open cover.docx
TRANSCRIPT
SURVEYING LAB
FIELD WORK NO. 7OPEN COMPASS TRAVERSE(TITLE OF THE EXPERIMENT)
MARCH 13, 2015 MARCH 20, 2015 DATE PERFORMED DATE OF SUBMISSION
PREPARED BY:PREPARED FOR:
DEL PRADO, MA. CYNAHVILLE M.ENGR. DONAMEL M. SAIYARI(Name of Student)(Name of Instructor)
BS ARCHITECTURE / 201310747(Course/Student Number)