design & start
purchasing materials.
Reallocate $110K to
reseals or MR57N if
able to seal before
winter.
This is Page No.38 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
W???? MR7521
Kiacatoo Road
extra culverts
RMS Block
Grant
50,000
-30,000
* 20,000
0 Reduce future flood
closures.
* Defer due to high
workload generally &
for culvert gang.
Leave $20K for
design & start
purchasing materials.
Reallocate $30K to
reseals or MR57N if
able to seal before
winter.
Total regional
roads capital
renewals and
improvements
2012/13
2,515,000
127,862
This is Page No.39 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
REGIONAL ROADS MAINTENANCE:
3340.0540
W167-
179
W1166
W1349
W1350
General
Maintenance
(roads & culverts)
Sealed
Unsealed
MR7514
MR61N
MR
57N
RMS
Block
Grant
638,160
326,783
24,983
34,791
26,866
413,423
MR57N unsealed
sections need more
frequent grading as
traffic increases.
Some transfers out to be
calculated for flood
damage work.
3320.0547 Traffic Facilities
Local Roads &
Regional Roads
RMS
Traffic
facilities
126,000
allocated
(Budget
est. was
$123,600)
80631
-56,272
24,359
For both regional &
local roads. Exp has
tended to be low, so will
work on upgrading
signage.
$56,272 exp to 30 Nov
in 2012/13 is
attributable to 2011/12
FY annual return.
Estimated balance is
2012/13 exp so far (to
be confirmed)
Total RMS
funded
Maintenance
764,160 437,782
Total RMS Block
Grant
REPAIR
2012/13
2,879,000
400,000
3,279,160
437,782
0
437,782
Roads to Recovery
The R2R program is halted for the moment pending the outcome of current discussions with the
Commonwealth over Annual Returns. A condition of accepting the R2R grant is that council’s
expenditure on roads is not reduced below the reference amount, without good reason such as
drought. This required revision of the previous annual statements, which have now been resubmitted.
It now appears that expenditure on roads from ‘own sources’ has fallen short by over $200K each
year.
This is Page No.40 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Most of the 2011/12 expenditure has been raised as a debtor as very little was paid to council. About
half of the program was deferred to reduce the amount of that exposure.
Council has recently received a formal notice of being in breach of the program guidelines.
Apparently this step is necessary to progress to negotiating a resolution and getting the grant funds
flowing again. This may require council to catch up on the road expenditure shortfall over the next
few years. This will be reported later when the situation is clarified.
Quarterly returns are still submitted, but payments for work done are suspended until the annual
return issues are resolved.
The R2R contact suggests continuing with the works anyway to avoid building up too much for the
final year of R2R round 3. However, having a heavy workload elsewhere, R2R work has been halted
until there is a clearer indication of when council will be paid.
Given the heavy workload with concurrent flood damage and R2R catch up works in the next year
and a half, it may be necessary to revise the R2R program into fewer but larger projects that spend
the funds more quickly. Further, the difficulty in finding water for roadworks may dictate where and
what works can be undertaken in the next few months. The R2R program will be reviewed in the next
few weeks and further advice provided if changes are to be recommended.
General
Local roads maintenance activity has varied, fitting around flood damage and capital works, but is
roughly on parity for the time of year.
Requests are coming in for grading of roads damaged by harvest traffic, so these are being
programmed when crews are available.
The season is becoming drier, with some landholders becoming wary of allowing council to have
water for roads. The grader operators are requesting extra water carts to keep enough moisture in the
road to work it properly.
It is better to repair the worst affected roads properly at higher cost than to do nothing or do it poorly.
A dry grade cannot effectively replace a grade, water and roll – potholes reappear quickly and the
disturbed gravel blows away more quickly as dust. Recent rain was patchy. It will be necessary to
consider other ways to get water to roadworks if rain does not resolve the problem. This might
include bores, and/or buying river water, hiring bulk tankers to carry water for longer distances to
water carts or temporary storage tanks near roadwork sites. Investigations are continuing.
The ‘do nothing’ option would jeopardise future Roads to Recovery funding – council has to
maintain the same level of expenditure on roads, as a condition of the grant funds.
As previously flagged, there will be an increased workload for about 1.5 years to further strain the
water requirements and increase the short term plant requirements:
1. Substantial flood damage program – most of the $7.2M allocation;
2. Over $1M of deferred Roads to Recovery projects.
The 2 new graders are arriving shortly. The two old graders will be retained for a year or so and
contractors can provide resources.
The subdivisions are completed except for electricity and telephone cabling in the Lake Cargelligo
residential estate scheduled for March.
This is Page No.41 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Flood Damage March 2012
The $9.3M claim sought for flood damage repairs from March 2012 on both regional and local roads
was assessed as $7,250,617 after some upward adjustment based on responses to questions from the
RMS assessor. After deducting council’s contribution of $29,000, the total is $7,221,617.
The March 2012 flood damage claim included reconstructing more sections of SR11 Moira Vale
Road. There was partial success, with the completed reconstruction and widening of the narrow
segment at SR12 reimbursed on a pro rate width basis. However, other soft sections had healed to
some extent when inspected by RMS so the allocation allows for some shoulder repairs only. This
means that no more sections of SR11 can be reconstructed and widened for now.
Regional Roads
A further suggestion to accommodate the high workload is to defer some culvert projects on Regional
Roads until next year. They require designs for sizing the culverts and the determining the causeway
heights to minimise road closures without creating unintended flooding problems nearby. Therefore
some funds would remain for design and to start purchasing materials such as culverts as supply can
have a long lead time. Notional amounts are shown in the table, but these could vary depending on
the number and size of culverts required. If so, the reseals amount could be further adjusted.
The workload has slowed the acquisition process on MR57N. It has commenced and work should
start in about March or April. Culverts require a period for bedding in, with some settlement being
normal despite compacting the fill and pavement around them. A delay before sealing is therefore
useful, to allow for any repairs to soft spots and culvert settlement. Sealing normally should not occur
beyond April with the onset of winter. With funding being tight, sealing would be better done in
spring, probably around October. Depending on the seasonal conditions, September may be suitable,
particularly if there are carry over funds to be spent by 30 September 2013.
Formal adjustments to the program can be made with the Quarterly budget review, to allow a little
more time to review the progress and trends in the regional roads program. Therefore likely changes
are flagged in italics in the table above, but not yet recommended. The overall program total does not
change.
Fires
Council staff members and plant have assisted the Rural Fire Service at two fires around the
Australia Day weekend. There was a small fire off SR230 near Kiacatoo and a larger fire between
Manna Mountain and Burcher for which a Section 44 Emergency was declared.
Financial Implications
As noted above.
This is Page No.42 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
6.2.4 PARKES & RESERVES WORKS PROGRAM
Community
Strategic Plan
3 Build and Maintain Community Infrastructure and Systems
5 Living in the Natural Environment
Strategic
Outcome
3.3 Visually appealing built environment, landscapes and streetscapes
5.2 Increased recreational use of lakes and rivers
Delivery
Program
Includes many different delivery program actions
Operational Plan Includes many different operational plan actions
Summary
This report outlines the Works Program and advises Council of progress made with works to date.
Councillor Phillips arrived at 10.34am.
Committee Recommendation
That Council notes the information for the Parks & Reserves Budget.
(Medcalf/Brady)
Background
Works Program Status Summary tables as at 29th January 2013.
No. WO No. Description Source of
funds
Budget YTD
Exp $
YTD
%
Comments
Capital Works Program
1 W1507 2-12 Melrose St
Footpath
Replacement
General
Fund
12,500 0 0% Council to remove
existing path and
prepare new path
foundations.
Seeking Quotes for
the concrete works.
This is Page No.43 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
No. WO No. Description Source of
funds
Budget YTD
Exp $
YTD
%
Comments
2 W1511 New Footpath
Yelkin & Bokhara
Sts (PAMP Lak04a)
General
Fund
60,300 0 0% Council to remove
existing path and
prepare new path
foundations.
Seeking Quotes for
the concrete works.
Investigating the
pedestrian refuge
construction.
3 W1514 Resheet Gum Bend
Lake Path
General
Fund
Revote
20,000
13,500
33.500
0 0% 3.3km total length;
1km can be sealed
with $30,000.
Investigating work
schedule.
4 Gum Bend Lake
Capital Works –
Picnic Tables
General
Fund
Revote
10,000
10,000
20,000
0 0% Picnic Table project
nominated by the
Gum Bend Lake
Committee.
5 W1508 Gum Bend Lake
Jetty
General
Fund
Better
Boating
Program
29,900
29,900
59,800
0 0% Acceptance issued to
RMS. Quotation
documents
developed to be
reviewed. Quotes to
be sought shortly
after.
6 W1512 Replace Irrigation
System Major
Mitchell Park
General
Fund
12,300 0 0% Quotes being sought.
7 W1515 Replace Irrigation
System Sacred Park
General
Fund
20,300 0 0% Quotes being sought.
8 W1043 Shade Structure
Wiradjuri Park
General
Fund
Revote
20,000
10,000
30,000
0 0% Waiting on
discussions from the
community on final
shade requirements.
9 W1509 Install Illuminator
Oval Lighting
Control – SRA
Ground
General
Fund
15,000 0 0% Quotes being sought.
This is Page No.44 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
No. WO No. Description Source of
funds
Budget YTD
Exp $
YTD
%
Comments
10 W1477 Paint Tottenham
Pool
General
Fund
30,000 48,645 100% Complete
11 W1510 Paint Lake
Cargelligo Pool
General
Fund
50,000 0 0% To commence at the
end of the swimming
season. Some
repairs to the fibre
glass lining will be
required.
12 W1513 Install Fence around
Chlorine Room @
Lake Pool
General
Fund
10,000 1,504 15% Fence complete,
allocated to
maintenance;
Journals to be made.
13 W1472 Relocate Chlorine
Room Tottenham
Pool
General
Fund
30,000 23,433 78.1% Building Complete,
Fence installed.
Chlorinator installed
some operational
issues to be sorted.
14 W1040 Banner Poles
Condobolin, Lake
Cargelligo &
Tottenham
General
Fund –
Revote
39,070 7,831 20% Condobolin banner
poles COMPLETE.
Tottenham Banner
Poles complete.
15 W1041 Condobolin
Swimming Pool
Swimming
Pool
Reserve –
Revote
69,573 0 0% New Chemical
Dosing System –
chlorine & soda ash
complete.
Install safe access to
balance tank foot
valve for cleaning
complete.
Install backflow
prevention device on
water service
complete.
Fencing of the water
meter and backflow
device to commence.
This is Page No.45 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
No. WO No. Description Source of
funds
Budget YTD
Exp $
YTD
%
Comments
16 W1044 Foster St
Beautification Lake
Cargelligo
General
Fund –
Revote
40,000 0 0% Council resolved that
drawings be prepared
for consideration by
the community for
the upgrade of Foster
Street.
DTS to follow up on
consultant.
17 W1045 Lake Cargelligo
Walkway Stage 2
General
Fund
111,839 0 0% Area surveyed.
DTS and Lakes
Alive will walk
through to determine
final location.
18 W1047 Filtration System
Irrigation Lake
Cargelligo
Recreation Ground
General
Fund
15,000 0 0% The operational
status of the
subsurface irrigation
system is being
determined.
19 W1051 Condobolin Netball
Courts
General
Fund -
Revote
Sport &
Rec
Funding –
unspent
grants
9,331
9,331
18,662
0 0% Remaining funds to
upgrade new kiosk –
e.g. Air Conditioning
etc.
20 W1050 Lake Recreation
Ground Amenities –
Practice Cricket
Nets
General
Fund --
Revote
10,000 0 0% The location of the
pitch has been
decided.
DTS to follow up
with sporting groups.
21 W1048 Skate Park (09/10) General
Fund --
Revote
149,209
26,600
175,809
8,400 4.8% Location has been
determined as Bill
Hurley Park.
Waiting on final
designs of Skate
Park.
This is Page No.46 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
No. WO No. Description Source of
funds
Budget YTD
Exp $
YTD
%
Comments
22 W1415 Footpath
Construction
McDonnell/
Bathurst Sts
General
Fund --
Revote
11,500 11,434 100% Complete
23 Footpath – Mogille
St & The Bogan
Way from Moodana
to the Bowling
Club; Tottenham
General
Fund --
Revote
24,000 0 0% Works measured,
quotes being sought.
24 Footpath – The
Bogan Way from
the Bowling Club to
the Caravan Park;
Tottenham
General
Fund --
Revote
6,000 0 0% Works measured,
quotes being sought.
DTS to investigate
stormwater crossing.
25 Footpath – Lake
Cargelligo
General
Fund --
Revote
25,000 0 0% DTS to talk with
Councillors on
priority.
26 W1520 Tullibigeal Netball
Courts
General
Fund --
Revote
80,000
(+ in-kind
works
$80,000)
8,612 10.8% The Community has
completed the
platform.
Asphalt seal
complete; requires 3
weeks before final
coating. Finalising
quotes.
27 W938 Fifield Recreation
Ground
General
Fund --
Revote
8,580 0 0%
Financial Implications
As noted in the tables above.
This is Page No.47 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
6.2.5 COMMUNITY IMPROVEMENT PROGRAM
Community
Strategic Plan
3 Build and Maintain Community Infrastructure and Systems
Strategic
Outcome
3.5 Grant income supports infrastructure programs
Delivery
Program
3.5.1 Continue to provide the community grants program to assist with
community infrastructure projects
Operational Plan 3.5.1 Ongoing annual program delivered
Summary
This report outlines the Works Program and advises Council of progress made with works to date.
Committee Recommendation
That Council notes the information for the Community Improvement Budget.
(Scott/Ridley)
Background
Works Program Status Summary tables as at 29th January 2013.
No. WO No Description Source of
funds Budget
YTD
Exp $
YTD
% Comments/Acquittal
Community Improvement Program
1 W1456 Burcher Park –
Railway Display
General
Fund
Burcher
Progress
Assoc.
7,100
1,070
8,170
(+ in-kind
works
$2,600)
0 0% DA submitted.
2 W1194 Fifield Cemetery
New Fence & Gate
General
Fund
Fifield
Community
Facilities
Committee
1,183
150
1,333
(+ in-kind
works
$3,200)
1,067 80% Materials purchased.
This is Page No.48 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
No. WO No Description Source of
funds Budget
YTD
Exp $
YTD
% Comments/Acquittal
3 W1458 Pavers & Roof for
park & restoration
of Old Jail –
Albert.
General
Fund
8,000
(+ in-kind
works
$3,000)
0 0% Works have
commenced.
4 W1460 Connect Water to
Albert Cemetery
General
Fund
Tottenham,
Albert
Cemetery
Committee
1,000
1,000
2,000
(+in-kind
works
$500)
1,000 100% Connection to Mains
and road crossing
completed by Council.
Council’s contribution
paid to Community
Group.
Waiting on group to
complete project.
5 W1186 Security Fence &
Water Line (11/12)
General
Fund –
Revote
Condobolin
Picnic Races
5,500
2,750
8,250
0 0% New committee
members are aware of
funding; will advise
Council of a variation
to the application after
the Picnic Races in
2012.
6 W962 Lakes Alive –
Water Feature at
Information Centre
(09/10)
General
Fund -
Revote
2,480 3,225 100% Complete
Financial Implications
As noted in the tables above.
This is Page No.49 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
6.2.6 TECHNICAL SERVICES MISCELLANEOUS WORKS PROGRAM
Community
Strategic Plan
3 Build and Maintain Community Infrastructure and Systems
Strategic
Outcome
None Identified
Delivery
Program
None Identified
Operational Plan None Identified
Summary
This report outlines the Works Program and advises Council of progress made with works to date.
Committee Recommendation
That Council notes the information for the Technical Services Miscellaneous Works Budget.
(Hall/Medcalf)
Background
Works Program Status Summary tables as at 29th January 2013.
No. WO
No
Description Source
of funds
Budget YTD
Exp $
YTD
%
Comments
Capital Works Program
1 Trade Sheds at
Works Depot
General
Fund
70,000 0 0%
2 W926 Tottenham Depot
Site Office and
Amenities (09/10)
General
Fund -
Revote
2,492 0 0%
3 W 929 Condobolin Depot
Air Conditioner
(09/10)
General
Fund -
Revote
11,279 8,411 74.6%
4 W1085 Rest Area Lions
Park Tottenham
(10/11)
General
Fund -
Revote
5,000 0 0%
Financial Implications
As noted in the tables above.
This is Page No.50 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
6.2.7 WATER AND SEWER WORKS PROGRAM
Community
Strategic Plan
Goal 3 BUILD AND MAINTAIN COMMUNITY INFRASTRUCTURE
AND SYSTEMS
Strategic
Outcome
3.2 Water, sewer and energy utilities meet best practice standards with up to
date technology
Delivery Program 3.2.3 Implement the Asset maintenance and renewal program for water and
sewerage services
Operational Plan 3.2.3 Complete annual maintenance and renewals program.
Summary
This report outlines the Water and Sewer Works Program and advises Council of progress made with
works to date. Significant maintenance programs and Capital Works Programs are described.
Committee Recommendation
That Council notes the report on the Water and Sewer Works Program and status of current
major projects.
(Ridley/Frankel)
Background
Works Program Status Summary table as at 21st January 2013 for Capital Works Approved in
2012/2013 Budget:
Lachlan Shire Council Budget Report
YTD 29/1/2013
WO Task Fund
Annual
Curren
t
Budget
YTD
Actual
Incl
Committe
d
YTD Budget
Unspent
% YTD
Expende
d 29-1-
2013
00000867 - 16 Mile Reservoir Roof
0385 - Capital Expenditure 12,000 6,580 5,420
00000867 - 16 Mile Reservoir Roof
Total
Wate
r 12,000 6,580 5,420 54.83%
16 Mile Balance Tank roof constructed and galvanised. Erection of roof by Council Workshop staff
and contract crane completed. External access ladder completed. Internal access ladder completed by
external contractor. Davit to be installed. Completion anticipated end of February 2013.
This is Page No.51 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
00000974 - Building Restoration
Condobolin
0385 - Capital Expenditure
183,05
9 14,903 168,156
00000974 - Building Restoration
Condobolin Total
Wate
r
183,05
9 14,903 168,156 8.14%
Minor progress. Project involves the removal of dry chemical feeders, removal of dry chemical
storage and loading area (3rd
and 4th storey of building), removal of old staging and mixer in
chemical mixing well, installation of new staging, installation of new walls and roof chemical
mixing well, paint and render repair external surfaces of the water treatment plant building. In
process of obtaining quotations from suitable trades (painters, demolition, metal fabricators,
electricians, etc.).
Asbestos assessment has been completed.
This is Page No.52 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
00000975 - Tottenham WTP Clear
Water Pump Replacement
0385 - Capital Expenditure 8,515 0 8,515
00000975 - Tottenham WTP Clear
Water Pump Replacement Total
Wate
r 8,515 0 8,515 0.00%
Purchase suspended due to unreasonable pump price. Alternate pump quotations being sought.
00000976 - Lake Cargelligo -
Emergency Watering System
0385 - Capital Expenditure 20,000 8,138 11,862
00000976 - Lake Cargelligo -
Emergency Watering System Total
Wate
r 20,000 8,138 11,862 40.69%
COMPLETED - Removal of Translake Pipeline completed October 2012.
00000979 - Condobolin Bores 2 & 3
0385 - Capital Expenditure
297,58
5 35,300 262,285
00000979 - Condobolin Bores 2 & 3
Total
Wate
r
297,58
5 35,300 262,282 11.86%
Hydrogeological desktop assessment completed. Net Present Value assessment of desalination vs
bore field 22km east of Condobolin township being prepared.
00000981 - Burcher/Fifield Booster -
Telemetry System Upgrade
0385 - Capital Expenditure 75,915 837 75,078
00000981 - Burcher/Fifield Booster -
Telemetry System Upgrade Total
Wate
r 75,915 837 75,078 1.10%
Improvements to Burcher and Fifield completed. Further work is required at Burcher Raw Water
Pump Station.
00000984 - Lake Cargelligo WTP
Automation & Process Control
0385 - Capital Expenditure 24,308 5,093 19,215
00000984 - Lake Cargelligo WTP
Automation & Process Control Total
Wate
r 24,308 5,093 19,215 20.95%
This is ongoing work involving the repair and replacement of worn valves, actuators, solenoids and
associated equipment in the process control and automation equipment at the Lake Cargelligo WTP.
This is Page No.53 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
00000985 - Lake Cargelligo WTP Air
Actuated Valve & Solenoids
0385 - Capital Expenditure 43,286 0 43,286
00000985 - Lake Cargelligo WTP Air
Actuated Valve & Solenoids Total
Wate
r 43.286 0 43,286 0.00%
This is ongoing work involving the repair and replacement of worn air/pneumatic system
components and associated equipment at the Lake Cargelligo WTP.
00000987 - Backflow prevention
device WTP`s and Standpipes
0385 - Capital Expenditure 26,188 0 26,188
00000987 - Backflow prevention
device WTP`s and Standpipes Total
Wate
r 26,188 0 26,188 0.00%
Review of Councils water facilities at Condobolin completed and backflow equipment ordered.
Remainder of sites to be reviewed at later stage. Installation at Condobolin to commence once staff
are available to undertake work.
This is Page No.54 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
00000989 - Pumping Station
Condobolin
0385 - Capital Expenditure
403,88
9 31,352 372,537
00000989 - Pumping Station
Condobolin Total Sewer
403,88
9 31,352 372,537 7.76%
Roll out of this program to be arranged through Councils Department of Environmental Services and
Planning. This project is the low pressure sewer system for Roger Street Condobolin.
00000990 - Sewer Equipment
0385 - Capital Expenditure 54,525 17,396 37,129
00000990 - Sewer Equipment Total Sewer 54,525 17,396 37,129 31.90%
Phase 2 of this project has commenced.
00000991 - Backflow Prevention
Devices STP`s & SPS`s
0385 - Capital Expenditure 25,503 0 25,503
00000991 - Backflow Prevention
Devices STP`s & SPS`s Total Sewer 25,503 0 25,503 0.00%
Review of Councils sewer facilities at Condobolin completed and backflow equipment ordered.
Remainder of sites to be reviewed at later stage. Installation at Condobolin to commence once staff
are available to undertake work.
00001000 - Sewer Reuse Golf Course
Dam
0385 - Capital Expenditure 50,000 0 50,000
00001000 - Sewer Reuse Golf Course
Dam Total Sewer 50,000 0 50,000 0.00%
Public Works have provided a fee proposal to commence investigation and approvals. Funds for
Investigation only. No further progress has been made on this project.
00001001 - Sewer Reuse Lake
Cargelligo STP Pond/Lining
0385 - Capital Expenditure 50,000 0 50,000
00001001 - Sewer Reuse Lake
Cargelligo STP Pond/Lining Total Sewer 50,000 0 50,000 0.00%
Public Works have provided a fee proposal to commence investigation and approvals. Funds for
This is Page No.55 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Investigation only. No further progress has been made on this project.
00001002 - Sludge Lagoon Dewater &
Disposal
0385 - Capital Expenditure 48,020 965 47,055
00001002 - Sludge Lagoon Dewater &
Disposal Total Sewer 48,020 965 47,055 2.01%
Works complete for Sludge Lagoon No. 1. Removal of sludge from Sludge Lagoon No.2 to
commence once sludge is dry.
00001003 - Strategic Business Plan
0385 - Capital Expenditure
180,00
0 58,753 121,247
00001003 - Strategic Business Plan
Total Sewer
180,00
0 58,753 121,247 32.64%
Consultants engaged to complete Strategic Business Plan. Workshop programmed for 30/31 January
2013.
This is Page No.56 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
00001006 - SPS Vent System
0385 - Capital Expenditure 32,000 0 32,000
00001006 - SPS Vent System Total Sewer 32,000 0 32,000 0.00%
This project has not yet commenced.
00001008 - Condobolin Crane Rail
SRA Cottage SPS
0385 - Capital Expenditure 14,182 13,799 383
00001008 - Condobolin Crane Rail
SRA Cottage SPS Total Sewer 14,182 13,799 383 97.30%
COMPLETED December 2012.
00001015 - Reservoir - Burcher Land
Acquisition & Licensing
0385 - Capital Expenditure 26,500 0 26,500
00001015 - Reservoir - Burcher Land
Acquisition & Licensing Total
Wate
r 26,500 0 26,500 0.00%
Acquisition plans prepared and lodged, compulsory acquisition resolved by Council, Dept. of Lands
valuation reports completed. Moore and Co. Solicitors progressing acquisition with Dept. of Lands.
Native Title claim over TSR which includes the dam site is extending the acquisition process. No
further progress since lodgement of intent to proceed with Dept. Of Lands.
00001016 - Reservoir - Fifield Land
Acquisition & Licensing
0385 - Capital Expenditure 27,290 0 27,290
00001016 - Reservoir - Fifield Land
Acquisition & Licensing Total
Wate
r 27,290 0 27,290 0.00%
NSW Crown Lands has requested changes to the area of proposed acquisition. New acquisition plan
to be prepared by Surveyor before Council's solicitors can progress this project further.
00001018 - Tottenham Reservoir
0385 - Capital Expenditure 68,000 0 68,000
00001018 - Tottenham Reservoir
Total
Wate
r 68,000 0 68,000 0.00%
Project involves external access ladder and davit, replacement of existing internal fill line to
reservoir. Council looking at engaging specialist contractor to undertake work.
This is Page No.57 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
00001020 - Fifield TWS Filtration
0385 - Capital Expenditure
125,00
0 0 125,000
00001020 - Fifield TWS Filtration
Total
Wate
r
125,00
0 0 125,000 0.00%
Preliminary assessment carried out. Detailed water quality assessment and electricity supply
required before project can progress further.
00001022 - Burcher TWS Filtration
0385 - Capital Expenditure
160,00
0 0 160,000
00001022 - Burcher TWS Filtration
Total
Wate
r
160,00
0 0 160,000 0.00%
Preliminary assessment carried out. Detailed water quality assessment and electricity supply
required before project can progress further.
00001023 - Integrated Water Cycle
Management Plan
0385 - Capital Expenditure
305,64
1 21,450 284,191
00001023 - Integrated Water Cycle
Management Plan Total
Wate
r
305,64
1 21,450 284,191 7.02%
Consultants engaged to complete three of the 7 components of the management plans through a
CENTROC collective tender. These plans are expected to be completed in December 2012. Drafts
for Drought Management Plan and Demand Management Plan received and under review. Integrated
Water Cycle Management Plan still being finalised. Demand Management Plan Draft completed
May 2012.
The remainder of the components for the management plans are expected to be tendered early 2013
and completed mid – late 2013.
00001065 - Stormwater - Gross
Pollutant Trap Condobolin
0385 - Capital Expenditure 10,480 0 10,480
00001065 - Stormwater - Gross
Pollutant Trap Condobolin Total
Stor
m
water 10,480 0 10,480 0.00%
This project is 95% complete and requires general site tidy up only.
00001066 - Stormwater - Gross
This is Page No.58 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Pollutant Trap - Lake Cargelligo
0385 - Capital Expenditure 7,020 0 7,020
00001066 - Stormwater - Gross
Pollutant Trap - Lake Cargelligo
Total
Stor
m
water 7,020 0 7,020 0.00%
GPT is on site awaiting installation. Contractor to be arranged once an overseer can be secured to
supervise works.
00001067 - Stormwater Officers
Parade Subdivision
0385 - Capital Expenditure 12,305 2,588 9,718
00001067 - Stormwater Officers
Parade Subdivision Total
Stor
m
water 12,305 2,588 9,718 21.03%
This project is 95% complete and requires general site tidy up only. Councils Construction Crew to
complete after Stewart Place Subdivision.
00001068 - Stormwater Whiley Street
0385 - Capital Expenditure 14,295 0 14,295
00001068 - Stormwater Whiley Street
Total
Stor
m
water 14,295 0 14,295 0.00%
This project has not yet commenced.
00001146 - Avdata Metering
Standpipes
0385 - Capital Expenditure 65,000 0 65,000
00001146 - Avdata Metering
Standpipes Total
Wate
r 65,000 0 65,000 0.00%
No further progress has been made on this project. Implementation to be discussed with Finance and
Administration prior to proceeding further.
00001147 - Condobolin WTP PS VFD
0385 - Capital Expenditure 6,500 0 6,500
00001147 - Condobolin WTP PS VFD
Total
Wate
r 6,500 0 6,500 0.00%
No further progress has been made on this project. Work to be scheduled after April when water
demand decreases to where a single raw water pump is capable of supplying Condobolin township
This is Page No.59 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
water demand.
00001148 - Burcher Reservoir Ladder
0385 - Capital Expenditure 27,500 0 27,500
00001148 - Burcher Reservoir Ladder
Total
Wate
r 27,500 0 27,500 0.00%
Design of access ladder and safety cage completed. Council's workshop estimating construction cost
prior to commencement.
00001149 - Fifield Reservoir Ladder
0385 - Capital Expenditure 27,500 0 27,500
00001149 - Fifield Reservoir Ladder
Total
Wate
r 27,500 0 27,500 0.00%
Design of access ladder and safety cage completed. Council's workshop estimating construction cost
prior to commencement.
00001150 - Condobolin WTP Rapid
Mixers
0385 - Capital Expenditure 48,000 8,232 39,768
00001150 - Condobolin WTP Rapid
Mixers Total
Wate
r 48,000 8,232 39,768 17.15%
00001151 - Fifield reservoir
acquisition
0385 - Capital Expenditure 10,000 0 10,000
00001151 - Fifield reservoir
acquisition Total
Wate
r 10,000 0 10,000 0.00%
NSW Crown Lands has requested changes to the area of proposed acquisition. New acquisition plan
to be prepared by Surveyor before Council's solicitors can progress this project further.
This is Page No.60 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
00001152 - Tottenham Reservoir
Mains Replacement
0385 - Capital Expenditure 37,846 0 37,846
00001152 - Tottenham Reservoir
Mains Replacement Total
Wate
r 37,846 0 37,846 0.00%
This project has not yet commenced.
00001153 - Sewer Access Condobolin
STP Lagoons
0385 - Capital Expenditure 7,500 0 7,500
00001153 - Sewer Access Condobolin
STP Lagoons Total Sewer 7,500 0 7,500 0.00%
Awaiting DA for Bird Hides to be completed prior to constructing gravel access.
00001155 - Sewer Effluent Reuse
Tottenham
0385 - Capital Expenditure 52,000 0 52,000
00001155 - Sewer Effluent Reuse
Tottenham Total Sewer 52,000 0 52,000 0.00%
Public Works have provided a fee proposal to commence investigation and approvals. Funds for
Investigation only. No further progress has been made on this project.
00001488 - Water Mains Renewal
Condobolin
0385 - Capital Expenditure 45,000 0 45,000
00001488 – Water Mains Renewal
Condobolin Total
Wate
r 45,000 0 45,000 0.00%
This project has not yet commenced.
00001489 - Water Mains Renewal
Lake Cargelligo
0385 - Capital Expenditure 50,000 0 50,000
00001489 – Water Mains Renewal
Lake Cargelligo Total
Wate
r 50,000 0 50,000 0.00%
This project has not yet commenced.
This is Page No.61 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
00001490 - Water Mains Renewal
Tottenham
0385 - Capital Expenditure 40,000 0 40,000
00001490 – Water Mains Renewal
Tottenham Total
Wate
r 40,000 0 40,000 0.00%
This project has not yet commenced.
00001491 - Water Mains Condobolin
Gatenby Street Renewal
0385 - Capital Expenditure 35,800 0 35,800
00001491 – Water Mains Condobolin
Gatenby Street Renewal Total
Wate
r 35,800 0 35,800 0.00%
This project has not yet commenced.
00001492 - Water Mains Condobolin
Innes Street Renewal
0385 - Capital Expenditure 32,600 0 32,600
00001492 – Water Mains Condobolin
Innes Street Renewal Total
Wate
r 32,600 0 32,600 0.00%
This project has not yet commenced.
00001493 - Water Mains B Section
Pipeline Renewal
0385 - Capital Expenditure
145,00
0 62,547 82,453
00001493 – Water Mains B Section
Pipeline Renewal Total
Wate
r
145,00
0 62,547 82,453 43.14%
Materials ordered.
00001494 - Water Mains Tulli Rural
Pipeline Renewal
0385 - Capital Expenditure
130,00
0 0 130,000
00001494 – Water Mains Tulli Rural
Pipeline Renewal Total
Wate
r
130,00
0 0 130,000 0.00%
This project has not yet commenced.
This is Page No.62 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
00001496 – ADWG Management
Plan Condobolin TWS Scheme
0385 - Capital Expenditure 90,000 2,730 87,270
00001496 – ADWG Management
Plan Condobolin TWS Scheme Total
Wate
r 90,000 2,730 87,270 3.03%
Council has been successful in securing funding through NSW Health to subsidise this project. The
project has commenced with the Project Workshop completed the end of November 2012. Awaiting
draft report from consultants.
00001497 – ADWG Management
Plan Tottenham TWS Scheme
0385 - Capital Expenditure 90,000 0 90,000
00001497 – ADWG Management
Plan Tottenham TWS Scheme Total
Wate
r 90,000 0 90,000 0.00%
Council has been successful in securing funding through NSW Health to subsidise this project. The
project has commenced with the Project Workshop completed the end of November 2012. Awaiting
draft report from consultants.
00001498 - Sewer repairs to trickling
filter plant concrete cancer and
railing
0385 - Capital Expenditure 55,000 0 55,000
00001498 - Sewer repairs to trickling
filter plant concrete cancer and
railing Total Sewer 55,000 0 55,000 0.00%
This project has not yet commenced.
00001495 - Water Pumping Stations
Tottenham
0385 - Capital Expenditure 25,000 0 25,000
00001495 – Water Pumping Stations
Tottenham Total
Wate
r 25,000 0 25,000 0.00%
This project has not yet commenced.
Financial Implications
NIL
This is Page No.63 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
6.2.8 LAKE CARGELLIGO FOOTPATH CAPITAL WORKS
Community
Strategic Plan
Goal 3 BUILD AND MAINTAIN COMMUNITY
INFRASTRUCTURE AND SYSTEMS
Strategic
Outcome
3.3 Visually appealing built environment, landscapes and streetscapes
Delivery
Program
None Identified
Operational Plan None Identified
Summary
This report requires a project location to be determined for the expenditure of Footpath Capital
Works funding titled “Footpath – Lake Cargelligo”, so that planning for construction can commence.
Committee Recommendation
That Council apply the funding to the LAK01 PAMP 2009 project and subject to inspection by
Director Technical Services and riding Councillors.
(Hall/Phillips)
Background
Funding of $25,000 was revoted in November 2012 for footpath capital works, with no specific
location described. Planning for construction can only commence after a location has been selected.
In accordance with the Lachlan Shire’s Pedestrian And Mobility Plan (PAMP) Feb 2009, the number
one footpath upgrade priority in Lake Cargelligo, for both RMS and LSC, is item LAK01 which runs
along sections of Canada St, at the southern end of the town. See Diagram 1 below.
PAMP Item LAK04A is already scheduled for construction, but there are a number of other locations
identified for upgrade by the consultants GHD in the PAMP, which will provide increased ease of
access for pedestrians and mobility impaired persons. Any of these could be chosen by Council for
completion with this funding.
The most efficient and effective method for construction of large areas of new footpath is for Council
machinery to be used to prepare the site, contractors be engaged to lay the concrete path, and Council
staff to finish the works, including restoration of the nature strip area.
This is Page No.64 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Diagram 1: LAK01 Footpath location map
Financial Implications
This project is 495m long. It is anticipated that $25,000 is adequate to fund about half the project.
This will be reviewed when a detailed project plan is prepared.
LAK01
Footpath
This is Page No.65 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
6.2.9 CONDOBOLIN WATER TREATMENT PLANT
Community
Strategic Plan
Goal 3 BUILD AND MAINTAIN COMMUNITY INFRASTRUCTURE AND SYSTEMS
Strategic
Outcome
3.2 Water, sewer and energy utilities meet best practice standards with up to
date technology
Delivery Program 3.2.3 Implement the Asset maintenance and renewal program for water and
sewerage services
Operational Plan 3.2.3 Complete annual maintenance and renewals program.
Summary
Major asset maintenance and renewals are due to commence at Condobolin Water Treatment Plant at
the conclusion of the summer water demand period.
Committee Recommendation
That Council note the report on the asset maintenance and renewal program Condobolin
Water Treatment Plant 2013-2014
(Frankel/Medcalf)
Background
The Condobolin Water Treatment Plant is now 77 years old this is well beyond the normal useful life
of a water treatment plant.
The goal of Asset maintenance and enhancement can be best achieved in this case by carrying out a
series of equipment and process upgrades and replacements, along with restoration of the existing
structure. Being a fully operational plant these works will be best achieved by a series of
strategically planned steps using a combination of Council staff and specialty contractors managed by
the Council Engineering Team.
The primary driver for these upgrades and enhancements is to maintain and improve compliance with
the 2011 Australian Drinking Water Guidelines. This will ensure that the requirements of the
recently enacted NSW Public Health Act Regulation of 2012 are met.
During the Drinking Water Management Risk Assessment Workshop carried out in December of
2012 the planned enhancements and renewals were evaluated by the expert panel present as part of
the assessment. The panel assembled consisted of representatives of the NSW Health Drinking
Water Unit, the NSW Office of Water, Atom Consulting, NSW Public Works Department and
Councils Engineering Team. These proposals were discussed and evaluated as to their effectiveness
in achieving compliance. It was agreed by all present that they would be essential to achieve this on
an ongoing basis.
This is Page No.66 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Planned Works
To comply with the 2011 Australian Drinking Water Guidelines, the 2012 NSW Public Health
Regulations and to prolong the lifespan of the Condobolin Water Treatment Plant, the following
sections of work will be carried out;
Section 1: Redevelopment of Raw Water Supply
- Redesign and redevelopment of raw water pump station (RWPS) to include Powder Activated
Carbon (PAC) dosing system.
- Demolish and replace existing structure over flocculation tank at Water Treatment Plant
(WTP) including removal of asbestos.
- Installation of new chemical dosing system and mixing units at WTP.
Section 2: Redevelopment of Filtration System
- Removal and replacement of filter media.
- Assessment and repair of filter underdrain’s if required.
- Installation of air scouring systems and associated controls.
Section 3: Redevelopment of Treated Water Systems
- Replacement of high lift pumps.
- Upgrade control system hardware.
- Install online water quality monitoring.
- Upgrade disinfection system by installation of dual 920kg chlorinators (COMPLETED).
Section 4: WHS – Security
- Removal of asbestos sheet ceiling above filters.
- Installation of auto closing chlorine cylinder safety system (COMPLETED).
- Installation of platforms for clarifier access and cleaning.
- Installation of new handrails on clarifier surrounds and elevated walkways.
- Installation of automatic opening and closing security access gate.
- Completion of laboratory upgrade (PART COMPLETED).
Section 5: Internal and External Restoration
- Installation of new ceiling above filters.
- Remediation of concrete walls and windows.
- Repaint internal and external structure.
Results
These upgrades and replacements will
- Improve compliance with drinking water guidelines and legislation.
- Improve drinking water quality and appearance.
- Improve compliance with EPA legislation by decreasing pollutant discharge back to the
Lachlan River.
- Decrease in EPA licensing costs due to decreased backwash discharge.
This is Page No.67 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
- Improve compliance with Work Health and Safety Legislation including asbestos issues.
- Improved energy efficiency via upgraded electrical equipment.
Financial Implications
Estimated costs of these works are $ 1,000,000.00.
$237,000 is available in the 2012-2013 Operational Plan. A further $500,000 will be required in the
2013-2014 budget with the final $263,000 being sought in 2014-2015.
It should be noted that the cost of a new Water Treatment Plant is currently estimated at $15,000,000
based on current data. This project will see the useful life of the current Water Treated Plant
extended by a further ten years.
This is Page No.68 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
6.3 ENVIRONMENTAL SERVICES COMMITTEE MEETING
MINUTES OF THE ENVIRONMENTAL SERVICES COMMITTEE MEETING HELD 06
FEBRUARY, 2013 COMMENCING AT 11.35AM
Attendees
Mayor, Councillor Des Manwaring, Councillors Scott (Chairperson), Medcalf, Nelson, Saunders,
Brady, Ridley, Frankel, Hall and Phillips
General Manager (L Collyer), Director of Environmental Services (A Butler), Manager Enviro and
Development (F Van der Berg), Damien Hartrey (Building Services Manager), Ros Patton (Manager
of Economic Development), Administration Assistant (E Buckland)
Quorum of six Councillors is required
6.3.1 Leave of Absence
6.3.2 Disclosure of Interest
6.3.3 Preparation of Interim Development Control Plan (DCP)
6.3.4 Contract 2012 – 05 – Construction of New Condobolin Medical Centre – Consideration of
Tenders for Construction
This is Page No.69 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
6.3.1 LEAVE OF ABSENCE
6.3.2 DISCLOSURE OF INTEREST
The provision of Chapter 14 of the NSW Local Government Act 1993 and Council’s Code of
Conduct regulate the way in which councilors and staff of Council conduct themselves to ensure that
there is no conflict between their private interests and their public trust.
The Act prescribes that where an official of Council (or a Committee of Council) has an interest in a
matter to be considered at a meeting of the Council (or Committee), that interest must be disclosed as
soon as practicable after the start of the meeting and the reasons for declaring such interest.
Recommendation
That Councillors and staff now disclose any interest in the matters under consideration by
Council at this meeting, describe the nature and type of interest, and in the case of ‘less than
significant on pecuniary interests’ the reasons why they consider the interest to be non
significant.
This is Page No.70 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
6.3.3 PREPARATION OF INTERIM DEVELOPMENT CONTROL PLAN (DCP)
Community
Strategic Plan
Goal 3 BUILD AND MAINTAIN COMMUNITY INFRASTRUCTURE
AND SYSTEMS
Strategic
Outcome
3.3 Visually appealing built environment, landscapes and streetscapes
Delivery Program 3.3.6 Develop and implement urban design guidleins for villages and towns
across the shire
Operational Plan Develop urban design guidelines
Summary
The purpose of this report is to present back to Council the draft interim development control plan
(DCP) to consolidate and replace the current DCPs, after the exhibition period. Council resolved at
the October 2012 meeting to exhibit this DCP as required and for it to be presented back to Council
for possible adoption following this.
Committee Recommendation
1. That Council adopts Lachlan Interim Development Control Plan 2013 to take effect on the
day of gazettal of draft Lachlan Local Environmental Plan 2012.
2. Repeal the following plans and policies on the day that Lachlan Interim Development
Control Plan 2013 takes effect:
- DCP Building Lines 2002,
- DCP Land Use 1997,
- DCP Village Development 2001,
- DCP Industrial,
- DCP Outdoor Advertising,
- DCP for Exempt and Complying Development, and
- DCP for Subdivisions.
Background
DCP’s are development control plans that sit underneath a Councils Local Environmental Plan (LEP)
to provide development guidelines. They are statutory documents as provided for in the
Environmental Planning and Assessment Act 1979 and are widely used to outline to developers
Councils expectations with respect to development standards. Lachlan Shire Council currently has
the following DCPs in-force:
DCP Building Lines 2002,
DCP Land Use 1997,
DCP Village Development 2001,
DCP Industrial,
DCP Outdoor Advertising,
DCP Public Notification of Development,
This is Page No.71 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
DCP for Exempt and Complying Development, and
DCP for Subdivisions.
Council has engaged Zenith Town Planning to review these plans to ensure consistency with
provisions and land use definitions that are being incorporated in draft Lachlan LEP 2012, and to
consolidate these plans into a single DCP which will take effect on the date of gazettal of draft
Lachlan LEP 2012. The Department of Planning require all Councils to repeal current DCP’s and
replace with a singular DCP within 6 months of gazettal of their new LEP. This is for a number of
reasons including –
1) Councils have many DCP’s and they are confusing to developers, and by having one combined
one, it is an attempt to simplify this.
2) Many of the DCP’s are outdated, and legislation no longer allows for some of the things that are
covered in current DCP’s.
The objective of preparing draft Lachlan Interim DCP 2012 is to ensure that statutory obligations are
met by carrying out an administrative transfer of the controls contained in current DCPs. The interim
DCP compliments the new LEP by using the same standard definitions and provides necessary
additional detail to development standards that are included in the LEP. It is required prior to the
completion of the new consolidated single DCP, as currently the DCP’s contain outdated standards
that are in conflict with the new LEP.
All current DCPs are proposed to be repealed from the date that Lachlan Interim DCP 2012 takes
effect. It is noted that the controls of DCP Exempt and Complying Development are now replaced by
the SEPP (Exempt and Complying Development Codes) or are included within schedules of the new
LEP.
Issues
The consolidation of the provisions of current DCPs into draft Interim DCP 2012 has involved:
Updating all references to Lachlan LEP 1991 and land use zones,
Ensuring all definitions are consistent with the Environmental Planning and Assessment Act
1979, the Environmental Planning and Assessment Regulation 2000 and draft Lachlan LEP
2012,
Deleting any references to floor space ratios, plot ratios and building heights as these cannot
be included in a DCP regardless of whether they are in the draft LEP. Site coverage and
numbers of storey controls have been retained,
Removing references to preferred uses that are now contained in DCP Land Use as this is
covered by permissible uses in the RU5 Village zone and the section 79C assessment process,
Adding any requirements for notification of development applications that are in the current
DCPs and Lachlan LEP 1991 to the public notification chapter,
Updating references to NSW government agencies,
Ensuring consistency of controls with State Environmental Planning Policy (Exempt and
Complying Development Codes) 2008 and outdoor advertising with SEPP 64 - Advertising
and Signage, and
Reviewing all text to clarify controls, to assist interpretation and ensure consistency of
language.
This is Page No.72 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
There are no changes to controls that are in place under current DCPs. It is necessary for Council to
prepare the interim DCP to ensure that current controls remain in force and are not able to be
misinterpreted following the gazettal of draft Lachlan LEP 2012.
Council intends to carry out a comprehensive review of this interim plan in the near future in order to
implement actions listed in the Lachlan Primary Production/Resource Strategy and the forthcoming
urban strategy. The review will cause either an amendment to this plan or the production of a new
DCP to replace this interim plan.
Conclusion
The draft Interim DCP consolidates the provisions of all current DCPs into a single plan. This will
satisfy Council’s statutory obligations with respect to development controls at the time of gazettal of
draft Lachlan LEP 2012.
Financial Implications
Council has allocated funding for this project in the Delivery Program 2012-2016.
Committee Recommendation
Summary
The purpose of this report is to present back to Council the draft interim development control plan
(DCP) to consolidate and replace the current DCPs, after the exhibition period. Council resolved
at the October 2012 meeting to exhibit this DCP as required and for it to be presented back to
Council for possible adoption following this.
Recommendation
1. That Council adopts Lachlan Interim Development Control Plan 2013 to take effect on
the day of gazettal of draft Lachlan Local Environmental Plan 2012.
2. Repeal the following plans and policies on the day that Lachlan Interim Development
Control Plan 2013 takes effect:
- DCP Building Lines 2002,
- DCP Land Use 1997,
- DCP Village Development 2001,
- DCP Industrial,
- DCP Outdoor Advertising,
- DCP for Exempt and Complying Development, and
- DCP for Subdivisions.
(Hall/Phillips)
This is Page No.73 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
6.3.4 CLOSED SESSION
NOTICE OF INTENTION TO DEAL WITH MATTERS IN CLOSED SESSION
It is necessary for the committee to adopt a resolution to formalise its intention to deal with certain
matters in closed session. The Local Government Act, 1993 requires the General Manager to identify
those matters which may be categorised as confidential in terms of Section 10A of the Local
Government Act, 1993.
The matter to be considered in closed session deals with the Contract 2012/05 – Construction of
new Condobolin Medical Centre – Consideration of tenders for Construction.
Any member of the public is entitled to make submissions to the meeting as to why the matter is to
be dealt with in closed session.
Recommendation
i) That pursuant to Section 10A 2(c) of the Local Government Act, 1993, the following
item be dealt with in closed session: Item 6.3.4.1 Contract 2012/05 – Construction
of New Condobolin Medical Centre – Consideration of Tenders for Construction
ii) That the reason for dealing with this item is it contains Information that would, if
disclosed, confer a commercial advantage on a person with whom the Council is
conducting (or proposes to conduct) business.
iii) That, in accordance with the resolution, the General Manager will report on this
matter to the meeting in closed session; and
iv) That the meeting be now closed to the public.
v) Council moved into closed session at 11.38am
(Phillips/Brady)
RESOLVED that Council move out of Closed Session and that the Recommendation be reported to
the public the time being 12.04pm.
(Brady/Phillips)
Committee Recommendation
i) That Council note the report on the tenders for the construction of the new Medical
Centre in Condobolin in November 2012;
ii) That all tenders received for the construction of the new Medical Centre in
Condobolin be rejected as all conforming tenders are significantly above the budget
for this project.
iii) That subject to the Capital Expenditure Review on the new Medical Centre for
Condobolin being adopted at the ordinary Council meeting on 20 February 2013,
Council enter into a contract with BLD Constructions based on their submitted price
of $1,186,900 inc. gst for the construction of the new Medical Centre in Condobolin,
based on the plans and specifications as exhibited for the tender subject to them
providing additional information to satisfy the tender assessment criteria, for the
following reasons –
a) The tendered price submitted by BLD Constructions is the closest to the estimated
This is Page No.74 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
cost for this project, and is $82,254.23 lower than the next lowest tender;
b) BLD Constructions have recently constructed the Warren Shire Council Medical
Centre on time and on budget, with this centre being very similar in design, size and
building materials, with the project being designed and managed by the same
consultant that this Council has appointed;
c) The lack of information submitted by BLD Constructions resulting in them being
considered nonconforming is considered to be more from an oversight in the
information required to be supplied on tender closing time, as opposed to not having
this information available or the resources and ability to successfully undertake this
construction;
d) The knowledge of their performance in undertaking the Warren Medical Centre
construction in addition to the requirement for BLD to provide the required extra
information is sufficient information in this regard to appoint BLD Constructions
(Frankel/Ridley)
There being no further business the meeting closed at 12.05pm.
This is Page No.75 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the
Council Chambers, Molong Street, Condobolin.
7.1 GENERAL MANAGER
7.1.1 REPORT TO COUNCIL ON PROGRESS WITH INCOMPLETE RESOLUTIONS
Community
Strategic Plan
Goal 4 BUILD CIVIC LEADERSHIP AND PRIDE
Strategic
Outcome
4.7 Strong effective Council
Delivery
Program
4.7.1 Council is financially sustainable and provides services at a level
expected by the community
Operational
Plan
Councils long term financial plan is sustainable
Councils long term objectives are being met
Councils decision making and operational activities meet regulation
and community expectation
ATTACHMENT
Summary
This report advises Council of the progress being made on issues covered by resolutions passed at
previous council meetings which have not previously been completed within the monthly meeting
cycle.
Recommendation
That Council:
i) Noted the report; and
ii) Approve the deletion of all items marked “Completed”
Background
This item has been included in my report to ensure that all resolutions of Council are implemented
and Councillors are informed of action taken. Please find attached a schedule of resolutions
passed by Council over the past months in relation to which some action has been taken.
Financial Implications
Items that have financial implications beyond normal budgeting will be reported separately to
Council for consideration.
This is Page No.76 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the
Council Chambers, Molong Street, Condobolin.
7.1.2 DELIVERY PROGRAM QUARTERLY REPORT
Community
Strategic Plan
Goal 4 BUILD CIVIC LEADERSHIP AND PRIDE
Strategic
Outcome
4.7 Strong effective Council
Delivery
Program
4.7.2 Council is meeting the objectives of its long term plans
Operational
Plan
Long term objectives are being met and reported to Council as
required by the regulation
ATTACHMENT
Summary
This report provides Council with an opportunity to review progress against the objectives
contained within the Delivery program and the Capital Works program for 2012/2013.
The relevant Officers have indicated against each objective progress to 31 December, 2013.
Recommendation
That Council note the report.
Background
Council is required to monitor progress against the completion of the objectives that are included
in the Delivery program and Operational Plan to ensure that it is meeting its obligations under the
Community Strategic Plan – Living Lachlan Style – 2022.
The attached report shows progress to 31 December, 2013 and also includes a detailed report
against the Capital Works projects included in the current budget. Following finalisation of the
Financial Reports for 2011/2012 and the approved revote’s will be added to this report.
Financial Implications
Financial Implications emanating from the review of the 2012/2013 budget will be reported to the
Council meeting.
This is Page No.77 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the
Council Chambers, Molong Street, Condobolin.
7.2 ENVIRONMENTAL SERVICES
7.2.1 DEVELOPMENT APPLICATIONS APPROVED DURING JANUARY 2013
Community
Strategic Plan
Goal 4 BUILD CIVIC LEADERSHIP AND PRIDE
Strategic
Outcome
4.3 Orderly neat and attractive towns
Delivery Program 4.3.5 Provide regulatory services to control and abate health and fire
hazards and unsightly properties
Operational Plan Provision of regulatory services.
Summary
This report advises of the Development and Complying Development Applications approved
during the month of January 2013.
Recommendation
That Council notes the report on Development (DA) and Complying Development (CDC)
Applications approved during the month of January 2013.
DELEGATED
AUTHORITY
OR COUNCIL
CONSENT
NO
SUBJECT
LAND
NATURE OF
DEVELOPMENT
Delegated 2012/020 13-15 Grace Street,
Lake Cargelligo
New Fabrication Shed 42 X
18 X 7.5m
Delegated 2012/056 8 Lake Street, Lake
Cargelligo
Demolition of existing
house and construction of a
new dwelling
Delegated 2012/064 Lot 24, Dp 752328 New Transportable House
Delegated 2012/066 Lot 50, Dp1143102 Subdivision
Delegated 2013/001 Lot 98, 752329 Consolidation of Lots
Total number for January 2013: 5
Total value of works for January 2013: $640 000
Total number for January 2012: 3
Total value of works for January 2012: $921 500
This is Page No.78 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the
Council Chambers, Molong Street, Condobolin.
7.2.2 MINUTES OF WILLOW BEND SPORTS CENTRE MANAGEMENT
COMMITTEE MEETING HELD 8.00 AM WEDNESDAY 6 FEBRUARY 2013
Community
Strategic Plan
Goal 3 BUILD AND MAINTAIN COMMUNITY INFRASTRUCTURE
AND SYSTEMS
Strategic
Outcome
3.4 Well maintained recreational facilities and community buildings
that meet statutory and user requirements
Delivery
Program
3.4.3
Maintain and develop council owned buildings
Operational
Plan
None identified
ATTACHMENT
Summary
The purpose of this report is to present the minutes from the Lachlan Shire Council Willow Bend
Sports Centre Advisory Committee meeting held 6 February 2013, and present the
recommendations contained therein.
Committee Recommendations
The committee elected Councillor Denis Brady as the new chairperson.
(King/Redenbach)
The committee notes and receives the correspondence.
(King/Redenbach)
This report provides an overview of the activities regarding operations at the Willow Bend
Sports Centre for the months of August- February 2013.
(Gibson/King)
Background
The full minutes are included in the attachment section of this business paper.
Financial Implications
Nil – the operations are within the approved budget.
This is Page No.79 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the
Council Chambers, Molong Street, Condobolin.
7.2.3 MINUTES OF LACHLAN SHIRE COUNCIL CRIME PREVENTION COMMITEE
MEETING HELD 1PM WEDNESDAY 6 FEBRUARY 2013
Community
Strategic Plan
Goal 4 BUILD CIVIC LEADERSHIP AND PRIDE
Strategic
Outcome
4.3 Orderly, neat and attractive towns
Delivery Program 4.3.9 Maintain an effective police presence through the towns
Operational Plan Meet quarterly with the Area Command.
ATTACHMENT
Summary
The Crime Prevention Meeting was held in the Council Chambers on 6 February, 2013.
Recommendations are as follows:
Recommendation
i) That Councillor Hall be elected as chair of the Lachlan Shire Council Crime Prevention
Committee;
ii) That leave of absence be granted to Mel Suitor, Senior Constable Dave Bell and Senior
Constable Daniel Greef, James Dobel, Crime Prevention Officer;
iii) That the Committee note the report from Sgt Gibson and Mr Reid;
iv) That the Committee note the report from Melanie Suitor, Road Safety Officer, Parkes
Forbes and Lachlan Shires;
v) The Committee note the report provided by Western Plains Regional Development
on the Youth Services and Community Drug Action Team activities;
vi) That the Committee note the report in relation to the proposed installation of CCTV cameras
in the Condobolin CBD area;
vii) That Council accept Norma Flemming’s resignation and note Norma’s support of the
Committee;
viii) That the Crime Prevention Committee name be changed to Safety in Lachlan Committee
and that the terms of reference and constitution and Crime Prevention Plan be reviewed and
bought back to the next committee meeting;
Background
The full minutes of the meeting are included in the attachments section of this business paper.
Financial implications Nil
This is Page No.80 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the
Council Chambers, Molong Street, Condobolin.
7.2.4 ENVIRONMENTAL SERVICES AND PLANNING – QUARTERLY STATUS
REPORT ON CAPITAL PROJECTS
Community
Strategic Plan
Goal 3 BUILD AND MAINTAIN COMMUNITY
INFRASTRUCTURE AND SYSTEMS
Strategic
Outcome
3.4 Well maintained recreational facilities and community
buildings that meet statutory and user requirements
Delivery
Program
3.3.4
3.4.3
4.3.4
5.2.1
5.2.4
5.5.4
6.4.4
6.6.1
6.7.1
Upgrade memorial park in Condobolin
Maintain and develop council owned buildings
Install CCTV cameras to Main Street of Condobolin
Install a boat ramp in the Lachlan River at the SRA grounds
Complete the sedge path in Condobolin
Maintain effective collection and disposal services
Provide community halls and facilities that support cultural
experiences
Build a new Medical Centre at Condobolin
Allocate annually to the capital replacement needs of the
Condobolin District Retirement Village
Operational
Plan
Various identified linked to above
Summary
This report presents the 2012/13 Capital Works program for the Environmental Services and
Planning stream to end of December 2012.
Recommendation
That Council note the 2012/13 Capital Works program status report to the end of December
2012, for the Environmental Services and Planning stream.
Background
The report is included in the attachments section of this business paper. The main focus on the
first part of 2013/14 in the buildings section was in completing the older projects, such as the 35
Bathurst Street Museum Condobolin, the SRA Netball Soccer Cricket Kiosk, and of the newer
projects, works were commenced on the Lake Cargelligo Showground Shed, and planning works
continued on the new Medical Centre for Condobolin. Many of the projects are on track to be
commenced shortly, and finalised prior to the end of 2012/13, subject to staff and contractor
availability. The main focus at present is on getting the RTA HVIS shed completed, and starting
on the Tottenham Hall reclad. Many of the other projects are in the early to advanced planning
stages.
This is Page No.81 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the
Council Chambers, Molong Street, Condobolin.
7.2.5 NEW MEDICAL CENTRE CONDOBOLIN – CAPITAL EXPENDITURE
REVIEW
Community
Strategic Plan
Goal 6 HEALTH WELLBEING AND CULTURE
Strategic
Outcome
6.6 Full time medical Services when needed
Delivery
Program
6.6.1 Build a new Medical Centre at Condobolin
Operational
Plan
Appoint Medical Centre Project Manager (Done)
Appoint Contractor to construct
ATTACHMENT
Summary
The purpose of this report is to table the draft Capital Expenditure Review for the new
Condobolin Medical Centre. A recommendation was presented to the December 2012 Council
meeting, and it was resolved that that the document be publicly exhibited for 28 days. The draft
report was tabled at the January 2013 Council meeting, and has completed the exhibition period.
No submissions were received in relation to this. Since the December and January meetings,
tender prices have been received for the construction, and also indicative estimates for the fit-out
of the new centre. This information is included in this report for Council to fully consider all
costs associated with this proposal, including the proposed refurbishment of the existing Melrose
Medical Centre, once the new one is operational.
Recommendation
i) That Council note the report on the draft Capital Expenditure Review for the new
Condobolin Medical Centre.
ii) That the draft Capital Expenditure Review for the new Condobolin Medical Centre
be adopted, with the following amendments –
Page 27 – delete ‘Councils financial position is not expected to be significantly altered
by this project, considering almost 50% will be grant funded’ and insert ‘Councils
financial position is not expected to be significantly altered by this project,
considering almost 35% will be grant funded’
iii) That suitable notification be submitted to the Division of Local Government as
required.
iv) That works proceed on the existing Medical Centre during and after the
construction of the new Medical Centre, as per the concept plans for the estimated
cost of $122,500.
Background
The Capital Expenditure (Capex) Reviews was prepared in accordance with the Division of Local
Government’s Director General’s guidelines pursuant to section 23A of the Local Government
Act 1993. Capex reviews are required for capital projects for infrastructure facilities, including
renovations and extensions that are expected to cost in excess of 10% of council’s annual ordinary
This is Page No.82 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the
Council Chambers, Molong Street, Condobolin.
rate revenue or $1 million, whichever is the greater (GST exclusive). As the new Condobolin
Medical Centre project falls within the range of being over $1 million dollars (original estimated
cost $1,471,900 fitted out) and is greater than 10% of the Councils ordinary annual rate revenue
(14%), a capital expenditure review is required. The review has been prepared under the
Divisions 2010 guidelines, pursuant to section 23A of the Local Government Act 1993. Council is
required to undertake a capex review and notify the Division of Local Government, of the review
and of the project.
Financial Implications
The projected cost of the development including GST is $1,396,900, should Council negotiate and
appoint the lowest price submitted in the tender process. The funds identified in council’s current
adopted budget, comprise the remainder of the Medical Centre reserve, approximately $525,000
and the grant of $500,000, equalling $1,025,000.
Since the preparation of the Cap ex review, and the January Council and February 2013
Committee meetings, a more accurate quote has been obtained for the furniture and fit out,
including medical and computer equipment. This is estimated at $90,000, down from earlier
estimates of $250,000 and $150,000. This involves bringing some of the more recent and suitable
medical equipment purchased by Council and Ochre over the past 2 – 3 years from the existing
centre into the new centre. This is acceptable as any use of the old centre would mostly be for
allied health services that could provide their own equipment.
The new breakup of the total project cost is as follows –
Total Building project cost (lowest price submitted inc gst) $ 1,186,900.00
Loose furniture and equipment inc gst $ 90,000.00
Consultant fees inc gst $ 120,000.00
Total Estimated Costs inc gst $ 1,396,900.00
Total Current funds available $ 1,025,030.00
Initial Shortfall $ 371,870.00
GST Component estimate (returns to Council) $ 126,991.00
Estimated reserve amount required $ 241,879.00
When considering that Council claim the GST back on these costs, the actual real dollar outlay
results in a cash transfer from the internal reserves of $241,879. Considering this, Council may
wish to approve in principal the proposed works to the existing Melrose Medical Centre – see
attached plans. Not all of these works could occur until after the new centre is built and operating,
to not impact on service delivery, but some external works possibly could, such as removal of the
front old garden beds, rear carport, and possibly redoing the fascia and window grills.
The internal works are considered important, given the existing Medical Centre is not at a stage
that warrants demolition, and would serve the community well for many more years, in a lesser
role in provision of Allied Health services. The external works including the cutting in of a new
door allow for a more linked facility, and a new internal reception at this area, would allow for the
existing reception to be retained for a possible separate business, such as dental, utilising the rear
entrance. The new reception lines up with the linked walkway from the new building. The other
external works including bagging and rendering the building are to present a more modern
appearance to better compliment the new centre.
Ochre health have been contacted and advised they are already working with several providers
such as pathology, podiatry and other services not currently available in the town. Ochre will
develop a business plan for both the old and new Centre for Council to consider, prior to letting
This is Page No.83 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the
Council Chambers, Molong Street, Condobolin.
leases for either centre. It is anticipated that the allied health providers from the exiting Medical
Centre would be able to provide some financial return to Council.
Concept plans for the future work on the existing centre are now finalised to a concept stage, and
preliminary estimates place this work at $122,500, and comprise the following works –
Existing Centre purposed works
Cut in, supply and install new Auto Door in and lintels etc $ 15,000.00
New Ducted Refrigerated Air con (required in any event) $ 25,000.00
External cleanup works, include remove old a/cs, replace window
bars with crimsafe $ 7,000.00
Remove old carport $ 3,500.00
New Fascia (FC and Painted) $ 15,000.00
New Bagged/Rendered Brickwork to entire exterior $ 40,000.00
Internal changes/door widened/new reception $ 12,000.00
Front garden works $ 5,000.00
Total $ 122,500.00
Reserve amount required for new Medical Centre $ 241,879.00
Total reserve amount required if both projects are completed $ 364,379.00
Possibly savings would be available in utilising contractors whilst they are on site as some works
could occur.
Conclusion
The capex review has been prepared in accordance with the guidelines and has now been
exhibited. Council are now in a position to adopt this, and forward notification as required to the
Division of Local Government, and consider a report to appoint a builder for this project.
This is Page No.84 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the
Council Chambers, Molong Street, Condobolin.
7.2.6 YOUTH SERVICES - WESTERN PLAINS REGIONAL DEVELOPMENT –
FINANCIAL REPORT ON 2011/12 YOUTH SERVICES PROGRAM
Community
Strategic Plan
Goal 6 HEALTH WELLBEING AND CULTURE
Strategic
Outcome
6.2 Childcare services and facilities that meet the needs of young families
Delivery
Program
6.2.4 Work with community groups to provide youth services and facilities
across the shire
Operational
Plan
Ongoing program delivery
ATTACHMENT
Summary
This report presents the 2011/12 Western Plains Regional Development (WPRD) financial report
on the Youth Services Program. The report recommends the surplus of approximately $12,000 be
retained, and carried forward to spend on much needed repairs to the Lake Cargelligo and
Tottenham Youth Centres.
Recommendation
That Council note the 2011/12 Western Plains Regional Development financial report on the
Youth Services Program and approves the carryover of 12187.93 to be used for repairs to
the Youth Centres at Tottenham and Lake Cargelligo.
Background
Council funds Western Plains Regional Development annually, approximately $170,000 to
undertake Youth Services across the shire. There is a wide ranging program co-ordinated by Ms
Heather Blackley, and assisted by other staff at WPRD and also volunteers at the Youth Centres.
Centres operate at Condobolin, Lake Cargelligo, Tullibigeal and Tottenham. The programs
provide a great benefit to the youth of the area.
Financial Implications
Council budget annually for the entire amount to be paid to WPRD, and so allowing for this
surplus to be carried forward will not impact upon the current budget.
This is Page No.85 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the
Council Chambers, Molong Street, Condobolin.
7.2.7 CONTINUATION OF SUPPORT FOR BUSH BURSARY (STUDENT DOCTOR)
PROGRAM
Community
Strategic Plan
Goal 6 HEALTH WELLBEING AND CULTURE
Strategic
Outcome
6.6 Full time medical Services when needed
Delivery
Program
6.6.2 Support programs to attract and retain medical professionals
Operational
Plan
Facilitate annual bush bursary program
ATTACHMENT
Summary
This report allows for tabling a letter from the NSW Rural Doctors Network thanking Council for
participating in the Bush Bursary/CWA Scholarship scheme in 2012, and invites Council to
participate in the scheme in 2013.
Recommendation
i) That Council notes the report on the Bush Bursary Sponsorship program 2013;
ii) That Council continues to support the Bush Bursary/CWA Scholarship by
participating in the scheme in 2013;
iii) That Council allocate funds in the 2013/ 14 budget to cover the scholarship and
administration costs;
Background
Council has received a written request from the NSW Rural Doctors Network (RDN) to
consider continuing the support provided in 2012 through participating in the 2013 Bush
Bursary/Country Women’s Association Scholarship Scheme. The scholarship will provide $3,300
to a medical student, who will agree to spend two weeks in a rural placement in the Lachlan Shire
during university holidays or over the Christmas break. Attraction and retention of medical and
nursing staff is critical to the health and wellbeing of the community and opportunities to support
projects aimed at attracting or up-skilling local students should be positively supported. This is a
key area identified in Council’s Delivery Plan for 2012/16. Council nominates a placement
coordinator (currently Francois Van der berg) who is responsible for liaising with the sponsored
student and organizing the activities for the placement including: liaison with local medical
practitioners and community groups, arranging accommodation, and arranging social aspects for
the two week placement.
It is recommended that Council continue with its support for this program.
Financial Implications
The financial impact to Council would be $3,300 for the Bush Bursary scholarship, and staff time
to coordinate the visit and expenses for the traditional BBQ at the hospital. This would be
included in the draft budget for 2013/14. Council budgets $4000 annually for this program.
Attachment – Letter from RDN
This is Page No.86 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the
Council Chambers, Molong Street, Condobolin.
7.3 TECHNICAL SERVICES
7.3.1 TOWN WATER SUPPLY CONSUMPTION REPORT PERIOD ENDING 31ST
JANUARY 2013
Community
Strategic Plan
Goal 3 BUILD AND MAINTAIN COMMUNITY INFRASTRUCTURE
AND SYSTEMS
Strategic
Outcome
3.2 Water, sewer and energy utilities meet best practice standards with up to
date technology
Delivery Program 3.2.3 Implement the Asset maintenance and renewal program for water and
sewerage services
Operational Plan 3.2.3 Complete annual maintenance and renewals program.
Summary
Consumption levels for the Condobolin, Lake Cargelligo and Tottenham Town Water Supplies at
present are within the forecast allowable consumption requiring no action.
Recommendation
That Council note the report on town water supply consumption to 31st
January
2013.
Background
The month of January 2013 has seen minor rainfall and runoff received into the Lachlan Valley
catchment. Storage levels described below for Wyangala Dam and Lake Cargelligo Storage are
current as of 7th
February 2013.
Wyangala Dam storage is currently holding 81.1%, a volume of 987,851 ML. This is a decrease in
storage level of 6.1% since the last reporting period. State Water have set releases from Wyangala
Dam between 1,750 ML to 2,200 ML per day to supply water consumers downstream of the dam.
Lake Cargelligo Storage is holding 78.4%, a volume of 28,385 ML. This is a storage decrease of
10.0% since the last reporting period.
The recorded consumption for Council’s town water supplies ending 31st January 2013 is as
follows;
Surface Water Extraction
Town Water Supply
Scheme Month Consumption
Percentage of
Allocation
Condobolin Jul 2012 47.24 ML 3.15%
Aug 2012 51.549 ML 3.44%
Sep 2012 67.375 ML 4.49%
Oct 2012 78.838 ML 5.26%
Nov 2012 99.973 ML 6.66%
Dec 2012 130.005 ML 8.67%
Jan 2012 154.983 ML 10.33%
Feb 2013 ML
This is Page No.87 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the
Council Chambers, Molong Street, Condobolin.
Mar 2013 ML
Apr 2013 ML
May 2013 ML
Jun 2013 ML
Totals 629.963 ML 42.00%
Lake Cargelligo Jul 2012 27.360 ML 3.91%
Aug 2012 33.260 ML 4.76%
Sep 2012 40.870 ML 5.85%
Oct 2012 53.390 ML 7.64%
Nov 2012 63.760 ML 9.12%
Dec 2012 72.950 ML 10.44%
Jan 2013 83.410 ML 11.93%
Feb 2013 ML
Mar 2013 ML
Apr 2013 ML
May 2013 ML
Jun 2013 ML
Totals 375.000 ML 53.65%
Tottenham Jul 2012 3.852 ML B Section Pipeline
Township Aug 2012 4.697 ML B Section Pipeline
Sep 2012 7.183 ML B Section Pipeline
0.420 ML Leg O Mutton WTP
Oct 2012 8.013 ML B Section Pipeline
0.370 ML Leg O Mutton WTP
Nov 2012 9.007 ML B Section Pipeline
2.117 ML Leg O Mutton WTP
Dec 2012 6.923 ML B Section Pipeline
5.030 ML Leg O Mutton WTP
Jan 2013 9.340 ML B Section Pipeline
6.087 ML Leg O Mutton WTP
Feb 2013 ML
Mar 2013 ML
Apr 2013 ML
May 2013 ML
Jun 2013 ML
Totals 63.039 ML
This is Page No.88 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the
Council Chambers, Molong Street, Condobolin.
Ground Water Extraction
Town Water Supply
Scheme Month Consumption
Percentage of
Allocation
Condobolin Jul 2012 0.000 ML 0.00%
Aug 2012 0.000 ML 0.00%
Sep 2012 0.000 ML 0.00%
Oct 2012 0.000 ML 0.00%
Nov 2012 0.013 ML 0.00%
Dec 2012 0.000 ML 0.00%
Jan 2013 0.000 ML 0.00%
Feb 2013 ML
Mar 2013 ML
Apr 2013 ML
May 2013 ML
Jun 2013 ML
Totals 0.013 ML 0.00%
Lake Cargelligo Jul 2012 1.560 ML
0.26%
Aug 2012 0.740 ML 0.12%
Sep 2012 0.000 ML 0.00%
Oct 2012 0.210 ML 0.04%
Nov 2012 0.094 ML 0.01%
Dec 2012 16.803 ML 2.80%
Jan 2013 0.000 ML 0.00
Feb 2013 ML
Mar 2013 ML
Apr 2013 ML
May 2013 ML
Jun 2013 ML
Totals 19.407 ML 3.23%
Condobolin township water consumption is within the allowable allocation. A total of 1506
properties are connected to this scheme equating to a monthly usage of 102.91 kL per connected
property. Condobolin consumed 42.00% of the available surface water allocation to 31st January
2013 for the 2012/2013 water year, the forecast allowable total consumption for this period is
60.5%. Compared to the previous water year, surface water consumption is approximately 43.54%
higher for the period, 629.963 ML (2012/2013) compared to 438.879 ML (2011/2012). Level 2
Water restrictions are in place due to mechanical failures but this is expected to be removed prior
to the council meeting.
Lake Cargelligo scheme consumption is within the allowable allocation. A total of 810 properties
are connected to the scheme equating to a monthly usage of 102.98 kL per connected property.
Lake Cargelligo water supply scheme has consumed 53.65% of the available surface water
allocation to 31st January 2013 for the 2012/2013 water year, the forecast allowable total
consumption for this period is 60.5%. Compared to the previous water year, surface water
This is Page No.89 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the
Council Chambers, Molong Street, Condobolin.
consumption is approximately 13.39% higher for the period, 375.000 ML (2012/2013) compared
to 330.730 ML (2011/2012).
Of the 83.41 ML processed at the Lake Cargelligo water treatment plant the village of Tullibigeal
and rural connections to the Tullibigeal – Kikoira Pipeline have consumed 11.302 ML,
approximately 13.5% of the water processed for the month of January 2013. A total of 154
properties are connected to this section of the scheme equating to a monthly usage of 73.39 kL per
connected property. This section of the scheme comprises 19.01% of the schemes total number of
connections.
A total of 253 properties are connected to the Tottenham town water supply scheme equating to a
monthly usage of 60.98 kL per connected property. The Leg O Mutton Water Filtration Plant at
Tottenham is presently supplementing the Tottenham town water supply when required. The
current storage level in the Leg O Mutton dam is 5.6 metres. Level 2 Water Restrictions are
implemented once monthly consumption increases above 50 kL per connected property or the Leg
O Mutton storage falls below 5.5 metres of storage. Notices reminding residents of Level 1
Conservation Water Restrictions in place since July 2010 were forwarded to residents during the
month of January. Level 2 Water Restrictions will need to be implemented once storage levels in
the Leg O Mutton dam fall below 5.5 metres of storage.
Financial Implications
Income from water sales are reviewed each quarter of the year.
This is Page No.90 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the
Council Chambers, Molong Street, Condobolin.
7.3.2 SECURING TOWN WATER SUPPLY FOR LAKE CARGELLIGO MERRI ABBA
BORE WATER SUPPLY PIPELINE PROJECT – PROGRESS REPORT PERIOD
ENDING 7TH FEBRUARY 2013
Community
Strategic Plan
Goal 3 BUILD AND MAINTAIN COMMUNITY INFRASTRUCTURE AND
SYSTEMS
Strategic
Outcome
3.2 Water, sewer and energy utilities meet best practice standards with up to
date technology
Delivery
Program
3.2.3 Implement the Asset maintenance and renewal program for water and
sewerage services
Operational Plan 3.2.3 Complete annual maintenance and renewals program.
Summary
This report advises Council of the progress being made in relation to the Merri Abba - Lake
Cargelligo bore pipeline project.
Mitchell Water Australia have completed construction activities for the project. Modifications to
programming of telemetry SCADA, telemetry RTU’s and the VSD’s, and rectifications of
identified defects were completed by 11th
December 2012. Demonstration of the remaining
components of the system was achieved by Mitchell Water Australia on Tuesday 11th
December
2012.
Commissioning was started on 14th
December 2012 but was suspended after 6 days following the
identification of a number of defects and omissions.
On 23rd
December 2012 a thunderstorm occurred at Lake Cargelligo. This storm resulted in
electrical surges and brownouts, and a total loss of electricity supply to Lake Cargelligo and
surrounding districts (including Merri Abba). Commissioning could not restart due to damage to
equipment and control failure.
Council are awaiting notification on when the damaged equipment will be repaired/replaced and
the additional surge protection installed on site. Council anticipate early rectification of the above
problems by the Contractor and commissioning to recommence soon.
Recommendation
That Council note the report on the Merri Abba Project up to 7th
February 2013.
Background
In February 2010, Council was successful in securing grants to the value of $19M for the
construction of a bore water supply for the Lake Cargelligo town water supply. The grants are
jointly funded by the Australian Government and the NSW State Government in partnership with
Lachlan Shire Council.
This is Page No.91 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the
Council Chambers, Molong Street, Condobolin.
The project is nearing completion. The target completion date of 30th June 2012 has been
exceeded due to a number of reasons including the flooding event which occurred in March 2012.
Mitchell Water Australia has completed construction activities for the project. Modifications to
programming of telemetry SCADA, telemetry RTU’s and the VSD’s, and rectification of earlier
identified defects were completed by 11th
December 2012.
Demonstration of the outstanding components of the system was achieved by Mitchell Water
Australia on Tuesday 11th December 2012. Technical and Engineering representatives of Lachlan
Shire Council, NSW Public Works and Mitchell Water Australia and their subcontractors were
present during the December 2012 testing and demonstration period.
Commissioning was started on 14th
December 2012 but was suspended after 6 days following the
identification of a number of omissions. These included;
1. Radtel Systems Pty. Ltd. were unable to provide training on the SCADA system until 16th and 17th
January 2013. Training is to be conducted concurrently with the commissioning period as
required in the contract.
2. A complete Operation and Maintenance Manual had not been provided for commissioning as
required in the contract.
3. Programming issues at the high lift pump station control was not allowing the intermediate
reservoir to maintain an acceptable level during operation. The intermediate reservoir drained
completely on at least one occasion.
4. Misting from the aeration system was providing an unsafe work environment.
5. Faults generated by the no-flow switches at the high lift pumping station resulted in pump failure
on both pumps after a brownout. This did not automatically reset as required.
Recommencement of commissioning was agreed to start Monday 14th January 2013 due to the
unavailability of the required representatives over the Christmas holiday period and to allow
Mitchell Water Australia to complete the required repairs/rectifications/provide documentation.
On 23rd
December 2012 a thunderstorm occurred at Lake Cargelligo. This storm resulted in
electrical surges and brownouts then in total loss of electricity supply to Lake Cargelligo and
surrounding districts (including Merri Abba).
Mitchell Water Australia and their subcontractors returned to site on Tuesday 15th January 2013 to
recommence commissioning. Mitchell Water Australia found the following to have occurred as a
result of the thunderstorm;
1. Three of the five ABB WaterMaster magflow water meter transmitters failed (possibly due to an
electrical surge).
2. The telemetry control RTU’s for Bore 2 failed (possibly due to an electrical surge).
3. Loss of electricity supply to the bore water supply control valve at Uabba Street. Power lines at the
corner of Uabba and Grace Streets blew down during the storm, emergency repairs were
undertaken by Essential Energy on 23rd December 2012 to reinstate electricity supply to the Lake
Cargelligo WTP. The control valve was left without electricity supply at this time. Electricity
supply to the control valve was reinstated be Essential Energy on 24th January 2013.
Commissioning could not restart due to the equipment and control failures.
This is Page No.92 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the
Council Chambers, Molong Street, Condobolin.
Earlier thunderstorms/brownouts/surges had resulted in five of the ABB WaterMaster transmitter
cartridges failing previous to the three failures on 23rd
December 2012. Mitchell Water Australia’s
electrical subcontractor Ladd Electrical have had meetings with ABB Australia in this regard who
have recommended the installation of additional surge protection devices in the switchboards to
protect the meters.
Council are awaiting notification on when the damaged equipment will be repaired/replaced and
the additional surge protection installed on site. Council believes the additional surge protection
equipment has been acquired by the electrical contractor. The electrical drawings indicating the
required changes to include the additional surge protection devices were received Monday 4th
February 2013 for review.
Council have also received a copy of the revised Operations and Maintenance Manuals for review.
Council anticipate early rectification of the above problems by the Contractor and commissioning
to recommence soon.
Council and NSW public Works will be required to continue inspection and verification until the
project is completed.
Merri Abba Project Expenditure
No.
Job
Number Description
Source of
Funds Budget
Expenditure
YTD as at
27-11-2012
% of
est. Comment
1 W916.389
Water Supply L/C Project – In
Kind Contribution 100% LSC
$100,000.00 SBC
approved budget $118,399.23 118.4
2 W916.390
Water Supply L/C Project -
Feasibility Study 100% LSC $19,909.00 $19,909.00 100.0 Completed
3 W916.392
Water Supply L/C Project -
Production Bores
Offer 1 50%
NOW up to
$37,500
Offer 2
100% NOW
$153,916.83
LSC
$92,500
$130,000.00 SBC
approved budget
$153,916.83
NOW Offer 2 $287,318.60 101.2 Completed
4 W916.393
Water Supply L/C Project -
Pipeline Survey
50% Fed
50% NOW
$127,500.00 SBC
approved budget $127,944.18 100.3 Completed
5 W916.394
Water Supply L/C Project -
Geotechnical Investigation
50% Fed
50% NOW
$145,000.00 SBC
approved budget $128,978.35 89.0 Completed
6 W916.395
Water Supply L/C Project -
Concept & Process Design
50% Fed
50% NOW
$77,500.00 SBC
approved budget $95,527.52 123.3
This is Page No.93 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the
Council Chambers, Molong Street, Condobolin.
Completed
7 W916.396
Water Supply L/C Project -
Detailed Design
50% Fed
50% NOW
$255,000.00 SBC
approved budget
Detail Design
$295,000.00 SBC
approved budget
Contract
Documentation $404,381.27 73.5 Completed
8 W916.397
Water Supply L/C Project -
Tender Advertisement &
Review
50% Fed
50% NOW
$122,500.00 SBC
approved budget $114,895.50 93.8 Completed
9 W916.398
Water Supply L/C Project -
Preparation of EIS,/Ref &
Heritage Assessment,
Preparation of AHIP
Documentation
50% Fed
50% NOW
Offer 2
100% NOW
$96,083.17
$575,000.00 SBC
approved budget
$96,083.17 NOW
Offer 2 $493,974.63 73.6 Completed
10 W916.399
Water Supply L/C Project -
Obtain Approvals, Permits
And Licenses
50% Fed
50% NOW
$55,000.00 SBC
approved budget $52,957.12 96.3 Completed
11 W916.400
Water Supply L/C Project -
Testing Demonstration
50% Fed
50% NOW
$183,000.00 SBC
approved budget $190,454.56 104.1 90%
Completed
12 W916.401
Water Supply L/C Project –
Pipeline Construction
50% Fed
50% NOW
$3,288,500.00
SBC approved
budget materials
$4,157,500.00
SBC approved
budget
construction $5,647,826.84 76.2
100%
Mitchell
Water
contract
completed
13
W916.402
Water Supply L/C Project –
Bore Pumping Station
Construction
50% Fed
50% NOW
$846,500.00 SBC
approved budget
materials
$278,500.00 SBC
approved budget
construction $1,015,858.07 90.3
100%
Mitchell
Water
contract
completed
100%
Radtel
Systems
contract
completed
14 W916.403
Water Supply L/C Project –
Reservoir Construction
50% Fed
50% NOW
$750,000.00 SBC
approved budget
materials
$523,500.00 SBC
approved budget
construction $848,944.18 66.7
100%
Mitchell
Water
contract
completed
This is Page No.94 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the
Council Chambers, Molong Street, Condobolin.
15
W916.404
Water Supply L/C Project –
Electricity Supply
Construction
50% Fed
50% NOW
$2,960,000.00
SBC approved
budget $1,625,302.14 54.9
100%
Mitchell
Water
contract
completed
16 W916.422
Water Supply L/C Project –
Balance Tank & High Lift
Pump Station
50% Fed
50% NOW
$1,555,000.00
SBC approved
budget materials
$700,000.00 SBC
approved budget $1,964,556.50 87.1
100%
Mitchell
Water
contract
completed
17 W916.423
Water Supply L/C Project –
Iron & Manganese Treatment
System
50% Fed
50% NOW
$750,000.00 SBC
approved budget $705,746.56 94.1
100%
Mitchell
Water
contract
completed
18 W916.424
Water Supply L/C Project –
Fit for Use Pipeline
50% Fed
50% NOW
$225,000.00 SBC
approved budget
materials
$275,000.00 SBC
approved budget
construction $353,601.51 70.7
100%
Mitchell
Water
contract
completed
19 W916.425
Water Supply L/C Project –
Telemetry
50% Fed
50% NOW
$375,000.00 SBC
approved budget $284,629.03 75.9
100%
Mitchell
Water
contract
completed
20 W916.439 Financing Costs
100%
interest from
NOW grant $130,000.00 $122,845.01
Overdraft
completed
TOTALS $19,149,909.00 $14,631,049.80 76.40
Breakdown of Total Project Budget for Merri Abba Pipeline Project
Strengthening Basin Communities $ 9,270,000.00
NSW Office of Water Offer 1 – Test bore drilling $ 37,500.00
Offer 2 – Approvals and production bores $ 250,000.00
SBC Partnership Grant $ 9,250,000.00
Lachlan Shire Council Cash $ 92,500.00
In-kind $ 100,000.00
Pre-grant investigation $ 19,909.00
Interest from NOW grant $ 130,000.00
Total Funds: $ 19,149,909.00
This is Page No.95 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the
Council Chambers, Molong Street, Condobolin.
Mitchell Water Australia Payment Schedule
Contract Sum ($)
Tender Price = $11,600,357.27
Variation 1 = $22,172.50
Variation 2 = $18,976.15
Variation 3 = $5,306.70
Variation 4 = $52,854.84
Total = $11,699,667.46
Contractor Claims for Payment
Claim No. Amount Payment Made
1 $319,013.06 YES
2 $2,662,218.64 YES
3 $2,349,425.85 YES
4 $2,007,968.75 YES
5 $1,155,609.12 YES
6 $1,159,075.95 YES
7 $1,028,610.92 YES
8 $599,552.37 YES
9 $325,815.21 YES
Total $11,607,289.87
Contract sum remaining = $92,377.59
This is Page No.96 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the
Council Chambers, Molong Street, Condobolin.
NSW Office of Water Grant $9,250,000
Claim No. Payment sought by Council Invoiced/Receipted
1 $2,270,000.00 Receipted
2 $807,963.64 Receipted
3 $631,910.31 Receipted
4 $1,018,263.67 Receipted
5 $578,528.89 Receipted
6 $581,023.55 Receipted
7 $493,629.54 Receipted
8 $327,759.96 Receipted
9 $170,069.12 Receipted
Total $6,879,148.68
Strengthening Basin Communities Grant $9,270,000
Claim No. Payment sought by Council Invoiced/Receipted
1 $223,750.00 Receipted
2 $166,250.00 Receipted
3 $236,250.00 Receipted
4 $1,516,400.00 Receipted
5 $1,597,100.00 Receipted
6 $788,125.00 Receipted
7 $866,445.00 Receipted
8(i) $626,250.00 Receipted
8(ii) $398,260.00 Receipted
8(iii) $50,000.00 Receipted
8(iv) $128,600.00 Receipted
Total $6,597,430.00
Financial Implications
The project is continuing within budget. The overdraft facility has been closed. Council are unable
to make further claims for reimbursement from the Federal and State Government until the project
is complete. All values in this report exclude GST.
This is Page No.97 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the
Council Chambers, Molong Street, Condobolin.
7.3.3 LACHLAN SHIRE TRAFFIC COMMITTEE
Community
Strategic Plan
Goal 3 BUILD AND MAINTAIN COMMUNITY INFRASTRUCTURE
AND SYSTEMS
Strategic
Outcome
3.1 Efficient transport networks that meet community and business
needs
Delivery
Program
3.1.1 Implement road maintenance, renewals and improvements in
accordance with asset management plan
Operational
Plan
3.1.1 Complete annual maintenance, renewals and improvements program
ATTACHMENT
Summary
Council Traffic Committee met on Thursday 06 February 2013. The following recommendations
are referred to Council for determination.
Recommendation
That Council:
1. Note the status of outstanding matters from previous Local Traffic Committee meetings.
2. Note the Road Safety Officers report to the Traffic Committee.
3. Install R9-213 High Pedestrian Activity Signs in Bulbodney Street and Umang Street and
that signs in Bulbodney Street be extended out to the intersection of Moodana and Merilba
Streets.
4. Approve the Traffic Plan No LSC 001/013 for the Condobolin Picnic Races.
5. Approve the Traffic Plan No LSC 002/013 for the Tottenham Picnic Races.
6. Approve the Traffic Plan No LSC 003/013 for the Tullibigeal Picnic Races.
7. Approve the Traffic Control Plan Nos. LSC 004/013; LSC 005/013; LSC 006/013 & LSC
007/013 for the Condo 750 Rally.
8. Note the Speed Zone Review Report for McInnes Street and Brooks Lane, Lake Cargelligo.
9. Prepare a concept plan for a Heavy Vehicle by-pass in Condobolin for submission for the
next traffic committee.
Background
The details of the matters considered by the Traffic Committee are outlined in the attachment. The
matters requiring Council to make determinations are shown above.
Financial Implications
Nil
This is Page No.98 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the
Council Chambers, Molong Street, Condobolin.
7.3.4 GUM BEND LAKE ADVISORY COMMITTEE
Community
Strategic Plan
Goal 3 BUILD AND MAINTAIN COMMUNITY
INFRASTRUCTURE AND SYSTEMS
Strategic
Outcome
3.4 Well maintained recreational facilities and community buildings
that meet statutory and user requirements
Delivery
Program
3.4.7 Progressively review and update public amenities across the shire
Operational
Plan
None identified
ATTACHMENT
Summary
The Advisory Committee met on 6 February 2013. And this reports represents a summary.
Recommendation
That Council;
1. Note the present position with implementing the pontoon proposal at Gum Bend
Lake
2. Note the present position with implementing the provision of two benches and shelter
sheds at Gum Bend Lake
3. Note the volume of water being used to fill Gum Bend Lake
Background
The committee has been formed to advise Council on strategic issues with the management of
Gum Bend Lake. The reports are in the attachment.
Financial Implications
There is no further financial implication other than that included in the 2012/13 Operational Plan.
This is Page No.99 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the
Council Chambers, Molong Street, Condobolin.
7.3.5 WEST WEIR ADVISORY COMMITTEE
Community
Strategic Plan
Goal 3 BUILD AND MAINTAIN COMMUNITY INFRASTRUCTURE
AND SYSTEMS
Strategic
Outcome
3.5 Grant income supports infrastructure programs
Delivery
Program
3.5.2 Actively seek grant programs to fund Council and community
projects
Operational
Plan
3.5.2 Continue to seek grant funding
ATTACHMENT
Summary
The Committee met on 6 February 2013 and the following recommendations are submitted for
Council’s consideration.
Recommendation
That Council note the report on progress with Condobolin West Weir study.
Background
The committee has been formed to advise Council on how to progress the construction of the
Condobolin West Weir.
Financial Implications
Nil at this time.
This is Page No.100 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the
Council Chambers, Molong Street, Condobolin.
7.4 CORPORATE AND COMMUNITY SERVICES
7.4.1 FINANCE AS AT 31ST JANUARY 2013
Community
Strategic Plan
Goal 4 BUILD CIVIC LEADERSHIP AND PRIDE
Strategic
Outcome
4.7 Strong effective Council.
Delivery
Program
4.6.2 Council is financially sustainable and provides services at a level
expected by the community.
Operational
Plan
Council’s long term financial plan is sustainable.
Summary
This report advises Council of the payment of accounts and levels of investment as at the 31st
January 2013
Recommendation
That Council note the payment of accounts totaling $2,165,446.96 and the level of
investment as detailed in the investments report.
Payment of Accounts
Accounts paid for the Month of January 2013 totaling $2,165,446.96 have been fully checked and
certified as to receipt of goods and/or the rendition of service, prices, computations and castings,
by the relevant Council officer. There was no expenditure involving investment of funds during
the month.
Investments
Financial Statements and the Investment Report drawn up in accordance with Clause 16(1) Local
Government (Financial Management) Regulation 1999 are detailed below. I hereby certify that the
above investments have been made in accordance with the Act, the Regulations and the Council’s
investment policies.
This is Page No.101 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
INVESTMENT BALANCES AS AT 31 JANUARY 2013
DATE
PLACED
DUE
DATE INSTITUTION PRODUCT
S & P
RATING RATE FACE VALUE
% OF
PORTFOLIO
MARKET
VALUE
Call St George – General Fund Call Account AA- 3.60% 499,000.00 2.18% 499,000.00
Call St George – Medical Centre Call Account AA- 3.60% 275,000.00 1.20% 275,000.00
Call NAB Call Account AA- 3.75% 1,600,000.00 6.99% 600,000.00
27-Nov-2012 08-Feb-2013 Bank West Term Deposit AA 4.45% 1,000,000.00 4.37% 1,000,000.00
16-Nov-2012 09-Feb-2013 Defence Bank Term Deposit NR 4.50% 1,000,000.00 4.37% 1,000,000.00
17-Feb-2011 17-Feb-2013 NAB Term Deposit AA- 6.65% 1,000,000.00 4.37% 1,000,000.00
24-Aug-2012 25-Feb-2013 Westpac Term Deposit AA- 4.92% 1,000,000.00 4.37% 1,000,000.00
06-Sep-2012 05-Mar-2013 People’s Choice Credit Union Term Deposit BBB+ 4.77% 1,000,000.00 4.37% 1,000,000.00
18-Sep-2012 18-Mar-2013 Bendigo Bank Term Deposit A- 5.05% 400,000.00 1.75% 400,000.00
21-Dec-2012 25-Mar-2013 ME Bank Term Deposit BBB 4.70% 1,000,000.00 4.37% 1,000,000.00
21-Dec-2012 15-Apr-2013 ME Bank Term Deposit BBB 4.70% 1,000,000.00 4.37% 1,000,000.00
27-May-2011 28-May-2013 RaboBank Term Deposit AA 6.70% 1,000,000.00 4.37% 1,000,000.00
28-Nov-2012 25-May-2013 RaboBank Term Deposit AA 4.60% 1,000,000.00 4.37% 1,000,000.00
18-Sep-2012 18-Sep-2013 Bendigo Bank Term Deposit A- 4.95% 300,000.00 1.31% 300,000.00
5-Nov-2010 05-Nov-2013 Widebay Aust Term Deposit BBB 7.15% 1,100,000.00 4.81% 1,100,000.00
31-May-2012 31-May-2014 Quay Credit Union Term Deposit NR 5.50% 1,000,000.00 4.37% 1,000,000.00
13-Oct-2012 13-Oct-2014 Rural Bank Term Deposit A- 4.80% 1,000,000.00 4.37% 1,000,000.00
31-May-2012 1-Jun-2015 Bank of Queensland Term Deposit BBB+ 5.25% 1,300,000.00 5.68% 1,300,000.00
6-May-2011 05-May-2016 Investec Term Deposit BBB- 7.65% 1,000,000.00 4.37% 1,000,000.00
31-May-2012 31-May-2016 Investec Term Deposit BBB- 5.47% 900,000.00 3.93% 900,000.00
3-Jun-2011 09-May-2016 Westpac FRN AA- 4.74% 1,800,000.00 7.87% 1,824,804.00
1-Sep-2011 21-Jun-2016 UBS/NAB FRN AA- 4.55% 1,400,000.00 6.12% 1,411,438.00
1-Jun-2012 31-May-2017 RaboBank Term Deposit AA 5.90% 1,300,000.00 5.68% 1,300,000.00
UBS/Grove Blackrock Units 0.00% 7,107.35 0.03% 7,107.35
UBS Cash Account 260.40 0.00% 152.08
22,881,367.75 100.00% 22,917,501.43
This is Page No.102 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the
Council Chambers, Molong Street, Condobolin.
STATEMENT OF CASH BOOK BALANCES AS AT 31 JANUARY 2013
GENERAL TRUST
Opening Balance 01-Jan-2013
877,039.52 2,000.00
Add: Receipts
2,141,298.94 -
Less: Payments
-2,165,446.96 -
Closing Balance 31-Jan-2013 852,891.50 2,000.00
Consolidated Overdraft arranged with Bank is $500,000.00.
I hereby certify that the bank accounts have been reconciled with the Councils accounts as at 31
January, 2013.
This is Page No.103 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the
Council Chambers, Molong Street, Condobolin.
7.4.2 REPORT – RECENT GRANT APPLICATIONS
Community
Strategic Plan
Goal 4 BUILD CIVIC LEADERSHIP AND PRIDE
Strategic
Outcome
4.2 Successful Grant funding
Delivery
Program
4.2.1 Seek grant funding for community initiatives and projects
Operational
Plan
Engage with State and Federal Government agencies and
develop partnerships to deliver projects in the shire
Summary
This report is to inform Council of the outcome of recent Grant applications.
Recommendation
That Council notes the report.
History
Program Project Funding
sought
Total Project
Cost Council
Contribution
QBR
adjustment
required if
successful
Outcome
1 NSW Crown Lands
Division
Pest and Feral Animal
Program 2012/13
Eradication program
$18,000 Current
Budget
No Pending
Announcement
date not
advised
2 NSW Country Passenger
Scheme
Taxi Stand upgrade $40,000 Nil No Successful
$50,000
3 NSW Country Passenger
Scheme
Bus Stop upgrade $20,000 Nil No Successful
$10,000
4 Environmental
Restoration &
Rehabilitation Program
Sedge pathway over three
years
$60,000 Nil No Pending
Announcement
date not
advised
5 Department Sport &
Recreation Participation
and Facilities Program
Rugby League ground
amenities Condobolin
$50,000 $50,000 Yes Unsuccessful
This is Page No.104 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the
Council Chambers, Molong Street, Condobolin.
6
NSW Community Building
Partnership
Dubbo Electorate –
Sealing of Waste Transfer
Tip face and entry at
Derriwong
$15,000
$15,000
Yes Pending
Announcement
March 2013
7
NSW Community Building
Partnership
Barwon Electorate –
Replacement of starting
blocks Tottenham Pool
$8,000
$8,000
Yes Pending
Announcement
March 2013
8 NSW Community Building
Partnership
Murrumbidgee Electorate
– Renovation of the
Memorial Park toilet block
Condobolin
$20,070
$20,070
Yes Pending
Announcement
March 2013
9 Local Govt Shires Assoc
Ageing Population Grant
Community Cntr lift
$25,000
$28,000
Yes Unsuccessful
10
Regional Development
Australia
Round 3 – Pat Timmins
Oval Facilities, Ground
Improvement and
Irrigation
$500,000
$623,300
Yes EOI
successful.
Announced
14th February,
13. Council
now
proceeding to
full application
to be submitted
by 20th March,
13.
11 Regional Development
Australia
Round 4 – Completion of
the Hillston to Eumungerie
Roadlink
$875,000
$875,000
Yes Pending
Announcement
14th Feb 2013
12
Tourism Infrastructure
Regional Funding –
Federal Funding
Completion of Stage 2
Lake Walkway;
Development of the
walkways around Gum
Bend Lake and into
Condobolin; Project title -
Walk the Talk - Wiradjuri
Experience
$200,000
$200,000
No
Pending
Announcement
date not
advised
This is Page No.105 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the
Council Chambers, Molong Street, Condobolin.
Financial Implications
Some projects as listed, if successful, will require an adjustment to the quarterly budget.
7.4.3 CONDOBOLIN SPORTS PROMOTION REQUEST~IN-KIND ASSISTANCE
Community
Strategic Plan
Goal 1 Grow a resilient Community
Strategic
Outcome
1.1 Vibrant Tourism Industry
Delivery Program 1.1.3 Work with event organisers on the implementation of events
Operational Plan Increase attendance at events
ATTACHMENT
Summary
This report is to advise Council of a request for assistance for the 2013 Slattery Auctions Condo
750 by Condobolin Sports Promotions and asks for determination of the level that will be
provided.
Recommendation
That Council:-
i) Provide a Traffic Control Plan, assist with production of accurate maps; the
printing of maps and use of the Council GPS system.
ii) Provide Barricades Bollards and Netting as arranged prior to the event with
reference to the Traffic Control Plan.
iii) Allow the use of 4 shire vehicles (Toyota Prado’s) to transport medical personnel.
Vehicles to be driven at all times by volunteers who are Council staff.
iv) Provide a projector, screen and PA system for the event.
v) Install the 750 banner in the main street 1 month prior to the event.
vi) Ensure all hire fees and refundable security deposits for not for profit
organisation’s are paid prior to the event. (NB currently a 66% discount applies as
per Council’s current fees and charges).
vii) Ensure that all of Councils Event Management requirements are met.
Background
The Slattery Auctions 750 is being held the 12th
13th & 14
th April 2013.
This is an annual motorbike and 4WD cross country race that Council supports with in kind and
assistance each year.
The event attracts visitors to Condobolin and surrounding district and boosts the local business
economy including motels, hotels, clubs and service station operators.
Council is providing a cash contribution from the 2012/13 Community Funding Program of
$3500.00.
It is estimated the cost to Council of in-kind assistance will be $5480.00
Financial Implications
The management plan contains a budget for in kind assistance to special events.
This is Page No.106 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the
Council Chambers, Molong Street, Condobolin.
7.4.4 QUARTERLY BUDGET REVIEW AS AT 31ST
DECEMBER 2012
Community
Strategic Plan
Goal 4 BUILD CIVIC LEADERSHIP AND PRIDE
Strategic
Outcome
4.7 Strong effective Council
Delivery
Program
4.7.1 Council is financially sustainable and provides services at a level
expected by the community
Operational Plan Councils long term financial plan is sustainable
Councils long term objectives are being met
Councils decision making and operational activities meet
regulation and community expectation
ATTACHMENT
Summary
This report and attachments provide details of the budget review to 31 December 2012. Council
had originally adopted a budget showing a small deficit in General Fund. If adopted this review
will result in a $30,119 increase in the Budget deficit, net adjustments to Water and Sewer Funds
are adjusted through their respective reserves and have a nil affect on the consolidated budget
result. The new budget result is a deficit of $94,409
Original Budget Position at Sep review Position this Review
General Fund ($32,410) Deficit ($64,290) Deficit ($94,409) Deficit
Water Fund Nil Surplus Nil Surplus Nil Surplus
Sewer Fund Nil Surplus Nil Surplus Nil Surplus
Recommendation
That:
i) The report on the Budget Review as at 31 December 2012 be noted.
ii) The budget variations contained therein be adopted.
Background
The following statement is made in accordance with clause 203(2) of the Local Government
(General) Regulations 2005.
It is my opinion that the Quarterly Budget Review Statement for Lachlan Shire Council for
the quarter ended 31 December 2012 indicates that Council’s projected financial position at
30 June 2013 will be satisfactory at year end.
Signed: _____________________ Date:___/____/_____
Responsible Accounting Officer, Lachlan Shire Council
This is Page No.107 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the
Council Chambers, Molong Street, Condobolin.
General Fund
The December 2012 budget review is showing the budget deficit increasing by $30,119 to a
deficit of $94,409. The adjustments which result in the increased deficit are listed below:
Function and comment Projected
Budget Variance
$
04100 – Health Administration and Inspection Expenditure
West Weir Investigation Study
+30,000
04073 – Contribution to Rural Fire Service
Reduction in Final Approved 2012/13 Program
-33,631
07240 – Sports Grounds & Recreation Facilities Capital Work
Lake Cargelligo Showground Shed
+33,750
The following adjustments which offset each other and have nil impact on the budget bottom line
are also recommended for adoption:
Function and comment Projected
Budget Variance
$
01810 - Aged & Disabled Revenue
Transfer from Trust for CVRV Capital Works
- 6,335
07810 - Aged & Disabled Capital Work
See above transfer from Trust for CDRV Capital Works
+ 6,335
02180 - Other Business Undertakings Revenue
Children’s services rent for New Building
-29,700
04180 – Other Business Undertakings Expenditure
Building maintenance expenses for Children’s Services Building
+29,700
03760 - Children’s Services Expenditure
Utilisation of 2011/12 Surplus for New Building expenditure
- 17,800
07760 – Children’s Services Capital Expenditure
Utilisation of 2011/12 Surplus for New Building expenditure
+17,800
01820 – Community Activities – Events and Grants Revenue -2,249
This is Page No.108 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the
Council Chambers, Molong Street, Condobolin.
Grant for Lake Tourism Centre volunteers
03820 - Community Activities - Events & Grants
Expenditure for Lake Tourism Centre Volunteers
+2,249
01850 – Home and Community Care Revenue
Home Care brokerage Charge
-216
03850 – Home and Community Care Expenditure
Additional expenses for Home Care brokerage
+216
01510 – Works / Labour Overheads Revenue
Workers Compensation recoveries
-55,000
03510 – Works / Labour Overheads Expenditure
Workers Compensation claims expenses
+55,000
02070 – Rural Fire Service Revenue
Reduction in Final Approved 2012/13 Program
+56,233
04070 – Rural Fire Service Expenditure
Reduction in Final Approved 2012/13 Program
-16,968
08070 – Rural Fire Service Capital Works
Reduction in Final Approved 2012/13 Program
-39,265
01320 – Traffic Facilities / Road Furniture Revenue
Grant – Taxi Rank and Bus Shelter
- 60,000
07320 – Traffic Facilities / Road Furniture Capital Works
Additional expenses for LEP
+60,000
01720 – Swimming Pools Revenue
Electricity costs responsibility of Contractors
-43,000
03720 – Swimming Pools Expenditure
Electricity costs responsibility of Contractors
43,000
Water Fund
21000 - Water Fund Revenue
Grant for finalisation of Merri Abba
-800,000
This is Page No.109 of the Business Paper of Lachlan Shire Council to be held 20 February, 2013 in the
Council Chambers, Molong Street, Condobolin.
23000 – Water Infrastructure Operations Expenditure
Reduced Insurance costs
-15,000
25000 – Transfer From Water Fund Reserve
Reduced Insurance costs
+15,000
27000 – Water Infrastructure Capital Works
Finalisation of Merri Abba
+800,000
Sewer Fund
33000 - Sewerage Services Operations Expenditure
Increased Insurance and Utility expenses
+39,614
33100 – Sewerage Services Asset Maintenance Expenditure
Emergency repairs Lachlan Street Pump Station
+20,000
35000 – Transfer from Sewer Fund Reserve -59,614
8.0 DEPUTATIONS
9.0 MEETINGS AND FUNCTIONS ATTENDED BY THE MAYOR
25 01 13 Dinner with Australia Day
Ambassador
Dinner with Australia Day Ambassador, Councillors
and the General Manager.
26 01 13 Australia Day Activities Condobolin Breakfast
Lake Cargelligo Awards ceremony and morning tea.
Tullibigeal Awards ceremony and lunch.
Fifield Awards Ceremony
Tottenham Awards ceremony and dinner.
05 02 13 Photo Shoot – receiving new
catipillar
05 02 13 Maurice Simpson recognition
dinner.
Attended Mo Simpson’s recognition dinner with GM.
06 02 13 Committee Meetings
08 02 13 Dr Allen’s Farewell Dinner
12 02 13 Precinct Committee Meeting Community Precinct Committee meeting at Parkes
attended by Mayor and GM’s from Parkes and Forbes.
12 02 13 Local Land Services Local Land Services Meeting held at Grenfell.
Attended with Councillors Medcalf and Ridley and the
General Manager.
10.0 NOTICES OF MOTION
11. 0 DELEGATES REPORTS
11.1 AUSTRALIA DAY 2013 – CR FRANKEL
On 26 January 2013 my wife Betty and I were invited to spend Australia Day in Penrith. As you would
be aware Penrith City Council and Lachlan Shire Council signed a Friendship Agreement in August
2006 and I along with Councillor Paul Phillips are the Lachlan Ambassadors for the relationship.
My first engagement for the day was my attendance at a Citizenship Ceremony where Penrith welcomed
69 new citizens into its community and Australia. This was a proud moment and the Ceremony was a
very happy occasion for all.
Penrith’s Australia Day Ambassador was Mr Tim Shaw, Australia’s best contemporary salesman … he’s
a real ‘Best Seller’. Tim Shaw is an actor, talk-back radio and TV presenter as well as an author.
From left to right: Mrs Tanya Davies MP, Member for Mulgoa, Joanne Ryan Penrith City Council’s
Partnerships & Events Officer, Mr Tim Shaw, Councillor Mark Davies Mayor of Penrith and Councillor
Max Frankel Lachlan Shire
Penrith City Council then provided an “Aussie” BBQ lunch for its newest citizens and all invited guests
to enjoy.
The afternoon’s activities consisted of a Premier’s Reception and Penrith’s ‘Celebrations at the Lakes’,
both held at the Sydney International Regatta Centre, Penrith Lakes.
The Premier’s Reception commenced at 5.00pm and was hosted by Mr Stuart Ayres MP, Member for
Penrith.
The ‘Celebrations at the Lakes’ commenced at 6.00pm with a full program of entertainment, including
performances by Timomatic, Seattle Sound and concluded with a fireworks and laser show spectacular.
It was a great day !
Councillor Max Frankel Lachlan Shire Council
12.0 CORRESPONDENCE
12.1 TOTTENHAM WAR MEMORIAL EARLY CHILDHOON CENTRE
ATTACHMENT
Correspondence received from the Tottenham War Memorial Early Childhood Centre, thank Council for
its support at the recent Tri-annual fundraising event.
Recommendation
That Council note the correspondence.
12.2 FINANCIAL ASSISTANCE GRANTS
Correspondence received from the Hon Simon Crean MP thanking Council for its letter of 16 October
2012, concerning Financial Assistance Grants allocation for 2012-2013 and advising that the reason for
this year’s larger than expected negative adjustment is because there was a reduction in the CPI figures
as well as an adjustment downwards of Australia’s population estimates.
Recommendation
That Council note the correspondence from the Hon Simon Crean MP.
12.3 CONDOBOLIN PONY CLUB
Correspondence received from the Condobolin Pony Club thanking Lachlan Shire Council for the
assistance with the grounds.
Recommendation
That Council note the correspondence.
12.4 DAY LIGHT SAVING
Correspondence received from the Attorney General & Justice Department thanking Council for its
correspondence regarding daylight saving and advising the NSW Government has no plans to change
the current daylight saving provision however notes that the Government is conscious of the impact of
daylight saving on some communities.
Recommendation
That the Council note the correspondence.
12.5 CONDOBOLIN CLOTHING
Correspondence received from Condobolin Clothing thanking council for the great Christmas banners in
the street.
Recommendation
That Council note the correspondence.
13.0 COMMON SEAL
14. 0 QUESTIONS OF WHICH NOTICE HAS BEEN GIVEN
15.0 MATTERS RULED URGENT BY THE MAYOR
attachments
This is Page No.129 of the Business Paper of Lachlan Shire Council to be held 16 January, 2013 in the Council
Chambers, Molong Street, Condobolin
ATTACHMENT 7.1.1
REPORT TO COUNCIL UPDATING PROGRESS ON PREVIOUS
RESOLUTIONS
As at December 2013 Council Meeting
Date Detail Office
r
Action taken to date Anticipated
date of
completion
That investigations be made
for an ablutions block at the
Fifield Recreation Grounds
DESP Consulted with Fifield Town
Committee, Consulted with
SRA committee on 13.2.2013
re this matter, project good to
proceed. Slab to be laid and
building moved. Works
commenced 14 02 13.
End June
2013
That a report be brought
back to the next meeting of
the Corporate Services
Committee to enable
Council to review the
Planning a Public Event
procedure manual.
GM
MED
Event procedure manual
under review. Councillor
workshop held 12 August.
Section 355 Committee
training scheduled for 28 Feb
& 1 March.
Community
Meetings
held with
good
attendance
Expect to
have revised
manual for
public
exhibition
following the
community
meetings
Themed street tree
replacement program to be
developed for Condobolin,
Lake Cargelligo and
Tottenham
DTS This is programmed for early
next calendar year.
March 2012.
RESOLVED that Council
employ a Town Planner,
Consultant or
Draughtsperson for the
upgrade of Foster Street re:
from Canada Street to Lake
DTS A Penrith City Council
landscape architect visited
Lake Cargelligo the week
commencing 18 June. A
report with recommendations
is expected in early 2013
March 2012.
This is Page No.130 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Street, Lake Cargelligo.
That construction of banner
poles for Lake Cargelligo
continues and Tottenham
Councillors confer with
owner of the Hotel and
advise if they wish to
continue.
DTS Lake Cargelligo banner poles
under review as part of the
landscape project.
Tottenham banner poles are
installed.
Ongoing
RESOLVED that Lachlan
Shire Council approach the
Australian Government to
fast track the roll out of the
National Broadband
Network (NBN) through the
major centres of the Lachlan
Shire. Being a Rural
Remote Region this will
have the obvious benefits
for not only E-Commerce
but especially for E-
medicine and E-Health.
MED MED liaising with NBN
Rollout team.
(Note: Centroc have been
very active on this issue and
have failed to influence the
rollout timetable. The Federal
Government have announced
the timing of the satellite
coverage that will apply to
some areas of the shire)
Ongoing
RESOLVED that Lachlan
Shire Council actively seek
to promote itself as a
“Renewable Energy
Production” friendly Shire.
This should not only include
the use of Biomass such as
Mallee Trees but also solar
photovoltaic, solar thermal
and wind production farms.
MED
GM
Meeting 6 Feb with DII&T,
CWFS, UWS & VFFF
representatives to discuss
future research opportunities
around renewable energy.
Council has written to all
leading producers of Solar
and Wind power inviting
them to consider Lachlan
Shire in their planning and to
visit the shire if the wished.
Two responses received and
they have been submitted to
Council.
Discussions held with DPI
regarding a possible grant
A report will
be submitted
to Council in
February
2013
outlining a
Solar Energy
Proposal.
This is Page No.131 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
application
Investigate the suitability of
the current site of the
Condobolin Filtration Plant
for replacement with a new
facility. The current facility
is ageing infrastructure and
will need renewal by
2015/2016. If the current
site is unsuited then a new
site needs to be identified
and established with the
relevant approvals in place.
That the Director bring
forward a report on
undertaking a feasibility
study for a water treatment
plant for Condobolin
DTS A workshop including PWD,
Health and NOW was held
on the 28 November 2012.
The staff’s proposal for
upgrading the WTP was
tabled and generally
endorsed. A report was
submitted to Council in
February 2013 outlining the
proposal. COMPLETE
February
2013
RESOLVED that Lachlan
Shire Council urgently
investigate strategies to
attract Private Veterinary
Services to Condobolin.
DESP All vets contacted require
Council support to establish a
presence – Council direction
required.
Ongoing, no
subsidised
premises
identified
and that is
what they all
require.
RESOLVED that Lachlan
Shire Council reinvestigate
the construction and
operation of a Fluoride
dosing unit for the Lake
Cargelligo Town Water
Supply system.
DTS A funding application has
been submitted to the State
Government.
Awaiting response.
Ongoing
RESOLVED that Lachlan
Shire Council investigates
and then improve the
landscaping on the William
Street side of the Willow
Bend Sports Stadium in
Condobolin
DESP Quote from S Huggins
obtained, proceeding with
this after this summer.
April 2013
This is Page No.132 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
RESOLVED that Lachlan
Shire Council investigate
and resource the
reintroduction of Business
Awards in Lachlan Shire on
a Biennial Basis.
MED Approached I&I for
sponsorship of section of
Business Awards, will apply
for funding in 12/13 FY
2012/13
RESOLVED that Council
investigates the relocation or
upgrade of ‘Lions Park’
Condobolin.
DTS To be investigated early next
year.
April 2013
RESOLVED that Council
investigates and provides
adequate street lighting in
Goobang Street,
Condobolin.
DTS To be investigated early next
year.
April 2013
RESOLVED that
investigations take place
into a new location for
Youth Services in
Condobolin.
DESP No action undertaken as yet. June 2013
Install/replace ‘School
Zone’ and ‘End School
Zone’ signs around the Lake
Cargelligo Central School
DTS Signs received, quote
approved by RMS 7/8/12,
work commenced.
February
2013
Support the installation of
blisters in
Conapaira/Canada Streets
and at the ‘Children’s
Crossing’ in Canada Street.
DTS Awaiting grant opportunities
Replace the raised
temporary island at the
intersection of Silos Road
ad Melrose Road with a
painted median with
reflective markers
DTS Report submitted to Council
17 October 2012. Placed on
works roster.
April 2013
Install/replace ‘School DTS Signs received, quote February
This is Page No.133 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Zone’ and ‘End School
Zone’ signs around the
Condobolin Public School;
St Xavier School;
Condobolin High School;
M.E.T School; St Joseph’s
Primary School and the
Tullibigeal Public School
approved by RMS 7/8/12,
work commenced.
2013
Support the installation of
blisters in Busby Street;
Officers Parade; Molong
Street and Williams Street.
DTS Awaiting grant opportunities
for funding.
Further that RMS be
requested to investigate
extending the school zone in
Officers Parade.
DTS To be investigated.
Install of guide posts to
prevent parking too close to
the intersection of MR57S
and MR7513 and to refresh
the line marking of this
intersection and to define
the holding line within the
intersection. Improve the
table drain drainage and
extend the seal north of the
intersection.
DTS Instructions issued for work March 2013
Upgrade and install crossing
signs in Orange Street.
Remove the old candy poles
in Orange Street
DTS Instruction issued for work February
2013
Improve the southern side of
the Road by installing a
gravel pad and to install
‘School Bus Route’ signs
along the route
encompassing the Poverty
DTS Signs installed and pad
scheduled with future
shoulder grading.
February
2013
This is Page No.134 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Point Bus Stop.
Contact Transport NSW to
obtain all relevant
information of all Bus
Routes within the Lachlan
Shire and designated Bus
Stops.
DTS Will soon be attended to. March 2013
Request school bus
operators confirm that the
information supplied by
Transport NSW is correct
DTS Will attend to once
information is received.
Ongoing
Install ‘School Bus Route’
signage on Melrose Street,
Condobolin.
DTS Instruction issued February
2013
Prepare a policy for school
bus stops (note this is on the
RSO’s agenda)
DTS Note:
Parkes Shire Council has a
draft document, when
adopted, will be used to
create one for LSC.
Ongoing
Note that installation of RV
friendly signs be considered
in conjunction with the
Short Term Truck
Machinery Parking Area
(Item 4).
DTS Awaiting truck site to be
resolved.
Note that installation of
‘The Bogan Way’ will be
undertaken as part of the
Rural Addressing Program
(Item 7).
DTS Will be undertaken as part of
signage for rural addressing
May RESOLVED that Council
authorize the placement of
DTS To be placed on exhibition in
March 2013. Report to
April 2013
This is Page No.135 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
2012 the Lachlan Shire Council
Drought Management Plan
and Centroc Regional
Drought Management Plan
on public exhibition for 28
days and seeking
community comment.
Council April 2013.
RESOLVED that the works
at Lake Cargelligo
Residential Estate and the
Lake Cargelligo Industrial
Estate be carried out
concurrently and that works
be carried out as a matter of
urgency.
DTS Electricity works planned for
installation early March
2013.
Early 2013
RESOLVED that Council
contact Graincorp and
request a permanent solution
to dust issues emanating
from all internal roads in
Lake Cargelligo site.
DTS A meeting is being sought
now.
March 2013
Essential Energy Street Tree
Replacement Program –
Lake Cargelligo
RESOLVED that Council
arrange a meeting with
Essential Energy, concerned
residents and Council.
DTS Meeting planned with
Country Energy on 20
February. Public meetings
planned for early 2013
February
2013
RESOLVED that the
Council pursue all avenues
to establish a Helipad at the
Condobolin Hospital ASAP,
in consultation with the
Department of Health.
This is becoming a matter of
urgency and needs to be
addressed now.
DTS
On site meeting occurred.
Concepts agreed. Survey
complete, design issues being
investigated. Concept plan
tabled at Health Council
Meeting. Significant impact
on grounds. Requested
Council to carry out further
investigations and highlight
Ongoing at
this time.
This is Page No.136 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
precise issues.
RESOLVED that Council
sell the house in McDonnell
Street after the relocation of
Children’s Services and the
proceeds be reserved
towards new JRL facilities.
DESP House to be listed for sale,
awaiting Manager Econ. Dev
to obtain independent
valuation.
June 2013
July
2012
BUSINESS AWARDS
That a panel be formed to
oversee the Awards, and
include a judging panel to
‘mystery shop’ nominated
businesses.
DCCS Advertisements for
community representatives
currently open. Meetings of
panel to occur following
formation of the group.
June 2013
Take a pedestrian and
vehicle counts at the
proposed location of the
Skate park and bring back a
report to this committee
DTS Vehicle count complete.
Pedestrian counts to occur in
the new year after school
returns.
February
2013
Aug
2012
RESOLVED that Council
Rename SR185 to Yelkin
Road; Council to advise the
residents of Yelkin Street of
the proposed renaming to
McKellar Street and invite
input. Submit report to
Council on outcomes.
DTS Will be attended to soon. March 2013
RESOLVED that Lachlan
Shire Council investigate
the purchase/construction of
a “Donation Box” (safe) for
siting at Gum Bend Lake
and the matter be referred to
Gum Bend Lake
Committee.
DTS Will be attended to soon. February
2013
This is Page No.137 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
(Harris/Weale
Return to Business Paper
This is Page No.129 of the Business Paper of Lachlan Shire Council to be held 16 January, 2013 in the Council Chambers, Molong Street, Condobolin
ATTACHMENT 7.1.2
Lachlan Shire Delivery Program 2012 - 2016
Incorporating the Operational Plan
2012-2013
Report on Progress to 31 December, 2012
L I V I N G
L A C H L A N
S T Y L E
2022
This is Page No.130 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
This is Page No.131 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
The Communities Vision for the Future
This is Page No.132 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Progressive, vibrant and prosperous communities
The many towns, villages and settlement throughout Lachlan are
alive and thriving with economic and community activities.
Livelihoods are made through the produce and associated products of
the land, the learning and experiences of the natural environment and the ancient and recent cultural heritage
found here
Families come to stay and enjoy a relaxed, healthy way of life and
strong community spirit
The strong, generous spirit of our community ensures people and
families are welcomed and supported. Being fit and healthy is part of Lachlan
living. Families and communities enjoy playing sport, participating in
recreational activities, being together at events and having fun.
Our natural environment of lakes, meandering waterways and red soil
plains is rich in cultural heritage, abundant wildlife and unparalleled
beauty
The rivers, lakes, waterways, land and soils are the life force of Lachlan. They contain the connection to our area’s
rich Wiradjuri Nation history, our more recent European history and the future we are building together. All that we aspire is nurtured by land and water. We share our home with abundant wildlife and birdlife. This is a beauty
that inspires.
Everything is possible, for all.
In Lachlan there are opportunities for all and no one should be left
behind. Everyone is encouraged to reach their potential and to be all
they are able to be
This is Page No.133 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
COUNCIL HAS ADOPTED THE SLOGAN OF ‘LACHLAN SHIRE – THE HEART OF NSW’ AS A BRAND FOR THE SHIRE.
LACHLAN SHIRE – VISION
FOR THE LACHLAN SHIRE TO BE A RESILIENT COMMUNITY PROVIDING ECONOMIC AND SOCIAL GROWTH,
THROUGH EVOLVING, AGRICULTURAL, BUSINESS AND MINERAL ACTIVITIES
LACHLAN SHIRE – MISSION
TO ENGAGE THE COMMUNITY, PROVIDING AND DELIVERING PROGRESSIVE SERVICES WHILST IMPLEMENTING A
LONG TERM STRATEGIC PLAN LEADING TO THE SOCIAL AND ECONOMIC BENEFIT OF THE COMMUNITY
‘‘LLaacchhllaann SShhiirree –– tthhee HHeeaarrtt ooff NNSSWW’’
The Delivery and Operational plans are organised to reflect the structure of the community strategic plan “Living
Lachlan Style – 2022” which contains six (6) key future directions that have been identified to achieve the
community vision...
LACHLAN SHIRE VISION AND MISSIO DELIVERY AND OPERATIONAL PLAN
This is Page No.134 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Grow a resilient economy
Increase opportunities and facilities for education and skill development
Build and maintain community infrastructure and systems
Build civic leadership and pride
Living in the natural environment
Health, wellbeing and culture
Each future direction is supported by a number of strategic outcomes, Councils role and details of other organisations and groups that need to
collaborate.
This report outlines progress to 30 September 2012 in achieving those actions that Council intends to take over the course of the four years to meet
its obligations under the plan.
This is Page No.135 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
GOAL 1: GROW A RESILIENT ECONOMY
GROW A RESILIENT ECONOMY
This is Page No.136 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
The community’s vision is for towns and villages in the shire to have a strong and sustainable economy. Lachlan Shire’s role in achieving that vision will centre on
strengthening the tourist industry, broadening the spread of industry providing local employment by supporting existing business and industry and by attracting new
businesses and by showing leadership and a positive outlook.
This delivery plan will focus on completing the industrial and residential estates in Condobolin and Lake Cargelligo and by effectively marketing those new lots to
assist local and new business to grow. Economic Development staff will be working with event organisers and tourist organisations to maximise the dollars flowing
to local business.
Council has a number of traineeships and apprenticeships at present and will look at expanding the number of positions in order to increase local skilled
employment. We will continue to work on strengthening our relationship with the schools and education and training providers.
Access to the latest technology is important and Council will be lobbying for the improvements in mobile phone coverage, access to ADSL2 and early rollout of the
National Broadband network.
The rural industries that form the backbone of the local economy are still to fully recover from the crippling drought and Council will lobby both State and Federal
Governments for continued financial support to farmers as the circumstances dictate.
CSP
No
Strategic Outcome Performance Measures
1.1 A vibrant tourist industry Stable or increasing population
1.2 A diversified manufacturing sector Employment opportunities
1.3 An innovative, progressive and growing agricultural sector Economic outputs of the shire
1.4 Access to reliable current technologies Housing approvals
1.5 A recognised and valued Lachlan Brand Number of qualified tradespeople
1.6 A diverse range of employment opportunities Number of businesses
Outcome 1.1: A Vibrant Tourism Industry
This is Page No.137 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Ref No Delivery Program Action
(2012/2016)
Operational Plan Action
(2012/2013)
Performance Measure Responsible officer Progress as at 30 September 2012
1.1.1 Work with the Regional
Tourism groups and
local tourism
committees to advance
tourism initiatives
Attend meetings of
relevant regional and local
tourism organisations and
encourage operators to
attend workshops and
provide assistance and
guidance for locally driven
projects
Increased tourism
numbers and spend
MED Attended CNSWT meetings July, Aug & Sept.
Grants workshop run by RDACW in Parkes in
September information forwarded to
operators.
1.1.2 Help provide visitor
information centres
Provide community groups
with locally specific tourist
information
Meet with committees
each quarter
MED Met with Lake Cargelligo and Tottenham
tourism committees, and Condobolin
Historical Society.
1.1.3 Work with event
organisers on the
implementation of
events
Actively participate and
promote events
Increased attendance at
events
MED Poppers in the Pines, PBR, Condo
Autosports – Motocross, Condobolin and
Lake Cargelligo Annual PAH&I shows,
Tottenham Flower Show, Classic Outback
Trail, Country and Regional Living Expo,
Yellow Mountain Cross Country, Variety Club
Bash, Campdraft, Condobolin Kennel Show,
Condo B&S Ball, Born to Read, Pony Club
Camp, Condobolin Show Ball. On The Road –
This Girl Laughs production.
1.1.4 Upgrade Council
facilities to support
events
Work with community
groups to upgrade facilities
through Councils grant
program
projects completed DTS/MI
MBS
This is Page No.138 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
1.1.5 Identify and help secure
grant funding for events
Apply for grant funds as
programs become available
Number of applications
lodged
MED LSC Community Grants Program included
support to: Condo 750, Born to Read,
Christmas functions for all towns and
villages, Condobolin Picnic Race Club,
Condobolin Clay Target Club, Tottenham
Swimming Club, Lake Cargelligo Arts and
Crafts, Tottenham Race Club.
Finished and acquitted Community Building
Partnerships funding for Rugby League Kiosk,
Welcome to Shire Signage.
Lachlan Regional Community Grants Fund –
launched 24 September and actively working
with the community to apply.
1.1.6 Progressively improve
road and town tourism
signage
Ensure effectiveness of
tourism signage
2 new signs installed
each year
MED
DTS
Six development applications approved. 3
signs erected.
Tourism signage report to September traffic
committee listing community/council
requests from Tottenham/Lake
Cargelligo/Condobolin.
1.1.7 Operate maintain and
develop Council owned
caravan parks
Develop Business plans for
the three parks
Complete extensions to
Lakeview Caravan Park
Complete by
30/12/2013
Complete by
DESP Fresh quote sought for Business Plans
This is Page No.139 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
office 30/12/2012 Plans finalised for office extension
1.1.8 Provide town parking
for recreational vehicles
with trailers or caravans
Liaise with Technical
Services staff to identify
suitable sites for parking
and seek funding for
designated signage
Review of parking
completed
DTS/MED Tourism signage report to September traffic
committee for Tottenham RV friendly
designated parking area.
1.1.9 In conjunction with
Aboriginal community
develop opportunities
for local tourism
ventures
Meet regularly with local
Aboriginal groups to
develop tourism proposals
Number of proposals
developed for funding
MED Meeting WCC re: Aboriginal Tourism Trail.
July & September.
Requested to attend July Condobolin
Wiradjuri Alliance Group meeting to go over
Community Strategic Plan and the future
direction.
“On The Road” team from Penrith
Performing and Visual Arts Ltd, Penrith
Regional Gallery, ICE Parramatta and
Nordoff-Robbins, met 17-20 Sept with
Murrin Bridge Local Aboriginal Lands Council
(LALC), requested to meet with Condobolin
LALC.
Looking to exhibit basket weaving in Penrith
Regional Gallery late 2013.
Quilting project for Aboriginal and Non-
indigenous quilting groups across the Shire
being formulated from Penrith Visit in
September.
This is Page No.140 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
1.1.10 Maintain and develop
Gum Bend Lake for
locals and visitors
Implement the annual
maintenance and upgrade
program
Ongoing DTS/MI Contractor engaged to supply two shelter
sheds for erection early March 2013.
Pathway to lake under construction Feb
2013.
Outcome 1.2: A diversified manufacturing sector
Ref No Delivery Program
Action (2012/2016)
Operational Plan Action
(2012/2013)
Performance Measure Responsible
Officer
Progress as at 30 September 2012
1.2.1 Develop and market
Industrial estates in
Lake Cargelligo and
Condobolin
Complete development
and commence marketing
of industrial estates in Lake
Cargelligo and Condobolin
Level of Sales MED
DTS
All Boona Road Stage One sold. Stage two
prices to be set at October Council meeting.
Land & Titles approval of Randall Place
(Stewart Crescent) subdivision received.
Only external drainage works required at
Boona Road to complete infrastructure.
1.2.2 Economic development
unit to engage with the
manufacturing and
business sector
Expand/Establish
manufacturing business
groups to examine
funding/business
opportunities
Grants Email quarterly
Meeting as necessary
MED Meetings organised for October with sector
to encourage listings with ICN – Industry
Capability Network.
1.2.3 Facilitate connections
between mining
companies community
and business
Business groups to
examine funding/business
opportunities
Database generation
upgrade and send out
quarterly emails of
opportunities or funding
MED Grants eblast sent out, and radio updates
broadcast.
This is Page No.141 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Outcome 1.3: An Innovative, progressive and growing agricultural sector
Ref No Delivery Program Action
(2012/2016)
Operational Plan Action
(2012/2013)
Performance Measure Responsible
Officer
Progress as at 30 September 2012
1.3.1 Provide transport
infrastructure needed to
support agriculture
Complete road annual
maintenance, renewals and
improvements program.
Programmed works
completed.
DTS/MO All programs are proceeding on schedule.
1.3.2 Advocate for the
continuation of the
Condobolin Agricultural
and Research Station
Ongoing liaison with
relevant funding agencies
Reconvene advisory
committee Yr 1
Level of advocacy
undertaken
Number of meetings of
advisory committee
MED NSW Budget has not affected jobs in the
current period.
Outcome 1.4: Access to reliable and Current Technologies
Ref No Delivery Program
Action (2012/2016)
Operational Plan Action
(2012/2013)
Performance Measure Responsible Officer Progress as at 30 September 2012
1.4.1 Advocate for the NBN
rollout in the
Lachlan Shire
Liaise with government
agencies to fast-track
Lachlan to receive NBN
rollout
Number of email updates to
community/business
register
MED The National VET Flexible E-learning Strategy
2012-15, may provide funding opportunities
for 2013/14 & 2014/15.
Currently – Condobolin & Lake Cargelligo are
not scheduled for rollout by 2015. Go to
www.nbnco.com.au for information.
1.4.2 Advocate for
complete mobile
phone coverage
Liaise with Telstra and
Federal Government for
increased mobile coverage
Increased Mobile Coverage in
Shire
MED/MIT Telstra/Optus shared tower at Tullamore to
be opened before end of 2012 will increase
This is Page No.142 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
throughout the shire throughout the Shire cover between Trundle & Albert.
1.4.3 Assist with the
provision of
differential GPS across
the shire
Liaise with and provide
information to CORSnet
(Department of Lands)
DGPS base stations installed
at Lake Cargelligo and
Tottenham.
MO/MED Agreement has been reached for one to be
installed at the aerodrome at Tottenham.
1.4.4 Advocate for ADSL2 at
Lake Cargelligo and
Tottenham
Liaise with Telstra and
Federal Government for
ADSL2 throughout the Shire
ADSL2 in Lake Cargelligo and
Tottenham
MED/MIT ADSL2 now available in Tottenham.
Discussions with Telstra have so far been
unsuccessful at Lake Cargelligo.
Outcome 1.5: A recognised and valued Lachlan Brand
Ref No Delivery Program
Action (2012/2016)
Operational Plan Action
(2012/2013)
Performance Measure Responsible Officer Progress as at 30 September 2012
1.5.1 Continue to work
with Western Plains
regional
development by
using the “Heart of
NSW” brand
Identify and partner
appropriate and
sustainable programs to
develop the Heart of
NSW Brand
Number of programs
developed and grants
received
MED Liaison to launch Lachlan Region Community
Grants Scheme. Applications close 2
November 2012.
“On the Road” opportunities via quilting and
West Women Weaving are being developed.
LSC is a pilot Council to develop a Tourism
App for smart phones. This is fully funded for
the development. Maintenance/support
annual fees from tourism budget. Filming
scheduled for October.
1.5.2 Encourage local
business to join in
the Heart of NSW
Work with local tourism
groups to indentify and
implement projects for
Lake Cargelligo,
Number of businesses
actively branding as the
HONSW
MED Businesses invited to participate in
information distributed at the CARLE.
All LCS communities engaged in
This is Page No.143 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
brand program Condobolin and
Tottenham.
development for HONSW visitor
guide/HONSW App.
Outcome 1.6: A diverse range of employment opportunities
Ref No Delivery Program
Action (2012/2016)
Operational Plan Action
(2012/2013)
Performance Measure Responsible Officer Progress as at 30 September 2012
1.6.1 Increase
opportunities for
indigenous
employment in
councils workforce
Develop strategies to
increase the level of
Indigenous employment
within Council W1.4
Appointment of an
Aboriginal Environmental
Health Officer Trainee
HRM Council has appointed an Aboriginal
Environmental Health Officer who
commenced on the 23 July 2012
1.6.2 Increase traineeships
and cadetships in
Council employment
Continue to foster the
growth of a local
workforce through
traineeship,
apprenticeships and
ongoing training W1.4
Trainees complete year of study HRM Cadets and Trainees currently undertaking
exams.
1.6.3 Work with schools to
provide work
experience in Local
Government
Work closely with
regional high school to
host school based
traineeships, work
experience and work
placement programs
1.4
Host Careers in Local
Government for Year 9.
School students undertake
work experience and work
placement with Council
HRM Careers in Local Government presentation
held at LSC on the 8 June 2012 for
Condobolin High School.
Council hosted Work Experience and Work
Placement students in outdoor staff, Gym
and Library in April/May 2012.
1.6.4 Advocate for the Engage with State and Number of collaborations MED Meeting with DEEWR and ICC. CareWest
This is Page No.144 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
State Government
agency staff to be
based in the shire
rather than serve as
outreach positions
Federal Government
agencies and develop
partnerships to deliver
employment in the shire
with relevant stakeholders
This is Page No.145 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
INCREASE OPPORTUNITIES AND FACILITIES
FOR EDUCATION AND SKILL DEVELOPMENT
This is Page No.146 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Residents involved in the development of the Community strategic plan placed a high emphasis on the importance education and skill development
and wanted to see improved opportunities for school leavers. Council’s role in meeting the vision of resident’s llivelihoods made through the
produce and associated products of the land, the learning and experiences of the natural environment, and the ancient and recent cultural heritage
found in this shire is mainly one of advocacy and facilitation.
Council will partner with training and education providers to work to improve school retention and completion rates, the suitability of courses
offered and the transition from school to work.
One of the issues facing this community is the need for students to leave the shire to attend high school, TAFE and university. The vision of a local
boarding school and a better range of locally offered courses perhaps capitalizing on technology is well founded and one that Council will pursue
The Wiradjuri Study Centre is a key component offering an outstanding opportunity for this community to establish local programs based on the
cultural heritage of this region. Council will continue to support the centre and all that it stands for and will hold regular meetings with the Wiradjuri
Alliance Group to ensure that Council is in touch and responding appropriately.
CSP
No
Strategic Outcome Performance Measures
2.1 More education opportunities in Lachlan Shire Non school qualifications
2.2 Improved school facilities including a local boarding school Number of students completing HSC
2.3 Successful transition from school to employment Transition into work
2.4 Industry targeted skill development School retention rates
2.5 Technology is used to facilitate education and training
opportunities
Age profile of workforce
2.6 Marginalised groups have targeted education and training
opportunities
Employment participation by minority groups
This is Page No.147 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Outcome 2.1: More Education Opportunities in Lachlan Shire
Ref No Delivery Program
Action (2012/2016)
Operational Plan Action
(2012/2013)
Performance Measure Responsible Officer Progress as at 30 September 2012
2.1.1 Continue to support
the development of
the Wiradjuri Study
centre
Promote the centre Number of event bookings at
WSC
MED Liaison with WCC and PPVA 18 September.
TO & MED met with WCC to develop
indigenous tourism trail.
WCC filmed for Ozzie Holiday TV series.
Footage to be uploaded to HONSW App.
2.1.2 Develop training
targeted at
Indigenous tourism
Promote training/course
delivery across in the
Shire
Partner with Murrin
Bridge Local Aboriginal
Lands Council,
Condobolin Local
Aboriginal Lands Council,
National Parks and
Wildlife Service, Western
Plains Regional
Development Inc, Lower
Lachlan Community
Services Inc.
Number of training courses
offered
MED E flexible learning.
Smart boarding with ICE
Communities invited to attend RDACW grant
funding training workshop in September.
Collaboration with Bland Shire regarding
Mining Trail – Manna Mountain
PPVA & ICE visit in September (17-21)
developing training for Indigenous artists for
tourism development
This is Page No.148 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Outcome 2.2: Improved school facilities including a local boarding school
Ref No Delivery Program
Action (2012/2016)
Operational Plan Action
(2012/2013)
Performance Measure Responsible Officer Progress as at 30 September 2012
2.2.1 Encourage the
Catholic Church to
extend its Primary
school into
secondary education
Liaise with Condobolin St
Josephs Primary School to
encourage a secondary
school expansion
Meeting with St Joseph’s
School
MED Informal discussions held with Principal of St
Josephs.
Outcome 2.3: Successful transition from school to employment
Ref No Delivery Program
Action (2012/2016)
Operational Plan Action
(2012/2013)
Performance Measure Responsible Officer Progress as at 30 September 2012
2.3.1 Encourage better
relationships
between schools,
employers and
trainers
Attend/facilitate
information days to
promote work experience
, work placement
programs with schools,
TAFE’s & Universities
W1.2
Number of information days
& expos
attended/facilitated.
Number of work related
courses delivered
MED /
HRM
MED & Youth Coordinator have fortnightly
meeting with CHS.
Youth Council in Condobolin established
August.
Feedback sessions indicated broader careers
advice requested in schools.
Outcome 2.4: Industry targeted skill development
Ref No Delivery Program
Action (2012/2016)
Operational Plan Action
(2012/2013)
Performance Measure Responsible Officer Progress as at 30 September 2012
2.4.1 Encourage stronger
relationships
Promote activities,
employment
Number of Region 19 MED July & September CWESIC meetings
This is Page No.149 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
between the mining
sector and schools
opportunities/scholarships
and open days
meetings attended attended.
Outcome 2.5: Technology is used to facilitate education and training opportunities
Ref No Delivery Program
Action (2012/2016)
Operational Plan Action
(2012/2013)
Performance Measure Responsible Officer Progress as at 30 September 2012
2.5.1 Encourage the use of
video conferencing
to enable the local
delivery of job
related training
Provide learning
opportunities as a
supplement to face to
face learning which can
provide a flexible delivery
option for staff
W4.1
Liaison with education
providers and business
community to align
course delivery for
employment vacancies
Staff undertake e – learning
opportunities and webinars
for training
Surveying businesses for
skills gap/growth
Region 19 meetings
attendance
MED/MHR
ICE & PPVA visit in September to investigate
delivery of professional development via
smartboarding.
CareWest & ICC investigating delivery
alignment between TAFE Western and TAFE
Riverina.
Webinars offered to Council staff include:
Handling difficult clients/customers; Work
Health & Safety and Writing Effective
Newsletters.
This is Page No.150 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Outcome 2.6: Marginalised groups have targeted education and training opportunities
Ref No Delivery Program
Action (2012/2016)
Operational Plan Action
(2012/2013)
Performance Measure Responsible Officer Progress as at 30 September 2012
2.6.1 Utilise library
programs to
encourage reading
and literacy training
Continue to provide
broadband for seniors
Early intervention reading
program continuity
Expand library services to
Lachlan Children’s
Services mobile preschool
Number of seniors attending
Number of children
attending
Number of books/materials
borrowed
DCCS Agreement in place to extend Broadband for
seniors for a further 2 years.
10 to 15 children + parents attending Friday
story time.
580 Picture Easy Books (early reading
intervention specific) borrowed during the
quarter.
Meeting to be held with new Children’s
Services Co-Ordinator to further develop this
project.
2.6.2 Ensure targeted
education and
training is delivered
across the shire
Liaison with education
providers and business
community to align
course delivery for
employment vacancies
Surveying businesses for
skills gap/growth
Region 19 meetings
attendance
MED Meeting with Minister for Education at
Opening of LCS Preschool building in
Condobolin.
July & Sept CWESIC meetings attended via
videoconference.
This is Page No.151 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Council fully supports the communities vision of modern infrastructure based on an effective transport system, best practice water and sewerage
systems and recreation and sporting facilities and will continue to strive with all means to achieve those aspirations. The priority given to transport is
reflected in the roads budget which over the 4 year Delivery Program is estimated to exceed $34m. The completion of the Hillston to Eumungerie
road link providing north south sealed access for locals, freight and tourists is number one and will be carried out in the life of this plan. Other major
components include completion of the flood damage restoration programs, routine roads maintenance and a resealing and resheeting program
based on funds received under the Roads to Recovery program and Financial Assistance grants.
Council staff have been working with consultants and the NSW public works and the major project of the Merri Abba to Lake Cargelligo pipeline is
nearing completion. This is the largest single project ever undertaken by Lachlan Shire and will bring certainty of supply and improved quality
outcomes for the people of Lake Cargelligo, Tullibigeal and surrounds. Council staff have also been involved with the Centroc Water Utilities Alliance
on management plans that are all designed to improve Council management capacity and ability to respond to drought and the future demands of
the schemes. Key projects proposed include seeking funding for the new reservoir in Lake Cargelligo and upgrading of the filtration plant in
Condobolin.
CSP
No
Strategic Outcome Performance Measures
3.1 Efficient transport networks that meet community and
business needs
Resident and user survey results
3.2 Water, Sewer and energy utilities meet best practice
standards with up to date technology
Compliance with service levels
3.3 Visually appealing built environment, landscapes and
streetscapes
Kilometres of sealed and unsealed road
BUILD AND MAINTAIN COMMUNITY
INFRASTRUCTURE AND SYSTEMS
This is Page No.152 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
3.4 Well maintained recreational facilities and community
buildings meet statutory and user requirements
Road safety statistics
3.5 Grant income supports infrastructure programs Completion of Best practice plans by 2012
Value of grants received
Projects undertaken on grant funding
Outcome 3.1: Efficient transport networks that meet community and business needs
Ref No Delivery Program
Action (2012/2016)
Operational Plan Action
(2012/2013)
Performance Measure Responsible Officer Progress as at 30 September 2012
3.1.1 Implement road
maintenance,
renewals and
improvements in
accordance with
asset management
plan
Complete annual
maintenance, renewals
and improvements
program.
Reseal program completed.
Grant funded programs
completed, e.g. Roads to
Recovery.
MO All programs on schedule. Progress being
reported quarterly to council.
3.1.2 Operate and
maintain airports at
Condobolin,
Tottenham and Lake
Cargelligo to meet
Complete annual
maintenance, renewal
and improvements
program.
Compliance with statutory
requirements
MO Drug and alcohol policy needs to be
established early 2013.
GOAL 3: BUILD AND MAINTAIN COMMUNITY INFRASTRUCTURE AND SYSTEMS
This is Page No.153 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
statutory standards
3.1.3 Complete the sealing
of MR57N
Fund improvements from
RMS Block Grant for next
stage works.
Completion of funded
segment.
Apply for RMS Repair Grants.
MO The next section of this road to be sealed is
the Condobolin side of Fifield and this is
programmed for early 2013.
3.1.4 Progressively widen
MR231
Complete reconstruction
and widening of
segments as a
progressive program
Completion of project
commenced in 2011/12.
MO Works have been completed for the existing
project and an application has been lodged
with RMS for a further repair program grant.
3.1.5 In conjunction with
the Barwon Group
advocate for
additional Regional
road funding
Participate in regional
group meetings and
provide information for
submissions as needed.
Participate in meetings,
information is provided and
submissions are made as
determined by regional
group.
DTS/MI The submission is complete and we await
Minister Humphries to call a meeting.
3.1.6 Encourage increased
use of rail for
transporting
agricultural product
Participate in regional
group meetings and
provide information for
submissions as needed.
Continue to lobby
state/federal agencies to
upgrade the rail network
for agricultural
products/logistics
Participate in meetings,
information is provided and
submissions are made as
determined by regional
group.
MED CENTROC regional plan updated.
Submission to NSW Inquiry into economic
impacts in Central West NSW.
This is Page No.154 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Outcome 3.2: Water, sewer and energy utilities meet best practice standards with up to date technology
Ref No Delivery Program
Action (2012/2016)
Operational Plan Action
(2012/2013)
Performance Measure Responsible Officer Progress as at 30 September 2012
3.2.1 Construct a new
reservoir at Lake
Cargelligo
Seek construction Grant
Funding from State and
Federal Government.
Planning and
development of plans and
documentation for
tender, subject to grant
funding approval.
Obtain grant funding.
Complete project to
appropriate standards.
DTS/MU Federal government will not release funds
for this project.
3.2.2 Lobby Essential
Energy and our
Contracted Retailer
for a more stable
power supply across
the Shire
Lobby directly and
participate in regional
group meetings and
provide information and
submissions as
applicable.
Continue to lobby
state/federal agencies
and private sector to
partner alternate energy
sources
Lobbying has been
undertaken. Participate in
meetings, information is
provided and submissions
are made as determined.
MED/DTS Investigation of alternate energy supply to
residential and commercial premises to
reduce load of essential energy supply
ongoing with Centroc.
This is Page No.155 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
3.2.3 Implement the Asset
maintenance and
renewal program for
water and sewerage
services
Complete annual
maintenance and
renewals program.
Maintenance and renewals
program completed.
MU Maintenance works are on schedule.
3.2.4 Upgrade the water
filtration plant at
Condobolin
Upgrade the WFP
building in stages.
Staged upgrades are
progressing satisfactorily.
MU A report has been presented to council in
February 2013.
3.2.5 Upgrade the
Tottenham water
pipeline
Replace valves and
control equipment.
Project completed. MU Stage 1 of this project is completed which
consisted of replacing failed valves. Stage 2
materials have been ordered for 26 air
valves and 18 stop valves.
3.2.6 Plan and
progressively
undertake a water
mains renewal
program
Implement a renewal
program each year.
Nominated renewal program
completed.
MU This is programmed for April 2013 so as not
to occur during peak water demand.
3.2.7 Encourage the
generation of
alternate energy in
the shire
Continue to lobby
state/federal agencies
and private sector to
partner alternate energy
sources
Number of submissions
made
MED Investigation of alternate energy supply to
residential and commercial premises to
reduce load of essential energy supply
ongoing with Centroc.
3.2.8 Council to improve
energy efficiency of
facilities and plant
Progressive investigations
and implementation of
more energy efficient
Funded projects completed.
DTS
Centroc’s CEEP is expected to be able to be
rolled out in about March 2013.
This is Page No.156 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
facilities and plant.
Instigate star rating
program for Energy
Efficiency Buildings –
refer Buildings Asset Mgt.
Plan - Recommendations
Star program in place,
energy savings.
DESP
None as yet
Outcome 3.3: Visually appealing built environment, landscapes and streetscapes
Ref No Delivery Program
Action (2012/2016)
Operational Plan Action
(2012/2013)
Performance Measure Responsible Officer Progress as at 30 September 2012
3.3.1 Undertake the
footpath inspection
and maintenance
program
Inspections undertaken
annually. High priority
maintenance and repairs
undertaken and other
works referred to future
program.
Inspections and urgent
repairs undertaken.
MI Inspections recently carried out and will be
repaired when resources are available.
3.3.2 Implement a themed
street tree
replacement
program
Develop and implement a
themed street tree
replacement program
Program developed. MI A draft proposal has been received by
Penrith Council in early February and will
start at Lake Cargelligo.
3.3.3 Improve access for
pedestrians and
mobility aid users in
areas lacking
footpaths
Staged implementation of
the Pedestrian Access
Mobility Plan (PAMP).
PAMP projects completed to
extent of funding provided.
MI Projects are included in this year’s
operation’s plan and will soon be
constructed.
This is Page No.157 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
3.3.4 Upgrade Memorial
Park in Condobolin
Implement year 4. MI Not proposed until 2016.
3.3.5 Maintain parks and
reserves across the
shire
Complete annual
maintenance program.
Parks and reserves
maintained to a reasonable
standard.
MI Maintenance programs are on schedule.
3.3.6 Develop and
implement urban
design guidelines for
villages and towns
across the shire
Develop urban design
guidelines.
To be developed within 6
months from gazettal of
new LEP
Urban design guidelines
developed.
Enactment of new DCPs
DTS
DESP
This will not occur until 2014.
Works underway including new updated
single Development Control Plan (DCP)
3.3.7 Upgrade Foster
Street Lake
Cargelligo
Design and implement
streetscape upgrade in
Foster Street.
Project completed. DTS/MI Penrith City Council landscape architect
submitted draft plans early in February.
3.3.8 Continue to provide
heritage funding to
enhance buildings in
main streets
Continue with existing
heritage funding
programme.
Acquittal of heritage grants DESP Local Heritage Fund Grant awarded for
2012/13 to Foodworks Tottenham. Heritage
Advisor visits monthly, report on work to
Heritage Committee.
3.3.9 Support the
development of
heritage walks that
tell the stories of the
Liaise with respective
heritage groups.
Interpretive heritage signage
and development
MED Engaged and completed Historical Self
Guided Walking Tour for Condobolin.
Attended Lake Cargelligo meetings.
Ongoing investigation and development of
This is Page No.158 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
towns and villages indigenous heritage walk, including Sedge
Path, GBL, Murie, Common and Mission.
3.3.10 Implement a Main
Street Buildings
Improvement Grant
Program
Develop criteria and
commence funding
program.
Acquittal of grants MEDS
Outcome 3.4: Well maintained recreational facilities and community buildings that meet statutory and user requirements
Ref No Delivery Program
Action (2012/2016)
Operational Plan Action
(2012/2013)
Performance Measure Responsible Officer Progress as at 30 September 2012
3.4.1 Complete and
implement the
Condobolin Sports
and Recreation
ground master plan
Review draft master plan. Master plan completed. DTS/MI This is proposed to be undertaken next year.
3.4.2 Maintain and
develop Council
owned sports fields
Complete annual
maintenance program.
(Development program
deferred).
Sports fields maintained to a
reasonable standard.
MI Maintenance programs are on schedule.
3.4.3 Maintain and
develop council
owned buildings
Implement
recommendations from
AMP to meet agreed
service levels
Meet community needs. MBS/DESP Maintenance program is on schedule
This is Page No.159 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
3.4.4 Maintain and
develop amenities at
Council owned pools
Implement
recommendations from
AMPs for buildings at the
pools.
Meet community needs. DTS
DESP
MBS
The comprehensive repainting of Tottenham
pool has been completed.
3.4.5 Support privately
owned and operated
recreational facilities
e.g., Tullibigeal pool
Provide funds and
support to community
operation of recreational
facilities.
Funds and support provided. MI Support will be provided as requested.
3.4.6 Build a skate park in
Condobolin
Proceed with
construction of skate park
as per Council resolution.
Handover of park to
community.
DESP Several Council 355 Committee meeting
held. Progressing draft concept plans for Bill
Hurley Park. Condobolin High School Youth
Council also holding meeting to provide
youth input for design. Next meeting 9th
October.
3.4.7 Progressively review
and update public
amenities across the
shire
Implement
recommendations from
AMP to agreed service
levels
Meet community needs. MBS Materials in hand for upgrade of Memorial
park amenities
3.4.8 Progressively review
compliance of
community buildings
with current
statutory
requirements for
asbestos, electrical
lead and fire
Develop an asbestos
register, maintenance in
accordance with AMP
Compliant buildings. MBS
MEDS
No progress to date
This is Page No.160 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
3.4.9 Review the need for
gymnasium facilities
in Lake Cargelligo,
Tottenham and
Tullibigeal
Liaise with current
providers and schools to
examine opportunities to
expand gymnasium
services
Meetings held DESP Working with a group wishing to re-establish
‘Little Athletics’ in Condobolin.
Support to Lake Cargelligo Gymnasium for
Public Liability Insurance.
3.4.10 Work with existing
sporting
organisations to
identify
opportunities for
diversified sporting
activity
Liaise with local sporting
bodies to examine the
option of establishing a
town based Sports
Councils. (Condo Youth
Forum)
Meetings held DTS/MED Meeting with Penrith Gallery Indigenous
Curator regarding Condobolin hosting a
Rugby League Knock Out.
Outcome 3.5: Grant income supports infrastructure programs
Ref No Delivery Program
Action (2012/2016)
Operational Plan Action
(2012/2013)
Performance Measure Responsible officer Progress as at 30 September 2012
3.5.1 Continue to provide
the community
grants program to
assist with projects
Ongoing annual program
delivered
Promote program and
deliver funding and
management
MED Promotion of Council’s funding via e-blast,
print and radio announcements.
GO & MED participation of LRCG program
with WPRD, FRRR & VFFF to provide $100K
prior to Christmas. www.frrr.org.au
3.5.2 Actively seek grant
programs to fund
Council and
Continue to seek grant
funding
Number of grant
applications lodged
MED Seven applications lodged.
GOAL 3: BUILD AND MAINTAIN COMMUNITY INFRASTRUCTURE AND SYSTEMS
This is Page No.161 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
community projects
3.5.3 Participate in
regional forums that
support grant
funding for
infrastructure
Ongoing collaboration
with regional partners
Centroc, Mid Lachlan
Alliance Councils meetings
attended
MED CNSWT meetings attended.
Quarterly MED meeting attended.
Joint funding attracted for Mining Trail
project.
EDA forum attracted pilot funding for
development of Tourism App.
3.5.4 Create and maintain
relationships with
grant providers
Engage with State and
Federal Government
agencies and develop
partnerships to deliver
grant funded programs
Number of collaborations
with relevant stakeholders
MED LSC & RDACW facilitated meeting for
applications to federal grant programs.
Meetings with CNSWT, MED Group, ICC,
Carewest, DEEWR, IBA, ITI, DPI, FACS,
This is Page No.162 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
The community are looking to the Council to lead a surge in community spirit and pride involving community groups, the business community,
residents and the Council itself. The success of this drive will be reflected in an increase in volunteerism, increased involvement in community
activities, more successful local projects and events, tidier and safer towns and streets and a better quality of life for all.
Council provides financial support to community groups in the way of an annual grants program and that has been strengthened by the addition of
another small program to directly assist Sec 355 committee meet ongoing expenses. These groups play an invaluable role and without them Council
would not be able to provide services in many of the smaller communities. Programs will also be run to try and attract more volunteers and provide
training and support and funds will be sought to assist in that process. Council will continue to drive participation in regional cooperative initiatives
with Penrith City Council, Centroc and the Vincent Fairfax Foundation. Council will, continue to hold annual Australia Day celebrations across the
shire providing a great opportunity for the community to celebrate local champions.
CCTV cameras will be installed in Condobolin and the Tidy Towns competition will continue to run in Tottenham.
CSP No
Strategic Outcome Peformance Measures
4.1 Involved active and strong community groups Increased volunteer participation
4.2 Successful grant funding Levels of government funding
4.3 Orderly neat and attractive towns Crime statistics
4.4 Broad representation and sufficient number of community leaders Resident satisfaction survey results
4.5 Individual champions with pride in their town and shire Numbers actively participating in community committees
4.6 Strong and active business community Number of Australia Day nominations
4.7 Strong effective Council Tidy Towns involvement
4.8 Responsive Council Champions of the Shire
Number of community driven projects
BUILD CIVIC LEADERSHIP AND PRIDE
This is Page No.163 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Outcome 4.1: Involved and Active Community Groups
Ref No Delivery Program
Action (2012/2016)
Operational Plan Action
(2012/2013)
Performance Measure Responsible Officer Progress as at 30 September 2012
4.1.1 Support and develop
the capacity of
Councils sec 355
committees that
manage Council
facilities
Ongoing liaison with
committees
Funding provided to S355s
each year
DCCS Operational funding provided to each
committee in 2012/13 Delivery Program
4.1.2 Work with
community groups
across the shire to
help achieve their
objectives
Promotion of annual
community grants
program
Number of community
groups assisted via
community grants program
DCCS Grants Program given wide coverage. All
known community groups contacted.
Current program involves 16 projects with
33 donations also made.
4.1.3 Help inspire younger
volunteers across
the community
through a volunteer
development
strategy
Develop a volunteer
strategy in liaison with
Volunteers Australia,
Indigenous Community
Volunteers, Vincent
Fairfax Family Foundation
and local community
groups
Complete volunteer strategy DCCS/MED Leadership program being scoped and
developed.
Youth Council for Condobolin has been
established. Tottenham and Lake Cargelligo
youth councils to be formed during school
term four.
GOAL 4: BUILD CIVIC LEADERSHIP AND PRIDE
This is Page No.164 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Outcome 4.2: Successful Grant funding
Ref No Delivery Program
Action (2012/2016)
Operational Plan Action
(2012/2013)
Performance Measure Responsible Officer Progress as at 30 September 2012
4.2.1 Seek grant funding
for
community
initiatives
and projects
Engage with State and
Federal Government
agencies and develop
partnerships to deliver
projects in the shire
Collaborate with relevant
stakeholders regularly.
MED Liaison with Community Building Partnership
funding program administrators.
CNSWT, MED Group, ICC, Carewest, DEEWR,
IBA, ITI, DPI, FACS,
4.2.2 Build the grant
application skills of
groups seeking
grants
Training courses are
designed and
implemented to assist
local groups and
operators to capitalise on
events/activities
Provide annual grants
seeking training
MED Regional training course offered in
September.
Next destination for our local grants writing
workshop is Tottenham.
Outcome 4.3: Orderly neat and attractive towns
Ref No Delivery Program
Action (2012/2016)
Operational Plan Action
(2012/2013)
Performance Measure Responsible Officer Progress as at 30 September 2012
4.3.1 Encourage the care
and maintenance of
nature strips by
property owners
Media campaign Neat and tidy nature strips in
town area.
DESP/DTS No progress to date
4.3.2 Support participation
in programs that
encourage pride in
township
appearance
Tidy towns and clean up
Australia
Neat and tidy towns. MEDS Inspections and letters and follow up work
underway on overgrown allotments
This is Page No.165 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
4.3.3 Provide street litter
collection and
disposal service
Continuation of waste
removal service.
Weekly removal of waste. MEDS No progress to date
4.3.4 Install CCTV systems
to minimise property
damage
Install CCTV cameras in
Bathurst Street to reduce
crime in the Condobolin
CBD
System installed and
operating
MIT/DCCS Camera poles being fabricated. Server,
computers and Video Management System
installed. Cameras installed on buildings.
4.3.5 Provide regulatory
services to control
and abate health and
fire hazards and
unsightly properties
Provision of regulatory
services.
Safe Community MEDS Council ranger conducting regular patrols
4.3.6 Provide street
cleansing services
Ongoing street cleaning
operations.
Clean streets. MI Maintenance program on schedule.
4.3.7 Develop strategies to
minimise Graffiti
Implement in year 3 DESP None as yet
4.3.8 Provide animal
management
services and
encourage
responsible
ownership
Hold discounted micro-
chipping and de-sexing
programs each year
MEDS None as yet
4.3.9 Maintain an effective
police presence
throughout the shire
Meet quarterly with the
Area Command
Meetings held GM Meeting scheduled for November
postponed, new regional Commander to be
appointed
This is Page No.166 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Outcome 4.4: Broad representation and sufficient number of community leaders
Ref No Delivery Program
Action (2012/2016)
Operational Plan Action
(2012/2013)
Performance Measure Responsible Officer Progress as at 30 September 2012
4.4.1 Encourage
community based
leadership
development
programs
Promote leadership
development programs
across the Shire with
partnered
agencies/businesses
Number of Leadership
programs delivered
MED Leadership program in collaboration with
VFFF being formulated.
4.4.2 Support forums and
leadership programs
for young people
Promote leadership
development programs
across the Shire with
partnered
agencies/businesses
Number of Leadership
programs delivered
Youth Council formed
DESP MED liaising with Vincent Fairfax Foundation
to formulate leadership program. See
Halifax.
4.4.3 Establish and
maintain an effective
working relationship
with Indigenous
leaders
Hold regular meetings
with the Wiradjuri
Alliance group, and the
Condobolin Local
Aboriginal Lands Council,
and the Murrin Bridge
Local Aboriginal Lands
Council and report to
Council on outcomes
Number of meetings
attended
GM MED introduced ICE & PPVA representative
and attended meetings with WCC.
CWAG meetings postponed.
MED meeting with MBLALC with PPVA
Penrith Gallery Indigenous Curator and the
Collections Curator.
GOAL 4: BUILD CIVIC LEADERSHIP AND PRIDE
This is Page No.167 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Outcome 4.5: Individual champions with pride in their community
Ref No Delivery Program
Action (2012/2016)
Operational Plan Action
(2012/2013)
Performance Measure Responsible Officer Progress as at 30 September 2012
4.5.1 Support programs
that recognise the
contribution and
achievements of
community
champions
Support Australia day
awards in each town and
village
No of awards given GM Australia day Councillor delegates appointed
and budget allocated
This is Page No.168 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Outcome 4.6: Strong and active business community
Ref No Delivery Program
Action (2012/2016)
Operational Plan Action
(2012/2013)
Performance Measure Responsible Officer Progress as at 30 September 2012
4.6.1 Provide and
economic
Development
program and
incentives for
business
development
To encourage the
expansion of outdoor
eating facilities in the
main streets
To encourage property
owners of commercial
property in Bathurst
Street and Foster Street,
and Umang to upgrade
vacant retail space
Re-examine industry
incentive policy
Council will sell
residential and industrial
land at a rate sufficient to
recover development
costs and having regard
to the current market
Number of outdoor eateries
Number of upgraded shop
fronts
Review industry incentive
policy
MED Report to new Councillors for sale prices of
Industrial estates to be presented when
costs for stormwater infrastructure works
are known, following which the incentive
policy can be reviewed
This is Page No.169 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
rates.
4.6.2 Encourage
organisations and
community groups
that provide support
to the business
community
Support and develop
collaborative working
relationships within the
Shire
Support provided to
community groups/S355s
via annual community grant
applications
MED Ongoing electronic distribution of
information about funding rounds that are
available sent via e-blast and itemised on
Council’s website.
For the 2012/13 period 49 Applications for
community projects were received.
4.6.3 Promote business
excellence
Develop business awards
program
Successful awards held MED Business Awards panel in development
Outcome 4.7: Strong effective Council
Ref No Delivery Program
Action (2012/2016)
Operational Plan Action
(2012/2013)
Performance Measure Responsible Officer Progress as at 30 September 2012
4.7.1 Council is financially
sustainable and
provides services at a
level expected by the
community
Councils long term
financial plan is
sustainable
Reported to Council as
required by regulation
GM Reports submitted as required
4.7.2 Council is meeting
the objectives of its
long term plans
Councils long term
objectives are being met
Reported to Council as
required by regulation
GM Reports detailing outcomes submitted to
Council
4.7.3 Councils decision
making is equitable
and ethical
Councils decision making
and operational activities
meet regulation and
Reported to Council as
required by regulation
GM No exceptions noted
This is Page No.170 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
community expectation
4.7.4 Strengthen Regional
cooperation to the
benefit of local
residents
Council leads the
community in developing
initiatives with Penrith
City Council, CENTROC
and the Vincent Fairfax
Foundation
Reported to Council on
activities held
GM
MED
Development of regional leadership
program. Liaising with Creative Industries
groups/individuals re: development for new
business enterprise in conjunction with
PPVA.
Outcome 4.8: Responsive Council
Ref No Delivery Plan Action
(2012/2016)
Operational Plan Action
(2012/2013)
Performance Measure Responsible Officer Progress as at 30 September 2012
4.8.1 Council is responsive
to the needs of the
community
Develop and implement a
communications plan
based on latest
technology
Community reports Council
is responsive and
communicates well
GM Community Engagement strategy adopted
and in use.
This is Page No.171 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Water not only sustains life in the shire but also delivers wonderful opportunity for recreation and relaxation. Council will continue to work with State and Federal agencies to maximise the availability of water for Lake users and for licences. Gum Bend Lake has been operating again since the drought broke and the advisory committee has been re-established to assist Council with management and upgrading. A grant has been received which when matched by Council will allow the construction of a jetty to assist in improving access. A new kayaking program involving the Condobolin High School has been commenced.
Council will continue to work with the Lachlan Catchment Management Authority to implement natural resource management programs and to advance the Lake Cargelligo wetlands project.
The waste service currently available to residents will continue however Council is committed to improving recycling and we will be examining options which will allow a kerbside service to be introduced. Minor upgrades are planned at Condobolin and Lake Cargelligo rubbish tips.
The annual clean up that started last year in Condobolin will continue and be broadened to include all towns An advisory committee has been established and Council will continue to lobby for the upgrade of the Condobolin West Weir which has the potential
to provide a secure water supply into the future for Condobolin.
CSP No
Strategic Outcome Performance Measures
5.1 Reliable high quality water supply Water levels in lakes and river
5.2 Increased recreational use of the lakes and river Volumes of waste recycled
5.3 Secure water licences for agricultural use Riverine carp trap counts
5.4 A healthy natural environment Numbers of boats accessing lakes and river
5.5 Modern waste management system Number of licensed irrigators, storage levels and capacity
Pest species and weeds
LIVING IN THE NATURAL ENVIRONMENT
This is Page No.172 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Outcome 5.1: Reliable high quality water supply
Ref No
Delivery Program
Action (2012/2016)
Operational Plan Action
(2012/2013)
Performance Measure Responsible Officer Progress as at 30 September 2012
5.1.1 Undertake regular
water sampling to
ensure water supply
meets standards
Water sampling
undertaken at required
frequency
% compliance with Aust.
Drinking Water guidelines
MEDS Sampling program proceeding
5.1.2 Advocate the
redevelopment of the
Condobolin west weir
Lobby directly and
participate in group
meetings and provide
information and
submissions as
applicable.
Lobbying has been
undertaken. Participated in
meetings, information is
provided and submissions
are made as determined.
DTS/MU PWD engaged and have commenced
feasibility study as at February 2013.
GOAL 5: LIVING IN THE NATURAL ENVIRONMENT
This is Page No.173 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Outcome 5.2: Increased recreational use of lakes and rivers
Ref No Delivery Program Action
(2012/2016)
Operational Plan Action
(2012/2013)
Performance Measure Responsible Officer Progress as at 30 September 2012
5.2.1 Install a boat ramp in the
Lachlan River at the SRA
grounds
Install a boat ramp in
the Lachlan River at the
SRA grounds
Boat ramp installed DESP Work progressing on plans. Site surveyed
Draft review of Environmental Factors
completed. Awaiting final engineering plans
to undertake final consultation and
construction.
5.2.2 Build a jetty at Gum Bend
Lake
Participate in group
meetings and provide
information and
submissions as
applicable. Construct
the jetty if endorsed.
Participate in meetings,
information is provided and
submissions are made as
determined.
Construct the jetty.
DTS Grant offer has been accepted and quotes
are being sought as at February 2013.
5.2.3 Complete the Lake
Cargelligo and Gum Bend
Lake walkways to
improve access
Partial gravel resheet of
Gum Bend Lake
walkway. Finalise Lake
Cargelligo foreshore
walkway design and
commence
implementation.
Gum Bend Lake walk way
resheet completed.
Lake Cargelligo foreshore
walkway design completed.
DTS Lakes alive were consulted in October 2012
and a walk to define the location of the walk
way will occur together early in 2013.
5.2.4 Complete the sedge path
walk alongside the
Lachlan River in
Condobolin
Apply for funding, if
successful construct
walkway bridge to link
path to town bridge
path, extend to boat
ramp area
Completed path. DESP Several funding applications made. 3 recent
small grant successful totalling $17,000 for
spraying of weeds, revegetation with native
plants. Existing path regraded and made
safe since flood.
This is Page No.174 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
5.2.5 In conjunction with the
Gum Bend advisory
committee implement
recommendations for the
continued development
of Gum Bend Lake
Staged implementation
of recommended
improvements.
Approved improvements
completed.
DTS The construction of two shelter sheds and
two benches is programmed for early March
2013.
5.2.6 Promote bird watching
facilities at rivers and
lakes
Promotion and
distribution of
environmental tourism
product material
Number of promotional
materials distributed and
events held
MED The Birds project: Showcasing birdlife in the
Lachlan by local photographer to be
exhibited at Penrith Gallery in January 2013.
Lachlan Shire expressed interest in being
part of the Bird Trails of the Riverina and
South West Slopes of NSW bird watching
publication.
Bird watching page included in the Heart of
NSW visitor Guide.
Bird watching list for Lake Cargelligo and
Surrounding Areas revised and uploaded to
Council website.
5.2.7 Partner with schools to
implement kayaking
programs
Develop kayaking
program, partnering
with WBSC, High School
and Youth Services
Program established MWBSC Program established
5.2.8 Secure a sustainable
water supply for Gum
Bend Lake
Lobby directly and
participate in regional
group meetings and
provide information and
submissions as
applicable. E.g.
Lobbying has been
undertaken. Participate in
meetings, information is
provided and submissions
are made as determined.
DTS/MU Previous attempts have not been successful.
This is Page No.175 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
involvement and
advocacy in
development of next
water sharing plan.
Outcome 5.3: Secure licences for agricultural water use
Ref No Delivery Program
Action (2012/2016)
Operational Plan Action
(2012/2013)
Performance Measure Responsible Officer Progress as at 30 September 2012
5.3.1 Support the
agricultural sector to
secure water licences
for their operations
Engage with State and
Federal Government
agencies and develop
partnerships to deliver
economic development
projects in the shire
Collaborate with relevant
stakeholders regularly.
MED Promoted to licence holders making
submissions to the MDBP inquiry.
Liaison with ITI/DPI on Condobolin
Agricultural Research and Advisory Station
(CARAS).
MED met with Minister for Western NSW at
CARLE.
5.3.2 Ensure the needs of
the community are
met in the
implementation of the
Murray Darling Basin
Plan
Engage with State and
Federal Government
agencies and
businesses, to develop
partnerships to deliver
economic development
projects in the shire as a
result of the MDBP
Collaborate with relevant
stakeholders regularly.
MED Promoted to licence holders making
submissions to the MDBP inquiry.
Liaison with ITI/DPI on Condobolin
Agricultural Research and Advisory Station
(CARAS).
MED met with Minister for Regional NSW at
CARLE.
This is Page No.176 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Outcome 5.4: A healthy natural environment
Ref No Delivery Program
Action (2012/2016)
Operational Plan Action
(2012/2013)
Performance Measure Responsible Officer Progress as at 30 September 2012
5.4.1 Conduct weed and
feral pest control
Ongoing inspection
program and control
operations
Undertake pest and
weed control program
on Council managed
reserves
Inspection program
implemented. Weed control
activities completed as
programmed.
Feral pest control program
completed,
% reserves sprayed, pest
numbers caught, controlled
MI – Weeds MEDS – Feral pests
Program being implemented on schedule.
5.4.2
Participate in the
annual state of the
environment (SOE)
report and implement
recommendations
Continue to participate
in the Central West
CMA regional SOE
report
SOE report prepared each
year
MEDS
Lachlan participating in regional program
5.4.3 Work with the Lachlan
Catchment
management
Authority to
implement natural
resource management
initiatives
1) Implement Natural
Resource Management
(NRM) Strategy
2) Progress Lake
Cargelligo Wetland
Project
1) NRM Strategy in place
2) Wetland constructed
DESP
MEDS
Work progressing on draft brief to advertise
for consultants.
This is Page No.177 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
5.4.4 Support and
collaborate with
environmental groups
on projects
Attend meetings with
groups such as
Aboriginal Land
Councils, LCMA and
Landcare as available
Meetings attended DESP Regular meetings with LCMA occurring.
5.4.5 Develop initiatives to
reduce Councils
carbon footprint
Hold regular
sustainability
committee meetings
No. of meetings held, actions
from, emissions
measurement
DESP None held as yet due to other more urgent
priorities.
Outcome 5.5: Modern Waste Management System
Ref No Delivery Program
Action (2012/2016)
Operational Plan Action
(2012/2013)
Performance Measure Responsible Officer Progress as at 30 September 2012
5.5.1 Review and implement
Councils waste
management strategy
Implement shire wide
Waste Management
Strategy
Strategy implemented DESP Consultant has undertaken community
survey. Work on the draft Waste Strategy
well advanced.
5.5.2 Develop and
implement landfill
environmental
management plans
Implement in year 2. Plans in place for all sites MEDS Year 2 project
5.5.3 Approve on site
sewerage
management
applications
Assess and
approve/manage on site
sewerage systems
No. of approvals MEDS
5.5.4 Provide solid waste
collection and disposal
Maintain effective
collection and disposal
No. of complaints DESP Services operating satisfactory. Several
complaints in relation to village landfill
This is Page No.178 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
services services management addressed.
5.5.5 Develop and
implement a trade
waste policy
Implement Policy in
year 2 through joint
project with
Centroc/Utilities
Alliance
Policy in place DTS This will be addressed in 2013.
5.5.6 Extend Councils
recycling services
Review draft waste
strategy and adopt
implement, to include
kerbside recycling
Kerb recycling in, drop off
bays at Waste Sites
DESP Consultant has undertaken community
survey. Work on the draft Waste Strategy
well advanced.
This is Page No.179 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
The wellbeing of residents is a top priority and health services are essential to all. Council will continue to play a lead role in ensuring that doctors are available and that general health services are not allowed to deteriorate. The delivery Program and budget contain serious commitments to support health services. Council will continue to fund Western Plains Regional Development who auspice the youth services for the shire and work will continue on upgrading facilities available to the young people. The Skatepark in Condobolin will go ahead on the site selected by Council and that project will be completed this year. Council has established an excellent relationship with Frank Whiddon Masonic Homes who run the Condobolin District Retirement Village on our behalf and further funds have been budgeted to allow ongoing building upgrades to occur. The completion of the upgrade of the old shire offices as a new museum will see a substantial step forward for the Condobolin Historical Society who will occupy that building later this year and establish a first class museum. The completion of the Children’s Services building in Condobolin will provide sufficient space for all preschool age children in that town to attend preschool. We all hope that the community will respond and take advantage of this wonderful new facility. Council is committed to upgrading the facilities for preschool and day care in Lake Cargelligo and staff will continue to work with the organising committee to bring that project to fruition. The Lachlan Shire Social Plan is due for review and that work will commence during the life of this program.
CSP
No
Strategic Outcome Performance Measures
6.1 Social Plan User survey results
6.2 Childcare services that meet the needs of young families Number of medical specialists visiting
6.3 Community transport available when needed Affordable housing approvals and construction
6.4 Thriving and vibrant arts and cultural activities Museum visitor numbers
6.5 Available affordable accommodation Accreditations for childcare services
6.6 Full time medical services available when needed Number of cultural and sporting events
6.7 Facilities and services that meet the needs of the ageing in our community Event attendances
HEALTH WELLBEING AND CULTURE
This is Page No.180 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Outcome 6.1: Social Planning
Ref No Delivery Program Action
(2012/2016)
Operational Plan
Action (2012/2013)
Performance Measure Responsible Officer Progress as at 30 September 2012
6.1.1 Social Plan Review and update
the Lachlan Shire
Council Social Plan
Review commenced DCCS To be commenced following completion of
annual statements of account, annual report,
and review of community strategic plan.
Outcome 6.2: Childcare services and Facilities that meet the needs of young families
Ref No Delivery Program Action
(2012/2016)
Operational Plan
Action (2012/2013)
Performance Measure Responsible Officer Progress as at 30 September 2012
6.2.1 Provide facilities for
preschools across the
shire
Ensure compliance of
services
Accreditation achieved
Approved funding
DCCS/MED Service Agreement for LCS 2 day/week
preschool funding resolved at September
meeting.
6.2.2 Advocate for a new
preschool and day care
facility at Lake
Cargelligo
Engage with
State/Federal
agencies, Condobolin
Preschool Inc and
LCDCCCA to provide
funding for
preschool/LDC
programs
Number of submissions to
increase preschool/LDC
service delivery
DCCS Preparation for construction of the new
facility in Lake Cargelligo is continuing.
GOAL 6: HEALTH WELLBEING AND CULTURE
This is Page No.181 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
6.2.3 Facilitate the integration
of children’s services
across the shire
No action for twelve
months
Review integration of
services
Review May 2013 DCCS Review of Lachlan Children’s Services charges
due December 2012.
6.2.4 Work with community
groups to provide youth
services and facilities
across the shire
Ongoing program
delivery
Number of Educators and
children in care
DCCS New Co-ordinator recruited & commenced
10/9. All positions covered at end September.
Pre-School operating at licensed capacity.
Mobile service operating as normal.
6.2.5 Operate the family day
care program
Liaise with
Federal/State agencies
and NGO’s for funding
opportunities
Number of submissions
lodged
DCCS Family Day Care to be addressed with new Co-
Ordinator to plan forward.
6.2.6 Advocate for improved
early intervention
funding programs
Seek funding for
ongoing programs to
support young parents
Number of submissions
lodged
DCCS MED in liaison with WPRD’s TAP coordinator
and EO to complete funding application.
6.2.7 Establish and maintain
support programs for
young parents
Seek funding for
ongoing programs to
support young parents
DCCS MED in liaison with WPRD’s TAP coordinator
and EO to complete funding application.
This is Page No.182 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Outcome 6.3: Community transport available when needed
Ref No Delivery Program Action
(2012/2016)
Operational Plan
Action (2012/2013)
Performance Measure Responsible Officer Progress as at 30 September 2012
6.3.1 Advocate for the
provision of community
transport
Engage with
Federal/State agencies
HACC to ensure
community transport
is available to all
Number of submissions
lodged to lobby for
transportation
DCCS Community Transport services exist in
Condobolin, Lake Cargelligo and Tottenham
for out of town services with limitations as to
destination. Limited services within
Condobolin provided through HACC service.
Outcome 6.4: Thriving and vibrant art and cultural activities
Ref No Delivery Program Action
(2012/2016)
Operational Plan
Action (2012/2013)
Performance Measure Responsible Officer Progress as at 30 September 2012
6.4.1 Support local indigenous
groups cultural heritage
management
Work with Aboriginal
Lands Councils and
Wiradjuri Condobolin
Corporation to assist
in projects
Meetings attended, projects
completed
DESP Meetings attended as required including on
Murie recognition as ‘Aboriginal Place’ and
the WCC proposal to create a pathway from
Willow Bend Village to the Murie.
6.4.2 Provide support to Arts
out West and local art
competitions
Maintain involvement
and partner in Arts
OutWest activities
Number of Arts Out West
activities in LSC
DCCS Currently attempting to foster interaction
between Arts Out West and the various arts
groups within LSC.
6.4.3 In conjunction with the
Penrith Alliance bring
performing and touring
cultural experiences
Ongoing partnered
support with Penrith
Performing and Visual
Arts Inc’s and Vincent
Fairfax Family
Number of Productions of
the “On the road” program
DCCS/MED Nordoff-Robbins Music Therapy Australia (N-
RMTA) provided sessions at Aged Care,
Independent Living and Schools in September.
Barking Gecko presented This Girl Laughs, This
GOAL 6: HEALTH WELLBEING AND CULTURE
This is Page No.183 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Foundation’s “On the
Road” program
Girl Cries, This Girl Does Nothing” at Lake
Cargelligo and Condobolin.
Penrith Gallery Director, Indigenous Curator,
and Collections Curator met with artists, and
creative industries enthusiasts.
6.4.4 Provide community halls
and facilities that
support cultural
experiences
Implement funded
recommendations
from AMP to meet
agreed service levels
Meet community
expectations
MBS Maintenance and funded improvements
underway
6.4.5 Support local museums
and get Condobolin
museum operational
Handover Condobolin
Museum to Historical
Society
Museum operational DESP
MBS
Handover occurred in July to Condobolin and
District Historical Society. Ongoing meetings
held to allow appointment of Museum and
Gallery advisor to assist in set-up.
6.4.6 In conjunction with the
Penrith Alliance
facilitate arts training
for young people,
sporting and cultural
exchanges and staff
training and exchanges
Partner the Penrith
Performing and Visual
Arts Inc. and Vincent
Fairfax Family
Foundation to deliver
the three year “On the
Road” project.
Actively foster and
support sporting and
cultural exchanges
Number of attendees in
programs
DCCS/GM 587 students attended “This Girl Laughs”
theatre production in Lake Cargelligo and
Condobolin.
Nordoff-Robbins Music Therapy Australia had
professional development sessions with staff
and intensive music therapy at schools in
Condobolin and Lake Cargelligo. They also met
with CDRV staff and residents as well as with
the Independent Living Centre staff/clients at
Condobolin Hospital.
PPVA staff delivered professional
development sessions to staff at Schools and
This is Page No.184 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Promote Staff training
or exchanges
preschools.
International Snapshot Photography
Exhibition launched and currently exhibited at
CDRV.
6.4.7 Support local heritage
and historical societies
DESP Local Historical Societies are active members
of the Heritage Committee. Support given as
required, including through Heritage Advisor.
6.4.8 Maintain membership
of film central to
encourage filming
locations across the
shire
Membership provided
for in budget
Number of meetings
attended
DCCS Screen Central continues as part of Centroc
operations with funding from MetroScreen
ceasing.
MED attended meetings via teleconference.
Film maker from ICE met in September.
6.4.9 Maintain membership
with Arts out West
Membership provided
for in budget
Number of meetings
attended
DCCS Heather Blackley is Council’s representative.
Provision for membership made in Delivery
Plan 2012/13.
Outcome 6.5: Available affordable accommodation
Ref No Delivery Program Action
(2012/2016)
Operational Plan
Action (2012/2013)
Performance Measure Responsible Officer Progress as at 30 September 2012
6.5.1 Develop and market
residential estates in
Condobolin and Lake
Cargelligo
Complete
development and
commence marketing
of residential estate in
Lake Cargelligo.
Completion of residential
estate development in Lake
Cargelligo.
Marketing of both
residential estates is
DTS/DCCS/MO Title registry for Randall Place (Stewart
Crescent) received, so sales may proceed.
This is Page No.185 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Market residential
estate in Condobolin.
resulting in sales.
6.5.2 Advocate for residential
development and visitor
accommodation
Engage with agencies
to further residential
development and
accommodation
Number of meetings
attended with Real
Estate/Developers
DCCS MED & DESP met with developers in August
and September regarding Aboriginal Housing,
and Investor development for rental
properties in Condobolin.
6.5.3 Work with state
agencies to develop
affordable housing
strategies
Engage with State
agencies to ascertain
and develop levels of
strategic assistance
available.
Endorse and
implement in line with
the “Closing the Gap”
Strategy
Strategies developed DCCS/MED MED met with representatives from ICC,
Carewest and DEEWR to discuss options
around “rent to purchase” homes.
6.5.4 Encourage the
development of rental
accommodation
Engage with agencies
to release existing
housing stocks for
rental
Meetings with local real
estate agents/owners
DESP
DCCS
DESP & MED met with prospective developers
for residential housing construction in
Condobolin.
Outcome 6.6: Full time medical services when needed
Ref No Delivery Program Action
(2012/2016)
Operational Plan
Action (2012/2013)
Performance Measure Responsible officer Progress as at 30 September 2012
6.6.1 Build a new medical
centre at Condobolin
1) Appoint Medical
Centre project
manager
Project status relevant to
project timeline
DESP 1. Designer/Contract Administration consultant appointed.
2. Consultation meetings held with main stakeholders to inform design.
This is Page No.186 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
2) Appoint contractor
to construct
3. Development Application (DA) plans finalised, DA lodged, and is on exhibition.
6.6.2 Support programs to
attract and retain
medical professionals
Facilitate annual bush
bursary program
Program completed DESP Medical student due early October.
6.6.3 Provide housing and
practice facilities to
attract and retain
doctors in the shire
Maintain Doctors
housing and Medical
Practices as per
Buildings Asset
Management Plan
Maintenance programs
implemented
DESP Works undertaken as required.
6.6.4 Advocate for improved
hospital and allied
health services
Discuss the level of
visiting specialist
services available to
residents and report
to the medical
committee on
outcomes
No. of meetings held,
outcomes
DESP Mayor attends regular meetings with Local
Health Councils and Health
Networks/Medicare Locals.
6.6.5 Support the three
health councils at
Condobolin, Lake
Cargelligo and
Tottenham
Attend meetings if
invited/required,
assist where possible
through provision of
Councils Medical
Services program
Meetings attended as
invited/required
DESP Attend meeting as able to. Unable to attend
recent Lake Cargelligo meeting due to other
commitments.
6.6.6 Work with and take
advice from Councils
medical services
Finalise Council
support to Doctors
Policy, Ensure regular
and formal meetings
Policy on Support for
Doctors adopted, Meeting
actions implemented
DESP Policy not yet finalised, however new Doctor
negotiations being undertaken on the
principles as agreed by Council.
This is Page No.187 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
advisory committee held,
recommendations to
Council meetings,
6.6.7 Encourage the
establishment of
veterinary services in
the shire
Liaise with
surrounding
veterinary clinics, vet
representation bodies
including state
government to
progress the matter
Private vet established in
Condobolin
DESP Letters sent to Veterinary Board of NSW, and
all surrounding Veterinary Practices.
Surrounding practices require Council
assistance if they are to establish a presence
in Condobolin.
6.6.8 Help with the
development of a
helicopter landing pad
in the Condobolin
hospital precinct
Attend meetings if
invited/required,
make representations
to relevant bodies
Helicopter Pad established DTS/DESP DTS is establishing requirements for design.
Survey complete but a consultant may need to
be engaged by others to resolve issues.
Outcome 6.7: facilities and services that meet the needs of the ageing in our communities
Ref No Delivery Program Action
(2012/2016)
Operational Plan
Action (2012/2013)
Performance Measure Responsible Officer Progress as at 30 September 2012
6.7.1 Facilitate the provision
of services via the
Condobolin District
Retirement Village
(CDRV)
Allocate annually to
the capital
replacement needs of
the village, develop
capital works program
each year in
conjunction with CDRV
manager
Capital works program
completed for CDRV
DCCS Meeting held with Facilities Maintenance
Manager and Care Manager from Whiddon
Group. Works Program 2012/13 formulated
and to be prioritised and costed by the
Whiddon Group. Will be reported to Council
when received.
This is Page No.188 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
6.7.2 Advocate for the
provision of aged care
services across the shire
Engage with relevant
Federal/State
agencies, The
Whiddon Group, Lake
Cargelligo All Care and
Tottenham Welfare
Council and NGO’s to
support aged services
Number of submissions
lodged
DCCS GO & MED to attend policy development and
funding/grant opportunities with DLG in
October.
6.7.3 Support the Men’s Shed
programs
Promote community
services/programs to
enhance project
delivery
Number of attendees at
Mens’ Shed programs
DCCS
This is Page No.189 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
CAPITAL WORKS
This is Page No.190 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Capital Works Projects
Budget
2012/2013
Expenditure
30
September
Responsible
Officer
Comments on progress
07200 - Engineer
Capital Works Engineer Capital Works
0730 - Building
Capital Works 5,000
07550 - Plant Depot
Capital Works Plant Depot Capital Works
0730 - Building
Capital Works
Building improvements 225,000
07570 - Works Depot
Capital Works Works Depot Capital Works
0730 - Building
Capital Works
Trade sheds 70,000
0 MBS None as yet due to other earlier/higher
priority building projects
07270 - Roads to
Recovery Program
Capital Works Roads to Recovery Program Capital Works
0740 - Road Capital
Works Upgrades
Seal Condobolin Tip access road (carried forward
from 2011/12) 120,000
This is Page No.191 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Capital Works Projects
Budget
2012/2013
Expenditure
30
September
Responsible
Officer
Comments on progress
Drainage improvements Tullibigeal 100,000
SR341 Jones Lane seal 270,000
SR19 Middlefield Rd concrete causeway, 1 culvert 55,000
SR37 concrete causeway (top up flood damage) 25,000
SR37 upgrade culvert (add 2 cells) 20,000
Road capital works upgrades total 590,000
0741 -
Reseals/Overlays
Capital Works
(Renewals)
Renewal
SR1169 Bobadah Rd resheet shoulders (c/f from
2011/12) 40,000
Renewal
SR10 Meadowview Rd resheet shoulders (c/f from
2011/12) 40,000
Renewal
SR185 Yelkin Rd resheet shoulders (c/f from
2011/12) 72,000
Renewal
SR11 Moira Vale Rd resheet shoulders (c/f from
2011/12) 36,000
Renewal
SR5 Lansdale rd resheet shoulders (c/f from
2011/12) 56,000
This is Page No.192 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Capital Works Projects
Budget
2012/2013
Expenditure
30
September
Responsible
Officer
Comments on progress
Renewal
SR3 Tabratong Crossing Rd resheet shoulders (c/f
from 2011/12) 32,000
Renewal SR1347 Albert Rd Melrose resheet 213,190
Renewal SR144 Burgooney Rd patch resheet 10km 150,000
Renewal SR34 Wilmatha Rd resheet 8km ** 76,000
Renewal SR67 Wilga Ridge Rd, resheet 6km 110,000
Renewal SR1006 Brotheroney/Begargo Rd resheet 5km 100,000
Renewal SR408 Deacons Rd resheet 2km 35,000
0741 - Reseals/Overlays Capital Works (Renewals) 960,190
07280 - Bridges
Capital Works Bridges Capital Works
0745 - Bridge &
Culvert Capital
Works
Renewal Island Creek Bridge reconstruct (Reserve $297,624) 297,620
07300 - Footpaths & Bike Track Capital Footpaths & Bike Track Capital Works
This is Page No.193 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Capital Works Projects
Budget
2012/2013
Expenditure
30
September
Responsible
Officer
Comments on progress
Works
0760 - Footpath Capital Works
Renewal
2 - 12 Melrose St Replace Footpath
(130m) 12,500
New 1.2m footpath Yelkin & Bokhara Sts
(PAMP Lak04a) 60,300
Renewal
Bike path resheeting - Gum Bend Road 20,000
07310 - Kerb & Gutter Capital Works Kerb & Gutter Capital Works
0746 - Kerb & Gutter Capital Works Renewals
Renewal Kerb & Gutter Reconstruction 30,000
07320 - Traffic Facilities/Road Furniture Capital Traffic Facilities/Road Furniture Capital
0748 - Traffic Control Capital Works Renewals
Renewal Upgrade Taxi & Bus Shelter 20,000
0
DESP Grant application lodged for upgrade of
bus shelter and new taxi shelter.
Awaiting outcome.
This is Page No.194 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Capital Works Projects
Budget
2012/2013
Expenditure
30
September
Responsible
Officer
Comments on progress
07330 - Urban Streets
Capital Works Urban Streets Capital Works
0740 - Road Capital
Works Renewals
Renewal
William St part reconstruction Bathurst St
to bridge 120,000
07340 - Regional Roads
Capital Works Regional Roads Capital Works
0740 - Road Capital
Works Renewals
Renewal Gravel resheets 100,000
Renewal Reseals 350,000
Renewal Culvert renewals 100,000
Renewal MR57S The Gipps Way shoulder resheet 120,000
Renewal
MR61N Henry Parkes Way shoulder
resheet 50,000
Renewal
MR371 Rankins Springs Road shoulder
resheet 50,000
Renewal
MR371 Rankins Springs Road
reconstruction 150,000
This is Page No.195 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Capital Works Projects
Budget
2012/2013
Expenditure
30
September
Responsible
Officer
Comments on progress
Renewal
MR7513 Lake Cargelligo Road shoulder
resheet 100,000
Regional Road capital works renewals
totals 1,020,000
Regional Road capital works upgrades
MR57N Fifield Road construction # 535,000
MR57S The Gipps Way raise Smyths
Corner 100,000
MR231 Wyalong Road progressive
reconstruct & widen # 131,000
MR371 Rankins Springs Road, culverts &
reno mattresses 50,000
MR7513 Lake Cargelligo Road raise at
Nillsons Lane 150,000
MR7521 Kiacatoo Road extra culverts 50,000
Regional Road capital works upgrades
total 1,016,000
# May attract additional RMS REPAIR
Grant of $400,000
This is Page No.196 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Capital Works Projects
Budget
2012/2013
Expenditure
30
September
Responsible
Officer
Comments on progress
07350 - Sealed Rural Roads Capital Works Sealed Rural Roads Capital Works
0740 - Road Capital Works
Renewal Local roads reseals 250,000
07350 - Sealed Rural Roads Capital Works Total Sealed Rural Roads Capital Works Total 250,000
07360 - Unsealed Rural Roads Capital Works Unsealed Rural Roads Capital Works
0740 - Road Capital Works
Renewal Unsealed rural roads resheets & urgent widening or reconstruction projects ## 176,910
##
Adjustment to match FAG Allocation
07360 - Unsealed Rural Roads Capital Works Total Unsealed Rural Roads Capital Works Total 176,910
08070 - Fire Control Capital
Works Fire Control Capital Works
0730 - Building Capital
Works
RFS stations 25,000
Non-cash fleet purchases 691,280
This is Page No.197 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Capital Works Projects
Budget
2012/2013
Expenditure
30
September
Responsible
Officer
Comments on progress
08080 - SES Capital Works SES Capital Works
0730 - Building Capital
Works
SES Condo building renewals 10,000
0
MBS
None as yet due to other earlier/higher
priority building projects
07230 - Parks Reserves & Horticulture Capital Works
Parks Reserves & Horticulture Capital
Works
0712 - Other Improvements to Land Capital Works
Gum Bend Lake Capital Works 10,000
Gum Bend Lake Jetty 59,800
Renewal
Replace Irrigation System Major Mitchell
Park Condobolin 12,300
Renewal
Replace Irrigation System Sacred Park
Condobolin 20,300
0713 - Playground
Capital Works Playground Capital Works
Shade Structure Wiradjuri Park
Condobolin 20,000
0730 - Building Capital Works
Renewal Shade Structures 15,000
0732 - Community Improvements Program Capital
Community Improvement Program 75,000
0734 - Scrap Metal Program 20,000 None as yet due to other earlier/higher
This is Page No.198 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Capital Works Projects
Budget
2012/2013
Expenditure
30
September
Responsible
Officer
Comments on progress
0 MBS priority building projects
07240 - Sport Grounds & Recreation Facilities Capital
Work
Sport Grounds & Recreation Facilities
Capital Work
0711 - Sport & Recreation Capital Works
Sports Grounds Upgrades 20,000
Install Illuminator Oval Lighting Control 15,000
35,000
07720 - Swimming Pool(s) Capital Works Swimming Pool(s) Capital Works
0700 - Other Capital Works (new/improved asset)
Renewal Paint Tottenham Pool 30,000
Renewal Paint Lake Pool 50,000
0730 - Building Capital Works
Install Security Fence around Chlorine
Room at Lake Cargelligo 10,000
Relocate Chlorine Room at Tottenham 30,000
07450 - Public Amenities Capital Works Public Amenities Capital Works
0731 - Public Amenities Capital Works 5,000
0
MBS
No specific project identified as yet.
Possibly use to supplement budget for
Memorial Park Toilet upgrade to allow
This is Page No.199 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Capital Works Projects
Budget
2012/2013
Expenditure
30
September
Responsible
Officer
Comments on progress
disabled toilet construction.
07450 - Public
Amenities Capital
Works Total Public Amenities Capital Works Total 5,000
27000 Water Infrastructure
Capital Works Fund 2 :
Water Asset Capital Works
Water Infrastructure Capital Works Fund
2 : Water Asset Capital Works
780 Capital Works
Renewal
00000695 - Water Mains Maintenance &
Repairs - Condobolin 45,000
Renewal
00000696 - Water Mains Maintenance &
Repairs - Lake Cargelligo 50,000
Renewal
00000697 - Water Mains Maintenance &
Repairs - Tottenham 40,000
00001015 - Reservior - Burcher Land
Acquisition & Licencing 17,500
00001016 - Reservoir - Fifield Land
Acquisition & Licencing 25,000
Renewal
00001144 - Water Mains Maintenance &
Repairs - Condobolin Gatenby St Renewal 35,800
Renewal
00001145 - Water Mains Maintenance &
Repairs - Condobolin Innes St Renewal 32,600
This is Page No.200 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Capital Works Projects
Budget
2012/2013
Expenditure
30
September
Responsible
Officer
Comments on progress
Renewal
Water Mains Maintenance & Repairs - B
Section Rural Pipeline Renewal 145,000
Renewal
Water Mains Maintenance & Repairs -
Tulli Rural Pipeline Renewal 130,000
Renewal Water Pumping Stations Tottenham 25,000
Water ADWG Quality Management Plan
Condobolin TWS Scheme 90,000
Water ADWG Quality Management Plan
Tottenham TWS Scheme 90,000
37000 Sewer Infrastructure
Capital Works F3 : Sewer
Asset Capital Works
Sewer Infr3structure Capital Works F3 :
Sewer Asset Capital Works
800 Capital Works
Renewal
00001156 - Sewer repairs to trickling filter
plant contrete cancer and railing 55,000
Buildings & Other Structures Capital
Works
7100 730 Civic Centre 5,000
0
MBS
Works likely to be on renewal of air
conditioner unit.
7810 730 Condobolin District Retirement Village 50,000 Meetings held with Whiddon Group to
This is Page No.201 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Capital Works Projects
Budget
2012/2013
Expenditure
30
September
Responsible
Officer
Comments on progress
0
MBS
identify and prioritise works. To
commence in October.
7490 730 Buildings - Dwellings 10,000
0
MBS
No specific project identified as yet.
Possibly use to supplement budget for
Memorial Park Toilet upgrade to allow
disabled toilet construction.
7490 791 Buildings - Dwellings - Plant & Equipment 3,000 0 MBS No specific project identified as yet.
8150 730 Caravan Park Cabins - (Yr 1 Tottenham) 50,000
240
MBS
Draft plans completed.
8120 730 Medical Centres 5,000
0
MBS
No specific project identified as yet.
7260 702
Willow Bend Sports Centre - Gym
Equipment etc 10,000
0 MWBSC No progress as yet, permanent manager
on leave.
7740 730 Halls & Community Centres (General) 10,000 0 MBS No specific project identified as yet.
7740 730
Halls & Community Centres - Complete
Tottenham Hall Resheet 47,380
480
MBS
User group meeting held. Draft plans
completed.
7740 730
Halls & Community Centres (Other Capital
Works) 15,310
MBS
No specific project identified as yet.
This is Page No.202 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Capital Works Projects
Budget
2012/2013
Expenditure
30
September
Responsible
Officer
Comments on progress
7230 734
Lake Cargelligo Showground
Improvements 35,000
59,771
MBS
Slab constructed, shed purchased, shed
to be erected in October
7410 821 Waste Management 50,000
31,600 MESP Works close to being finalised on
Derriwong Transfer Station
7200 730 Engineer Capital Works 5,000
7550 730 Plant Depot Capital Works 225,000
7570 730 Works Depot Capital Works 70,000
Corporate Services
7100 703 Information Technology
Communications Upgrade 9,000 Nil To be ordered November 2012
Server Replacements 5,000 Nil To be arranged early 2013
Computer Replacements 39,200 Nil Orders placed September 2012
Information Technology Totals 53,200 Nil T.Clark
7710 730 Libraries 17,400
3,258.19 S.Denyer Orders lodged for bulk of book
purchases.
This is Page No.203 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Capital Works Projects
Budget
2012/2013
Expenditure
30
September
Responsible
Officer
Comments on progress
7920 733
Tourism - Datatrax after hours touch
screens 4,000
Nil A.Strudwick To be ordered in Early 2013
This is Page No.204 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
PLANT
No
DESCRIPTION ESTIM
COST
Comment on replacement
046 Cat grader $270,000
048 Cat grader $270,000
060 Case backhoe * $130,000
061 Case backhoe * $130,000
068
069
Cat smooth drum roller * sell 2 rollers
Cat smooth drum roller * buy 1 roller *
$50,000
104 Bomag smooth drum roller $210,000
300 Komatsu fork lift * $55,000
323 Toro 3m mower * $65,000
355 Massey utility vehicle (weeds spray) $26,000
614 Western Star prime mover * $170,000
615 Western star tipping truck * $113,000
616 Western star tipping truck * $113,000
PLANT REPLACEMENT PROGRAM 2012-2013
This is Page No.205 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
617 Western star tipping truck * $113,000
618 Western star tipping truck * $113,000
619 Volvo water truck $190,000
Water carting dog trailer $100,000
627 Volvo water truck $190,000
Water carting dog trailer $100,000
Water truck 15000L * $300,000
Water carting dog trailer $100,000
620 Hino 10.4T light truck $80,000
621 Hino 10.4T light truck $80,000
622 Hino 10.4T light truck $80,000
623 Isuzu 4.5T light truck $55,000
624 Hino 16T truck with Hiab crane $110,000
628 Hino dual cab 4.5T light truck * $38,000
7000 Mitsubishi 10.4T light truck $50,000
New Mini excavator with trailer/ attachments $100,000
Road broom * $30,000
Heavy plant & trucks $3,431,000
This is Page No.206 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Light fleet $630,000
Minor plant $100,000
Plant total $4,161,000
Works Depot Capital Works (plant
related)
Condo depot workshop improvements $95,000
3 Bay plant shed $30,000
Upgrade fuel storage at Lake & Tott depots $100,000
225,000
* Note – carry over from 2011/12 – some ordered or in tender process.
Note – optimum plant life cycles are aimed at minimising down time, reducing lost time for crews and avoiding having to expand workshop
operations.
This is Page No.207 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
Acronym Full Designation Acronym Full Designation
AMA Australian Medical Association LSC Lachlan Shire Council
AMP Asset Management Plan LLCS Lower Lachlan Community Services inc.
BIRR Buildings and Infrastructure Renewal Ratio MBLALC Murrin Bridge Local Aboriginal Land Council
CANFA Conservation Agriculture and No-Till Farming Association MBS Manager of Building Services
CARLE Country and Regional Living Expo MED Manager of Economic Development
CDRV Condobolin District Retirement Village MEDS Manager of Environment and Development Services
CENTROC Central West Regional Organisation of Councils MHR Manager of Human Resources
CLALC Condobolin Local Aboriginal Land Council MI Manager of Infrastructure
CMA Catchment Management Authority MIT Manager of Information Technology
CNSWT Central NSW Tourism MLA Mid Lachlan Alliance
CRIA Country Rail Infrastructure Authority NSW MO Manager of Operations
CSP Community Strategic Plan MU Manager of Utilities
CTC Community Technology Centre MWBSC Manager Willow Bend Sports Centre
CWA Country Women’s Association NBN National Broadband Network
CWAG Condobolin Wiradjuri Alliance Group N-RMTA Nordoff-Robbins Music Therapy Australia
ALPHABETICAL LIST OF ACRONYMS AND ABBREVIATIONS
This is Page No.208 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
CWFS Central West Farming Systems P&C Parents and Citizens
DCCS Director of Corporate and Community Services P&F Parents and Friends
DCR Discretionary PCC Penrith City Council
DECC Department of Environment and Climate Change PPVA Penrith Performing and Visual Arts Ltd
DEEWR Department of Education Employment and Workplace
Relations
RDACW Regional Development Australia Central West
DESP Director of Environment Services and Planning RDN Rural Doctors Network
DOCS Department of Community Services (NSW) RESAP Regional Sustainability Action Plan
DPI Department of Primary Industry REX Regional Express Airlines
DSR Debt Service Ratio RMS Roads and Maritime Services
DTS Director of Technical Services STAT Statutory
FAG Financial Assistance Grant STP’s Sewerage Treatment Plants
FCR Full Cost Recovery SWOT Strengths Weaknesses Opportunities and Threats
LTFP Long Term Financial Plan UCR Unrestricted Current Ratio
GM General Manager Lachlan Shire Council WAG Wiradjuri Alliance Group
GRDC Grains Research and Development Corporation WNSWLHD Western NSW Local Health District
HACC Home and Community Care WCC Wiradjuri Condobolin Corporation
HONSW Heart of NSW WPRD Western Plains Regional Development
ICC Indigenous Coordination Centre Wagga Wagga WSC Wiradjuri Study Centre
ICE Information and Cultural Exchange, Parramatta
This is Page No.209 of the Business Paper of the Ordinary Meeting of Lachlan Shire Council to be held
20 February, 2013 in the Council Chambers, Molong Street, Condobolin.
LALC Local Aboriginal Land Councils
LCDCCCA Lake Cargelligo District Community Children’s Centre
Assoc.
Return to Business Paper
ATTACHMENT 7.2.2
6.5 CRIME PREVENTION COMMITTEE
Commencing at 1.00pm in the Council Chambers, Molong Street, Condobolin.
AGENDA
ATTENDEES
Committee Members
Cr Mayor D Manwaring, Cr Graham Scott, Cr Mark Hall, Mrs Heather Blackley (Western Plains
Regional Development - Youth Services Co-ordinator for Lachlan Shire/Community Drug Action
Team) Mrs. Novelle L’Estrange, Lachlan Area Command Crime Prevention Officer, Ms Melanie Suitor,
(Forbes Parkes Lachlan Shire Road Safety Officer) Peter Harris (Lake Cargelligo), Lake Cargelligo
Police, Condobolin Police, Tottenham Police, Graham Steigler Peters (Principal, Condobolin High
School), Principal Lake Cargelligo School, Robert King, Rebecca Shepherd (Condobolin Local
Aboriginal Lands Council, Murrin Bridge Aboriginal Lands Council, Principal St Francis Xavier School
(Lake Cargelligo)
Staff Members
Liz Collyer (General Manager), Adrian Butler, (Director, Department of Environmental Services and
Planning), Eliza Buckland, (Administration Officer - Department of Environmental Services and
Planning)
A quorum of 9 is required
AGENDA
6.5.1 Election of Chair
6.5.2 Leave of Absence
6.5.3 Disclosure of Interest
6.5.4 Report from Crime Prevention Officer, Lachlan Area Command
6.5.5 Report from Melanie Suitor, Road Safety Officer, Parkes/Forbes/Lachlan Shires.
6.5.6 Report from Western Plains Regional Development on behalf of Lachlan Shire Council.
6.5.7 Update on CCTV projector for Condobolin CBD Installation.
6.5.8 Resignation of Norma Fleming
6.5.1 ELECTION OF CHAIR
As this is the first meeting of the new Council, a chairperson is required to be elected.
Committee Recommendation
That Councillor Hall be elected as chair of the Lachlan Shire Council Crime Prevention
Committee.
(Scott/Manwaring)
6.5.2 LEAVE OF ABSENCE
Committee Recommendation
That leave of absence be granted to Mel Suitor, Senior Constable Dave Bell and Senior Constable
Daniel Greef, James Dobel, Crime Prevention Officer
(Scott/Manwaring)
6.5.3 DISCLOSURE OF INTEREST
The provision of Chapter 14 of the NSW Local Government Act 1993 and Council’s Code of Conduct
regulate the way in which councilors, and staff of Council, conduct themselves to ensure that there is no
conflict between their private interests and their public trust.
The Act prescribes that where an official of Council (or a Committee of Council) has an interest in a
matter to be considered at a meeting of the Council (or Committee), that interest must be disclosed as
soon as practicable after the start of the meeting and the reasons for declaring such interest.
Committee Recommendation
Nil.
6.5.4 REPORT FROM CRIME PREVENTION OFFICER – LACHLAN AREA COMMAND
Community
Strategic Plan
Goal 4 BUILD CIVIC LEADERSHIP AND PRIDE
Strategic
Outcome
4.3 Orderly, neat and attractive towns
Delivery Program 4.3.9 Maintain an effective police presence through the towns
Operational Plan Meet quarterly with the Area Command.
Summary
This report provides for tabling of information on the Lachlan Area Command crime prevention
activities and gives an overview of the latest crime statistics for the area.
Recommendation
That the Committee note the report from Sgt Gibson and Mr Reid.
(Steigler-Peters/Manwaring)
Background
If present, the Crime Prevention Officer for Lachlan Area Command will give an update on policing
activities and crime prevention across the area since the last meeting.
6.5.5 REPORT FROM MELANIE SUITOR – ROAD SAFETY OFFICER – PARKES/FORBES
LACHLAN SHIRE
Community
Strategic Plan
Goal 4 BUILD CIVIC LEADERSHIP AND PRIDE
Strategic
Outcome
4.3 Orderly neat and attractive towns
Delivery Program
Operational Plan
Summary
This report provides for tabling of a report by Melanie Suitor, Road Safety Officer, Parkes Forbes and
Lachlan Shire.
Recommendation
That the Committee note the report from Melanie Suitor, Road Safety Officer, Parkes Forbes and
Lachlan Shires
(Manwaring/Read)
Background
If present, Melanie Suitor, Road Safety Officer, Parkes Forbes and Lachlan Shires will give an update on
activities within the Road Safety Officer Program.
6.5.6 REPORT ON YOUTH SERVICES AND COMMUNITY DRUG ACTION TEAM
ACTIVITIES - WESTERN PLAINS REGIONAL DEVELOPMENT
Community
Strategic Plan
Goal 4 BUILD CIVIC LEADERSHIP AND PRIDE
Strategic
Outcome
4.3 Orderly neat and attractive towns
Delivery Program
Operational Plan
Summary
This report provides for tabling of a report by Western Plains Regional Development on the Youth
Services and Community Drug Action Team activities.
Officers Recommendation
The Committee note the report provided by Western Plains Regional Development on the Youth
Services and Community Drug Action Team activities.
(Manwaring/Scott)
Background
If present, Ms Heather Blackley, the Western Plains Regional Development Youth Services Co-
ordinator will present a report on the activities conducted under that program for the period.
6.5.7 UPDATE ON CCTV CAMERA INSTALLATION FOR CONDOBOLIN CBD
Community
Strategic Plan
Goal 4 BUILD CIVIC LEADERSHIP AND PRIDE
Strategic
Outcome
4.3 Orderly neat and attractive towns
Delivery Program 4.3.5 Provide regulatory services to control and abate health and fire
hazards and unsightly properties
Operational Plan Installation of CCTV cameras in Bathurst Street to reduce crime
in the Condobolin CBD.
Summary
This report allows for an update on the CCTV camera project for the Condobolin CBD.
Recommendation
That the Committee note the report in relation to the proposed installation of CCTV cameras in
the Condobolin CBD area.
(Blackley/Read)
Background
Council received a grant of $109,000 from the Federal Government Proceeds of Crime funding program.
The grant allows for the installation of CCTV cameras in the Condobolin CBD to reduce and deter crime
in this area. A working party was formed of staff, police and interested members of the public and
tenders were called and considered at the February 2012 meeting of Council.
The tender was awarded to Simtech of Dubbo, who have extensive experience in the field, and seemed
to present the most robust yet economical system. An inception meeting was held in March 2012, and
the project commenced shortly after.
Most of the works have been completed and approvals gained. Cameras are installed at the Community
Centre Condobolin, the Condobolin Hotel, and poles have been constructed and will be shortly installed,
at the intersection in front of the former theatre site, and one at the front of the Ambulance Station.
Viewing screens and computer systems are in place at the police station and at Council. The only
works remaining are the installation of the poles, and the fibre cable from the Council Offices through to
each camera and to the police station. Final connection works have not yet been completed, due to a
longer than anticipated period for the finalization of the design to gain Essential Energy approval to
utilize their infrastructure (poles) to run the fibre optic cable to link the system. The project will allow
for the installation of 10 cameras, with the ability for Council or other property owners to add to/expand
the network if they so wish. The project is expected to be a significant step in reducing crime and anti
social behavior in the area.
Financial Implications
All funds will be met from the grant, with Council budgeting $10,000 per year for ongoing maintenance.
It is not expected to be anywhere near this amount, and some of these funds could possibly be used on
expansion of the network to other Council properties that are targets of vandalism.
6.5.8 RESIGNATION OF NORMA FLEMING – COMMUNITY REP ON CRIME
PREVENTION COMMITTEE
Community
Strategic Plan
Goal 4 BUILD CIVIC LEADERSHIP AND PRIDE
Strategic
Outcome
4.3 Orderly neat and attractive towns
Delivery Program
Operational Plan
Summary
This report provides for tabling of a letter by Norma Flemming advising she is resigning from the
Committee.
Recommendation
That Council accept Norma Flemming’s resignation and note Norma’s support of the Committee.
(Scott/Gibson)
That the Crime Prevention Committee name be changed to Safety in Lachlan Committee and that
the terms of reference and constitution and Crime Prevention Plan be review and bought back to
the next committee meeting.
(Scott/Read)
Next meeting to be held in Lake Cargelligo on 12 June, 2013.
There being no further business the meeting closed at 2.12pm
Return to Business Paper
ATTACHMENT 7.2.5
Return to Business Paper
ATTACHMENT 7.2.6
Return to Business Paper
ATTACHMENT 7.2.7
Return to Business Paper
ATTACHMENT 7.3.3
LACHLAN SHIRE COUNCIL
TRAFFIC COMMITTEE MEETING
7 FEBRUARY 2013
Commencing at 10.30am
MINUTES
Agenda Item
Attendees
Representative Barwon Terry Fishpool, Representative Murrumbidgee Carol-Ann Malouf
Jackie Barry RMS Representative, Melanie Suitor RSO, Snr Cst Richard King NSW Police
Representative, Maree Linsket Manager Infrastructure LSC, Kevin Smith DTS LSC
1. Apologies
Sgt Dearne Jefferies NSW Police Representative
2. Section 451 Disclosures – disclosures of interest in matters to be considered by Council
Nil
3. Local Traffic Committee Protocols
4. Confirmation of the minutes
Carol-Ann Malouf /Jackie Barry
5. Reports 5.1. Pedestrian Safety at Bulbodney/Umang Street Intersection; Tottenham (71211)
5.2. Traffic Plan; Condobolin Picnic Races
5.3. Traffic Plan; Tottenham Picnic Races
5.4. Traffic Plan; Tullibigeal Picnic Races
5.5. Traffic Plan; Condo 750 Rally
6. Road Safety Officers Report
6.1. Road Safety Update
Helmets for the kids – Tottenham
Business House Cuppas
Mock Crash in August
Truck Forum in October
Changes to Road Rules
Scooter Safety Day (Seniors Week)
Learner Driver Parent Workshops
7. General Business
7.1. Terry Fishpool – Heavy Vehicle By-Pass in Condobolin. Investigate options for
alternate route.
Recommendation that Council prepare a concept plan for a Heavy Vehicle by-pass in
Condobolin for submission to the next traffic committee.
Moved Terry Fishpool Second Carol-Ann Malouf
8. Correspondence
Tottenham Welfare Council – Doc No 71211.
10. Attachments
10.1. Minutes Traffic Committee 6 December 2012
10.2. Correspondence
10.3. Speed Zone Review Report
10.4. Traffic Plans
11. Future Items for Investigation
11.1. Centre line Officers Parade bend near High School.
11.2.
12. Next Meeting Thursday 6th
June 2013; 10.00 am
13. Meeting Closed 11.10am
LOCAL TRAFFIC COMMITTEE PROTOCOL
As Lachlan Shire Council has not convened a local Traffic Committee (LTC) for twenty months
the main principles covering the operation of the Committee is tabled for its information.
The operation of Traffic Committees is explained in the RMS’s document “A Guide to the
Delegation to Councils for the Regulations of Traffic” March 2009. Some quotes extracted from
this document are:
The RMS is legislated as the organisation responsible for the control of traffic on all
roads in New South Wales. Traffic is controlled by the installation of prescribed traffic
control devices, such as regulatory signs, or traffic control facilities, such as medians.
The RMS has delegated certain aspects of the control of traffic on regional and local
roads to the Councils of Local Government areas.
Councils may only exercise their delegated function under the RMS’s document
“Delegation to Councils – Regulation of Traffic” executed 23 February 2009.
The Delegation requires Council to seek the advice of the NSW Police and the RMS prior
to exercising their delegated functions.
A Council must refer all traffic related matters to the LTC prior to exercising its
delegated functions.
The LTC has no decision making powers.
The LTC is not a committee within the meaning of the Local Government Act, 1993.
The LTC is primarily a technical review committee. It should consider the technical
merits of the proposal and ensure that the proposal meets current technical guidelines.
The LTC considers the technical aspects of the proposal and makes a recommendation to
Council for determination.
The merits of the scheme, from a public perspective, is the responsibility of the Council
and thus the residents views should be taken into account by the Council rather than the
LTC.
The LTC is made up of four formal members
1. One representative of Council – the Director Technical Services.
2. One representative of the NSW Police.
3. One representative of the RMS.
4. The local State Member of Parliament (MP) or their nominee.
Only these four member vote. Only the MP and NSW Police LAC, representing the State
electorate and LAC respectively, and containing the proposal are permitted to vote.
The public including Councillors, may observe meetings and by prior agreement address
the committee on specific topics to be considered in the agenda.
This is Page No.129 of the Business Paper of Lachlan Shire Council to be held 16 January, 2013 in the
Council Chambers, Molong Street, Condobolin
BUSINESS ARISING FROM PREVIOUS MINUTES OF THE TRAFFIC COMMITTEE
There are numerous matters from previous LTC’s that need to be investigated or implemented.
They are identified below.
Speed Limit Mc Innes Street, Lake Cargelligo
Waiting on RMS approval to replace existing speed restriction signs with 50 kms speed
restriction signs.
RMS is undertaking review and a decision was expected late September 2011. This issue
has been on the agenda since March 2009. Target early 2012.
Inspection by RMS Friday 28th
September 2012.
Further inspection by RMS 6 December 2012.
Council has received from RMS the Speed Zone Review Report for the Speed Limit of
Mc Innes Street, Lake Cargelligo. The recommendation is that; the speed limit on Mc
Innes Street from 650m northeast of Bokhara Street to Dead Man’s Point be changed
from 80km/h to 60km/h. Also the speed limit of the sealed section of Brooks Lane from
Mc Innes Street to 900m northwest be changed from the default 100km/h to 80km/h and
curve warning and advisory signage be install.
Council is yet to receive official notification of the approved recommendation.
RMS has approved proposal. It is to determine the location of the signs.
(Attachment)
School Crossings at Lake Cargelligo Central School
There are two school crossings, one in Canada Street and one in Prior Street.
Improvement works may be required. This matter will be investigated further and a
report submitted back to the LTC. RMS to meet with school concerning issues about the
two crossings.
A joint inspection between RMS and Council has occurred. RMS has supplied School
Zone Signage for both the Central School and St Xavier’s School. Council supports the
installation of blisters in Conapaira/Canada Streets and at the ‘children’s crossing’ in
Canada Street.
RMS Safety Around Schools Project Officer; Grant Sharkey provided a record of issues
and outcomes from a meeting with the Lake Central School.
Action to be taken:
1. Council to install/replace ‘School Zone’ and ‘End School Zone’ signs around the
Lake Cargelligo Central School. Quote for works has been email to RMS waiting
on response. Council has been advised in writing that the quotation for the
installation of signs is approved; Council has placed it on its Works Roster for
action.
2. RMS is intending to discuss removal of the children’s crossing in Prior Street
with the Lake Central School.
3. Council replace the bus zone signage at the Canada Street crossing with no
stopping signage at the required distance.
4. Council replace the timed no stopping signage at the Prior Street Crossing with
no stopping signage at the required distance.
5. Council refresh the line marking at both crossings at Lake Cargelligo Central
School.
6. Council install new flag holder brackets on the candy poles at both Children’s
Crossings.
7. Request additional police patrols in school zone times at Lake Cargelligo Central
School.
Speed Limits on Fifield Road (MR57N) on northern side of Fifield
Waiting on RMS approval to change the ‘50km/hr’ speed regulation sign to a “C” size
sign and relocated approx. 100m north. A ‘Reduce Speed’ and “C” size curves warning
sign north of Fifield will also be installed. RMS to inspect and advise.
RMS will upgrade the signage but not extend the 50km/hr zone. Consider 50 ahead sign
instead of reduce speed. This issue has been on the agenda since May 2009. Target
early 2012.
RMS approved Quote; Council has installed most of the signs waiting on delivery of
3x50km of signs. Pavement markings complete.
School Zone Signs
A joint inspection with the RMS and LSC has occurred of all school zones signs in
Condobolin Tullibigeal and Lake Cargelligo and RMS has provided council with new
signs as required for placement in appropriate areas. Signs have been received and are
scheduled to be installed as requested.
1. At the Condobolin Public School need to replace/install 4 school zone signs and
2 end school zone signs at various locations. Trim tree around the sign at
McDonnell Street.
2. At St Xavier School, Lake Cargelligo need to replace 12 school zone signs and 8
end school zone signs. Also remove existing school signs from Yelkin Street
and remove position zones in Reef and Grace Streets.
3. At the Condobolin High School need to install 1 school zone sign in Turner
Street. Review the installation of blisters in Busby Street and Officers Parade.
4. At the M.E.T School; Condobolin install 2 school zone signs.
5. At St Joseph’s Primary install 4 school zone signs and 4 end school zone signs.
Move school zone signage east of the laneway intersection in Molong Street.
Review the installation of blisters in Molong and William Streets at each end.
6. At the Tullibigeal Public School install/replace 6 school zone signs and 3 end
school zone signs. RMS to send work instruction for the inclusion of laneway
running off Currajong Street.
Action to be taken:
Council to install/replace ‘School Zone’ and ‘End School Zone’ signs around the
Condobolin Public School; St Xavier School; Condobolin High School; M.E.T
School; St Joseph’s Primary and Tullibigeal Public School. Council has been
advised in writing that the quotation for the installation of signs is approved.
Installation of the signs is almost complete.
School Bus Signage
With all the request for signage of Rural Bus Stop Signage
Another issue is if this bus stop is these are designated stop with the Minister of
Transport. Council is to contact Transport NSW to obtain all relevant information of all
the Bus Routes within the Lachlan Shire and designated Bus Stops; and to contact school
bus operators to confirm that the information supplied by the Transport NSW is correct.
Council is to prepare a Policy for school bus stops (note this is on the RSO’s agenda).
It is noted that Parkes Shire Council has a draft document, which when adopted, will be
used to create one for Lachlan Shire Council.
Tottenham Tourism Committee Signage Request (56543)
The Tottenham Tourism Committee has a number of requests for signage;
Item 1 – Blue/White service signs. Requesting the installation of service signs indicating
what services are available within Tottenham (Petrol; Food; Medical; Accommodation;
Caravans; Information). They have requested 5 signs as indicated in their request.
Council is designing and seeking quotations for the blue/white services signs.
RMS to investigate if TASAC should be approached.
Agreed that this is a Council decision.
New Pedestrian Crossing
The Skate Park Committee raised an issue with Council of pedestrian coming across the
McDonnell Street Bridge will cross McDonnell Street just as they leave the bridge to
cross through the park. Council investigated the area to determine the safest place to
cross the road and determined where the pedestrians were crossing was the safest location
for sight distance to both pedestrian and vehicles. (Attachment)
This bridge in the main access to the northern side of Condobolin’s residential area, of
which is located the Condobolin Hospital and Retirement Village.
That Council take a pedestrian and vehicle counts at the proposed location of the Skate
park and bring back a report to this committee comparing the figures against the
warrant. Council will undertake counts.
RECOMMENDATION
Council
i. Notes the status of outstanding matters from previous Local Traffic
Committee meetings.
ii. Note the Speed Zone Review Report for McInnes Street and Brooks Lane,
Lake Cargelligo.
Moved Jackie Barry Second Terry Fishpool
Carried
REPORTS
Pedestrian Safety at Bulbodney/Umang Street Intersection; Tottenham
The Tottenham Welfare Council are requesting the installation of pedestrian signage
leading into the intersection of Bulbodney/Umang Street. They state that traffic turning
into Umang Street at speed have little concern to pedestrian traffic.
The area of concern is the main shopping area in Umang Street from Mogille Street to
Meryula Street with Bulbodney Street crossing Umang Street. The map below indicates
the proposed location for the installation of the Pedestrian signs (W6-1).
W6-1
It was recommended that signs in Bulbodney Street be extended out to the intersection of
Moodana and Merilba Streets. Following placements traffic counts be undertaken.
RECOMMENDATION
That Council the install R9-213 High Pedestrian Activity Signs in Bulbodney Street and Umang
Street.
Traffic Plan; Condobolin Picnic Races
The Condobolin Picnic Race Club of Condobolin is to hold their annual Picnic Races on
Saturday 23rd
February 2013, at the Condobolin SRA Ground Race Track, Condobolin.
Attached is the Traffic Control Plans No LSC 001/013.
RECOMMENDATION
That Council approve the Traffic Plan No LSC 001/013 for the Condobolin Picnic
Races.
Traffic Plan; Tottenham Picnic Races
The Tottenham Picnic Race Club of Tottenham is to hold their annual Picnic Races on
Saturday 9th
March 2013, at the Tottenham Race Track, Tottenham. Attached is the
Traffic Control Plans No LSC 002/013.
RECOMMENDATION
That Council approve the Traffic Plan No LSC 002/013 for the Tottenham Picnic
Races.
Traffic Plan; Tullibigeal Picnic Races
The Tullibigeal Picnic Race Club of Tullibigeal is to hold their annual Picnic Races on
Saturday 30th March 2013, at the Tullibigeal Recreation Ground Race Track, Tullibigeal.
Attached is the Traffic Control Plans No LSC 003/013.
RECOMMENDATION
That Council approve the Traffic Plan No LSC 003/013 for the Tullibigeal Picnic
Races.
Traffic Plan; Condo 750 Rally
Condobolin Sports Promotion are to hold their annual Slattery Auction Condo 750 Cross
Country Rally, over the 12th
– 14th
April 2013. Attached are Traffic Control Plan Nos
LSC 004/013; LSC 005/013; LSC 006/013 & LSC 007/013.
Note: Where sight distance is an issue LSC 006/013 & LSC 007/013 will apply with a
temporary speed reduction required for these crossings. Exact locations of road crossing
are attached on a Council Road Network Map and accompany the TCP’s.
Roads which are affected are as follows:
MR 61N – The Henry Parkes Way
MR 7514 – Nyngan Road
SR 50 – Vermont Hill Road
SR 333 – Rosedale Road
SR 335 – Stewarts Lane
SR 46 – Boona West Road
SR 321 – Craig End Road
SR 55 – Needlewood Road
SR 1187 – Palesthan Road
SR 1347 – Albert Road
RECOMMENDATION
Council approve the Traffic Control Plan Nos. LSC 004/013; LSC 005/013; LSC
006/013 & LSC 007/013 for the Condo 750 Rally.
Council approve recommendations 6.1-6.5.
Moved Terry Fishpool
Seconded Carol-Ann Malouf
Return to Business Paper
ATTACHMENT 7.3.4
6.6 GUM BEND LAKE ADVISORY COMMITTEE
Commencing at 5.04pm
MINUTES
Members
Mayor D Manwaring, L Saunders (Chairperson), G Scott & D Brady
Ray Shields and Geoff Smith.
Observer
Jeremy Voss & Peter Gibson
General Manager (L Collyer), Director of Technical Services (K Smith) and Secretary Technical
Services (J Gilpin).
Apologies
B Nelson, Jamie Clemson, Wayne Denyer, Craig Ridley, John L’Estrange and General Manager (L
Collyer)
Quorum of three Councillors is required.
It is noted that that the Quorum should be six committee members.
6.6.1 Leave of Absence
6.6.2 Section 451 Disclosures - disclosure of interest in matter to be considered by Council
6.6.3 Pontoon Proposal
6.6.4 Shelter Sheds
6.6.5 Water Usage
6.6.1 LEAVE OF ABSENSE
B Nelson, Jamie Clemson, Wayne Denyer, Craig Ridley, John L’Estrange and General Manager (L
Collyer)
6.6.2 DISCLOSURE OF INTEREST
The provision of Chapter 14 of the NSW Local Government Act 1993 and Council’s Code of
Conduct regulate the way in which Councillors and staff of Council conduct themselves to ensure
that there is no conflict between their private interests and their public trust.
The Act prescribes that where an official of Council (or a Committee of Council) has an interest in a
matter to be considered at a meeting of the Council (or Committee), that interest must be disclosed
as soon as practicable after the start of the meeting and the reasons for declaring such interest.
Recommendation
That Committee Members and staff now disclose any interest in the matters under
consideration by Council at this meeting, describe the nature and type of interest, and in the
case of ‘less than significant on pecuniary interests’ the reasons why they consider the interest
to be non significant.
Geoff Smith – Item 6.6.4
6.6.3 PONTOON PROPOSAL
Community
Strategic Plan
Goal 3 BUILD AND MAINTAIN COMMUNITY INFRASTRUCTURE
AND SYSTEMS
Strategic
Outcome
3.5 Grant income supports infrastructure programs
Delivery Program 3.5.2 Actively seek grant programs to fund Council and community projects
Operational Plan 3.5.2 Continue to seek grant funding
Summary
Council at its Ordinary Meeting dated 15 August 2012 approved a recommendation from the Gum
Bend Lake Advisory Committee to accept a grant for the pontoon. This report updates Council on
progress.
Recommendation
That Council notes the present position with implementing the pontoon proposal at Gum
Bend Lake.
(Brady/Saunders)
Background
Documentation has been prepared to call quotes for the supply, delivery and installation of the
pontoon and gangway. It is anticipated that quotes would have been called prior to this report being
considered by the Committee.
Financial Implications
Council has allocated $29,900 from its 2012/13 Operational Plan to match grant funds of $29,900.
6.6.4 SHELTER SHEDS
Community
Strategic Plan
Goal 3 BUILD AND MAINTAIN COMMUNITY INFRASTRUCTURE
AND SYSTEMS
Strategic
Outcome
3.4 Well maintained recreational facilities and community buildings that meet
statutory and user requirements
Delivery Program 3.4.7 Progressively review and update public amenities across the shire
Operational Plan None identified
Summary
Council has allocated $20,000 for capital improvements in 2012/13 and these funds have been
allocated for the provision of additional shelter sheds.
Recommendation
That Council notes the present position with implementing the provision of two benches and
shelter sheds at Gum Bend Lake.
(Manwaring/Scott)
Background
G & S Fabrications have provided a quote to provide two (7.5) benches and two shelter sheds (9x6)
at $14,470 plus GST. An order has been issued for their provision. The quote allows for some in
kind work and council will need to construct the slabs.
Financial Implications
$20,000 is available in this year’s budget for the project.
6.6.5 WATER USUAGE
Community
Strategic Plan
Goal 3 BUILD AND MAINTAIN COMMUNITY INFRASTRUCTURE
AND SYSTEMS
Strategic
Outcome
3.3 Visually appealing built environment, landscapes and streetscapes
Delivery Program 3.3.5 Maintain parks and reserves across the shire
Operational Plan 3.3.5 Complete annual maintenance program.
Summary
Water levels in the lake are achieved by pumping water from the Lachlan River. This report updates
the committee on licenses and the quantity of water pumped.
Recommendation
That Council notes the volume of water being used to fill Gum Bend Lake.
(Manwaring/Brady)
Background
Council fills Gum Bend Lake from three sources:
1. General Security License Gum Bend Lake 700ML
2. High Security License Gibsonvale 800ML
3. Purchase of water on the open market.
The volume of water under the Gum Bend Lake License is determined by the NSW Office of
Water. The full General Security License is for 700ML share units. At this time 700ML is available
in 2012/13 for use. Water under the Gibsonvale license can be transferred to Gum Bend Lake as
other high security water demand is being met by their individual licenses. No water has been
purchased in this financial year.
The following table outlines water used to date:
Ordered (ML) Actual (ML)
July - -
August 200 201
September 300 300
October 50 50
November 50 60
December 60 90
January 250 309
February 50
March
April
May
June
TOTAL 1060 1010
Water allocation to supply Gum Bend Lake consists of 700ml general security and a transfer of
300ml from Gibsonvale license and 60ml from the Condobolin Abattoir License.
Financial Implications
Based on the above figures the water level in Gum Bend Lake may be able to be maintained over
summer without the need to purchase additional water.
Return to Business Paper
ATTACHMENT 7.3.5
6.7 WEST WEIR ADVISORY COMMITTEE
Commencing at 5.30 pm
MINUTES
Members
Mayor D Manwaring, Councillors G Scott (Chairperson), L Saunders and D Brady.
Director of Technical Services (K Smith) Juanita Gilpin (Secretary DTS).
Quorum of three Councillors is required
It is noted that Quorum of three committee members is required
6.6.1 Leave of Absence
6.6.2 Section 451 Disclosures – disclosures of interest in matters to be considered by Council
6.6.3 West Weir Feasibility Study
6.7.1 LEAVE OF ABSENCE
Colin Hackett and General Manager (L Collyer)
6.7.2 DISCLOSURE OF INTEREST
The provision of Chapter 14 of the NSW Local Government Act 1993 and Council’s Code of
Conduct regulate the way in which councilors and staff of Council conduct themselves to ensure
that there is no conflict between their private interests and their public trust.
The Act prescribes that where an official of Council (or a Committee of Council) has an interest in a
matter to be considered at a meeting of the Council (or Committee), that interest must be disclosed
as soon as practicable after the start of the meeting and the reasons for declaring such interest.
Recommendation
That Committee members and staff now disclose any interest in the matters under
consideration by the Committee at this meeting, describe the nature and type of interest, and
in the case of ‘less than significant non pecuniary interests’ the reasons why they consider the
interest to be non significant.
Nil
6.7.3 WEST WEIR FEASIBILITY STUDY
Community
Strategic Plan
Goal 5 LIVING IN THE NATURAL ENVIRONMENT
Strategic
Outcome
5.1 Reliable high quality water supply
Delivery Program 5.1.2 Advocate the redevelopment of the Condobolin west weir
Operational Plan 5.1.2 Lobby directly and participate in group meetings and provide information
and submissions as applicable.
Summary
At Council’s Ordinary Meeting dated 17 October 2012, Council resolved, ‘That $30,000 be
allocated from the budget for a preliminary investigation and report to the Condobolin West Weir
Committee’. This report advises the Committee on progress.
Recommendation
That Council notes the report on progress with Condobolin West Weir study.
(Saunders/Manwaring)
Background
NSW Public Works has been engaged to undertake this assignment. A site inspection is planned for
5 February 2013. Council is also undertaking a survey to enable the storage capacity of the weir to
be calculated.
Financial Implications
$30,000 is available for the study.
Return to Business Paper