Orange Coast R/C Club

Field Move

This is your flying field

Page 2: Orange Coast R/C Club Field Move This is your flying field

259

43

6

Members

FullYouthLife

Total Membership is 308Full: 259Youth: 43Life: 6

Page 3: Orange Coast R/C Club Field Move This is your flying field

2,500

1,320

2,403

1,045

665

293 50

800

500

100 500

500 500

Expenses

Site rentalMeeting roomSanitationStorage binTrash dumpsterTrash pickupWebsiteSite maintenanceEducationRaffleEventsMembershipMisc. / Reserve

Total Annual Expenditures: $11,176

Income from Dues: $11,655

Page 4: Orange Coast R/C Club Field Move This is your flying field
Page 5: Orange Coast R/C Club Field Move This is your flying field

Overhead View towards Right Side

Page 6: Orange Coast R/C Club Field Move This is your flying field

Right Side from over Runway

Page 7: Orange Coast R/C Club Field Move This is your flying field

Overhead View towards Back Right

Page 8: Orange Coast R/C Club Field Move This is your flying field

Existing 190' + dirt Asphalt 45'x100' Asphalt 45'x150' Asphalt 85'x150'Cover debris field

7,800

7,800

7,800

7,800

Runway 9,360

14,940

26,520

Container move 77

77

77

77

Weed killer 50

50

50

50

Striping Paint 50

50

50

50

Total Costs 7,977

17,337

22,917

34,497

Reserve Funds 6,000

6,000

6,000

6,000

Required Funds 1,977

11,337

16,917

28,497

Runway Extension Options

Page 9: Orange Coast R/C Club Field Move This is your flying field

How Can We Fund This?

• Donations

• Member Assessment

• Delay Runway Extension and Raise Dues Each Year

Page 10: Orange Coast R/C Club Field Move This is your flying field

How Can We Fund This?• Donations

• Unable to plan for work until sufficient funds are received

• Member Assessment

• Requires vote of members

• Assuming assessment passes then must still collect the funds

• Delay Runway Extension and Raise Dues Each Year

• Places significant takeoff and landing restrictions on everyone

• Costs will be higher in future years to extend runway

Page 11: Orange Coast R/C Club Field Move This is your flying field

Existing 190' + dirt Asphalt 45'x100' Asphalt 45'x150' Asphalt 85'x150'Cover debris field

7,800

7,800

7,800

7,800

Runway 9,360

14,940

26,520

Container move 77

77

77

77

Weed killer 50

50

50

50

Striping Paint 50

50

50

50

Total Costs 7,977

17,337

22,917

34,497

Reserve Funds 6,000

6,000

6,000

6,000

Required Funds 1,977

11,337

16,917

28,497

Ideal Plan

Page 12: Orange Coast R/C Club Field Move This is your flying field

Options• Member Assessment• Will need to have membership vote to approve the

assessment

• Collect monies quickly in order to get asphalt runway extension scheduled (if we delay then cost increases due to 2nd move in of equipment)

• Option A – 45’ x 150’ Asphalt Runway Extension

• Assessment of $100 per Full Member

• Option B – 45’ x 100’ Asphalt Runway Extension

• Assessment of $75 per Full Member

• Option C – Dirt Runway Extension

• Assessment of $20 per Full Member

Page 13: Orange Coast R/C Club Field Move This is your flying field

Runway Extension OptionsExisting 190' + dirt Asphalt 45'x100' Asphalt 45'x150' Asphalt 85'x150'

Cover debris field

7,800

7,800

7,800

7,800

Runway 9,360

14,940

26,520

Container move

77

77

77

77

Weed killer 50

50

50

50

Striping Paint 50

50

50

50

Total Costs 7,977

17,337

22,917

34,497

Reserve Funds 6,000

6,000

6,000

6,000

Required Funds 1,977

11,337

16,917

28,497

Ideal Plan

Page 14: Orange Coast R/C Club Field Move This is your flying field
Page 15: Orange Coast R/C Club Field Move This is your flying field

Questions / Comments

This is your flying field