operation manual for states pmkvy...

48
Operation Manual for States PMKVY 2016-2020 Centrally Sponsored State Managed Component

Upload: others

Post on 23-Jun-2020

13 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

Operation Manual for StatesPMKVY 2016-2020

Centrally SponsoredState ManagedComponent

Page 2: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

Shri Narendra ModiHonorable Prime Minister

Let's make

India the Skill Capital

of the World

Page 3: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

Dharmendra Pradhan

Minister of Petroleum &

Natural Gas and Minister of

Skill Development &

Entrepreneurship,

Government of India

Page 4: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval
Page 5: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

Table of Contents

Background 1

1. Project Approval and Fund Flow Process 3

1.1. Project Approval Process

1.2. Proposal Submission Process Flow

1.3. Fund Disbursement from MSDE

1.4. Fund Disbursement Process and Utilization.

1.5. Terms of Fund Disbursement to States

2. Standards and Quality Assurance 7

2.1. Emerging Job-role Requirement at State-level

2.2. Integration with Centre Accreditation and Affiliation Process (SMART) and IT System

2.3. Development of New Job-roles for Category 2

3. Empanelment of Training Partners 9

3.1. Process of Empanelment

3.2. Contract/agreement

3.3. Employment Potential Provided by Training Partner

4. Smart process: Centre Accreditation and Affiliation 11

4.1. SMART Expected Timelines

4.2. SMART Payment Modules

5. Target Allocation 13

5.1. Adherence to the Centre Accreditation and Affiliation Process

5.2. Training through other Schemes in a PMKVY CSSM centres.

Page 6: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

6. Training Life Cycle 15

6.1. Skill Gap Assessments

6.2. Training of Trainers

6.3. Batch Lifecycle

6.4. Aadhaar enabled biometric attendance

6.5. Induction kits and participant handbook

6.6. Mentorship and Placements

7. Reimbursement of training cost 18

8. IT System integration (Management Information System) 19

9. Monitoring and Evaluation of Training Partners 22

9.1. Monitoring of the Scheme

9.2. Evaluation of the Scheme � District, State, and Central Level Review

10. Role of stakeholders SSC, NSDC and MSDE 24

Annexures 27

Annexure 1: List and Links of all relevant documents concerned with the guidelines. 27

Annexure 2: Creation of QPs, Curriculum and Content (Category 1, 2, 4)

Annexure 3: New QP Request Format for Category 2

Annexure 4: State Job Role Readiness Dashboard

Annexure 5: TP Empanelment by State � Basic Information

Annexure 6: Format for Consolidated report of allocation of target to4 be shared monthly with MSDE/NSDC

Annexure 7: Standard Operating Procedure � Batch Life Cycle (does not apply to category 3 job roles)

Page 7: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval
Page 8: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

Operation Manual for States PMKVY 2016-2020 | 01

Background

1. The Union Cabinet approved India�s largest Skill Certification Scheme, Pradhan Mantri Kaushal th thVikas Yojana, on 20 March 2015. The scheme was subsequently launched on 15 July 2015, on the

occasion of World Youth Skills Day by Honourable Prime Minister, Shri Narendra Modi. The Union

Cabinet has approved the Scheme for four years (2016 � 2020) to impart skilling to 10 million youth of

the country. Pradhan Mantri Kaushal Vikas Yojana (2016 - 2020) hereafter referred to as PMKVY is

now the flagship outcome-based Skill Training Scheme of the Ministry of Skill Development and

Entrepreneurship (MSDE), Govt. of India.

2. The scheme is being implemented through two components:

a. Centrally Sponsored Centrally Managed (CSCM): 75% of the PMKVY funds shall be available to

MSDE for skilling through National Skill Development Corporation (NSDC)

b. Centrally Sponsored State Managed (CSSM): 25% of the funds of PMKVY shall be allocated to

the States

3. To support the implementation of training under the CSSM component, MSDE has issued the

�Guidelines for State Engagement under PMKVY 2.0� here after referred as PMKVY state guidelines.

The mentioned guidelines provide a framework for the state/UT government�s role & processes in

PMKVY, the funding support and the scheme�s implementation & monitoring mechanisms. For the

purpose of this manual, the term �State� is used for both, states and UTs.

4. Since the roll out of the CSSM component of PMKVY, proposals of many states have been approved

by the states Project Approval Committee of MSDE. The MSDE has received requests from the state

government to provide clarity on operational issues in the implementation of PMKVY CSSM.

5. Owing to the requests, MSDE has come up with this �States Operation Manual� document. This

manual is to be read in conjunction with the PMKVY 2.0 scheme guidelines (referred hereafter as

PMKVY guidelines) and with PMKVY State guidelines. Links to both these documents are available

in Annexure 1. This document shall be referred to by the stakeholders like State Governments

(SSDMs), training providers (TPs) etc. to find answers and suggestions to operational issues that

may be restricting the stakeholders from effectively implementing the CSSM component of PMKVY.

6. thA workshop on CSSM component of states was conducted on 12 May 2017 by MSDE and NSDC.

MSDE and NSDC shared the broad approach with the states and circulated a draft �States Operation

Manual� to states for comments. This document has been developed with inputs received from the

states on the draft. MSDE would like to thank all the states who provided inputs that were used to

make this operational manual robust.

Page 9: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

7. The centrally sponsored state managed component of PMKVY has been designed in accordance

with the following principles:

a. The PMKVY 2 (including both CSCM and CSSM components) is a National Skill Qualification

Framework (NSQF) aligned scheme. It also fully adheres to common norms of the MSDE.

b. The central government (MSDE) will play a regulatory as well as an enabling role in the

implementation of PMKVY CSSM through its various agencies.

c. The functions of a) standard setting and quality assurance b) accreditation and affiliation and c)

assessment and certification will be carried out by MSDE through its various agencies like

NSDC, National Skill Development Authority (NSDA) and Sector Skill Councils (SSCs).

d. Apart from the three regulatory and quality assurance functions mentioned above, the

implementation of the scheme including monitoring and outcome tracking of the scheme will be

the sole responsibility of the state governments.

e. The State governments should work towards setting up robust systems and processes in place

for the implementation of skill development schemes, particularly PMKVY CSSM. NSDC will

play an enabling and facilitation role to provide technical assistance to the states for the same.

8. This document will be appended by the MSDE periodically.

Operation Manual for States PMKVY 2016-2020 | 02

Page 10: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

01

Operation Manual for States PMKVY 2016-2020 | 03

Project Approval and Fund Flow Process

1.1. Project Approval Process PMKVY state guidelines provides the proposal submission and approval process. The guidelines

provide a procedure under which the State PMKVY Plan (SPP) is scrutinised by the Ministry of Skill

Development and Entrepreneurship (MSDE)

a) Hard copy of the proposal i.e. State PMKVY Proposal (SPP) is to be submitted by the states to MSDE.

The SPP template for Centrally Sponsored State Managed (CSSM) component is available in

PMKVY state guidelines (Annexure 1).

b) Post the submission of the SPP by the state, it undergoes a desk evaluation by the PMKVY Project

Management Unit (PMU) team in MSDE. Desk evaluation is conducted on the following parameters:

o Training and placement track record

o Year-wise training plan proposed and fund requirement

o Category-wise distribution of training targets

c) The PMKVY PMU team in MSDE seeks clarifications on the SPP from the state. States are required to

provide clarifications in a time-bound manner. The states may submit the state requirement to PMU

team to be appended in the proposal.

d) The proposals for which the desk approval is conducted are then presented to the Project Approval

Committee (PAC). The PAC meeting is conducted by MSDE on 25th of every month subject to

availability of all committee members for evaluating and sanctioning proposals received under

CSSM component of PMKVY. This committee is chaired by Joint Secretary, MSDE.

e) Fund Disbursement: MSDE will issue a sanction order which would define the fund disbursement

criteria and timelines for fund transfer. On approval of the SPP by MSDE, funds earmarked for each

state shall be released to the states as per the sanction order. MSDE shall also intimate the states

once the state budget has been released in their respective accounts. A copy of the sanction order

will also be uploaded on the MSDE website for reference. Subsequent funds earmarked for states

shall be released by MSDE as per the PMKVY state guidelines

f) States on achieving targets (physical and financial) shall submit all documents and Utilization

Certificates for project closure. The sanction order issued by the MSDE details submission of the

Utilization Certificate in form 19-A along with audited statements of accounts as per the General

Financial Rules (GFR) 2005

Page 11: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

State Skill Missions prepare proposals as per Annex-1

of the State engagement guidelines

State PMKVY Plan (SPP) sent to Director MSDE by respective SSDM

Director MSDE forwards to MSDE-PMU Team for desk evaluation

Desk evaluation status

State invited for Project Approval Committee (PAC) meeting

Sanction order approved and funds released to states

States implement and monitor PMKVY � CSSM component

Query resolution with the

state on the proposal OK?

OK?

No

Yes

Yes

MoM with approved targets/funds releases by MSDE

1.2. Proposal Submission Process Flow

Operation Manual for States PMKVY 2016-2020 | 04

Page 12: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

Operation Manual for States PMKVY 2016-2020 | 05

1.3. Fund Disbursement from MSDE

MSDE will define the fund disbursement criteria and timelines for fund transfer. On approval of the

SPP by MSDE, funds earmarked for each state shall be released to the states as per defined criteria.

Sanction order released to the states will also be available on MSDE�s website for reference. MSDE

shall also intimate the states once the state budget has been released in their respective accounts.

The fund disbursement to the states shall be done in 4 instalments, subject to utilization of the

disbursed funds as shown in the fund release conditions in table below.

1.4. Fund Disbursement Process and Utilization.

02 0401 03Approval of the

CSSM project by

MSDE

Disbursement of

the funds to state

treasury. State may

coordinate with

their treasury for

further transfer.

States to submit

the UC for the

release of the next

tranche of

payment. (The

target to be

achieved to be

counted from the

date of sanctioning

of the funds and

transfer in the

respective

accounts of the

states)

States to maintain

a monthly tracker

for disbursement of

further funds to TP

and share with

MSDE as and when

requested.

Page 13: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

Operation Manual for States PMKVY 2016-2020 | 06

1.5. Terms of Fund Disbursement to States

InstalmentProportion of project

cost allocated to statesFund Release Condition

1

2

3

3

100% of project

cost for Year- 1

100% of project

cost for Year -2

100% of project

cost for Year -3

100% of project

cost for Year � 4

On sanction of project and signing of MoU

Onst a. Spending of 80% of funds disbursed as 1

instalment & achieving 50% of Year-1 physical

targets

b. States to submit a Utilization Certificate of the st1 tranche

On: -

a. Spending 100% of funds disbursed as 1st instalment and 80% of funds disbursed as 2nd instalment

b. Achieving 70 % of Year -1 physical targets and 50 % of Year -2 targets

c. States to submit a Utilization Certificate for 1st and 2nd tranches

On: -

a. Spending 100% of funds disbursed as 2nd instalment and spending 80% of funds disbursed as 3rd instalment

b. Achieving 100% of Year-1 physical targets, 70% of Year-2 physical targets and 50% of Year -3 physical targets

c. States to submit a Utilization Certificate for 2nd & 3rd tranches

States on achieving targets (physical and financial) shall submit all documents and Utilization

Certificates for project closure

Page 14: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

Operation Manual for States PMKVY 2016-2020 | 07

02 Standards and Quality Assurance

The four categories of Job roles in which state can undertake training in PMKVY CSSM have been defined in

the PMKVY state engagement guidelines (Page 12, Point no. 15, Table 3). The section below details the

operational process in Creation of Industry Relevant Job roles [Qualification Packs (QPs) and National

Occupational Standards (NoS), Curriculum and Content] along with standards to be followed for quality

assurance. The Standards and quality assurance will remain largely a regulatory function to ensure national

and industry relevant standards within all courses delivered within the ambit of PMKVY scheme. The standard

setting function will rest largely with the central government through Sector Skill Councils in close

collaboration with state governments. NSDC will facilitate the entire process. The detailed process of Creation

of QPs, Curriculum and Content for Category 1, 2, 4 job roles are appended in Annexure 2. Also, the link for the

list of model curriculum is available in annex 1.

2.1 Emerging Job-role Requirement at State-level

States may share with MSDE/NSDC, new job-role requests supported by proper reasoning and

demand of such job role in quantifiable numbers for all categories of Job roles except category 3.

MSDE shall analyse the new job-role request and subject to the progress made by the state in

PMKVY implementation, states may be granted approval for these job-roles. A sample format for QP

request is appended in annexure 3.

2.2. Integration with Centre Accreditation and Affiliation Process

(SMART) and IT System

For Category 2, after alignment of courses with National Skill Qualification Framework, NSDC will

integrate the same with SMART and IT system.

For Category 3, MSDE through NSDC will coordinate integration of the State specific traditional

courses, obtain the required specifications for alignment with Smart and IT System. NSDC, upon

receipt of these specifications will integrate these courses with SMART and IT system.

Note: The updated list of available QPs is to be put up NSDC/PMKVY websites from time to time. A

sample of the dashboard (indicative) is appended as Annexure -4.

2.3. Development of New Job-roles for Category 2

The new Category 2 job-role-creation requested by the states will be aligned to NSQF in a time-

bound manner. Respective sector skill council (SSC) will address the QP requirement of the state.

A process flow describing the QP development is mentioned below:

Page 15: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

Operation Manual for States PMKVY 2016-2020 | 08

Category 2 QP requested

by States to MSDE

01 02

03

0405

06

Request shared with NSDC

(Standards team)

NSDC (Standards team)

coordinates QP creation

with SSC

NSDC (QA team) coordinates

with SSC for Model curriculum

creation for the new QP.

NSDC(QA team) floats request to vendors to align their content with the new QP, and make available on the content marketplace.

SSC coordinates basic vetting of the Content before it enters the Content marketplace

Page 16: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

03

Operation Manual for States PMKVY 2016-2020 | 09

Empanelment of Training Partners

3.1. Process of Empanelment

Once the sanction has been accorded to the state skill development mission by the MSDE, they are

required to empanel training providers (TPs) to undertake trainings under the state component of

PMKVY. MSDE doesn�t prescribe any specific approach/methodology for the states to empanel the

TPs. Empanelment of TPs shall follow the norms/processes laid down by the respective state

governments.

Suggestive methods for empanelment of training providers for implementing the Centrally

Sponsored State Managed (CSSM) component of PMKVY could be (but not limited to);

1. By floating an Expression of Interest (EOI) to seek proposals from the prospective training providers

or

2. Empanelment of National Skill Development Corporation (NSDC)�s affiliated TPs

or

3. Empanelment of TPs already executing other skill development programs promoted by Central

Ministries (Central Sector Schemes)

or

4. Empanelment of TPs already executing the state scheme of the respective skill development

mission/nodal skill agency in the state

or

5. Any other method in compliance with the state procurement/empanelment norms

During the TP empanelment by the state skill mission, the state may request the following details:

1. Details of centres where the TP wants to run PMKVY CSSM component

2. Sectors and job-roles proposed by TPs in each of the above centres.

3. List of centres that have been accredited and affiliation through SMART.

The PMKVY implementation team at state level will maintain the details of all the empanelled TPs and

share with the MSDE/NSDC as and when requested by MSDE. Format for sharing list of empanelled

TPs is appended in annexure -5.

3.2. Contract/Agreement

Post TP empanelment, a contract/agreement may be signed between the State Skill Development

Mission and the respective TP. The state may choose to sign the contract with the TP either after

empanelment or after accreditation and affiliation by SMART (described in section 4 of this

guidelines).

Page 17: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

The state may choose to empanel the training provider for a period that the state deems fit within the

overall period of the PMKVY scheme. States skill mission shall review the performance of empanelled

TPs at regular intervals to ensure quality delivery of trainings under PMKVY.

Signing of contract/agreement doesn't guarantee allocation of physical targets to TPs but an

opportunity to undertake training in accordance with target allocation principles listed in this manual.

It is suggested that if an empanelled TP does not conduct any training within a period of 3 months post

target allocation to its training centres or within a period of 6 months of finishing the training of the last

batch, the contract may be cancelled. The state may, however, choose to define their own criteria for

non-performance of the TP, which would lead to cancellation or suspension of the contract. These

should be clearly listed in the contract itself.

3.3. Employment Potential Provided by Training Partner

PMKVY 2 is an outcome based program. The training provider is required to provide employment

opportunities (wage/self) in line with the provisions under the PMKVY guidelines and common norms

notification released by the MSDE. This is a critical element in the training lifecycle and hence the

prospective training providers interested to undertake PMKVY trainings should have a clear strategy

for placement linkages. This may include (but not limited to);

1. Agreements with employers for the identified sectors

2. Plan of action for rozgar melas and other industry connect workshops/events to be conduct within

the state

3. Self-employment opportunities

It is suggested that the state skill mission assess the adequacy of the proposal from the Training

Provider on employment front during the time of evaluation for empanelment under PMKVY.

Operation Manual for States PMKVY 2016-2020 | 10

Page 18: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

04

Operation Manual for States PMKVY 2016-2020 | 11

Smart Process: Centre Accreditation and Affiliation All centres of empanelled training partners with the state government are required to undergo centre

accreditation and affiliation process as defined in Skill Ecosystem guidelines.

SMART provides a mandatory single window IT application that facilitates standardized and effective

processes with respect to Accreditation, Affiliation, and Continuous Monitoring of the Training Centres.

Detailed documents regarding Accreditation, Affiliation & Continuous Monitoring of Training Centres for the

Skill Ecosystem, Revised Accreditation Standards Grading Metrics and Sample Centre Accreditation and

Affiliation Form (CAAF) are available on www.smartnsdc.org under the knowledge bank section.

All states will be provided a state specific dashboard to give them a visibility of TPs/TCs who have applied for

accreditation and affiliation within the state. This will provide states a visibility for TPs/TCs for CSSM

components.

The centre accreditation and affiliation process under PMKVY is shown in the figure below:

Training provider(TP) Fills the TPform and pays

the fee

Inspection Agency (IA) to

conduct DesktopAssessment (DA)and Shares the status with TP

If TP Desktop Assessment(DA) status is ‘Deemed

Read’, TP to createTraining Centre (TC)

TC to fill CAAF and paythe Accreditation Fee

IA to conduct DA andShares the status with TC

IA to conduct the physicalinspection at the Centre

If TC is recommended for Accreditation or

Conditional Accreditation, the case is shared with

TC and SSC to share a final decision

If SSC approves the accreditation result, TC to

pay the continuous

If SSC approves the Accreditation result, TC to apply for Affiliation for accredited job Roles

and pay the fees

In case SSC disapproves the

Accreditation result,Accreditation Committee totake the final

decision

Allocation of targets to TC by

TC is continuouslymonitored through

SMART

Post 1year, TC

to reapply foraccreditation and

Affiliation

Registration Accreditation Affiliation Continuous Monitoring

Renewal

Page 19: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

4.1. SMART Expected Timelines

The expected timelines for completion of the key processes are given in the table below.

The complete accreditation and affiliation process should take 44 calendar days. However,

the timelines may vary due to compliance issues.

Operation Manual for States PMKVY 2016-2020 | 12

Process Timelines

Training Provider (TP) registration on SMART

TP Desktop Assessment (DA) by Inspection Agency

TP creates Training TC and TC fills up CAAF

On-site Inspection of the TC by Inspection Agency

Preparing detailed post-inspection report

Review of Inspection Report by the concerned SSC

TC is informed about the Accreditation Result

TC is given time to pay continuous monitoring fee to

get the Accreditation Certificate

Accreditation Certificate provided to TC

Raising Affiliation Request along with payment of affiliation Fee

Awarding Affiliation Certificate

1 Day

2 Days

1 Day

12 Days

3 Days

7 Days

1 Day

7 Days

2 Days

1 Day

3 Days

4.2. SMART Payment Modules Every training provider will have to pay a one-time registration fee of INR 10,000 at the time of

registration on SMART. The figure below indicates the accreditation and affiliation fees for centre

accreditation through the SMART portal:

Registration Accreditation AffiliationContinuous Monitoring Renewal

A Training Provider (TP) to pay

at the INR 10,000time of registration

at SMART

TC pays INR 12,000

and INR1,000 s per job role a

Accreditation fee

If TC gets accredited, it needs to pay I asNR 8,000

Continuous Monitoring fee

TC pay INR 6,000 per asjob role

Affiliation free to SSC

TC has to applyagain for renewalof AccreditationAffiliation, at the and of the year

Note: all the government run institutions/centres willing to run PMKVY CSSM will have to be accredited and

affiliated through SMART, however, the fees at all stages has been waived off for central government run

institutions.

Page 20: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

05

Operation Manual for States PMKVY 2016-2020 | 13

Target Allocation

The states are free to devise a methodology for target allocation. The targets may be assigned to the TCs on a

long-term basis with a provision for periodic review or on a short-term basis, depending on the state strategy

for target allocation. The methodology for allocation may change, depending upon the geography and sector

requirements. The target allocation should be done in accordance with the PMKVY guidelines and PMKVY

state guidelines and should adhere to the following parameters:

� States should allocate targets to the empanelled training providers (refer to section 1) in line with the

sanction order of MSDE as per the approved State PMKVY Plan (SPP).

� Allocation of targets in category 3 should not be greater than 25% of the total targets allocated.

� Allocation of targets in category 4 should not be greater than 20% of the total targets allocated.

� The readiness of the Job role in terms of availability of the following should be ensured before

allocation of targets:

o Qualification Pack

o Curriculum

o Lab and Equipment list

o Model Content

o Participant handbook

States should work closely with Sector Skill Councils and NSDC in this regard. Details for job role readiness are

in accordance with section 2 of this guideline.

� The State government bears the responsibility of ensuring the following prior to allocating the

targets:

1. Checking the authenticity of SMART generated Centre Inspection report produced by the

training partner before Centre allocation

2. Checking if any allocations have been made to the training partner�s centre through the central

component. This may be done through BI tool provided to the state or by downloading the

training target allocation data available on pmkvyofficial.org. The data can also be requested

from NSDC through the State Engagement officers (Annex 1).

5.1. Adherence to the Centre Accreditation and Affiliation Process

The target allocation should be done by the state government to the concerned training centre only

after the centre validation process is done by MSDE designated agency. The target allocation could

take into consideration the Star Rating assigned to the TC along with the grade card of the TC by the

Centre Accreditation and Affiliation Committee. Post inspection, the grading card of the TCs will be

made available to the state governments through a dedicated dashboard on SMART Portal.

Page 21: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

Operation Manual for States PMKVY 2016-2020 | 14

As the PMKVY aspires to build quality and aspirational training centres, the state governments are

encouraged to allocate targets to higher rated centres. However, the decision to allocate targets to

�Qualified� Centres after Centre Accreditation and Affiliation through SMART lies with state

governments. The state government should encourage training partners to upgrade the quality of

their centres.

The states may also choose to allocate targets to the centres that have already been accredited and

affiliated through SMART but have not received targets from NSDC in PMKVY central component on

any account (such as a lower star rating, saturation of a geography/sector/job role for PMKVY central

component

Consolidated report of allocation of target should be submitted to MSDE/NSDC by each state

government in the format provided in Annexure 6 on or before 5th of every month.

5.2. Training Through Other Schemes in a PMKVY CSSM Centres.

The states are only allowed to run PMKVY CSSM as well as state government sponsored skill training

schemes parallelly in the same centres only if these centres are either state government run (for e.g.

livelihood colleges in Chhattisgarh) or central government run (for e.g. CIPET). In this case, the

training centre would have to maintain strict adherence to the PMKVY branding guidelines. One

centre is not allowed to run PMKVY CSCM and PMKVY CSSM components in the same centre in

parallel.

Page 22: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

06

Operation Manual for States PMKVY 2016-2020 | 15

Training Life Cycle

6.1. Skill Gap AssessmentsTargets for the PMKVY state component shall be allotted after giving due weightage to the skill-gap

findings conducted at state and district levels. While the NSDC�s skill gap studies will be the starting

point, the states are encouraged to conduct their own skill gap studies with the help of professional

agencies and/ or academic institutions. States may seek technical support from NSDC and SSCs in

designing these studies. The states may also institute other appropriate mechanisms to discover the

demand of skilled workers in particular job roles keeping in mind local as well as global economy.

This could form the basis of target allocation by the state governments.

6.2. Training of TrainersThe training partners and centres must ensure that all the trainers are trained and certified under the

Training of Trainers (ToT) programme. The ToTs will be conducted in accordance with the draft ToT

guidelines available on the NSDC website (refer annexure 1). The MSDE will circulate the ToT

guidelines to the states after approval.

SSCs are mandated to conduct ToTs for certification of trainers. The SSCs will be responsible for

arranging for ToTs and organize these sessions zone-wise and ensure maximum geographical

coverage thereby minimizing travel constraints for trainers. The state government is encouraged to

facilitate the process by aggregating demand at the state level and sending it to SSCs based on the

requirements of the TPs. NSDC would ensure that ToT calendar for at-least next 3 months is made

available on the SSC, NSDC, PMKVY and MSDE websites.

NSDC has created a ToT and Training of Assessors portal which will give visibility to state on the

trainers available in the system as well as the ToT schedules (Annex 1). The portal will have the facility

of registering any candidate who has requisite qualifications and is interested in becoming a trainer.

Such details will be shared periodically with the states through the MSDE/PMKVY/NSDC websites.

6.3. Batch LifecycleTraining would be imparted as per National Skill Qualification Framework (NSQF). The model

curriculum and content for the respective QPs, developed/vetted by SSCs, shall be used for all

categories of job role apart from category 3 job roles for which the state will have to bear

responsibility to create the job roles and provide details to MIS system for integration.

Since PMKVY CSSM is a scheme implemented by the states, the entire responsibility of managing

batch life cycle lies on the state. State will need to make sure that each and every candidate

undergoing training under this component follows common norms (Link in Annex 1). The

responsibility of assessment and certification of the candidate lies with SSCs and will be facilitated

by NSDC. NSDC will make sure that there is no duplication between the details of the candidates

submitted for assessment and certification by state and the database of candidates enrolled in the

Page 23: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

Operation Manual for States PMKVY 2016-2020 | 16

PMKVY Centrally Sponsored centrally managed component.

It is mandatory for the candidates to have an Aadhaar ID during the enrolment process, apart from

north eastern states and J&K where alternate ID could be used. It is mandatory for the students to

maintain 70% attendance to be eligible to appear in the assessments. As per the approved model

curriculum candidates would also undergo entrepreneurship, financial and digital literacy modules

during their trainings.

Once the assessment request is raised by the training partner/state, it is the responsibility of the

Sector Skill Council to ensure that:

a) the trainees� assessments are scheduled in timely manner

b) Results are uploaded and approved on IT MIS

c) Certificates are issued in a timely manner

For the detailed batch life cycle including assessment and certification, please refer to Annexure 7

(SOP � Candidate life Cycle). In addition, the assessment and certification should also be in

accordance with the PMKVY guidelines, section 1.4.7 Assessments and Certifications and 1.4.9 Re-

Assessment of Candidates

6.4. Aadhaar Enabled Biometric AttendanceRecording of candidate attendance via the Aadhaar Enabled Biometric Attendance System (AEBAS)

is a pre-requisite to participate in PMKVY 2. As it is an integral part of PMKVY 2, AEBAS stands as a

non-negotiable component of CSSM. Biometric devices for capturing students� and trainers�

attendances (Aadhaar enabled) shall be mandatory at the PMKVY CSSM centres. The state

governments will be provided access to skill attendance portal for registering their TCs by

MSDE/NSDC.

The state of Jammu and Kashmir as well as North � Eastern states are exempted from Aadhaar

enabled biometric attendance. The state governments should put in place suitable mechanisms to

monitor attendance in these states.

Process for Aadhaar Enabled Biometric Attendance System On-Boarding is detailed in two

documents present on the NSDC/PMKVY website, links to which are included in annexure 1.

6.5. Induction Kits and Participant HandbookThe states may devise a suitable and efficient process of supplying the induction kits to the Training

Centres. The state will be responsible for monitoring the availability as well as quality of these

induction kits at every centre which have been allocated targets. This should be captured as a

parameter for monitoring by the mechanisms put in place by the state for monitoring (refer). All

candidates must be provided the course curriculum booklet along with the Induction kit by the

Training Centre. The induction kit should include at least:

� T-shirt (Male) or Jacket (Female)

� Diary (with PMKVY Logo)

� ID Card holder with Lanyard

� Back Pack (Bag)

All the items supplied in the induction kit should adhere to the State Component - branding and

communication guidelines (Annexure 1)

Page 24: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

6.6. Mentorship and Placements

Mentorships and placements are important outcome indicators for the PMKVY. Section 1.4.10 on

Mentorship and Placements of the PMKVY guidelines will be applicable to the State component of

PMKVY as well. In addition to this, states are encouraged to explore forward linkages, especially for

category 3 job roles through efficient mechanisms and partnerships within the state departments

and external agencies. State missions should to ensure proper tracking and reporting of the

placements and are free to devise efficient mechanisms for the same. To ensure post-placement

tracking, continuous tracking mechanisms should be designed by the states and accordingly

implemented. The state should also share selected data on placements with the NSDC through

central IT system. More details on this are available in section 8, IT Systems.

Operation Manual for States PMKVY 2016-2020 | 17

Page 25: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

07Reimbursement of Training Cost

Operation Manual for States PMKVY 2016-2020 | 18

Budget for each state has been calculated based on total targets and considering an average training cost per

trainee. In addition to this, each state shall be provided with funds equal to 4% of the training funds to pay for

the administrative expenses.

PMKVY will follow transparent funding of skill training. The below mentioned sections for Monetary pay-outs

may be done in accordance with the common norms as well as section 1.7 � monetary pay-out of the PMKVY

Guidelines.

SL NO DETAIL EXPLANATION

1

2

3

4

5

6

Base Costs

Training Partner Payouts

Boarding and Lodging Payouts

Post Placement Support

Conveyance Support

Assessment and Certification

According to Common

Norms and PMKVY

Guidelines

Pay-out milestones mentioned in section 1.7.2 of the PMKVY guidelines outline the minimum milestones to be

followed for the scheme. The states are free to put in place any milestones stricter than the milestones

mentioned in the section 1.7.2 of the PMKVY guidelines.

The states should use their own payment mechanisms for the payments to various stakeholders.

Page 26: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

08

Operation Manual for States PMKVY 2016-2020 | 19

IT System Integration (Management Information System)

With involvement of different states which will be having different data structure for Candidate�s data,

adherence to Common Norms standards and PMKVY guidelines will be the key consideration:

1. Candidates may enrol second time in the same or different course in the Scheme, but the pay-out for

such candidates shall only be given for a maximum of two courses provided there is a six-month gap

between the certification date of the first course and batch start date of the subsequent course.

2. Aadhaar validation of candidates is must at the time of registration except candidates belonging to

North eastern states and J&K.

The responsibility of implementation of the scheme lies with the states and thus the responsibility of

managing a candidate through the life cycle will be with the states. The states are free to use their

own MIS for managing the candidate/batch life cycle. The responsibility of designing/redesigning

the IT systems to incorporate checks and balances imposed by common norms and PMKVY

guidelines (annex 1) is the responsibility of the implementing states. For facilitating assessment and

certification of candidates, which is the responsibility of SSCs, NSDC will extend the support to

states through its IT System. For accessing the IT system of NSDC, states will have three options

according to the following conditions

States Using NSDC MIS

Option 1: - MSDE through NSDC will provide support to states that do not have a robust MIS to cater

to the requirements of PMKVY CSSM. In this case, the Training partners/training centres allocated

targets by states will have to use NSDC�s SDMS. The state officials will play the approver role

wherever approval is required. Full lifecycle of candidate will be managed by NSDC MIS; however,

the ownership of data will lie with the state. The states should make sure that the candidates that are

being registered on NSDC�s SDMS are unique candidates. The NSDC SDMS will only be responsible

for de-duplication of candidates against the existing database of students enrolled in the PMKVY

scheme (Central and state component) and only unique candidates will be accepted on the SDMS.

The responsibility of fund disbursement to any stakeholder (Training partner, candidate, SSC or any

other stakeholder) will also be of the respective state. The NSDC MIS will not do any fund

disbursement, but will provide reports on candidate�s enrolment, training, assessment and

certification etc. requested on a regular basis that will enable states to transfer funds.

States Using their Own MIS:

The states willing to use their own MIS for managing the candidate life cycle will have two options for

accessing NSDCs� SDMS for assessment and certification:

Excel upload: NSDC will provide a system for the states to upload candidate and batch Option 2:

data in excel format which will be used for assessment and certification generation. If states use this

Page 27: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

system, the state MIS SPOC would have access to an online system for uploading batches with

candidate details. The system will provide an excel format for download. The State SPOC will have to

extract data from respective State MIS and/or collate the candidate data from TCs in an Excel. This

collated data can be uploaded to the system for verification, de-duplication against existing

candidates available in PMKVY database and assessment and certification. This system will only

allow the assessment and certification of candidates if there is a six-month gap between the

certification date of the first course and batch start date of the subsequent courses, to the maximum

of two courses per candidate in PMKVY 2.0.

Integration of state MIS with SDMS- The States and NSDC will work together to integrate Option 3:

State MIS with SDMS for flow of data for assessment and certification through NSDC SDMS. While,

the data sharing method may vary from state to state as each state may have a different MIS system,

majority of integration will be done through an API framework. Upon receipt of candidate/batch data

NSDC will do the de-duplication test on the received data with the existing data of candidates in the

PMKVY database (central and state component). Candidates not passing the de duplication test will

be rejected and not allowed to proceed further. After de-duplication, NSDC will be responsible for

providing IT platform for assessment and certification of these candidates. The list of minimum fields

to be incorporated on the existing states MIS, for the purpose of integration along with other

technical specifications common to all states- will be available in the link provided in annexure 1.

Procedure to be Followed for Availing NSDC IT Platform

1 The states may reach out to NSDC for gaining access to assessment and certification services of

NSDC SDMS with their preferred choice from the options described above through the NSDC state

engagement officers (annex 1).

2 The Excel upload solution may also be used by the state as a temporary system until the integration

of NSDC SDMS and State MIS system is fully functional.

3 All the three options will be able to take input for only those job roles that are configured in the SDMS

system, readiness of which will be available on the system itself. Initially, Job Role belonging to

CSSM Category 4 will be readily defined in the system. More job roles belonging to CSSM category 1

and 2 will be added progressively and updates will be provided on the system itself. The states can

also send request to NSDC for addition of Job roles to the SDMS in case the other readiness

parameters are in place.

4 All these systems are applicable only for job roles where SSCs are the certifying authorities under

NSQF. In case of category 3 job roles where states are taking the job roles for NSQF alignment

through state agencies, these systems won�t be applicable.

5 For Category 3 job roles, NSDC will only be responsible for de-duplication of candidates against

existing database on NSDC�s SDMS. A guidance note on the procedure for that will be uploaded in

the �IT Systems� section link available in annexure 1.

6 Each state will have to sign a memorandum of understanding/terms and conditions with NSDC

based on mutual agreement (in annex 1), clearly defining the roles, responsibilities and data

ownerships of the states for any option they are willing to choose.

Operation Manual for States PMKVY 2016-2020 | 20

Page 28: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

Key Responsibilities

1 The ownership of data in both the cases � own MIS or NSDC provided MIS�s will be with the states.

2 NSDC will be responsible for providing an IT platform connecting States and SSCs for assessment

and certification of candidates for all the states. NSDC will also monitor the progress of assessments

and certifications on behalf of states and provide periodic reports to states. The actual

implementation of assessment and certification will be the responsibility of respective SSCs.

3 Only Candidates clearing the de-duplication check across both the components of PMKVY will be

eligible for Assessment and Certification.

4 States will be responsible for Candidate�s ID verification and Domicile State/ District verification.

5 States will be responsible for following Batch Cycle according to the scheme.

6 States will be responsible for making sure that the State TP and State TC data is not duplicate as that

of Central System. Currently one training centre is not allowed to run CSSM and CSCM components

of PMKVY in the same centre.

7 Target allocation to State TC is responsibility of State. The state should maintain its own database for

allocation of targets under PMKVY- CSSM.

8 States will be responsible for checking the system readiness of Job Roles defined in SDMS before

uploading a batch. Any batches for job roles that are not configured in the SDMS will not be

processed.

9 States will be responsible for tranche calculation as per common norms and handling disbursements

for all the stakeholders i.e. Training Partner, Candidates, SSC based on the special group / category.

10 States will be responsible for getting authorised permissions in order to share Aadhaar details with

NSDC MIS for Assessment and Certification.

Operation Manual for States PMKVY 2016-2020 | 21

Page 29: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

The states that are using their own MIS portal for managing candidate life cycle (apart from assessment and

certification) should provide a view dashboard to the MSDE. Alternatively, the states may choose to provide

required monitoring data to MSDE as and when requested.

9.1. Monitoring of the Scheme

The guidelines and key objectives for Accreditation, Affiliation and Continuous Monitoring of Training

Centres for PMKVY 2 have been aligned to Skills Ecosystem guideline. (Refer Annexure 1)

Continuous and Effective Monitoring and Evaluation is crucial towards the success delivery of the

scheme at the ground level.

The Implementation of the scheme takes place in the States, hence, their involvement in the

implementation as well as monitoring is expected to significantly improve the effectiveness of the

Scheme. States are empowered to carry out the following roles in accordance to the Monitoring

section under the PMKVY guidelines.

� States to develop a monitoring framework and mechanisms that standardise processes to

monitor Training Centres in a continuous and effective manner.

� State Governments through their respective SSDMs are required to follow the skill ecosystem

guidelines and to have a functional dedicated team to oversee the execution and monitoring of

PMKVY trainings for the allotted state targets.

� The respective SSDMs should create effective monitoring mechanisms at State and District

levels to oversee the training activities through the formation of the State-level Skill Monitoring

Committee (SSMC) and District Skill Monitoring Committee (DSMC) as described in PMKVY

state guidelines.

� Rigorous continuous monitoring systems linked to a consequence monitoring framework must

be framed by states to ensure adherence of training under PMKVY to quality standards and

PMKVY guidelines. States are required to submit a note on their monitoring mechanisms to

MSDE upon formulation for information only.

09 Monitoring and Evaluation of Training Partners

Operation Manual for States PMKVY 2016-2020 | 22

Page 30: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

9.2. Evaluation of the Scheme � District, State, and Central Level

Review1. The state may define a process of evaluating the scheme on a regular basis.

2. Quarterly progress review of States will be done by the MSDE. The states will be required to share

data at regular intervals with the programs in the formats that will be circulated by MSDE.

3. Mid-term Evaluation of the Scheme would be carried out by MSDE in FY 2018

4. The states may use PMKVY Grading Metrics for Compliance Standards and PMKVY Grading Metrics

for performance Standards described in the PMKVY guidelines - annexure A and B as indicators for

monitoring. The states are free to designate any score as minimum score in any part of the

compliance and performance standards above the minimum standards- set by PMKVY guidelines.

Operation Manual for States PMKVY 2016-2020 | 23

Page 31: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

The entire responsibility of implementation and monitoring of the CSSM component is of the state

government.

� The role of SSCs majorly lies in standard setting (except category 3), training of trainers and

assessment and certification to ensure high quality of the skilled manpower being trained and

certified across the country.

� The role of NSDC is of an enabler and technical assistance provider to the states for

implementing the component. The NSDC state engagement officers will be the first point of

contact for the states for any coordination/support. The contact details of all state engagement

officers currently with will be available on the PMKVY website.

� MSDE (with the support of NSDC) would perform a regulatory function.

The list of roles and responsibilities of each of the above state holders is summarized in the table

below.

10Role of Stakeholders SSC, NSDC and MSDE

DETAILS SSC NSDC MSDE/NSDC

Section 1: Project Approval and fund flow process

Section 2: Standards & Quality Assurance

1.1 Project Approval process

1.3 Fund Disbursement from MSDE

Desk evaluation by the PMKVY Project Management Unit (PMU) team.

MSDE will define the fund disbursement criteria and timelines for fund transfer.

2.1 Creation of QPs, Curriculum and Content (Category 1, 2, 4)

2.3 Development of new Job-roles for Category 2

Cat 1-Model Curriculum development

Cat 2- QP creation, Mapping Existing QPs with requirements (MES/others)

Model Curriculum creation.

Cat 1 - Develop a priority list of courses - Facilitate the availability of content for these Priority job roles through content vendors

Cat 2 - Facilitate the creation of curriculum through SSC.

- Content facilitation through the Content

MSDE will define the fund disbursement criteria and timelines for fund transfer.

Operation Manual for States PMKVY 2016-2020 | 24

Page 32: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

Marketplace.

Cat 3 - Coordinate integration of state specific traditional courses with Smart and IT System (wherever applicable).

All Categories - Integration of job roles with SMART and IT system (wherever applicable). For CAT 3, after receipt of specifications from state.As and when new QPs are added to Category 1/2/4, the list will be updated on the website to help the state�s plan further trainings.

Section 3: Smart Process: Centre Accreditation and Affiliation

Section 4: Training Life Cycle

3.1.1 Review of inspection report on SMART portal

4.1 Skill Gap Assessments

Review 3rd party inspection report

Implement the process of Centre accreditation and affiliation.

Provide dashboard to states for visibility

Provide technical support to states in designing any skill gap studies/ methodologies.

4.2 Training of Trainers

4.3 Batch Lifecycle

Conduct ToTs of trainers according to states need.

Ensure trainees� assessments are scheduled in timely

Ensure that ToT calendar for at least next 3 months to be made available on the SSC, NSDC, PMKVY and MSDE website respectively.

Assessment and certification of candidates through SSCs

The MSDE will circulate the ToT guidelines to the states after approval.

The MSDE will circulate the ToT guidelines to the states after approval.

DETAILS SSC NSDC MSDE/NSDC

Operation Manual for States PMKVY 2016-2020 | 25

Page 33: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

DETAILS SSC NSDC MSDE/NSDC

4.4 AADHAR enabled biometric attendance

manner, Results are uploaded and Certificates are issued in a timely manner.

The actual implementation of assessment and certification.

Quarterly progress review of States

Mid-term Evaluation of the Scheme in would be carried out in FY 2018

7.2 Evaluation of the Scheme � District, State, and Central Level Review

IT Platform for assessment and certification

Providing list of minimum fields to be incorporated on the existing states MIS for the purpose of certification and assessment.

Supporting states without any MIS upon request.

Provide access to skill attendance portal to state governments.

MSDE through NSDC will facilitate the same

Section 5: IT System integration (Management Information System)

Section 6: Monitoring and Evaluation of Training Partners

Operation Manual for States PMKVY 2016-2020 | 26

Page 34: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

List and Links of all relevant documents concerned with the guidelines.

Annexure 1

1. PMKVY Guidelines (2016-2020)

http://www.pmkvyofficial.org/App_Documents/News/PMKVY%20Guidelines%20(2016-2020).pdf

2. Guidelines for Accreditation, Affiliation & Continuous Monitoring of Training Centres for the Skills Ecosystem

http://www.pmkvyofficial.org/App_Documents/News/Guidelines%20for%20Skill%20Ecosystem.pdf

3. State Engagement under PMKVY Guidelines

http://msde.gov.in/assets/images/pmkvy/State%20engagement%20guidelines%20-%20PMKVY.pdf

4. Draft Guidelines on Training of Trainers (ToT) and Training of Assessors (ToA) V2.3 � 15th Feb 2017

http://www.nsdcindia.org/sites/default/files/files/Draft_Guidelines_on_ToT_and_ToA%20_V2.3_Date_5th_Feb_2017.pdf

5. Training of Trainers & Training of Assessors Calendar for FY17-18

http://www.nsdcindia.org/training-trainers-tot-calendar-fy2016-17-0

6. On-boarding Manual for Training Centres to Install Aadhaar-enabled Biometric Attendance System

http://www.pmkvyofficial.org/App_Documents/News/Onboarding%20Manual_AEBAS_PMKVY%2020.pdf

7. PMKVY-Process for Aadhaar-enabled Biometric Attendance System Onboarding

http://www.pmkvyofficial.org/App_Documents/News/AEBAS_Onboarding_Instructions(1).pdf

8. Model curriculums for 221 job roles.

https://www.nsdcindia.org/New/qp-nos-results

9. Common Norms with Amendments

http://msde.gov.in/assets/images/Notification/common%20norms.pdf

10. Standard operating procedure for presenting qualifications for NSQF alignment issued by NSDA

http://www.nsda.gov.in/nsqc-sop/Standard%20Operating%20Procedure%20-%20NSQC%20.pdf

11. IT Systems

http://www.pmkvyofficial.org/statecomponent.aspx

Operation Manual for States PMKVY 2016-2020 | 27

Page 35: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

12. Contact details of NSDC state engagement

http://www.pmkvyofficial.org/statecomponent.aspx

13. Category 1 QPs prioritized as on 01-06-2017

Latest list will be available at (Under State http://www.pmkvyofficial.org/Index.aspx Component Tab Section) - amended from time to time

14. MES courses mapped to QPs as on 01-06-2017

Latest list will be available at (Under State http://www.pmkvyofficial.org/Index.aspx Component Tab Section) - amended from time to time

15. Sector wise Publisher Contact details for PMKVY books.

Latest list will be available at (Under State http://www.pmkvyofficial.org/Index.aspx Component Tab Section) - amended from time to time

16. Branding and communication guidelines

Available on (Resources Section).http://www.pmkvyofficial.org/Index.aspx

Financial Annual Net Name of Name CA IT Returns ITR Audit/

Year Turnover (INR) worth the CA Firm of CA membership. Filed Acknowledgement Non-audit No. No.

Operation Manual for States PMKVY 2016-2020 | 28

Page 36: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

Th

e f

ollo

win

g p

rocess

will

be a

do

pte

d f

or

the c

reati

on o

f Q

Ps, C

urr

icu

lum

an

d C

on

ten

t co

urs

es

liste

d f

or

cate

go

ry 1

, 2 a

nd

4 jo

b r

ole

s.

Cre

ati

on

of

QP

s, C

urr

icu

lum

an

d C

on

ten

t (C

ate

go

ry 1

, 2

, 4

)

Annexure

2

Cate

go

ry

Descri

pti

on

Deta

ils

QP

/NO

S

Mo

del C

urr

icu

lum

C

on

ten

t

Cat

1

Cat

2

No

n-C

SC

M S

SC

lis

ted

job

ro

les

Sta

te s

pecifi

c n

on

-SS

C

liste

d jo

b r

ole

s

Sta

tes

may

cho

ose

fro

m the N

SQ

F a

ligned

1222*

job

ro

les

of le

vels

3,4

and

5

(exclu

des

221 jo

b ro

les

und

er C

SC

M) l

iste

d

by

SS

Cs

SS

C G

uid

elin

es

to b

e fo

llow

ed

NS

DC

will

deve

lop

a p

rio

rity

list

of co

urs

es

und

er th

is c

ate

go

ry, aft

er co

nsi

dering a

nd

matc

hin

g req

uest

s acro

ss s

tate

s. T

his

list

will

be p

ost

ed

on the P

MK

VY

as

well

as

NS

DC

web

site

s and

up

date

d reg

ula

rly.

The

curr

ent lis

t o

f p

rio

rity

job

ro

les

is a

vaila

ble

in

Annexure

1.

Sta

te s

pecifi

c jo

b r

ole

s n

ot

in S

SC

lis

t.

Sta

te S

SD

Ms

to w

ork

clo

sely

wit

h S

SC

s

for

develo

pm

en

t o

f Q

Ps,

cu

rric

ulu

m a

nd

mo

del c

on

ten

t.

ME

S c

ou

rses

no

t m

ap

ped

to

SS

C Q

P-

No

S m

ay

als

o b

e t

aken u

p.

Pre

sen

tly,

th

ese jo

b-r

ole

s m

ay

or

may

no

t b

e a

lign

ed

to

NS

QF.

QP

/NO

S f

or

these jo

b r

ole

s is

alr

ead

y

availa

ble

in N

SD

C w

eb

sit

e.

Resp

on

sib

ility

- S

SC

Acti

ve M

ES

co

urs

es

(Ref.

An

nexu

re 1

)

are

bein

g m

ap

ped

wit

h c

orr

esp

on

din

g

QP

s w

ith

in N

SQ

F f

ram

ew

ork

. M

erg

er

of

QP

s m

ay

be f

acili

tate

d b

y N

SD

C

(Sta

nd

ard

s te

am

) u

po

n r

eq

uest.

New

QP

Req

uest

can b

e s

ub

mit

ted

thro

ug

h a

�Q

P r

eq

uest

sh

eet�

(p

resen

t in

an

nexu

re 3

) to

NS

DC

, to

be s

ub

mit

ted

thro

ug

h N

SD

C�s

Sta

te E

ng

ag

em

en

t

Offi

cers

.

Ten

tati

ve t

imelin

e -

4-6

mo

nth

s

Resp

on

sib

ility

- S

SC

NS

DC

will

in

itia

te M

od

el C

urr

icu

lum

develo

pm

en

t fo

r th

ese jo

b r

ole

s th

rou

gh

SS

Cs.

Ten

tati

ve t

imelin

e �

2 m

on

ths

aft

er

req

uest.

Resp

on

sib

ility

- S

SC

Po

st

QP

cre

ati

on

, M

od

el C

urr

icu

lum

cre

ati

on

will

be u

nd

ert

aken

by

SS

C.

NS

DC

will

facili

tate

th

e c

reati

on

of

this

cu

rric

ulu

m.

NS

DC

will

facili

tate

th

e a

vaila

bili

ty o

f

co

nte

nt

for

these P

rio

rity

jo

b r

ole

s

thro

ug

h c

on

ten

t ven

do

rs m

ad

e

accessib

le t

hro

ug

h t

he C

on

ten

t

Mark

etp

lace w

hic

h is

bein

g p

lan

ned

on

the N

SD

C w

eb

sit

e

Co

nte

nt

facili

tati

on

th

rou

gh

th

e C

on

ten

t

Mark

etp

lace w

ill b

e d

on

e b

y N

SD

C

(Qu

alit

y A

ssu

ran

ce t

eam

)

1 A

ll jo

b r

ole

s to

be N

SQ

F a

lign

ed

. T

he S

SC

lis

ted

jo

b r

ole

s sh

all

be a

men

ded

fro

m t

ime t

o t

ime

Operation Manual for States PMKVY 2016-2020 | 29

Page 37: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

Cat

4

Cat

3

CS

CM

Jo

b R

ole

s w

ith

sig

nifi

can

t d

em

an

d in

Sta

te

Jo

b R

ole

s re

late

d t

o

trad

itio

nal a

rts

an

d

cra

fts

(tra

dit

ion

al

ap

pre

nti

cesh

ip )

Targ

ets

up

to

20

% o

f to

tal t

arg

ets

can b

e

allo

cate

d u

nd

er

this

cate

go

ry

Sta

tes

may

ch

oo

se f

rom

th

e N

SQ

F

alig

ned

22

1*

job

ro

les

un

der

CS

CM

if

there

is

a s

ign

ifican

t d

em

an

d in t

he

Sta

te. S

tate

s to

pro

vid

e c

lear

justi

ficati

on

s o

n t

he n

eed

to

sele

ct

these

job

ro

les.

SS

C G

uid

elin

es

to b

e f

ollo

wed

Targ

ets

up

to

25

% o

f to

tal t

arg

ets

can b

e

allo

cate

d u

nd

er

this

cate

go

ry

Th

ese jo

b r

ole

s d

iffe

r fr

om

oth

er

cate

go

ries

as

these c

an b

e t

aken u

p in

no

n-c

lassro

om

mo

de t

rain

ing

s

co

nd

ucte

d b

y a m

aste

r cra

ftsp

ers

on

.

Sta

tes

may

en

gag

e t

he S

CV

T o

r o

ther

co

mp

ete

nt

org

an

izati

on f

or

the

develo

pm

en

t.

NS

DC

will

cir

cu

late

a g

uid

an

ce n

ote

fo

r

the s

tate

s o

n t

he p

rocess

sep

ara

tely

.

Th

e lin

k t

o S

tan

dard

op

era

tin

g

pro

ced

ure

fo

r p

resen

tin

g q

ualifi

cati

on

s

for

NS

QF

alig

nm

en

t is

su

ed

by

NS

DA

is

pro

vid

ed

in a

nn

ex 1

.

QP

/NO

S f

or

these jo

b r

ole

s is

alr

ead

y

availa

ble

in N

SD

C w

eb

sit

e.

Resp

on

sib

ility

� S

tate

Skill

Mis

sio

ns

QP

cre

ati

on m

ay

or

no

t b

e r

eq

uir

ed

fo

r

these.

Mo

del C

urr

icu

lum

fo

r th

ese a

re a

vaila

ble

thro

ug

h N

SD

C w

eb

sit

e.

Resp

on

sib

ility

� S

tate

Skill

Mis

sio

ns

Cu

rric

ulu

m a

nd

Co

nte

nt

for

these w

ill b

e

the r

esp

on

sib

ility

of

Sta

tes

them

selv

es.

Th

e c

on

ten

t is

availa

ble

th

rou

gh

th

e

em

pan

elle

d p

ub

lish

ers

lis

ted

is

availa

ble

in A

nn

exu

re 1

.

Resp

on

sib

ility

� S

tate

Skill

Mis

sio

ns

Cu

rric

ulu

m a

nd

Co

nte

nt

for

these w

ill b

e

resp

on

sib

ility

of

Sta

tes

them

selv

es.

Cate

go

ry

Descri

pti

on

Deta

ils

QP

/NO

S

Mo

del C

urr

icu

lum

C

on

ten

t

Fir

st

Level s

up

po

rt w

ill b

e p

rovid

ed

by

NS

DC

sta

te e

ng

ag

em

en

t o

fficers

. T

he a

bo

ve-m

en

tio

ned

cate

go

riza

tio

n s

hall

be v

isib

le a

t m

ult

iple

fro

nts

su

ch a

s S

MA

RT,

IT s

yste

m, etc

. an

d h

en

ce it

is r

eq

ueste

d t

hat

sta

tes

dir

ect

their

em

pan

elle

d T

Ps

to u

nd

ers

tan

d t

he c

ate

go

riza

tio

n a

nd

acco

rdin

gly

id

en

tify

th

e jo

b r

ole

s to

be

co

nsid

ere

d f

or

imp

lem

en

tati

on u

nd

er

PM

KV

Y-S

tate

Co

mp

on

en

t.

2 S

ign

ifican

t d

em

an

d r

efe

rs t

o s

pecifi

c in

du

str

y clu

ste

rs in t

he s

tate

havin

g a

cu

te s

ho

rtag

e o

f skill

ed

wo

rkfo

rce

3 N

on

-cla

ssro

om

mo

de t

rain

ing

s in

tra

dit

ion

al a

rts

& c

raft

s co

nd

ucte

d b

y M

aste

r C

raft

sp

ers

on

Operation Manual for States PMKVY 2016-2020 | 30

Page 38: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

Th

e f

ollo

win

g p

rocess

will

be a

do

pte

d f

or

the c

reati

on o

f Q

Ps, C

urr

icu

lum

an

d C

on

ten

t co

urs

es

liste

d f

or

cate

go

ry 1

, 2 a

nd

4 jo

b r

ole

s.

New

QP

Req

uest

Fo

rmat

for

Cate

go

ry 2

Annexure

3

S.N

o.

Sta

teS

ecto

rN

am

e o

f th

e jo

b r

ole

Jo

b r

ole

Descri

pti

on (m

en

tio

n 3

-4 lin

es

of

the o

vera

ge in t

his

jo

b r

ole

s)

NS

QF

L

evel

Targ

ete

d N

um

ber

of

Train

ess

Operation Manual for States PMKVY 2016-2020 | 31

Page 39: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

Sta

te J

ob

Ro

le R

ead

iness

Dash

bo

ard

Annexure

4

S.N

o.

Sta

teC

ate

go

ry (I,

II,I

II,I

V)

Secto

rJo

b R

ole

Nam

eR

eq

ueste

d o

n

NS

QF

Alig

nm

en

t S

tatu

s (Y

/N)

QP

Co

de

Sh

eet

Nam

e: S

tate

Jo

b-r

ole

read

iness

dash

bo

ard

Operation Manual for States PMKVY 2016-2020 | 32

Page 40: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

Sh

eet

Nam

e : T

P im

pan

elm

en

t b

y sta

te/U

T -

Basic

In

form

ati

on

TP

Em

pan

elm

en

t b

y S

tate

� B

asic

In

form

ati

on

Annexu

re 5

S.N

o.

Sta

teTr

ain

ing

Pro

vid

er

Nam

e

Em

pan

elle

d t

hro

ug

h

(Pro

cess)

Date

of

Em

pan

elm

en

t

TP

Sta

te

SP

oC

Nam

e

TP

Sta

te

SP

oC

Nam

e

TP

Sta

te

Offi

ce A

dd

ress

Train

ing

Cen

tre

Nam

e /

Ad

dre

ss

TC

wis

e

Jo

b R

ole

s

Operation Manual for States PMKVY 2016-2020 | 33

Page 41: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

Part

ner

ID

Part

ner

Nam

e

TP

SP

OC

Nam

e

TP

SP

OC

Mo

bile

TP

SP

OC

Em

ail

Secto

r ID

Secto

r Jo

b r

ole

ID

Jo

b R

ole

Train

ing

Cen

tre ID

(A

s p

er

Sm

art

)

Cen

tre G

rad

ing

Sco

re

Cen

tre N

am

e

TC

Cen

tre A

dd

ress

TC

SP

OC

Nam

e

TC

SP

OC

Em

ail

TC

SP

OC

Mo

bile

Sta

te

Dis

tric

t

Cu

mu

lati

ve T

arg

et

Is T

rain

ing

Sta

rted

?

Fo

rmat

for

Co

nso

lidate

d R

ep

ort

of

Allo

cati

on o

f Ta

rget

to b

e S

hare

d M

on

thly

wit

h M

SD

E/N

SD

C

Annexu

re 6

No

te, if a

tra

inin

g c

en

tre h

as

been a

llocate

d t

arg

ets

in m

ore

th

an o

ne jo

b r

ole

, all

job

ro

les

mu

st

have a

un

iqu

e lin

e ite

m.

Operation Manual for States PMKVY 2016-2020 | 34

Page 42: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

Acti

vit

y1 �

Can

did

ate

reg

istr

ati

on a

nd

Batc

h a

pp

roval b

y th

e s

tate

skill

mis

sio

n

Sta

nd

ard

Op

era

tin

g P

roced

ure

� B

atc

h L

ife C

ycle

(d

oes

no

t ap

ply

to

cate

go

ry 3

jo

b r

ole

s)

Annexure

7

TC

Resp

on

sib

ility

(1

)S

tate

resp

on

sib

ility

(2

)

Sta

te s

kill

mis

sio

n h

as

the r

esp

on

sib

ility

of

ap

pro

vin

g t

he b

atc

h (aft

er

en

try

by

the T

P/T

C in t

he d

esig

nate

d M

IS) b

y veri

fyin

g e

lem

en

ts o

f th

e b

atc

h o

n t

he

desig

nate

d M

IS (O

wn M

IS o

r M

IS p

rovid

ed

by

NS

DC

) w

ith

in s

tip

ula

ted

tim

elin

e. It

is

the r

esp

on

sib

ility

of

the s

tate

go

vern

men

t to

en

su

re t

hat

the c

om

mo

n

no

rms

as

well

as

PM

KV

Y g

uid

elin

es

are

fo

llow

ed

fo

r each c

an

did

ate

th

at

is b

ein

g a

pp

roved

by

the s

tate

s as

a p

art

of

the b

atc

h.

NS

DC

will

be r

esp

on

sib

le f

or

de-d

up

licati

on o

f th

e c

an

did

ate

s ag

ain

st

CS

CM

data

base a

s w

ell

as

CS

SM

data

base e

xis

tin

g o

n N

SD

C S

DM

S o

nly

.

Up

load

ing

th

e b

atc

h o

n d

esig

nate

d M

IS w

ith t

he fi

eld

s sp

ecifi

ed

B

atch

ap

pro

val a

nd

sen

din

g to

NSD

C

for

asse

ssm

ent

and

de-

du

pe.

All

elem

ents

of

the

bat

ch n

eed

to

b

e ve

rifi

ed a

s m

en�

on

ed

Acti

vit

y 2 -

Assessm

en

t o

f a B

atc

h, R

esu

lt a

pp

roval a

nd

Cert

ificati

on

It is

the r

esp

on

sib

ility

of

the S

SC

to

en

su

re t

hat

the t

rain

ees

assessm

en

t re

su

lts

are

up

load

ed

, are

ap

pro

ved

on d

esig

nate

d M

IS a

nd

cert

ificate

s are

issu

ed

in a

ti

mely

man

ner

TC

Resp

on

sib

ility

(1

)S

SC

resp

on

sib

ility

(2

)T

imelin

es

(3)

Co

nse

qu

en

ces/

Pen

alt

ies/

Oth

er

Acti

on

sS

tate

Go

vern

men

t R

esp

on

sib

ility

(6

)

Fin

an

cia

l Pen

alt

y (4

)O

ther

acti

on

s/P

en

alt

ies

(5)

Targ

ets

up

to

25

% o

f to

tal

targ

ets

can b

e a

llocate

d

un

der

this

cate

go

ry

Th

ese jo

b r

ole

s d

iffe

r fr

om

oth

er

cate

go

ries

as

these

can b

e t

aken u

p in n

on

-

cla

ssro

om

mo

de t

rain

ing

s

co

nd

ucte

d b

y a m

aste

r

cra

ftsp

ers

on

. S

tate

s m

ay

.

Assessm

en

t o

f a

batc

h, R

esu

lt

ap

pro

val a

nd

Cert

ificati

on

1)

Th

e S

SC

sh

ou

ld e

nsu

re t

he d

ate

of

assessm

en

t o

f th

e b

atc

h a

s w

ell

as

assessm

en

t ag

en

cy

is lin

ed

up

as

so

on a

s

the b

atc

h is

ap

pro

ved

by

NS

DC

� a

fter

ap

pro

val f

rom

Sta

te.

2)

Th

e A

ssesso

r m

ust

veri

fy c

an

did

ate

deta

ils,

receip

t o

f Tr

ain

ee H

an

db

oo

k,

receip

t o

f

Ind

ucti

on K

it,

Ind

ucti

on v

ideo

, A

ltern

ate

Id

do

cu

men

t an

d C

an

did

ate

Feed

back F

orm

.

1)

Ass

esso

r an

d

Ass

essm

ent A

gen

cy

will b

e p

rovi

ded

with

5 w

ork

ing

day

s fro

m

the d

ay o

f

asse

ssm

ent to

sub

mit

appro

ved

asse

ssm

ent re

sults

to

SS

C.

1) A

ssessm

en

t F

ee w

ill b

e

red

uced

by

1 %

assessm

en

t fe

e p

er

day

per

train

ee (p

aym

en

t to

SS

C), if

there

is

dela

y in

up

load

/ap

pro

val o

f

assessm

en

t m

ark

s b

y

Assesso

r/A

ssessm

en

t

Ag

en

cy/S

SC

.

1) It

is

the S

SC

�s

resp

on

sib

ility

to

co

ntr

ol

an

d m

on

ito

r th

e

Assessm

en

t A

gen

cie

s

as

well

as

to m

on

ito

r th

e

assessm

en

t d

on

e b

y th

e

them

an

d t

heir

Assesso

rs.

Sta

tes

sh

ou

ld m

ake s

ure

that

the p

aym

en

t o

f

assessm

en

t fe

e t

o S

SC

s is

do

ne o

n t

ime.

Operation Manual for States PMKVY 2016-2020 | 35

Page 43: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

en

gag

e t

he S

CV

T o

r o

ther

co

mp

ete

nt

org

an

izati

on f

or

the d

evelo

pm

en

t.

NS

DC

will

cir

cu

late

a

gu

idan

ce n

ote

fo

r th

e

sta

tes

on t

he p

rocess

sep

ara

tely

.

Th

e lin

k t

o S

tan

dard

op

era

tin

g p

roced

ure

fo

r

pre

sen

tin

g q

ualifi

cati

on

s fo

r

NS

QF

alig

nm

en

t is

su

ed

by

NS

DA

is

pro

vid

ed

in a

nn

ex

1.

3)

All

Assesso

rs m

ust

have v

alid

Aad

har

Ids

4)

It is

Assesso

r's

resp

on

sib

ility

to

ch

eck

AE

BA

S,

Man

ual A

tten

dan

ce,

Train

er'

s

Cert

ificate

, co

rrectn

ess

of

data

rela

ted

to

TC

Lo

cati

on

. T

his

has

to b

e r

eco

rded

in t

he

Assesso

r's

Ap

p

5)

Th

e A

ssesso

rs t

o b

e p

rovid

ed

wit

h c

en

tre

deta

ils t

hro

ug

h d

esig

nate

d M

IS.

6)

If n

um

ber

of

can

did

ate

s p

resen

t d

uri

ng

assessm

en

t is

less

than 2

0 t

hen t

he

TC

s/S

tate

need

to

pay

SS

Cs

the

Assessm

en

t F

ees

for

20 c

an

did

ate

s

7)

A s

oft

co

py

of

the c

ert

ificate

sh

ou

ld b

e s

en

t

to t

he c

an

did

ate

via

em

ail

aft

er

cert

ificati

on

an

d a

lso

be u

plo

ad

ed

to

th

eir

resp

ecti

ve

dig

i-lo

cker.

8)

SS

Cs

sh

ou

ld k

eep

a s

oft

co

py

of

the

cert

ificate

wit

h t

hem

an

d p

rovid

e a

so

ft

co

py

to t

he T

P. S

SC

s are

no

t re

sp

on

sib

le

for

pri

nti

ng

an

d d

istr

ibu

tin

g c

ert

ificate

s.

2) P

ost

this

SS

C

sh

ou

ld c

heck

an

d a

pp

rove t

he

resu

lts.

3) T

Cs/S

tate

sh

ou

l

d m

ake t

he

paym

en

t to

SS

Cs

wit

hin

15

wo

rkin

g d

ays

of

the r

esu

lt

up

load

ing

.

2) T

here

will

be n

o p

en

alt

y

if r

esu

lts

are

ap

pro

ved

/reje

cte

d

wit

hin

10

wo

rkin

g d

ays

fro

m t

he d

ay

of

assessm

en

t

3) P

ost

10 w

ork

ing

days

fro

m t

he d

ays

of

assessm

en

t, a

pen

alt

y

of

1 %

assessm

en

t fe

e

per

day

per

train

ee

(paym

en

t to

SS

C) w

ill b

e

levie

d.

2) In

case o

f re

peate

d d

ela

y

on

part

of

the A

As

in

up

load

ing

th

e r

esu

lts

or

an

y m

alp

racti

ces

co

min

g in

to n

oti

ce, th

e

SS

Cs

are

exp

ecte

d t

o

take s

uit

ab

le a

cti

on

ag

ain

st

the a

gen

cie

s,

inclu

din

g

su

sp

en

sio

n/b

lacklis

tin

g

fro

m t

he s

ch

em

e, as

the

case m

ay

be.

5) If

it

is f

ou

nd

th

at

a S

SC

is

no

t veri

fyin

g t

he

resu

lts/m

on

ito

rin

g t

he

assessm

en

t, t

he s

tate

go

vern

men

t m

ay

do

cu

men

t th

e c

ase a

nd

refe

r to

MS

DE

/NS

DC

.

Assessm

en

t F

ees

for

Jo

b r

ole

s:

Man

ufa

ctu

rin

g S

ecto

r:

Rs. 1

20

0 p

er

train

ee

Serv

ices

Secto

r: R

s.

80

0 p

er

train

ee

Th

e s

tate

go

vern

men

t

sh

ou

ld o

vers

ee a

nd

mo

nit

or

the e

nti

re p

rocess. It

sh

ou

ld

do

cu

men

t an

y th

e c

ases

of

dela

y b

y S

SC

an

d/o

r

assessm

en

t ag

en

cie

s an

d

refe

r th

e s

am

e t

o

MS

DE

/NS

DC

fo

r acti

on

.

Operation Manual for States PMKVY 2016-2020 | 36

TC

Resp

on

sib

ility

(1

)S

SC

resp

on

sib

ility

(2

)T

imelin

es

(3)

Co

nse

qu

en

ces/

Pen

alt

ies/

Oth

er

Acti

on

sS

tate

Go

vern

men

t R

esp

on

sib

ility

(6

)

Fin

an

cia

l Pen

alt

y (4

)O

ther

acti

on

s/P

en

alt

ies

(5)

Page 44: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

TC

Resp

on

sib

ility

(1

)S

SC

resp

on

sib

ility

(2

)T

imelin

es

(3)

Co

nse

qu

en

ces/

Pen

alt

ies/

Oth

er

Acti

on

sS

tate

Go

vern

men

t R

esp

on

sib

ility

(6

)

Fin

an

cia

l Pen

alt

y (4

)O

ther

acti

on

s/P

en

alt

ies

(5)

Resu

lt r

eje

cti

on

1)

Th

e S

SC

can r

eje

ct

the b

atc

h u

po

n s

tati

ng

reaso

ns

for

reje

cti

on a

t can

did

ate

, A

ssesso

r

or

batc

h level.

Assessm

en

t F

ee w

ill b

e

red

uced

by

1 %

assessm

en

t fe

e p

er

day

per

train

ee (p

aym

en

t to

SS

C), if

there

is

dela

y in

reje

cti

on

of

assessm

en

t m

ark

s b

y

Assesso

r/A

ssessm

en

t

Ag

en

cy/S

SC

.

1) T

here

will

be n

o p

en

alt

y

if r

esu

lts

are

reje

cte

d

wit

hin

10 w

ork

ing

days

fro

m t

he d

ay

of

assessm

en

t

2) P

ost

10 w

ork

ing

days

fro

m t

he d

ays

of

assessm

en

t, a

pen

alt

y

of

1 %

assessm

en

t fe

e

per

day

per

train

ee

(paym

en

t to

SS

C) w

ill b

e

levie

d

1) It

is

the S

SC

�s

resp

on

sib

ility

to

co

ntr

ol

an

d m

on

ito

r th

e

Assessm

en

t A

gen

cie

s

as

well

as

to m

on

ito

r th

e

assessm

en

t d

on

e b

y th

e

them

an

d t

heir

Assesso

rs.

2) In

case o

f re

peate

d d

ela

y

on

part

of

the A

As

in

up

load

ing

th

e r

esu

lts

or

an

y m

alp

racti

ces

co

min

g in

to n

oti

ce, th

e

SS

Cs

are

exp

ecte

d t

o

take s

uit

ab

le a

cti

on

ag

ain

st

the a

gen

cie

s,

inclu

din

g

su

sp

en

sio

n/b

lacklis

tin

g

fro

m t

he s

ch

em

e, as

the

case m

ay

be.

5) If

it

is f

ou

nd

th

at

a S

SC

is

no

t veri

fyin

g t

he

resu

lts/m

on

ito

rin

g t

he

assessm

en

t, t

he s

tate

go

vern

men

t m

ay

do

cu

men

t th

e c

ase a

nd

Ap

art

fro

m fi

nan

cia

l

pen

alt

ies, an

y g

ross

issu

e/d

iscre

pan

cy

can

att

ract

dis

cip

linary

acti

on

s

as

man

date

d b

y th

e M

SD

E.

In c

ase o

f th

e c

on

dit

ion

s

dis

cu

ssed

in

Fin

an

cia

l

Pen

alt

y co

lum

n, M

SD

E

an

d/o

r S

SC

is

exp

ecte

d t

o

take s

uit

ab

le a

cti

on

ag

ain

st

AA

s an

d /

or

Assesso

rs

wh

ich

may

inclu

de

su

sp

en

sio

n o

r b

lacklis

tin

g

of

AA

s an

d /

or

Assesso

rs.

Operation Manual for States PMKVY 2016-2020 | 37

Page 45: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

Acti

vit

y 3 -

Au

then

ticit

y o

f th

e t

rain

ees

It is

the r

esp

on

sib

ility

of

the S

SC

to

en

su

re t

hat

on

ly a

uth

en

tic a

nd

elig

ible

tra

inees

are

assessed

.

TC

Resp

on

sib

ility

(1

)S

SC

resp

on

sib

ility

(2

)T

imelin

es

(3)

Co

nse

qu

en

ces/

Pen

alt

ies/

Oth

er

Acti

on

sS

tate

Go

vern

men

t R

esp

on

sib

ility

(7

)F

inan

cia

l Pen

alt

y (4

)O

ther

acti

on

s/P

en

alt

ies

(6)

Th

e T

C is

resp

on

sib

le f

or

en

su

rin

g a

uth

en

tic t

rain

ees

are

en

rolle

d in a

batc

h a

nd

go

th

rou

gh t

he t

rain

ing

.

SS

C m

ust

en

su

re t

hat

the f

ollo

win

g a

sp

ects

are

ch

ecked

du

rin

g a

ssessm

en

ts (th

rou

gh

Assesso

rs):

(1) Tr

ain

ees

en

rolle

d a

t th

e T

C a

re s

am

e a

s

tho

se u

plo

ad

ed

on d

esig

nate

d M

IS-

Veri

ficati

on

to b

e d

on

e b

y ch

eckin

g o

f A

ad

har

ID a

nd

en

rolm

en

t fo

rms

(2) Tr

ain

ees

have r

eg

ula

rly

att

en

ded

th

e t

rain

ing

at

the T

C V

eri

ficati

on t

o b

e d

on

e b

y ch

eckin

g

the a

tten

dan

ce r

eco

rds

an

d in

tera

cti

on w

ith t

he

train

ees

(3) Tr

ain

ees

have a

ware

ness

reg

ard

ing

PM

KV

Y -

Veri

ficati

on t

o b

e d

on

e b

y in

tera

cti

on w

ith

train

ees

In c

ase o

f an

y g

ross

issu

e/d

iscre

pan

cy,

su

ch a

s fa

ke

en

rolm

en

ts id

en

tified

du

rin

g

assessm

en

t an

d/o

r fa

ke c

an

did

ate

ap

peara

nce f

or

assessm

en

t, S

SC

to im

med

iate

ly r

ep

ort

th

e s

am

e t

o

Sta

te g

overn

men

t fo

r ap

pro

pri

ate

acti

on

.

Fo

r th

e s

pecifi

c c

ases

like:

(1) A

As

an

d/o

r assesso

rs h

ave n

ot

follo

wed

th

e d

ue p

rocess

wh

ich

led

to

th

e a

ssessm

en

ts o

f fa

ke

train

ees,

an

d/o

r

(2) A

As

an

d/o

r assesso

rs h

ave

co

nd

ucte

d t

he a

ssessm

en

t o

f fa

ke

train

ees

in r

etu

rn o

f fin

an

cia

l an

d

oth

er

favo

rs f

rom

TC

, an

d/o

r

(3) A

As

an

d /

or

Assesso

rs f

aile

d t

o

rep

ort

th

e d

iscre

pan

cie

s re

gard

ing

irre

gu

lari

ty o

f tr

ain

ing

an

d

train

ees�

aw

are

ness

ab

ou

t

PM

KV

Y.

Fo

r all

the c

ases

dis

cu

ssed

ab

ove,

Assessm

en

t F

ees

to t

he S

SC

fo

r th

at

batc

h w

ill b

e r

efu

nd

ed

to

Sta

te

go

vern

men

t

Ap

art

fro

m fi

nan

cia

l pen

alt

ies, an

y

gro

ss

issu

e/d

iscre

pan

cy

can

att

ract

dis

cip

linary

acti

on

s as

man

date

d b

y th

e M

SD

E.

In c

ase o

f th

e c

on

dit

ion

s d

iscu

ssed

in F

inan

cia

l Pen

alt

y co

lum

n,

PM

C a

nd

/or

SS

C is

exp

ecte

d t

o

take s

uit

ab

le a

cti

on

ag

ain

st

AA

s

an

d /

or

Assesso

rs w

hic

h m

ay

inclu

de s

usp

en

sio

n o

r

bla

cklis

tin

g o

f A

As

an

d /

or

Assesso

rs

Th

e r

esp

on

sib

ility

of

overs

eein

g t

he p

rog

ram

lie

s

wit

h t

he s

tate

go

vern

men

t.

Th

e s

tate

go

vern

men

t sh

all

bri

ng

an

y d

ela

y b

y

SS

Cs/A

As

to t

he n

oti

ce o

f

MS

DE

/NS

DC

AS

AP

Operation Manual for States PMKVY 2016-2020 | 38

Page 46: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

Acti

vit

y 4

- In

du

lgen

ce in u

neth

ical p

racti

ces

To m

on

ito

r, if

the T

C a

nd

/or

AA

are

fo

un

d in

du

lgin

g in u

neth

ical p

racti

ces

TC

Resp

on

sib

ility

(1

)S

SC

resp

on

sib

ility

(2

)T

imelin

es

(3)

Co

nse

qu

en

ces/

Pen

alt

ies/

Oth

er

Acti

on

sS

tate

Go

vern

men

t R

esp

on

sib

ility

(6

)F

inan

cia

l Pen

alt

y (4

)O

ther

acti

on

s/P

en

alt

ies

(5)

SS

C t

o r

ep

ort

th

e

irre

gu

lari

ty t

o t

he

MS

DE

/NS

DC

in a

tim

ely

man

ner

To m

on

ito

r cases

su

ch a

s o

fferi

ng

or

dem

an

din

g

bri

bery

to

in

flu

en

ce t

he o

utc

om

e o

f assessm

en

t,

or

an

y o

ther

matt

er

that

ind

icate

s in

du

lgen

ce in

un

eth

ical p

racti

ce.

SS

C h

as

to in

itia

te t

he a

cti

on a

gain

st

gu

ilty

an

d

up

date

th

e s

am

e t

o t

he s

tate

go

vern

men

t an

d

MS

DE

/NS

DC

in a

tim

ely

man

ner

Su

itab

le fi

nan

cia

l pen

alt

y m

ay

be

imp

osed

on t

he S

SC

, if S

SC

is

invo

lved

in m

alp

racti

ces.

Su

itab

le fi

nan

cia

l pen

alt

y w

ou

ld b

e

imp

osed

on t

he T

Cs

if t

hey

are

fo

un

d

to b

e in

du

lged

in m

alp

racti

ces

Su

itab

le d

iscip

linary

acti

on

s m

ay

be

taken a

gain

st

SS

Cs/T

Cs

as

man

date

d b

y th

e M

SD

E.

Fo

r exam

ple

-If

co

mp

lain

t w

ith

valid

pro

ofs

receiv

ed

ab

ou

t th

e T

C o

r th

e

AA

/Assesso

r o

fferi

ng

or

seekin

g

an

y u

nd

ue f

avo

r in

cash

or

kin

d t

o

influ

en

ce t

he o

utc

om

e o

f

assessm

en

t an

d S

SC

fails

to

init

iate

su

itab

le a

cti

on

ag

ain

st

AA

an

d u

pd

ate

th

e s

am

e t

o P

MK

VY

Mo

nit

ori

ng

Co

mm

itte

e(P

MC

) in

a

tim

ely

man

ner

(In

case a

TC

is

fou

nd

in

du

lged

in

un

eth

ical

pra

cti

ce, S

SC

sh

ou

ld r

ep

ort

th

e

case t

o P

MC

).If

su

ch

no

n-

co

mp

lian

ces

are

ob

serv

ed

in

mo

re

than

tw

o T

Cs, P

MC

may

refe

r th

e

case t

o t

he G

rievan

ce C

om

mit

tee

of

the S

SC

to

take s

uit

ab

le

ad

min

istr

ati

ve a

cti

on

ag

ain

st

the

co

ncern

ed

SS

C. T

his

is

in a

dd

itio

n t

o t

he

fin

an

cia

l pen

alt

y. In

cases

wh

ere

AA

s an

d /

or

Assesso

rs a

re f

ou

nd

ind

ulg

ed

in

un

eth

ical p

racti

ces, th

e

SS

C is

exp

ecte

d t

o t

ake s

uit

ab

le

acti

on

ag

ain

st

AA

s an

d/o

r

Assesso

rs w

hic

h m

ay

inclu

de t

heir

su

sp

en

sio

n o

r b

lacklis

tin

g.

Th

e r

esp

on

sib

ility

of

overs

eein

g t

he p

rog

ram

an

d p

utt

ing

in

mech

an

ism

s

to b

rin

g t

ran

sp

are

ncy

lies

wit

h t

he s

tate

go

vern

men

t.

Th

e s

tate

go

vern

men

t sh

all

bri

ng

an

y m

alp

racti

ces

by

SS

Cs/A

As

to t

he n

oti

ce o

f

MS

DE

/NS

DC

AS

AP.

Operation Manual for States PMKVY 2016-2020 | 39

Page 47: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval
Page 48: Operation Manual for States PMKVY 2016-2020livelihoods.rajasthan.gov.in/content/dam/livlihood/RSLDC/Guidelines/... · Operation Manual for States PMKVY 2016-2020 | 03 Project Approval

Website: www.pmkvyofficial.org | E-mail: [email protected]

Mobile: 088000-55555Facebook: h�ps://www.facebook.com/PMKVYOfficial

For more informa�on