Optimizing SystemsIndustrial Engineering Lab

BSS 2011

Page 2: Optimizing Systems Industrial Engineering Lab BSS 2011

Learning Objectives

• You will design your own manufacturing process line complete with:– Models– Design work and flows– Control processes

Page 3: Optimizing Systems Industrial Engineering Lab BSS 2011

Your Product

• You are the manufacturer of a cheese cracker (saltine, spread, saltine)

Page 4: Optimizing Systems Industrial Engineering Lab BSS 2011

Your Goal• Make money• Produce cracker sandwiches that meet the

product requirementsParameter ValueThickness (cm) No greater than .5

inchAlignment between top and bottom cracker

Within 1/16 inch

Page 5: Optimizing Systems Industrial Engineering Lab BSS 2011

Defects• You must avoid defects:– Anything that doesn’t meet the height and

alignment targets decide what to do with (scrap? Rework?)

– No cheese can extend beyond the edge or through the holes in the cracker.

– No breakage or damaged edges of crackers must occur. This is scrap.

– Sandwiches must be in bags with 3 sandwiches per bag.

Page 6: Optimizing Systems Industrial Engineering Lab BSS 2011

The Rules• No:

• Everyone participates: use all of team as workers

Page 7: Optimizing Systems Industrial Engineering Lab BSS 2011

Disclaimer

• Eating your product afterward is your own decision and BSS is not responsible for any resulting illness.

Page 8: Optimizing Systems Industrial Engineering Lab BSS 2011

Activity 1

• First we analyze the problem• Open the file model_student and go to the

worksheet “cost model”– Open from impact.asu.edu/~bss11

• Answer all questions

Page 9: Optimizing Systems Industrial Engineering Lab BSS 2011

Activity 2

• Design your processes/flows• You must design the work and the rest of the

system and collect data

Page 10: Optimizing Systems Industrial Engineering Lab BSS 2011

Activity 3

• After lab, fill out document your designs in the file “Operating_Specification.doc” passed out to each group