operation and instruction manual - …. wiring diagram: wiring diagram for 3phase, 4wire, dual...

16
8. WIRING DIAGRAM : Wiring Diagram for ac, 3Phase, 4Wire, Dual Source Whole Current Static Energy Meter Meter Terminal Block R Y B N Mains/Generator Selection : When ac 240V (± 20%) is available at P&N terminals the energy shall be recorded in Generator Energy Register, otherwise it shall be recorded in Mains Energy Register. 1(In) 1(Out) 2(In) 2(Out) 3(In) 3(Out) N(In) N(Out) P N P N RS485 (240V, ac in Generator Mode) Tx (+) Tx (-) X (NC) X (NC) RS485 Port RS485 Port 1. INSTALLATION a. Refer to the wiring diagram shown in the manual for installation. b. Ensure that the cable connections are properly connected as per connection diagram. 2. FRONT VIEW / PANEL DESCRIPTION a. Active Energy (kWh) pulse indication. b. Push Button 1 : To be used for display in absence of mains supply. c. Push button 2 : Forward Scroll. d. Push button 3 : Back Scroll. e. Optical Communication Port. f . RS485 Port. 3. TECHNICAL FEATURES 3.1 ENERGY REGISTER : The meter measures following energy. a. Active Energy b. Apparent Energy 3.2 MAXIMUM DEMAND AND MD INTEGRATION PERIOD The demand is monitored during each demand interval of 15/30 minutes (default 30 minutes ) integration and the maximum of these demand is stored as maximum demand along with date and time. - 1 - OPERATION AND INSTRUCTION MANUAL ac, 3 Phase, 4 Wire Dual Source Static Energy Meter d e a b c f (without MD Reset) - 6 - HSPL/DUAL SOURCE/DHVVNL/3P/OC HPL Electric & Power Pvt. Ltd. 1/21, Asaf Ali Road, New Delhi - 110 002, Phone: 91-11-23234411, 23234811 Fax : 91-11-23232639, E-mail: [email protected], Website: www.hplindia.com (Due to continuous development, specification and features are subject to change without prior notice.)

Upload: doandung

Post on 14-Mar-2018

218 views

Category:

Documents


1 download

TRANSCRIPT

8. WIRING DIAGRAM :

Wiring Diagram for ac, 3Phase, 4Wire, Dual Source Whole CurrentStatic Energy Meter

Meter Terminal Block

R

Y

B

N

Mains/Generator Selection : When ac 240V (± 20%) is available at P&N terminals

the energy shall be recorded in Generator Energy Register, otherwise it shall be

recorded in Mains Energy Register.

1(In) 1(Out) 2(In) 2(Out) 3(In) 3(Out) N(In) N(Out)P

N

P

N RS485

(240V, ac inGenerator Mode)

Tx(+)

Tx(-)

X(NC)

X(NC)

RS485 Port

RS485 Port

1. INSTALLATION

a. Refer to the wiring diagram shown in the manual for installation.

b. Ensure that the cable connections are properly connected as per connectiondiagram.

2. FRONT VIEW / PANEL DESCRIPTION

a. Active Energy (kWh) pulse indication.

b. Push Button 1 : To be used for display in absence of mains supply.

c. Push button 2 : Forward Scroll.

d. Push button 3 : Back Scroll.

e. Optical Communication Port.

f . RS485 Port.

3. TECHNICAL FEATURES3.1 ENERGY REGISTER : The meter measures following energy.

a. Active Energyb. Apparent Energy

3.2 MAXIMUM DEMAND AND MD INTEGRATION PERIODThe demand is monitored during each demand interval of 15/30 minutes(default 30 minutes ) integration and the maximum of these demand is storedas maximum demand along with date and time.

- 1 -

OPERATION AND INSTRUCTION MANUALac, 3 Phase, 4 Wire Dual Source Static Energy Meter

d

e

a

b

c

f

(with

out

MD

Res

et)

- 6 -

HS

PL/

DU

AL

SO

UR

CE

/DH

VV

NL/

3P/O

C

HPL Electric & Power Pvt. Ltd.1/21, Asaf Ali Road, New Delhi - 110 002, Phone: 91-11-23234411, 23234811Fax : 91-11-23232639, E-mail: [email protected], Website: www.hplindia.com(Due to continuous development, specification and features are subject to change without prior notice.)

1. INSTALLATION

a. Refer to the wiring diagram shown in the manual for installation.

b. Ensure that the cable connections are properly connected as per connectiondiagram.

2. FRONT VIEW / PANEL DESCRIPTION

a. Active Energy (kWh) pulse indication.

b. Push Button 1 : To be used for display in absence of mains supply.

c. Push button 2 : Forward Scroll.

d. Push button 3 : Back Scroll.

e. Optical Communication Port.

f . RS485 Port.

3. TECHNICAL FEATURES3.1 ENERGY REGISTER : The meter measures following energy.

a. Active Energyb. Apparent Energy

3.2 MAXIMUM DEMAND AND MD INTEGRATION PERIODThe demand is monitored during each demand interval of 15/30 minutes(default 30 minutes ) integration and the maximum of these demand is storedas maximum demand along with date and time.

- 1 -

OPERATION AND INSTRUCTION MANUALac, 3 Phase, 4 Wire Dual Source Static Energy Meter

(with

out

MD

Res

et)

- 6 -

DU

AL

SO

UR

CE

/3P

/OC

/BA

R-5

A

8. WIRING DIAGRAM: Wiring Diagram for 3Phase, 4Wire, Dual Source LT CT Operated Energy Meter.

Mains/Generator Selection : When dc 24V (± 20%) is available at P&N terminals

the energy shall be recorded in Generator Energy Register, otherwise it shall be

recorded in Mains Energy Register.

(NC) (NC)(+) (-)

RS 485 Port

Tx Tx X X

Meter Terminal Block

Mains/Generator Selection

-/5A

-/5A

-/5A

-/5A

HPL ELECTRIC & POWER PVT. LTD.1/21, Asaf Ali Road, New Delhi -110002, Phone : 91-11-23234411, 23234811Fax: 91-11-23232639, Email: [email protected], Website: www.hplindia.comDue to continuous development, specification and features are subject to change without prior notice.

f

b

c

a

e

d

3.3 MAXIMUM DEMAND RESETIt is possible to reset the MD is following two ways.

a. CMRIb. Auto Reset : MD shall be reset automatic at 00.00 Hrs on the date for

which billing date is programmed. (for e.g. 1st day of month).

3.4 LOAD SURVEYThe following parameters are provided for load survey with 30 minutesintegration period.

a. Total kWhb. Total kVAhc. Utility kWhd. DG kWh

Load survey is available for last 120 days.

3.5 TOD : The meters have been programmed for 6 TOD slots. The defaultTOD slot timings are as follows :

Slot 1 : 00.00 hrs. to 06.00 hrs.

Slot 2 : 06.00 hrs. to 18.00 hrs.

Slot 3 : 18.00 hrs. to 19.00 hrs.

Slot 4 : 19.00 hrs. to 21.00 hrs.

Slot 5 : 21.00 hrs. to 23.00 hrs.

Slot 6 : 23.00 hrs. to 00.00 hrs.

3.6 POWER ON/OFFPower On/Off event is recorded whenever DG Power goes off for more than5 minutes. Last 20 Power On/Off events are recorded by meter in FIFO basis.

4. DISPLAY DETAILS : As soon as the meter is powered On, it shall show the version number of the firmware.

Then it shall go to first display parameter.

There are two modes of display :a. Auto scroll Modeb. Push Button mode

- 2 -

a. Auto Scroll Mode : Auto scroll mode always displays the following parameter.

Auto Scroll Button Parameters Typical Screen Shots

1. Total Cumulative Energy kWh

2. Utility Cumulative Energy kWh

3. DG Cumulative Energy kWh

000129.4RYB kVArhMD

kWhDateBILL

TimeTOD

MAGNETCOVEROPEN

000079.9RYB kVArh

TimeTOD

MAGNETCOVEROPEN

000049.5RYB kVArhMD

kWhB

COVEROPEN

kWh

E0Eal

8g

UELIE9

- 5 -

7. TECHNICAL CHARACTERISTICS OF METER :

1. Enclosure : Engineering plastic

2. Display : Backlit LCD display

Large digit size 10 mm x 5 mm

3. Protection Index : IP51

4. System : AC 3 Phase, 4 Wire

5. Inputs : Starting Current : 0.2% of Ib

Rated Voltage : 3 x 240V

Current Rating : -/5A

Frequency : 50 Hz ± 5%

Power factor : Zero lag - unity - Zero lead

6. Class of Accuracy : Class 1.0

7. Application Standard : IS 13779 : 1999

CBIP-88

6. TAMPER THRESHOLDS :

TAMPER EVENT THRESHOLD FOR TAMPER

Occurrence Limit

Occurrence Time

Restoration Time

Restoration Time

Compart –ment No.

1. Missing Potential 20 minute 20 minute

0

a. Voltage in tamper phase

< 20% Vref > 40%Vref

b. Current in tamper phase > 10% Ib Ignored

2. Neutral Disturbance 20 minute 20 minute

a. Voltage in any phase

> 300V Ignored

b. Voltage in all phase Ignored < 300V

3. CT Polarity Reversal 20 minute 20 minute

a. Current in tamper phase

> 5% Ib (In reverse direction)

> 10% Ib (in forward direction)

b. Voltage in Tampered phase

> 20% Vref > 20% Vref

c. Power factor > 0.1 > 0.1

4. CT Bypass 20 minute 20 minute

a. Bypass Current > 30% Ib < 10% Ib

5. Frequency Variation 20 minute 20 minute

a. Freq < 47.5Hz

or > 52.5Hz

Freq > 47.5Hz

or < 52.5Hz

6. Magnet 20 seconds 20 seconds

Under Influence of abnormal Magnetic field

After removal of abnormal Magnetic f ield

Version NumberRYBMAGNET 8888

HISTORYk W h

KVArh MDP -274.XX

18

RYB MAGNET

RYB

kWhMAGNET

- 4 -

5. COMMUNICATION : Following parameters can be obtained through optical portby using CMRI / BCS.

a. Last 6 months billing data.

b. Instantaneous parameters at the time of meter reading.

c. TOD Data.

d. Tamper data.

Note 1.0

Last tamper Occurrence ID shall be as follows:

i. If CT Reversal is occurred, display shows “ Ctr ”.

ii. If Missing Potential is occurred, display shows “ nP ”.

iii. If CT Bypass tamper occurred, display shows “ ctb ”.

iv. If Neutral disturbance is occurred, display shows “ nd ”.

v. If Magnet Tamper is occurred, display shows “ nG ”.

vi. If Frequency Variation is occurred, display shows “ FrEq ”.

17. Last Billing DG Maximum Demand Date & Time

18. Meter Serial Number e.g.(1000001)

19. High Resolution Display for kWh

20. Missing Potential Tamper with PhaseIdentification

21. Current Potential Reversal Tamper with PhaseIdentification

22. Current Bypass Tamper (“tanperd” shall be displayed in

place of “ - - - ” whenever CT Bypass tamper is present.)

23. Neutral Disturbance Tamper Present Status

24. Frequency Tamper Present Status(“tanperd” shall be displayed in place of “ - - - ” whenever

Frequency Variation tamper is present.)

25. Total Tamper Count

TimeTOD10.00

04.11.10kVArhMD

kWhDateBILL

MAGNET

-9-kVArhMD

kWhMAGNET

h--DateBILL

MAGNETCOVEROPEN

---MAGNET

COVEROPEN

BCOVEROPEN

0000001MAGNET

COVEROPEN

ffE9

1kVArhMD

kWhMAGNET

129.4327 kWhB

COVEROPEN

MD

sh

hp

cE8

---h8g

---

Ec

26. Last Tamper Type Occurrence (See Note 1.0)

27. Date of Last Tamper Occurrence

28. Time of Last Tamper Occurrence

29. Slave Address

30. CT Ratio

occ

04.11.10DateBILL

MAGNET

10:00MAGNET

COVEROPEN

ce8occ

TimeTOD

E0Eal

occ

5

5-5

cEf

sla8

cEfE

- 3 -

Note : In meter display, following icon shall be displayed to show status of variouscondition as given below.

i. “ R ”, “ Y ”, “ B ” enunciator indicates presence of the respective phase.

ii. “ ” with “ R ”, “ Y ”, “ B ” enunciator blinking indicates respective phase current reverse.

iii. “ MAGNET ” indicates magnetic tamper.iv. Blinking of “ ” icon shall indicate that meter is working in generator

mode.b. Push Button Mode : The parameter in this mode can be viewed by pressingthe push button 2 or 3 to reach to the required parameter. On every press of pushbutton 2 the display shall move 1 parameter forward.On every press of pushbutton 3 the display shall move 1 parameter backward.

kVArhMDCOVEROPENDateBILL

1. LCD Segment Check

2. EEPROM Check

3. Battery Check

4. Total Cumulative Energy kWh

5. Utility Cumulative Energy kWh

6. DG Cumulative Energy kWh

7. Real Date & Time

8. Utility Maximum Demand in kW

9. DG Maximum Demand in kW

10. Last Billing Date & Time

11. Last Billing Total Cumulative Energy kWh

12. Last Billing Utility Total Cumulative Energy kWh

13. Last Billing DG Total Cumulative Energy kWh

14. Last Billing Utility Maximum Demand in kW

15. Last Billing Utility Maximum Demand Date & Time

16. Last Billing DG Maximum Demand in kW

Push Button Parameters Typical Screen Shots

eepkVArhMD

BCOVEROPEN 8g888

kVArhMDB

COVEROPEN 8g888

8ae

TimeTOD10.00

04.11.10kVArhMD

kWhDateBILL

MAGNET

TimeTOD10.00

04.11.10kVArhMD

kWhDateBILL

MAGNET

000129.4kVArhMD

kWhDateBILL

TimeTOD

MAGNETCOVEROPEN

000079.9kVArh

TimeTOD

MAGNETCOVEROPEN

000049.5kVArhMD

kWhB

COVEROPEN

kWh

E0Eal

8g

UELIE9

000100.4 kWhDateBILL

MAGNET

000070.2kVArh

TimeTOD

MAGNETCOVEROPEN

000030.2kVArhMD

kWhB

COVEROPEN

kWh

8g

UELIE9DateBILL

DateBILL

3.260kVArh

TimeTOD

MAGNETCOVEROPEN

kWhUELIE9 MD

3.260kVArh

TimeTOD

MAGNETCOVEROPEN

kWhUELIE9 MD

DateBILL

TimeTOD10.00

04.11.10kVArhMD

kWhDateBILL

MAGNETMD

3.120kVArhMD

kWhB

COVEROPEN 8g MD

3.260 kWhB MD

DateBILL

TimeTOD

MAGNETCOVER OPEN

RYB

E0Eal

1. INSTALLATION

a. Refer to the wiring diagram shown in the manual for installation.

b. Ensure that the cable connections are properly connected as per connectiondiagram.

2. FRONT VIEW / PANEL DESCRIPTION

a. Active Energy (kWh) pulse indication.

b. Push Button 1 : To be used for display in absence of mains supply.

c. Push button 2 : Forward Scroll.

d. Push button 3 : Back Scroll.

e. Optical Communication Port.

f . RS485 Port.

3. TECHNICAL FEATURES3.1 ENERGY REGISTER : The meter measures following energy.

a. Active Energyb. Apparent Energy

3.2 MAXIMUM DEMAND AND MD INTEGRATION PERIODThe demand is monitored during each demand interval of 15/30 minutes(default 30 minutes ) integration and the maximum of these demand is storedas maximum demand along with date and time.

- 1 -

OPERATION AND INSTRUCTION MANUALac, 3 Phase, 4 Wire Dual Source Static Energy Meter

(with

out

MD

Res

et)

- 6 -

DU

AL

SO

UR

CE

//3P

/OC

/BA

R-5

A

8. WIRING DIAGRAM: Wiring Diagram for 3Phase, 4Wire, Dual Source LT CT Operated Energy Meter.

Mains/Generator Selection : When ac 240V (± 20%) is available at P&N terminals

the energy shall be recorded in Generator Energy Register, otherwise it shall be

recorded in Mains Energy Register.

f

b

c

a

e

d

HPL Electric & Power Pvt. Ltd.1/21, Asaf Ali Road, New Delhi - 110 002, Phone: 91-11-23234411, 23234811Fax : 91-11-23232639, E-mail: [email protected], Website: www.hplindia.com(Due to continuous development, specification and features are subject to change without prior notice.)

(NC) (NC)(+) (-)

RS 485 Port

Tx Tx X X

Meter Terminal Block

Mains/Generator Selection

-/5A

-/5A

-/5A

-/5A

3.3 MAXIMUM DEMAND RESETIt is possible to reset the MD is following two ways.

a. CMRIb. Auto Reset : MD shall be reset automatic at 00.00 Hrs on the date for

which billing date is programmed. (for e.g. 1st day of month).

3.4 LOAD SURVEYThe following parameters are provided for load survey with 30 minutesintegration period.

a. Total kWhb. Total kVAhc. Utility kWhd. DG kWh

Load survey is available for last 120 days.

3.5 TOD : The meters have been programmed for 6 TOD slots. The defaultTOD slot timings are as follows :

Slot 1 : 00.00 hrs. to 06.00 hrs.

Slot 2 : 06.00 hrs. to 18.00 hrs.

Slot 3 : 18.00 hrs. to 19.00 hrs.

Slot 4 : 19.00 hrs. to 21.00 hrs.

Slot 5 : 21.00 hrs. to 23.00 hrs.

Slot 6 : 23.00 hrs. to 00.00 hrs.

3.6 POWER ON/OFFPower On/Off event is recorded whenever DG Power goes off for more than5 minutes. Last 20 Power On/Off events are recorded by meter in FIFO basis.

4. DISPLAY DETAILS : As soon as the meter is powered On, it shall show the version number of the firmware.

Then it shall go to first display parameter.

There are two modes of display :a. Auto scroll Modeb. Push Button mode

- 2 -

a. Auto Scroll Mode : Auto scroll mode always displays the following parameter.

Auto Scroll Button Parameters Typical Screen Shots

1. Total Cumulative Energy kWh

2. Utility Cumulative Energy kWh

3. DG Cumulative Energy kWh

000129.4RYB kVArhMD

kWhDateBILL

TimeTOD

MAGNETCOVEROPEN

000079.9RYB kVArh

TimeTOD

MAGNETCOVEROPEN

000049.5RYB kVArhMD

kWhB

COVEROPEN

kWh

E0Eal

8g

UELIE9

- 5 -

7. TECHNICAL CHARACTERISTICS OF METER :

1. Enclosure : Engineering plastic

2. Display : Backlit LCD display

Large digit size 10 mm x 5 mm

3. Protection Index : IP51

4. System : AC 3 Phase, 4 Wire

5. Inputs : Starting Current : 0.1% of Ib

Rated Voltage : 3 x 240V

Current Rating : -/5A

Frequency : 50 Hz ± 5%

Power factor : Zero lag - unity - Zero lead

6. Class of Accuracy : Class 0.5S

7. Application Standard : IS 14697 : 1999

CBIP-88

6. TAMPER THRESHOLDS :

TAMPER EVENT THRESHOLD FOR TAMPER

Occurrence Limit

Occurrence Time

Restoration Time

Restoration Time

Compart –ment No.

1. Missing Potential 20 minute 20 minute

0

a. Voltage in tamper phase

< 20% Vref > 40%Vref

b. Current in tamper phase > 10% Ib Ignored

2. Neutral Disturbance 20 minute 20 minute

a. Voltage in any phase

> 300V Ignored

b. Voltage in all phase Ignored < 300V

3. CT Polarity Reversal 20 minute 20 minute

a. Current in tamper phase

> 5% Ib (In reverse direction)

> 10% Ib (in forward direction)

b. Voltage in Tampered phase

> 20% Vref > 20% Vref

c. Power factor > 0.1 > 0.1

4. CT Bypass 20 minute 20 minute

a. Bypass Current > 30% Ib < 10% Ib

5. Frequency Variation 20 minute 20 minute

a. Freq < 47.5Hz

or > 52.5Hz

Freq > 47.5Hz

or < 52.5Hz

6. Magnet 20 seconds 20 seconds

Under Influence of abnormal Magnetic field

After removal of abnormal Magnetic f ield

Version NumberRYBMAGNET 8888

HISTORYk W h

KVArh MDP -225.XX

18

RYB MAGNET

RYB

kWhMAGNET

- 4 -

5. COMMUNICATION : Following parameters can be obtained through optical portby using CMRI / BCS.

a. Last 6 months billing data.

b. Instantaneous parameters at the time of meter reading.

c. TOD Data.

d. Tamper data.

Note 1.0

Last tamper Occurrence ID shall be as follows:

i. If CT Reversal is occurred, display shows “ Ctr ”.

ii. If Missing Potential is occurred, display shows “ nP ”.

iii. If CT Bypass tamper occurred, display shows “ ctb ”.

iv. If Neutral disturbance is occurred, display shows “ nd ”.

v. If Magnet Tamper is occurred, display shows “ nG ”.

vi. If Frequency Variation is occurred, display shows “ FrEq ”.

17. Last Billing DG Maximum Demand Date & Time

18. Meter Serial Number e.g.(1000001)

19. High Resolution Display for kWh

20. Missing Potential Tamper with PhaseIdentification

21. Current Potential Reversal Tamper with PhaseIdentification

22. Current Bypass Tamper (“tanperd” shall be displayed in

place of “ - - - ” whenever CT Bypass tamper is present.)

23. Neutral Disturbance Tamper Present Status

24. Frequency Tamper Present Status(“tanperd” shall be displayed in place of “ - - - ” whenever

Frequency Variation tamper is present.)

25. Total Tamper Count

TimeTOD10.00

04.11.10kVArhMD

kWhDateBILL

MAGNET

-9-kVArhMD

kWhMAGNET

h--DateBILL

MAGNETCOVEROPEN

---MAGNET

COVEROPEN

BCOVEROPEN

0000001MAGNET

COVEROPEN

ffE9

1kVArhMD

kWhMAGNET

129.4327 kWhB

COVEROPEN

MD

sh

hp

cE8

---h8g

---

Ec

26. Last Tamper Type Occurrence (See Note 1.0)

27. Date of Last Tamper Occurrence

28. Time of Last Tamper Occurrence

29. Slave Address

30. CT Ratio

occ

04.11.10DateBILL

MAGNET

10:00MAGNET

COVEROPEN

ce8occ

TimeTOD

E0Eal

occ

5

5-5

cEf

sla8

cEfE

- 3 -

Note : In meter display, following icon shall be displayed to show status of variouscondition as given below.

i. “ R ”, “ Y ”, “ B ” enunciator indicates presence of the respective phase.

ii. “ ” with “ R ”, “ Y ”, “ B ” enunciator blinking indicates respective phase current reverse.

iii. “ MAGNET ” indicates magnetic tamper.iv. Blinking of “ ” icon shall indicate that meter is working in generator

mode.b. Push Button Mode : The parameter in this mode can be viewed by pressingthe push button 2 or 3 to reach to the required parameter. On every press of pushbutton 2 the display shall move 1 parameter forward.On every press of pushbutton 3 the display shall move 1 parameter backward.

kVArhMDCOVEROPENDateBILL

1. LCD Segment Check

2. EEPROM Check

3. Battery Check

4. Total Cumulative Energy kWh

5. Utility Cumulative Energy kWh

6. DG Cumulative Energy kWh

7. Real Date & Time

8. Utility Maximum Demand in kW

9. DG Maximum Demand in kW

10. Last Billing Date & Time

11. Last Billing Total Cumulative Energy kWh

12. Last Billing Utility Total Cumulative Energy kWh

13. Last Billing DG Total Cumulative Energy kWh

14. Last Billing Utility Maximum Demand in kW

15. Last Billing Utility Maximum Demand Date & Time

16. Last Billing DG Maximum Demand in kW

Push Button Parameters Typical Screen Shots

eepkVArhMD

BCOVEROPEN 8g888

kVArhMDB

COVEROPEN 8g888

8ae

TimeTOD10.00

04.11.10kVArhMD

kWhDateBILL

MAGNET

TimeTOD10.00

04.11.10kVArhMD

kWhDateBILL

MAGNET

000129.4kVArhMD

kWhDateBILL

TimeTOD

MAGNETCOVEROPEN

000079.9kVArh

TimeTOD

MAGNETCOVEROPEN

000049.5kVArhMD

kWhB

COVEROPEN

kWh

E0Eal

8g

UELIE9

000100.4 kWhDateBILL

MAGNET

000070.2kVArh

TimeTOD

MAGNETCOVEROPEN

000030.2kVArhMD

kWhB

COVEROPEN

kWh

8g

UELIE9DateBILL

DateBILL

3.260kVArh

TimeTOD

MAGNETCOVEROPEN

kWhUELIE9 MD

3.260kVArh

TimeTOD

MAGNETCOVEROPEN

kWhUELIE9 MD

DateBILL

TimeTOD10.00

04.11.10kVArhMD

kWhDateBILL

MAGNETMD

3.120kVArhMD

kWhB

COVEROPEN 8g MD

3.260 kWhB MD

DateBILL

TimeTOD

MAGNETCOVER OPEN

RYB

E0Eal

1. INSTALLATION

a. Refer to the wiring diagram shown in the manual for installation.

b. Ensure that the cable connections are properly connected as per connectiondiagram.

2. FRONT VIEW / PANEL DESCRIPTION

a. Active Energy (kWh) pulse indication.

b. Push Button 1 : To be used for display in absence of mains supply.

c. Push button 2 : Forward Scroll.

d. Push button 3 : Back Scroll.

e. Optical Communication Port.

f . RS485 Port.

3. TECHNICAL FEATURES3.1 ENERGY REGISTER : The meter measures following energy.

a. Active Energyb. Apparent Energy

3.2 MAXIMUM DEMAND AND MD INTEGRATION PERIODThe demand is monitored during each demand interval of 15/30 minutes(default 30 minutes ) integration and the maximum of these demand is storedas maximum demand along with date and time.

- 1 -

OPERATION AND INSTRUCTION MANUALac, 3 Phase, 4 Wire Dual Source Static Energy Meter

(with

out

MD

Res

et)

- 6 -

DU

AL

SO

UR

CE

/3P

/OC

/10-

60A

HPL ELECTRIC & POWER PVT. LTD.1/21, Asaf Ali Road, New Delhi -110002, Phone : 91-11-23234411, 23234811Fax: 91-11-23232639, Email: [email protected], Website: www.hplindia.comDue to continuous development, specification and features are subject to change without prior notice.

d

e

a

b

c

f

8. WIRING DIAGRAM :

Wiring Diagram for ac, 3Phase, 4Wire, Dual Source Whole CurrentStatic Energy Meter

Mains/Generator Selection : When dc 24V (± 20%) is available at P&N terminals

the energy shall be recorded in Generator Energy Register, otherwise it shall be

recorded in Mains Energy Register.

R

Y

B

N

(24V, dc inGenerator Mode)

Tx(+)

Tx(-)

X(NC)

X(NC)

RS485 Port

RS485 Port

Meter Terminal Block

1(In) 1(Out) 2(In) 2(Out) 3(In) 3(Out) N(In) N(Out)P

N

P

N RS485

3.3 MAXIMUM DEMAND RESETIt is possible to reset the MD is following three ways.

a. CMRIb. Auto Reset : MD shall be reset automatic at 00.00Hrs on the date for

which billing date is programmed. (for e.g. 1st day of month).

3.4 LOAD SURVEYThe following parameters are provided for load survey with 30 minutesintegration period.

a. Total kWhb. Total kVAhc. Utility kWhd. DG kWh

Load survey is available for last 120 days.

3.5 TOD : The meters have been programmed for 6 TOD slots. The defaultTOD slot timings are as follows :

Slot 1 : 00.00 hrs. to 06.00 hrs.

Slot 2 : 06.00 hrs. to 18.00 hrs.

Slot 3 : 18.00 hrs. to 19.00 hrs.

Slot 4 : 19.00 hrs. to 21.00 hrs.

Slot 5 : 21.00 hrs. to 23.00 hrs.

Slot 6 : 23.00 hrs. to 00.00 hrs.

3.6 POWER ON/OFFPower On/Off event is recorded when ever DG Power goes off for more than5 minutes. Last 20 Power On/Off events are recorded by meter in FIFO basis.

4. DISPLAY DETAILS : As soon as the meter is powered On, it shall show theversion number of the firmware.

Then it shall go to first display parameter.

There are two modes of display :a. Auto scroll Modeb. Push Button mode

- 2 -

a. Auto Scroll Mode : Auto scroll mode always displays the following parameter.

Auto Scroll Button Parameters Typical Screen Shots

1. Total Cumulative Energy kWh

2. Utility Cumulative Energy kWh

3. DG Cumulative Energy kWh

000129.4RYB kVArhMD

kWhDateBILL

TimeTOD

MAGNETCOVEROPEN

000079.9RYB kVArh

TimeTOD

MAGNETCOVEROPEN

000049.5RYB kVArhMD

kWhB

COVEROPEN

kWh

E0Eal

8g

UELIE9

- 5 -

7. TECHNICAL CHARACTERISTICS OF METER :

1. Enclosure : Engineering plastic

2. Display : Backlit LCD display

Large digit size 10 mm x 5 mm

3. Protection Index : IP51

4. System : AC 3 Phase, 4 Wire

5. Inputs : Starting Current : 0.2% of Ib

Rated Voltage : 3 x 240V

Current Rating : 10-60A

Frequency : 50 Hz ± 5%

Power factor : Zero lag - unity - Zero lead

6. Class of Accuracy : Class 1.0

7. Application Standard : IS 13779 : 1999

CBIP-88

6. TAMPER THRESHOLDS :

THRESHOLD FOR TAMPER TAMPER EVENT Occurrence

Limit Occurrence

Time Restoration

Time Restoration

Time Compart –ment No.

1. Missing Potential 20 minute 20 minute

a. Voltage in tamper phase

< 20% Vref > 40%Vref

b. Current in tamper phase

> 10% Ib Ignored

2. Neutral Disturbance 20 minute 20 minute

a. Voltage in any phase

> 300V Ignored

b. Voltage in all phase Ignored < 300V

3. CT Polarity Reversal 20 minute 20 minute

a. Current in tamper phase

> 5% Ib (In reverse direction)

> 10% Ib (in forward direction)

b. Voltage in Tampered phase

> 20% Vref > 20% Vref

c. Power factor > 0.1 > 0.1

4. CT Bypass 20 minute 20 minute

a. Bypass Current > 30% Ib < 10% Ib

5. Frequency Variation 20 minute 20 minute

a. Freq < 47.5Hz

or > 52.5Hz

Freq > 47.5Hz

or < 52.5Hz

0

6. Magnet 20 seconds 20 seconds

Under Influence of abnormal Magnetic field

After removal of abnormal Magnetic field

Version NumberRYBMAGNET 8888

HISTORYk W h

KVArh MDP -255.XX

18

RYB MAGNET

RYB

kWhMAGNET

- 4 -

5. COMMUNICATION : Following parameters can be obtained through optical portby using CMRI / BCS.

a. Last 6 months billing data.

b. Instantaneous parameters at the time of meter reading.

c. TOD Data.

d. Tamper data.

Note 1.0

Last tamper Occurrence ID shall be as follows:

i. If CT Reversal is occurred, display shows “ Ctr ”.

ii. If Missing Potential is occurred, display shows “ nP ”.

iii. If CT Bypass tamper occurred, display shows “ ctb ”.

iv. If Neutral disturbance is occurred, display shows “ nd ”.

v. If Magnet Tamper is occurred, display shows “ nG ”.

vi. If Frequency Variation is occurred, display shows “ FrEq ”.

17. Last Billing DG Maximum Demand Date & Time

18. Meter Serial Number e.g.(1000001)

19. High Resolution Display for kWh

20. Missing Potential Tamper with PhaseIdentification

21. Current Potential Reversal Tamper with PhaseIdentification

22. Current Bypass Tamper (“tanperd” shall be displayed in

place of “ - - - ” whenever CT Bypass tamper is present.)

23. Neutral Disturbance Tamper Present Status

24. Frequency Tamper Present Status(“tanperd” shall be displayed in place of “ - - - ” whenever

Frequency Variation tamper is present.)

25. Total Tamper Count

TimeTOD10.00

04.11.10kVArhMD

kWhDateBILL

MAGNET

-9-kVArhMD

kWhMAGNET

h--DateBILL

MAGNETCOVEROPEN

---MAGNET

COVEROPEN

BCOVEROPEN

0000001MAGNET

COVEROPEN

ffE9

1kVArhMD

kWhMAGNET

129.4327 kWhB

COVEROPEN

MD

sh

hp

cEf

cE8

---h8g

---

Ec

26. Last Tamper Type Occurrence (See Note 1.0)

27. Date of Last Tamper Occurrence

28. Time of Last Tamper Occurrence

29. Slave Address

occ

04.11.10DateBILL

MAGNET

10:00MAGNET

COVEROPEN

5B

COVEROPEN

ce8occ

sla8

TimeTOD

E0Eal

occ

MDDateBILLCOVEROPEN

- 3 -

Note : In meter display, following icon shall be displayed to show status of variouscondition as given below.

i. “ R ”, “ Y ”, “ B ” enunciator indicates presence of the respective phase.

ii. “ ” with “ R ”, “ Y ”, “ B ” enunciator blinking indicates respective phase current reverse.

iii. “ MAGNET ” indicates magnetic tamper.iv. Blinking of “ ” icon shall indicate that meter is working in generator

mode.b. Push Button Mode : The parameter in this mode can be viewed by pressingthe push button 2 or 3 to reach to the required parameter. On every press of pushbutton 2 the display shall move 1 parameter forward.On every press of pushbutton 3 the display shall move 1 parameter backward.

kVArhMDCOVEROPENDateBILL

1. LCD Segment Check

2. EEPROM Check

3. Battery Check

4. Total Cumulative Energy kWh

5. Utility Cumulative Energy kWh

6. DG Cumulative Energy kWh

7. Real Date & Time

8. Utility Maximum Demand in kW

9. DG Maximum Demand in kW

10. Last Billing Date & Time

11. Last Billing Total Cumulative Energy kWh

12. Last Billing Utility Total Cumulative Energy kWh

13. Last Billing DG Total Cumulative Energy kWh

14. Last Billing Utility Maximum Demand in kW

15. Last Billing Utility Maximum Demand Date & Time

16. Last Billing DG Maximum Demand in kW

Push Button Parameters Typical Screen Shots

eepkVArhMD

BCOVEROPEN 8g888

kVArhMDB

COVEROPEN 8g888

8ae

TimeTOD10.00

04.11.10kVArhMD

kWhDateBILL

MAGNET

TimeTOD10.00

04.11.10kVArhMD

kWhDateBILL

MAGNET

000129.4kVArhMD

kWhDateBILL

TimeTOD

MAGNETCOVEROPEN

000079.9kVArh

TimeTOD

MAGNETCOVEROPEN

000049.5kVArhMD

kWhB

COVEROPEN

kWh

E0Eal

8g

UELIE9

000100.4 kWhDateBILL

MAGNET

000070.2kVArh

TimeTOD

MAGNETCOVEROPEN

000030.2kVArhMD

kWhB

COVEROPEN

kWh

8g

UELIE9DateBILL

DateBILL

3.260kVArh

TimeTOD

MAGNETCOVEROPEN

kWhUELIE9 MD

3.260kVArh

TimeTOD

MAGNETCOVEROPEN

kWhUELIE9 MD

DateBILL

TimeTOD10.00

04.11.10kVArhMD

kWhDateBILL

MAGNETMD

3.120kVArhMD

kWhB

COVEROPEN 8g MD

3.260 kWhB MD

DateBILL

TimeTOD

MAGNETCOVER OPEN

RYB

E0Eal

3.3 MAXIMUM DEMAND RESETIt is possible to reset the MD is following three ways.

a. CMRIb. Auto Reset : MD shall be reset automatic at 00.00Hrs on the date for

which billing date is programmed. (for e.g. 1st day of month).

3.4 LOAD SURVEYThe following parameters are provided for load survey with 30 minutesintegration period.

a. Total kWhb. Total kVAhc. Utility kWhd. DG kWh

Load survey is available for last 120 days.

3.5 TOD : The meters have been programmed for 6 TOD slots. The defaultTOD slot timings are as follows :

Slot 1 : 00.00 hrs. to 06.00 hrs.

Slot 2 : 06.00 hrs. to 18.00 hrs.

Slot 3 : 18.00 hrs. to 19.00 hrs.

Slot 4 : 19.00 hrs. to 21.00 hrs.

Slot 5 : 21.00 hrs. to 23.00 hrs.

Slot 6 : 23.00 hrs. to 00.00 hrs.

3.6 POWER ON/OFFPower On/Off event is recorded when ever DG Power goes off for more than5 minutes. Last 20 Power On/Off events are recorded by meter in FIFO basis.

4. DISPLAY DETAILS : As soon as the meter is powered On, it shall show theversion number of the firmware.

Then it shall go to first display parameter.

There are two modes of display :a. Auto scroll Modeb. Push Button mode

- 2 -

a. Auto Scroll Mode : Auto scroll mode always displays the following parameter.

Auto Scroll Button Parameters Typical Screen Shots

1. Total Cumulative Energy kWh

2. Utility Cumulative Energy kWh

3. DG Cumulative Energy kWh

000129.4RYB kVArhMD

kWhDateBILL

TimeTOD

MAGNETCOVEROPEN

000079.9RYB kVArh

TimeTOD

MAGNETCOVEROPEN

000049.5RYB kVArhMD

kWhB

COVEROPEN

kWh

E0Eal

8g

UELIE9

- 5 -

7. TECHNICAL CHARACTERISTICS OF METER :

1. Enclosure : Engineering plastic

2. Display : Backlit LCD display

Large digit size 10 mm x 5 mm

3. Protection Index : IP51

4. System : AC 3 Phase, 4 Wire

5. Inputs : Starting Current : 0.2% of Ib

Rated Voltage : 3 x 240V

Current Rating : 10-60A

Frequency : 50 Hz ± 5%

Power factor : Zero lag - unity - Zero lead

6. Class of Accuracy : Class 1.0

7. Application Standard : IS 13779 : 1999

CBIP-88

6. TAMPER THRESHOLDS :

THRESHOLD FOR TAMPER TAMPER EVENT Occurrence

Limit Occurrence

Time Restoration

Time Restoration

Time Compart –ment No.

1. Missing Potential 20 minute 20 minute

a. Voltage in tamper phase

< 20% Vref > 40%Vref

b. Current in tamper phase

> 10% Ib Ignored

2. Neutral Disturbance 20 minute 20 minute

a. Voltage in any phase

> 300V Ignored

b. Voltage in all phase Ignored < 300V

3. CT Polarity Reversal 20 minute 20 minute

a. Current in tamper phase

> 5% Ib (In reverse direction)

> 10% Ib (in forward direction)

b. Voltage in Tampered phase

> 20% Vref > 20% Vref

c. Power factor > 0.1 > 0.1

4. CT Bypass 20 minute 20 minute

a. Bypass Current > 30% Ib < 10% Ib

5. Frequency Variation 20 minute 20 minute

a. Freq < 47.5Hz

or > 52.5Hz

Freq > 47.5Hz

or < 52.5Hz

0

6. Magnet 20 seconds 20 seconds

Under Influence of abnormal Magnetic field

After removal of abnormal Magnetic field

Version NumberRYBMAGNET 8888

HISTORYk W h

KVArh MDP -210.XX

18

RYB MAGNET

RYB

kWhMAGNET

- 4 -

5. COMMUNICATION : Following parameters can be obtained through optical portby using CMRI / BCS.

a. Last 6 months billing data.

b. Instantaneous parameters at the time of meter reading.

c. TOD Data.

d. Tamper data.

Note 1.0

Last tamper Occurrence ID shall be as follows:

i. If CT Reversal is occurred, display shows “ Ctr ”.

ii. If Missing Potential is occurred, display shows “ nP ”.

iii. If CT Bypass tamper occurred, display shows “ ctb ”.

iv. If Neutral disturbance is occurred, display shows “ nd ”.

v. If Magnet Tamper is occurred, display shows “ nG ”.

vi. If Frequency Variation is occurred, display shows “ FrEq ”.

17. Last Billing DG Maximum Demand Date & Time

18. Meter Serial Number e.g.(1000001)

19. High Resolution Display for kWh

20. Missing Potential Tamper with PhaseIdentification

21. Current Potential Reversal Tamper with PhaseIdentification

22. Current Bypass Tamper (“tanperd” shall be displayed in

place of “ - - - ” whenever CT Bypass tamper is present.)

23. Neutral Disturbance Tamper Present Status

24. Frequency Tamper Present Status(“tanperd” shall be displayed in place of “ - - - ” whenever

Frequency Variation tamper is present.)

25. Total Tamper Count

TimeTOD10.00

04.11.10kVArhMD

kWhDateBILL

MAGNET

-9-kVArhMD

kWhMAGNET

h--DateBILL

MAGNETCOVEROPEN

---MAGNET

COVEROPEN

BCOVEROPEN

0000001MAGNET

COVEROPEN

ffE9

1kVArhMD

kWhMAGNET

129.4327 kWhB

COVEROPEN

MD

sh

hp

cEf

cE8

---h8g

---

Ec

26. Last Tamper Type Occurrence (See Note 1.0)

27. Date of Last Tamper Occurrence

28. Time of Last Tamper Occurrence

29. Slave Address

occ

04.11.10DateBILL

MAGNET

10:00MAGNET

COVEROPEN

5B

COVEROPEN

ce8occ

sla8

TimeTOD

E0Eal

occ

MDDateBILLCOVEROPEN

- 3 -

Note : In meter display, following icon shall be displayed to show status of variouscondition as given below.

i. “ R ”, “ Y ”, “ B ” enunciator indicates presence of the respective phase.

ii. “ ” with “ R ”, “ Y ”, “ B ” enunciator blinking indicates respective phase current reverse.

iii. “ MAGNET ” indicates magnetic tamper.iv. Blinking of “ ” icon shall indicate that meter is working in generator

mode.b. Push Button Mode : The parameter in this mode can be viewed by pressingthe push button 2 or 3 to reach to the required parameter. On every press of pushbutton 2 the display shall move 1 parameter forward.On every press of pushbutton 3 the display shall move 1 parameter backward.

kVArhMDCOVEROPENDateBILL

1. LCD Segment Check

2. EEPROM Check

3. Battery Check

4. Total Cumulative Energy kWh

5. Utility Cumulative Energy kWh

6. DG Cumulative Energy kWh

7. Real Date & Time

8. Utility Maximum Demand in kW

9. DG Maximum Demand in kW

10. Last Billing Date & Time

11. Last Billing Total Cumulative Energy kWh

12. Last Billing Utility Total Cumulative Energy kWh

13. Last Billing DG Total Cumulative Energy kWh

14. Last Billing Utility Maximum Demand in kW

15. Last Billing Utility Maximum Demand Date & Time

16. Last Billing DG Maximum Demand in kW

Push Button Parameters Typical Screen Shots

eepkVArhMD

BCOVEROPEN 8g888

kVArhMDB

COVEROPEN 8g888

8ae

TimeTOD10.00

04.11.10kVArhMD

kWhDateBILL

MAGNET

TimeTOD10.00

04.11.10kVArhMD

kWhDateBILL

MAGNET

000129.4kVArhMD

kWhDateBILL

TimeTOD

MAGNETCOVEROPEN

000079.9kVArh

TimeTOD

MAGNETCOVEROPEN

000049.5kVArhMD

kWhB

COVEROPEN

kWh

E0Eal

8g

UELIE9

000100.4 kWhDateBILL

MAGNET

000070.2kVArh

TimeTOD

MAGNETCOVEROPEN

000030.2kVArhMD

kWhB

COVEROPEN

kWh

8g

UELIE9DateBILL

DateBILL

3.260kVArh

TimeTOD

MAGNETCOVEROPEN

kWhUELIE9 MD

3.260kVArh

TimeTOD

MAGNETCOVEROPEN

kWhUELIE9 MD

DateBILL

TimeTOD10.00

04.11.10kVArhMD

kWhDateBILL

MAGNETMD

3.120kVArhMD

kWhB

COVEROPEN 8g MD

3.260 kWhB MD

DateBILL

TimeTOD

MAGNETCOVER OPEN

RYB

E0Eal