operation of and results from opera ciro pistillo lhep bern university chipp plenary meeting...

24
Operation of and results from OPERA Ciro Pistillo LHEP Bern University CHIPP Plenary meeting Lausanne, EPFL-LPHE September 8-9 2008

Upload: marshall-patterson

Post on 13-Jan-2016

219 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Operation of and results from OPERA Ciro Pistillo LHEP Bern University CHIPP Plenary meeting Lausanne, EPFL-LPHE September 8-9 2008

Operation of and results from OPERA

Ciro Pistillo LHEP Bern University

CHIPP Plenary meeting Lausanne, EPFL-LPHE September 8-9 2008 

Page 2: Operation of and results from OPERA Ciro Pistillo LHEP Bern University CHIPP Plenary meeting Lausanne, EPFL-LPHE September 8-9 2008

The swiss participation in OPERA

2 INSTITUTIONS, 17 PHYSICISTS

CHIPP Plenary meeting C.Pistillo - Bern Univ. 2

A. Badertscher

C. Lazzaro

A. Rubbia

T. Strauss

A. Ariga

T. Ariga

A. Ereditato

J. Knüsel

F. Juget *

I. Kreslo

G. Lutter *

F. Meisel *

U. Moser

M. Messina

C. Pistillo

K. Pretzl

J.L Vuilleumier *

* previously forming the Neuchatel group, moved to Bern in August

LHEP

ETHZ

(OPERA: 35 institutions, ~200 physicists)

Page 3: Operation of and results from OPERA Ciro Pistillo LHEP Bern University CHIPP Plenary meeting Lausanne, EPFL-LPHE September 8-9 2008

OPERA is designed for the direct observation of appearance in a pure νμ beam in order to provide a final confirmation of neutrino oscillations in the atmospheric sector

Physics goal

best fit:

E(GeV)

L(Km)m27.1sin)(cos)2(sin)νν(P

2312

134

232

τμ

CHIPP Plenary meeting C.Pistillo - Bern Univ. 3

Page 4: Operation of and results from OPERA Ciro Pistillo LHEP Bern University CHIPP Plenary meeting Lausanne, EPFL-LPHE September 8-9 2008

The Cern Neutrino to Gran Sasso (CNGS) beam

L=730 km ; <E>=17 GeV

(e+e)/=0.7% = 2%

730 Km

CERN

LNGS

CHIPP Plenary meeting C.Pistillo - Bern Univ. 4

C.Borer

Diploma thesis (LHEP)

preliminary

Page 5: Operation of and results from OPERA Ciro Pistillo LHEP Bern University CHIPP Plenary meeting Lausanne, EPFL-LPHE September 8-9 2008

Detection of the appearance signal

Two conflicting requirements: Large mass low Xsection High spatial resolution signal selection, background rejection

-

Decay “kink”

-

~1 mm

oscillation

-

CHIPP Plenary meeting C.Pistillo - Bern Univ. 5

h- e-

Page 6: Operation of and results from OPERA Ciro Pistillo LHEP Bern University CHIPP Plenary meeting Lausanne, EPFL-LPHE September 8-9 2008

8.3 Kg

Pb

Emulsion layers

1 mm

10 X0’s

The OPERA target is composed of ~150000 bricks

The OPERA target

CHIPP Plenary meeting C.Pistillo - Bern Univ. 6

Page 7: Operation of and results from OPERA Ciro Pistillo LHEP Bern University CHIPP Plenary meeting Lausanne, EPFL-LPHE September 8-9 2008

Veto plane (RPC)

Spectrometer:XPC, HPT, RPC, magnet

SM1 SM2

0.68 kton 0.68 kton

OPERA : a hybrid detector

Target and Target Tracker

CHIPP Plenary meeting C.Pistillo - Bern Univ. 7

Page 8: Operation of and results from OPERA Ciro Pistillo LHEP Bern University CHIPP Plenary meeting Lausanne, EPFL-LPHE September 8-9 2008

Brick handling

Brick Manipulator System

Xray machine

Brick extraction

XRay exposure (local reference frame)

CHIPP Plenary meeting C.Pistillo - Bern Univ. 8

Page 9: Operation of and results from OPERA Ciro Pistillo LHEP Bern University CHIPP Plenary meeting Lausanne, EPFL-LPHE September 8-9 2008

Chemical plant for emulsion development

A dedicateted building @ LNGS

CHIPP Plenary meeting C.Pistillo - Bern Univ. 9

Page 10: Operation of and results from OPERA Ciro Pistillo LHEP Bern University CHIPP Plenary meeting Lausanne, EPFL-LPHE September 8-9 2008

Automated emulsion analysis

Swiss Scanning Station @ LHEPFully unattended emulsion scanning.

40 microscopes in OPERA

2 cm

LHEP Bern: Swiss Scanning Station with 5 microscopes. ~10 physicist from Bern and ETH Zürich involved.

Goal: analyze ~ 20% of the total OPERA bricks statistics (700/1000 brick/year).

CHIPP Plenary meeting C.Pistillo - Bern Univ. 10

Page 11: Operation of and results from OPERA Ciro Pistillo LHEP Bern University CHIPP Plenary meeting Lausanne, EPFL-LPHE September 8-9 2008

Strategy for event analysis

h

muon

2 cm

2 m

m

2 cmCHIPP Plenary meeting C.Pistillo - Bern Univ. 11

2.5 m

Page 12: Operation of and results from OPERA Ciro Pistillo LHEP Bern University CHIPP Plenary meeting Lausanne, EPFL-LPHE September 8-9 2008

Status of the experiment data taking

May 2006: electronic detectors commissioning

Aug 2006: technical run, 0.76*1018 pot collected

319 interactions in the rock, mechanical structure and iron of the spectrometer

Oct 2006: start of brick production

Oct 2007: pilot physics run (~40% target) 0.82*1018 pot

first 38 neutrino events in the target

Jun 2008: OPERA detector filled and fully commissioned, 146000 bricks inserted (150000 by end 2008)

Jun 2008: Start first OPERA production run

Sep 2008: 5.6*1018 pot and ~500 neutrino events in the targetCHIPP Plenary meeting C.Pistillo - Bern Univ. 12

1 year CNGS nominal 4.5*1019 pot

Page 13: Operation of and results from OPERA Ciro Pistillo LHEP Bern University CHIPP Plenary meeting Lausanne, EPFL-LPHE September 8-9 2008

Event 178969961: CC interaction

5 prongs

<IP> = 9 m

Electromagnetic shower pointing to the vertex ( conversion)

19 m

8 m

43 mm

17 m

m

CHIPP Plenary meeting C.Pistillo - Bern Univ. 13

Page 14: Operation of and results from OPERA Ciro Pistillo LHEP Bern University CHIPP Plenary meeting Lausanne, EPFL-LPHE September 8-9 2008

24 mm

8 m

m

Em. Shower

E = 4.71.3 GeV

Event 183545620 located in Bern – first (only) e candidate

Neutrino vertex

IP = ~m

CHIPP Plenary meeting C.Pistillo - Bern Univ. 14

Page 15: Operation of and results from OPERA Ciro Pistillo LHEP Bern University CHIPP Plenary meeting Lausanne, EPFL-LPHE September 8-9 2008

Flight length: 3247.2 μmkink: 0.204 radPdaughter: 3.9 (+1.7 -0.9) GeVPT: 796 MeV (> 606 MeV )

Two e. m. showers pointing to vertexClear kink topology + EM shower

Event 180718369: a charm candidate

CHIPP Plenary meeting C.Pistillo - Bern Univ. 15

Page 16: Operation of and results from OPERA Ciro Pistillo LHEP Bern University CHIPP Plenary meeting Lausanne, EPFL-LPHE September 8-9 2008

OPERA ντ observation probability

CHIPP Plenary meeting C.Pistillo - Bern Univ. 16

SK 90% CL(L/E analysis)

ob

serv

ati

on

pro

bab

ilit

y

%

MINOS

3 σ sensitivity

4 σ sensitivity

OPERA 10-15 event 0.8 BG (5 full CNGS years)

Page 17: Operation of and results from OPERA Ciro Pistillo LHEP Bern University CHIPP Plenary meeting Lausanne, EPFL-LPHE September 8-9 2008

The 2008 OPERA run

Expectations:127 days for the CNGS2.3*1019 p.o.t

Total number of interactions

2660

CC events 2000

NC events 600

ee events 17

Charm decay 84

Tau candidate (@2.5 10-3 eV2)

1.0

Current situation (Aug 31th)

After 68 days: 5.6*1018 p.o.t~45% of what originally expected

CHIPP Plenary meeting C.Pistillo - Bern Univ. 17

5.6*1018 p.o.t

JUNE SEPT

Page 18: Operation of and results from OPERA Ciro Pistillo LHEP Bern University CHIPP Plenary meeting Lausanne, EPFL-LPHE September 8-9 2008

Past activities of the Swiss researchers

conceptual design proposal CNGS beam design and optimization construction of the Target Tracker lead production monitoring development of European microscopes emulsion film robot test beams physics analysis…

CHIPP Plenary meeting C.Pistillo - Bern Univ. 18

Page 19: Operation of and results from OPERA Ciro Pistillo LHEP Bern University CHIPP Plenary meeting Lausanne, EPFL-LPHE September 8-9 2008

Responsibilities of the Swiss researchers

Management of the experiment:

A.Ereditato (spokesperson), U. Moser (member of publication committee)

Emulsion scanning:

Largest scanning team in Europe (~10 physicist) and ~20% brick scanning at LHEP

Data Analysis responsabilities:

Electron identification, shower reconstruction, 0 detection and search in

-> e channel

Other Analysis activities:

Strategies for neutrino interaction vertex location for muon-less events

Determination of neutrino energy spectrum

Charm event studies

CHIPP Plenary meeting C.Pistillo - Bern Univ. 19

Page 20: Operation of and results from OPERA Ciro Pistillo LHEP Bern University CHIPP Plenary meeting Lausanne, EPFL-LPHE September 8-9 2008

Education

PhD thesis in progress:

J. Knüsel (LHEP): low momentum muon identification

C. Lazzaro (ETHZ): determination of the CNGS neutrino energy spectrum from CC events reconstructed with the electronic detectors

F. Meisel (LHEP): measurement of the e contamination of the CNGS

beam

T. Strauss (ETHZ): neutrino induced charmed particle decays

CHIPP Plenary meeting C.Pistillo - Bern Univ. 20

Page 21: Operation of and results from OPERA Ciro Pistillo LHEP Bern University CHIPP Plenary meeting Lausanne, EPFL-LPHE September 8-9 2008

-The whole detector is fully commissioned-The concept of the OPERA detector is experimentally validated

The first physics run started in June- After 68 days 5.6*1018 p.o.t have been collected~500 neutrino interactions have been triggered by electronic detectors and are being analyzed in the scanning laboratories

Conclusions

Interesting topologies detected (charmed particle decay, prompt e) We just miss the tau! Chance to observe the first candidate event with 2008 run?

CHIPP Plenary meeting C.Pistillo - Bern Univ. 21

Page 22: Operation of and results from OPERA Ciro Pistillo LHEP Bern University CHIPP Plenary meeting Lausanne, EPFL-LPHE September 8-9 2008

BACKUP SLIDES

Page 23: Operation of and results from OPERA Ciro Pistillo LHEP Bern University CHIPP Plenary meeting Lausanne, EPFL-LPHE September 8-9 2008

τ search : Backgrounds

-

,e,e-

+

e+

h+

D+

Same decay topology as

Charm production in CC,common to the 3 channels

Good muon identification is fundamental

Primary lepton not identified

Coulombian large angle scattering of muons in Lead : Bck. to

Hadronic interactions in Pb: Bck. to hor to if hadron mis-identified as muon)

Expected number of background events after 5 years running with nominal beam:

h h

τe τμ τh τ3h TotalCharm background .173 .008 .134 .181 .496

Large angle μ scattering .096 .096

Hadronic background .077 .095 . .172

Total per channel .173 .181 .229 .181 .764

Page 24: Operation of and results from OPERA Ciro Pistillo LHEP Bern University CHIPP Plenary meeting Lausanne, EPFL-LPHE September 8-9 2008

ee oscillation search oscillation search

13 SIGNAL e beam e NC CC

9° 9.3 18 4.5 5.2 1.0

7° 5.8 18 4.5 5.2 1.0

5° 3.0 18 4.6 5.2 1.0

mm232322 = 2.5 x 10-3 eV2 23 23 = 45° = 45°

nominal CNGS beam

Combined fit of ECombined fit of Eee, E, Evisvis, (pt), (pt)missmiss

to improve S/B ratioto improve S/B ratio

90% C.L. limits on sin90% C.L. limits on sin22(2(21313) and ) and 13 13 ::

sinsin22(2(21313)<0.05 )<0.05 13 13 < 7.1º< 7.1º

5 years

(pt)miss

GeV

2.5x10-3 eV2

7.1o6.4o