1 Operations and Performance Update Nuon Power Buggenum GTC meeting, oct 2002 Marco Kanaar Manager Projects & Engineering

Upload: duongthuan

Post on 26-May-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Operations and Performance Update Nuon Power … Library/Research/Coal...Operations and Performance Update Nuon Power Buggenum GTC meeting, oct 2002 Marco Kanaar Manager Projects &

1

Operations and Performance Update Nuon Power Buggenum

GTC meeting, oct 2002Marco Kanaar

Manager Projects & Engineering

Page 2: Operations and Performance Update Nuon Power … Library/Research/Coal...Operations and Performance Update Nuon Power Buggenum GTC meeting, oct 2002 Marco Kanaar Manager Projects &

2

Suppliers in the Netherlands 2001

ESSENTDeltaNuts

6

9

ENECO

REMUNuon

ESSENTNuon

Nuon

11

7

8

10

Bron: Energie in Nederland 2001; EnergieNed

Page 3: Operations and Performance Update Nuon Power … Library/Research/Coal...Operations and Performance Update Nuon Power Buggenum GTC meeting, oct 2002 Marco Kanaar Manager Projects &

3

Nuon

Eneco

EndesaOther

Essent

36%

33%

18%

7%6%

clients electricity100% = 7.2 mln

clients green electricity 100% = 0.75 mln

Other

Nuon

Essent

Eneco

32%

28%

21%

7%

12%Endesa

Marketshare in the Netherlands 2001

Page 4: Operations and Performance Update Nuon Power … Library/Research/Coal...Operations and Performance Update Nuon Power Buggenum GTC meeting, oct 2002 Marco Kanaar Manager Projects &

4

Marketshare in the Netherlands 2001

Nuon

Eneco

Other

RWE

Essent

Delta

30%

27%

21%

7%

6%5% 4%

Endesa

clients gas100% = 6.7 mln

Vitens

PWNWOB

DZH

Overige

Hydron

23%

15%

10%9%

8%

35%

clients water100% = 6.6 mln

Page 5: Operations and Performance Update Nuon Power … Library/Research/Coal...Operations and Performance Update Nuon Power Buggenum GTC meeting, oct 2002 Marco Kanaar Manager Projects &

5

Sustainable energy Nuon 2001

• Sustainable energy4.275 million kWh being 15,5% of the whole sale

• “Green Power” for business market12,6 million kWh of which 1,1 from the WAC

• “Natural Power” for retail534 million kWhgenerated out of sun, wind and water

• As from 2002: “Green Power” for retailgenerated out of biomass, wind and water

Page 6: Operations and Performance Update Nuon Power … Library/Research/Coal...Operations and Performance Update Nuon Power Buggenum GTC meeting, oct 2002 Marco Kanaar Manager Projects &

6

• Limited own production capacity

• Clean coal technology

• Lots of opportunities

• Large potential for green energy

WhyWhy the the WillemWillem--Alexander Alexander Centrale?Centrale?

Page 7: Operations and Performance Update Nuon Power … Library/Research/Coal...Operations and Performance Update Nuon Power Buggenum GTC meeting, oct 2002 Marco Kanaar Manager Projects &

7

1.1.2002 targett/m 200230.8.2002

Availability WAC: 96,4 % 86 %*Planned shut-down: 3,3 % 9,9 %Unplanned shut-down: 0,3 % 4,3 %

Availability gasifier: 86,1 % 69 %Planned shut-down: 8,3 % 13 %Unplanned shut-down: 5,6 % 18 %

* realisation in 2001: 79%

Performance of the Willem-AlexanderCentrale

Page 8: Operations and Performance Update Nuon Power … Library/Research/Coal...Operations and Performance Update Nuon Power Buggenum GTC meeting, oct 2002 Marco Kanaar Manager Projects &

8

IGCC Operating hours SG / NG in % per week planning and realisation

0

10

20

30

40

50

60

70

80

90

100

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51

weken

%

0

1000

2000

3000

4000

5000

6000

7000

8000

hour

s

Realisatie % week SG % week AG van het net

Page 9: Operations and Performance Update Nuon Power … Library/Research/Coal...Operations and Performance Update Nuon Power Buggenum GTC meeting, oct 2002 Marco Kanaar Manager Projects &

9

Operating hours per year and per fuel

0

2000

4000

6000

8000

1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003

hour s

coal coal and nat ur al gas ( cum. )

Page 10: Operations and Performance Update Nuon Power … Library/Research/Coal...Operations and Performance Update Nuon Power Buggenum GTC meeting, oct 2002 Marco Kanaar Manager Projects &

10

Gasifier and CC starts

0

10

20

30

40

50

60

70

80

90

100

1994 1995 1996 1997 1998 1999 2000 2001 2002 untill wk35

# st

arts

Gasifier CC

`

Page 11: Operations and Performance Update Nuon Power … Library/Research/Coal...Operations and Performance Update Nuon Power Buggenum GTC meeting, oct 2002 Marco Kanaar Manager Projects &

11

Reasons for better results

Different mode of operation: Operate on power unbalance market, lower base load.

Note: every 4 seconds new setpoint!

Clear purpose.Power unbalance prices are high! Focus on reliability

Nuon buys coal on Buggenum specification.

Page 12: Operations and Performance Update Nuon Power … Library/Research/Coal...Operations and Performance Update Nuon Power Buggenum GTC meeting, oct 2002 Marco Kanaar Manager Projects &

12

Syngas production

Formation of slag lumpsDischarge and processing of slag finesDamage heatskirtBridging in powder coal sluicing vesselLeakages syngas coolerSevere fouling of top of syngas coolerProcessing of slag bath water

Critical items I

Page 13: Operations and Performance Update Nuon Power … Library/Research/Coal...Operations and Performance Update Nuon Power Buggenum GTC meeting, oct 2002 Marco Kanaar Manager Projects &

13

Syngas and waste water treating

Failure ceramic candlespH-control syngas scrubberDegradation sulfinolContamination of water with sulfinolPlugging waste water equipmentSeparation and processing of salt crystalsZero liquid discharge/surplus process water

Critical items II

Page 14: Operations and Performance Update Nuon Power … Library/Research/Coal...Operations and Performance Update Nuon Power Buggenum GTC meeting, oct 2002 Marco Kanaar Manager Projects &

14

Combined cycle, ASU and auxiliariesBurners gas turbine (humming, overheating)Production of make up water steamcycleGeneral controls ASUHydro-thermal ageing molsieve materialOxygen distribution (compressor, back-up)Damage seals LIN/LOX pumps

Critical items III

Page 15: Operations and Performance Update Nuon Power … Library/Research/Coal...Operations and Performance Update Nuon Power Buggenum GTC meeting, oct 2002 Marco Kanaar Manager Projects &

15

Recent problems less serious:

Leakages:

hot gas filter blow back nozzle (trip)

slag bath circulation system (trip)

LIN-vaporizer, cracks due to thermal shock

Caustic line, Halogenes wash column.

GT trip due to calibration work in ASU

HC build up in ASU (trip)

Trip quench gas compressor (instrumentation)

Flyash transportation (plugging)

Slag transportation chain stuck

Page 16: Operations and Performance Update Nuon Power … Library/Research/Coal...Operations and Performance Update Nuon Power Buggenum GTC meeting, oct 2002 Marco Kanaar Manager Projects &

16

Existing and planned activities

secundary fuels

biomass

fluxes

energy

sustainable energy

Usable by products

waste

coal

Page 17: Operations and Performance Update Nuon Power … Library/Research/Coal...Operations and Performance Update Nuon Power Buggenum GTC meeting, oct 2002 Marco Kanaar Manager Projects &

17

Project Green Power

Want • Stake holders value Nuon

• Front runner sustainable energy

Must • Kyoto: climate convenant

• Dutch coal convenant

Page 18: Operations and Performance Update Nuon Power … Library/Research/Coal...Operations and Performance Update Nuon Power Buggenum GTC meeting, oct 2002 Marco Kanaar Manager Projects &

18

Boundary Conditions

Slag and fly-ash disposal through existing channelsNett CO2-reductionIntegrity installationAvailability biomassEmission requirementsProfitableSustainable

Page 19: Operations and Performance Update Nuon Power … Library/Research/Coal...Operations and Performance Update Nuon Power Buggenum GTC meeting, oct 2002 Marco Kanaar Manager Projects &

19

Example of slag and fly ash re-use

Page 20: Operations and Performance Update Nuon Power … Library/Research/Coal...Operations and Performance Update Nuon Power Buggenum GTC meeting, oct 2002 Marco Kanaar Manager Projects &

20

Separation walls in bulk storage area

Page 21: Operations and Performance Update Nuon Power … Library/Research/Coal...Operations and Performance Update Nuon Power Buggenum GTC meeting, oct 2002 Marco Kanaar Manager Projects &

21

Detail showing included slag particles

Page 22: Operations and Performance Update Nuon Power … Library/Research/Coal...Operations and Performance Update Nuon Power Buggenum GTC meeting, oct 2002 Marco Kanaar Manager Projects &

22

Biomasses

Poultry litter, sewage sludge, waste wood, road side grass

Fluxes

Chalk grains, paper pulp, bentonite

Other fuels

Subcoal, pet cokes, pyrolysis cokes

Examples cogasification fuels

Page 23: Operations and Performance Update Nuon Power … Library/Research/Coal...Operations and Performance Update Nuon Power Buggenum GTC meeting, oct 2002 Marco Kanaar Manager Projects &

23

Testprogram

Fuel Tested Planned(ton)* (ton)**

Sewage sludge 2.300 5.000Chicken litter 800 10.000Wood 130 500

Paperpulp 1.000 __3004.230 15.800

* Nov 2000 - Dec 2001** Juni 2002 - Dec 2002

Page 24: Operations and Performance Update Nuon Power … Library/Research/Coal...Operations and Performance Update Nuon Power Buggenum GTC meeting, oct 2002 Marco Kanaar Manager Projects &

24

Project execution in 2 phases

Phase 1: 30 wt % co-gasification early 2004

Phase 2: 50 wt % co-gasification2005*

* 3 x 100.000 ton biomass per year, appr. 50 MWe

Page 25: Operations and Performance Update Nuon Power … Library/Research/Coal...Operations and Performance Update Nuon Power Buggenum GTC meeting, oct 2002 Marco Kanaar Manager Projects &

25

Biomass logistics

Coal-

mills

12 per day

10 per day

Chicken litter

silo’s

Chicken litter feed system

22 per day

Sewage sludge

silo’s

2 per week

Milled wood

silo’s

New Existing

Alternative transport wood

Sewage sludgefeed system

Milled wood feed system

Page 26: Operations and Performance Update Nuon Power … Library/Research/Coal...Operations and Performance Update Nuon Power Buggenum GTC meeting, oct 2002 Marco Kanaar Manager Projects &

26

Page 27: Operations and Performance Update Nuon Power … Library/Research/Coal...Operations and Performance Update Nuon Power Buggenum GTC meeting, oct 2002 Marco Kanaar Manager Projects &

27

3810Paper pulp

14Lime stone

100Wood

100Poultry litter

382100Sewage sludge

10768.451Nat. gas

471363543Coal

8760 hrs coal gas

2000 hrs nat. gas

6200 hrs coal gas

1200 hrs nat. gas

6200 hrs coal gas

1200 hrs nat. gas

Worst case pack.Average packageReference package

Fuel packages considered (kton/year)

Page 28: Operations and Performance Update Nuon Power … Library/Research/Coal...Operations and Performance Update Nuon Power Buggenum GTC meeting, oct 2002 Marco Kanaar Manager Projects &

28

Air emissions (concentrations mg/m3)HRSG chimney and BLA requirements

Referencepackage

average package

worst casepackage

BLA factor belowBLA

SO2 3,8 3,4 6,9 40 6NOx 13,4 16,1 16,1 70 4dust < 1 < 1 < 1 5 5HCl < 0,05 < 0,05 < 0,05 10 200HF < 0,05 < 0,05 < 0,05 1 20CO < 1 < 1 < 1 50 50CxHy < 2 < 2 < 2 10 5Cd 3,02E -06 1,04E -04 2,71E -04 0,05 185Hg 3,19E -05 2,01E -04 4,10E -04 0,05 122Sum heavy metalsBLA

1,61E -02 7,10E -02 1,58E -01 1 6

dioxins/furans(ng TEQ/Nm 3)

< 0,05 < 0,05 < 0,05 0,1 2

Page 29: Operations and Performance Update Nuon Power … Library/Research/Coal...Operations and Performance Update Nuon Power Buggenum GTC meeting, oct 2002 Marco Kanaar Manager Projects &

29

ByproductsAmount of byproducts increases

• Slag and fly ash from 72 to max. 179

kton/year

• Sulphur from 4,6 to max. 7,2 kton/year

Byproducts stay re-usableBron: par. 5.5

Page 30: Operations and Performance Update Nuon Power … Library/Research/Coal...Operations and Performance Update Nuon Power Buggenum GTC meeting, oct 2002 Marco Kanaar Manager Projects &

30

Avoided environmental effects

CO2-emission 30 % reduction

Less biomass to dumps

Savings on primary minerals• Coal• Lime stone• Marl

Bron: par. 5.11

Page 31: Operations and Performance Update Nuon Power … Library/Research/Coal...Operations and Performance Update Nuon Power Buggenum GTC meeting, oct 2002 Marco Kanaar Manager Projects &

31

Avoided CO2 emissions

emission fossil CO 2(kton)

average package worst case package

Reference 12551) 12551)

FutureCoal 835 851Natural gas 37+ 37+Total Future 872 -/- 888 -/-

Avoided CO 2 383 367

1)1249 kton from coal and 6 kton from lime stone

Page 32: Operations and Performance Update Nuon Power … Library/Research/Coal...Operations and Performance Update Nuon Power Buggenum GTC meeting, oct 2002 Marco Kanaar Manager Projects &

32

reference average package worst case packagetons/yearSO2 489,5 507,5 879,3NOx (syngas + nat.gasbedrijf) 240+79 265+79 309+132dust 9,3 9,3 15HCl 0,4 0,4 0,5HF 0,4 0,4 0,5CO 15,5 15,5 71CxHy 18 19 99

kg/yearAs 28,6 137,5 364,7Ba 6,8 30,0 38,3Be 0,1 0,1 0,3Cd 0,0 0,9 2,8Co 0,5 1,3 3,9Cr 0,9 2,9 5,6Cu 2,4 58,5 86,0Hg 0,9 6,0 11,0Mn 2,3 19,0 51,0Mo 0,1 0,8 0,9Ni 77,1 292,8 915,7Pb 0,3 7,1 6,5Sb 0,5 6,4 12,3Se 7,0 22,1 48,2Sn 2,5 17,7 48,2Te 0,5 6,5 13,7V 0,8 1,0 2,1Zn 2,1 65,4 152,4

Calculated Chimney Emissions