optix rtn 900 v1r1 installation guide-vdf

40
www.huawei.com Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. OptiX RTN 900 V1R1 Installation Guide

Upload: shahid-rasool

Post on 21-Apr-2015

2.040 views

Category:

Documents


33 download

DESCRIPTION

huawei OptiX RTN 900 series

TRANSCRIPT

Page 1: OptiX RTN 900 V1R1 Installation Guide-VDF

www.huawei.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved.

OptiX RTN 900 V1R1 Installation Guide

Page 2: OptiX RTN 900 V1R1 Installation Guide-VDF

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

CONTENTS

Mandatory Rules InstallationInstallation

Page 3: OptiX RTN 900 V1R1 Installation Guide-VDF

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

Mandatory RulesRules Description Requirement

1 Operate IF board’s ODU-PWR switch accurately .

Before turning the toggle lever switch, you must pull it out slightly.

Otherwise, the switch will be broken, and the project will be delayed.

Every team, every member should and must know it.

2 Do not remove or insert the IF Jumper when the ODU is powered on.

Before removing or inserting the IF Jumper, you must power off the ODU (turn off the switch of IFE2 ODU-PWR).

Otherwise, the board will be damaged, and the project will be delayed.

Every team, every member should and must know it.

Page 4: OptiX RTN 900 V1R1 Installation Guide-VDF

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

Mandatory Rules• Before turning the toggle lever switch, you must pull i t out slightly.

•The damaged boards by wrong operation method.

•The right operation method.

Page 5: OptiX RTN 900 V1R1 Installation Guide-VDF

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

Mandatory Rules• Before removing or inserting the IF Jumper, you must power off the ODU.

• Do not remove or insert the IF cable when the ODU is powered on.

Page 6: OptiX RTN 900 V1R1 Installation Guide-VDF

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

Mandatory Rules• Before removing or inserting the IF Jumper, you must power off the ODU.

• Do not remove or insert the IF cable when the ODU is powered on.

•IF cable is easy to short on the tower, it will damage the IFE2 if power is ON.

Page 7: OptiX RTN 900 V1R1 Installation Guide-VDF

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

Mandatory Rules• Before removing or inserting the IF board, you must power off the ODU.

• Do not remove or insert the IF board when the ODU is powered on.

Page 8: OptiX RTN 900 V1R1 Installation Guide-VDF

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

Mandatory Rules• Don’t open the ODU, and don’t tear up the seal.

• Move and install the ODU carefully.

Page 9: OptiX RTN 900 V1R1 Installation Guide-VDF

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

CONTENTS

Mandatory Rules Installation

Page 10: OptiX RTN 900 V1R1 Installation Guide-VDF

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

Installation– Before You StartChecking the Power SystemItems that need to be checked include the AC power system and the DC power system.Table Checklist for the power system

Page 11: OptiX RTN 900 V1R1 Installation Guide-VDF

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

IDU Installation

Power Specifications RTN 910 RTN 950

power consumption (with typical configuration) (W)

52 (without microwave)114 (with microwave)

90(without microwave)203 (with microwave)

Maximum power consumption (W)

95 (without microwave)176 (with microwave)

218 (without microwave)495 (with microwave)

Voltage range (V, DC) - 38.4 to - 72.0 - 38.4 to - 72.0

Maximum current (A)2.6 (without microwave)5 (with microwave)

6 (without microwave)14.3 (with microwave)

Fuse dimenssion 12 A 20 A

• RTN 900 Power Specification

Page 12: OptiX RTN 900 V1R1 Installation Guide-VDF

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

IDU Installation

RTN 910 RTN 950

Weight

(kg)

Empty chassis: 1.97 Empty chassis: 2.80

Dimensio

n

442 mm (width) x 220 mm (depth) x 1 U (height, 1 U = 44.45 mm).

442 mm (width) x 220 mm (depth) x 2 U (height, 1 U = 44.45 mm).

•The OptiX RTN 900 can be installed in the following:

- ETSI cabinet (300 mm deep)- ETSI cabinet (600 mm deep)- 19 inch cabinet (450 mm deep)- 19 inch cabinet (600 mm deep)- Open rack- Wall- Desktop

• RTN 900 Hardware Structure

Page 13: OptiX RTN 900 V1R1 Installation Guide-VDF

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

IDU Installation steps• Installing the IDU in a 19’’ Rack

PGND

Page 14: OptiX RTN 900 V1R1 Installation Guide-VDF

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

IDU Installation• Installing the IDU in a ETSI Rack

For ETSI rack, RTN 900 IDU should install transfer fixer.

For ETSI rack, RTN 900 IDU should install PGND cable ahead, then install the IDU in the rack..

Page 15: OptiX RTN 900 V1R1 Installation Guide-VDF

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

IDU Installing

WarningThe conductor of power cable must insert the connector completely, prevent getting an electrical shock!

• Installing the Power Cable

If the power cable isn’t assembled in factory, it needs to be made in site.

Page 16: OptiX RTN 900 V1R1 Installation Guide-VDF

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

IDU Installing• For 1+1, the IF cable between IFE2 and ODU should be connected correctly.

Working IFE2 IF cable can’t connect with standby ODU.

Slot3: working board.Slot4: protection board.

working protection

Page 17: OptiX RTN 900 V1R1 Installation Guide-VDF

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

IDU Installing• Installing the E1 Cable

Page 18: OptiX RTN 900 V1R1 Installation Guide-VDF

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

IDU Installing• Installing the E1 Cable

•The table of all pin assignments is packed with the cable.E1 cable installing should according to it.

Page 19: OptiX RTN 900 V1R1 Installation Guide-VDF

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

IDU Installing• Installing the E1 Cable

•The table of all pin assignments is packed with the cable.E1 cable installing should according to it.

Page 20: OptiX RTN 900 V1R1 Installation Guide-VDF

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

IDU Installing

Interface on the Front

Panel

Interface Type

Usage Remark

1 ETH OAM RJ-45 10Base-T/100Base-TX NM Ethernet interface or NM serial interface

For WEBLCT

2 CLK1/TOD1 RJ-45 External clock/time input/output interface

3 CLK2/TOD2 RJ-45 External clock/time input/output interface

4 EXT/S1 RJ-45 10Base-T/100Base-TX extended Ethernet interface or 64k transparent data interface

5 PHONE RJ-45 Orderwire interface

6 ALMI/ALM0 RJ-45 3 x alarm inputs and 1 x alarm output interface

7 FE1 - FE4 RJ-45 Input/output interface for FE electrical signals

For FE service

8 E1(1 - 16) Anea 96 E1 service input/output interface For E1 service

• CXPA/CXPB Cable Interface

1 2 3 4 5 6 7 8

Page 21: OptiX RTN 900 V1R1 Installation Guide-VDF

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

IDU Installing• EF8T/EF8F Cable Interface

• EF8T: Accesses 8 x FE electrical signals.

• EF8F: Accesses 8 x FE optical signals.

• EF8T: 8 x FE electrical signals.

• EF8F: 8 x FE electrical signals.

Page 22: OptiX RTN 900 V1R1 Installation Guide-VDF

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

IDU Installing• Cable Routing and Sequence (from 1 to 4).

Page 23: OptiX RTN 900 V1R1 Installation Guide-VDF

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

Installation– ODU

Installing an ODU on an Antenna

In this case, use four latches to mount an ODU on the back of the antenna.Follow the steps below:

1 Installing the AntennaFollowing the instructions packed with it, install the antenna.

2 Setting the Antenna PolarizationBy default, the antenna applies vertical polarization. If horizontal polarization is required, rotate the feed boom at the back of the antenna to change the polarization direction of the antenna.

3 Installing the ODU on the AntennaUse four latches to mount the ODU on the antenna.

Page 24: OptiX RTN 900 V1R1 Installation Guide-VDF

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

Setting the Antenna PolarizationBy default, the antenna applies vertical polarization. If horizontal polarization is required, rotate the feed boom at the back of the antenna to change the polarization direction of the antenna.

Installation– ODU

ProcedureStep 1 Check if the antenna is vertically polarized.

Step 2 Loosen the fixing bolts enough to allow the feed boom to rotate freely.

Page 25: OptiX RTN 900 V1R1 Installation Guide-VDF

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

Step 3 Rotate the feed boom 90 degrees to the right or left until its positioning pin plugs into the positioning slot in the base.

Figure Horizontally polarized antenna

Installation– ODU

Step 4 Tighten the fixing bolts.

Page 26: OptiX RTN 900 V1R1 Installation Guide-VDF

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

Installing the ODU on the Antenna

Installation– ODU

ProcedureStep 1 Remove the protective caps from the feed boom of the antenna and from the ODU antenna interface. Apply appropriate lubricant to the gasket of the feed boom.

Step 2 Place the ODU antenna interface against the feed boom. Slowly fit the feed boom in to make the four ODU latches engage the four antenna hooks.

Figure Installing the ODU on the antenna (vertically polarized)

Next page

Page 27: OptiX RTN 900 V1R1 Installation Guide-VDF

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

Installation– ODU

Page 28: OptiX RTN 900 V1R1 Installation Guide-VDF

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

Installing Two ODUs on an Antenna

Installation– ODU

In this case, use a hybrid coupler to mount two ODUs on the back of the antenna.

Setting the Antenna Polarization

By default, the antenna applies vertical polarization. If horizontal polarization is required, rotate the feed boom at the back of the antenna to change the polarization direction of the antenna.

Step 1 Check the polarization direction of the antenna.If The antenna is vertically polarized, Go to the next step.The antenna is horizontally polarized, Go to Step 3.

Step 2 Remove the protective cap from the antenna interface on the coupler. Replace the polarization converter in the interface by a horizontal polarizer.

Procedure

Page 29: OptiX RTN 900 V1R1 Installation Guide-VDF

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

Step 3 Remove the protective caps from the feed boom and the antenna interface. Apply appropriate lubricant to the gasket of the feed boom.

Installation– ODU

Figure 4Installing the ODU on the hybrid coupler

Step 4 Close the four latches cornerwise.

Page 30: OptiX RTN 900 V1R1 Installation Guide-VDF

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

Installation– ODU Cables

Installing the ODU Protection Grounding Cable

ProcedureStep 1 Fix the OT terminal of the protection grounding cable onto the grounding stud of the ODU.

Step 2 Connect the other end of the protection grounding cable to the grounding point on the tower thatis the nearest to the ODU.

Page 31: OptiX RTN 900 V1R1 Installation Guide-VDF

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

Installing the IF CableOne end of the IF cable is connected to the ODU, while the other end is connected to the IF jumper from the IDU.

Installation– ODU Cables

ProcedureStep 1 Depending on the distance between the IDU and the ODU, cut off a length of IF cable with a slack of 3 m to 5 m.

Step 2 Refer to A Terminating the IF Cable with Connectors, make a connector for the end that is connected to the ODU.Take protective measures for the connector to avoid damage to the connectors during installation.

Step 3 Affix temporary labels to both ends of the IF cable.

Step 4 Leave enough slack of the IF cable for routing and binding it along the mast, wiring ladder and wiring frame.

Page 32: OptiX RTN 900 V1R1 Installation Guide-VDF

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

Installation– ODU Cables

Figure 5-2 Waterproof curves before the IF cable enters the IDU room

Step 5 Insert the type-N male connector of the IF cable to the IF interface of the ODU and screw tight.

Page 33: OptiX RTN 900 V1R1 Installation Guide-VDF

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

Figure 5-3 Connecting the IF cable to the ODU

Installation– ODU Cables

Page 34: OptiX RTN 900 V1R1 Installation Guide-VDF

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

Grounding the IF Cable In general, the IF cable should be grounded to a minimum of three points. When the IF cable is longer than 60 meters, add a grounding point for every extra 50 meters. The place about 1 m away from the ODU and 1 m away from the cable entry are propositional grounding point. All of outdoor connector should be waterproofed.

1,2,3,4:IF Cable Grounding Point.

The 3 grounding kits must be mounted.

Page 35: OptiX RTN 900 V1R1 Installation Guide-VDF

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

Check IF Cable Installation

The angle between IF cable and grounding cable is the smaller the better.

The angle should <15°.

Page 36: OptiX RTN 900 V1R1 Installation Guide-VDF

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

Check IF Cable Installation

You should scrape the paint on the iron before mounting the grounding kits.

Page 37: OptiX RTN 900 V1R1 Installation Guide-VDF

HUAWEI TECHNOLOGIES CO., LTD. Page 37Huawei Confidential

Check IF Cable InstallationPorthole: IF cable must be up-tilted or have Waterproof curve in the entrance of porthole.The IF cable route and position for the cabling should be designed beforehand and arranged neatly. IF cable turns should be smooth, and the bending radius should be larger than 30 cm.

Page 38: OptiX RTN 900 V1R1 Installation Guide-VDF

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

Check IF Cable Installation

All of outdoor connector should be waterproofed.

The ODU IF interface should be waterproofed.

The area for grounding kit should be waterproof.

Page 39: OptiX RTN 900 V1R1 Installation Guide-VDF

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

Check IF Cable Installation

The operation of waterproof must be regular.

Wrapping a layer of PVC tape.

Wrapping three layers of waterproof insulation tape.

Wrapping three layers of PVC tape over the waterproof insulation tape.

Using the outdoor bundling strap to bind the PVC tape tight at both ends.

Page 40: OptiX RTN 900 V1R1 Installation Guide-VDF

www.huawei.com

THANK YOU