operation management ( icwa inter)

157
Operations Management ICWA – Inter - Notes Presentation by: Ulhas D Wadivkar - BE (Electrical), MBA ( Finance) Retired Vice President, Graphite India Limited Satpur, Nashik, Maharashtra. Chief Executive Adviser – Nirman Group - Nashik Guest Faculty in MBA Institutions in Nashik

Upload: ulhas-wadivkar

Post on 31-Oct-2014

3.365 views

Category:

Education


0 download

DESCRIPTION

Operation Management : ( ICWA Inter) : Notes for students. The matter is Under process and being updated on weekly basis.

TRANSCRIPT

Page 1: Operation Management  ( ICWA Inter)

Operations Management – ICWA – Inter - Notes

Presentation by:Ulhas D Wadivkar - BE (Electrical), MBA ( Finance)

Retired Vice President, Graphite India LimitedSatpur, Nashik, Maharashtra.Chief Executive Adviser – Nirman Group - NashikGuest Faculty in MBA Institutions in Nashik

Page 2: Operation Management  ( ICWA Inter)

Operations Management• Management:• "To manage is to forecast and to plan, to organise, to command,

to co-ordinate and to control." – Henry Fayol• "Management is a multi-purpose organ that manages business

and manages managers and manages workers and work." – Peter Drucker

• "Management is the art of getting things done through people." - Mary Parker Follet,

• Operation Management is the management of that part of an organization that is responsible for producing goods and / or services.

• An Operating System is defined as a configuration of resources combined for the provision of goods or services.

Page 3: Operation Management  ( ICWA Inter)

Operating System• Any operating system converts inputs, using physical resources,

to create outputs, to satisfy customer`s wants.

• The creation of goods or services involves transforming or converting inputs into outputs. Various inputs such as capital, labour, and information are used to create goods or services using one or more transformation processes (e.g., storing, transporting, and cutting).

• To ensure that the desired output are obtained, an organization takes measurements at various points in the transformation process (feedback) and then compares with them with previously established standards to determine whether corrective action is needed (control).

Page 4: Operation Management  ( ICWA Inter)

Resources in an operating system

• The physical resources generally utilized by operating systems can be categorized for convenience in the in the following manner:-

• Materials: Physical items that are consumed or converted by the system. e.g. - raw materials, fuel, indirect materials, etc.

• Machines/ (Facilities): Those physical items that are utilized by the system, so that the consumption / conversion of materials can be done in an optimum manner. e.g. - plant, tools vehicles, buildings etc.

• Labour: The people who provide or contribute to the operation of the system and ensure that the machines and materials are effectively used.

Page 5: Operation Management  ( ICWA Inter)

Principal functions of an Operating System - 1

• The functions of an operating system are a reflection of the purpose it serves for its customers. The following four principal functions identified below also relate to the basic four operations done in any organization:

• 1) Manufacture: Manufacturing function is the one which involves some physical transformation or a change in the form utility of the resources. Something is physically created and the output consists of goods which differ physical (e.g., in terms of form, content etc.) from those materials input to the system.

• 2) Transport: This function of operating system provides a change in the place utility of something or someone in order to satisfy customer. The customer or something belonging to the customer is moved from place to place and thus results in the change in location. There is no major change in the form of resources. …….contd.

Page 6: Operation Management  ( ICWA Inter)

Principal functions of an Operating System - 23) Supply: This function provides a change in the possession utility of a resource, i.e., the ownership or possession of goods is changed. Unlike manufacture, outputs of the system are physically same as the inputs.

4) Service: This function primarily results in a change in the state utility of a resource. The principal common characteristic is the treatment or accommodation of something or someone. The state or condition of the physical outputs will differ from the inputs as they have undergone same kind of treatment.

• Most large and complex organizations have to perform all the principal four functions of operating systems, discussed above. Thus we may redefine operating system as a configuration of resources combined for the function of manufacture, transport, supply or service.

Page 7: Operation Management  ( ICWA Inter)

Structures for operating systems:• S = Stock, O = Operation, D = Direct, Q = Customer Queue, C = Customer direct Input

• (a) SOS - ‘Make from stock, to stock, to customer’, i.e. all input resources are stocked and the customer is served from a stock of finished goods.

• (b) DOS - ‘Make from source, to stock, to customer’, i.e. no input resource stocks are held, but goods are produced to stock.

• (c) SOD - ‘Make from stock, direct to customer’, i.e. all input resources are stocked but goods are made only against and on receipt of customers’ orders.

• (d) DOD - ‘Make from source, direct to customer’, i.e. no input resource stocks are held and all goods are made only against and on receipt of customers’ orders.

• (e) SCO - ‘Function from stock, and from customer’, i.e. input resources are stocked, except in the case of customer inputs where no queuing exists.

• (f) DOQ - ‘Function from source, and from customer queue’, i.e. no input resources are stocked although customer inputs accumulate in a queue (or stock).

• (g) SQO - ‘Function from stock and from customer queue’, in which all inputs are stocked and/or allowed to accumulate in stocks.

Page 8: Operation Management  ( ICWA Inter)

• The customers exert some ‘push’ on the system.

• In manufacture and supply the customers act directly on output: they ‘pull’ the system, in that they pull goods out of the system whether direct from the function (structures (c) and (d)) or from output stock (structures (a) and (b)).

• In transport and service the customers push the system: they act directly on input. In such systems, therefore, some part of the resource input is not directly under the control of operations management. In these ‘push’ systems the customers control an input channel, and we must therefore distinguish this channel when developing models of systems.

Page 9: Operation Management  ( ICWA Inter)

Operation Management is defined as the management which is concerned with the design and the operation of systems for manufacture, transport, supply or service. • Manufacture: Goods at given Specification, acceptable cost,

delivered at desired time.• Transport: Movements from destination to destination at given

cost, delivered at given time.• Supply:Procurement of Goods at given Specification at reasonable

price at required time.• Service: Providing a service (Treatment) at given desired

specification of Customer in given time at given cost in required time.

Operation Management has also a responsibility of being effective. The effectiveness is the difference between Input Cost plus cost of value adding costs and also non value adding costs i.e. the cost of output goods and Price available in Market.

Page 10: Operation Management  ( ICWA Inter)

The scope of operations management:• Design & Planning: Involvement in design / specification of the goods /

services, design / specification of process / system, location of facilities 1) Layout of facilities / resources and materials handling . 2 ) Determination of capacity / capability 3) Design of work or jobs 4) Involvement in determination of remuneration system and work standards

Operation and control: Planning and-scheduling of activitiesControl and planning of inventoriesControl of qualityScheduling and-control of maintenanceReplacement of facilitiesInvolvement in performance measurement

Capacity Management and Demand Matching operating system: : Activity Scheduling: Planning: Timing the conversion activities

: Inventory Management: Planning and controlling physical stocks

Page 11: Operation Management  ( ICWA Inter)

Responsibilities for Operation Management• Inventories, Quality,

• Maintenance and replacement of facilities,

• Scheduling of activities, Location,

• layout, Capacity determination and staffing.

• Goods / Services Design and Specification,

• Process / System Design and Specification,

• Location of Facilities,

• Layout of Facilities Resources and Materials Handling,

• The Design of Work and of Jobs,

• Remuneration System Design,

• Operations Control,

• Quality Control and Reliability,

• Maintenance and Replacement, Performance Measurement

Page 12: Operation Management  ( ICWA Inter)
Page 13: Operation Management  ( ICWA Inter)

The operations management decision-making process• Operations management decision-making process is ‘the

formulation of overall strategies for operations, typically involving interrelated areas of responsibility within operations management, and the making of decisions in these areas in pursuit of these strategies within the broader business context.

• Quality-based strategy that focuses on quality in all phases of an organization: Quality-based Strategies:

• : Attracting and retaining Customers• : Catch up with competition• : Maintain existing image• : Cost reduction• : Increased Productivity• : Reduced delivery Time

Page 14: Operation Management  ( ICWA Inter)

• Time-based strategy that focuses on reduction of time needed to accomplish tasks:

• : Planning time: The time needed to react to a competitive threat, to develop strategies and select tactics.

• : Product / service design time: The time needed to develop and market new or redesigned products or services.

• : Processing time: The time needed to produce goods or provide services. This can involve scheduling repairing equipment, methods used, inventories, quality, and training

• : Changeover time: The time needed to change from producing one type of product or service to another. This may involve new equipment settings and attachments, different methods, equipment, schedules, or materials.

• : Delivery time: The time needed to fill orders.• : Response time for complaints: These might be customer complaints

about quality, timing of deliveries, and incorrect shipments. These might also be complaints from employees about working conditions (e.g., safety, lighting, heat or cold), equipment problems, or quality problems.

Page 15: Operation Management  ( ICWA Inter)

Strategic operations management decisions:1. Product and service design: Costs, quality, liability and environmental issues2. Capacity: Cost structure, flexibility3. Process selection and layout: Costs, flexibility, skill level needed, capacity4. Work design: Quality of work life, employee safety, productivity5. Location: Costs, visibility6. Quality: Ability to meet or exceed customer expectations7. Inventory: Costs, shortages8. Maintenance: Costs, equipment reliability, productivity9. Scheduling: Flexibility, efficiency10. Supply chains Costs, quality, agility, shortages, vendor relations:11. Projects: Costs, new products, services, or operating systems

Page 16: Operation Management  ( ICWA Inter)

The Role of Operations in Designing of a new ProductPreliminary Stages: Information and Intelligence from Markets, Suppliers, Competitors, Regulators etc.

Stage 1: Ideas Generation: • Operations has a contribution to make in stages 2, 3, 4, 5, 6 and 7 for

there is little benefit in conceiving a product which cannot efficiently, fully or economically be provided. Hence operations must enter into the design dialogue as follows:

• Market-or technology-oriented ideas• New concepts or incremental developments• Internally or externally generated

Stage 2: Screening and selection:• Can the product / service be provided by the operating system?• Do we have the processes, technology and skill?• Do we have the capacity?• Market analysis test, Technological feasibility, Competitive advantage,

Risk assessment

Page 17: Operation Management  ( ICWA Inter)

Stage 3: Initial design:• What is the most appropriate design required for providing, at the required

quality and probable cost?• Specification of major aspects/features, Initial model/’mock-up’

Stage 4: Economic analysis:• How much would it cost to make the appropriate volumes, and at the required

quality?• Estimate of development cost, Estimate of provision cost, Estimate of final cost• Estimate of price

Stage 5: Prototype testing:• Check providability through operating system• Performance / function testing, Consumer tests, Test of Providability’

Stage 6: Redesigning / modification:• Introduce modifications to providability, Improvements, corrections and

modifications, Retesting if necessary, Approval for final designStage 7: Final specification:

• Future appropriate quality specifications. Begin process specification in marketing the above contribution, operations must have regard to the following: Full detailed specification of content, structure, function and performance

Page 18: Operation Management  ( ICWA Inter)

(a) Computer Aided Design: Computers are increasingly used for product design. CAD uses computer graphics for product design.

• The design can be maneuvered on the screen, it can be rotated to provide the designer different views of the product, it can be split apart to have a view of the inside and a position of the product can be enlarged for closer view. The printed version of the completed design can be taken and also the design can be stored electronically.

• Also a database can be created for manufacturing which can supply required information on product geometry and dimensions, tolerances, material specifications etc.

• Also, some CAD systems facilitate engineering and cost analyses on proposed designs, for example, calculation of volume and weight and also stress analysis can be done using CAD systems.

• It is possible to generate a number of alternative designs using computer aided design systems and identify the best alternative which meets the designer’s criteria.

Page 19: Operation Management  ( ICWA Inter)

Value Engineering / Value Analysis in Product Design:

• Value engineering or value analysis is concerned with the improvement of design and specifications at various stages such as research, design and product development. Benefits of value engineering are:

• Cost reduction.• Less complex products.• Use of standard parts/components.• Improvement in functions of the product.• Better job design and job safety.• Better maintainability and serviceability.• Robust design.

• Value engineering aims at cost reduction at equivalent performance. It can reduce costs to the extent of 15% to 70% without reducing quality.

• While value engineering focuses on preproduction design improvement, value analysis, a related technique seeks improvements during the production process.

• Once launched, even good products have limited lives and, to remain viable, the organization seeks a flow of new product possibilities. Let’s examine the product’s birth-to-mortality pattern.

Page 20: Operation Management  ( ICWA Inter)

Product Life Cycle• Products, like men, are mortal. They flourish for a time, then

decline and die. • A product that has not built up its potential during its formative

years is likely to be relatively unsuccessful on its maturity. • The product, thus, has “life cycles” just as human beings have.

From its birth, a product passes through various stages, until it is finally abandoned, i.e. discontinued from the market.

• These stages taken together are referred, to as “The product life

cycle”. • This life cycle of the product comprises four stages: Introduction,

Growth, Maturity and Decline.

Page 21: Operation Management  ( ICWA Inter)

• The introduction stage is preceded by ‘production planning and development’. This period requires greater investment. This investment should be gradually recouped as the sales pick up. The concept of life cycle would give the management an idea as to the time within which the original investment could be recouped.

• In the growth stage, both sales and profits will begin to increase. It is here that similar other new products begin to appear in the market as substitutes and offer competition. At the end of this stage, the distribution arrangement is likely to get completed and the prices, if necessary, are reduced a little.

• The third stage is the maturity stage. During this stage the manufacturers introduce new or modified models or adopt methods to retain their position in the market. The number of buyers will continue to grow, but more slowly. In economic terms this is the stage where supply exceeds demand. Some of the promotional efforts may lengthen the span of this stage but they will not offer a permanent solution.

• At the final stage of decline, profit margins touch a low level, competition becomes severe and customers start using newer and better products. It is here that the story of a product ends-a natural but hard end.

Page 22: Operation Management  ( ICWA Inter)
Page 23: Operation Management  ( ICWA Inter)

Process Planning and Process Design:

• At the time of designing and developing a product, due consideration is given for the manufacturability or producibility of the product using the current process technology and the capability of the firm to manufacture the product.

• If the firm already has the required technology, the facilities (machines and equipments) and the manufacturing processes, and the firm has sufficient capacity or can acquire the needed capacity to manufacture the product, then decision is taken to go ahead with the product design.

• After the final design of the product has been approved and released for production, the production planning and control department takes the responsibility of process planning and process design for converting the product design into a tangible product. As the process plans are firmly established, the processing time required for carrying out the production operations on the equipments and machines selected are estimated. These processing times are compared with the available machine and labour capacities and also against the cost of acquiring new machines and equipments required before a final decision is made to manufacture the product completely in house or any parts or sub-assemblies must be outsourced.

Page 24: Operation Management  ( ICWA Inter)

What is a Process?• A process is a sequence of activities that is intended to achieve

some result, typically to create added value for the customers.• A process converts inputs into outputs in a production system.

It involves the use of organisation’s resources to provide something of value. No product can be made and no service can be provided without a process and no process can exist without a product or service.

• Processes underlie all work activities and are found in all organisations and in all functions of an organisation. Deciding what processes to use is an essential issue in the design of a production system.

• Process decisions involve many different choices in selecting human resources, equipment and machinery, and materials. Process decisions are strategic and can affect an organisation’s ability to compete in the long run.

Page 25: Operation Management  ( ICWA Inter)

• Types of Processes: Basically, processes can be categorised as:

• (i) Conversion processes, i.e., converting the raw materials into finished products (for example, converting iron ore into iron and then to steel). The conversion processes could be metallurgical or chemical or manufacturing or construction processes.

a) Forming processes include foundry processes (to produce castings) and other processes such as forging, stamping, embossing and spinning. These processes change the shape of the raw material (a metal) into the shape of the work piece without removing or adding material.b) Machining processes comprise metal removal operations such as turning, milling, drilling, grinding, shaping, planing, boring etc.c) Assembly processes involve joining of parts or components to produce assemblies having specific functions. Examples of assembly processes are welding, brazing, soldering, riveting, fastening with bolts and nuts and joining using adhesives.

• (ii) Manufacturing processes can be categorised into (a) Forming processes, (b) Machining processes and (c) Assembly processes.

• (iii) Testing processes which involve inspection and testing of products (sometimes considered as part of the manufacturing processes).

Page 26: Operation Management  ( ICWA Inter)

Process Planning:• Process planning is concerned with planning the conversion

processes needed to convert the raw material into finished products. It consists of two parts:

• Process design and • Operations design.• Process Design is concerned with the overall sequences of

operations required to achieve the product specifications. It specifies the type of work stations to be used, the machines and equipments necessary to carry out the operations.

• The sequence of operations are determined by (a) The nature of the product, (b) The materials used, (c) The quantities to be produced and (d) The existing physical layout of the plant.

Page 27: Operation Management  ( ICWA Inter)

Operations DesignOperations Design is concerned with the design of the individual manufacturing operation. It examines the man-machine relationship in the manufacturing process. Operations design must specify how much labour and machine time is required to produce each unit of the product. Framework for Process Design• The process design is concerned with the following:• Characteristics of the product or service offered to the customers.• Expected volume of output.• Kinds of equipments and machines available in the firm.• Whether equipments and machines should be of special purpose or

general purpose.• Cost of equipments and machines needed.• Kind of labour skills available, amount of labour available and their wage

rates.• Expenditure to be incurred for manufacturing processes.• Whether the process should be capital-intensive or labour-intensive.• Make or buy decision.• Method of handling materials economically.

Page 28: Operation Management  ( ICWA Inter)

Process Selection• Process selection refers to the way production of goods

or services is organised. It is the basis for decisions regarding capacity planning, facilities (or plant) layout, equipments and design of work systems. Process selection is necessary when a firm takes up production of new products or services to be offered to the customers.

• Three primary questions to be addressed before deciding on process selection are:

(i) How much variety of products or services will the system need to handle?

(ii) What degree of equipment flexibility will be needed?

(iii) What is the expected volume of output?

Page 29: Operation Management  ( ICWA Inter)

Process Strategy• A process strategy is an organisation’s approach to process selection for the purpose

of transforming resource inputs into goods and services (outputs). The objective of a process strategy is to find a way to produce goods and services that meet customer requirement and product specification (i.e., design specifications) within the constraints of cost and other managerial limitations.

• The process selected will have a long-term effect on efficiency and production as well as flexibility, cost, and quality of the goods produced. Hence it is necessary that a firm has a sound process strategy at the time of selecting the process.

Key aspects in process strategy include:(i) Make or buy decisions : Make or buy decisions refer to the extent to which a

firm will produce goods or provide services in-house or go for outsourcing (buying or subcontracting).

(ii) Capital intensity : Capital intensity refers to the mix of equipment and labour which will be used by the firm.

(iii) Process flexibility : Process Flexibility refers to the degree to which the system can be adjusted to changes in processing requirements due to such factors as changes in product or service design, changes in volume of products produced and changes in technology.

Page 30: Operation Management  ( ICWA Inter)

• Three process strategies: • Virtually every good or service is made by using some variation of

one of three process strategies. They are: (i) Process focus (ii) Repetitive focus and (iii) Product focus.

• (i) Process Focus: Majority (about 75 per cent) of global production is devoted to low volume, high variety products in manufacturing facilities called job shops. Such facilities are organised around performing processes. For example, the processes might be welding, grinding or painting carried out in departments devoted to these processes. Such facilities are process focussed in terms of equipment, machines, layout and supervision. They provide a high degree of product flexibility as products move intermittently between processes. Each process is designed to perform a wide variety of activities and handle frequent changes. Such processes are called intermittent processes. These facilities have high variable costs and low utilisation of facilities.

Page 31: Operation Management  ( ICWA Inter)

(ii) Repetitive Focus: A repetitive process is a product oriented production process that uses modules. It falls between product focus and process focus. It uses modules which are parts or components prepared often in a continuous or mass production process. A good example of repetitive process is the assembly line which is used for assembling automobiles and household appliances and is less flexible than process-focused facility. Personal computer is an example of a repetitive process using modules in which the modules are assembled to get a custom product with the desired configuration.(iii) Product Focus: It is a facility organised around products, a product oriented, high-volume low variety process. It is also referred to as continuous process because it has very long continuous production run. Examples of product focussed processes are steel, glass, paper, electric bulbs, chemicals and pharmaceutical products, bolts and nuts etc. Product-focussed facilities need standardisation and effective quality control. The specialised nature of the facility requires high fixed cost, but low variable costs reward high facility utilisation.

Page 32: Operation Management  ( ICWA Inter)

• Process Management:• Process management is concerned with the selection of inputs,

operations, work flows and methods that transform inputs into outputs. The starting point of input selection is the make-or-buy decision (i.e., deciding which parts and components are to be produced in-house and which are to be purchased from outside suppliers). Process decisions are concerned with the proper mix of human skills and equipments needed to produce the parts in-house and which part of the processes are to be performed by each equipment and worker.

• Process decisions: It must be made when:(i) A new or modified product or service is being offered.(ii) Quality must be improved.(iii) Competitive priorities have changed.(iv) Demand for a product or service is changing.(v) Cost or availability of materials has changed(vi) Competitors are doing better by using a new technology or a new

process.

Page 33: Operation Management  ( ICWA Inter)

Major Process Decisions:• Process Choice: The production manager has to choose from five basic

process types — (i) job shop, (ii) batch, (iii) repetitive or assembly line, (iv) continuous and (v) project.

• (i) Job shop process: It is used in job shops when a low volume of high-variety goods are needed. Processing is intermittent, each job requires somewhat different processing requirements. A job shop is characterised by high customisation (made to order), high flexibility of equipment and skilled labour and low volume. A tool and die shop is an example of job shop, where job process is carried out to produce one-of-a kind of tools. Firms having job shops often carry out job works for other firms. A job shop uses a flexible flow strategy, with resources organised around the process.

• (ii) Batch process: Batch processing is used when a moderate volume of goods or services is required and also a moderate variety in products or services. A batch process differs from the job process with respect to volume and variety. In batch processing, volumes are higher because same or similar products or services are repeatedly provided, examples of products produced in batches include paint, ice cream, soft drinks, books and magazines.

Page 34: Operation Management  ( ICWA Inter)

(iii) Repetitive process: This is used when higher volumes of more standardised goods or services are needed. This type of process is characterised by slight flexibility of equipment (as products are standardised) and generally low labour skills. Products produced include automobiles, home appliances, television sets, computers, toys etc. Repetitive process is also referred to as line processes as it include production lines and assembly lines in mass production. Resources are organised around a product or service and materials move in a line flow from one operation to the next according to a fixed sequence with little work-in-progress inventory. This kind of process is suitable to “manufacture-to-stock” strategy with standard products held in finished goods inventory. However, “assemble-to-order” strategy and “mass customisation” are also possible in repetitive process.(iv) Continuous process: This is used when a very highly standardised product is desired in high volumes. These systems have almost no variety in output and hence there is no need for equipment flexibility. A continuous process is the extreme end of high volume, standardized production with rigid line flows. The process often is capital intensive and operate round the clock to maximise equipment utilisation and to avoid expensive shut downs and shut ups. Examples of products made in continuous process systems include petroleum products, steel, sugar, flour, paper, cement, fertilisers etc.

Page 35: Operation Management  ( ICWA Inter)

• (v) Project process: It is characterised by high degree of job customisation, the large scope for each project and need for substantial resources to complete the project. Examples of projects are building a shopping centre, a dam, a bridge, construction of a factory, hospital, developing a new product, publishing a new book etc. Projects tend to be complex, take a long time and consist of a large number of complex activities. Equipment flexibility and labour skills can range from low to high depending on the type of projects.

Page 36: Operation Management  ( ICWA Inter)

• Vertical Integration: Vertical integration is the amount of the production and distribution chain, from suppliers of components to the delivery of products/services to customers, which is brought under the ownership of a firm. The management decides the level or degree of integration by considering all the activities performed from the acquisition of raw materials to the delivery of finished products to customers. The degree to which a firm decides to be vertically integrated determines how many production processes need to be planned and designed to be carried out in-house and how many by outsourcing. When managers decide to have more vertical integration, there is less outsourcing.

• The vertical integration is based on “make-or-buy” decisions, with make decisions meaning more integration and a buy decision meaning less integration and more outsourcing. Two directions of vertical integration are

(a) Backward integration which represents moving upstream toward the sources of raw materials and parts, for example a steel mill going for backward integration by owning iron ore and coal mines and a large fleet of transport vehicles to move these raw materials to the steel plant,

(b) Forward integration in which the firm acquires the channel of distribution (such as having its own warehouses, and retail outlets).

Page 37: Operation Management  ( ICWA Inter)

• Advantages of vertical integration are:• Can sometimes increase market share and allow the firm

enter foreign markets more easily.• Can achieve savings in production cost and produce

higher quality goods.• Can achieve more timely delivery.• Better utilisation of all types of resources.

• Disadvantages of vertical integration are:• Not attractive for low volumes.• High capital investment and operating costs.• Less ability to react more quickly to changes in customer

demands, competitive actions and new techniques.

Page 38: Operation Management  ( ICWA Inter)

3. Resource flexibility:

• The choices that management makes concerning competitive priorities determine the degree of flexibility required of a firm’s resources — its employees, facilities and equipment. Production managers must decide whether to have flexible workforce which will provide reliable customer service and avoid capacity bottlenecks. Flexible workforce is useful with flexible flow strategy to even out fluctuating workloads.

• Also when volume flexibility is required, instead of laying-off and hiring workforce to match varying demands, it is better to have certain amount of permanent workforce having multiple skills. This will facilitate movement of surplus workforce from low-load work centres to higher-load work centres.

• When a firm’s product has a short life cycle and a high degree of customisation, low production volumes mean that the firm should select flexible general purpose machines and equipments.

Page 39: Operation Management  ( ICWA Inter)

• 4. Customer-involvement is the extent to which customers interact with the process. A firm which competes on customisation allows customers to come up with their own product specification or even become involved in the designing process for the product (quality function deployment approach to design for incorporating the voice of the customer).

• 5. Capital intensity means the predominant resource used in manufacturing, i.e., capital equipments and machines rather than labour. Decision regarding the amount of capital investment needed for equipments and machines is important for the design of a new process or the redesign of an existing one. As the capabilities of technology increase (for example automation), costs also will increase and managers have to decide about the extent of automation needed. While one advantage of adding capital intensity is significant increase in product quality and productivity, one big disadvantage can be high investment cost for low-volume operations.

Page 40: Operation Management  ( ICWA Inter)

• The list of manufacturing environments is never-ending and an indication of the range and length is given in the following list, adapted from Government statistical publications under the classification ‘Production

• Industries’ / ‘Manufacturing Industry’:• Mining and quarrying• Food processing and manufacture• Food consumption• Drink and tobacco• Coal and petroleum products• Chemical and allied industries.• Metal manufacture• Mechanical engineering• Instrumental and electrical engineering• Shipbuilding, vehicles and other metal goods• Textiles, leather, leather goods and fur.• Clothing and footwear.• Bricks, pottery, glass, cement, etc.• Paper, printing and publishing• Construction.• Gas, electricity and water.

Page 41: Operation Management  ( ICWA Inter)

• Among these few are regulated & thus covered under cost audit report rules by government rest are unregulated

• Under the provisions of Cost and Works Accounts Act, 1959 (23 of 1959) : The regulated industries are –

• i) Pharmaceutical Industry• ii) Fertilizers Industry• iii) Sugar & Alcohol Industry• iv) Electricity Industry• v) Petroleum Industry• vi) Telecommunication Industry

• Amongst these regulated industries, most are manufacturing, except the telecommunication.

Page 42: Operation Management  ( ICWA Inter)

Measuring Process Performance -1

• Efficiency is a ratio of the actual output of a process relative to some standard. For example, consider a machine designed to package cereal at a rate of 30 boxes per minute. If during a shift the operators actually produce at a rate of 36 boxes per minute, then the efficiency of the machine is 120 percent (36/30).

• Run time is the time required to produce a batch of parts. This is calculated by multiplying the time required to produce each

unit by the batch size. Example: Package cereal at a rate of 30 boxes per minute. Therefore Run Time will be 60 Seconds / 30 = 2 Seconds• The Setup time is the time required to prepare a machine to make a

particular item. Machines that have significant setup time will typically run parts in batches.

• The Operation time is the sum of the setup time and run time for a batch of parts that are run on a machine.

• Consider the cereal-boxing machine that is designed to produce at a rate of 30 boxes per minute.

• The run time for each box is 2 seconds.

Page 43: Operation Management  ( ICWA Inter)

• To switch the machine from 16-ounce boxes to 12-ounce boxes requires a setup time of 30 minutes.

• The operation time to make a batch of 10,000, 12-ounce boxes is 21,800 seconds

(30 minutes’ setup = 30 x 60 = 1800 seconds) + (2 seconds / box x 10,000 boxes) = 21800 Seconds or 363.33 minutes.• The cycle time is the elapsed time between starting and completing a job.

Example: For a Batch of 10,000 Boxes the Cycle time is 20,000 Seconds or 333.33 Minutes • Throughput time includes the time that the unit spends actually being

worked on together with the time spent waiting in a queue. • The Throughput rate is the output rate that the process is expected to

produce over a period of time. • Process velocity (also known as throughput ratio) is the ratio of the total

throughput time to the value added time. • Value-added time is the time in which useful work is actually being done

on the unit.

Page 44: Operation Management  ( ICWA Inter)

Measuring Process Performance -2• Little’s Law states a mathematical relationship between throughput rate,

throughput time, and the amount of work-in-process inventory. Little’s Law estimates the time that spend in work-in-process inventory, which can be useful for calculating the total throughput time for a process. Using the terminology defined in this section, Little’s Law is defined as follows-

• Throughput time = Work-in-Progress divided by Throughput rate

• This formula holds for any process that is operating at a Steady Rate.

• By Steady Rate we mean that work is entering and exiting the system at the same rate over the time period being analyzed. Our assembly line has 120 units entering and 120 units exiting the process each hour. If, for example, 150 units were entering the system each hour but only 120 units were exiting, then the system would not be operating at a steady rate since 30 additional units would be accumulating in the system each hour. These 30 units add to work-in-process, which would cause the throughput time to increase each hour. The actual increase in throughput time would be 15 minutes per hour (30 units/120 units per hour = 0.25 hour)

Page 45: Operation Management  ( ICWA Inter)

Study Note – 2: PRODUCTION PLANNING:

• All the activities in the manufacturing or production cycle must be planned, coordinated, organised, and controlled to achieve the objective “Delivery of products to “customers” or to “inventory” stocks according to some predetermined schedule.”

• Long-term Production Planning (usually from seven to ten years or more) deals with plant construction and location and with product-line, design and development.

• Short range Production Planning (from several months to a year) focuses on such areas as inventory goals and wage budgets

• Production consists of a sequence of operations that transform materials from a given form to a desired form (products). The highest efficiency in production is obtained by manufacturing the required quantity of products, of the required quality, at the required time, by the best and cheapest method.

Page 46: Operation Management  ( ICWA Inter)

Three stages in PPC• (i) Planning: The choice from several alternatives of

the best means of utilising the resource available to achieve the desired objectives in the most efficient and economic manner.

• (ii) Operations: Performance in accordance with the details set out in the production plan.

• (iii) Control: The monitoring of performance through a feed-back by comparing the result achieved with the planned targets so that performance can be improved through proper corrective action by subsequent adjusting, modifying and redefining plans and targets in order to ensure the attainment of goals.

Page 47: Operation Management  ( ICWA Inter)

• The functions of PPC can be classified under the following:

• Materials: Raw materials, spare parts and components which must be available in the correct quantities and specifications at the right time. Planning for procurement of raw materials, components and spare parts in the right quantities and specifications at ·the right time from the right source at the right price. Purchasing, storage, inventory control, standardisation, variety reduction, value analysis and inspection are the other activities associated with materials.

• Methods: It involves deciding the best sequence of operations for manufacturing the parts, building up subassemblies and major assemblies which in turn will make up the finished product, within the limitations of existing layout and workflow. Includes choosing the best method of processing from several alternatives. It also includes determining the best sequence of operations (process plans) and planning for tooling, jigs and fixtures etc.

Page 48: Operation Management  ( ICWA Inter)

The functions of PPC -1• Machines and Equipments: PPC is concerned with selection of machines and

equipments and also with maintenance policy, procedure and schedules, replacement policy and tooling. (Design and manufacture of tools). Manufacturing methods are related to production facilities available in the production system. It involves facilities planning, capacity planning, allocation and utilization of plant and equipments, machines etc. It also involves equipments replacement policy, maintenance policy and maintenance schedules, tools manufacture and maintenance of tools etc.

• Manpower: Planning for man power (labour, supervisory and managerial levels) having appropriate skills and expertise.

• Routing: Routing prescribes the flow of work in the plant and is related to consideration of layout, of temporary storage locations for raw materials, components and semi processed parts, and of material handling systems. Routing is a basic PPC function. Determining the flow of work, material handling in the plant, and sequence of operations or processing steps. This is related to considerations of appropriate shop layout and plant layout, temporary storage locations for raw materials, components and semi-finished goods, and of materials handling systems

Page 49: Operation Management  ( ICWA Inter)

The functions of PPC - 2

• Estimating: The processing times (both set up time and operation time per piece) required for the parts to be manufactured in-house are estimated and the standard time (both machine time and labour time) are established as performance standards. Establishing operation times leading to fixation of performance standards both for workers and machines.

• Loading and Scheduling: Machines have to be loaded according to their capacity and capability. Machine loading is carried out in conjunction with routing (as indicated in process layouts or operations analysis and routing sheets) to ensure smooth workflow and the prescribed feeds. Speeds of machines are adhered to as well as the estimated time (standard time which is the allowed time to do a job). Machine loading is allocation of jobs to machines in conjunction with routing and with due consideration for capacity of machines and priority for jobs in order to utilize the machines to the maximum possible extent.

Page 50: Operation Management  ( ICWA Inter)

The functions of PPC - 3• Scheduling: Determines the utilisation of equipment and manpower and hence

the efficiency of the plant. Scheduling determines the starting time and completion time for each and every operation for each and every part to be manufactured and sub-unit to be assembled so that the finish product is ready to be shipped to the customer as per the predetermined delivery schedules.

• Dispatching: This is concerned with the execution of planning functions. Production orders and instructions are released according to the schedule, sequences indicated in route sheets, and machine loading schedules are adhered to and authorisation is given for release of materials and tools to the operators to carry out the work. This is concerned with the execution of the planning functions. It gives necessary authority to start a particular work which has already been planned under routing and scheduling functions. Dispatching is release of orders and instructions for the starting of production in accordance with the route sheets and schedule charts.

• Expediting or Progressing: This means follow-up or keeping track of the progress made in completing the production as per schedules. This follows dispatching function logically. Means chasing, follow up or progressing which is done after dispatching function. It keeps a close liaison with scheduling in order to provide an efficient feedback and prompt review of targets and schedules.

Page 51: Operation Management  ( ICWA Inter)

The functions of PPC - 4• Inspection: This function relates to checking the quality of production

and of evaluating the efficiency of the processes, methods and workers so that improvements can be made to achieve the desired level of quality. This function is related to maintenance of quality in production and of evaluating the efficiency of the processes, methods and labour so that improvements can be made to achieve the quality standards set by product design

• Evaluating or Controlling: The objective of evaluation or controlling is to improve performance. Methods and facilities are evaluated to improve their performance. To sum up, we can state that PPC is a management tool, employed for the direction of the manufacturing operations and their co-ordination with other activities of the firm. The objective of evaluation is to improve performance. Performance of machines, processes and labour is evaluated to improve the same.

• Cost Control: Manufacturing cost is controlled by wastage reduction, value analysis, inventory control and efficient utilization of all resources.

Page 52: Operation Management  ( ICWA Inter)

Objectives of Production Planning and Control:1. To deliver quality goods in required quantities to the customer in the

required delivery schedule to achieve maximum customer satisfaction and minimum possible cost.

2. To ensure maximum utilization of all resources.3. To ensure production of quality products.4. To minimise the product through-put time or production/manufacturing cycle

time.5. To maintain optimum inventory levels.6. To maintain flexibility in manufacturing operations.7. To co-ordinate, between labour and machines and various supporting

departments.8. To plan for plant capacities for future requirements.9. To remove bottle-necks at all stages of production and to solve problems

related to production.10. To ensure effective cost reduction and cost control.11. To prepare production schedules and ensure that promised delivery dates are

met.12. To produce effective results for least total cost

Page 53: Operation Management  ( ICWA Inter)

Basic types of Production Control: • Block control: This type of control is most prominent in textiles and book and magazine

printing. In these industries it is necessary to keep things separated and this is the fundamental reason why industries resort to block control.

• Flow control: This type of control is commonly applied in industries like chemicals, petroleum, glass, and some areas of food manufacturing and processing. Once the production system is thoroughly designed, the production planning and control department controls the rate of flow of work into the system and checks it as it comes out of the system. But, under this method, routing and scheduling are done when the plant is laid out. That is to say, the production line which is established is well balanced and sequenced before production operations begin; this type of control is more prevalent in continuous production systems.

• Load control: Load control is typically found wherever a particular bottleneck machine exists in the process of manufacturing.

• Order control: The most, common type of production control is called order control. This type of control is commonly employed in companies with intermittent production systems, the so-called job-lot shops. Under this method, orders come into the shop for different quantities for different products. Therefore, production planning and control must be based on the individual orders.

• Special project control: Special production control is necessary in certain projects like the construction of bridges, office buildings, schools, colleges, universities, hospitals and any other construction industries. Under this

Page 54: Operation Management  ( ICWA Inter)

Requirements of Production Planning and Control System1. Sound organizational structure with mechanism for proper delegation of authority and fixation of responsibility at all levels. 2. Information feedback system should provide reliable and up-to-date information to all persons carrying out PPC functions. 3. Standardisation of materials, tools, equipments, labour, quality, workmanship etc. 4. Trained personnel for using the special tools, equipments and manufacturing processes. 5. Flexibility to accommodate changes and bottle-necks such as shortage of materials, power failures, machine break downs and absenteeism of employees. 6. Appropriate management policies regarding production and inventory levels, product -mix and inventory turnover. 7. Accurate assessment of manufacturing lead times and procurement lead times.

8. Plant capacity should be adequate to meet the demand. The plant should be flexible in order to respond to the introduction of new products, changes in product-mix and production rate.

Page 55: Operation Management  ( ICWA Inter)

Limitations of PPC(a) Production planning and control function is based on certain assumptions or forecasts of customers demand, plant capacity, availability of materials, power etc. If these assumptions go wrong, PPC becomes ineffective.(b) Employees may resist changes is production levels set as per production plans if such plans are rigid.(c) The production planning process is time consuming when it is necessary to carry out routing and scheduling functions for large and complex products consisting of a large no. of parts going into the product.(d) Production planning and control function becomes extremely difficult when the environmental factors change very rapidly such as technology, customers’ taste regarding fashion or style of products needed, Government policy and controls stoppages of power supply by electricity boards due to power cuts, break in supply chain due to natural calamities such as floods, earthquakes, war etc.

Page 56: Operation Management  ( ICWA Inter)

2.3 Work Study• The British Standards Institution defines work study as ‘a generic term for

those techniques, particularly method study and work measurement, which are used in the examination of human work in all its contexts, and which lead systematically to the investigation of all the factors which affect the efficiency and economy of the situations being reviewed, in order to effect improvements’.

• Time Study & Method Study can be defined to be a searching scientific

analysis the methods and equipments used in doing a piece of work, developing a method in practical detail and of the best manner of doing it and determination of time required.

• The aims of work study are, by analysis of work methods and the materials and equipment used, to:

(a) Establish the most economical way of doing the work;(b) Standardise this method, and the materials and equipment involved;(c) Establish the time required by a qualified and adequately trained worker to do the job while working at a defined level of performance;(d) Install this work method as standard practice.

Page 57: Operation Management  ( ICWA Inter)

Operation Analysis • The operation analysis is the study of the entire process for elimination of

wasteful activity and deciding sequence to avoid unnecessary transportation. It concentrates on

• Idle time of Machines• Tools Used• Equipments used• Working conditions (Light, Temperature, Ventilation, Safety etc.)• Whether manual work is an important part of the job, e.g. (1) the wage

rate for the job, (2) the ratio of machine time to manual time in the work cycle;

• Utilization of equipment, machines, tools, etc., the cost of such equipment, and whether the utilization is dependent on the work method;

• Method study is normally conducted before work measurement. Apart from the possible-need to compare the times for old work methods with the times for new methods, work measurement conducted before method study is poor practice.

Page 58: Operation Management  ( ICWA Inter)

Job Analysis / Job Standardisation:

• Best way of performing the job.• Perfect / Exact Recording of Method.• Time taken for each element.• Determination of Standard Time.• Determination of special & essential factors

specific to work and qualifications necessary of worker to perform the job.

• This analysis is used for wages, incentive and up-gradation of worker.

Page 59: Operation Management  ( ICWA Inter)

WORK STUDY•

Method study Work Measurement • Record Method Direct Work measurement Indirect Work measurement

• Examine the Method Motion Study Synthetic Times Time Study PMTS

Developing a Method in Activity Sampling Analytical EstimatingPractical details in best manner.

Develop and define the Work Method

Job Analysis and Job Standardisation Provide Time Allowances Calculate Standard Time for the Job • Install & Maintain the Work method

Page 60: Operation Management  ( ICWA Inter)

Job Evaluation: • Preparation of preliminary description of each existing

job.• Analysing each job to document final job description.• Finding worth or value of the Job.• Qualification required of a worker.• Job critical activities.• Job Responsibilities.• Allowance for working conditions.• Use of ranking, grading method, Factor comparison

Method, Point Rating Method. ( Straight Point Method, Weighted Point Method)

• Valuation of job in terms of money.

Page 61: Operation Management  ( ICWA Inter)

Basic Work Study Procedure:1. There are eight basic steps involved in a work study procedure. Some of them are common to both

2. Method study and work measurement. These steps are:a) Select the job or the process or the operation to be studied.b) Record all relevant facts about the job or process or operation using suitable

charting techniquesc) Such as operation process chart, flow process chart, flow diagram, SIMO chart

(simultaneous motion chart) and man-machine chart.d) Examine critically all the recorded facts, questioning the purpose, place, sequence,

person and the means of doing the job/process/operation.e) Develop the new method for the job/process/operation.f) Measure the work content and establish the standard time using an appropriate

work measurement technique, viz; time study using stop watch, synthesis method, analytical estimating method, predetermined motion time system and work sampling.

g) Define the new method for the job/process/operation.h) Install the new method as standard practice.i) Maintain the new method for the job/process/operation.

Page 62: Operation Management  ( ICWA Inter)

Method Study Procedure1. The various steps involved in method study are:

2. Select the work or job to be studied and define the objectives to be achieved by method study. The job selected to have maximum economic advantage, shall offer vast scope for work improvement through reduction of excessive material handling and fatigue to workmen, offer scope for improving the working conditions and improving the utilization of resources.3. Record all the relevant facts or information pertaining to the existing method using the recording techniques such as -a) Process chartsb) Outline process chartc) Operation process chartd) Flow process chart-material type, man type and machine type/equipment type.e) Man-machine chartf) Two handed process chart4. Diagrams such asg) Multiple activity charth) Simultaneous motion chart (SIMO chart)i) Motion chart5. Diagram such asj) Flow diagramk) String diagraml) Cycle graphm) Chronocycligraph

Page 63: Operation Management  ( ICWA Inter)

Computation of Standard Time• OT + PRF + PA + RA + CA + SA = ST• ST + POA = AT• Standard Time + Policy Allowance = Allowed Time• Where:

OT = Observed TimePRF = Performance Rating Factor

PA = Process AllowanceRA = Relaxation AllowanceCA = Contingency AllowanceSA = Special AllowanceST = Standard TimePOA = Policy Allowance AT = Allowed Time

Page 64: Operation Management  ( ICWA Inter)

Work Sampling Procedure• In work sampling study, the works study engineer takes a great number of observations

of a worker or machine random times throughout the working shift or day. He records precisely what the worker or the machine is doing (i.e., working or idle) at the time of observation. No stop-watch is used. The objective is to find the frequency of occurrence of every work element.

• The technique is based upon the laws of probability. It is based on the statistical premise that the occurrences in an adequate random sample observations of an activity will follow the same distribution pattern that might be found in a lengthy, continuous study of the same activity. Algebraically put,

• P= x / N = (Number of observation of the activity) / (Total number of observations)

• Thus, the work sampling method, as stated above consists of taking a number of intermittent, randomly spaced instantaneous observations of the activity being studied and from this determining the percent of time devoted to each aspect of the operation.

• In order to set a standard by the work sampling procedure, it is necessary to level or rate the performance of the worker being studied (as with stop watch time study) and to count the actual number of units produced during the period under study.

Page 65: Operation Management  ( ICWA Inter)

Steps in Work Sampling

• The work sampling study consists of essentially the following steps:1. Determine the objective of the study, including definitions of

the states of activity to be observed.2. Plan the sampling procedure including:

(a) An estimate of the percentage of time being devoted to each phase of the activity.(b) The setting of accuracy limits.(c) An estimation of the number of observations required.(d) The selection of the length of the study period and the programming of the number of readings over this period.(e) The establishment of the mechanics of making the

observations, the route to follow and the recording of data. 3. Collect the data as planned. 4. Process the data and present the results.

Page 66: Operation Management  ( ICWA Inter)

Advantages of Work Sampling over Conventional Work Measurement Methods

1. Economical to use and usually costs considerably less than a continuous time study.

2. Can be used to measure many activities that are impractical to measure by time study.

3. Not necessary to use a trained work measurement analyst to make the observations.

4. Work sampling measurements may be made with a pre-assigned degree of reliability.

5. Measures the utilization of people and equipment directly.6. Eliminates the necessity of using stop watch for

measurements.7. Provides observation over a sufficiently long period of time to

decrease the chance of day to day variation affecting the results.

Page 67: Operation Management  ( ICWA Inter)

2.4 FORECASTING• Planning is fundamental to management. Forecasting, which involves a study of the present and past,

with a view to estimate the future activities, which forms the basis of planning.• Forecasting is important to production and operations management in a number of decisions; to

make an annual plan of production / operations, to make a weekly or daily schedule of production or service operations, to procure or manufacture the raw materials or components and to plan the manpower, requirement amongst various other things.

• Advantages of forecasting are stated as under:• Past data provides guidance for future and is a tool to train. Forecasts based on past data helps in

correct planning.• Forecasting of customer’s demand help in strategy planning, capacity planning, location planning and

layout planning.• Past data provides trends, which are used to forecast the future trends and helps to decide on

products or services pursued or to be stopped or abandoned.• Forecast of manufacturing is essential to ensure the availability of materials for sub-assemblies and

final assemblies. • Forecasting by specifying future demands reduce the costs of readjustment of operations in response

to the unexpected deviation.• Accurate estimation of future demands of goods and services through forecasting increases the

operating efficiency.• Forecasting is an important component of strategic and operational planning.• Utilization of the plant is improved with correct forecasts.

Page 68: Operation Management  ( ICWA Inter)

Forecast Error• Normally there is a gap between forecasted demand and actual demand. If the

forecasted demand is less than the actual demand,• Forecast error is the numeric difference between the forecasted and actual demand.

• There are two measures of error as stated below.• Mean Absolute Deviation (MAD): MAD is the ratio of sum of absolute deviations for all

periods to the total number of periods studied. Deviation means Difference between Forecasted Demand and actual demand for that period.

• It is represented as below: MAD = (sum of absolute values of deviations for all periods)

---------------------------------------------------------------------------------------------------------------------

(Total number of periods studied = n)• Bias: Bias is worked out by using algebraic difference between forecasted and actual

demands for all the periods. The algebraic differences are summed up and divided by the total number of periods studied.

• Bias is represented as: Sum of algebraic errors for all the periods----------------------------------------------------------------------------------------------------------------

Total number of periods studied

• Bias indicates the directional tendency of the forecast errors.

Page 69: Operation Management  ( ICWA Inter)

Tracking Signals (TS)• The TS indicates the direction of the forecasting error.• If TS is positive – increase the forecasts, but • if TS is negative – decrease the forecasts. • It is the ratio of the cumulative algebraic sum of the deviations

between the forecasts and the actual values to the mean absolute deviation.

• If the TS is around zero, the forecasting model is performing well. A forecast is considered out of control, if the value of Tracking Signal exceeds plus or minus 4.

• Mathematically, Tracking Signal is presented as below: Algebraic sum of deviations

Tracking Signals (TS) = ------------------------------------------------------ Mean Absolute Deviations (MAD)

Page 70: Operation Management  ( ICWA Inter)

Forecasting Approaches• Qualitative Approaches: Qualitative approaches include five forecasting techniques:

• Grass-root Forecasting: People at the grass-root level in the organization, who are in direct contact with the phenomenon under study, are asked to give inputs in forecasting. For example, sales representatives could be asked to give information on current market conditions. These inputs are satisfactory for short term planning.

• Focused Forecasting: This method integrates common sense, grass-root inputs and computer simulation processes to assess the forecasts. For example, an Income-tax Inspector would forecast the earning of a store from the number of customers entering the store. He would multiply the number of customers with an expected average value of purchases made by each customer. This gives him a rough estimate of the earnings of the store.

• Historical Analogy: Information of past events is used to give insights into prediction on related future developments. It is assumed that the future events would follow similar pattern as of the past events. This approach gives inaccurate forecasts as the past events might not have had similar conditions as that which the future events could encounter. For example, demand for laptop computers based on the past sales of desktop computers does not give a correct forecast

• Panel Consensus: A group of knowledgeable persons are invited for an open discussion on a topic selected for forecasting. It is believed that a single person might not be able to consider all the aspects on the topic. Collective effort of the group invited to interact and come to a consensus on a subject, is considered as the acceptable approach for forecasting. The group could have persons from marketing, engineering, sales, materials management, etc. The basic objective of this approach is to use the creatively of the members of the group. This process is not sophisticated, and works well as the group members have a true sense of participation and bring out workable solutions.

Page 71: Operation Management  ( ICWA Inter)

• Delphi Method: A number of experts associated with the subject are asked to give their response to pre-selected questions, which would help in forecasting. The experts could be persons from within the organization or from outside the organization.

• The coordinator for forecasting obtains the responses from the experts, complies and analyses the responses and gives feedback to the experts involved in the process.

• The coordinator again formulates new questions to obtain the response from the experts again. The process of obtaining responses is repeated in few rounds until the coordinator is satisfied that a good conclusion is reached on the subject.

• As the experts come from diverse backgrounds, they look at the issue independently from their own perspectives. On getting the feedback, they are able to appreciate the views of the experts from other expertise fields also. This gives them better understanding of the issue. The result of Delphi is arrived by pooling up the knowledge of various experts and brings very good results.

Merits of Delphi: Delphi is preferred for the following reasons:• It involves knowledgeable persons on the subject.• Members in Delphi exercise come from different backgrounds and therefore the method is able

to consider and pool up various aspects of the issue.• Since the members do not meet each other, their views are not influenced by the views of

others.• No conflict of personality is seen in the process.• No dominance by any influential expert on the other experts.• It gives quick results as compared to quantitative techniques and helps in timely decisions.

Page 72: Operation Management  ( ICWA Inter)

Quantitative Forecasting• Quantitative forecasting techniques use the past numerical data for forecasting the future

events. The quantitative techniques use time series, which includes the following:• Simple Average.• Simple Moving Average: In this method, the number of past periods is selected. The

average of the selected number of periods is calculated instead of average of all the periods taken together. In this case, the average is changing as we move forward and reflects the demand of the recent period more closely. As the one period elapses, the demand for the oldest period is not counted and the demand for the most recent period is added for the next calculation.

• Weighted Moving Average: In case the planner wants to give different weights to different periods, he could use weighted moving average method by incorporating some weight for old demand instead of equal weightage for all past periods under consideration. Weighted Moving Average (WMA) = Sum of the product of weight factor and demand for the month

• Exponential Smoothing: This method is more popular. The pattern of weight is exponential in form. In this method, the demand for the most recent period is weighted most heavily and the weights of just preceding periods are lowered exponentially. As we go back in time, the weight is decreased exponentially. This method cannot be used for an item, which has trend or seasonal pattern. This is best suited for independent demand with no trend and seasonality.

• A new forecast is presented as under: N F = OF+ α (AD-OF) Where NF = New Forecast, OF = Old Forecast, α = Weight Factor, normally called smoothing coefficient and A D = Actual Demand.

Page 73: Operation Management  ( ICWA Inter)

Trend Projection

• To forecast a time series that has a long-term linear trend. The type of time series for which the trend projection method is applicable shows a consistent increase or decrease over time; because it is not stable; following Techniques are used:

• Equation for Linear Trend Tt = b0 + b1t• Calculating the Seasonal Indexes• De-seasonalizing the Time Series• Seasonal Adjustments• Cyclical Component• Regression Analysis• Curve Fitting: Curve fitting is the process of finding a linear or non-linear, relationship between the

dependent variable (which is usually the demand in forecasting) and an independent variable. It is helpful in causal methods where the demand is said to depend upon some factor(s), as also in the decomposition methods of time series analysis where a trend-line is to be obtained prior to forecasting/estimating the demand in a future time period.

• CAUSAL METHODS• Regression and Correlation - Regression is an estimation of the dependent variable, say Y, from the

independent variables X1, X2, X3, . . . XN. A regression equation is an equation representing this relationship.

• Equation of a Line is Y = a + bx : In case of a straight line: If there are N points (X1, Y1), (X2, Y2), . . . (XN, YN), then the constants, a and b are determined by solving the simultaneous equations.

1. ∑ Y = a.N + b ∑ X and2. ∑ XY = a ∑ X + b ∑ X²

Y X X² XY. . . .. . . .. . . .∑ Y ∑ X ∑ X² ∑ XY

Page 74: Operation Management  ( ICWA Inter)

2.5 Capacity planning

• Capacity of a facility is referred to as its capability to produce.• Definition of Capacity: Capacity is the rate of output from an operating system per unit time.

Capacity is based on the output that the system can produce, store, and transport. • For example, a cement plant could be capable to produce 3000 tons per day (tpd) of cement.

Output is also measured in terms of number of products that could be produced from the process.

• Capacity is classified in many ways such as budgeted, dedicated, productive, protective, rated, safety, standing, and demonstrated. Mainly, the classification of capacity is talked in terms of:

• Designed or rated capacity• Planned capacity• Demonstrated capacity

• Designed or Rated Capacity: Designed capacity is also the maximum capacity, which a facility can achieve. It defines the highest normal output that a process could achieve. Designed capacity is usually higher than the normal output rate.

• The designed capacity of a process is calculated by taking into account the following:• • Number of machines available.• • Capacity of each machine.• • Number of shifts operated.• • Duration of each shift.• • Number of workdays in the period under consideration.

Page 75: Operation Management  ( ICWA Inter)

• Planned Capacity: Planned capacity is the capacity, which is maintained or achieved in normal operations. Production plans and schedules are worked out based on planned capacity. Planned capacity is usually less than the designed capacity due to the following reasons:

• Unexpected demand comes from some customers. Important customers often ask for shorter delivery to meet their urgent requirements, which need quick response and disturbs the planned programme.

• Preventive and predictive maintenance need time and influence the available time for production. Any variation in the time taken in completing the preventive and predictive maintenance would adversely affect the planned capacity. Preventive and predictive maintenance are important for uninterrupted work as the possibilities of breakdowns are reduced.

• Corrective repairs need time to take care of the unexpected breakdowns, which adversely affect the capacity of the process.

• Running at maximum capacity could be sustained for short time as both men and machines are strained, if they have to operate at the maximum capacity. If it is not taken care, the effect is harmful to both men and the machines. Therefore a reasonable efficiency is taken into consideration while determining the planned capacity. Normally it is 85 to 90 percent

Page 76: Operation Management  ( ICWA Inter)

• Demonstrated Capacity

• The actual level of output for a process over a period of time is known as the demonstrated capacity. Demonstrated capacity deals with the actual production over a time rather than the calculated designed capacity or planned capacity. Demonstrated capacity is determined by averaging the recorded figures of actual output over a period of time.

• Demonstrated Capacity might differ from both the designed and the planned capacities for various reasons, such as:

• Product mix• Operator skill and experience• Health of equipment or machines• Type of jobs• Quality of materials• Inaccurate standards for process performance• Idling time• Blockages• Rejection due to poor quality• Training time of the operators• Other factor

Page 77: Operation Management  ( ICWA Inter)

• Efficiency = Standard time / Actual time

• Utilization = Actual hours/Scheduled available hours

• Planned capacity = Designed capacity × Efficiency × Utilization factor

• Productivity = Efficiency x Utilization

• Illustration : A worker is employed for 12 hours. During this period he takes 8 hours to complete a job with the standard time of 7 hours. Calculate the productivity of the workers as a percentage.

• Efficiency = Actual hours used / Standard time allowed= (7 /8) x100 = 87.5%

• Utilization = Actual time worked / Hours available= (8 / 12) x100 = 66.67%

• Productivity = Efficiency x Utilization = 87.5% x 66.67% = 58.83%

• Productivity = Standard hours of output / Clock time scheduled = (7 / 12) x 100 = 58.33%

Page 78: Operation Management  ( ICWA Inter)

• Capacity Requirement Plans: Forecast for demand of the product is the base for estimating the short-term workload on the facility. Companies make plans for a period of about one year and workout the expected output of different products or services based on the forecast. Capacity Requirement Plans (CRP) looks into the individual operations by using the routine information. Each operation is valued in standard hours, which results in total hours required per work center per time period.

• Rough Cut Capacity Plans: Rough Cut Capacity Plans (RCCP) serves the Master Production Schedule (MPS) for one or two years. RCCP is used to check the balance of scheduled items, normally finished goods, and time period. RCCP looks at the workload for each critical area by time period.

• Resource Requirement Planning: Resource Requirement Planning (RRP) serves the production plan and covers a number of years. Longer-term capacity requirements are difficult to determine due to the uncertainties in the future market demand and technologies. RRP is interactive. What-if module is used.

• Input /Output control and operation sequencing: Input /Output control and operation sequencing are related to the daily plan and provides the means to control the volume of work and determines the priority sequence in which it is required to be produced.

• Input /Output Control: It is a control technique where the planned and actual inputs are monitored. Actual input is compared to planned inputs to identify where work center output might vary from the plan because work is not available at the work center. Actual output is also compared to the planned output to identify problems within the work center. Planned and actual inputs as well as outputs have an impact on the Work-in-Process (WIP) inventory.

Page 79: Operation Management  ( ICWA Inter)

• Calculation of Capacity: Following steps are taken in the calculation of capacity:1. Prepare a flow chart for the process. Stream line the operation or plan parallel operations as needed.2. Assign time for every activity in the process over the same time period for which the capacity of the

process is to be measured; say year, month, week or a day.3. Use a common unit of measurement for the entire process.4. Determine the designed capacity of the process. Designed capacity of individual activity as well as the

overall capacity of the process should be worked out. This would require consideration of operation whether in sequence or in parallel.

5. Work out planned capacity for the overall process based on utilization factor and efficiency.6. Determine the demonstrated capacity based on the observed results over time.7. Compare demonstrated, planned and designed capacities and decide on

1. Reducing the input rate.2. Adding resources to increase the upper limit on process capacity.3. Evaluating the current uses of capacity.

• The management of capacity is the key planning responsibility of operations managers. All other operations planning takes place within the framework set by capacity decisions. Capacity management is concerned with the matching of the capacity of the operating system and the demand placed on that system. A Systematic Approach to Capacity Decisions

• Although each situation is somewhat different, a four-step procedure generally can help managers make sound capacity decisions. In describing this procedure, we assume that management has already performed the preliminary step of determining existing capacity.1. Estimate future capacity requirements.2. Identify gaps by comparing requirements with available capacity.3. Develop alternative plans for filing the gaps.4. Evaluate each alternative, both qualitative and quantitative, and make a final choice.

Page 80: Operation Management  ( ICWA Inter)

• The demand forecast has to be converted to a number that can be compared directly with the capacity measure being used. Suppose that capacity is expressed as the number of available machines at an operation. When just one product (service) is being processed, the number of machines required, M, is

• Number of machines required = • Processing hours required for year's demand • Hours available from one machine per year after deducting desired cushion • DP• M = -----------------• N (1 – (C/100))• Where D = number of units (customers) forecasts per year• P = processing time (in hours per unit or customers)• N = total number of hours per year during which the process operates• C = desired capacity cushion• If multiple products or services are involved, extra time is needed to change over from one

product or service to the next. Setup time is the time required to change a machine from making one product or service to making another.Number of machines required=

Processing and setup hours required for year's demand, summed over all products• M = ----------------------------------------------------------------------------------------

Hours available from one machine per year after deducting desired cushion(Dp1 + (D/Q)s) + (Dp2 + (D/Q)s) + ……..(Dpn + (D/Q)s)

• M = ---------------------------------------------------------------------- N (1 – (C/100))

• Where Q = number of units in each lot & s = setup time (in hours) per lot

• Always round up the fractional part unless it is cost efficient to use short-term conditions such as overtime or stock outs to cover any shortfalls.

Page 81: Operation Management  ( ICWA Inter)

2.6 Process Planning:

• Process Planning is defined as the systematic determination of methods by which a product is to be manufactured economically and competitively. It consists of selecting the proper machines, determining the sequence of operations, specifying the inspection stages, and tools, jigs and fixtures such that the product can be manufactured as per the required specification. The detailed process planning is done at each component level. : The activities that are associated with process planning are:

• List of operations to be performed and their sequence.• Specifications of the machines and equipment required.• Necessary tooling, jigs and fixtures. • Gives the manufacturing details with respect to feed,

speed, and depth of cut for each operation to be performed.• It gives the estimated or processing time of operations.

• Steps in Process Planning1. Detailed study of the component drawings to identify the salient features that influence process

selection, machine selection, inspection stages and tooling required.2. List the surfaces to be machined.3. The surfaces to be machined are combined into basic operations. This step helps in selection of

machines for operation.4. Determine the work centre, tools, cutting tools, jigs and fixtures and inspection stages and

equipment.5. Determine the speed, feed and depth of cut for each operation.6. Estimate the operation time.7. Find the total time to complete the job taking into account the loading and unloading times,

handling times, and other allowances.8. Represent the details on the process sheet.

Page 82: Operation Management  ( ICWA Inter)

• A number of tools help production manager to understand the complexities of process design and redesign. Flow Diagrams: It is a drawing used to analyse the movement of people or material or product to understand, analyse and communicate the process to others.

• Assembly Charts: Assembly charts are used to provide an overall macro view of how materials and sub-assemblies are assembled to form finished products. These charts list all major materials, components, sub-assembly operations, inspections and assembly operations.

• Process Charts: A process chart is understood as a graphic representation of events and information relating to them during a series of actions or operations

• Application of BCA (Break-even Cost Analysis) in the choice of machines or process, this analysis is the most convenient method for selecting the optimum method of manufacture or machine amongst the competing ones. The cost estimates of the competing methods (both fixed and variable costs) are prepared and a particular quantity N is determined at which the alternatives give the same cost.

• If the quantity to be manufactured is less than N the process with lower fixed cost is selected and if the quantity to be produced is more than N the process with lower variable cost is selected.

• Let FA = the Annual Fixed Cost of Machine A & FB = the Annual Fixed Cost of Machine B• VA = Variable Cost per unit for Machine A & VB = Variable Cost per unit for Machine B• N = Quantity at which costs on both machines will be equal. Flow Diagrams: It is a drawing

used to analyse the movement of people or material or product to understand, analyse and communicate the process to others.

Total cost on machine A = Total cost on Machine B for Quantity N

F A + VA.N = FB+VB.N & N (VA-VB) = (FB- FA), therefore, N = (FB – FA) / (VA – VB)

Page 83: Operation Management  ( ICWA Inter)

Principles of Layout• Plant Layout: Meaning, Definition and Scope: A plant layout refers to the arrangement of

machinery, equipment and other industrial facilities – such as receiving and shipping departments, tools rooms, maintenance rooms, employee amenities, etc., for the purpose of achieving the quickest and smoothest production at the least cost.

(i) The Principle of Minimum Travel: Men and materials should travel the shortest distance between operations so as to avoid waste of labour and time and minimize the cost of materials handling.

(ii) Principle of Sequence: Machinery and operations should be arranged in a sequential order. This principle is best achieved in product layout, and efforts should be made to have it adopted in the process layout.

(iii) Principle of Usage: Every foot of available space should be effectively utilized. This principle should receive top consideration in towns and cities where land is costly.

(iv) Principle of Compactness: There should be a harmonious fusion of all the relevant factors so that the final layout looks well integrated and compact.

(v) Principle of Safety and Satisfaction: The layout should contain built in revisions for safety for the workmen. It should also be planned on the basis of the comfort and convenience of the workmen so that they feel satisfied.

(vi) Principle of Flexibility: The layout should permit revisions with the least difficulty and at minimum cost.

(vii) Principle of Minimum Investment: The layout should result in savings in fixed capital investment, not by avoiding installation of the necessary facilities but by an intensive use of available facility

Page 84: Operation Management  ( ICWA Inter)

• Process Layout : Also called the functional layout, layout for job lot manufacture on batch production layout, the process layout involves grouping together of like machines in one department. For example, machines performing drilling operations are fixed in the drilling department machines performing casting operations are grouped in the casting department;

• Product Layout: Also called the straight-line layout or layout for serialized manufacture (the term straight-line, as applied to production, refers to the movements which do not involve backtracking of crossing of the line of movement of the product), the product layout involves the arrangement of machines in one line

Page 85: Operation Management  ( ICWA Inter)

Process Layout Product Layout

1. Reduction in the investment on machines as they are general purpose machines.

1. Mechanisation of materials handling and consequent reduction in materials handling cost.

2. Greater flexibility in production. 2. Avoidance of bottlenecks.

3. Better and more efficient supervision possible through specialization.

3. Economy in manufacturing time.

4. Better scope for expansion. 4. Better production control.5. Better utilization of men and machines.

5. Less floor area required per unit of production

6. Easier to handle breakdowns of equipment by transferring work to another machine or station.

6. Minimum investment in work-in-progress

7. Full utilization of the plant. 7. Early detection of mistakes or badly produced items.

8. Greater incentive to individual workers to raise the level of their performance.

8. Greater incentive to a group of workers to raise their performance.

Page 86: Operation Management  ( ICWA Inter)

Cellular Manufacturing (CM) Layouts• In cellular manufacturing (CM), machines are grouped into cells, and the

cells function somewhat like a product layout within a larger shop or process layout. Figure is an illustration of CM. Each cell in the CM layout is formed to produce a single parts family – a few parts all with common characteristics, which usually means that they require the same machines and have similar machine settings.

Page 87: Operation Management  ( ICWA Inter)

Fixed Position Layout• As the term itself implies, the fixed position layout involves the movement of

men and machines to the product which remains stationary. In this type of layout, the material or major component remains in a fixed location, and tools, machinery and men as well as other pieces of material are brought to this location. The movement of men and machines to the product is advisable because the cost of moving them would be less than the cost of moving the product which is very bulky.

Page 88: Operation Management  ( ICWA Inter)

Criteria for Selection and Design of Layouts• The various methods used for selecting the best layout among several

alternatives layouts are illustrated below with example:1. Travel Chart Method

• The travel chart which is also known as from-to-chart is helpful in analysing the overall flow of material. It shows the number of moves made between departments and identifies the most active departments.

2. Load-Distance Analysis Method• Load-distance analysis is useful in comparing alternative layouts to

identify the one with the least product or material travel time per period. This method helps to minimise transportation costs by evaluating alternate layouts on the basis of the total of the product of actual distance moved and the load (the units moved) for each layout alternative. Alternatively, the material handling costs can be computed directly by multiplying the number of loads by the material-handling cost per load. The layout with the lowest total (load x distance) or total (load x cost) is the best choice.

Page 89: Operation Management  ( ICWA Inter)

PROJECT MANAGEMENT – DEFINITION

• Project is a activity for development product in time, within specified budget, in conformance with the pre-determined performance specifications. It is a set of finite activities that are usually prepared only once and have well designed objectives, using a combination of human and non-human resources within limits of time. It consists of a series of non-routine, interrelated activities with a goal that must be completed with a set amount of resources and within a set time limit.

• Project Management is a scientific way of planning, implementing, monitoring and controlling the various aspects of project, such as time, money, materials and other resources (e.g., manpower) with the intention of achieving the basic objectives or goals (technical, costs, time) while formulating a project.

Page 90: Operation Management  ( ICWA Inter)

Project Management• Project Management Institute (PMI) identifies six basic

functions that project management must address. These are:• Manage the project’s scope to define-the goals and the work

to be done in sufficient detail to facilitate understanding and correct performance by participants,

• Manage the human resources involved in a project effectively,

• Managing communications to see that appropriate parties are informed and have sufficient information to keep the project coordinated,

• Manage time by planning and meeting schedules,• Manage quality so that project results are satisfactory, and• Manage costs to see that project is performed at the

minimum possible cost and within the budget, if possible.

Page 91: Operation Management  ( ICWA Inter)

Project Life Cycle steps:

1. Market Needs 1. Conception phase2. Definition Proposal 2. Definition phase3. Feasibility Studies4. Planning Estimating 3. Planning and organising phase5. Experimenting6. Design Development7. Prototype Testing 4. Implementation

phase8. Commissioning 5. Project clean-up

phase

Page 92: Operation Management  ( ICWA Inter)

A Framework for Project Management Issues:

Element Description

• Strategy The high-level requirements of the project and means to achieve them.

• Structure The organisational arrangement to carry out the project

• Systems The methods for work to be designed monitored and controlled.

• Staff Selection, recruitment, management and leadership of staff working on the project staff working on the project.

• Skills The management and technical tools available to the project manager and the staff.

• Style/culture The underlying way of working and interrelating within he work team or organisation.

• Stakeholders Individuals and groups who have an interest in the project process and outcome.

Page 93: Operation Management  ( ICWA Inter)

Project Selection Technique :

• Cost benefit analysis • Risk and sensitivity analysis• Project Execution Planning Techniques• Work breakdown structure (WBS), • Project execution plan (PEP),• Project responsibility matrix, and Project management manual.• Project Scheduling and Coordinating Techniques

• Bar chart, • Project life cycle ,• Line of balance (LOB), Networking techniques (PERT/CPM).• Project Monitoring and Progressing • Progress measurement technique,• Performance monitoring technique,• Updating, reviewing and reporting technique.• Project Cost and Productivity Control • Productivity budgeting technique,• Value engineering, and Cost calculation using WBS.• Project Communications and Clean-up Techniques Control Room, and

Computerised information systems.

Page 94: Operation Management  ( ICWA Inter)

• Bar Chart: This is a pictorial device in which the activities are represented by horizontal bars on the time axis. The left-hand end of the bar shows the beginning time, the right-hand end the ending time. The duration of the activity is indicated by the length of the bar. The manpower required for the activity is shown by a number on the bar.

• Gantt chart is one of the oldest techniques used for planning, scheduling and controlling of projects. Gantt chart was developed by H.L. Gantt in 1917 and is in use till today. Gantt charts were used even before computer came on the scene. Even today, Gantt chart applies to manufacturing as well as service organizations.

• Gantt chart is a graphical representation of a series of activities drawn to a. time scale. Horizontal axis (X-axis) represents time and vertical axis (Y-axis) shows the activities to be performed. The Gantt chart shows activities to specific jobs at individual / work centers by horizontal bars. Also known as a ‘bar chart’ because of its graphic presentation of the information, the position and the length of the horizontal bar indicates the start and completion date of the activity

Page 95: Operation Management  ( ICWA Inter)

Network Techniques:• These are more sophisticated than the traditional bar chart. In these techniques, the

activities, events, and their inter-relationships are represented by a network diagram, also called an arrow diagram.

• Network-Based Scheduling Techniques: These techniques are the Program Evaluation and Review Technique (PERT) and the Critical Path Method (CPM). Both are based on the use of a network or graphical model to depict the work tasks being scheduled. Both were designed to schedule long-duration projects that were to be performed only once or in low volume. These are more sophisticated than the traditional bar chart. In these techniques, the activities, events, and their inter-relationships are represented by a network diagram, also called an arrow diagram.

• Network-Based Scheduling Techniques: These techniques are the Program Evaluation and Review Technique (PERT) and the Critical Path Method (CPM). Both are based on the use of a network or graphical model to depict the work tasks being scheduled. Both were designed to schedule long-duration projects that were to be performed only once or in low volume.

• Computer programs are available for both PERT and CPM, which are helpful in developing timely information about large projects, particularly those that are to be updated and revised several times before completion. Following techniques can be used to solve a problem through a network:

Page 96: Operation Management  ( ICWA Inter)

Symbols Used in Network• 1. Activity by → (arrow): Arrow can have any size or slope. It starts from tail and ends at the

head of arrow, e.g., assembly of parts, mixing of concrete, preparing budget, etc.• 2. Dummy activity ---------> (broken arrow): These activities consume no time. This is

introduced to prevent dangling. This happens when an activity ends without being joined to end event, thus breaking continuity.

• 3. Event O (circle or node): Event is represented by node. Event takes no time but it connects two or more activities. Events may be classified into three categories: merge event, burst event, merge and burst event, e.g. design completed, pipe line laid, started issue, tested.

• Earliest start time (ES): This is the earliest occurrence time for the event from which the activity arrow originates.

• Earliest finish time (EF): This is the earliest occurrence time for the event from which activity arrow originates plus duration for the activity : EF (a) = ES (a) +t

• Latest start time (LS): This is the latest occurrence time for the node at which activity arrow terminates minus the duration for the activity: LS = LF-t

• Latest finish time (LF): This is the latest occurrence time for the node at which activity arrow terminates.

Ability to measure uncertainty in estimating• a = Optimistic Time, b= Pessimistic Time, m = Most Likely Time• Single Time Estimate (Expected Time) “te” = (a + 4m + b) / 6• Variance: (square of sigma) = Square of ((b-a)/6)• Standard Deviation ( ) = Σ[Square of {(b − a)/6} ] and under root of the sum

Page 97: Operation Management  ( ICWA Inter)

• Floats and Slack Times: Float allows some flexibility in scheduling activities. An activity can be intentionally delayed if the delay will result in a more uniform workload or provides some other advantage. Some amount of float should be retained if possible, because float is like insurance. The float is useful under the following conditions: uncertain material deliveries, possible strikes, delayed drawing approvals and so on; it is wise to have a time cushion if it can be afforded.

• Total Float: Amount of time by which the completion of an activity could be delayed beyond the earliest completion time without affecting the overall project duration time.

• Free Float: Time by which the completion of an event can be delayed beyond the earliest finish time without affecting the earliest start of a subsequent (succeeding) activity is based on the possibility that all events occur at their earliest times, i.e., all activities start as early as possible.

• Free float for an activity is the difference between its earliest finish time and the earliest start time for its successor activity. It is that portion of the total float within which an activity can be manipulated without affecting the floats of subsequent activity.

• So, for all activities, the free float can take “t” values from ‘Total Float’ to ‘Zero’ but cannot exceed Total Float. Free float is useful for rescheduling the activities with minimum disruption of earlier plans.

• FF (I-J) = (Earliest time for event ‘J’-Earliest time for event ‘I’) - Activity time for (I-J)

• FS (a) = Minimum of ES times of all immediate successors of activity ‘a’- EF (a)

• FF = ES (Succeeding) - EF (Activity)

• FF = Total Float - Slack at Head Event

Page 98: Operation Management  ( ICWA Inter)

Difference between CPM and PERT• CPM originated from construction project while PERT evolved from R & D projects. Both CPM and

PERT share the same approach for constructing the project network and for determining the critical path of the network.

• There is some basic differences between PERT and CPM. PERT is associated with uncertainty in the time estimates for activity while in CPM these estimates are treated as fairly deterministic. CPM is also extended to cost-time trade-off decisions. As the project completion time is squeezed, the time for the lowest project cost is the optional decision for project planning PERT is considered event oriented while CPM is mainly activity oriented.

PERT CPM1 Time estimate is probabilistic with

uncertainty in time duration Three time estimates

Time estimate is deterministic with known time durations. Single time estimate

2 Event oriented Activity oriented

3 Focused on time Focused on time-cost trade off

4 More suitable for new projects More suited for repetitive projects

5 Most costly to maintain Easy to maintain

6 Suitable for complex projects where uncertain timing is like research programmes

Suitable where problems of resourceallocation exist like construction projects

7 Dummy activity required for propersequencing

Use of dummy activity not necessary

Page 99: Operation Management  ( ICWA Inter)

• Economic Batch Quantity (EBQ) or Economic Run Length (ERL): Two types of costs associated with lot manufacture are: (a) Set-up costs i.e., costs/unit which decrease with batch size. (b) Inventory carrying cost which increases with batch size.

• Economic Batch Qty. (EBQ) or Economic Run Length (ERL) = 2 x Annual demand x Set-up cost

Under root of ------------------------------------------- Unit cost x Inventory carrying cost (%)• If inventory carrying cost is expressed as carrying cost per unit per year for an item instead of as a percentage of

the value of its inventory, then, Carrying cost per unit per year Cc = C x l (Rupees) (i.e., unit cost x carrying cost as %age)

• 2 x A x S• The EBQ formula can be rewritten as EBQ = UNDER ROOT OF ---------- • Cc

• Economic Batch Quantity 2 x Annual Cost x Setup cost

= Under Root of --------------------------------------------------------------

Unit cost Inventory carrying cost per unit per year (Rs)• Considering the case where production and consumption of an item takes place simultaneously• Let A = Annual demand for an item & d = demand or consumption rate (unit/time period (say weekly)• p = production rate (units/time period (say weekly)] & S = set up cost per set up• C = cost per unit of item produced & I = Inventory carrying cost per year per unit as a % ge of value of inventory• Economic batch quantity (Non-instantaneous supply)

• Economic Batch Quantity 2 x A x S= Under Root of ---------------------------------------

C x I x (1 – d / p)

Page 100: Operation Management  ( ICWA Inter)

Just-in-Time:• JIT is defined as “a philosophy of manufacturing based on

planned elimination of all waste and continuous improvement of productivity.”

• It encompasses the successful execution of all manufacturing activities required to produce a final product, from design engineering to delivery and including all stages of conversion from raw materials onward. The primary elements of JIT are to have only the required inventory when needed, to improve quality to zero defects, to reduce lead times by reducing set-up times, queue lengths and lot sizes, to incrementally revise the operations themselves and to accomplish these things at minimum cost. In the broad sense, it applies to all forms of manufacturing, job-shop, process as well as repetitive

Page 101: Operation Management  ( ICWA Inter)

• Not all companies use the term JIT. • IBM uses the term continuous flow manufacture; • Hewlett-Packard calls it both stock-less production and the repetitive

manufacturing system, • GE calls it management by sight,• Boeing calls it lean manufacturing, • Motorola calls it short cycle manufacturing and • Several Japanese use the term “The Toyota System”. • Some companies use the term time based competition (TBC). • Just-in-time systems are also known as “zero inventory”, “synchronous

manufacturing”, “material as needed” and “Kan-ban system”.

• Lean Production and JIT• Lean production has its roots in the Toyota Automobile Co., of Japan, where

waste was to be avoided at all costs:• (i) the waste in time caused by having to repair faulty products• (ii) the waste of investment in keeping high inventories and• (iii) the waste of having idle workers.

Page 102: Operation Management  ( ICWA Inter)

• The elements of lean production are: -

(i) To consider the organisation in terms of a supply chain of value streams that extends from suppliers of raw materials, through transformation to the final customer.

(ii) To organise workers in teams and to have everyone in the organisation conscious of his or her work(iii) To produce products of perfect quality and to have continuous quality

(iii) improvement as a goal.(IV) To organise the operation by product or cellular manufacturing,

rather than using a functional or process lay-out.(v) To operate the facility in a just-in-time mode.

• Just-in-time is a key element of lean production, (conceived by Taiichi Ohno, the former president of Toyota Motor Co. of Japan in the 1980s).

• The Japanese manufacturing success, with increased productivity, low product cost and often superior quality products which is very much be attributed to JIT manufacturing.

Page 103: Operation Management  ( ICWA Inter)

JIT means(1) the waste of investment in keeping high inventories and(2) the waste of having idle workers.

The elements of lean production are: -(i) To consider the organisation in terms of a supply chain of value streams that extends from

suppliers of raw materials, through transformation to the final customer.(ii) To organise workers in teams and to have everyone in the organisation conscious of his or

her work (iii) To produce products of perfect quality and to have continuous quality improvement as a

goal.(IV) To organise the operation by product or cellular manufacturing, rather than using a

functional or process lay-out.v) To operate the facility in a just-in-time mode.

JIT means(i) Producing the quantity of units that is needed, no more, no less.(ii) Producing them on the date and at the time required, not before and not after.(iii) That a supplier delivers the exact quantity demanded, at the scheduled time and date.

• Any deviations from these requirements mean that either ‘resources’ are being unnecessarily wasted or that ‘customer’s needs’ are not being respected.

• JIT is simply an acronym for being efficient, organised and rigorous, having the ability to be flexible, with an ultimate objective of satisfying the customer, respecting delivery time, having the specified quality and producing at minimum cost.

Page 104: Operation Management  ( ICWA Inter)

Just-in-time Philosophy• JIT is a philosophy of continuous and forced problem solving. With JIT,

supplies and components are “pulled” through a system to arrive where they are needed and when they are needed. When good units do not arrive in time (just as needed), a “problem” has been identified.

• This makes JIT an excellent tool to help operations managers add value by driving out waste and unwanted variability. Because there is no excess inventory or excess time in a JIT system, costs associated with unneeded inventory are eliminated and throughput improved. Consequently, any deviations from these requirements mean that either ‘resources’ are being unnecessarily wasted or that ‘customer’s needs’ are not being respected.

Concepts of JITThe three fundamental concepts of JIT are:(i) Elimination of waste and variability(ii) “Pull” versus “Push” system and(iii) Manufacturing cycle time (or “throughput” time).

Page 105: Operation Management  ( ICWA Inter)

Overview of JIT manufacturingJIT manufacturing includes many activities:

(i) Inventory reduction: JIT is a system for reducing inventory levels at all stages of production viz. raw materials, work-in-progress and finished goods.

(ii) Quality improvement: JIT provides a procedure for improving quality both within the firm and outside the firm.

(iii) Lead time reduction: With JIT, lead time components such as set-up and move times are significantly reduced.

(IV) Vendor control / Performance improvement: JIT gives the buying organisation greater power in buyer supplier relationship. The firm moves from a situation where multiple suppliers are used to a situation where only one or two suppliers are used for supplying most parts. With fewer suppliers; the buying organisation has more power because it is making larger purchases from each vendor. Also, the buying organisation can now impose higher requirements on each supplier in terms of delivery and quality.

(v) Continuous Improvement: In the JIT system, existing problems are corrected and new problems identified in a never-ending: approach to operations management.

(VI) Total Preventive Maintenance: JIT emphasises preventive maintenance to reduce the risk of equipment break-downs which may cause production hold ups and increase in manufacturing cycle time due to delays.

(vii) Strategic Gain: JIT provides the firm’s management with a means of developing, implementing and maintaining a sustainable competitive advantage in the market place.

Page 106: Operation Management  ( ICWA Inter)

Replacement of Machine and Other Relevant Concept:• Machines are purchased and replacement of old machines is made mainly for two

reasons:1. To increase the productive capacity and2. To reduce cost of production.

• Various other reasons for replacement are the following:1. To get rid of worn out, broken down or obsolete machines,2. To accommodate larger sizes of work and increase the machine capacity,3. To reduce labour cost by introducing semi-automatic machines or machines

more than one of which can be operated by a single operator,4. To simplify operations by using automatic machines which are capable of

performing variety of work usually performed by a number of different machines,5. To minimise repair cost and reduce idle time.

• An analysis of the above five reasons will lead to either increase in capacity or reduction in cost or both.

• Replacement Program: It is prudent to have phased policies of machine replacement plans than to wait until breakdown occurs, causing production hold ups. There are different forms of the programme.

Page 107: Operation Management  ( ICWA Inter)

Replacement Program:It is prudent to have phased policies of machine replacement plans than to wait until breakdown occurs, causing production hold ups. There are different forms of the programme.

1. A definite amount of money or a certain percentage of earning of the company is used each year to replace existing machines which are either superseded by improved models or are not in tip top condition or are having insufficient capacity

2. Replacement is made of the oldest or most inadequate machine each year by up to date machines of greater accuracy or higher capacity. Sometimes automatic machines are gradually introduced in this way which is capable of doing several operations with lesser number of operators.

3. The economy of working on various machines are studied .and replacement of machines are made only to have a definite cost reduction. Whatever may be the programme, replacement question is to be carefully considered in prosperous and normal years only. In slump or dull periods, replacement should not be done unless it is unavoidable.

• The basic concept of ‘Replacement Theory’ is to take decision about the time when an item of ‘Capital Asset’ should be replaced by another of the same type or by a different one. In other words ‘Replacement Theory’ concerns about ‘optimum period of replacement’.

Page 108: Operation Management  ( ICWA Inter)

• For the purpose of ‘Replacement Theory’ Capital equipment are basically divided under two broad categories:

• 1. Replacement policy for Equipment which deteriorates with time gradually;

• 2. Items which fail suddenly and cannot be made workable by incurring repairing costs.

• Again, replacement of Capital equipment which gradually deteriorates with time can be worked-out under two different ways: Ignoring the concept of time value of money and considering the time value of money.

• (i) When time value of money is not considered: Determination of optimum period of ‘Replacement’ Let us, consider the following formula

• T® = C – S + ∑ Mt and A® = 1/r (C – S + ∑ Mt)• where, T(r) denotes owning and maintaining cost of keeping an equipment

for ‘r years’• C = Capital cost of the equipment• S = Salvage value of the equipment at the end of ‘r years’• Mt = Summation of Cost of maintenance in year t for r years• The optimal replacement period would be the year, in which A(r) = Year in

which the Average cost is minimum.

Page 109: Operation Management  ( ICWA Inter)

3.1 PRODUCTIVITY• The I.L.O. publication, “Higher Productivity in Manufacturing Industries” has

defined productivity as the ratio between output of wealth and the input of resources used in the process of production.

• The Organisation for European Economic Co-operation (OEEC) has defined the concept of productivity as follows: “In its widest sense, it may be said that productivity is the measurement of the economic soundness of the means.”

• The organised labour has tried to interpret productivity as the value of all output divided by man-hours of work.

• The term productivity can be defined in two ways. In simple terms, productivity is defined as a ratio between the output and input – between what is produced and what is required to produce it.

• Effectiveness = Target Achieved / Target Achievable• Productivity = Output obtained / inputs consumed• Productivity = Value of Gross Output / Total Value • Productivity = Performance achieved / Resources consumed • Productivity = Effectiveness / Economy in Consumption

Page 110: Operation Management  ( ICWA Inter)

• Productivity = Gross Output = Value Added• All Variables Main Variables• Production Efficiency = Maximum Effectiveness

Minimum Cost• Input Efficiency = Actual Consumption

Desired or Standard Consumption• Organisational Effectiveness = Achieved Performance Target

Desired Target or Performance

• Thus, organizational effectiveness at the minimum cost may be called organizational efficiency. Efficiency enters into the picture only when monetary values (prices) are involved. In case the input and output data are available in value terms, not in physical units, productivity can be calculated after deflating them. Just like the estimation of production functions with deflated values, it will serve the purpose of estimating productivity in physical terms.

Page 111: Operation Management  ( ICWA Inter)

KAIZEN and Productivity• No matter what the definition of the productivity be (quality based or cost

based) either side of this is KAIZEN. It becomes much easier to remove the differing perception of management and labour since no one can dispute the value of improvements.

• The KAIZEN simply means improvements, on-going improvements involving everyone in the organisation from door-man to the chairman. One should have a religious feel in promoting the KAIZEN strategy. KAIZEN is a religion in order to lay a long term foundation for a sustained business activity as against a short-term approach for immediate pay off.

• Whenever you need to manage people, then you need to manage them from the heart, not with your head. If everyone starts changing with, team spirit, cooperation, support self-commitment comes automatically. This thinking requires ‘Change of Heart’ on the part of the chief executive first, it is then followed by ‘Change of Heart’ of the employees and even the labour-unions too.

• Different companies have different approaches to overcome hurdles in the management of productivity improvements. These are as follows:

(a) Management by internal motivation (i.e., KAIZEN).(b) Management by incentives.(c) Management by fear.

Page 112: Operation Management  ( ICWA Inter)

Quality Circles: • Japan was worst hit during World War II and the industrial units in Japan were

going from bad to worse and it was necessary for Japan to put their shattered economy back on the rails. To do so they had to wipe out their poor image of quality. Later with the help of American quality management experts Dr. Deming and Dr. Juran, the Japanese managers learnt the quality control techniques and different aspects of quality management. It was at this point, Dr. K. Ishikawa added a new dimension to this effort by involving task performers at the grass root levels to work towards the improvement of quality. He motivated the workmen to follow quality control technique in their shop floors by forming small groups and sought their help in solving the daily problems of the company. After all the persons who are actually doing the job knows the job best. This is the basic philosophy behind forming QUALITY CIRCLES. Japan swears by PDCA - Deming Wheel/Deming Cycle/P-D-C-A Cycle

Deming Wheel/Deming Cycle/P-D-C-A Cycle• P - Plan (process) the improvement• D - Do - Implement the plan• C - Check - Check how closely result meets goals• A - Act - Use the improved process as standard practice

Page 113: Operation Management  ( ICWA Inter)
Page 114: Operation Management  ( ICWA Inter)

• According to the formal definition given by Union of Japanese Scientists and Engineers (JUSE) “Quality Circle is a small group formed to perform voluntarily QC activities leading to self-development within the work place”.

Structure• The success of a QC mainly depends upon the structure and the main feature of

a QC principle lies in that form top management to a small worker are tied up. The following basic elements constitute the structure of a QC: (i) Top Management., (ii) Steering Committee. ,(iii) Coordinating Agency., (iv) Facilitates. ,(v) Leaders/Deputy Leaders. , (vi) Members.

Quality Circle Technique: It is necessary for QC to adopt following technique in order to smooth working of QC.1. Team is necessary for QC to adopt following technique in order to smooth

working of QC.2. Pareto Principle3. Collection of Data4. Analysis of Problem5. Problem Selection and Solution6. Presentation to Management7. Code of Conduct.

Page 115: Operation Management  ( ICWA Inter)
Page 116: Operation Management  ( ICWA Inter)

TQM Concepts - 1

• The above principles are bandied freely around in the above discussion. Its worth dwelling with each for a moment.

• Be customer-focused means everything you do will be done by placing the customer in the centre. The company should regularly check customer’s attitudes. This will include the external and internal customer concept.

• Do it right first time so that there is no rework. This essentially means cutting down on the amount of defective work.

• Constantly improve, this allows the company gradually to get better. One of the axioms use by TQM people is “A 5% improvement in 100% of the areas is easier than a 100% improvement in 5% of the areas.

• Quality is an attitude The attitude is what differentiates between excellence and mediocrity. Therefore it’s very important to change the attitude of the entire workforce i.e., basically the way the company works company’s work culture.

• Communication: Telling the staff what is going on means keeping the entire workforce informed about the general direction the company is headed in typically this includes them briefings, one of the main elements to TQM.

Page 117: Operation Management  ( ICWA Inter)

TQM Concepts - 2• Training and education of the workforce is a vital ingredient, as

untrained staff tend to commit mistakes. Enlarging the skill base of the staff essentially makes them do a wider range of jobs and do them better. In the new system of working under TQM educating the staff is one of the principles.

• Measurement of work allows the company to make decisions based on facts, it also helps them to maintain standards and keep processes within the agreed tolerance levels.

• The involvement of senior management is essential. The lack of which will cause the TQM program to fail.

• Getting employees to make decision on the spot so that the customer does not face any inconvenience in empowering the employees.

• Making it a good place to work. • In many an organisation there exists a lot of fear in the staff. The fear

of the boss, fear of mistakes of being sacked. TQM program in any company filled with fear cannot work, therefore fear has to be driven out of the company before starting of TQM program.

Page 118: Operation Management  ( ICWA Inter)

• Introduce team working, its boosts employee morale. It also reduces conflict among the staff. It reduces the role of authority and responsibility, and it provides better more balanced solutions. In a lot of companies teamwork is discouraged, so TQM programs must encourage it.

• Organise by process, not by function. This concentrates on getting the product to the customer by reducing the barriers between the different departments.

Basic Approach : TQM requires six basic concepts:1. A committed and involved management to provide long-term top-to-bottom organizational support.2. An unwavering focus on the customer, both internally and externally.3. Effective involvement and utilization of the entire work force.4. Continuous improvement of the business and production process.5. Treating suppliers as partners6. Establish performance measures for the processes

Five Principles of TQM

Page 119: Operation Management  ( ICWA Inter)

What is Quality? - Quality is:

1. Conformance to specifications.2. Conformance to requirements.3. What the customer thinks it is.4. Measure of the conformance of the product/service to the

customer’s needs.5. Combination of aesthetics features and design.6. Value for money.7. The ability of a product to meet customer’s needs.8. Meeting or exceeding customer requirements now and in the

future.9. Fitness for use of a product/service by the intended customer.10. A customer’s perception of the degree to which the

product/service meets his/her expectations.11. Totality of features and characteristics of a product/service that

bears on its ability to satisfy a stated or implied need.

Page 120: Operation Management  ( ICWA Inter)

• New Thinking about QualityOld Quality is “small q” New Quality is “Big Q”About products About organisationsTechnical StrategicFor inspectors For everyoneLed by experts Led by ManagementHigh grade The appropriate gradeAbout control About improvement

• Eight Dimensions of Product Quality1. Performance 2. Features3. Reliability 4. Serviceability5. Aesthetics (appearance)6. Durability 7. Customer service8. Safety

Page 121: Operation Management  ( ICWA Inter)

Principles of Total Quality Control (TQC)

1. Top management policies - Zero defects, continuous improvement etc.2. Quality control training for everyone3. Quality at product/service design stage4. Quality materials from suppliers5. Quality control in production (SQC)6. Quality-control in distribution, installation and usage.

• Preparing Managers for TQM: While preparing managers for TQM the following three factors have to be considered.

1. Managers must be empowered. They are expected to further delegate this and if they don’t have power and resources at their disposal, how will they delegate it.

2. Manager must evaluate their style. They will have to consider the way they are doing their jobs currently and how they will have to change as TQM is introduced.

3. Management training at TQM has to be given careful attention. This will acquaint manager with TQM, dispose them favourably towards TQM, show them ways of gradually introducing TQM ideas, and convince them of TQM’s benefits and gains.

Page 122: Operation Management  ( ICWA Inter)

TQM ORGANIZATION

Increased profits

Reduced Costs Increased Sales

Reduce waste and error Satisfaction of Customer’s Needs

Continuous Improvement

TQM Programme

Total Quality Management Organisation

Page 123: Operation Management  ( ICWA Inter)

SIX SIGMA (6σ) QUALITY:

• An Overview: ‘Sigma’ is used to designate the distribution or spread about the mean (average) of any process. Sigma (σ) is another word for standard deviation. For a business or manufacturing process, the Sigma value is a metric that indicates how well that process is performing.

• The higher the sigma value, (2 σ, 3 σ, 4 σ etc.) the better the process. Sigma measures the capability of the process to perform defect-free-work. A defect is anything that results in customer dissatisfaction. With 6 σ, the common measurement index is ‘defects-per-unit’, where unit can be virtually anything-a component, a piece of a material, a line of code, an administrative form, a time frame, a distance, etc.

• The sigma value indicates how often defects are likely to occur. The higher the sigma value, the less likely a process will produce defects. As sigma value increases, costs go down, cycle time goes down, and customer satisfaction goes up.

• A 6σ process simply means that between the target specification and the tolerance limit six standard deviations can be fitted-in, 3 σ = 93.3193% , 5 σ = 99.9767% and the 6 σ process capability means 3.4 ppm defects or 99.99966% good.

Page 124: Operation Management  ( ICWA Inter)

• First, it is a statistical measurement. It tells us how good our products, services and processes really are. It allows us to draw comparisons with other similar or dissimilar products, services and processes. We can see where we need to go and what we must do to get there. In other words, 6s helps us establish our course and gauge our pace in the race for total customer satisfaction.

• Second, it is a business strategy. It can greatly help us gain a competitive, edge. The reason for this is very simple — as you improve the sigma rating of a process, the product quality improves and costs go down. Naturally, the customer becomes more satisfied as a result.

• Third, it is a philosophy. It is an outlook, a way that we perceive and work within the business world around us. Essentially, the philosophy is one of working smarter, not harder. This translates to making fewer and fewer mistakes in everything we do — from the way we manufacture products to the way we fill out a purchase order.

• As we discover and neutralize harmful sources of variation, our sigma rating goes up. Again, this means that our process capability improves and the defects (mistakes) go away. 6 σ is a disciplined Quality Improvement methodology that focuses on moving every process that touches the customers — every product and service — towards near perfect Quality. It is a measure of the Company’s Quality.

If you have to successfully implement 6s: • The Company should be: – Open to change• – Hungry to learn and• – Anxious to move quickly on a good idea• It is ‘6 σ quality, along with a culture of learning, sharing and unending excitement.

The DMAIC methodology for 6 σ consists of five steps namely: • Define (D), Measure (M), Analyse (A), Improve (I) and Control (C).

Page 125: Operation Management  ( ICWA Inter)

Benchmarking

• Benchmarking is the process of comparing one's business processes and performance metrics to industry bests or best practices from other industries. Dimensions typically measured are quality, time and cost. In the process of best practice benchmarking, management identifies the best firms in their industry, or in another industry where similar processes exist, and compares the results and processes of those studied (the "targets") to one's own results and processes. In this way, they learn how well the targets perform and, more importantly, the business processes that explain why these firms are successful.

• Benchmarking is used to measure performance using a specific indicator (cost per unit of measure, productivity per unit of measure, cycle time of x per unit of measure or defects per unit of measure) resulting in a metric of performance that is then compared to others.[

• A measurement of the quality of an organization's policies, products, programs, strategies, etc., and their comparison with standard measurements, or similar measurements of its peers.

• The objectives of benchmarking are (1) to determine what and where improvements are called for, (2) to analyze how other organizations achieve their high performance levels, and (3)to use this information to improve performance.

• The Benchmarking process has three categories of partners that can be selected • : Internal organisations, • : direct competitors, or • : non-competitors.

Page 126: Operation Management  ( ICWA Inter)

Eight Steps Benchmarking Process

• There are two forms of Benchmarking: strategic and functional or operational. • Operational Benchmarking focuses on the operational processes and practices and

service offered by an organisation. • Strategic benchmarking focuses on strategic marketing, financial, organisational and

technological issues facing an organisation. • The Benchmarking process consists of three general activities: Planning, Analysis, and

Integration/action.• Overall, the process follows the Plan-Do-Study-Act Cycle of all quality processes.

• It is recommended to use eight steps of benchmarking: • Planning: 1. Select Benchmarking subject and

appropriate team2. Identify performance indicators and Drivers3. Select Benchmark partners4. Determine data collection method and collect data

• Analysis: 5. Analyse performance gaps.• Integration: 6. Communicate Findings and identify projects

to close gaps• Action: 7. Implement plans and monitor results !• 8. Recalibrate benchmarks

Page 127: Operation Management  ( ICWA Inter)

Benchmarking and TQM

• Benchmarking is a tool that can be exceptionally useful in a TQM program. It is closely related to customer orientation. The companies that you select as benchmarking partners are those, which excel at satisfying customer in a given area.

• Benchmarking is an excellent source of ideas for quality improvement projects. It provides both ideas about ways of accomplishing tasks, and specific goals in terms of levels of performance.

• Benchmarking Purpose: • To establish a superior performance in the organisation by filling the gaps in performance by

putting in place the best available practice.• When to Use: Benchmarking is a tool used while the organisation wants to implement and

ensure the prevalence of TQM. This is done when each process is looked at independently and the performance is compared to that of others.

• How to Use: To progressively stimulate an improvement a company can use the foil types of benchmarking.

• Internal Benchmarking: The main aim of IB is to optimize performance through removal of errors the comparison in case of IB is generally between functions and similar organisation.

• Competitive Benchmarking: This type of benchmarking can be carried out on the basis of product, functions department or on a co. wide basis this is a cross comparison with in one industrial sector aimed at establishing best practice through the identification of gaps between your own and your competitors performance.

• Comparative Benchmarking: This type is one where comparison takes place across all business sectors aimed at establishing the practice in all areas.

Page 128: Operation Management  ( ICWA Inter)

Quality Management Systems• Quality is not a chance occurrence. It has to be built up consciously

and stage by stage through suitable processes, procedures, resources responsibilities and an appropriate organisation structure that knits all these factors together. The amalgamation of all these factors which are aimed at achieving desired quality levels consistently in what is termed as a Quality Management System (QMS).

• A formal quality system helps remove uncertainty by formalizing the Who, Why, Where, What and How of Quality so that processes for achieving quality are established, whereby customer satisfaction can be achieved consistently irrespective of the personnel involved. A quality system standard helps to check or implement a system against standard checkpoints, which ensure that all aspects of managing quality have been looked into. It also indicates to the customers, the quality status of the supplier’s organisation, which these days is becoming as important as the quality status of the product.

Page 129: Operation Management  ( ICWA Inter)

• Uses of the ISO 9000 Standards: The standard can be used for these purposes Internal Audit. An organisation can audit its existing systems with reference to the standard to provide feedback to management regarding the deficiencies of the system.

• Vendor Assessment: To assess and ensure a vendor’s capability to consistently meet the quality standards for products standards desired by the organisation.

• Supplier Capability: To provide confidence to its customers regarding its capability to consistently meet the quality standards desired by the customer.

• Contents of ISO 9000: The ISO 9000 is a series of five standards. A brief description of each is given on next page to highlight the essential difference between them.

• ISO 9000: This contains guidelines on the selection and use of this series of standards, along with definitions of key terms and explanation of basic quality concepts.

• ISO 9001: This is the most comprehensive standard in the series. It specifies system requirements in purchase, Design and Development, Production, Installation and Servicing.

• This standard is not necessary for all organisations having an in house design/development department. It is necessary only for those organisations who design or develop at least a few of their product specifically tailored to customers’ requirements.

Page 130: Operation Management  ( ICWA Inter)

Essence of the Standard: • To put it in the simplest of terms the standard (9001-3) recommends that an

organisation should:• Decide its Quality Policy• Determine how the policy is to be implemented and design a system accordingly• Implement the system• Review the system regularly to gauge its effectiveness• The 9004 provide guidelines to the organisation on all the above activities.• Quality system has to be tailor-made to suit the organisation’s requirements, so

as to be effective. Therefore, the standard only provides the basic framework for the system and offers unlimited freedom within the basic framework.

• Employee participation, morale, attitudinal change etc., though all these are mentioned in the form of guidelines in the 9004; all of which are important ingredients of the TQM philosophy. Therefore, an ISO 9004 has only taken one more step towards being the TQM Company and is not necessarily a TQM company. However, a TQM company will always conform to a Quality System standard, which may either be the ISO 9000 or an equivalent Certification. Certification is not mandatory for all organisations that conform to the standard.

Page 131: Operation Management  ( ICWA Inter)

• For example, if an organisation decides that vendors for a particular product should conform to the ISO 9000. It can send its own team of qualified auditors to assess the vendor’s organisation. However, an ISO 9000 certificate is a proof of conformance, which therefore obviates such individual assessments.

• Accreditation’s to the standard is achieved only after the QMS of an organisation is assessed and approved by a recognized third party certifying body. After certification the organization is assessed at regular intervals by the same certifying body to ensure continuous conformance.

• The body has to be accredited to the ‘National Accreditation Council for Certification Bodies”, (NACCS), UK, or the Dutch Government’s “Radd Voorde Certificate.” Presently there are no approved certifying bodies in India. More likely, organisations such as the Bureau of Indian Standards, the Confederation of Engineering Industry (CEI) may get themselves credited for the same. Until then, Indian as the British Standards Institute, Lloyd’s Register Quality Assurance Limited (LRCA), Bureau Veritas Quality International (BVQI) etc., or similar organisations is other countries.

Page 132: Operation Management  ( ICWA Inter)

(A) Implementation ISO:9000:

• There are a number of steps that are necessary to implement a quality management system.

1. Senior Management Commitment: The most important step in implementing a quality system that will meet or exceed an ISO 9000 standard is to acquire the full support of upper management The Chief Excessive Officer (CEO) must be willing to commit the resources necessary to achieve certification.2. Appoint the Management Representative: Once the commitment has been made, the process can proceed by adopting a project team approach and treating the same as other business undertaking and then management representative. This person is responsible for co-coordinating the implementation and maintenance of the quality system and is the contact person for all parties involved in the process, both internal and external. The implementation of the quality system should involve everyone in the organization. The standard requires the management representative be a person who is able to ensure that the quality system is effectively implemented and maintained irrespective of other responsibilities. 3. Awareness: This step requires an awareness program. Because the process is going to affect every member of the organization as well as require their input, and everyone should understand the quality system. They should know how it will affect day-to-day operation and the potential benefits.

Page 133: Operation Management  ( ICWA Inter)

(B) Implementation ISO:9000:

4. Appoint an Implementation Team: After everyone has been informed of the organizations intentions to develop the quality system, an implementation team should be assembled. This team should be drawn from all levels and areas of the organizations.

5. Training: The implementation team, supervisors and internal audit team should be trained. This activity can be accomplished by sending team leaders for training and by bringing the training in house for all team members through a one or two day seminar.

6. Time Schedule: This activity develops a time schedule, for implementation and registration of the system. The time frame will very demanding on the size and type of organizations and the extent of its existing quality system.

7. Select Element Owners: The implementation team selects owners for each of the system elements. Many of these owners will be members of the implementation team. Owners may has be assigned more than one elements. Each owner has the option of selecting a team to assist in the process.

8. Review & Record all the present-quality system. Copies of quality manuals, procedures, work instructions and forms presently in use are obtained. These documents are sorted into system elements to determine what is available and what is needed to complete the system.

Page 134: Operation Management  ( ICWA Inter)

(C) Implementation ISO:9000:

9. Write the Documents: Before written quality and procedure manuals — they can be combined into one document. Write appropriate work instructions to maintain the quality of specific functions. This process should involve every employee, because the best person to write work instructions is the one who performs the job on a regular basis.

10. Install the New System: Integrate the policies, procedures and work instructions into the day-to-day workings of the organizational and document what is being done. It is not necessary for all elements to be implemented at the same time.

11. Internal Audit: Conduct an internal audit of the quality system. This step is necessary to ensure that the system is working efficiency and to provide management with information for the comprehensive management review.

12. Management Review: Conduct a management review, the management review is used to determine the effectiveness of the system in achieving the stated quality goals.

13. Pre-assessment: If a good job has been done on the previous steps, pre assessment is not necessary.

Page 135: Operation Management  ( ICWA Inter)

(D) Implementation ISO:9000:

14. Registration & Certification: This step requires three parts, choosing a registrar, submitting an application and conducting the registrar system audit. Choosing a registrar include cost, lead time, your customer’s acceptance of the registrar, the registrar’s accreditation and similarity with your industry. The application for registration should also include supplying the registrar with the policy and procedure manuals for their review. The time involved in the registrar’s system audit and procedure manuals for their review. The time involved in the register’s system audit will vary depending on the size and complexity of the organization and the number of auditors involved. It is usually one to three days and will consist of an opening meeting to describe the process the auditors will follow, the audit itself and a closing meeting to discuss the finding of the auditors will follow, the audit itself and a closing meeting to discuss the finding of the audit.

Page 136: Operation Management  ( ICWA Inter)

Quality Function Deployment

• Quality Function Deployment can be an aid to achieving our goals of:• Quality• Cost• Timeliness• Value

• Definition of QFD• “QFD is a very systematic and organised approach of taking customer needs

and demands into consideration when designing new product and services or when improving existing products and services.” Another name for this approach is “customer-driven engineering” because the voice of the customer is diffused throughout the product (or service) development life cycle.

• QFD is a planning tool that defines a process for developing products or services. The aptitude to plan is rare in the human race. Managers are evaluated on short-term results, which further inhabit this aptitude for planning. It is difficult to use Deming’s PDCA (Plan, Do, Check, Act) cycle to improve the product development process if the P of PDCA Cycle is weak. QFD is applying TQM philosophy to product development by focusing on P. Using QFD counteracts the inherent weakness embedded in human nature — that of avoiding planning.

Page 137: Operation Management  ( ICWA Inter)

4. Economics of Maintenance and Spares Management

• Maintenance is defined as “that function of production management that is concerned with the day to day problem of keeping the physical plant in good operating condition. It is an essential activity in every manufacturing firm, because it is necessary to ensure the availability of the machines, buildings and services needed by other parts of the organisation for the performance of their function at an optimum return on investment in machines, materials and employees”. Maintenance Engineering

• Maintenance Engineering: is that function of production management that is concerned with the day to day problems of keeping the physical plant in good operating condition.

• Maintenance Management: Maintenance Management is concerned with the direction and organisation of resources in order to control the availability and performance of the industrial plants to some specified level. It is a function supporting production function and is entrusted with the task of keeping the machinery/equipment and plant services in proper working condition. It also involves maintenance planning, maintenance scheduling, execution of maintenance activities (repair, breakdown and preventive maintenance) and also controlling costs of maintenance.

Page 138: Operation Management  ( ICWA Inter)

Scope of Maintenance

(a) Primary functions(i) Maintenance of existing plant and equipments.(ii) Maintenance of existing plant buildings and grounds.(iii) Equipment inspection and lubrication.(iv) Utilities generation and distribution.(v) Alterations to existing equipments and buildings,(vi) New installations of equipments and buildings.

(b) Secondary functions(i) Storekeeping (keeping stock of spare parts)(ii) Plant protection including fire protection.(iii) Waste disposal.(iv) Salvage.(v) Insurance administration (against fire, theft, etc.).(vi) Janitorial services.(vii) Property accounting(viii) Pollution and noise abatement or control.(ix) Any other service delegated to maintenance by plant management.

Page 139: Operation Management  ( ICWA Inter)

Types of Maintenance

1. Break Down Maintenance or Corrective MaintenanceAs the name suggests, corrective maintenance occurs when there is a work stoppage

because of machine breakdown. In this sense, maintenance becomes repair work. Repairs are made after the equipment is out of order - an electric motor will not start, a conveyor belt is ripped, or a shaft has broken. In cases such as these, the maintenance department checks into the difficulty and makes the necessary repairs. Role of the department is almost passive. Nevertheless, corrective maintenance seeks to achieve the following objectives :

1. To get equipment back into operation as quickly as possible in order to minimise interruption to production. This objective can directly affect production capacity, production costs, product quality and customer satisfaction.

2. To control the cost of repair crews, including regular time and overtime labour costs.3. To control the cost of the operation of repair shops.4. To control the investment in replacement spare parts that are used when machines are

repaired.5. To control the investment in replacement spare machines which are also called standup

or backup machines. These replace manufacturing machines until the needed repairs are completed.

6. To perform the appropriate amount of repairs at each malfunction. The decision about how far to go with a repair ranges from a band-aid and bubble gum fix to a complete overhaul. Some parts can be replaced early to extend the time until the next repair is required.

Page 140: Operation Management  ( ICWA Inter)

2. Preventive Maintenance In marked contrast to corrective maintenance is preventive maintenance,

which is undertaken before the need arises and aims to minimise the possibility of unanticipated production interruptions or major breakdowns. Preventive maintenance consists of :1. Proper design and installation of equipment,2. Periodic inspection of plant and equipment to prevent break downs before

they occur,3. Repetitive servicing, upkeep and overhaul of equipment, and4. Adequate lubrication, cleaning and painting of buildings and equipment.

The key to all good preventive maintenance is inspection. Inspection should cover virtually everything, including production machinery, motors, controls, materials handling equipment, process equipment, lighting, buildings and plant services. Some organisations inspect only costly items, but others cover almost all. As a rule, if a failure in upkeep may harm an employee, stop production, or waste plant assets, then consideration should be given to including it in the preventive maintenance programme. Suitable statistical techniques have been developed for determining how often to inspect.

Page 141: Operation Management  ( ICWA Inter)

• A well-conceived preventive maintenance programme should contain the following features:

1. Proper identification of all items to be included in the programme.2. Adequate records covering, volume of work, cost and so forth.3. Inspections on a definite schedule with standing orders on specific assignments.4. Use of checklists by inspectors.5. An inspection frequency schedule may vary from as often as once every six

hours to as little as once a year.6. Well-qualified inspectors have craftsmen familiar with items being inspected

and capable of making simple repairs as soon as a trouble is noticed.7. Use of repair budgets for major items of equipment.8. Administrative procedures that provide necessary fulfillment and follow-up on

programme.

Benefits of Preventive MaintenancePreventive maintenance offers several benefits to the users. They include

greater safety for workers, decreased production downtime, fewer large scale and repetitive repairs, less cost for simple repairs made before breakdown, less standby equipment required, better spare parts control, identification of items with high maintenance costs, and lower unit cost of manufacture.

Page 142: Operation Management  ( ICWA Inter)

Planning and Scheduling of Maintenance• Steps in Maintenance Planning1. Know the equipment to be maintained, available technique for maintenance and

the facilities available to carry out maintenance work.2. Establish the priorities of maintenance activities by categorising the activities as

emergency work, priority work and non priority work.3. Investigate the maintenance work to be done at the workstation to ascertain

physical access and space limitations, facilities for lifting and handling (moving), facilities for disposal of water, oil, gas and other hazardous materials, space for keeping the dismantled parts etc.

4. Develop the repair plan on the basis of(a) Recommendation of original equipment manufacturer,(b) Technical experience,(c) Equipment history and(d) Management decision for a new technique of maintenance work.

5. Prepare a list of maintenance materials and spare parts required.6. Prepare a list of special tools and special facilities such as material handling equipments (such as crane) required.7. Estimate the time required to do the maintenance work.8. Provide for necessary safety devices and safety instructions.

Knowledge regarding equipments and machines and how the maintenance work has to be carried out can be obtained from maintenance manuals, design drawings of the machines or equipments, instruction manuals for installation and repair etc. The maintenance manuals give in detail the procedures for dismantling, servicing, carrying out repairs/replacing spare parts, tools to be used etc., which are followed by maintenance mechanics or crew.

Page 143: Operation Management  ( ICWA Inter)

Control of Maintenance

• Maintenance involves cost, and the cost is quite high. Hence the need for control. Control is facilitated by the following measures:

(a) Maintenance work must commence only after it has been authorised by a responsible official.

(b) Maintenance schedule must be prepared stipulating the timing of maintenance and number of staff required.

(c) Materials such as bearings must be issued by the storekeeper against proper authorisation from the maintenance department.

(d) Maintenance budgets must be prepared and used to determine whether the actual expenses are within estimates.

(e) Equipment records must be maintained. Information from the records will be useful when ordering parts or when seeking clarification from the equipment supplier.

(f) Management should give serious thought to certain issues -issues which have bearing on maintenance costs. The questions are:(i) How much maintenance is needed?(ii) What size maintenance crews should be used?(iii) Can maintenance be sub-contracted?(iv) Should maintenance staff be covered by wage incentive schemes?(v) Can effective use be made of computers for analysing and scheduling activities?

Page 144: Operation Management  ( ICWA Inter)

Steps in Preventive Maintenance Programme

(i) Job identification or preparing facility register : A facility register defines what is to be maintained. It gives a list of plant, equipments and machinery and other facilities which are to be brought under the purview of preventive maintenance.

(ii) Preparation of preventive maintenance schedule : A maintenance schedule indicates ! the method, time and place of carrying out maintenance work, it gives information about maintenance crew available and the time phasing of maintenance loading on maintenance crew.

(iii) Preparation of history card : Machine history card gives complete record of all repairs, replacement and engineering changes carried out on equipment or machinery during its service period. It also gives frequency of occurrence of break downs, rate of wear of different components, total machine or equipment down time due to failure and repair.

(iv) Preparation of job specification : Job specification is a document which provides useful information about the maintenance work to be done. They are prepared for each maintenance job and serve as guide for maintenance crew.

(v) Preparation of preventive maintenance program : It is a list which indicates allocation of specific maintenance work to a specific period.

Page 145: Operation Management  ( ICWA Inter)

• Preparation of preventive maintenance schedule (weekly or monthly): According to the importance of machines/equipments, their maintenance frequency is decided and the weekly or monthly maintenance schedule is prepared.

The maintenance programme includes the following :(a) Reconditioning or replacing of worn out parts or tools.(b) Repairing or replacing worn out parts or tools.(c) Checking all electrical connection of the machine or

equipment.(d) Checking the performance of each part of the machine or

equipment.(e) Cleaning of interior parts such as gear box, radiator etc., of

transport and material handling equipments.(f) Checking of control systems.(g) Complete overhauling.

Page 146: Operation Management  ( ICWA Inter)

Advantages of Preventive Maintenance

(i) Increase in life of machines and equipments by reduction of wear and tear.

(ii) Reduction in frequency of breakdowns.(iii) Improvement in productivity due to lesser machine down-time

and consequent loss of production.(iv) High reliability of production system due to lesser breakdown and

repairs.(v) Higher worker safety while using the plant and equipment.(vi) Planned shutdowns and start-ups of plant and equipment possible.(vii) Lesser requirement of stand-by machines due to lesser

breakdowns,(viii) Minimum work-in-progress inventory due to reduced production

hold ups due to equipment breakdowns.(ix) Lesser rejection and better quality control.(x) Less serious consequences of breakdowns and lesser breakdown

maintenance costs.

Page 147: Operation Management  ( ICWA Inter)

Maintenance Effectiveness : (Annual Maintenance Cost) ×100

(i) Maintenance cost index (as a percentage) = (Cost of Production) (Number of break downs per week)

(ii) Frequency of break downs = (Available machine hours per week)(Down time per week) X 100

(iii) Down time index (as a percentage)= (Available machine hours per week)

Available machine hours = (Weekly working days) × Hours per day× Number of machines

(iv) Break-down Maintenance index (as a percentage) =(Labour hour spent on break-down maintenance) X 100

(Labour hours spent on all forms of maintenance)

(v) Labour cost of planned maintenance index (as a percentage) =(Labour hour spent on planned maintenance) X100(Labour hours spent on all maintenance)

(vi) Equipment availability = (Operating time) X 100 (Operating time + Maintenance time)

Page 148: Operation Management  ( ICWA Inter)

TOTAL PRODUCTIVE MAINTENANCE• Total Productive Maintenance (TPM) is an approach which brings the concept of total

quality management in the practice of preventive maintenance. It involves the concept of reducing variability through employee involvement and excellent maintenance records.

• Total productive maintenance is a method designed to eliminate the losses caused by breakdown of machines and equipments by identifying and attacking all causes of equipment breakdowns and system down-time. It places a high value on teamwork, consensus building and continuous improvement.

• Specific actions of TPM require the following :(i) Restoring equipment to a like-new condition,(ii) Having operators involved in the maintenance of the equipment or machine,(iii) Improving maintenance efficiency and effectiveness,(iv) Training the labour force to improve their job skills,(v) The effective use of preventive and predictive maintenance technology.

• TPM aims at “Zero breakdown” or “Zero down time”. The philosophy of TPM is that if equipment is in good condition and producing what it is designed to produce, most problems then arise only from human error. In such cases, the firms should aim to employ equipment that is easy to use correctly but difficult to use incorrectly under this approach, TPM focuses on improving the reliability of the complete manufacturing.

Page 149: Operation Management  ( ICWA Inter)

Total productive maintenance approach

• Total productive maintenance approach has the potential of providing almost a seamless integration of production and maintenance through development of strong partnership between production personnel and maintenance personnel. Work culture oriented towards excellence, presence of effective work teams and a basic maintenance management system functioning well will enhance and accelerate TPM implementation.

• Total in “Total Production Maintenance” means :(i) Total employee involvement,(ii) Total equipment effectiveness (i.e., Zero breakdown) and(iii) Total maintenance delivery system.• The crux of TPM is that production equipment operators share the

preventive maintenance efforts, assist maintenance mechanics with repairs when equipments breakdown and they work together on equipment and process improvements in team activities.

Page 150: Operation Management  ( ICWA Inter)

• TPM is a comprehensive system of equipment maintenance that encompasses all activities with any influence on equipment up time (i.e., working time). These activities are :

(i) Regulating basic conditions : TPM advocates keeping a well organised shop floor which should be very clean.

(ii) Adhering to proper operating procedures : The most significant cause of failure is operators deviating from procedures and introduce errors and variance into the process.

(iii) Restoring deterioration : TPM requires diligent efforts to discover and predict deterioration in equipment and then follow standard repair methods to eliminate any source of variation in the system.

(iv) Improving weaknesses in design : TPM tries to identify and correct any defects in equipment designs that contribute to break-downs or complicate maintenance.

(v) Improving operation and maintenance skills : Equipment users (i.e., workers) contribute to TPM by learning and following correct operating procedures to prevent errors and correct any problems on the first attempt. TPM enhances the skill of both users and maintenance workers through education and training.

• Through these activities TPM attacks, variances and waste created by breakdowns by preventing problem and eliminating causes of defects.

Page 151: Operation Management  ( ICWA Inter)

Obsolescence & Replacement

• In any establishment, sooner or later all equipment needs to be replaced. A replacement is called for whenever new equipment offers more efficient or economical service than the old, existing one. For example, the old equipment might fail and work no more, or is worn out and needs higher expenditure on its maintenance. The problem, in such situations, is to determine the best policy to be adopted with respect to replacement of the equipment. The replacement theory provides answer to this question in terms of optimal replacement period.

(a) Replacement policy for equipment which deteriorates gradually:We know that the cost of a piece of equipment over a given time period, say n years, has threeelements:Purchase price - Value remaining after n years + Maintenance cost for n yearsLet C = the purchase price of the equipment,

S = the scrap value of the equipment at the end of n years, andMt = the maintenance cost of the equipment in year t.

The total cost, T(n), of owning and maintaining the equipment for n years shall beT (n) C- S + ∑ Mt (for t from 1 to n years)

Correspondingly, the average cost, A(n), would be defined as,A(n) = 1 C – S + ∑ Mt n

Page 152: Operation Management  ( ICWA Inter)

(b) Replacement of items that fail suddenly: Optimal policy for replacing items used in large numbers which do not deteriorate gradually but fail all of a sudden. They may not involve any maintenance cost, but fail without warning. Light bulbs and fluorescent tubes are examples of this type. It may, however, be observed that although the failure of a single unit, a bulb for instance, is random, the behaviour of the group as a whole is expected to be fairly stable.Generally, in such situations, the replacement of individual units, upon their failure, costs relatively high, whereas if the entire group is replaced, the unit cost works out to be comparatively a much lower value. Thus, we might be inclined to replace the whole lot at certain intervals together with the individual replacements as and when needed.

GR represents the sum of the cost of group replacement per unit of time (G/T) and the cost of individual replacement of items which fail during the replacement interval (also per unit of time) and, hence, equal to

GR = 1 G + I (T)

T

(c) Staff replacement As mentioned earlier, the staff of an organisation calls for replacements because people leave the organisation for several reasons. For planning a suitable recruitment policy, historical data are collected to estimate the likely stay of individuals with the organisation through time. Here also, the stay of an individual employee may be a random variable but the characteristics of the group of employees are likely to be fairly stable. We use this fact for the purpose at hand.

Page 153: Operation Management  ( ICWA Inter)

4.9 Failure• The phenomenon of breakdown or failure is very important in Maintenance

Management. A vital information in this regard relates to Failure Statistics. An important statistic is the relative frequency of failure or probability density of failure with respect to the age of the item in question. It has been observed that there are three prominent kinds of failure probability distribution:

(a) Normal Distribution(b) Negative exponential Distribution(c) Hyper-exponential Distribution• Most wear-out phenomena show Normal Failure Behaviour, the items failing

at some mean operating age, with some failing sooner and some later. Some items fail, not because they wear out, but due to overload or defect in the system external to them; e.g., an electrical fuse. The failure rate, here, is not age-specific; it is constant. The Negative Exponential distribution fits well in this case. For many equipments the probability density of failure is much higher during the initial ‘teething’ periods than during their subsequent life. Hyper-exponential distribution fits these types of failure behaviours.

• The above information on failure behaviour will be of much help in planning various maintenance actions. The fact can be illustrated through various problems.

Page 154: Operation Management  ( ICWA Inter)

4.11 Preventive Replacement

• Preventive replacement of parts and equipments at a certain periodicity, before they fail is many a time a prudent policy as the costs of replacement/repair following a breakdown of the components or equipment, outweigh that of preventive replacement. Thus, a cost comparison between preventive replacement and breakdown replacement/repair would many a time favour the choice of the former.

• The following examples illustrate such comparisons and consequent decisions. Breakdown repair/ replacement is generally more costly as (a) breakdowns occur randomly and suddenly thus injecting an element of chaos and (b) a breakdown or failure of one component may lead to breakdowns or extra-wear of other components thus complicating or accentuating the situation. However, it should be noted that there are factors such as human safety which should also be kept in view while making a decision in such cases although such factors are usually non-quantifiable.

Page 155: Operation Management  ( ICWA Inter)

4.12 Queueing Theory Applications in Maintenance• Some of the problems in the management of maintenance, particularly those pertaining to the

determination of the size of the maintenance resources, can be represented in a queueing format. For instance, machines may await (a) repairs by the available maintenance crew or (b) the replacement of the damaged parts by reconditioned spares. Thus, the machine breakdowns are the “arrivals” in the queue and they may have their own frequency distribution. The service times of the maintenance crew for the repairs of the machines, or the servicing times taken for the reconditioning of the reconditionable spares may constitute a particular frequency distribution. From the view-point of policy considerations, some characteristics of the queueing system such as

(a) the average waiting time of the failed machines; (b) the average number of machines waiting in the queue, and (c) The utilisation of the repair crew or of the reconditioning facilities would be useful. This

information will help the maintenance manager in:

1. Determining cost trade-offs between down-time of machines and the number of maintenance hands or spares,

2. Determining the queue discipline which will improve the breakdown maintenance service, and3. Appropriately improving preventive maintenance, thereby reducing the breakdown rate, etc.

Many of the problems mentioned above fall into the category of Multiple Channel Single Service queue systems. While some of these are likely to have a large number of ‘arrivals’ which can be approximated to infinite arrivals, some of the situations represent finite arrivals as the number machines (population) may be small.

Page 156: Operation Management  ( ICWA Inter)

4.13 Planning and Control of Spare Parts• However, no amount of preventive maintenance can completely eliminate failures

necessitating breakdown maintenance. Spare parts are required for this purpose also. Therefore the planning for a spare part item requires that, based on the failure pattern we compute the number of spares to be stocked, having decided on the availability or service-level for that spare-part item.

• Failure statistics are useful in the calculation of both, (a) the spares for preventive maintenance and (b) the spares for breakdown maintenance. However, the latter is uncertain or stochastic and, therefore, requires the use of the concept of service level or the down time/ under-stocking cost.

• For stocking policy analysis, the spares may be classified as follows:

SPARE PARTS

Regular Spares Insurance Spares Capital Spares Rotable Spares

• Regular Spares : (Also called as Maintenance spares and Breakdown spares) These are required regularly and so, in substantial numbers. Both the reliability and the per unit cost of these items are not very high. The service level as mentioned The breakdown rates occur either according to a Normal distribution (wear-out of the parts) or according to a Poisson distribution (system overloads).

Page 157: Operation Management  ( ICWA Inter)

• Insurance Spares: Spares of this class have a very high reliability and are required rarely, if ever, during the life time of an equipment besides being a high cost item. Thus, a company or organisation which decides to buy such a spare does so only to keep it for the life time of the equipment. Now if the spare was not expensive, But our insurance spare is also a critical item whose non-availability has a very heavy down-time cost.

• Capital Spares: Regular spares and Insurance spares are two ends of the spectrum; Capital spares fall somewhere in between. A few—say five or ten—of these spares are required, over the lifetime of an equipment. These spares are expensive and therefore it would be desirable to keep only as many as would be required from the viewpoint of service level. This decision is guided by the probability that a certain number of them are required over the life of the equipment.

• Rotable Spares: These are repairable and re-usable spares, such as a jet engine or an electric motor which can be reconditioned after failure and put back in operation. This situation can be visualised in a Multiple Channel Single Service Queueing theory format, where the defective equipments are the arrivals and the spares are the servers. The service times are given by the distribution of time to recondition a spare. The inter-arrival times of the defective items can also be modelled in terms of a probability distribution. An equipment is down only when no spare is available from the spares bank. The average waiting time for this situation can be found from the queueing tables for an infinite or a finite source (as the situation may be) for a Multiple Channel Single Service queue system. These downtimes and associated costs can be calculated for various stocking policies for the spares (i.e. various assumed number of spares).

• The total costs of any policy are the downtime costs and the costs of stocking the spares.