option 3 shared use on the west side of the road 3... · option 3 – shared use on the west side...

7
Option 3 Shared use on the west side of the road Section 1 Hillfoot to Birch View

Upload: vuque

Post on 25-Mar-2018

216 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Option 3 Shared use on the west side of the road 3... · Option 3 – Shared use on the west side of the road Section 1 – Hillfoot to Birch View

Option 3 – Shared use on the west side of the road

Section 1 – Hillfoot to Birch View

Page 2: Option 3 Shared use on the west side of the road 3... · Option 3 – Shared use on the west side of the road Section 1 – Hillfoot to Birch View

Section 2 – Birch View to ASDA junction

Page 3: Option 3 Shared use on the west side of the road 3... · Option 3 – Shared use on the west side of the road Section 1 – Hillfoot to Birch View

Section 3 – ASDA junction to Kessington

Page 4: Option 3 Shared use on the west side of the road 3... · Option 3 – Shared use on the west side of the road Section 1 – Hillfoot to Birch View

DateRev Description By Chk`d Approved Purpose of IssueNotes : Client

Rev

Project

Title

Scale Drawn

Date

Checked

Date Date

Approved Drawing No.

Section 1

Hillfoot

Section 2

Boclair

Section 3

Kessington

Two way Segregated Cycle Facility

Shared use facility

With-flow Segregated Cycle lanes Facility

Section 3

Kessington

North North

I:\En

gin

eeri

ng

\Cu

rren

t P

roje

cts\

679 -

East

Du

nb

art

on

shir

e C

ou

nci

l\05 -

Dra

win

gs

- B

ofQ

- M

isc\

2016-0

7-2

0-P

hase

2-S

chem

ati

cs-V

1-0

B.d

wg

, 200, 0

1/0

8/2

016 1

2:2

3:3

3

Page 5: Option 3 Shared use on the west side of the road 3... · Option 3 – Shared use on the west side of the road Section 1 – Hillfoot to Birch View

Client

Road Corridor Width = ~19 m

Road Corridor Width = 18.3 m

Road Corridor Width = 15.5 m

Road Corridor Width = 18.2 m

Rev

Project

Title

Scale Drawn

Date

Checked

Date Date

Approved Drawing No.

North

to Milngavie

From Glasgow

Vehicle Lane

3m and over

Parking

2.0 to 2.4m

Vehicle Lane

with turning

Turning Lane

dedicated

20mph Mandatory speed limit

956 - Route for use by pedal cycles and pedestrians only.

957 - Route comprising two ways, separated by the road marking for use by pedal

cycles and pedestrians only.

955 - Route for use by pedal cycle only

Segregated Cycle Facility

Shared use facility

With-flow Segregated Cycle Facility

500mm safety "buffer" zoneParking

2.0 to 2.4m

Vehicle Lane

3m and over

Road Corridor Width = ~19 m

Road Corridor Width = 18.3m

Road Corridor Width = 18.2m

Ghost Island Area

Road Corridor Width = 15.5m

I:\En

gin

eeri

ng

\Cu

rren

t P

roje

cts\

679 -

East

Du

nb

art

on

shir

e C

ou

nci

l\05 -

Dra

win

gs

- B

ofQ

- M

isc\

2016-0

7-2

0-P

hase

2-S

chem

ati

cs-V

1-0

B.d

wg

, 201, 0

1/0

8/2

016 1

2:2

3:3

4

Page 6: Option 3 Shared use on the west side of the road 3... · Option 3 – Shared use on the west side of the road Section 1 – Hillfoot to Birch View

Client

Road Corridor Width = 18.2

Road Corridor Width = 18.0

Road Corridor Width = 18.5 m

Road Corridor Width = 15.9 m

3.0m lane

Rev

Project

Title

Scale Drawn

Date

Checked

Date Date

Approved Drawing No.

3.0m lane

Vehicle Lane

3m and over

Parking

2.0 to 2.4m

Vehicle Lane

with turning

Turning Lane

dedicated

20mph Mandatory speed limit

956 - Route for use by pedal cycles and pedestrians only.

957 - Route comprising two ways, separated by the road marking for use by pedal

cycles and pedestrians only.

955 - Route for use by pedal cycle only

Segregated Cycle Facility

Shared use facility

With-flow Segregated Cycle Facility

500mm safety "buffer" zoneParking

2.0 to 2.4m

Vehicle Lane

3m and over

* *

* *

North

to Milngavie

From Glasgow

Road Corridor Width = 18.2m

Road Corridor Width = 18.0m

Road Corridor Width = 18.5 m

Road Corridor Width = 15.9 m

2.5m lane 2.5m lane 2.9m lane

I:\En

gin

eeri

ng

\Cu

rren

t P

roje

cts\

679 -

East

Du

nb

art

on

shir

e C

ou

nci

l\05 -

Dra

win

gs

- B

ofQ

- M

isc\

2016-0

7-2

0-P

hase

2-S

chem

ati

cs-V

1-0

B.d

wg

, 202, 0

1/0

8/2

016 1

2:2

3:3

5

Page 7: Option 3 Shared use on the west side of the road 3... · Option 3 – Shared use on the west side of the road Section 1 – Hillfoot to Birch View

Client

Road Corridor Width = ~18.6

Road Corridor Width = ~18.6

Road Corridor Width = 16.0 m

Rev

Project

Title

Scale Drawn

Date

Checked

Date Date

Approved Drawing No.

Vehicle Lane

3m and over

Parking

2.0 to 2.4m

Vehicle Lane

with turning

Turning Lane

dedicated

20mph Mandatory speed limit

956 - Route for use by pedal cycles and pedestrians only.

957 - Route comprising two ways, separated by the road marking for use by pedal

cycles and pedestrians only.

955 - Route for use by pedal cycle only

Segregated Cycle Facility

Shared use facility

With-flow Segregated Cycle Facility

500mm safety "buffer" zoneParking

2.0 to 2.4m

Vehicle Lane

3m and over

North

to Milngavie

From Glasgow

Road Corridor Width = 18.3 m

Road Corridor Width = ~18.6m

Road Corridor Width = ~18.6m

Road Corridor Width = 16.0 m

Road Corridor Width = 18.3 m

I:\En

gin

eeri

ng

\Cu

rren

t P

roje

cts\

679 -

East

Du

nb

art

on

shir

e C

ou

nci

l\05 -

Dra

win

gs

- B

ofQ

- M

isc\

2016-0

7-2

0-P

hase

2-S

chem

ati

cs-V

1-0

B.d

wg

, 203, 0

1/0

8/2

016 1

2:2

3:3

7