operations management prezi wv
DESCRIPTION
OMTRANSCRIPT
![Page 1: Operations Management Prezi WV](https://reader035.vdocuments.site/reader035/viewer/2022081502/5695d2301a28ab9b0299732f/html5/thumbnails/1.jpg)
Operations Management
Group membersNoman Saleem L12-4808
Atif Mukhtar L124746Huda Khan L124752Umair Tariq L12-4740
Fatima Nasir L12-4728
![Page 2: Operations Management Prezi WV](https://reader035.vdocuments.site/reader035/viewer/2022081502/5695d2301a28ab9b0299732f/html5/thumbnails/2.jpg)
DriveBy Car wash
![Page 3: Operations Management Prezi WV](https://reader035.vdocuments.site/reader035/viewer/2022081502/5695d2301a28ab9b0299732f/html5/thumbnails/3.jpg)
Introduction
• Five type of car washes
• Our focus is on exterior (only) and full service of car wash
• Following processes are included in the car wash
• Drive in, soap up, scrub, blast, rinse, wax, dry, touch up
![Page 4: Operations Management Prezi WV](https://reader035.vdocuments.site/reader035/viewer/2022081502/5695d2301a28ab9b0299732f/html5/thumbnails/4.jpg)
Idea Development
Two main things that should be ensure for success of every
project:
Time
Quality
Hence we provide services in less time but of best quality.
![Page 5: Operations Management Prezi WV](https://reader035.vdocuments.site/reader035/viewer/2022081502/5695d2301a28ab9b0299732f/html5/thumbnails/5.jpg)
Essential Resources Required
Well as our business is based on cleaning system. It mainly
requires:
Clean and soft water
Shampoos and detergents
Waxes and polishes
Towels and air fresheners
![Page 6: Operations Management Prezi WV](https://reader035.vdocuments.site/reader035/viewer/2022081502/5695d2301a28ab9b0299732f/html5/thumbnails/6.jpg)
Continued…
For further administration of business we need:
One person at Point of sale
One engineer for maintenance
One administrator
Three attendants
![Page 7: Operations Management Prezi WV](https://reader035.vdocuments.site/reader035/viewer/2022081502/5695d2301a28ab9b0299732f/html5/thumbnails/7.jpg)
Preliminary design There are two type of services:
Field based services
Facility based services
Our business is of facility based services
In preliminary design we set up equipment according to the
requirement.
It will be further explain in detail in facility layout and space
requirement for each station.
![Page 8: Operations Management Prezi WV](https://reader035.vdocuments.site/reader035/viewer/2022081502/5695d2301a28ab9b0299732f/html5/thumbnails/8.jpg)
Competitive Dimensions Every customer has different set of priorities
Companies are always making tradeoffs between these
dimensions:
Cost
Quality
Time/Speed
Flexibility
![Page 9: Operations Management Prezi WV](https://reader035.vdocuments.site/reader035/viewer/2022081502/5695d2301a28ab9b0299732f/html5/thumbnails/9.jpg)
What are we focusing on? • Main focus on quality
• Not pricing very high
• Exterior wash= 5 min; Full wash 15-17 min
• Service available from 7am to 9pm whole week.
![Page 10: Operations Management Prezi WV](https://reader035.vdocuments.site/reader035/viewer/2022081502/5695d2301a28ab9b0299732f/html5/thumbnails/10.jpg)
Service System Design Matrix
![Page 11: Operations Management Prezi WV](https://reader035.vdocuments.site/reader035/viewer/2022081502/5695d2301a28ab9b0299732f/html5/thumbnails/11.jpg)
Supply Chain Strategy Service based business- no as such raw material
The whole service itself is the supply chain
Vendors for the supply of resources- detergents, shampoos,
polishes, shiners etc.
Outsourcing “Marketing and Promotion”
Marketing firm to design whole marketing campaign of our
business.
![Page 12: Operations Management Prezi WV](https://reader035.vdocuments.site/reader035/viewer/2022081502/5695d2301a28ab9b0299732f/html5/thumbnails/12.jpg)
Inventory Strategy
Focus on JIT Not having a stock of products
Lean manufacturing Usage of time in services
Underutilizing employees
![Page 13: Operations Management Prezi WV](https://reader035.vdocuments.site/reader035/viewer/2022081502/5695d2301a28ab9b0299732f/html5/thumbnails/13.jpg)
Flow Chart
Yes Yes
Touch screen panel
Select wash cycle
Full service Exterior service
Further Steps Further steps
Satisfied customer
Satisfied customer
No No
Delay for 5 min
Drive out
![Page 14: Operations Management Prezi WV](https://reader035.vdocuments.site/reader035/viewer/2022081502/5695d2301a28ab9b0299732f/html5/thumbnails/14.jpg)
Continuous Improvement
Maintenance of machinery Maintenance schedule
Store inspection
Best services Upselling customers
Maintaining cleanliness
Inventory analysis Helps in forecasting and demand of equipment
![Page 15: Operations Management Prezi WV](https://reader035.vdocuments.site/reader035/viewer/2022081502/5695d2301a28ab9b0299732f/html5/thumbnails/15.jpg)
Capital costs and expenditures
• Initial investment is high i.e. land, building and plant
![Page 16: Operations Management Prezi WV](https://reader035.vdocuments.site/reader035/viewer/2022081502/5695d2301a28ab9b0299732f/html5/thumbnails/16.jpg)
Revenue
![Page 17: Operations Management Prezi WV](https://reader035.vdocuments.site/reader035/viewer/2022081502/5695d2301a28ab9b0299732f/html5/thumbnails/17.jpg)
Break-even Analysis
![Page 18: Operations Management Prezi WV](https://reader035.vdocuments.site/reader035/viewer/2022081502/5695d2301a28ab9b0299732f/html5/thumbnails/18.jpg)
Productivity
![Page 19: Operations Management Prezi WV](https://reader035.vdocuments.site/reader035/viewer/2022081502/5695d2301a28ab9b0299732f/html5/thumbnails/19.jpg)
Full Capacity Production
In 14 hours, full capacity estimation is 104 cars per day and
37,960 cars per year
32 full service and 72 exterior only service
Revenue at full capacity is Rs. 75,200 daily and Rs. 27,448,000
yearly
Break-even reached in 3rd year
![Page 20: Operations Management Prezi WV](https://reader035.vdocuments.site/reader035/viewer/2022081502/5695d2301a28ab9b0299732f/html5/thumbnails/20.jpg)
Forecasting • Forecasting can vary above and below the per year average output
of 31,025 cars but cannot exceed our full capacity output of 37,960
cars per year
![Page 21: Operations Management Prezi WV](https://reader035.vdocuments.site/reader035/viewer/2022081502/5695d2301a28ab9b0299732f/html5/thumbnails/21.jpg)
• Assembly like layout
• Stationary equipments work on the
moving car
• Product layouto Facility organized so that equipment or work
processes are arranged according to the established
sequence by which the product is made.
Facility layout
![Page 22: Operations Management Prezi WV](https://reader035.vdocuments.site/reader035/viewer/2022081502/5695d2301a28ab9b0299732f/html5/thumbnails/22.jpg)
Facility layoutPoint of sale Interior air
blowerPre soaker
Mitter curtain
Rinser Foam applicator
Scrubbers High pressure washer
Undercarriage wash applicator
Wax applicator
Mitter curtain
Scrubbers
Rinser Dryer Manual detail services
Enter
Exit
![Page 23: Operations Management Prezi WV](https://reader035.vdocuments.site/reader035/viewer/2022081502/5695d2301a28ab9b0299732f/html5/thumbnails/23.jpg)
Space Requirements
Scale: 1 cm = 10 foot Scale: 1cm = 5 foot
![Page 24: Operations Management Prezi WV](https://reader035.vdocuments.site/reader035/viewer/2022081502/5695d2301a28ab9b0299732f/html5/thumbnails/24.jpg)
Quality Control
Output at each station
Blocking time
Measuring quality quantitatively