Explore your department needs for efficientreprocessing equipment.
Determine manpower needs.
Highlight the risk for cross contamination andrecontamination of disinfectedinstrumentation.
Compare the water quality after installation of
RO water treatment plant.
14 October 2012
Abu Dhabi, Patient Safety, Disinfection
& Sterilization
-
7/30/2019 operational quality
3/12
Tawam hospital has financed and constructedone Reverse osmosis plant for CSSD toprovide RO water for all washer disinfectors
and steam sterilizers .
This removes silicates ,iron, chlorides andminerals from the water which prevent anybuild up of sediments in steam generators andwasher disinfectors heating elements.
14 October 2012
Abu Dhabi, Patient Safety, Disinfection
& Sterilization
-
7/30/2019 operational quality
4/12
14 October 2012
Abu Dhabi, Patient Safety, Disinfection
& Sterilization
Provides clean and safe water from infectioncontrol perspectives.
The life span of the reprocessing equipment isprolonged.
Money is saved on repairs and manpower
needs.
Improvement of the condition of instrumentshas been noticed.
-
7/30/2019 operational quality
5/12
Plan is discussed among the staff what can be
changed to improve work flow, efficiency and time
management
Request for capital equipment (BWDs) andspecifications
Go ahead, submit request for the redesign the existing
decontamination room
Abu Dhabi, Patient Safety, Disinfection
& Sterilization14 October 2012
-
7/30/2019 operational quality
6/12
14 October 2012
Abu Dhabi, Patient Safety, Disinfection
& Sterilization
-
7/30/2019 operational quality
7/12
14 October 2012
Abu Dhabi, Patient Safety, Disinfection
& Sterilization
-
7/30/2019 operational quality
8/12
Loading the double door BWD that
is close to the preparation sink.
One movement only for this load,
Unloaded on the clean side.
Abu Dhabi, Patient Safety, Disinfection
& Sterilization14 October 2012
-
7/30/2019 operational quality
9/12
Following renovation:
Double Door BWDs x 2, 350 liter chamber volumewith incorporated drying cycle.
Two washing cycles
Dedicated R/O plant for BWDs and steam sterilizers
Improvements:
Loading, no unloading required
One way flow
Less time spent walking back and forth
Risk for recontamination of instruments eliminated.
BWD time: One hour
Loading/unloading/time in BWD; 10 minutes.
Total time: 1 hour 10 minutes.
-
7/30/2019 operational quality
10/12
IMPROVEMENTS / OUTCOME: Reprocessing 15 to 20% more instrument sets for the O.R, within the same timeframe as previously
Cleaner instruments, 2 wash cycles in R/O water.
Risk for recontamination of instruments eliminated as they are not returned back
into the decontamination room
Because of saving time, not performing previously unnecessary tasks,
assignments can be made more specific, one staff assigned for the setting and a
second for the checking of instrument sets.
Staff responsible for loading and unloading sterilizers as well as processdocumentation and statistics.
14 October 2012
Abu Dhabi, Patient Safety, Disinfection
& Sterilization
-
7/30/2019 operational quality
11/12
Whitewater, Infection Control in CentralService, 11 February 2011.
www.whitewaterireland.ie
ANSI/AAMI ST79:A1:2010, page 23/ 3.2.3
14 October 2012
Abu Dhabi, Patient Safety, Disinfection
& Sterilization
-
7/30/2019 operational quality
12/12
Abu Dhabi, Patient Safety, Disinfection
& Sterilization14 October 2012