Onondaga County CSO Abatement Gray Project Update. 2012 Gray Project Update. Harbor Brook Intercepting Sewer Replacement Project CSO 044 Conveyance Pipeline CSO 022/045 Sewer Separation Projects Clinton CSO Storage Facility Lower Harbor Brook CSO Storage Facility CSO 063 Conveyance Project - PowerPoint PPT PresentationTRANSCRIPT
Onondaga County CSO Abatement Gray Project Update
2
2012 Gray Project Update• Harbor Brook Intercepting Sewer Replacement
Project• CSO 044 Conveyance Pipeline• CSO 022/045 Sewer Separation Projects• Clinton CSO Storage Facility• Lower Harbor Brook CSO Storage Facility• CSO 063 Conveyance Project• Floatables Assessment Plan
3
Harbor Brook Intercepting Sewer Replacement Project – ACJ Milestone Date 12/31/2013• Replaces a significant portion
of infrastructure that was originally installed in the early 1900’s.
• 7500 feet of interceptor sewer replacement, 5200 feet of local sewer replacement and 1860 feet of sewer rehabilitation.
• Project green infrastructure elements included tree basins, rain gardens and bio-retention basins.
• Estimated annual CSO capture is 0.9% or 36 million gallons.
• Included separation of CSO 013 (Seymour Street) and CSO 016 (Lydell Street)
4
CSO 044 Conveyance Project-ACJ Milestone Date 12/31/2011• 500 foot long 96-inch
diameter conveyance pipe line.
• Conveyance will capture the full 1 year 2 hour storm volume from CSO 044.
• Project incorporated storm water capture for pipe line flushing.
• Final restoration included rain gardens.
• Estimated annual CSO capture is 0.3% or 12 million gallons.
5
CSO 022/045 Sewer Separation Project• Combined project into one
construction contract to minimize administration costs.
• CSO 022 – Fayette Street and West Genesee Street near Dinosaur BBQ. (Clinton Lower Main Intercepting Sewer CSO Area)
• CSO 045 – Hudson Street and Crescent Street. (Midland CSO Area)
6
Clinton CSO Storage Facility – ACJ Milestone 12/31/2013
• 6.5 million gallon storage capacity - volume of storage was increased by 40%.
• Facility will employ green and innovative technologies to reduce operating costs.
• Very challenging construction▫ Limited site space▫ High chloride
concentration in groundwater
7
Clinton CSO Storage Facility (cont.)
8
9
10
Lower Harbor Brook CSO Storage Facility – ACJ Milestone 12/31/2013
• 4.9 million gallon storage capacity – volume of storage was increased by 35%.
• Facility will employ green and innovative technologies to reduce operating costs.
• Very challenging construction▫ Limited site space▫ High chloride
concentration in groundwater
11
12
13
Future Projects• Floatables Control
Plan• CSO 063 (Emerson
Avenue – Harbor Brook CSO Area) Conveyance Pipe Line.
• CSO 061 (Crehange Street – Midland CSO Area) Sewer Separation