open day 2017 regulatory reporting hub

12
Open Day 2017 Regulatory Reporting Hub Marco Popp and Regina Geschmayová 5 October 2017

Upload: others

Post on 03-Feb-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Open Day 2017 Regulatory Reporting Hub

Open Day 2017Regulatory Reporting HubMarco Popp and Regina Geschmayová5 October 2017

Page 2: Open Day 2017 Regulatory Reporting Hub

2 Regulatory Reporting Hub Introduction 7 Technical connectivity matrix

3 Release roadmap 9 Connectivity set-up

6 Customer and operational readiness

Contents

Deutsche Börse Group 1

Page 3: Open Day 2017 Regulatory Reporting Hub

Regulatory Reporting Hub (RRH)

§ Service offered by Deutsche Börse MD+S to fulfil the regulatory requirements

§ Multi-regulation and multi-jurisdiction reporting capability on a single platform

§ Customers send:

Reconciliation

On-exchange trades

OTC transactions data

Regulatory Reporting Hub

National Regulatory Authorities (NCAs)

Reporting

Consolidation & enrichmentValidation

Deutsche Börse Group 2

Page 4: Open Day 2017 Regulatory Reporting Hub

Release 1.0

Nov 2017Oct 2017Jul 2017 Jan 2018

Release roadmap (1/3)Overview

Trad

e re

porti

ngTr

ansa

ctio

n re

porti

ng

MiFID II Release 1.1

28 Sep 2017

EMIR 2 Release 1.1

15 Nov 2017

Release 1 Feb – 15 Nov17

Release 1 Feb – 15 Nov 2017

Reg

ulat

ions Go-live

EMIR 2Go-live MiFID II

28 Oct 2017 3 Jan 2018

Deutsche Börse Group 3

Page 5: Open Day 2017 Regulatory Reporting Hub

Release roadmap (2/3)OTC trade reporting / SI services

OTC trade reporting§ Price / volume checks,

(including FX rates)§ TOAX flag via ARM service§ Assisted reporting§ Instrument scope check and

reporting party check (OTC derivatives, FpML / XML-based)

SI services§ Quote publication§ Quote withdrawal and mass

cancellation§ Amend and cancel quotes

§ Post-trade deferrals and transparency suspensions

§ Package trades§ Trade aggregation§ Reporting on behalf§ Amend and cancel

trades

§ Quote and tradecompliance report

§ Reporting on behalf§ Quality of execution

Release 1.0

OTC Trade Reporting§ Portfolio compression§ NCA report to the BaFiN§ Audit trail§ Return reference data to

customers§ ISIN service

SI services§ SI identification (trade)§ Top 5 venue reporting§ Top 5 broker reporting§ SI reference data reporting

to NCAs incl. ANNA DSB

28 Sep 2017 15 Nov 2017

Nov 2017Oct 2017Jul 2017 Jan 2018

Release 1 Feb – 15 Nov 2017

Deutsche Börse Group 4

Go-live EMIR 2

Go-live MiFID II

28 Oct 2017 3 Jan 2018

Page 6: Open Day 2017 Regulatory Reporting Hub

Release roadmap (3/3)Transaction reporting

Transaction reporting§ Updated validation rules according to ESMA update on guidelines

and instruction rules§ Automatic framework to copy NCA outbound files to customers§ GUI audit trail tab§ Member Section

EMIR 2§ Transactions§ Positions§ Valuations§ Portfolio-based collaterals

Transaction reporting§ MiFIR process feedback from NCA§ Enrichment with APA data§ Load instrument data from ESMA§ DBAG trading venue enrichment

(Eurex & Xetra)§ Four Eyes Approval

28 Sep 2017 15 Nov 2017

§ Interface to TR (Regis)§ GUI file upload§ Validation rules

§ Additional audit trail events§ Pre-trade transparency

waiver§ Audit trail search§ User audit trail§ Assisted reporting

Art. 58§ On venue position reporting for EUREX,

EEX, Powernext (Art 58 III)§ OTC position reporting to BaFin, AMF, FCA

(Art. 58 II)

EMIR 2§ GUI collateral tab

Nov 2017Oct 2017Jul 2017 Jan 2018

Release 1 Feb – 15 Nov 17

Release 1.0

Deutsche Börse Group 5

Go-live EMIR 2

Go-live MiFID II

28 Oct 2017 3 Jan 2018

Page 7: Open Day 2017 Regulatory Reporting Hub

Customer and operational readiness

Phased customer production onboarding (technical connectivity; ping test)

30 Sep31 Aug 31 Oct 31 Dec30 Nov

Regulatory services internal processes ready

Ops readiness Checklists EMIR/ MiFIR agreed

Transparency on all existing hurdles

Readiness EMIR declared

Readiness MiFIR declared

OLAs defined

Tim

elin

e

Set-up NCA connectivity§ Phased approach focused on top 4 NCAs (BaFin, FCA, AMF,

FSMA)

§ Challenges:§ Number of NCAs (at least 25)§ High level of uncertainty on NCA-side and partially un-

readiness of several smaller NCAs§ Various communication protocols (SFTP, Webservice,

FTPS) and data formats

Ope

ratio

nal r

eadi

ness

Cus

tom

er re

adin

ess

Deutsche Börse Group 6

Page 8: Open Day 2017 Regulatory Reporting Hub

Internet (VPN)

Internet

Leased line (VPN)

Leased line

Internet

Technical connectivity matrix (1/2)Approved Reporting Menchanism (ARM)

Deutsche Börse Group 7

MiF

ID II

tran

sact

ion

repo

rting

(A

ppro

ved

Rep

ortin

gM

echa

nism

) Web GUI

SFTP

MQ server

CertificateGenerated and downloaded via RRH Member Section; uploaded in the browser

SSH key pairCreated by customer and public key send to [email protected]

MQ service engineered and provided by company NTT data

Interface Connectivity Set-up

SFTP LimitationsMax. number of files / day: 50Max. number of records / file: 300.000Max. size / file: 300 Mb

Page 9: Open Day 2017 Regulatory Reporting Hub

Leased line (VPN)

Internet (VPN)

Leased line

Leased line

Internet

Internet

Internet

Technical connectivity matrix (2/2)Approved Publication Arrangement (APA)

Deutsche Börse Group 8

RRH channel with FIX sessions Ordered via RRH Member Section

CRE key pairCreation and upload as usual CRE set-up

MQ service engineered and provided by company NTT data

Interface Connectivity Set-up

MiF

ID II

OTC

trad

e re

porti

ng(A

ppro

ved

Publ

icat

ion

Arra

ngem

ent) Certificate

Generated and downloaded via RRH Member Section; uploaded in the browser

Web GUI

MQ server

CRE

FIX Gateway

Page 10: Open Day 2017 Regulatory Reporting Hub

Connectivity set-up (1/2)

§ Customer onboarding [email protected]

§ Central coordinator assigns RRH rights for otherRRH users / admins

§ Certificate generation and download (section RRH Administration > User)

− User Manual RRH Member Section; Version 1.0

§ Customer uploads the private part of the certificate (.p12) into his browser

§ Login with the same password as for RRH Member Section

RRH Member Sectionhttps://member.regulatoryreportinghub.com

Web GUIhttps://simu.regulatoryreportinghub.com

Deutsche Börse Group 9

Page 11: Open Day 2017 Regulatory Reporting Hub

Connectivity set-up (2/2)

§ Customer generates SSH key pair§ Sends public key to Regulatory

Reporting Relationship Manager

§ Customer orders RRH channel (offered bandwidth: 1, 3, 5, or 10 Mbps)§ FIX session ordered via Member

Section (created under RRH member ID!)§ Supported formats: 4.2 and 4.4

SFTP FIX Gateway

MQ server§ Connectivity provided by NTT data

Deutsche Börse Group 10

Page 12: Open Day 2017 Regulatory Reporting Hub

Deutsche Börse Group 11

Thank you for your attention.ContactE-Mail [email protected] (Functional help)

[email protected] (Technical help)Phone +49 (0) 69 -2 11 -1 77 55 (DE)

+44 (0) 20 -7 86 -2 77 55 (UK)