Page 1: OPERATION OFFICE / WORKSHOP: MALAYSIA - d … OFFICE / WORKSHOP: PT 12510 ... (profesional and labours forces) ... LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA

OPERATION OFFICE / WORKSHOP:PT 12510 (A-13),Kawasan Perusahaan Chacar,23100 Dungun,Terengganu Darul Iman,MALAYSIATel : +609 - 827 7200 / 0201Fax : +609 - 827 0185Website : www.d-petro.com

Page 2: OPERATION OFFICE / WORKSHOP: MALAYSIA - d … OFFICE / WORKSHOP: PT 12510 ... (profesional and labours forces) ... LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA

SECTION 1.0 INTRODUCTION

Brief Summary Of CompanyCompany Mission StatementCorporate InformationCorporate Registration

SECTION 2.0 ORGANISATION

DiPETRO Organization Chart Profile Of Key Personnel

SECTION 3.0 MANPOWER REPORT

SECTION 4.0 COMPANY CAPABILITIES

Plant Maintenance ServicesPlant Turnaround ServicesBlasting, Painting And Fire Proofing WorksEpcc/Construction/Fabrication WorksScaffolding Supply, Delivery Erection & Dismantling ServicesHot & Cold Insulation Manpower Supply

SECTION 5.0 ON GOING PROJECT FLIERSPlant Maintenance/ Construction Division

SECTION 6.0 COMPANY FACILITIES & PAST PROJECT FLIERSWorkshop / Fabrication YardPast Project & Fliers

Page 3: OPERATION OFFICE / WORKSHOP: MALAYSIA - d … OFFICE / WORKSHOP: PT 12510 ... (profesional and labours forces) ... LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA
Page 4: OPERATION OFFICE / WORKSHOP: MALAYSIA - d … OFFICE / WORKSHOP: PT 12510 ... (profesional and labours forces) ... LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA

DiPETRO SYNERGY ENG SDN BHD (hereinafter referred to as DiPETRO) is 100% Bumiputera,company both in equity and as well as management control. The Company was formelyknown as HP Engineering Enterprise was incorporated in February 2009. Beginning with sub contarcting work from Main Contractor, HP Engineering Enterprise emerged forwardand expand its business to become Main Contractor with the inception of newly SendirianBerhad Company. In coping with the new business challenge, The newly formed Company(DiPETRO) was then incorporated on 8th April 2011.

DiPETRO management staff and key projects supervisory personnel have vast experience in oil, gas and petrochemical industry. In addition to indirect manpower (key personnel)above, DiPETRO has been proven to be able to deploy huge amount of direct manpowerof multi-discipline crews (profesional and labours forces) for its plant maintenance,construction.With technical support from both in-house and DiPETRO subcontractors, DiPETRO possesstechnical know-how project management experience and local knowledge to manage and engage in Plant Construction, Maintenance and Turnaround works. DiPETRO and its associates have successfully completed projects for the following work:

� Mechanical, Plant Civil & Steel Fabrication Works� Plant Maintenance Services & Turnaround Works� Statutory Tank Maintenance� Scaffolding Erection, Dismantle & Rental Services� Blasting & Painting Works� Hot & Cold Insulation Works� Manpower Supply

DiPETRO is committed to maximize its business potential and is confident to render qualityservices to our clients as we have in-place Quality and Safety Programs which are adheredto during execution of our works.

To be the leading company for the provision of :

� Experienced, qualified and competent manpower in their own field of expertise to our clients in the oil, gas and petrochemical industry.

� Uncompromised quality, safety and timely execution of Engineering Services including Mechanical & Civil Works.

Page 5: OPERATION OFFICE / WORKSHOP: MALAYSIA - d … OFFICE / WORKSHOP: PT 12510 ... (profesional and labours forces) ... LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA

GENERAL

Company Name : DiPETRO SYNERGY ENG SDN BHD(Formely known as HP Engineering Enterprise)

Registration No. : 939710-U

Date of Incorporation : 8th April 2011

Registered Address : A1-02-02, Hata Square, Jalan Mewah 1/3, Pandan Mewah, 68000 Ampang, Selangor

Head Office : PT 12510 (A-13), Kawasan Perusahaan Chacar,Mukim Kuala Paka,23100 Dungun Terengganu Darul Iman

Contact No : (609)827 7200 / 0201 Fax No : (609)827 0185E-mail : [email protected]

Web Address : www.d-petro.com

Company Secretary : MOHD FAIRUZ BIN A RAZAK

& Auditor A1-02-02, Hata Square, Jalan Mewah 1/3,Pandan Mewah, 68000 Ampang, Selangor

Contact No : Tel : (03) 4296 9694; Fax No : (603) 4296 9692

Equity Structure : 100% Bumiputera

Page 6: OPERATION OFFICE / WORKSHOP: MALAYSIA - d … OFFICE / WORKSHOP: PT 12510 ... (profesional and labours forces) ... LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA

CAPITAL STRUCTURE

Authorised Capital : RM 1,000,000.00Paid Up Capital : RM 1,000,000.00Working Capital : RM 1,000,000.00

SHAREHOLDERS

Ahmad Fikeri Bin Mohamad : ShareholderMohd Hanafiah Bin Darmadan : Shareholder

BOARD OF DIRECTORS

Ahmad Fikeri Bin Mohamad : Managing DirectorMohd Hanafiah Bin Darmadan : Executive/Operation Director

BANKER

Name of Bank : Bumiputra Commerce Berhad (CIMB)Address : Dungun, Terengganu.Current Account. No. : 8601785563

BANKING FACILITIES

1. Name of Bank : RHB BANKOD : RM 1,000,000.00Term Loan : RM 72,000.00BA : RM 250,000.00BG : RM 1,500,000.00

Total RM 2,822,000.00

2. Name of Bank : PUBLIC BANK (BG Facilities)Total RM 500,000.00

3. Name of Bank : SME BANKOD / Trade Line : RM 1,000,000.00BG : RM 2,500,000.00

Total RM 3,500,000.00

GRAND TOTAL OF FACILITIES : RM 6,822,000.00

Page 7: OPERATION OFFICE / WORKSHOP: MALAYSIA - d … OFFICE / WORKSHOP: PT 12510 ... (profesional and labours forces) ... LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA

1) United Kingdom Accreditation Services (UKAS)

2) Kementerian Kewangan Malaysia (MOF)

3) Construction Industri Development Board (CIDB)

4) Petroleum Nasional Berhad (PETRONAS)

5) Dewan Perniagaan Melayu Malaysia

6) Akta Kumpulan Wang Simpanan Pekerja (KWSP)

7) Others

Page 8: OPERATION OFFICE / WORKSHOP: MALAYSIA - d … OFFICE / WORKSHOP: PT 12510 ... (profesional and labours forces) ... LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA

1) United Kingdom Accreditation Service (UKAS)ISO 9001 - 2008, Quality Management System - Requirement

Provision of Mechanical & Civil Services

2) KEMENTERIAN KEWANGAN MALAYSIA140100 BAHAN BINAAN 220111 PERALATAN KAWALAN KESELAMATAN

140200 PERALATAN KESELAMATAN JALAN JAYA 220112 SAND BLASTING & MENGECAT UNTUK KAPAL

180100 MESIN DAN KELENGKAPAN BENGKEL 220501 KONTRAK BURUH

180200 PERALATAN PERINDUSTRIAN MINYAK 220802 BANGUNAN

180300 MESIN DAN KELENGKAPAN KHUSUS 221404 MEMBAIKPULIH : BARANG LOGAM

200200 STESYEN JANAKUASA LETRIK DAN PERALATAN 200300 KABEL, AKSESORI DAN KONDUKTOR

GENERATOR/ ALAT GANTI

TARIKH LUPUT : 12/08/2017

3) LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA (CIDB)G7 B PEMBINAAN BANGUNAN B04 KERJA BANGUNAN AM

G7 CE PEMBINAAN KEJURUTERAAN AWAM CE21 KERJA-KERJA KEJURUTERAAN AWAM

G7 ME MEKANIKAL DAN ELEKTRIKAL M15 KELENGKAPAN AM PELBAGAI

TARIKH LUPUT : 28/05/2018

Page 9: OPERATION OFFICE / WORKSHOP: MALAYSIA - d … OFFICE / WORKSHOP: PT 12510 ... (profesional and labours forces) ... LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA

5) PETROLIAM NASIONAL BERHAD (PETRONAS)

SM2 MANPOWER SUPPLY 03 Specialist Manpower 11 Lecturing & Training Personnel

SM5 01 Floating Roof Storage Tank

SM5 02 Fixed Roof Storage Tank

SM5 03 Cryrogenic Storage Tank

SM5

SM5 04 Heat Exchanger, Condensors & Cooler

SM5 07 Pressure & Unpressurized Vessel

SM5 01 Mechanical Valve

SM5 01 Metallic Structural/Piping

SM5 03 Lined Pipe

SQ1 03 Painting & Coating

SM5 01 Hot Insulation

SM5 02 Cold Insulation

SO2 02 Onshore Fabrication 01 Minor Onshore Fabrication - Civil Work

SO2 02 Major Fabrication 03 Onshore Facilities

SO2 02 Onshore Fabrication

SP1 03 Pipeline Coating

SC2

SM 5090100

SM 5090300

SQ 1060100

SM 5120100

SM 5120200

SM 5010103

SM 5010300

SM 5010400

SM 5010700

SM 5030100

MECHANICAL ENGINEERING & MAINTENANCE

01 Stationary Equipment Repair & Maintenance

MECHANICAL ENGINEERING & MAINTENANCE

01 Stationary Equipment Repair & Maintenance

03 Columns, stripper & Corrugated Plate Interceptor

MECHANICAL ENGINEERING & MAINTENANCE

01 Stationary Equipment Repair & Maintenance

MECHANICAL ENGINEERING & MAINTENANCE

01 Stationary Equipment Repair & Maintenance

MECHANICAL ENGINEERING & MAINTENANCE 03 Valve Repair & Maintenance

MECHANICAL ENGINEERING & MAINTENANCE

09 Structural & Piping Fabrication/ Welding Services

MECHANICAL ENGINEERING & MAINTENANCE

Code Services/ Specialist

MECHANICAL ENGINEERING & MAINTENANCE

01 Stationary Equipment Repair & Maintenance

MECHANICAL ENGINEERING & MAINTENANCE

01 Stationary Equipment Repair & Maintenance

SM 2031100

SM 5010101

SM 5010102

09 Structural & Piping Fabrication/ Welding Services

PIPELINE & ASSOCIATED SERVICES

02 Pipeline Construction (Fabrication & Installation)

MECHANICAL ENGINEERING & MAINTENANCE 11 Coating Services

MECHANICAL ENGINEERING & MAINTENANCE 12 Insulation Work

MECHANICAL ENGINEERING & MAINTENANCE 12 Insulation Work

03 Minor Onshore Fabrication - Mechanical

OFFSHORE FACILITIES CONS-

OFFSHORE FACILITIES CONSTRUCTIONOFFSHORE FACILITIES CONSTRUCTION

SC 2080000 CIVIL STRUCTURAL & BUILDING MAINTENANCE SERVICES 08 Scaffolding Services & Inspection

SO 2020201

SO 2020102

SO 2020203

SP 1020300

Page 10: OPERATION OFFICE / WORKSHOP: MALAYSIA - d … OFFICE / WORKSHOP: PT 12510 ... (profesional and labours forces) ... LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA
Page 11: OPERATION OFFICE / WORKSHOP: MALAYSIA - d … OFFICE / WORKSHOP: PT 12510 ... (profesional and labours forces) ... LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA

Management Structure:

The company is led by a strong and experienced team which includes representative drawn

from various professional fields, i.e. business, engineering, maintenance, fabrication and

construction in the oil, gas and petrochemical industries. This bring depth and diversity in

expertise and perspectives towards leadership of the company. As of today, the key

management team of DiPetro Synergy Eng Sdn Bhd (DiPETRO), consist of the following individuals:-

i) Ahmad Fikeri Bin Mohamad Managing Director

ii) Mohd Hanafiah Darmadan Executive/Operation Director

Aged 46, is the Managing Director of the company. He has a Degree in

Mechanical Engineering from California State University. He has joined

DiPETRO in April 2011 as Managing Director and in-charge of the overall

admin, financials and operations of the company. For project purposes

he acts as Project Advisor/ Manager monitoring all operation and

technical matters including planning, execution, safety, quality control

and procedures, etc.

Prior to his appointment in DiPETRO, he had served Hse Resources Sdn Bhd

as Technical Director (from May 2005 - March 2011), Technotest Sdn Bhd

as a General Manager (Jan 2004 - April 2005) as well as a Director in

its subsidiary EN-ES Technologies Sdn Bhd, Asaga Corporation Sdn Bhd

as a General Manager and same time as Managing Director in its subsidiary Asaga Engineering &

Construction Sdn Bhd (June 2003 - Dec 2003), Mushtari Maintenance Services Sdn Bhd as

Operation Manager (March 1997 - May 2003) and as Project Engineer (July 1995 - Feb 1997) and

Perusaahan Otomobil Nasional Sdn Bhd (PROTON) as Technical Executive (July 1990 - July 1992).

His professional qualification includes as a PTS Protective Coating & Lining CORAL Committee,

Institute Material of Malaysia (IMM) Qualified Blasting & Painting Inspector, Welding Inspector

(CSWIP), and Qualified Project/ Turnaround Manager. Apart from that he is also member of the

Board of Engineers and Institution of Engineers of Malaysia.

Managing Director

Ahmad Fikeri Mohamad

Page 12: OPERATION OFFICE / WORKSHOP: MALAYSIA - d … OFFICE / WORKSHOP: PT 12510 ... (profesional and labours forces) ... LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA

As a highly responsible management, he had undergone various Safety Courses both onshore

and offshore. Among the courses that he had attended were conducted by Terengganu Safety

Training Centre Sdn Bhd (TATI) namely onshore Safety Orientation, Safety for Line Supervisor,

and Offshore Safety Training/HUET Training, conducted by OGP Technical Services namely

Turnaround Safety Passport Scheme Training, conducted by National Institute of Occupational

Safety and Health (NIOSH) namely Kursus Akta Keselamatan dan Kesihatan Pekerjaan 1994 and

NIOSH Petronas Safety Passport (NPSP)

In summary, he has more than 20 years of experience in Oil & Gas and Petrochemical industries in

the field of construction, commisioning, maintenance and turnaround/ shutdown works. He is a

multidicipline manager which specialization is in mechanical field. During the course of his work,

he has been handling various disciplines namely mechanical and maintenance work (construction

including EPCC Project), Turnaround (heat exchanger, vessel, etc), Civil & Structure works,

Electrical & Instrument works, Scaffolding and Insulations works, Blasting & Painting works, etc.

Aged 46, is the Executive cum Operation Director of the Company.

He has a Diploma In Electrical Engineering from Universiti Teknologi

MARA (UiTM). He has joined DiPETRO in April 2011 as Executive as well

as Operation Director and in-charge of the overall technical and

operations of the company. For the project purposes, he acts as

Project Advisor/ Manager monitoring all operation and technical;

matters including planning, scheduling, execution, safety of the

projects and procedures, etc.

Executive/Operation Director

Prior to his appointment in DiPETRO, he had served HSE Resouces Sdn Bhd

as Operation Director (from May 2005 - March 2011), Technotest Sdn Bhd

as a Deputy General Manager (August 2003 - April 2005) as well as a

Director in its subsidiary EN-ES Technologies Sdn Bhd, Mushtari

Maintenance Services Sdn Bhd as Turnaroud Manager (August 1999 - June 2003) and as

Superintendent (Jan 1995 - July 1999) and Warga Hikmat Kejuruteraan Sdn Bhd as Site Supervisor

(Feb 1990 - Dec 1994).

Mohd Hanafiah Darmadan

Page 13: OPERATION OFFICE / WORKSHOP: MALAYSIA - d … OFFICE / WORKSHOP: PT 12510 ... (profesional and labours forces) ... LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA

His profesional qualification includes as a qualified Turnaround/ Shutdown Manager, Institute

Material of Malaysia (IMM) Qualified Blasting & Painting Technician and Safety Supervisor.

As a highly responsible management, he had undergone various Safety Courses both onshore

and offshore. Among the courses that he had attended were conducted by Terengganu Safety

Training Centre Sdn Bhd (TATI) namely Onshore Safety Orientation, Safety for Line Supervisor,

and Offshore Safety Training/HUET Training, conducted by OGP Technical Services namely

Turnaround Safety Passport Scheme Training, conducted by National Institute of Occupational

Safety and Health (NIOSH) namely Kursus Akta Keselamatan dan Kesihatan Pekerjaan 1994 and

NIOSH Petronas Safety Passport (NPSP)

In summary, he has more than 20 years of experience in Oil & Gas and Petrochemical industries in

the field of construction, commisioning, maintenance and turnaround/ shutdown works. He is a

multidicipline manager which specialization is in mechanical field. During the course of his work,

he has been handling various disciplines namely mechanical and maintenance work (construction

including EPCC Project), Turnaround (heat exchanger, vessel, etc), Civil & Structure works,

Electrical & Instrument works, Scaffolding and Insulations works, Blasting & Painting works, etc.

Page 14: OPERATION OFFICE / WORKSHOP: MALAYSIA - d … OFFICE / WORKSHOP: PT 12510 ... (profesional and labours forces) ... LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA
Page 15: OPERATION OFFICE / WORKSHOP: MALAYSIA - d … OFFICE / WORKSHOP: PT 12510 ... (profesional and labours forces) ... LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA

1) PERMANENT STAFF

As to date, DiPetro Synergy Eng Sdn Bhd (DiPETRO) maintained 18 numbers of

permanent staff.

The detailed breakdown is as follows:

DIVISION PERMANENT EMPLOYEE

a) MECHANICAL DIVISION 12 Pax

b) CIVIL / SCAFFOLDING / INSULATION DIVISION 3 Pax

c) ADMIN, PROCUREMENT & FINANCE 3 Pax

2) CONTRACT STAFF

DiPetro Synergy Eng Sdn Bhd employs multi-discipline staff on contract basis depending

on the prevailing workload. As to date, DiPETRO maintained 30 numbers of

contract staff.

The detailed breakdown is as follows:

DIVISION CONTRACT EMPLOYEE

a) CIVIL / SCAFFOLDING / INSULATION DIVISION > 10 Pax (Long Term Contract)

b) MECHANICAL DIVISION > 20 Pax (Long Term Contract)

3) DIRECT HIRE STAFF/SUB-CONTRACT

DiPetro Synergy Eng Sdn Bhd engages direct hire professional and labour forces to carry out

committed projects with the client. Most of these direct hired staff are taken to compliment

permanent and contract staff manning level in order to meet the peak manpower requirement

of the company.

This is typically required during plant turnaround and major EPCC projects.To-date, DiPETRO

had proven itself to be able to mobilize some 500 direct hire staff (professional and labour

forces) for its plant turnaround and EPCC during the respective projects peak construction

periods. Depending on the nature and size of the project, at one time Direct Hires professionals

and labours can reach as high as 1,000 person especially for turnaround work.

The detailed breakdown is as follows:

DIVISION DIRECT HIRE STAFF

a. CIVIL / SCAFFOLDING / INSULATION DIVISION > 50 Pax (Short Term Contract)

b. MECHANICAL DIVISION > 500 to 1,000 Pax (Short Term Contract)

Page 16: OPERATION OFFICE / WORKSHOP: MALAYSIA - d … OFFICE / WORKSHOP: PT 12510 ... (profesional and labours forces) ... LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA
Page 17: OPERATION OFFICE / WORKSHOP: MALAYSIA - d … OFFICE / WORKSHOP: PT 12510 ... (profesional and labours forces) ... LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA

1 IntroductionDiPETRO has been active in this field since March 2009. In general, the Companyprovides resources of tehcnical know-how in the form of manpower, equipment, toolsmaterials and consumables to perform the construction and maintenance servicesfor the oil, gas and petrochemical industries.

To-date a total of about RM 88.4 million worth of orders were executed by the Company.This equates to some 1,794,600 manhours being exposed and performed on orders and requisitions from the various clients.

2 Plant Maintenance and Turnaround ServicesFrom the modest beginning of providing minor plant maintenance repairs and services in2009, the Company has since developed into renowned force in providing a more complexand integrated services, including plant turnaround works.The Company involved in the turnaround works of various plantnamely, Processing Plant like Export Terminal and CompressorCompressor Stations & Gas Processing Plant i.e. GPP 1,2,3,4,5,6Refineries (Petronas Penapisan Terengganu Sdn Bhd andPetronas Penapisan Melaka Sdn Bhd and Petrochemical Plant(MTBE, Ethylene & Optimal), etc.

3 Maintenance and Construction Works for Blasting, Painting and Fire Proofing WorksThe Plant Maintenance Division obtained necessary supports for the above works from in-house Construction and Minor EPCC group as well as from network of contractors whoare proficient in this field. The Company has good reputation and contacts with established paint manufacturers for competitive material offers to the clients. To date the company has completed sizeable blasting & painting work for various type ofplant equipment namely Storage Tanks, vessels, pipings and structures.

The following are the core scope of work that we offer for our Industrial Coating Services as follows:-- corrosion protection, - waterproofing, insulation, - concrete repair, - fire protection and surface preparation

Page 18: OPERATION OFFICE / WORKSHOP: MALAYSIA - d … OFFICE / WORKSHOP: PT 12510 ... (profesional and labours forces) ... LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA

4 EPCC/Construction/Fabrication WorksThe Company undertakes contracts from clients to carryout fabrication of piping works and structural steel for oil, gas and petrochemical plants in the area. The fabrication works is carryout in our fabrication yards located in Paka, Terengganu. The Company has been handling many projects which involved multi disciplinesi.e. mechanical, civil, electrical & instrumentation works.

Examples of project undertaken by the Company includes the EPCC Of The New Filter Water Seperator (FWS) at PDB Fuel & & Aviation Storage Terminal which involved blasting/painting, fabrication and installation of 5,000 dia-inch piping c/wstructure as well as the Installation of Process Stipper Feed PumpUpgrading Project which involved fabrication and installation of suctionand discharge piping c/w new Pump. These projects involved multi discipline i.e. mechanical, civil, electrical & instrumentation works.

5 Scaffolding Supply, Delivery Erection & Dismantling ServicesDiPETRO have involved in scaffolding works in construction, plant maintenance as wellas plant major turnaround services in various oil & gas & petrochemical plants.

DiPETRO capable of providing Conventional tube & fitting and quick erect, modular systems incompliance to BS 1139 with capacity of 30,000m3 of scaffolding materials.

5.1 Significant Performances :

a) Subcontractor to HSE Resources Sdn Bhd : i) 15,000 m3 Scaffolding Erection for 2010 Plant Mini-Turnaround at KR-2, PPTSB.ii) 20,000 m3 of Scaffolding Erection at Optimal Chemical for 2011 Plant Turnaround works.

Page 19: OPERATION OFFICE / WORKSHOP: MALAYSIA - d … OFFICE / WORKSHOP: PT 12510 ... (profesional and labours forces) ... LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA

6 Statutory Tank Maintenance

6.1 Above Ground Storage Tank� Crude Oil Tank� Product Terminals � Refineries � Petrochemical & Power Plants

� Tank Inspection - API 653 Inspection , DOSH, NDE, etc.� Tank Maintenance & Repair� Tank Products� Tank Fabrication� Tank Engineering & Design� Tank Coating and Lining� Tank Cleaning� Tank Calibration� New Tank Construction� Safe and efficient removal of tank bottom sludge� Turnkey Projects, etc

Choosing the right contractor for any project is important, but when the project is cleaning a large above ground storage tank, selecting the right vendor is essential.

Our on-site supervisors are experienced veterans who know how to keep a tank cleaning project on track and avoid time consuming and costly mistakes. Our crews consist of full-time personnel trained to do their work safely and efficiently. Type of Tank Services provided are:-

Page 20: OPERATION OFFICE / WORKSHOP: MALAYSIA - d … OFFICE / WORKSHOP: PT 12510 ... (profesional and labours forces) ... LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA

7 Hot & Cold Insulation Since mid of 2009, DiPETRO has diversified its business activities into insulationServices. Our latest Insulation activities / contract are as follows:-

i) Hot & Cold Insulation Contract for the Turnaroundwork at MTBE Malaysia

8 Manpower SupplyDiPETRO has managed and successfully supplied experienced and qualified manpower to various CLIENTs either directly to PETRONAS or to Main Contractors.DiPETRO has the capability of providing the following range of manpower requirements:

8.1 PROFESSIONAL/ TECHNICAL� Project/Turnaround Manager� Project/Turnaround Engineer� Safety Officer/ Supervisor

� Scaffolding Inspector/ Supervisor � Material Controller

� QA/ QC Engineer and Inspector� Planner & Scheduler

8.2 SKILLED & UN-SKILLED WORKERS � Mechanical and Civil Supervisor � Pipe Fitter � Electrician � Foreman � Scaffolding Erector

� Tig Welder � Scaffolding Supervisors� 6G Welder � Rigger

� Blaster � Semi Skill/ General Workers� Painter� Insulator

Page 21: OPERATION OFFICE / WORKSHOP: MALAYSIA - d … OFFICE / WORKSHOP: PT 12510 ... (profesional and labours forces) ... LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA
Page 22: OPERATION OFFICE / WORKSHOP: MALAYSIA - d … OFFICE / WORKSHOP: PT 12510 ... (profesional and labours forces) ... LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA

DiPETRO Management personnel and its owned internal resources and expertise had experienced through the following mentioned projects:

No Name of Project/ contract and location Description Of Work Performed Date Client

Total Estimated/ Value of Contract

(RM)

Estimated Total manhours

Name of Referees for each Project

1Engineering, Procurement, Construction and Commissioning (EPCC) of Water Cooled Heat Exchangers Installation at GPP2, GPP3 & GPP4, Gas Processing Kertih (GPK), Terengganu

Shutdown July 15 - Jan 17 PETRONAS Gas Berhad 25,000,000.00 241,000 Murad Jaafar (03-2331 1329)

2 Heat Exchanger - E-1604 - Bottom Channel Shell Repair Shutdown Oct 15 - Dec 15

FPG Oleochemicals Sdn Bhd 150,000.00 1,200 Arumugam Balakrishnan

(09-5852233)

25,150,000.00 242,200 Total Services Rendered =

Page 23: OPERATION OFFICE / WORKSHOP: MALAYSIA - d … OFFICE / WORKSHOP: PT 12510 ... (profesional and labours forces) ... LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA
Page 24: OPERATION OFFICE / WORKSHOP: MALAYSIA - d … OFFICE / WORKSHOP: PT 12510 ... (profesional and labours forces) ... LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA

A. EPCC/ PCC FOR MECHANICAL, PIPING & CIVILDiPETRO Management personnel and its owned internal resources and expertise had experienced through the following mentioned projects:

No Name of Project/ contract and location Description Of Work Performed Date Client Total Value of

Contract (RM)Estimated Total

ManhoursReferees for each

Project

1 Soap Water and Waste Water Treatment Project March 2009HRSB/Petronas

Dagangan Berhad 35,000.00 1,800 En Mohd Darail

2 Modify HPRT Control System (Mechanical Tie-in work)Project/ Shutdown

workMarch -

April 2009TKE/ Petronas Gas

Berhad 520,000.00 29,000 En Harmaini - PGB Senior Engineer

3 PN660019 Refurbishment of Sand Filter ProjectMarch -

April 2009HRSB/Petronas

Penapisan Melaka 50,000.00 2,900 En Mohd Zainuddin Bin Awang Ahmad - Persiaran Penapisan,

76300 Sg Udang, Melaka

4 Manpower supply for blinding/ loading unloading ProjectSept - Oct

2009HRSB/Ethylene

Malaysia 96,550.00 5,500 A Mutalib Shafiai/ En Yusof Bin Ahmad - 09-829 2530

5Term Contract for Plant Civil & Structure Repair at Polyethlene Malaysia Term Contract

Sept 09 - Aug 2010

HRSB/Ethylene Malaysia 176,000.00 8,000 Roskarno Ismail - 09-829

2530

6Recommissioning Sludge Dryer Vessels (Include Mechanical Tie-in works) Project Dec 2009

HRSB/Petronas Gas Berhad 86,500.00 2,900

En M Sallehin Bin Kassim/ En Shuhaime Bin Hashim - 09-

831 2345

7 Installation of Drum Rotator at PP Plant Project Jan 2010HRSB /

Polypropylene Malaysia

78,000.00 2,800 Abd Rahim Mohamed

8 Metallic structural Piping (Include Mechanical Tie-in works)Project / Shutdown

workFeb 2010 - March 2010

HRSB/Petronas Gas Berhad 549,571.00 17,000 Azhar Bin Abdullah - Tel 09-

831 2369

9 Fire Water Line Upgrading Project at PPTSB ProjectFeb 2010 - May 2010

HRSB/Petronas Penapisan (T) Sdn

Bhd680,000.00 18,800 Izwan Nazim

10The Price Agreement for the Supply, Fabrication, Galvanising, Maintenance and Delivery of 50kg LPG Cylinder Steel Pallet for PDB

ProjectMar 2010 - Oct 2010

HRSB/Petronas Dagangan Berhad 138,000.00 12,800

Abdul Majeed K. Kunheen - General Manager - Finance

Division

11 Replace & rectify 12LBB45 Alloy Pipe inclusive PWHT ProjectMarch 2010 -May 2010

Panglima Power Sdn Bhd 61,573.86 6,200 06 351 3048

12 Repair Floating Suction Pipe Tank T-202 Project May 2010HRSB/Petronas

Dagangan Berhad 95,000.00 8,900 A Mutalib Shafiai/ En M

Shariff Hj Ibrahim (Procurement)

13Delivery, Installation & comm of Process Stripper Feed Pump Upgrading at EMSB Project

May - June 2010

HRSB/Ethylene (M) Sdn Bhd 385,000.00 10,800

A Mutalib Shafiai/ En M Shariff Hj Ibrahim

(Procurement)

Page 25: OPERATION OFFICE / WORKSHOP: MALAYSIA - d … OFFICE / WORKSHOP: PT 12510 ... (profesional and labours forces) ... LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA

14Metallic Structural/ Piping (Cooling Water Piping Replacement)(Include Mechanical Tie-in works)

Project / Shutdown work

Oct 2010 - Nov 2010

HRSB/Petronas Gas Berhad 422,000.00 16,900 Muhammad Bin Idris

(Procurement)

15Price Agreement (PA) for the Repair Work of LPG Pallet for Petronas Dagangan Berhad at Melaka LPG Terminal Project

Dec 2010- Mar 2011

HRSB/Petronas Dagangan Berhad 276,000.00 9,800 M Ruslan Asari - Manager,

Supply Chain Mgt

16The EPCC of the New Filter Water Separator (FWS) at PDB Fuel and Aviation Storage Terminals EPCC

Dec 2010 - Aug 2011

HRSB/Petronas Dagangan Berhad 4,900,000.00 68,000 En Rozaini Bin Mohd Sani -

General Manager

17Mechanical Piping UCON-26-LS Configuration Project Petronas Chemical Derivatives Sdn Bhd Project

Dec 2012 - Jan 2013

Petronas Chemical Derivatives Sdn Bhd 2,941,200.00 93,000 En Shamsulisam

18 Fabrication and Installation of Pipe Bridge at Kaneka ProjectSept 2012 - Feb 2013 Kaneka (M) Sdn Bhd 4,500,000.00 25,000 En Saiful Adlee -

609-583 7000

19 GPP 4 Tie In Works at Petronas Gas Berhad Complex A Project / ShutdownOct 2012 - Feb 2013 PGB / Shinryo 350,000.00 18,800 En Harmaini / En Azhar

20 Mechanical and Piping GPP1 Boot Level Controller Modification Project / ShutdownFeb - March

2013 Petronas Gas Berhad 641,000.00 29,000 En Harmaini

21Engineering, Design Serv-Mechanical & Piping GPP2 Boot Level Modification EPCC

Feb - Mar 2013 Petronas Gas Berhad 354,200.00 10,000 Hasanul Arifin Che Jawias

22EPCC Of 2-PSV-1101, 2-PSV-1102, 2-PSV-1103, And 2-PSV-1104 Discharge Headers To GPP-1 Project

Sept - Oct 2013 Petronas Gas Berhad 650,000.00 13,000 Harmainie Yahaya

23EPCC of Fire Wall for Hydrogen Skid for Argon Plant at ASU2, CUF Kertih, Terengganu Darul Iman EPCC

April - July 2013

Petronas Gas Berhad (CUF) 488,900.00 28,000 En. M Madzhir Bin Ibrahim

09 867 3677

24 Pressure Vessel Servicing Job Turnaround June 13 - July 13

KANEKA 93,000.00 5,000 Muhamad Tirmizi 09 582 6000

25 EPCC For Installation And Integration Of Owners Supplied Skids For Advanced C02 Pilot at GPP3

EPCC June 13 - April 14

PETRONAS Technical Services Sdn Bhd

4,982,200.00 43,900 Azmil Azim

26 New Line Of Underground Firewater and OWS for GPPA & GPPB ProjectJune 13 - April 14

PETRONAS Gas Berhad 2,050,000.00 44,800 Mohd Asmadi

03 2144 8966

27 Installation Of Fire Walls Between Transformer and Cable Celler ProjectDec 14 - Feb 15

PETRONAS Chemicals

Derivatives Sdn Bhd380,900.00 8,700 Nur Syazwani Amira Bt M

Munir

28Engineering, Procurement, Construction And Commissioning (EPCC) Services For Resak Line Upgrading (RLU) Project At Gas Processing Plant (GPP)

Project / EPCC8 July 14 -

Apr 15PETRONAS Gas

Berhad 10,656,136.00 117,600 Harmaini Yahya 03 2051 5000

Page 26: OPERATION OFFICE / WORKSHOP: MALAYSIA - d … OFFICE / WORKSHOP: PT 12510 ... (profesional and labours forces) ... LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA

B. TANK CLEANING/ INSPECTION WORK

No Name of Project/ contract and location Description Of Work Performed Date Client Total Value of

Contract (RM)Estimated Total

ManhoursName of two Referees

for each Project

1 Repair & Refurbish Floating Suction Pipe for T-205 Project April 2009 - May 2009

HRSB/Petronas Dagangan Berhad

96,000.00 5,800 En Roslan Omar/ 03-2331 6325

2 Repair & Refurbish Floating Suction Pipe for T-202 ProjectOct 2009 - Nov 2009

HRSB/Petronas Dagangan Berhad 95,000.00 5,800 En Roslan Omar/ 03-2331

6325

3 T901- BD Ball Tank for DOSH Inspection ProjectJuly -

August 2010 Kaneka (M) Sdn Bhd 78,000.00 5,900 En Saiful Adlee - 609-583 7000

4 Tank Cleaning & Dosh Inspection on T-0003 Spherical TankTank Cleaning &

OverhaulJan - March

2012Kaneka Paste

Polymers Sdn Bhd 100,000.00 7,000 En Saiful Adlee - 609-583 7000

5 Repair Leaking Roof ACR Building ProjectOct - Nov

2012Kerteh terminal Sdn

Bhd 23,520.00 4,000 En Ahmad Fakri Mohd 09 830 5886/5788

6 Maintenance Repair of Portable Access Platform Project Dec 2012Kerteh terminal Sdn

Bhd 4,900.00 5,800 En Ahmad Fakri Mohd 09 830 5886/5788

7 Tank Internal Cleaning and DOSH Inspection on BT-0003B at Kaneka Port Storage

Project Nov 2012 - Feb 2013

Kaneka Paste Polymers Sdn. Bhd.

106,330.00 5,000 En Muhamad Tirmizi / En Saiful Adli (09 582 6000)

8 Tank Internal Cleaning and DOSH Inspection on BD Sperical Tank (T-901)

Project June 2013 Kaneka (Malaysia) Sdn. Bhd.

86,000.00 9,830 MK Hafiz

9 Tank Internal Cleaning and DOSH Inspection on BD Sperical Tank (T-902)

Project Feb - March 2014

Kaneka (Malaysia) Sdn. Bhd.

86,000.00 1,280 En Hafiz (09 582 6000)

10 To Repair Nozzle On BD Spherical Tank (T-902) Shutdown Feb-14 Kaneka (M) Sdn Bhd 25,000.00 5,000 MK Hafiz

The above summary of experiences provides indicative measure concerning DSESB future potentials and direction. The management of DSESB is committed to providing its client best-value-for-money project deliveries.

Page 27: OPERATION OFFICE / WORKSHOP: MALAYSIA - d … OFFICE / WORKSHOP: PT 12510 ... (profesional and labours forces) ... LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA

C. TURNAROUND / SHUTDOWN

No Project Title / Description Type Of Work Date Client Total Value of Contract (RM)

Estimated Total Manhours

Name of two Referees for each Project

12009 Plant Turnaround Work For Utilities, Butanol And Derivatives At Optimal Petrochemical Complex, Kerteh, Terengganu Turnaround

Sept 2008 - June 2009

Optimal Chemical (M) Sdn Bhd 467,000.00 48,700

En Mansor Ahmad/ Kerteh Industrial Area. Km 106, Jalan

Kuantan-Kuala Terengganu,Terengganu

2The Dismantling & installation of Four(4) Nos of E 2005 AFC Bundle and its Auxiliaries During PDH shutdown October 2009

Project/Shutdown Works

Aug 2009 - Oct 2009

MTBE Malaysia Sdn Bhd 187,000.00 17,900 Tuan Suzira Bt Tuan Mat

3 Main Mechanical Contractor for KR2 Shutdown 2010 Project/Shutdown Works

March 2010 -April 2010

Petronas Penapisan (T) Sdn Bhd

420,000.00 35,600 En Ramniza Mat Rani

4Provision of 2011 Plant Turnaround Work for Derivatives and Utilities Package

Project/Turnaround Works

Oct 2010 - Feb 2011

Optimal Chemical (M) Sdn Bhd 558,000.00 46,000 Mansor bin Ahmad -

Maintenance Dept

5 Integrated Planning for Heat Exchanger Overhaul Works for MMSB Plant Shutdown Aprill 2011

Project/Shutdown Works

April 2011 HRSB/MTBE 785,000.00 35,000 Hj Sufian Ayob

6 MBS Plant Shutdown At Kaneka Malaysia Shutdown May-11 Kaneka 45,000.00 7,600 En Saiful Adlee - 609-583 7000

7 Polyplastic Shutdown December 2011 Shutdown Nov - Dec 2011

Polyplastic 200,000.00 28,000 En Razali & En Azlizi 09 585 8363

8 Kertih Terminal Shutdown January 2012 Shutdown January 2012

Kerteh Terminal Sdn Bhd

280,000.00 30,300 En Amir - 09 826 6463

9 CUF Defect Works Project January 2012

Kaneka/PGB/CUF/PDH

40,000.00 2,800 En Saiful Adlee - 609-583 7000

10 To Perform of Mechanical Shutdown work during Optimal Turnaround 2012 for Package B

Turnaround /Shutdown Jan - May 2012

Optimal Chemical (M) Sdn Bhd

12,980,000.00 211,000 En M Reza Shawal - 609-830 7613

11 Flexsys Chemical Annual Shutdown Shutdown Oct 2012 - Jan 2013

Flexsys Chemical (M) Sdn Bhd

600,000.00 40,000 En Shahrizan

12 GPP 4 Tie-In Works at Petronas Gas Berhad Complex A Project Sept - Jan 2013

PGB/Shinryo 350,000.00 18,000 En Harmaini / En Azhar

Page 28: OPERATION OFFICE / WORKSHOP: MALAYSIA - d … OFFICE / WORKSHOP: PT 12510 ... (profesional and labours forces) ... LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA

13 To Perform Service At Chilled Water Tower Distributor At PGB-CUF Kerteh

Turnaround June - Sept 2013

Petronas Gas Berhad (CUF)

220,000.00 22,700 Rostam Abd Ghani

14 9 Unit BOG Equipment Servicing & Inspection For DOSH Project May 2014 Kertih Terminals Sdn Bhd

98,000.00 9,400 Anuar Ali

15Provision of Labour, Tool, Equipment and Consumable in Order To Perform 2014 Plant Turnaround Mechanical Work Package For Static Equipment

Turnaround 15 May 14 - 31 May 14

Flexsys Chemical Sdn Bhd

327,000.00 28,600 Mat Noor Salleh 09-585 6296

16 Construction Work For Boiler Noise @ F24101 Project Dec 14 - Jan 15

PETRONAS Penapisan

(Terengganu) Sdn Bhd

210,000.00 5,600 Zakiah Bt Mat Daud

17 To Supply Manpower, Tools, Equipment and Consumable For 2015 Turnaround For DOSH Registered Equipment at KTSB

Turnaround Dec 14 - Feb 15

Kertih Terminals Sdn Bhd

240,000.00 15,200 Surizan Khalil 09 830 5788

18 FPG 2015 Plant Turnaround Works Turnaround May 15 - June 15

FPG Oleochemicals Sdn. Bhd.

6,400,000.00 120,000 Azhari / Arumugam

19 DOSH CF Renewal For Five (5) Exchangers E120, E122, E126, E131, E225 During Mini Shutdown 2015

Shutdown June 15 - Aug 15

PETRONAS Chemicals Ethylene

Sdn. Bhd.185,000.00 4,500 Azila C Omar (09-8272040)

20 DOSH Inspection - 9 Unit BOG Equipment for CF Renewal Shutdown Sept 2015 Kerteh Terminal Sdn. Bhd

98,500.00 2,500 Anuar Bin Ali (09-8305095)

Page 29: OPERATION OFFICE / WORKSHOP: MALAYSIA - d … OFFICE / WORKSHOP: PT 12510 ... (profesional and labours forces) ... LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA

D. SCAFFOLDING

No Project Title / Description Type Of Work Date Client Total Value of Contract (RM)

Estimated Total Manhours

Name of two Referees for each Project

1 Scaffolding Services & Inspection ProjectNov - Dec

2009Ethylene (M) Sdn

Bhd 47,000.00 5,400 En Nadzir Bin Ismail - Tel 09-829 2512

2 Scaffolding Services & Inspection Term ContractDec 2009 - April 2010

Optimal Chemical (M) Sdn Bhd 135,000.00 16,760 Mansor bin Ahmad -

Maintenance Dept

3 Scaffolding Services & Inspection Project/TAOct 2010 - Feb 2011

Optimal Chemical (M) Sdn Bhd 215,000.00 19,400 Mansor bin Ahmad -

Maintenance Dept

4 Scaffolding Services & Inspection TurnaroundApril 2015 - July 2015

FPG Oleochemicals Sdn. Bhd. 500,000.00 35,000 Azhari/Arumugam

Page 30: OPERATION OFFICE / WORKSHOP: MALAYSIA - d … OFFICE / WORKSHOP: PT 12510 ... (profesional and labours forces) ... LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA

E. BLASTING & PAINTING WORK

No Project Title / Description Type Of Work Date Client Project Value (RM)

Estimated Total Manhours

Name of two Referees for each Project

1Term Contract Blasting and Painting 2+1 at Petronas Fertilizer Kedah Sdn Bhd Term Contract

Feb 2007 - Feb 2009

Petronas Fertilizer Kedah Sdn Bhd 156,800.00 9,830

En Zenol Arifin Mohd Sidek, KM 3, Jalan Jeniangm P.O. Box 22,

08300 Gurun, Kedah

2Additional Work during 2009 Plant Turnaround Work For Utilities, Butanol And Derivatives At Optimal Petrochemical Complex, Kerteh, Terengganu

Turnaround Feb 2009 - June 2009

Optimal Chemical (M) Sdn Bhd

96,000.00 8,900

Mansor Ahmad/ Kerteh Industrial Area. Km 106, Jalan

Kuantan-Kuala Terengganu,Terengganu

3 External Painting Work for Fire Water Tank At MBS Plant Project July - Aug 2011

Kaneka (M) Sdn Bhd 30,000.00 3,400 En Saiful Adlee - 609 583 7000

4 Maintenance Painting Work of Pipe Rack at KEPS Plant ProjectJuly - Aug

2011 Kaneka (M) Sdn Bhd 118,000.00 8,700 En Saiful Adlee - 609 583 7000

5 External Painting Work for VCM Tank ProjectSept - Nov

2012 Kaneka (M) Sdn Bhd 95,000.00 8,000 En Saiful Adlee - 609 583 7000

63,420,780.86 1,553,600.00

25,150,000.00 242,200.00

88,570,780.86 1,795,800.00

Total Services Rendered =

Total On Going Services =

Grand Total Service Rendered =

Page 31: OPERATION OFFICE / WORKSHOP: MALAYSIA - d … OFFICE / WORKSHOP: PT 12510 ... (profesional and labours forces) ... LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA
Page 32: OPERATION OFFICE / WORKSHOP: MALAYSIA - d … OFFICE / WORKSHOP: PT 12510 ... (profesional and labours forces) ... LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA

WORKSHOP / FABRICATION YARD

24 meters

35 meters

Page 33: OPERATION OFFICE / WORKSHOP: MALAYSIA - d … OFFICE / WORKSHOP: PT 12510 ... (profesional and labours forces) ... LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA
Page 34: OPERATION OFFICE / WORKSHOP: MALAYSIA - d … OFFICE / WORKSHOP: PT 12510 ... (profesional and labours forces) ... LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA