Operational Plan “Safeguarding the Basingstoke Canal
for the future”
Page 37
7
Item 7
Page 38
7
Contents
1. Operational Plan - Introduction
2. Prioritisation and Assessment Of Work
3. Monitoring and Performance
3.1. Key Results Indicators and Key Performance Indicators
Appendices
A = Revenue Work Plan
B = Capital Work Plan
C = Operational Policies
1 Operational Plan - Introduction
The Operational Plan sets out the management and operational objectives and medium term
project targets in a five year Work Programme (Appendices A & B). This Plan refers to a number
of other operational documents which set out operational procedures to ensure the safety of the
Canal users, the public and property. This plan also contains a set of operational policies for the
Canal which will be added to over time as these develop (Appendix C).
There are two main work programmes for the Basingstoke Canal, which are the Revenue Work
Programme and the Capital Work Programme. The Capital Work Programme is delivered directly
by the owning County Councils and supported by the Basingstoke Canal Authority (BCA). The
Revenue Work Programme focuses on the work of the Basingstoke Canal Authority, the Ranger
staff, volunteers and contractors.
Sitting alongside these (but not included in this document) are also work programmes for the
Visitor Services team and the Finance and Administration team.
The work for all these plans derives mainly from the following sources;
Extensive Inspections Regime (as outlined in the Asset Management Plan)
Planned works from other Canal plans such as the Conservation Plan, Emergency Plan,
Asset Plan, Business Plan
Direct correspondence from members of the public
Canal user groups meetings (recorded in minutes/actions of meetings)
Canal staff & staff Valuing Performance Appraisals
The work is also influenced by the following Acts, Legislation and policy;
Policy from Hampshire County Council (HCC) such as Health & Safety, Waste, Transport,
Finance, Trees
Governing Acts such as Byelaws,National Parks & Access to the Countryside, Canal Act
Other policy from Environment Agency, Natural England (SSSI),
Local Authority Planning (Conservation Planning Area)
Page 39
7
2 Prioritisation and Assessment of Work
Work is assessed for its priority and allocated appropriately. Factors taken into consideration are;
immediate risk to members of the public
likely cost
required timescale of works to start and length of work
what time of year work would need to be completed
staff or contractor requirements
the procurement process that would be required
operational policies
Different inspections have a different priority system appropriate to the asset; many of these are
based on the Canal and River Trust’s inspection regime and Asset Inspection Protocols (See
Asset Management Plan).
Asset related work is recorded, where appropriate, into the Asset Geodatabase and allocated
priority. Other works are put straight into the revenue work programme or issued immediately for
attention.
When larger structural works are completed these are then recorded as completed in the Asset
Geodatabase to complete the recording loop. Day to day recording of work is via a diary in the
Canal Centre office.
Improvement projects are often identified but unless these have a direct benefit for improving a
risk issue then these are kept as a wish list (GIS Layer held by strategic manager) until funding
may become available. The other factor that might change this is if the project has a potential
revenue income benefit, in which case a business plan may be drawn up and presented to JMC
for consideration.
3 Monitoring and Performance The Key Results Indicators (KRI’s) aid Members and Senior Managers in assessing how the well
the BCA are doing in achieving their targets and goals.
The Strategy gives the Partnership an overarching mission of “Safeguarding the Basingstoke
Canal for the future”
It draws on the Strategy & Vision, Asset Management Plan and Conservation Management Plan to
arrive at a set of seven Strategic Priorities for the Canal. These cover accessibility and safety for
all users (on and off water), economy, environment, water strategy, community engagement and
heritage.
A dash-board of 10 Key Results Indicators are then used to demonstrate performance for
managers and Members. These will be fed through many more Key Performance Indicators which
will be based on the actions and priorities contained in the underpinning delivery level plans. This
system mirrors closely that used by Canal and Rivers Trust (C&RT).
Page 40
7
3.1 Performance will be communicated using the Key Results Indicators (taken from Canal Strategy, ‘V’ numbers refer to items in Vision) and monitored with Key Performance Indicators See Links below (double click to open in either Excel or PDF)
(NOTE: Oct 2016 - The spreadsheet shows the KPI’s and KRI’s and the banding of the RAG status for each. This will not be shown in future and is only for information in initially agreeing this document. These will later be hidden and a simple Red, Amber or Green will be shown instead) Each plan contains a series of actions which in the main, lend themselves only to subjective assessment of progress prior to completion. Progress against these actions will be monitored using a traffic light system. These plan actions will be used to inform the Key Results Indicators. The Operational Plan will be a compilation of the annual actions or longer term projects from each of the main plans setting out priority, key resources and timescales for each of the actions, and as such will be a dynamic document. Appendices
A = Revenue Work Plan
B = Capital Work Plan
C = Operational Policies
Basingstoke Canal KPI table 2016.xlsx
Basingstoke Canal KPI table 2016.pdf
Page 41
7
Appendix A Revenue Work Programme 16/17
Page 42
7
Page 43
7
Page 44
7
Appendix B Capital Work Programme
Jo
b R
efe
ren
ce
Project Pro
jec
t C
od
e
Pri
ori
ty
Re
sp
on
sib
ilit
y
Wo
rks
allo
ca
ted
Re
oc
cu
rrin
g?
Fre
qu
en
cy
Job Source Equipment 01
-Ap
r-1
4
01
-Ma
y-1
4
01
-Ju
n-1
4
01
-Ju
l-1
4
01
-Au
g-1
4
01
-Se
p-1
4
01
-Oc
t-1
4
01
-No
v-1
4
01
-De
c-1
4
01
-Ja
n-1
5
01
-Fe
b-1
5
01
-Ma
r-1
5
01
-Ap
r-1
5
01
-Ma
y-1
5
01
-Ju
n-1
5
01
-Ju
l-1
5
01
-Au
g-1
5
01
-Se
p-1
5
01
-Oc
t-1
5
01
-No
v-1
5
01
-De
c-1
5
01
-Ja
n-1
6
01
-Fe
b-1
6
01
-Ma
r-1
6
01
-Ap
r-1
6
01
-Ma
y-1
6
01
-Ju
n-1
6
Ju
l-1
6
Au
16
Se
p-1
6
Oc
t-1
6
No
v-1
6
De
c-1
6
Ja
n-1
7
Fe
b-1
7
Ma
r-1
7
C01
Embankment repairs: (Emankment 66-68 - Ash Embankment)** (SCC to also
undertake works on HCC side of same embankment as part of one scheme E 1SCC Complete N N/A PI
C02
Embankment repairs: (Embankment 125 - Step Bridge)** [Engineering inspection
found that soft bank works completed in 2009 are adequate - no further work
required] E1
SCC Complete N N/A PI
C03 HV cable duct culvert below lock 26 - leakage and headwalls (culvert 17) CVT 1 SCC S&S Energy / MoD N N/A PI
C04
Mytchett Lake Embankment (Embankment 74) - contingencies from Reservoirs Act
improvements** [Additional works not required by ARPE - final report only] E 1SCC Complete N N/A Reservoir Inspecting Engineer
C05 Purchase of emergency equipment* R 1SCC / HCC JT / FS N N/A Risk Improvement programme
C06 Redway Cottage culvert leakage (culvert 8) [Fixed by Ranger team] LK 1 SCC Ranger team N N/A PI
C07 Rive Ditch - Woking Culvert (culvert 5) - replacement** CVT 1 SCC Engineers / contractor N N/A PI
C53 Principle Inspection of Whitewater Aqueduct** CVT 1 HCC Engineers / contractor N N/A AMP programme
C54 Culvert repair: Barley Mow culvert (pipe cracked under Canal)** C.L001053.01 CVT 1 HCC Engineers / contractor N N/A PI
C55 Crookham Embankment (resolve leaking issues)** E 1 HCC Contractor N N/A LI
C56 Culvert repair: Tundry Bank Culvert (deformed brick arch)** C.L001053.01 CVT 1 HCC Contractor N N/A PI
C57 Eastrop House Embankment leak LK 1 HCC Contractor N N/A LI / emergecny repairs
C08 Weir crest replacement - Ash Embankment Weir W 2 SCC Complete N N/A LI
C10 Backlog of tree maintenace following tree survey (Surrey) T 2 SCC FS / Contractor N N/A PI
C11 Bypass channels rebuild Locks 19 & 20** L 2 SCC Engineers N N/A PI
C12 Embankment repairs: (Embankment 76 - Frimley Lodge Park)** E 2 SCC Complete N N/A PI
C13 Embankment repairs: (Embankment 77 - Canal Centre)** E 2 SCC Complete N N/A PI
C14 Hermitage weir replacement of brickwork and add sluice.** W 2 SCC Complete N N/A LI
C15 Invest in Telemetry R 2SCC / HCC
JT / FS / JG / Society
Volunteers / Contractor N N/A Risk Improvement programme
C16 Lock 10 - purchase of new gates L 2 SCC Complete N N/A PI / AMP programme
C17 Lock 12 - structural repairs (replace bypass, repoint chamber) L 2 SCC Engineers N N/A PI
C18 Lock 17 - structural repairs (replace upper wing walls) L 2 SCC Engineers N N/A PI
C19 Lock 5 - Lower wing wall replacement L 2 SCC Contractor N N/A PI
C20 Purchase of mini-tractor* V 2SCC / HCC Complete N N/A
LI / public compaints /
Conservation SG
C21
Sluice upgrade to Horsell Sluice [currently inoperable] (culvert 6) - the only sluice on
Woking Pound ** W 2SCC Ranger team N N/A PI
C22 Flood risk assessment for works to weirs at Wilderness, Hosell and Hermitage 2 SCC JT N N/A
C23 Towpath reinstatement - repairing erosion (Surrey) TP 2 SCC JT / Engineers / JG / N N/A LI
C58
Dogmersfield Landslip ** (Original code was WBS C.L000973.01 replacement
code is C.L001051.01) C 2 HCC Engineers N N/A Emergency repairs
C59
Embankment repairs: Ash Embankment West (65) ** (works to be carried out as
part of associated SCC scheme and recharged to HCC) E 2 HCC Contractor N N/A PI
C60 Embankment repairs: Chaltons (22) ** E 2 HCC N N/A PI
C61
Flood risk assessment for flood risk avoidance (required ahead of increasing weir
capacity or new weirs / sluices)** 2 HCC N N/A
C62 Swan cutting dredging ** C 2 HCC Engineers N N/A PI
C63 Swan cutting towpath repair ** (WBS CL001060.01) C 2 HCC Contractor N N/A PI / LI / emergency repairs
C64 Towpath reinstatement - repairing errosion TP 2 HCC Contractor N N/A LI
C65 Zebon copse swing bridge refurbishment** BDG 2 HCC Structures N N/A Public complaints
C68 Culvert repair: Wilks Water Culvert (resolve leaks)** C.L001053.01 CVT 2 HCC Engineers / contractor N N/A PI
C69 Backlog of tree maintenace following tree survey (Hampshire) T 2 HCC Contractor N N/A PI
C88 Lock 21 - solve leak around t/s upper wing wall L 2 SCC Engineer / contractor N N/A BCA
C09 Ash wharf re-pile £1000/m** E 3 SCC Engineers N N/A PI
C24 Automatic stopgates Ash Aquaeduct R 3 SCC N N/A Test exercises
C25 Automation of wilderness weir** W 3 SCC N N/A BCA
C26 Dredging £50k/km -£70K/km CL 3 SCC JT N N/A Public complaints
C27 Full channel survey (incl depth & siltation) * I 3SCC / HCC JT / Consultant N N/A
Public complaints / AMP
programme
C29 Lock 10 - investigate / repair leaking old paddle L 3 SCC Contractor N N/A Emergency repairs
C30 Lock 13 - structural repairs** L 3 SCC Contractor N N/A PI
C31 Lock 14 - structural repairs** L 3 SCC Contractor N N/A PI
C32
Lock 15 - structural repairs (pointing, voiding under wingwall, replace bypass
pipe)** L 3SCC Contractor N N/A PI
C33 Lock 16 - structural repairs (pointing)** L 3 SCC Contractor N N/A PI
C34 Lock 20 - solve leak around o/s upper wing wall L 3 SCC Contractor N N/A PI
C35 Lock 22 - structural repairs (leak behind wing wall / pointing)** L 3 SCC Contractor N N/A PI
C36 Lock 23 - structural repairs (pointing, replace upper o/s wingwall)** L 3 SCC Contractor N N/A PI
C37 Lock 27 - structural repairs (upper t/s wingwall, bypass channel)** L 3 SCC Contractor N N/A PI
C38 Lock 4 - structural repairs (bypass)** L 3 SCC Contractor N N/A PI
C39 Purchase new improved hydraulic system for dredger* CL 3 SCC / HCC Society volunteers N N/A Equipment failure
2014/15 2015/16 2016/17
Page 45
7
C40 Repairs and security improvemnets at Deepcut Depot P 3SCC N N/A
Property inspection / Risk
Improvement programme
C41
Scotland Bridge Road car park improvement (may have contribution from SCC
Estates) CP 3SCC Engineer N N/A Property inspection
C42 Stop gate at Mytchett Place Road bridge** R 3 SCC N N/A BCA
C43 10 year overhaul of backpumping equipment I 3 SCC Society volunteers N N/A AMP programme
C66
Culvert repair: Broadoak culvert (pipe downstream of Canal collapsed)**
C.L001053.01 CVT 3 HCC Engineers / contractor N N/A PI
C67
Culvert repair: Farnborough Road Weir (pipe cracked downstream of weir)**
C.L001053.01 CVT 3 HCC Engineers / contractor N N/A PI
C70 North Warnborough add weir to sluice & renew downstream pipework W 3 HCC Contractor N N/A LI / emergecny repairs
C71
Automatic stopgates Ash Aquaeduct * [Cut from programme due to
Dogmersfield Landslip] R 3 HCC N N/A
BCA / Risk Improvement
programme
C76 New weir / sluice at Crookham (location tbc)** W 3 HCC N N/A Risk Improvement programme
C77 Reading Road Weir enlargement and add sluice W 3 HCC N N/A Risk Improvement programme
C80
Culvert repir: Double Bridge culvert (pipe cracked downstream of Canal)**
C.L001053.01 CVT 3 HCC Landowner N N/A PI
C28 Installation of stop plank grooves at Chertsey Road bridge** R 4SCC N N/A Risk Improvement programme
C44 Brookwood to Great Bottom flash path re-surface TP 4 SCC N N/A BCA
C45 Build new footbridge over hermitage pound to avoid road bridge crossing** TP 4SCC N N/A
Cycle Woking / SCC
Highways
C46 Lower lock stop plank grooves L 4 SCC N N/A BCA
C47 Upgrade all paddles with new frames and plastic L 4 SCC N N/A BCA
C48 Signage works - Information / Navigation VS 4 SCC Ranger team N N/A BCA
C49
Work to install iron quoins on lock gates to help prevent leakage £1,500/pair of
gates L 4SCC N N/A BCA
C72 Hard bank boat moorings (permament moorings) M 4 HCC N N/A Long term strategy
C73 Hard bank boat moorings (visitor moorings): Fox & Hounds M 4 HCC N N/A BCA
C74 Hard bank boat moorings (visitor moorings): Reading Road M 4 HCC N N/A BCA
C75 Increase capacity of bypass at Ash Lock W 4 HCC N N/A Water Strategy Group
C78
Stop plank grooves (location tbc - depending on flood risk assesment)** [Cut from
programme due to Dogmersfield Landslip] R 4 HCC N N/A Risk Improvement programme
C79
Stop plank grooves (location tbc - depending on flood risk assesment)**[Cut from
programme due to Dogmersfield Landslip] R 4 HCC N N/A Risk Improvement programme
C81 Culvert repir: Dunley's Hill Feeder (pipe cracked upstream of Canal) C.L001053.01 CVT 4 HCC N N/A PI
C83 Dredging £50k/km -£70K/km CL 4 HCC N N/A
Public complaints / AMP
programme
C84 Hard bank boat moorings (visitor moorings): Farnborough Road M 4 HCC N N/A Long term strategy
C86 Signage works - Information / Navigation VS 4 HCC N N/A BCA
C89 Install second lock ladder in lock chambers 1-28 L 4 SCC N N/A CRT asset inspection protocol
C90 Install second lock ladder in lock 29 chamber L 4 HCC N N/A CRT asset inspection protocol
C50 Hard surfacing of all urban lock tops L 5 SCC N N/A BCA
C51 Signage works - Interpretation Panels VS 5 SCC N N/A BCA
C52 LSTF grant for Woking towpath works TP/VS 5 SCC N N/A SCC partial grant funding
C82 Ash Lock - feasibility study P 5 HCC N N/A Long term strategy
C85 Hatchwood Farm - mooring basin P 5 HCC N N/A Long term strategy
C87 Signage works - Interpretation Panels VS 5 HCC N N/A BCA
Page 46
7
Appendix C Operational Policies (To be added to as created)
Area Of Work Policy Ref No. Policy Name & E-link Brief Description
Operational Op1 Managed Navigation
Managed Navigation Policy.docx
A description of how the locks are managed to preserve water to extend the boating season as long as possible
Op2 Weir/Water level protocols (see link below)
Day to day procedure for managing the operation of weirs and sluices
Op3 Severe weather
protocols
emergency weir protocols and severe weather.docx
Procedures for operation of Locks, weirs and sluices during severe weather
Asset & Estate Management
AE1 Garden Licence Procedure
Garden licence enquiry form_(HF000010452813).docx
Garden Licence Procedure for the Basingstoke Canal Authority Flow chart_(HF000010631915).docx
Office procedure to deal with a garden licence enquiry
Canal Users C1 Unpowered Boat Policy
Unpowered boat Policy- v3_(HF000011105307).pdf
Canal policy on all unpowered craft and their use of the canal
C2 Minimum Standards for Navigation
Minimum requirements for boat navigation of the canal
C3 Minimum Standards for Licencing (being drafted)
Minimum standards for licencing of boats on the canal
C4 Boaters Information
Boating Information Pack 2016_(HF000011102636).pdf
A pack containing a large amount of useful information for boaters visiting and using the canal
Page 47
7
C5 Boater terms and conditions
Boating Terms And Conditions 2016 v.2_(HF000010934571).doc
Terms and conditions for boaters using the canal that all powered boaters sign up to when buying a licence for the canal.
C6 Debtors Policy
Boating Debtors Policy 2016_(HF000010934601).doc
Policy and procedure for non payment of fees
Page 48
7