Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275

Upload: others

Post on 26-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275

Open House #2 Summary Report

Date of Meeting:

July 16, 2008

Prepared by:

4601 DTC Boulevard, Suite 700 Denver, CO 80237

303-221-7275

Page 2: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275
Page 3: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275

Page 1

INTRODUCTION

This report contains a summary of public involvement efforts associated with the second US 6 - Clifton Access Management Plan Open House. The purpose of the open house was to present the preliminary access management plan recommendations developed by the study team. Members of the project team, including representatives from the Colorado Department of Transportation, Mesa County, and PBS&J, were on hand to address the public’s questions and concerns. The open house format allowed people to come and go at their convenience and provided opportunities for people to speak with project team members one-on-one. Assistance for people with disabilities was offered upon request. Project information was presented through a combination of display boards, roll plots, brochures, and a DVD video. Attendees began the open house by registering at a sign-in table, where a staff member collected their contact information. Display boards were placed around the room, covering various aspects of the study. Two large study area maps displaying the proposed access modifications were on display in the center of the room. Attendees were able to use Post-it notes to provide comments on both the boards and the map. A video presentation providing an overview of access management was played throughout the evening. Tables were available for attendees to sit and complete their comment forms and enjoy refreshments. The meeting date, time, and location were as follows: Date: July 16, 2008 Time: 5-8 p.m. Location: Clifton Community Hall 126 2nd St There were 34 people in attendance. The sign-in sheets are attached to this report as Appendix A.

Page 4: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275

Page 2

INFORMATION PRESENTED The following materials were available at the open house and are attached to this report as Appendix B:

Handouts

1. Comment Form 2. Brochure: Benefits of Access Management (Federal Highway Administration)

DVD Video

Access Management Overview (Federal Highway Administration, May 1997) Note: This is not available in the appendix.

Display Materials

1. Boards (Q. 19) 2. Proposed Access Modifications Map

PUBLIC NOTIFICATION Several communication tools were utilized to notify the public of the open house. Examples are attached to this report as Appendix C :

Post Card – The post card served as an invitation to attend the open house. The post card was mailed to residents, property owners, and businesses within the study area. The mailing list contained 430 addresses.

Web site – The project Web site (www.dot.state.co.us/us6clifton/) provided the date, time, and location of the open house and also provided an overview of the study.

Print Advertisements – Open house print advertisements were published as follows: Grand Junction Daily Sentinel: 7/3/08; 7/16/08

Press Release – A press release was developed and distributed to media outlets throughout the corridor.

COMMENTS RECEIVED Comments were provided at the open house on comment forms and directly onto the proposed access modifications map. The complete comment forms are attached as Appendix D. A summary of the comments received is found on the following page.

Page 5: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275

Category Comment The changes to US 6 and I-70 BL will make for easier and safer access. The impacts on the post office, fire department, school and numerous businesses will be enormous. The intersection of 3rd into Peach Tree should have a ¾ intersection. This would eliminate most of the accidents that have occurred and still keep access viable to the shopping center. Please consider a ¾ access or a ½ access minimum. The other access nearby is a very difficult access to maneuver and would damage business substantially. It is difficult to be a small business if there is not direct access.

Access

Southbound I-70 B traffic that wants to access US 6 should be forced to do so at 32 ½ Road instead of at the traffic signal at I-70B/FRoad.

Moving the access point for Peach Tree Center to 2nd Street will diminish the value of the vacant land near the center. It will make the F Road visibility for the two lots that front F Road have relatively little value to the developers.

Peach Tree Center access must be taken into consideration fur future planning. It must remain a retail hub. Access is always a consideration for retail space value.

Traffic Traffic turn lights on I-70 BL need to be adjusted to volume of turning vehicles. Numerous contentious issues will arise, due to the access changes. Residents will do their best to keep their interests in the forefront of the project. Environmental Justice of the local population has been neglected at the post office, where the bulk of locals obtain their mail. The local grade school has been forced by the plan to forfeit the playground to traffic and the children will have a smaller play area close to the major road.

Misc.

Good presentation.

The two “T” intersections are not conducive to efficient movement of east/west traffic on F Road. Looking to the future it is even more imperative that the flow of east/west traffic not be impeded.

NEXT STEPS The display boards and proposed access modifications map are available on the project Web site. The project team will consider questions and comments provided by the public during the open house.

Page 6: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275
Page 7: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275

Appendix A: Sign-in Sheets

Page 8: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275
Page 9: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275
Page 10: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275
Page 11: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275
Page 12: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275
Page 13: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275

Appendix B: Information Presented

Page 14: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275
Page 15: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275

US 6 - Clifton Access Management Plan

Public Open House #2 Comment Form Wednesday, July 16, 2008 · 5:00-8:00 P.M.

Clifton Community Hall

Name

Address

Phone/E-mail

1. After reviewing the information presented at tonight’s meeting, what are your overall thoughts about the

recommended future changes to US 6 access between the I-70 Business Loop and the railroad viaduct east of

33 Road?

________________________________________________________________________________________

________________________________________________________________________________________

________________________________________________________________________________________

________________________________________________________________________________________

________________________________________________________________________________________

________________________________________________________________________________________

2. Do you own property with direct access to US 6? Yes No

If yes, please provide the property address(es) (if different than above): ________________________________

_________________________________________________________________________________________

3. Where do you access US 6? ______________________________________________________________

_________________________________________________________________________________________

4. How often do you drive the US 6 corridor? (circle one) Daily Weekly Monthly Rarely This was my 1st time

5. How did you hear about this meeting? __________________________________________________________

6. Please tell us how we can improve the information presented and the best way to keep you informed. _______

__________________________________________________________________________________________

__________________________________________________________________________________________

__________________________________________________________________________________________

OVER

Page 16: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275

US 6 - Clifton Access Management Plan

Public Open House #2 Comment Form Wednesday, July 16, 2008 · 5:00-8:00 P.M.

Clifton Community Hall

Additional comments: _________________________________________________________________________

__________________________________________________________________________________________

__________________________________________________________________________________________

__________________________________________________________________________________________

__________________________________________________________________________________________

___________________________________________________________________________________________

___________________________________________________________________________________________

___________________________________________________________________________________________

___________________________________________________________________________________________

For more information, contact: US 6 - Clifton Access Management Plan

c/o David Sprague Consultant Project Manager

PBS&J 4601 DTC Blvd., Ste. 700

Denver, CO 80237 800-497-5529

Please place in comment box or mail to address above.

THANK YOU FOR YOUR PARTICIPATION

Page 17: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275

CIT

ATIO

NS

[1]

Col

orad

o D

epar

tmen

t of

Hig

hway

s, 1

98

5,

Fina

l R

epor

t of

the

Col

orad

o A

cces

s Con

trol

Dem

onst

ratio

n Pro

ject

, Col

orad

o.

[2]

Eise

le,

W.

E.,

and

W.

E. Fr

awle

y, 1

99

9,

A M

etho

dolo

gy fo

r D

eter

min

ing

Econ

omic

Impa

cts

of R

aise

d M

edia

ns:

Dat

a A

nalysi

s on

Add

ition

al C

ase

Stu

dies

, R

esea

rch

Rep

ort

39

04

-3,

Texa

sTr

ansp

orta

tion

Inst

itute

, Col

lege

Sta

tion,

Texa

s, O

ctob

er.

[3]

Fraw

ley,

W.

E.,

and

W.

E. E

isel

e, 1

99

8,

A M

etho

dolo

gy t

o D

eter

min

e Ec

onom

ic Im

pact

sof

R

aise

d M

edia

ns on

A

djac

ent

Bus

ines

ses,

1

99

8 N

atio

nal

Con

fere

nce

on A

cces

sM

anag

emen

t.

[4]

Glu

ck,

J.,

H.

S.

Levi

nson

, an

d V.

Sto

ver,

19

99

, Im

pact

s of

A

cces

s M

anag

emen

tTe

chni

ques

, N

CH

RP R

epor

t 4

20

, Tr

ansp

orta

tion

Res

earc

h B

oard

.

[5]

Iow

a D

epar

tmen

t of

Tr

ansp

orta

tion

, 1

99

7,

Acc

ess

Man

agem

ent

Res

earc

h an

dAw

aren

ess

Pro

gram

: P

hase

II R

epor

t.

[6]

Jacq

uem

art,

G

., 1

99

8,

Syn

thes

is of

H

ighw

ay Pra

ctic

e 2

64

: M

oder

n R

ound

abou

tPra

ctic

e in

the

Uni

ted

Sta

tes,

Nat

iona

l Coo

pera

tive

Hig

hway

Res

earc

h Pro

gram

, N

atio

nal A

cade

my

Pre

ss,

Was

hing

ton,

D.C

.

[7]

Lall,

B.

K.,

D.

Hun

tingt

on,

and

A.

Eght

edar

i, 1

99

6,

Acc

ess

Man

agem

ent

and

Traf

ficSaf

ety,

Pap

er p

rese

nted

at

the

Sec

ond

Ann

ual A

cces

s M

anag

emen

t Con

fere

nce.

[8]

Long

, G

, C.T

. G

an,

and

B.S

. M

orriso

n. "

Impa

cts

of S

elec

ted

Med

ian

and

Acc

ess

Des

ign

Feat

ures

."

Flor

ida

Dep

artm

ent

of T

rans

port

atio

n R

epor

t,Tr

ansp

orta

tion

Res

earc

h Cen

ter, U

nive

rsity

of

Flor

ida,

May

19

93

.

[9]

Mey

ers,

E.

J.,

19

99

, A

ccid

ent

Red

uctio

n w

ith R

ound

abou

ts,

Pap

er p

rese

nted

at

the

69

th A

nnua

l IT

E M

eetin

g, L

as V

egas

, N

evad

a.

[10

]N

euw

irth

, R

. M

., G

. E.

Wei

sbro

d, a

nd S

. D

. D

ecke

r. 1

99

3,

Met

hodo

logy

for

Eva

luat

ion

Econ

omic

Impa

cts

of R

estr

ictin

g Le

ft T

urns

, Pap

er p

rese

nted

at

the

Firs

t A

nnua

l Acc

ess

Man

agem

ent

Con

fere

nce.

[11

]Pan

t, P

. D

., M

.D.,

S.

Ula

, an

d Y.

Liu

, 1

99

8,

Met

hodo

logy

for

Ass

essi

ng t

he E

ffec

tiven

ess

of A

cces

s M

anag

emen

t Te

chni

ques

, Fi

nal R

epor

t, p

repa

red

for

the

Ohi

o D

epar

tmen

t of

Tran

spor

tatio

n.

[12

]Par

sons

on,

P. S

., M

. G

. W

ater

s III

, an

d J.

S.

Finc

her, 2

00

0,

Geo

rgia

Stu

dy C

onfir

ms

the

Con

tinui

ng S

afet

y A

dvan

tage

of R

aise

d M

edia

ns O

ver

Two-

Way

Lef

t-Tu

rn L

anes

, pr

esen

t-ed

at

the

Four

th N

atio

nal Con

fere

nce

on A

cces

s M

anag

emen

t, P

ortla

nd,

Ore

gon.

[13

]S/

KTr

ansp

orta

tion

Con

sulta

nts,

Inc.

, 2

00

0,

Nat

iona

l Hig

hway

Inst

itute

Cou

rse

Num

ber

13

30

78

: A

cces

s M

anag

emen

t, L

ocat

ion,

and

Des

ign,

Apr

il.

[14

]Te

xas

Tran

spor

tatio

n In

stitu

te,

In P

rogr

ess,

An

Eval

uatio

n of

Str

ateg

ies

for

Impr

ovin

gTr

ansp

orta

tion

Mob

ility

and

Ene

rgy

Effic

ienc

y in

Urb

an A

reas

, Te

xas

A&

M U

nive

rsity

,Pro

ject

60

01

1.

FO

R M

OR

E I

NFO

RM

ATIO

N

http

://

ww

w.a

cces

sman

agem

ent.

gov

FHW

A D

ocum

ent

Num

ber

FHW

A-O

P-0

3-0

66

WH

AT I

S A

CC

ES

S

MA

NA

GE

ME

NT?

Acc

ess

man

agem

ent

is a

set

of

tech

niqu

es t

hat

stat

e an

d lo

cal go

v-er

nmen

ts c

an u

se to

cont

rol a

cces

s to

hig

hway

s, m

ajor

art

eria

ls, an

dot

her

road

way

s.

Acc

ess

man

agem

ent

incl

udes

sev

eral

tec

hniq

ues

that

are

des

igne

d to

inc

reas

e th

e ca

paci

ty o

f th

ese

road

s, m

anag

eco

nges

tion,

and

red

uce

cras

hes.

�In

crea

sing

spa

cing

bet

wee

n si

gnal

s an

d in

terc

hang

es;

�D

rive

way

loca

tion,

spa

cing

, an

d de

sign

;�

Use

of ex

clus

ive

turn

ing

lane

s;�

Med

ian

trea

tmen

ts, in

clud

ing

two-

way

left t

urn

lane

s (T

WLT

L) t

hat

allo

w t

urn

mov

emen

ts i

n m

ultip

le d

irec

tions

fro

m a

cen

ter

lane

and

rais

ed m

edia

ns t

hat

prev

ent

mov

emen

ts a

cros

s a

road

way

;�

Use

of se

rvic

e an

d fr

onta

ge r

oads

; an

d�

Land

use

pol

icie

s th

at li

mit

righ

t-of

-way

acc

ess

to h

ighw

ays.

Sta

te,

regi

onal

, an

d lo

cal

gove

rnm

ents

acr

oss

the

Uni

ted

Sta

tes

use

acce

ss m

anag

emen

t po

licie

s to

pre

serv

e th

e fu

nction

ality

ofth

eir

road

way

sy

stem

s. Th

is is

of

ten

done

by

de

sign

atin

g an

appr

opri

ate

leve

l of

acc

ess

cont

rol

for

each

of

a va

riet

y of

fac

ili-

ties

. L

ocal

res

iden

tial

roa

ds a

re a

llow

ed f

ull ac

cess

, w

hile

maj

orhi

ghw

ays

and

free

way

s al

low

ver

y lit

tle.

In

bet

wee

n ar

e a

seri

esof

roa

d ty

pes

that

req

uire

sta

ndar

ds t

o he

lp e

nsur

e th

e fr

ee f

low

of t

raffic

and

min

imiz

e cr

ashe

s, w

hile

still

allo

win

g ac

cess

to

maj

orbu

sine

sses

and

oth

er lan

d us

es a

long

a r

oad,

PU

RP

OS

E O

F T

HE

BR

OC

HU

RE

This

bro

chur

e se

rves

as

a gu

ide

to t

he m

ajor

ben

efits

of

seve

ral

acce

ss m

anag

emen

t te

chni

ques

in u

se a

cros

s th

e U

nite

d Sta

tes.

The

purp

ose

of t

his

broc

hure

is

to p

rovide

a c

ompr

ehen

sive

and

suc

cinc

tex

amin

atio

n of

the

ben

efits

of ac

cess

man

agem

ent

and

addr

ess

maj

orco

ncer

ns t

hat

are

ofte

n ra

ised

abo

ut a

cces

s m

anag

emen

t.Th

e be

nefit

s us

ually

id

entif

ied

with

ac

cess

m

anag

emen

t in

clud

eim

prov

ed m

ovem

ent

of t

hrou

gh t

raffic

, re

duce

d cr

ashe

s, a

nd f

ewer

vehi

cle

conf

licts

. M

ost

maj

or c

once

rns

abou

t ac

cess

man

agem

ent

rela

te to

po

tent

ial

redu

ctio

ns in

re

venu

e to

lo

cal

busi

ness

es th

atde

pend

on

pass

-by

traf

fic.

This

bro

chur

e do

es n

ot d

escr

ibe

the

prec

ise

stra

tegi

es t

hat

tran

s-po

rtat

ion

depa

rtm

ents

sho

uld

follo

w t

o im

plem

ent

an a

cces

s m

an-

agem

ent

prog

ram

, bu

t ra

ther

pro

vide

s an

int

rodu

ctio

n to

the

key

conc

epts

. T

he b

roch

ure

may

als

o be

a u

sefu

l to

ol t

o di

stribu

te a

tpu

blic

mee

tings

for

bot

h ge

nera

l ac

cess

man

agem

ent

plan

s an

dsp

ecifi

c ap

plic

atio

ns o

f ac

cess

man

agem

ent

tech

niqu

es.

This

bro

chur

e de

scribe

s th

e re

leva

nt b

enef

its a

nd iss

ues

with

thr

eeke

y se

ts o

f ac

cess

man

agem

ent

tech

niqu

es:

1.

Acc

ess

spac

ing,

incl

udin

g sp

acin

g be

twee

n si

gnal

ized

inte

rsec

tions

and

dist

ance

bet

wee

n dr

ivew

ays;

2.

Turn

ing

lane

s, i

nclu

ding

ded

icat

ed l

eft- a

nd r

ight

-tur

n la

nes,

as

wel

l as

ind

irec

t le

ft t

urns

and

U-tur

ns,

and

roun

dabo

uts;

and

3.

Med

ian

trea

tmen

ts,

incl

udin

g tw

o-w

ay l

eft-tu

rn l

anes

and

rai

sed

med

ians

.

Page 18: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275

AC

CE

SS

SP

AC

ING

Sig

nal

Spacin

gIn

crea

sing

the

dis

tanc

e be

twee

n tr

affic

sig

nals

im

prov

es t

heflo

w o

f tr

affic

on

maj

or a

rter

ials

, re

duce

s co

nges

tion,

and

impr

oves

air q

ualit

y fo

r he

avily

tra

vele

d co

rrid

ors.

Th

e ap

pro-

pria

te

spac

ing

betw

een

sign

als

for

a pa

rtic

ular

co

rrid

orde

pend

s gr

eatly

upo

n th

e sp

eed

and

flow

of

traf

fic,

but

any-

thin

g gr

eate

r th

an tw

o si

gnal

s pe

r m

ile ha

s a

sign

ifica

ntim

pact

on

cong

estio

n an

d sa

fety

.A m

ajor

syn

thes

is o

f re

sear

ch o

n ac

cess

man

agem

ent

foun

dth

at e

ach

addi

tiona

l si

gnal

ove

r tw

o pe

r m

ile (

i.e., a

one

-hal

fm

ile s

igna

l spa

cing

) in

crea

sed

trav

el t

ime

by o

ver

six

perc

ent.

[4] A

stu

dy o

f an

inte

rsec

tion

in C

inci

nnat

i whe

re a

sig

nal w

asad

ded

foun

d a

20 p

erce

nt in

crea

se in

pea

k tr

avel

tim

es. [1

1]

A d

emon

stra

tion

proj

ect in

Col

orad

o re

veal

ed tha

t ha

lf m

ile s

igna

l spa

cing

and

rai

sed

med

i-an

s on

a fi

ve-m

ile r

oadw

ay s

egm

ent re

duce

d to

tal h

ours

of v

ehic

le tra

vel b

y 42 p

erce

nt a

ndto

tal h

ours

of de

lay

by 5

9 p

erce

nt,

com

pare

d to

qua

rter

mile

sig

nal s

paci

ng.

[1]

Impr

oved

spe

eds

and

trav

el t

imes

tra

nsla

te d

irec

tly in

to e

nvi-

ronm

enta

l be

nefit

s. A

n on

goin

g st

udy

in T

exas

fou

nd t

hat

ate

n m

ile f

our-

lane

art

eria

l w

ith o

ne-h

alf

mile

sig

nal

spac

ing

redu

ced

fuel

co

nsum

ptio

n by

2

40

,00

0

gallo

ns

from

incr

ease

d sp

eed

and

335,0

00 g

allo

ns f

rom

red

uced

del

ay,

com

pare

d to

qua

rter

mile

sig

nal s

paci

ng.

[14]

Incr

easi

ng t

he

dist

ance

bet

wee

n si

gnal

s al

so r

educ

es t

hein

cide

nce

of c

rash

es.

A r

evie

w o

f cr

ash

data

fro

m s

even

stat

es d

emon

stra

ted

that

the

cra

sh r

ate

incr

ease

d su

bsta

ntia

lly w

ith a

dditi

onal

sig

nals

per

mile

. [4

] T

his

is p

artly

rel

ated

to

acce

ss s

paci

ng,

whi

ch is

pre

sent

ed n

ext.

Dri

vew

ay

Spacin

gApp

ropr

iate

drive

way

spa

cing

pre

sent

s an

othe

r m

ajor

acc

ess

issu

e.

Larg

e nu

mbe

rs o

fdr

ivew

ays

incr

ease

the

pot

entia

l co

nflic

ts o

n th

e ro

ad.

Few

er d

rive

way

s sp

aced

fur

ther

apar

t al

low

for

mor

e or

derly

mer

ging

of tr

affic

and

pre

sent

few

er c

halle

nges

to

driver

s.Th

e co

nges

tion

impa

cts

of r

educ

ed d

rive

way

s ar

e fa

irly c

lear

. I

t is

im

poss

ible

for

am

ajor

art

eria

l or

hig

hway

to

mai

ntai

n fr

ee f

low

spe

eds

with

num

erou

s ac

cess

poi

nts

that

ad

d sl

ow

mov

ing

vehi

cles

.

Are

sear

ch s

ynth

esis

fou

nd t

hat

road

way

spee

ds w

ere

redu

ced

an av

erag

e of

2.5

mile

s pe

r ho

ur for

eve

ry 1

0 a

cces

spo

ints

per

mile

, up

to

a m

axim

um o

f a

10 m

iles

per

hour

re

duct

ion

(at

40

acce

ss p

oint

s pe

r m

ile). [4] W

ith h

igh-

er n

umbe

rs o

f ac

cess

poi

nts,

con

ges-

tion

will in

crea

se s

igni

fican

tly.

An

over

abun

danc

e of

dr

ivew

ays

also

incr

ease

s th

e ra

te o

f ca

r cr

ashe

s.

An

exam

inat

ion

of

cras

h da

ta

in

seve

nst

ates

in

dica

ted

foun

d a

stro

ng lin

ear

rela

tions

hip

betw

een

the

num

ber

ofcr

ashe

s an

d th

e nu

mbe

r of

drive

way

s.Rur

al

area

s ha

d a

sim

ilar,

but

less

stro

ng r

elat

ions

hip.

[4,7

]

ME

DIA

N T

RE

ATM

EN

TS

Media

ns

Med

ian

trea

tmen

ts for

roa

dway

s re

p-re

sent

on

e of

th

e m

ost

effe

ctive

mea

ns t

o re

gula

te a

cces

s, b

ut a

real

so t

he m

ost

cont

rove

rsia

l. T

he t

wo

maj

or

med

ian

trea

tmen

ts

incl

ude

two-

way

lef

t tu

rn lan

es (

TWLT

L) a

ndra

ised

med

ians

.

The

safe

ty

bene

fits

of

med

ian

impr

ovem

ents

hav

e be

en t

he s

ubje

ctof

num

erou

s st

udie

s an

d sy

nthe

ses.

Stu

dies

of

both

par

ticul

ar c

orrido

rsan

d co

mpa

rativ

e re

sear

ch o

n di

ffer

-en

t ty

pes

of m

edia

n tr

eatm

ents

ind

i-ca

te

the

sign

ifica

nt

safe

ty

bene

fits

from

ac

cess

m

anag

emen

t te

ch-

niqu

es.

Acc

ordi

ng t

o an

ana

lysi

s of

cra

sh d

ata

in s

even

sta

tes,

rai

sed

med

ians

red

uce

cras

hes

by o

ver

40 p

erce

nt in

urb

an a

reas

and

ove

r 60 p

erce

nt in

rur

al a

reas

. [4

]

A s

tudy

of co

rrid

ors

in s

ever

al c

ities

in Io

wa

foun

d th

at tw

o-w

ay le

ft-tur

n la

nes

redu

ced

cras

hes

by a

s m

uch

as 7

0 p

erce

nt,

impr

oved

lev

el o

f se

rvic

e by

one

ful

l gr

ade

inso

me

area

s, a

nd inc

reas

ed lan

e ca

paci

ty b

y as

muc

h as

36

per

cent

. [5

]

Rai

sed

med

ians

als

o pr

ovid

e ex

tra

prot

ectio

n fo

r pe

dest

rian

s.

A s

tudy

of m

edia

n tr

eat-

men

ts in

Geo

rgia

fou

nd t

hat

rais

ed m

edia

ns r

educ

ed p

edes

tria

n-in

volved

cra

shes

by

45

perc

ent

and

fata

litie

s by

78 p

erce

nt,

com

pare

d to

tw

o-w

ay le

ft-tur

n la

nes.

[12]

TU

RN

ING

LA

NE

S

Left

Turn

sEx

clus

ive

turn

ing

lane

s fo

r ve

hicl

es r

emov

e st

oppe

d ve

hicl

es f

rom

thro

ugh

traf

fic. L

eft-tu

rn la

nes

at in

ters

ectio

ns s

ubst

antia

lly r

educ

ere

ar-e

nd c

rash

es.

A m

ajor

syn

thes

is o

f re

sear

ch o

n le

ft-tur

n la

nes

dem

onst

rate

d th

at e

xclu

sive

tur

n la

nes

redu

ce c

rash

es b

etw

een

18

to 7

7 p

erce

nt (

50 p

erce

nt a

vera

ge)

and

redu

ce r

ear-

end

collisi

ons

betw

een

60 a

nd 8

8 p

erce

nt.

[4]

Left-tur

n la

nes

also

sub

stan

tially

incr

ease

the

cap

acity

of m

any

road

way

s. A s

hare

d le

ft-

turn

and

thr

ough

lan

e ha

s ab

out

40 t

o 60 p

erce

nt t

he c

apac

ity o

f a

stan

dard

thr

ough

lane

. [4

].

A s

ynth

esis

of re

sear

ch o

n th

is t

opic

fou

nd a

25 p

erce

nt in

crea

se in

cap

acity

,on

ave

rage

, fo

r ro

adw

ays

that

add

ed a

left-tu

rn la

ne.

[13]

Indir

ect

Turn

sSom

e of

the

big

gest

issu

es w

ith m

anag

ing

acce

ss c

ome

at in

ters

ectio

ns w

here

veh

icle

sm

ust

cros

s tr

affic

. S

ome

stat

es a

nd c

ities

hav

e ad

opte

d in

dire

ct t

urns

to

redu

ce t

hese

conf

licts

. I

n N

ew J

erse

y, t

he jug

-han

dle

left t

urn

requ

ires

a r

ight

tur

n on

to a

fee

der

stre

et, fo

llow

ed b

y a

left o

nto

a cr

oss

stre

et. D

etro

it ha

sex

tens

ivel

y us

ed a

n in

dire

ct U

-tur

n th

at r

equi

res

a U

-tur

npa

st a

n in

ters

ectio

n, fol

low

ed b

y a

righ

t tu

rn in

stea

d of

are

gula

r le

ft t

urn.

Like

de

dica

ted

left

-tur

nla

nes,

indi

rect

tur

ns r

educ

ecr

ashe

s,

impr

ove

cong

es-

tion

, an

d ad

d ca

paci

ty.

Cra

shes

dec

line

by 2

0 p

er-

cent

on

av

erag

e,

and

35

perc

ent

if th

e in

dire

ct t

urn

inte

rsec

tion

is

sign

aliz

ed.

Cap

acity

ty

pica

lly

show

s a

15 t

o 20 p

erce

nt g

ain.

[4]

Rig

ht

Turn

sR

ight

-tur

n la

nes

typi

cally

hav

e a

less

sub

stan

tial

impa

ct o

ncr

ashe

s an

d ro

adw

ay

capa

city

th

an

othe

r ty

pes

of

turn

stra

tegi

es,

beca

use

ther

e ar

e fe

wer

lim

itatio

ns

on

righ

ttu

rns.

Th

ough

the

re a

re f

ewer

stu

dies

of

thes

e im

pact

s,th

ere

is a

cle

ar r

elat

ions

hip

betw

een

the

num

ber

of v

ehic

les

atte

mpt

ing

a righ

t tu

rn in

a t

hrou

gh t

raffic

lane

and

its

dela

yto

thr

ough

tra

ffic

. T

his

rela

tions

hip

is e

xpon

entia

l –

each

addi

tiona

l car

tha

t m

ust

wai

t fo

r a

righ

t tu

rn w

ill in

crea

se t

hede

lay

mor

e th

an t

he p

revi

ous

car.

A

t in

ters

ectio

ns w

ith s

ubst

antia

l righ

t-tu

rn m

ove-

men

ts,

a de

dica

ted

righ

t-tu

rn l

ane

segr

egat

es t

hese

car

s fr

om t

hrou

gh t

raffic

and

incr

ease

s th

e ca

paci

ty o

f th

e ro

ad.

Roundabouts

Rou

ndab

outs

rep

rese

nt a

pot

entia

l so

lutio

n fo

r in

ter-

sect

ions

with

man

y co

nflic

t po

ints

. T

houg

h no

t ap

pro-

pria

te f

or a

ll si

tuat

ions

, ro

unda

bout

s re

duce

veh

icle

mov

emen

ts a

cros

s tr

affic

. O

nly

a fe

w s

tudi

es h

ave

exam

ined

the

saf

ety

bene

fits

of r

ound

abou

ts.

One

stud

y of

fou

r in

ters

ectio

ns t

hat

wer

e re

plac

ed w

ithro

unda

bout

s in

M

arylan

d fo

und

a dr

op in

cr

ashe

sbe

twee

n 18 a

nd 2

9 p

erce

nt a

nd a

red

uctio

n in

inju

rycr

ashe

s be

twee

n 63 a

nd 8

8 p

erce

nt.

The

cos

t of

cras

hes

at t

hese

loca

tions

– o

ne m

easu

re o

f se

verity

– w

as a

lso

redu

ced

by 6

8 p

erce

nt.

Ove

rall

cras

hes

on r

ound

abou

ts w

ere

mor

e m

inor

tha

n th

ose

at lef

ttu

rn loc

atio

ns.

[9]

Ano

ther

stu

dy o

f ro

unda

bout

s in

seve

ral

loca

tions

fo

und

a 51 pe

rcen

t re

duct

ion

incr

ashe

s, i

nclu

ding

a 7

3 p

erce

nt r

educ

tion

in i

njur

ycr

ashe

s an

d a

32 p

erce

nt r

educ

tion

in p

rope

rty-da

mag

e-on

ly c

rash

es fo

r si

ngle

-lane

rou

nd-

abou

ts.

Mul

ti-la

ne r

ound

abou

ts o

nly

expe

rien

ced

a 29 p

erce

nt r

educ

tion

in c

rash

es.

[6]

RE

LA

TE

DTE

CH

NIQ

UE

SA

ccess

m

anagem

ent

incl

udes

more

tech

niqu

es t

han

can

be d

iscu

ssed

in

asi

ngle

br

ochu

re.

Som

e of

th

ese

tech

-niq

ues

are

new

er

and

have

been

rese

arch

ed

som

ewha

t le

ss.

Fr

onta

gero

ads

have

be

en th

e su

bjec

t of

so

me

deba

te i

n th

e lit

erat

ure,

but

the

re i

s no

clea

r in

dica

tion

of

thei

r be

nefit

s.

Oth

erte

chniq

ues,

su

ch

as

the

rela

tion

ship

betw

een

high

way

in

terc

hang

e sp

acin

gan

d lo

cal

traf

fic,

are

new

to

pics

th

atre

quir

e m

ore

rese

arch

.

Man

y ci

ties

and

sta

tes

deve

lop

acce

ssm

anagem

ent

pro

gra

ms

to

dea

l w

ith

exis

ting

iss

ues

of c

onge

stio

n an

d sa

fety

.A

n ac

tive

acc

ess

man

agem

ent

prog

ram

,ho

wev

er,

wou

ld n

eed

to inc

lude

cha

nges

to loc

al lan

d us

e po

licie

s th

at e

ncou

rage

the

ration

al d

evel

opm

ent

of m

ajor

roa

ds.

In n

ewly

dev

elop

ing

area

s, l

and

use

and

zoni

ng c

ontr

ols

that

lim

it t

he n

umbe

r of

acce

ss p

oint

s an

d le

ave

spac

e fo

r m

edi-

an im

prov

emen

ts ca

n sa

ve m

oney

an

def

fort

as

thes

e ar

eas

deve

lop.

Busin

ess C

oncern

sIn

stal

ling

rais

ed m

edia

ns o

ften

rai

ses

seriou

s co

ncer

ns b

y th

e bu

sine

ss c

omm

unity

that

loc

al b

usin

esse

s th

at d

epen

d up

on p

ass-

by t

raffic

(es

peci

ally g

as s

tatio

ns a

ndfa

st-fo

od r

esta

uran

ts [

10

]) w

ill b

e ad

vers

ely

affe

cted

by

med

ians

. T

houg

h th

ere

are

few

stu

dies

of th

e ac

tual

impa

cts

of m

edia

ns o

n bu

sine

ss s

ales

, th

ere

are

seve

ral s

ur-

veys

of bu

sine

ss o

wne

r op

inio

ns.

Sur

veys

con

duct

ed in

mul

-tip

le c

orrido

rs in

Texa

s, Iow

a, a

nd F

lorida

dem

onst

rate

tha

tth

e va

st m

ajor

ity o

f bu

sine

ss o

wne

rs b

elie

ve t

here

hav

e be

enno

dec

lines

in

sale

s, w

ith s

ome

belie

ving

the

re a

re a

ctua

llyim

prov

emen

ts in

bus

ines

s sa

les.

[2

,5,8

] One

stu

dy in

Tex

asin

dica

ted

that

cor

rido

rs w

ith a

cces

s co

ntro

l im

prov

emen

tsex

perien

ced

an 1

8 p

erce

nt in

crea

se in

pro

pert

y va

lues

aft

erco

nstr

uctio

n. [

2]

Page 19: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275

WELCOMEto the

US 6–CliftonAccess Management Plan

Open HousePurpose of tonight’s meeting:

Review the study’s purpose and objectives

Present existing and projected future conditions

Present the recommended Access Management Plan

Discuss the next steps in the study process

Gather your comments regarding the study recommendations

Study team members wearing name badges can answer your questions and listen to your comments.

Please take a moment to complete a comment form before you leave.

Thank You. We Appreciate Your Participation.

Please sign in.

Page 20: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275

What is an access management plan?Any intersection or driveway along a roadway is called an access point. The purpose of an access management plan is to determine what access points will be allowed, where they will be located, and what kinds of traffic movements will be allowed at each one.

What are the goals of an access management plan?

Provide appropriate level of access to properties adjacent to the highway

Provide for the safe and efficient flow of traffic

Overview

Page 21: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275

Right-in, Right-out

Only right turns are allowed

Traffi c median prevents left turns and

straight movements – these movements must be completed at another intersection

3/4 Movement

Right-in, right-out and left-in are allowed

Traffi c median prevents left-out and

straight movements – these movements must be completed at another intersection

Full Movement

All movements in all directions

are allowed

May require the

installation of a traffi c signal

OverviewWhat are Typical Types of Access?

Page 22: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275

Why Have an Access Management Plan?

Without an access management plan residents, property owners, and businesses could experience:

Greater number of crashes involving vehicles and/or pedestrians

Increased traffic congestion, resulting in higher levels of pollution and more delays

A loss of visual appeal along the roadway

A difficult driving experience due to driveway clutter

Customers doing business on a highway with a better driving experience

Overview

Page 23: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275

How is an Access Management Plan Developed and Implemented?

Conduct the study

Propose improvements based on study findings and public input

Accept the final plan

Prepare an Intergovernmental Agreement between CDOT and Mesa County

Specify how elements of the plan can be changed in the future, if necessary

Sign the Intergovernmental Agreement and adopt the plan

Present to the Colorado Transportation Commission and get approval from the CDOT Chief Engineer so the plan becomes law

Continuing coordination between CDOT and the communities in the corridor to ensure proper implementation of the plan in the future

Overview

Page 24: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275

OJ F M A M J J A S2008

Access ManagementAnalysis

DataCollection

Traffic Analysis

Final Traffic Study and Access Management Plan

Start IntergovernmentalAgreement Process

Final PublicOpen House

Initial Public Open HouseApril 2, 2008

Project Initiation

2nd Public Open House

Agency Presentation

AgencyPresentation

Final Report

We are hereWe are here

OverviewWhat is the Study Timeline for the US 6 - Clifton Access Management Plan?

Page 25: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275

What are the Limits of the Study?

The study area is from the I-70 Business Loop to the railroad viaduct east of 33 Road, a distance of just under one mile.

33 R

d

33¾

Rd

34 R

d

Front St

F Rd F Rd

G Rd

E½ RdE½ Rd

F½ Rd

E Rd

E¼ Rd

6

6

141

Study AreaudyStudy Area

Overview

Page 26: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275

Highway Characteristics:

Classified as an urban arterial

Designed to accommodate moderate speeds and moderate to high traffic volumes

Service to through traffic movements has priority over providing direct access to properties

Note: Preferred spacing between full movement intersections is 1/2 mile

Access Conditions:

Study area contains 44 access points

All existing access locations are full-movement

Access points are 32% roads (public streets and alleys) and 68% driveways

Existing Conditions

Page 27: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275

Existing Conditions

= Signalized IntersectionLegend

= Number of Accidents at Intersections with High Accident Rates

X

Alle

y 33 R

d.

Clift

on E

lem

enta

ry B

us D

rop-

off

Clift

on E

lem

enta

ryPa

rkin

g Lo

t5t

h St

.

4th

St.

Smal

lwoo

d Ln

.

Holla

nd S

t.

Lois

St.

1st S

t.

Park

n’ R

ide

Car W

ash

3rd

St.

2nd

St.

Alle

y

Peac

h Tr

eeSh

oppi

ng C

ente

r

Alle

y

Alle

y

Alle

y

98 5 411 296

Accident History178 accidents occurred within the project limits between January 2000 and December 2005

96% of the accidents were intersection or intersection-related, and 4% were non-intersection related

Based on accident data from similar highways in Colorado US 6 has a higher-than-average accident rate

25%

23%38%

5%

5%4%

Other

Broadside

Approach-Turn

Rear-End

Sideswipe

FixedObject

Total Accident TypesIntersection and Intersection-Related

TOTAL = 170

Other

Rear-EndFixedObject 49%

13%

38%

Total Accident TypesNon-Intersection Related

TOTAL = 8

Page 28: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275

= Signalized Intersection

= Intersection/Critical Movement Level of Service A, B, or C

Legend

Not to Scale

= Peak Hour Traffic VolumeXXX= Intersection/Critical Movement Level of Service D

= Intersection/Critical Movement Level of Service E or F

= Arterial Level of Service A, B, or C

= Arterial Level of Service D

= Arterial Level of Service E or F

800

750

600

300

800

850

500

600

Alle

y

33 R

d.

Clift

on E

lem

enta

ry B

us D

rop-

off

Clift

on E

lem

enta

ryPa

rkin

g Lo

t

Pede

stria

n Cr

ossi

ng

5th

St.

4th

St.

Smal

lwoo

d Ln

.

Holla

nd S

t.

Lois

St.

1st S

t.

Park

n’ R

ide

Car W

ash

3rd

St.

2nd

St.

Alle

y

Peac

h Tr

eeSh

oppi

ng C

ente

r

Alle

y

Alle

y

Alle

y

F Rd.

Alle

y

33 R

d.

Clift

on E

lem

enta

ry B

us D

rop-

off

Clift

on E

lem

enta

ryPa

rkin

g Lo

t

Pede

stria

n Cr

ossi

ng

5th

St.

4th

St.

Smal

lwoo

d Ln

.

Holla

nd S

t.

Lois

St.

1st.

St.

Park

n’ R

ide

Car W

ash

3rd

St.

2nd

St.

Alle

y

Peac

h Tr

eeSh

oppi

ng C

ente

r

Alle

y

Alle

y

Alle

y

F Rd.

6

6

AM PEAK HOUR

PM PEAK HOUR

2008 Existing Traffi c Volumes and Level of Service

Page 29: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275

Roadway traffic congestion is expressed in terms of level of service (LOS) as defined by the Highway Capacity Manual (HCM). The conditions defining the LOS for roadways are:

A

BB

CC

DD

EE

FF

What is LOS?

LOS A – Represents the best operating conditions and is considered free flow. Individual users are virtually unaffected by the presence of others in the traffic stream.

LOS B – Represents reasonably free-flowing conditions but with some influence by others.

LOS C – Represents a constrained constant flow below speed limits, with additional attention required by drivers to maintain safe operations. Comfort and convenience levels of the driver decline noticeably.

LOS D – Represents traffic operations approaching unstable flow with high passing demand and passing capacity near zero, characterized by drivers being severely restricted in maneuverability.

LOS E – Represents unstable flow near capacity.

LOS F – Represents the worst conditions with heavily congested flow and traffic demand exceeding capacity, characterized by stop-and-go waves, poor travel time, low comfort and convenience, and increased accident exposure.

Page 30: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275

Why Does US 6 -Clifton Need an Access Management Plan?US 6 is an important resource for the communities of Clifton, Palisade, and Grand Junction

Traffic volumes on US 6 are projected to significantly increase in the future

Current and Future Traffic Volumes

US 6 Segment Daily Traffic Volume (2008)

Daily Traffic Volume (2035) % Increase

I-70 B to 2nd Street 18,000 49,000 170%

2nd Street to 33 Road 12,500 39,000 210%

East of 33 Road 9,060 19,000 110%

2008 Daily Traffi c Volume Source: CDOT and PBS&J2035 Daily Traffi c Volume Source: Mesa County

One of the best ways to keep US 6 safe and efficient is to manage the location and design of access points

Page 31: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275

= Signalized Intersection

= Intersection/Critical Movement Level of Service A, B, or C

Legend

Not to Scale

= Peak Hour Traffic VolumeXXX= Intersection/Critical Movement Level of Service D

= Intersection/Critical Movement Level of Service E or F

= Arterial Level of Service A, B, or C

= Arterial Level of Service D

= Arterial Level of Service E or F

1800

1200

1600

900

1500

2300

1200

1750

Alle

y

33 R

d.

Clift

on E

lem

enta

ry B

us D

rop-

off

Clift

on E

lem

enta

ryPa

rkin

g Lo

t

Pede

stria

n Cr

ossi

ng

5th

St.

4th

St.

Smal

lwoo

d Ln

.

Holla

nd S

t.

Lois

St.

1st S

t.

Park

n’ R

ide

Car W

ash

3rd

St.

2nd

St.

Alle

y

Peac

h Tr

eeSh

oppi

ng C

ente

r

Alle

y

Alle

y

Alle

yF Rd.

Alle

y

33 R

d.

Clift

on E

lem

enta

ry B

us D

rop-

off

Clift

on E

lem

enta

ryPa

rkin

g Lo

t

Pede

stria

n Cr

ossi

ng

5th

St.

4th

St.

Smal

lwoo

d Ln

.

Holla

nd S

t.

Lois

St.

1st.

St.

Park

n’ R

ide

Car W

ash

3rd

St.

2nd

St.

Alle

y

Peac

h Tr

eeSh

oppi

ng C

ente

r

Alle

y

Alle

y

Alle

y

F Rd.

6

6

AM PEAK HOUR

PM PEAK HOUR

2035 No-Build* Traffi c Volumes and Level of Service

*Under no-build conditions all roadway conditions (number of lanes) and all access locations are assumed to remain the same as existing conditions.

Page 32: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275

Access Management Methods Being Considered for US 6 - CliftonAccess Elimination

Access to local properties through

secondary roadwaysReduce the number of access locations

where vehicles may enter or exit highwayReduce the number of confl ict points

Access Conversion with Median Treatment Eliminate some or all turning movements

Reduce the number of confl icts between

left turning vehicles and through vehicles on the highway

Access Relocation Align opposite approaches

Create a more familiar intersection design

Access Consolidation Consolidate adjacent access points into

one locationThe number of confl ict points are reduced

Before After

Before After

Before After

Before After

Page 33: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275

= Signalized Intersection

= Intersection/Critical Movement Level of Service A, B, or C

Legend

Not to Scale

= Peak Hour Traffic VolumeXXX= Intersection/Critical Movement Level of Service D

= Intersection/Critical Movement Level of Service E or F

= Arterial Level of Service A, B, or C

= Arterial Level of Service D

= Arterial Level of Service E or F

1800

1200

1600

900

1500

2200

1200

1750

33 R

d.

Clift

on E

lem

enta

ryPa

rkin

g Lo

t5t

h St

.

Holla

nd S

t.

Lois

St.

1st S

t.

3rd

St.

2nd

St.

33 R

d.

Clift

on E

lem

enta

ryPa

rkin

g Lo

t5t

h St

.

Holla

nd S

t.

Lois

St.

1st.

St.

3rd

St.

2nd

St.

6

6

AM PEAK HOUR

PM PEAK HOUR

2035 Build* Traffi c Volumes and Level of Service

*Under build conditions the roadway was assumed to have two lanes in each direction with turn lanes at intersections, and access conditions were changed to match the recommended plan.

Page 34: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275

The recommended Access Management Plan provides several benefits to the overall operations and safety along the US 6 - Clifton corridor. The following is a summary of the potential improvements and benefits.

Improve Traffi c Flow

The number of access points is reduced.

Reduce Traffi c Confl icts

Reduction in the number of conflict points.

Median cross over points are eliminated at non-critical locations.

Improve Traffi c Safety

The potential of high-speed rear-end, broadside, and sideswipe accidents is reduced.

More vehicles enter and exit the highway by making right turns, which are safer than left turns.

Provide Adequate Access to Adjacent Land Uses

All properties have access to US 6 or the secondary street system

Better use of the secondary street system or shared access locations to prove access to adjacent land uses.

The recommended Access Management Plan meets the established goals for the project by improving traffic flow, reducing the number of conflicts, improving traffic safety, and providing adequate access to the adjacent land uses.

Benefi ts of the Recommended Access Management Plan

Page 35: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275

Access Management Plan is a long range vision for US 6 -Clifton

Implementation of the plan will occur in phases or incrementally over time based on:

Traffi c needs

Safety needs

Available funding

Redevelopment

There are currently no planned state or federal projects or identified funding for improvements to US 6 that would change access in the near future

Additional planning and public input are needed to support the recommendations of the Access Management Plan and to identify the ultimate design (right-of-way needs) for US 6.

The future studies will consider the appropriate improvements to US 6 that address both traffic and pedestrian needs.

Plan Implementation

Page 36: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275

F RD

33 RD

FRONT ST

LOIS

ST

F 1/4 RD

E 3/4 RD

2ND

ST

3RD

ST

US HWY 6

4TH

ST

5TH

ST

I70

BUSINESS L

P

GRAND AVE

ORSON AVE

I70B

FR

ON

TAG

E R

D LAUREL LN

LOMBARDY LN

LAU

RA

AV

E

HO

LLA

ND

ST

SM

ALL

WO

OD

DR

1ST

ST

32 5

/8 R

D

32 1

/2 R

D

PEACH ST

OLG

A S

T

DENNIS AVE

VILLASUR DR

STEVEN AVE

N GOOD HOPE CIR

CASTANEDA DR

32 3/4 RD

LIV

VY

CT

PRICE DITCH RD

GLOBE WILLOW CT

32 4

/10

RD

W WILLOW CT

CARDENAS DR

SM

ALL

WO

OD

LN

1ST

ST

I70

BUSINESS L

P

F 1/4 RD

I70

BUSINESS L

P

32 1

/2 R

D

PEACH ST

0 200 400 600 800100

Feet

Legend

Right-in Right-out Driveway

Property LinesExisting Signalized Intersection

3/4 Movement Road

Full Movement Road

Potential Pavement Markings

Future Signalized Intersectiononly if/when meets warrants

Potential Future Cross Access Property Agreement

Full Movement Driveway

Potential Edge of Pavement

Potential Future Roadway (Exact Location TBD)

Potential Future Sidewalk

Potential Median Treatment

The following conceptual diagram depicts one possible option for future laneage on US 6 through Clifton based on 2035 volume projections developed by Mesa County. Mesa County and CDOT will conduct future studies and public involvement to determine the exact number of lanes and right-of-way requirements to ensure US 6 meets the future needs of local residents, property owners, and business owners as well as accommodating pedestrians and future traffic volumes.

The Potential Future Look of US 6 Through Clifton

Page 37: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275

Complete a comment form

Attend future public meetings and workshops

Request an individual workshop(Individual workshops are being considered. If you are interested in participating please talk to a project team member tonight.)

Contact the study team:

US 6-Clifton Access Management Planc/o David Sprague

Consultant Project ManagerPBS&J

4601 DTC Blvd., Ste. 700Denver, CO 80237

800-497-5529

Visit the study Web site: www.dot.state.co.us/us6clifton/

Stay Involved

Page 38: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275

! (# *

# *# *! (

! (

# *

! (# *# *

! (! (# *# *# *! (

! (! (# *# *# * ! (

! (

! (# *# *

! (# *# *# *

# *! (

# *# *# *

# *! (

# *# *# *# *

# * # *# *

! (

# *

D

DD D

D D

DDDDDD

DDDD D

DDD

DD

D

DDD

D

DDDD

D DD

F

RD

33 RD

FR

ON

T S

T

2ND ST

E 3

/4 R

D

LOIS ST

3RD ST

4TH ST

US

HW

Y 6

F 1

/4 R

D

5TH ST

32 1/2 RD

I70 B

USIN

ESS LP

GR

AN

D A

VE

OR

SO

N A

VE

I70B

FRO

NTA

GE R

D

LA

UR

EL L

N

LOM

BAR

DY L

N

LAURA AVE

HOLLAND ST

SMALLWOOD DR

1ST ST

PE

AC

H S

T

OLGA ST

DE

NN

IS A

VE

VIL

LA

SU

R D

R

ST

EV

EN

AV

E

N G

OO

D H

OP

E C

IR

32 5/8 RD

CA

STA

NE

DA

DR

W W

ILL

OW

CT

CA

RD

EN

AS

DR

SMALLWOOD LN

I70 B

USIN

ESS LP

I70 B

USIN

ESS LP

32 1/2 RD

1ST ST

98

7

6

54 3

2

1

46

45

44

43

42

41

39

38

37

36

35

34

33

32

31

30

29

28 27

26

25

24

23

22

21

20

19

18

17

16

15

14

13

11

10

40

12

020

040

060

080

010

0

Fe

et�

Pro

po

sed

Ult

imate

Acc

ess

Lo

ca

tio

ns

Le

gen

d

Ro

ad C

losure

with I

nte

rim

Pro

ject

Rig

ht-

in R

igh

t-ou

t R

oad

Dri

vew

ay C

losure

with I

nte

rim

Pro

ject

Rig

ht-

in R

igh

t-ou

t D

rive

wa

y

Pro

pert

y L

ines

Exis

tin

g S

ignaliz

ed In

ters

ection

3/4

Move

me

nt R

oa

d

Full

Move

ment

Ro

ad

3/4

Movem

ent D

rivew

ay

Pro

posed U

ltim

ate

Access C

losure

DF

utu

re S

ign

aliz

ed

Inte

rse

ctio

nonly

if/

wh

en m

ee

ts w

arr

ants

Futu

re C

ross A

ccess

Pro

pert

y A

gre

em

ent

! ( ! ( ! ( ! (F

ull

Movem

ent

Dri

vew

ay

Ed

ge o

f P

avem

ent

Pro

posed F

utu

re R

oadw

ay

(Exact Lo

cation T

BD

)

Med

ian T

reatm

en

t

Page 39: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275

Appendix C: Public Notification

Page 40: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275
Page 41: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275

US

6 - C

lifto

n Ac

cess

Man

agem

ent P

lan

Proje

ct Up

date

The

stud

y te

am h

as a

sses

sed

the

exis

ting

and

prop

osed

inte

rsec

tions

and

dri

vew

ays

(acc

ess

poin

ts)

on U

S H

ighw

ay 6

fro

m t

he I-

70 B

usin

ess

Loop

to

the

railr

oad

viad

uct

east

of

33 R

oad,

has

co

nsid

ered

pub

lic c

omm

ents

pro

vide

d at

our

fir

st

open

hou

se in

Apr

il 20

08, a

nd is

now

rea

dy t

o sh

are

its r

ecom

men

datio

ns f

or f

utur

e ch

ange

s.

Pub

lic in

put

is w

elco

med

and

enc

oura

ged.

Lear

n m

ore

at w

ww

.dot

.sta

te.c

o.us

/us6

clift

on/

or c

onta

ct:

Zan

e Z

nam

enac

ek, P

.E.

Ope

ratio

ns a

nd P

erm

it E

ngin

eer

Col

orad

o D

epar

tmen

t of

Tra

nspo

rtat

ion,

Reg

ion

322

2 S

outh

6th

St.

, Rm

. 100

Gra

nd J

unct

ion,

CO

815

0197

0-68

3-62

78

Pleas

e join

us at

our

open

hous

e:

Wed

nesd

ay

July

16, 2

008

Anyt

ime f

rom

5:00 –

8:00

p.m.

***N

EW LO

CATIO

N***

Clifto

n Com

munit

y Hall

12

6 2nd

Stre

et

Page 42: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275

Join

us

at th

e US

6 -Cl

ifton

Ac

cess

Man

agem

ent

Plan O

pen H

ouse

and

see

our

reco

mm

enda

tions

for

futu

re c

hang

es t

o US

6 ac

cess

Mor

e in

form

atio

n is

ava

ilabl

e at

w

ww

.dot

.sta

te.c

o.us

/us6

clift

on/

Rea

sona

ble

acco

mm

odat

ions

pro

vide

d up

on re

ques

t fo

r pe

ople

with

dis

abili

ties.

C

onta

ct R

yan

Ada

ms

at 8

00-4

97-5

529.

Page 43: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275

You

are

invite

d to

the

US 6

-Clif

ton A

cces

s Man

agem

ent P

lan

Open

Hou

se

An

Acc

ess

Man

agem

ent P

lan

for

US

Hig

hway

6 fr

om th

e I-

70 B

usin

ess

Loop

to th

e ra

ilroa

d vi

aduc

t eas

t of 3

3 R

oad

is b

eing

pre

pare

d by

the

Col

orad

o D

epar

tmen

t of T

rans

port

atio

n an

d M

esa

Cou

nty.

The

stu

dy te

am h

as a

sses

sed

exis

ting

and

prop

osed

inte

rsec

tions

and

dr

ivew

ays

(acc

ess

poin

ts) o

n U

S 6

, has

con

side

red

publ

ic c

omm

ents

pro

vide

d at

our

firs

t op

en h

ouse

in A

pril

2008

, and

is n

ow re

ady

to s

hare

its

reco

mm

enda

tions

for

futu

re c

hang

es.

Lear

n m

ore

at w

ww

.do

t.sta

te.c

o.u

s/u

s6

clift

on

/ o

r co

ntac

t:Z

ane

Zna

men

acek

, P.E

., O

per

atio

ns a

nd P

erm

it E

ngin

eer

Co

lora

do

Dep

artm

ent

of

Tran

spo

rtat

ion,

Reg

ion

3 za

ne.z

nam

enac

ek@

do

t.st

ate.

co.u

s •

970-

683-

6278

Reas

onab

le a

ccom

mod

atio

ns w

ill b

e pr

ovid

ed

upon

requ

est f

or p

eopl

e w

ith d

isab

ilitie

s.

If yo

u re

quire

spe

cific

acc

omm

odat

ions

co

ntac

t Rya

n Ad

ams

at 1

-800

-497

-552

9.

Pleas

e join

us at

our o

pen h

ouse

:

Wed

nesd

ay, J

uly 16

, 200

8An

ytim

e fro

m 5:0

0 – 8:

00 p.

m.**

*NEW

LOCA

TION*

**Cli

fton C

ommu

nity H

all, 12

6 2nd

Stre

et©

Goog

le -

Map

dat

a ©

2008

NAV

TEQ™

Page 44: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275

News From The Colorado Department Of Transportation

www.dot.state.co.us July 2, 2008

Contact: Nancy Shanks, CDOT Public Relations Manager, (970) 385-1428

PUBLIC INVITED TO US 6 - CLIFTON ACCESS MANAGEMENT PLAN OPEN HOUSE

We’re Studying Your Access to US 6!

MESA COUNTY – The Colorado Department of Transportation (CDOT) and Mesa County are inviting residents to the open house regarding the Access Management Plan being developed for US Highway 6, from the I-70 Business Loop to the railroad viaduct just east of 33 Road. The open house will be held Wednesday, July 16 2008 at the Clifton Community Hall, located at 126 2nd Street in Clifton. People can attend anytime between 5:00 p.m. and 8:00 p.m. Representatives from CDOT, Mesa County, and their consultant, PBS&J, will be available to address questions or concerns about the plan. The study team has assessed the existing and proposed intersections and driveways (access points) on US 6, has considered public comments provided at the first open house in April 2008, and is now ready to share its recommendations for future changes. Informational boards explaining the plan’s goals and objectives, and maps identifying recommended future access points will be on display at the meeting. Additional information is available on the project Web site: http://www.dot.state.co.us/us6clifton/. Reasonable accommodations will be provided for persons with disabilities. Please call Ryan Adams at PBS&J, (800) 497-5529, if you require such assistance.

###

Page 45: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275

Appendix D: Comments Received

Page 46: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275
Page 47: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275
Page 48: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275
Page 49: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275
Page 50: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275
Page 51: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275
Page 52: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275
Page 53: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275
Page 54: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275
Page 55: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275
Page 56: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275
Page 57: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275
Page 58: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275
Page 59: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275
Page 60: Open House #2 Summary Report · Open House #2 Summary Report Date of Meeting: July 16, 2008 Prepared by: 4601 DTC Boulevard, Suite 700 Denver, CO 80237 303-221-7275